Loading...
HomeMy WebLinkAbout4.05 Award of Bid 97-02CITY CLERK File # J-"-JJ~J~]J~-J~]J~ AGENDA STATEMENT CITY COUNCIL MEETING DATE: March 18, 1997 SUBJECT: Award of Bid - Contract 97-02, Annual Sidewalk Safety Repair (Remove and Replace) Report Prepared by: Lee S. Thompson, Public Works Director EXHIBITS ATTACHED: 1) Resolution of Award 2) Bid Results / ~A RECOMMENDATION: dopt resolution awarding bid to Sposeto Engineering, Inc. FINANCIAL STATEMENT: Design, Inspection & Misc. Costs: Construction: Sidewalk Civic Center Parking Lot and Stagecoach Park Sidewalk TOTAL: PROJECT ESTIMATE WITH BUDGET LOW BID $10,000 $10,000.00 (estimated) $ 40,000 $ 38,921.70 $ 2.900 $ 3.046.40 $ 52,900 $ 51,968.10 The Budgeted sm of the Remove and Replace sidewalk, curb and gutter work, together with the new sidewalks in the Civic Center Parking Lot and in Stagecoach Park is $42,900. The low bid is $41,968 ~3. This work has been budgeted in the General Fund. As the project is bid by hne item costs, Staff will modify the actual quantities, if necessary, to keep the project within budget. DESCRIPTION: On February 18, 1997, the City Council authorized Staffto solicit bids for Contract 97-02, Annual Sidewalk Safety Repair project. The Annual Sidewalk Safety Repair project repairs sidewalk locations that are offset 3/4" or more and may pose a tripping hazard. This contract specifies removal of the existing sidewalk, and in the case of root problems, removal of the tree roots, installation of a root barrier to mitigate future problems, and then replacement of the concrete sidewalk. This year, a number of curb and gutter repairs are also included. COPIES TO: Bidders ITEM NO. 4.~ g:\mtceproj~sidewalk\agstawrd A total of 7 bids were received for this project. The low bidder was Sposeto Engineering, Inc. with a bid of $41,968.10. Staff has reviewed the bid results, checked with references, and recommends that the City Council adopt the resolution awarding the bid to Sposeto Engineering, Inc. Page 2 RESOLUTION NO. - 97 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF DUBLIN AWARDING CONTRACT 97-02, 1997 ANNUAL SIDEWALK SAFETY REPAIR PROGRAM AND HANDICAP RAMP CONSTRUCTION TO SPOSETO ENGINEERING, INC. WHEREAS, the City of Dublin did on March 11, 1997, publicly open, examine, and declare all sealed bids for doing the work described in the approved Plans, Specifications, and Modifications for Contract 97-02, 1997 Annual Sidewalk Safety Repair Program and Handicap Ramp Construction, authorized by the City Council on February 18, 1997, which Plans, Specifications, and Modifications are hereby expressly referred to for a description of said work and for all particulars relative to the proceedings under the request for bids; and WHEREAS, said bids were submitted to the City Engineer, who has reviewed the bids to determine the lowest bid which was responsive to the requirements of the bid