Loading...
HomeMy WebLinkAbout4.05 Award of Bid 94-02 CITY OF DUBLIN AGENDA STATEMENT City Council Meeting Date: April 11, 1994 SUBJECT: Award of Bid - 1993-94 Annual Sidewalk Safety Repair Program, Contract No. 94-02 Report by Public Works Director Lee Thompson EXHXBITB ATTACHED: 1) 2) Resolution of Award Summary of Bids RECOI~ENDATION: 1) 2) Adopt resolution awarding bid to Wayne E. Swisher, Cement Contractor, Inc. Authorize Mayor to execute Agreement. FXNANCIAL STATEMENT: Sidewalk Safety Procram Design/Survey/Inspection Construction Subtotal: ~%dded Driveway at Miracle Auto Paint as part of Dublin Blvd. Extension right-of-way negotiations TOTAL: BUDGETED BUDGETED THIS CONTRACT FUTURE CONTRACT (REMOVE/REPLACE) (GRINDING) $ 7,000 $ 3,000 25,000 15~000 $32,000 $18,000 $ 1,300 $33,300 $18,000 TOTAL AMOUNT BUDGETED $t0,000 40~000 $50,000 (General Fund) $ 1,300 (DBX Fund) $51,300 Low Bid (Construction) $23,400.~0 DESCRIPTION: At its February 14, 1994, City Council meeting, the City Council reviewed the City's sidewalk repair policy and determined that the Annual Sidewalk Safety Repair should again be funded by the City for Fiscal Year 1993-94. Staff requested that the City Council authorize an additional appropriation from the General Fund in the amount of $50,000 and reduce the contribution from Fund 300 by the same amount. This Sidewalk Removal and Repair Project is estimated to cost $32,000, including engineering and inspection work. The contract also will remove existing curb and gutter and install a driveway in front of Miracle Auto Painting on Scarlett Court. Funding for this driveway will come from the DBX project as the result of an agreement with the property owner of Miracle Auto. The bid for this work was $1,300. Staff anticipates using the remaining $18,000 of the Sidewalk Repair budget for a secondary repair program which will involve grinding smaller sidewalk offsets. This repair method was initiated last year and has proven to be lower in cost per location, and the number of locations corrected has therefore been able to be increased. --Wayne E. Swisher, Cement Contractor, Inc. is the low bidder for this remove and replace ~idewalk Repair Project with a total bid of $23,400.90 and includes $1,300 for the Dublin Blvd. Extension . This bid, less the Dublin Blvd. Extension work, is $22,100.90 and compares to the construction budget of $25,000. Staff recommends that the City Council adopt the Resolution awarding the bid to Wayne E. Swisher, Cement Contractor, Inc. a:sidewalk~agstawrd · Bidders ! C I T Y C L E R K I I I loloH ] RESOLUTION NO. 30-94 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF DUBLIN AWARDING CONTRACT 94-02, 1993-94 ANNUAL SIDEWALK SAFETY REPAIR PROGRAM TO N&YNE E. SNISEER, CENENT CONTIIACTOR, INC. WHEREAS, the City of Dublin did on April 1, 1994, publicly open, examine, and declare all sealed bids for doing the work described in the approved Plans, Specifications, and Modifications for Contract 94-02, 1993-94 Annual Sidewalk Safety Repair Program, authorized by the City Council on March 14, 1994, which Plans, Specifications, and Modifications are hereby expressly referred to for a description of said work and for all particulars relative to the proceedings under the request for bids; and WHEREAS, said bids were submitted to the city Engineer, who has reviewed the bids to determine the lowest bid which was responsive to the requirements of the bid documents; NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Dublin does hereby award Contract 94-02 to the lowest responsible bidder therefor, to wit, Wayne E. Swisher, Cement Contractor, Inc., at a bid of Twenty-Three Thousand Four Hundred Dollars and Ninety Cents ($23,400.90), the particulars of which bid are on file in the office of the City Engineer. PASSED, APPROVED AND ADOPTED this llth day of April, 1994. Councilmembers Burton, Houston, Howard, Moffatt and Mayor Snyder AYES: NOES: None ABSENT: None Bid Results - Sidewalk Safety Program (R_emove & Replace) Contract 94-02 I Engr's Est. Wayne Swisher Harris & Harris Item Unit Unit Total Unit Total Unit Total No. Desc r!p_ t i~o.n_ Mea~s. Qty. Price Pdce Price Price Price Price 1 Sawcut S/W LF 1,545 0.50 772.50 1.90 2,935,50 w 1.91 2,950.95 2 S/W Remv & Repl SF 3,077 5.50 16,923.50 4.20 12,923.40 4.89 15,046.53 3 C/G Remv & Repl LF 268 21.50 5,762.00 14.00 3,752.00 16.50 4,422.00 4 AC Paving SF 180 8.00 1,440.00 3.00 540.00 3.20 576.00 5 Remv C/G & Inst Dwy LF 20 36.25 725.00 65.00 1,300.00 43.00 860.00 6 Remv D~ & Inst C/G LF 30 72.50 2,175.00 65.00 1,950.00 69.50 2,085.00 Ambo En.q neer n,q Unit Total Price Price 1.70 2,626.50 5.70 17,538.90 19.90 5,333.20 6.00 1,080.00 44.00 880.00 62.00 1,860.00 TOTALS: 27,798.00 23,400.90 ~ 25,940.48 29,318.60 P & F Construction Strancle & Chalmers Cunningham & Sons Item Unit Unit Total Unit Total Unit Total No. Descriptior~ Maas. ~ Price Price Price Price Price Price 1 Sawcut S/~V LF 1,545 2.20 3,399.00 2.70 4,171.50 3.10 4,789.50 2 S/W Remv & Repl SF 3,077 5.90 18,154.30 6.20 19,077.40 8.75 26,923.75 3 C/G Remv & Repl LF 268 18.00 4,824.00 18.00 4,824.00 15.50 4,154.00 4 AC Paving SF 180 4.80 864.00 16.20 2,916.00 7.00 1,260.00 5 Remv C/G & Inst Dwy LF 20 44.00 880.00 63.00 1,260.00 40.00 800.00 6 Remv Dwy & Inst C/G LF 30 70.00 2,100.O0 90.00 2,700.00 50.00 t,500.00 TOTALS: 30,221.30 34,948.90 39,427.25