Loading...
HomeMy WebLinkAbout4.04 PG&E LightEmitDiodeRebate , CITY CLERK File # [2J0J[g)[Q]-~[Q] . AGENDA STATEMENT CITY COUNCIL MEETING DATE: November 4, 1997 SUBJECT: Request to Apply for PG&E Rebate for LED (Light Emitting Diode) Traffic Signal Conversion; Request for Appropriation to Purchase Equipment in 1997-98 Fiscal Year Report Prepared by: Lee S. Thompson, Public Works Director EXHIBITS ATTACHED: 1) 2) Application Form and I~tersection Detail List Budget Change Form RECOMMENDATION: ~pprove funding for new Capital Improvement Project and '" application for rebate FINANCIAL STATEMENT: See below . DESCRIPTION: The development of LED (light emitting diode) signal equipment began several years ago, and technology has now reached the point that the equipment is more reliable. The advantage to LED's over the traditional incandescent bulbs is that the LED's use far less power, and they are guaranteed to last at least five years, reducing the cost of annual relamping. For example, the bulbs used in 12" signal lights are 150 Watt vs. 14 Watt for a comparable LED signal face. LED's are primarily used for the red traffic signals and, now, for the orange portion of the pedestrian signals. While yellow and green LED's are available, these two colors are still very expensive and do not meet the ITE (Institute of Traffic Engineers) luminance requirements; therefore they are not recommended for installation at this time. LED's were used in all of the new traffic signal heads that were supplied on the Dublin Boulevard 'Widening project, which included five downtown intersections. This project did not replace all traffic heads at all of the intersections; so a few incandescent lights remain. LED pedestrian signals were not installed at these intersections. In addition, some intersections were increased in size and would normally be expected to use more power. Since installing the LED's, the City has experienced an average 29% . reduction in electric usage at these intersections, comparing the 1995-96 usage vs. the 1996-97 usage. All things considered, Staff estimates that if all the red lights had been converted, plus all of the pedestrian heads, the percentage of savings would be at least 35% to 40%. In addition, LED's have been specified for all of the new intersections being constructed, including the BART access roads and other eastern Dublin streets. . ---------------------------------------------------------------------- COPIES TO: ITEM NO. 4.4 f: \contract\signals\agstled 7 Two circumstances have arisen that create a benefit for LED conversions at this time. One circumstance is . that PG&E is offering a rebate on conversions that is available only if applied for by November 30, 1997, with the equipment to be installed by March 30, 1998. The other circumstance is a greatly reduced price offered by one or more manufacturers, which is the same as quantity pricing provided to the City of San Diego. The special pricing is only available for City-wide conversions for jurisdictions in California and is less than half the original price of the LED's. This information did not become available until after the beginning of the current fiscal year; so no funds were budgeted for this purpose. Alameda County, which has provided traffic signal maintenance services for the City since incorporation, has made the decision to convert all of its intersections through this program. The County's traffic signal maintenance crew has typically reacted conservatively to new products and not begun widespread use until the equipment has gone through an initial shakedown period. Staff feels this is at least an indication that the LED technology has progressed to a low-risk point. Staff feels that this is a good opportunity to achieve some savings on electricity. Following is a brief analysis of the costs involved and an estimated payback period for the investment. Total material cost (see attached equipment breakdown) Sales tax: $38,671 3,190 Estimated labor through Alameda County maintenance contract: Total expenditure: 5.500 $47,361 . PG&E Rebate: Net total expenditure: (I 1.485) $35,876 Total power bill for 16 intersections for one year (1996-97) $36,280 Estimated electric savings per year @ 35%: Estimated relamping savings per year - materials (bulbs) -labor Ihr/intersection Total est. savings for one year: $12,698 $ 500 $ 1.360 $14,558 $35,876 + $14,558 = 2.46 years payback, after which time the savings for power and relamping would continue. After deducting approximately $2,000 per year interest on the capital outlay, the total estimated . savings for the first five-year period is approximately $26,000. The