documents; NOW, THEREFORE, BE IT RESOLVED that that the City Council of the City of Dublin does hereby award Contract 97-02 to the lowest responsible bidder therefor, to wit, Sposeto Engineering, Inc., at a bid of Forty-One Thousand Nine Hundred Sixty-Eight Dollars and Ten Cents ($41,968.10), the particulars of which bid are on file in the office of the City Engineer. PASSED, APPROVED AND ADOPTED this 18th day of March, 1997. AYES: NOES: ABSENT: ABSTAIN: Mayor ATTEST: City Clerk g:~-ntceproj~sidewalk~resoawrd II BID RESULTS -SIDEWALK SAFETY REPAIR, CONTRACT NO. 97-02 -- BID OPENING DATE - MARCH 11, 1997 ............. --__ __ ENGINE~ER'S ESTIMATE SPOSETO ENGINEERING VANGUARD CONST. HARRIS & HARRIS BID UNIT UNIT ITEM ITEM DESCRIPTION MEASURE QTY PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE UNIT PRICE I TOTAL PRICE 1 :Saw Cut Concrete LF 809 $ 2.00 $ 1,618.00 $ 2.30 $ 1,860.70 $ 2.75 $ 2,224.75 $ 2.00 $ 1,618.00 2 Sidewalk Remove & Replace SF -- 2,16~' $ 6.0-~ $ 13,008.00 $ 5.95 $ 12,899.60 $ 5.80 $ 12,574.40 $ 5.75 $ 12,466.00 3 Curb/Gutter Remove & Replace L~ 61~ $ 20.0'~ $ 12,360.00 $ 20.90 $ 12,916.20 $ 19.00 $ 11,742.00 $ 23.00 $ 14,214.00 4 a.C. Paving -- S~F 618 $ 6.0-~-----'-~- $ 3,7~08.00 $ 4.9~ $ 3,028.20 $ 5.0~ $ 3,090.0~ $ 6.00 $ 3,708.00 5 Handicap Ramps EA- ~- $ 850.0~ $ 6,800.0~ $ 799.0~ $ 6,392.0'~-'~- $ 839.0~ $ 6,712.0~ $ 1,080.00 $ 8,640.00 6 Root Shield LF-- 25~ $ 8.0~ $ 2,000.0~ $ 7.3~ $~,825.0~~0-- $ 2,150.00 $ 8.50 $ 2,125.00 7 2' 6"x 7' Concrete Walkways EA -- 1~ $ 122.00 $ 1,708.00 $ 120.00 $ 1,680.00 $ 164.00 $ 2,296.00 $ 95.00 $ 1,330.00 8 Path at Stagecoach Park SF 244 $ 7.0~- $ 1,~708.0~ ~ 5.6~ ~ $~ 6.1~ ~ $ 5.0_~_ $ 1,220.0~ TOTAL BASE BID: ---- -- ...... $ 4~2,910.0~0--~~---- $ 42,277.5~ ---- $ 45,321.00 ~ STRANGE & CHALM~-~ S.R.P. COMPANY SWISHER CEMENT LUCAS CONCRETE BID UNIT UNIT ITEM ITEM DESCRIPTION MEASURE QTY PRICE TOTAL PRICE ~UNIT PRICE TOTAL PRIC[ UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE 1 Saw Cut Concrete LF 809 $ 3.25 $ 2,629.25 $ 2.60 $ 2,103.40 $ 6.00 $ 4,854.00 $ 2.00 $ 1,618.00 2 Sidewalk Remove & Replace SF 2,166 $ 5.70 i $ 12,357.6~ ~ $ 13,008.0~ $ 6.6~ $ 14,308.8~ $ 6.30 $ 13,658.4~0 3 Curb/Gutter Remove & Replace L~ 616 $ 20.85 ' $ 12,885.3~ $ 23.0~ $ 14,214.0~ $ 20.0-~ ~ $ 27.0~ $ 16,686.0~0 4 A.C. Paving -- --SF 618 . $ 6.0~ $ 3,708.0~ $ 7.0~ $ 4,326.0~ $ 6.50 $ 4,017.00 ~ $ 3.50 $ 2,163.00 5 Handicap Ramps EA 8 ~ $ 7,320.00 $ 950.00 $ 7,600.00 $ 900.00 $ 7,200.00 $ 950.00 $ 7,600.00 6 RootShield LF 25~ $ 6.0~ $ 1,500.0'~ $ 9.0~ $ 2,250.0~ $ 8.5~ $ 2,125.0~-~ $ 15.00 $ 3,750.00 7 2~' 6"x 7' Concret~ Walkways --EA 14 $ 295.00 $ 4,130.00 $ 105.00 $ 1,470.00 $ 110.00 $ 1,540.00 , $ 600.00 $ 8,400.00 8 Path at Stagecoach Park SF 24~4 $ 7.0~00 $ 1,708.0~0 $ 6.5~0 $ 1,586.0~0 $ 5.2~0 $ 1,268.8~0 $ 6.C~0 $ 1,464.0~0 ----~______~~~$ 46,238.15 $ 46,557.40 ~~~~$ 47,673.60 * $ 55,339.40 "m?~ ....... *TOTAL ADJ~~~