HomeMy WebLinkAbout4.06 Award Of Bid 86-3CITY OF DUBLIN
AGENDA STAT1:IVI I'
City Council Meeting Date: April 14, 1986
SUBJECT: Award of Bid - Contract No. 86-3
1986 Sidewalk Repair Program and Arroyo Vista Sidewalk
Connections
EXHIBITS ATTACHED: Summary of Bids
RECOMMENDATION: f4Award Bid to P
Venture
2) Authorize Mayor
FINANCIAL STATEMENT:
Low Bid Received:
Funds Budgeted:
$33,558.89
Construction Des=
&
W & S & W Construction, Inc., A Joint
to execute agreement.
Total
Annual Sidewalk $20,50025,000
Repair
Arroyo Vista Sidewalk 12,500 2,500 15,000
Connections
Total 33,000 7,000 40,000
DESCRIPTION:
At its meeting of February 24, 1986, the City Council authorized Staff to
advertise for bids for Contract 86-3, 1986 Sidewalk Repair Program, Zone I through
Zone V and Arroyo Vista,
The City received a total of four (4) bids (see attached bid summary) for
this project. The low bidder was P & W & S & W Construction, Inc., A Joint Venture,
with a bid of $33,558,89,
Staff has reviewed the low bidder's proposal and checked with references
and recommends that the City Council award the bid to the low bidder.
COPIES T0: P & W & S & W Construction, Inc.
A Joint Venture
1986 sIDEWALK R~PAIR PROGRAM, CONFRAC~ 86
XT~IZATION OF WORK ENGINEER'S ESTIMATE P & W CONSTRUC~I(DN MCE CORPORATION P & F CONSTRUCTION AMBO CONCRETE
liD ITEM UNIT UNIT TOTAL UNIT TOTAL UNIT TOTAL UNIT TOTAL UNIT TOTAL
ITEM DESCRIPTION MEAS. QTY. PRICE PRICE PRICE PRICE PRICE PRICE PRICE PRICE PRICE PRICE
1 MOBILIZATION 1 LS 3,000.00 3,000.00 316.68 316.68 3,000.00 3,000.00 925.00 925.00 800.00 800.[
2 TRAFFIC CORTI~ROL 1 LS 2,000.00 2,000.00 1,752.46 1,752.46 2,500.00 2,500.00 2,000.00 2,000.00 800.00 800.[
3 SAW-CUT (ARR. VISTA) 104 LF 2.50 260.00 2.93 304.72 2.00 208.00 3.50 364.00 2.25 234.[
4 SAW-CUT (ZONE I THRU V) 298 LF 2.50 745.00 2.93 873.14 2.00 596.00 3.50 1,043.00 2.25 670.5
5 REMOVE/DISPOSE CON. 1 LS 1,000.00 1,000.00 1,016.37 1,016.37 1,000.00 1,000.00 1,960.00 1,960.00 1,400.00 1,400.[
WALK/A.C. (ARR. VISTA)
6 RF~OVE/DISPOSE CON. 1 LS 6,000.00 6,000.00 2,787.32 2,787.32 8,312.50 8,312.50 6,600.00 6,600.00 9,000.00 9,~00.C
SW/C&G (ZONE I THRU V)
7 REINF. CON. STEPS & THICK 180 SF :23.00 4,140.00 15.00 2,700.00 . 13.00 2,340.00 41.35 7,443.00 57.00 10,260.[
SLAB W/A.C. (ARR. VISTA)
8 CON. WALK W/3" n.B. 246 SF 3.50 861.00 3.98 979.08 4.00 984.00 3.48 856.08 ..5.85 1,439.]
(ARROYO VISTA)
9 CON. S.W. W/3" A.B. 2935 SF 3.50 10,272.00 3.82 11,211.70 3.50 10,272.50 3.14 9,215.90 5.35 15,702.~
(ZONE I THRU V)
10 CON. CURB (ARR. VIS.) 27 LF 15.00 405.00 12.50 33~.50 15.00 405.00 21.50 580.50 32.00 864.[
11 CON. C & G (ZONE I-V) 130 LF 14.00 1,820.00 10.00 1,300.00 20.00 2,600.00 13.00 1,690.00 23.00 2,990.[
12 A.C. PVMT.(PRKG/ARR.VlS.) 108 SF 6.00 648.00 3.15 340.20 4.00 432.00 7.80 842.40 7.00 ~6.[
13 HANDRAIL (ARR. VISTA) 1 LS 3,000.00 3,000.00 1,260.10 1,260.10 i2,800.00 2,800.00 2,200.00 2,200.00 2,000.00 2,000.[
14 CLEAR, GRUB, EARTHWRK 1 LS 500.00 500.00 2,729.62 2,729.62 500.00 500.00 485.00 485.00 4,000.00 4,000.[
FIN GRADE (ARR. VISTA)
15 RCOT BARRIER (I - V) 150 LF 10.00 1,500.00 15.00 2,250.00 10.00 1,500.00 15.00 2,250.00 12.00 1,800.[
16 PRKG STRIPING (ARR. VIS.) 1 LS 600.00 600.00 600.00 600.00 500.00 500.00 275.00 275.00 400.00 400.(
17 HANDICAP RAMP 4 EA 800.00 3,200.00 '/OU.0U '?00.00 ~UU.UU 2,~UU.UU ~U.UU z,Ibu.Uu 735.00 2,940.[
(ARROYO,VISTA)
TOTAL: 39,951.50 33,558.89 40,750.00 40,889.88 56,055.[