warranty period on the LED units is five years; so the payback period is approximately half the manufacturer's life expectancy for the units. Two types of failures occur with the LED units - a complete failure, in which the unit does not function at all (similar to a burned out bulb), and a gradual degradation of light output. At the end of the five-year warranty period, it is possible that some or all of the LED units may need to be replaced. At current prices, the City could incur an expenditure at the end of the warranty period that would be similar to the expenditure being proposed at this time, and the savings in power cost would continue on the same basis; i.e., a $26,000 savings over five years. If a complete replacement is not necessary, the savings would be proportionately higher. It should be noted that modifying the signal heads back to incandescent would . Page 2 . . . cost nearly as much as replacing the LED units, and the power bills would then go back up. Staff feels that it is likely that five years from now the cost of the red LED's will be even less, based on the fact that the cost has dropped from $300 to less than $200 over the past two years. Improving technology may also reduce the cost of the yellow and green LED's, making it feasible to reduce the power bills by as much as 80% to 90% by using all LED's. As with any new technology, there is not a sufficient track record at this point to make guarantees. Staff recommends that the City Council approve a new Capital Improvement Project to convert the City's 16 remaining intersections to LED's (red lights and pedestrian signals) and approve the rebate application to PG&E. No commitments would be made toward purchase until the project is approved by PG&E. Page 3 . CITY OF DUBLIN BUDGET CHANGE FORM CHANGE FORM # New Appropriations (City Council Approval Required): Budget Transfers: X From Unappropriated Reserves From Budgeted Contingent Reserve (1080-799.000) Within Same Department Activity X From New Revenues Between Departments (City Council Approval Required) IlftDEcREAsE{ifuDGETti(f.eQuNiWff=:::f=rffht&iouNT::rIIt:::ttt:tiNC~gE{BmGE1fACC.OUNj%=::fttffftfAMOtJNtit::::f::f::: ..... .. ... ................... .. ,','. "":..:':';';':':':':';':':':':':':':';';':':.. :'.:' .. ......................................... ....n..... ................... .. ..................... Name: Unappropriated reserves Name: LED Traffic Signal Conversion $35,876 Alameda County install cost $5,500 Account #; (none) Account #: 001-96xx-740~00 Name: New revenue - miscellaneous Name: LED Traffic Signal Conversion PG&E rebate $11,485 Material purchase $41,861 Account #; 00 1-1000-570-003 Account #: 001-96xx-750-050 Name: Name: Account #: Account #: City Manager: Date: Signature . REASON FOR BUDGET CHANGE ENTRY: Requesting new Capital Improvement Project in order to take advantage ofPG&E rebate and special manufacturer pricing. Rebate amount $11,485 is anticipated to be received within current fiscal year. Payback period on balance of cost is anticipated to be 2.5 years. . .....-4iA-pprQy~4atth.~QityQp~qirM~~t~~g9R:. DCtt~t;:::::::)::: Mayor: Date: Signature Posted By: Date: Signature form.Jlbudgchng I 'r"'VI, ,,~~~ t"'r :: r\t.n!,~~ ; ~l'!V""la. '" APPLICATION DEADLINE: November 30, 1997 . Available to Commercial, Industrial and Agricultural Customers r'". ;:.;.." .~ .~ " .-. '~-' . I I " I '~""-' Application Number . Number. of Applications Attache Check one: C8:.Rebate qFinancing (Capital Advantage) __ .0 Project Implementatio~.Assistance (fEPA)., .- Customer Information .. Please print clearly N~U "-5..& 1004, b I a q~ccount Number I - I 'J-r?.:5 d-.O ~ Federal Tax ID Number Tax Status (check one): CITY a:: 'DUBLI~ Name of Company I G INGElZ- Ku..~"ELL / l..JD~ THomPSON Name of Contact Person . ( 510 ) 633 -CoG 30 Area Code Telephone Number of Contact Person 1 Co I N TEf-SEC:::rl Dr0S - SEE LlST Address Wnere Item(s) Ins'".alled 'DcA-t3 L / ~ City :;'" If.~ ~ ~_. ~: '" ,<- g,- .~ €~. ::.~ ..i.:: ;..-= d:t-:I, Electric Rate Schedule Gas Rate Schedule o Corporation o Non-Corporation o Exempt ( 570 ) 83=3-Co&'Z5 Fax Num r of Contact Person A Total Square Footage of Building(s) (required) q~ZoD 'p CA State Check Should Be Made Payable to: . Check if same as above UTY q)~ 'Du[3LI~ Name lOO CI\Jlc... ~ Address VL-lbl- I~ City Agreement Clause As a qualified PG&E cusromer. I certify that I meet all Retrofit Efficiency Options Program eligibility requiremems and tl'.ar all infonnation that I have supplied fot my application is trUe and correa. I certify that J have read and understand the requiremerns set forth in the program brochure and application forms and that I agree to abide b)' those requirementS I understand that program panidpation is conditional upon PG&Es pre-instaJlation acceptance of myapplicaIion and that PG&E makes program commirrnellls only through pre-installation wrtlIe!l aD:.."P= by way of this properIy signed and countersigned form I understand that incentive pa)merns are bas...