Loading...
HomeMy WebLinkAbout4.04 RjctBidsReadvertise94-4CITY OF DUBLIN AGENDA STATEMENT City Council Meeting Date: November 14, 1994 SUBJECT: Contract 94-04 Dougherty Road/Sierra Lane Improvements Report by: Public Works Director Lee Thompson EXHIBITS ATTACHED: RECOMMF~NDATION: ~ 1) 2) Resolution Rejecting All Bids Bid Summary Adopt resolution rejecting all bids on the basis of insufficient funds and authorize Staff to readvertise the project with a reduced scope of work. FINANCIAL STATEMENT: BUDGET Preliminary Engineering (Environmental and Topo) Design Inspection/Construction Staking Construction Miscellaneous ENGINEER~S ESTIMATE: LOW BID RECEIVED: Est. Prior Year 1994-95 Total Expenditures Budget Project $ 41,753 $ 0 $ 41,753 23,656 3,050 26,706 0 25,100 25,100 0 252,000 252,000 0 850 850 TOTAL: $ 65,409 From Fund ISTEA Developer Contribution Gas Tax General Fund TOTAL: Base Bid, $247,350.00 Base Bid, $270,452.60 $281,000 $ 346,409 $ 183,291 73,116 85,360 4,642 $ 346,409 With Alternam 1:$251,350.00 With Almrnam 1:$278,377.60 DESCRIPTION: On September 12, 1994, the City Council authorized Staff to advertise for bids for Contract No. 94-04, Dougherty Road/Sierra Lane Improvements. This project will add a traffic signal at the Dougherty Road/Sierra Lane intersection and construct median and channelization improvements on Dougherty Road between Sierra Lane and Dublin Boulevard. A large portion of the construction cost of this project is being funded by a Federal ISTEA grant, which was obtained in Fiscal Year 1993-94. The low base bid received, from Meridian Grading and Pa~,ing, is $18,452.60 higher than funds budgeted for construction of this project. Rather than incur this additional expense, Staff recommends that the City Council reject all bids and authorize Staff to readvertise the project. Staff proposes to bid the paving stone item as an Alternate in the hope of obtaining bids that are within budget. The pavers are primarily cosmetic in nature, and in the event that the cost exceeds the budget, the median could be constructed without pavers. There will be paving stone work on the Dublin Boulevard Widening project, which is scheduled to be constructed in the spring, and the Dougherty Road median pavers could be added into that project. Staff proposes to retain the installation of the City Entrance sign as an Alternate also. Staff recommends that the City Council adopt the resolution rejecting all bids and authorizing Staff to readvertise the project with the pavers and City Entrance Sign installation as alternates. a: ~gnallagst~ct P~e2 RESOLUTION NO. -94 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF DUBLIN REJECTING ALL BIDS FOR CONTRACT 94-04 DOUGHERTY ROAD/SIERRA LANE IMPROVEMENTS AND AUTHORIZING STAFF TO READVERTISE THE PROJECT WHEREAS, the City of Dublin did, on October 14, 1994, publicly open, examine, and declare all sealed bids for doing the work described in the approved Plans, Specifications, and Modifications for Contract 94-04 authorized by the City Council on September 12, 1994, which Plans, Specifications, and Modifications are hereby expressly referred to for a description of said work and for all particulars relative to the proceedings under the request for bids; and WHEREAS, the lowest base bid received, $270,452.60, is significantly higher than the $252,000 available construction funds for the project; and WHEREAS, said bids were submitted to the City Engineer, who has recommended that all of the bids be rejected on the basis of insufficient funds; NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Dublin does hereby reject all bids received on October 14, 1994, for City of Dublin Contract 94-04. BE IT FURTHER RESOLVED that the City Engineer is authorized to readvertise for bids for Contract 94-04 with the paving stone bid item and the City Entrance Sign item as Alternates. PASSED, APPROVED, AND ADOPTED this 14th day of November, 1994. AYES: NOES: ABSENT: Mayor ATrEST: City Clerk a:L~ignallresorjct BID RESULTS CONTRACT 24-O4 DO~GHI~TY ROADJSII~RA LANE I~ROVEMENTS ENGINEEr'S ESTIMATE M~I[NAN REDGWICK D.W. YOUNG O.C. JOULES &SONS BID ri~M UNIT OF UNIT TOTAL UNIT TOTAL UNIT TOTAL UNIT TOTAL UNIT TOTAL rTEM DESCRIP'~ON MEASURE QTY PRICE PRICE PRICE PRICE PRICE PRICE PRICE PRICE PRICE PRICE I MOBILtZATION LS 1 10,000.00 10,000.0~ 5,100.00 5,100.00 21,400.00 21,400.00 9,000.00 9,000.