Loading...
HomeMy WebLinkAbout4.06 Accept Work 93-05 CITY OF DUBLIN AOSNDA STATEMENT City Council Meeting Date: June 14, 1993 SUBJECT: Acceptance of Work - Contract 93-05, Street Subdrains Report by: Public Works Director Lee Thompson EXHIBITS ATTACHED: None Accept improvements constructed under Contract 93-05 Authorize retention payment to Betchart and Norwood in the amount of $4,626.82 FINANCIAL STATEMENT: BUDGET ACTUAL COST Design $ 2,500.00 $ 878.00 Inspection 4,600.00 2,989.00 Improvements 95,215.00 92,536.00 Miscellaneous (Legal/printing) 180.00 811.00 $102,495.00 $ 97,214.00 DESCRIPTION: On April 12, 1993, the City Council awarded Contract 93-05, the Street Subdrain Project, to Betchart and Norwood. Subdrains have been placed in locations where water is seeping under the street sections, causing asphalt pavement failures. The water is originating from median irrigation and from springs. These subdrains will intercept the water before it gets under the street and will carry it off to a storm drain system. The result of installing these subdrains is to extend the life of the street pavement section. Streets that were included in the project are: Village Parkway (Dublin Blvd. north to Kimball Avenue), Amador Valley Blvd. (east of York Drive), and Stagecoach Road (end of median near Stagecoach Park). The city Engineer has reviewed the work on the project and determined that it is complete and in accordance with the approved plans and specifications. Staff recommends tha~ the City Council accept the improvements and authorize retention payment to Betchart and Norwood in the amount of $4,626.82. a:subdrains~agstacpt ........... ............................................. 1 .... 'i'T'F---GtiE R K ITEM NO.~ COPIES TO: Betchart and Norwood IFiLE