-a on related energy benefirs over the life of the product. I agree that if I) I do not provide PG&E with I 00% of the related energy bew..firs specified in the application for the life of the ptodua Ot fot a perIod of five (;) years from receipt of the incentive. whichever is leSs. or 1) I cease to be a CUSlomer of PG&E during said time perIod. rh"Jl I shall refund a prorated amount of incentive dollars to PG&E based on the acruaJ p<>Jiod of time in which I provided the related energy b<>Jlefirs as an eleartc ancllor gas QISlOmer of PG&E. I understand that this application must be received by PG&E or posrrnarked no later than November 30. J 997. and that an projecrs must be completed by November 30. 1998. Tax liability m=ves are raxable and will be reponed to the IRS unless you are exempt. PG&E will report your incentive as income to you on IRS Form J 099 unless you have checked corporation or exempt taX Starns above. You are urged to consult your rax advisot concerning the raxabili!)' of incennves. PG&E is not responsible for any raxes that may be imposed on your business as a result of your re-r....eipt of this incentive. x / / .' . Customer SigTl2ture Date Narnell rtie of t.~ com;::.a..,y om:er- responsible for authorizing project (please print) . CA qi5~ Zip State PG&E Pre-installation Acceptance Thank you for participating in PG&Es 1997 Retrofit EfficienC)' Options Program Your copy of this dOOJl11ent. SJglled below by the authorized PG&E employees. is proof that your application has been accepted. and incentive monel' has been set aside for your project. Acceptance is based on preliminary project. infonnation (e.g.. equipment characteristics and approximate cost). PG&E reserves the right to disavow eligibility of the application if the installed equipment is different. Based on the information contained in this application. your potential incentive is S II)fB500. . Please note that any changes in the proposed units and quantities may affect this amount. Upon completion of the project. submit your 0tiginaJ. itemized. paid invoices and contact our office to arrange a final inspeCtion. In no case will PG&:E pay more !ban 100% of the aauaI purthase price of the items. Any manufaaurer rebate received (or to be received) must be subtraaed from the purchase price before the submission of this application. This program has a limited budget for each PG&:E Division. Applications will be accepted on a first-come, first -served basis until the Division's allocated funds are spent. . The Tailored Energy Planning Assistance CTEP A) Program option is a pilot and may be canceIled at any time. x / / . PG&E Representative Signature Date X PG& e"'i-;f ~I~J;~ /} ~ .~^~1!t}1 E ~. PLEASE MAKE A COPY OF THIS DOCUMENT FOR YOUR R -- - .-. REO Liqht Emittinq Diode (LED) Traffic Liqht Proqram Supplemental Sheet . Application No. NJN SB 00461-9 Customer Material Costs Listing of TC-1 accounts with LED signals Installed. 12" Ball $114.50 8" Ball $75.00 (To be submitted with LED rebate application payment !equest.) 12" Arrow $70.00 Ped. Siqnal $130.00 Red Red 12" 12" Red 8" Orange Materials TC-1 Account # Intersection/Address Ball Arrow Ball Ped Rebate Cost ii!~~~~i~~~ij!j!!f:ti~~f~gM!!!~~mft~!!~jiti!i!i!i!!i!!~!~~M!~L!IIii!!!!!!!!!ii!!i!i!i!!i~~ti!!!~i!!!!!MH%!iI!~~iii!!!!JKlt%l\1!!~iiI!t!!i $40 $25 $30 $25 1 CJN22-10682 Village Pkwy. / Amador 4 0 12 8 $720 $2,398 Valley 2 CJN22-21 002 Amador Valley/Regional 6 0 7 8 $650 $2,252 3 CJN22-21482 Amador Valley/Donohue 6 0 6 8 $620 $2,177 4 CJN22-21721 Amador Valley/Amador 6 4 5 8 $690 $2,382 Plaza 5 CJN22-26201 Village Pkwy.lLewis Ave. 6 4 5 8 $690 $2,382 6 CJ N26-39321 Amador Valley/Stage- 6 4 6 8 $720 $2,457 coach 7 GJN55-16302 Amador Valley/San 4 6 9 6 $730 $2,333 Ramon 8 GJN55-23702 San Ramon/Shannon 6 4 6 8 $720 $2,457 9 GJN55-23801 San RamonNomac 4 4 10 8 $760 $2,528 10 HJN14-05001 Dublin BUDublin Ct. 4 4 9 8 $730 $2,453 11 HJN14-26502 Dublin BUDougherty Rd. 13 5 0 8 $845 $2,879 12 HJN15-05001 Dougherty Rd.lSierra Ln. 17 4 0 8 $980 $3,267 13 HJN15-62251 Dublin BUSierra Ct. 14 4 0 8 $860 $2,923 14 HJN15-76741 Amador Vly.lDougherty 4 2 6 6 $540 $1,828 15 JJN24-20901 Dublin BUClark Ave. 8 4 6 8 $800 $2,686 16 LJN05-05001 San Ramon/Silvergate 3 2 7 2 $430 $1,269 TOTALS 151 76 124 143 $11,485 $38,671