~0 22,285.00 22,285.00 2 CONS~RUC33ON AREA SIGNS LS 1 1,000.00 1,000.00 2,300.00 2,300.00 1,000.00 1,000.00 2,500.00 2,500.00 2,500.00 2,500.00 3 'I3:IARFIC CONTROL SYSTEMS LS I 10,000.00 10,000.0~ 5,500.(x) 5,500.00 12,000.00 12,000.00 4.000.(30 4,1~o.00 7,000.00 7,000.~0 4 REMV CULVERTS/PIPELINES LS I 500.00 500.0C 600.00 600.00 2,500.00 2,500.00 200.00 200.00 3,000.00 3,000.00 5 RMV OR RELOC E~ S FACILITIES LS 1 500.00 500.0c 2,700.00 2,700.00 100.00 100.00 100.00 100.00 1,000.00 1,000.00 8 ADJ MH FRN~ES/C~S TO GRADE EA 2 1 (X).00 200.0C 180.00 360.00 400.00 800.0~ 275.00 550.00 400.00 800.00 7 ADJ O33-iER FRAMES/C'VRS TO GRADE EA 3 100.00 300.0C leO.CO 480.00 400.00 1,200.00 175.00 528.00 400.00 1,200.00 8 CLEN~ & GRUR LS 1 7,500.(30 7,500.00 10,000.00 10,000.00 2,500.00 2,500.00/) 2,500.00 2,500.00 4,0(X).00 4,000.00 9 ROADWAY EXCAVA33ON LS 1 3,000.00 3,000.00 14,150.00 14,150.00 32,000.00 32,000.00 20,000.00 20,(XX).00 29,500.00 29,500.00 10 ~ENCH SHCRING LS 1 500.00 500.0{: 350.00 350.00 1.00 1.00 100.oo 100.00 500.00 500.00 11 FINISHING ROADWAY LS I 500.00 500.0¢: 500.00 500.00 100.00 100.00 100.00 100.00 10,000.00 10,000.00 12 §/12/14 ROADWAY SECTION SF 9,088 4.50 40,896.0~ 4.50 40,896.00 3.85 34,988.80 5.50 49,984.00 5.10 46,348.80 13 2/5 PARKING SEC33ON SF 1,130 2.50 2,825.00 4.00 4,520.00 2.70 3,051.00 3.25 3,572.50 2.75 3,107.~0 14 DROF INLETS EA 2 1,200.00 2,400,00 1,260.00 2,520.00 1,400.00 2,8CO.00 1,200.00 2,400.00 1,400.~0 2,800.00 15 STORM DRAIN MANHOLES EA I 1,200.(30 1,200.00 1,630.~0 1,630.00 2,000.00 2,000.00 2,200.(~O 2,200.00 2,000.~0 2,000.00 15 CONN TO E~S DflNN S*I~ UC EA 2 900.00 1,800.00 315.00 630.00 400.00 800.C~ 100.OO 200.00 400.00 800.00 17 INSTALL SIGNS EA 11 100.00 1,100.00 210.00 2,310.00 200.00 2,200.00 175.OO 1,925.00 135.C~ 1,485.00 18 RCP LF 152 38.00 5,776.00 58.00 5,816.00 75.00 11,400.C0 25.CO 14,440.00 65.00 9,880.00 12 DUC'I3LE IRON PIPE LF 52 42.00 2,184.00 130.00 6,760.00 85.00 4,420.00 65.00 3,380.00 82.00 4,2~4.00 20 DITCH & HEN3WALL INSTAM-~TION LS I 1,500.00 1,500.00 1,075.00 1,075.00 3,500.00 3,500.00 1,800.~O 1,8CO.00 1,050.00 1,050~00 21 CURB &GL~ i~t LF 88 14.00 1,232.00 13.00 1,144.00 21.00 1,848.00 16.00 1,408.00 12.50 1,100.00 22 MEDIAN CURB &GUi i~1 LF 810 14.00 7,140.00 10.00 5,100.00 16,00 8,160.00 12.00 6,120.00 9.40 4,794,00 23 MEDIAN CURB (NO GIJ i I ~J'~) LF 475 9.00 4,284.00 7.00 3,332.00 7.25 3,451.00 7.00 3,332.00 0.80 3,238.80 24 SIDEWALK & DRrVEWAY SF 699 4.00 2,79~.00 5.40 3,774.80 5.25 3,6~9.75 3.50 2,44~.50 3.50 2,446.50 25 IN'/ER LOCKING PAVING STONES LS I 5,000.00 6,0OO.00 13,800.00 13,800.00 18,000.00 18,000.00 19,000.00 19,000.00 13,000.00 13,0~0.00 26 5~IPING, MARKING, MARKERS LS I 11,000.00 11,000.0~ 2,500.00 9,500.00 12,500.00 12,500.00 15,000.oo 16,000.00 11,800.00 11,800.00 (S)27 SIGNAL INSTALLATION LS I 112,000.00 112,000.00 115,700.00 115,700.00 114,000.00 114,000.00 135,300.00 135,300.C0 116,000.00 118,000.00 28 ELEC'EROLIERS EA 2 3,000.(X) 6,000.00 1,6~0.00 3,320.(X) 2,000.00 4,000.00 1,850.00 3,700.00 1,e00.{30 3,200.00 29 '~AFFIC BARRICADE LS 1 1,000.00 1,000.00 735.00 735.00 700.00 700.00 850.00 850.00 700.00 700.00 30 RELOCATE WATI~ ~a=~c,~ LS I 1,000.~0 1,000.00 2,850.{x) 2,850.00 1,000.(X) 1,000.00 1,200.00 1,200.00 1,000.(30 1,000.00 TOTAL BASE BID: 246~133.0~ 270,452.60 306,080.55 30~.933.oo 310,797.60 ALT. 1 CONCRETE ENTRY SIGN LS 1 4,000.CO 4,000.00 7,925.00 7,925.00 9,000.00 9,000.00 8,000.00 8,000.00 8,912.00 8,912.00 TOTAL BID ~ AL'n-3R NA]E: 250,133_{x~ 278,377.60 315,089.55 316,933.00 310,709.60