HomeMy WebLinkAbout4.06 Award of Bid 98-07CITY CLERK AGENDA STATEMENT CITY COUNCIL MEETING DATE: August 18, 1998 SUBJECT: Award of Bid - Contract 98-07, Mape Memorial Park Pedestrian Bridge Report Prepared by: Public Works Director Lee Thompson EXHIBITS ATTACHED: 1) 2) 3) Resolution of Award Summary of Bids Location Map RECOMMENDATION: ~U/ Adopt resolution awarding bid to Biland Construction Co. FINANCIAL STATEMENT: Construction Budget: $ 41,000 Engineer's Bid Estimate: $ 37,250 Low Bid: Low Bid plus 10% Contingency: $ 35,720 $ 39,292 DESCRIPTION: At the City Council meeting of July 21, 1998, City Council authorized Staff to solicit bids for Contract 98-07, Mape Memorial Park Pedestrian Bridge. This project was originally part of the Mape Memorial Park Renovation project, but was not constructed due to lack of funding. The City subsequently received a $47,000 Transportation Development Act (Fund 211) grant to fund this Capital Improvement Project. The pedestrian bridge is proposed to be installed across Martin Canyon Creek providing access to Mape Memorial Park fxom the bike/pedestrian path along San Ramon Road. Included in the project are the construction of the two bridge abutments and asphalt and concrete paths leading to the bridge. It is estimated that the pedestrian bridge will take approximately 8 weeks fxom the time it is ordered to be fabricated and delivered. A total of two (2) bids were received with the low bid being submitted by Biland Construction Co. in the amount of $35,720. Staff has reviewed the low bidder's proposal, checked with references and recommends that the City Council adopt the resolution awarding Contract 98-07 to Biland Construction Co. gSmiscproj\pcdbrdg¢\agstawrd COPIES TO: Bidders John McCallum, MTC ITEM NO. RESOLUTION NO. -98 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF DUBLIN AWARDING CONTRACT 98-07 MAPE MEMORIAL PARK PEDESTRIAN BRIDGE TO BILAND CONSTRUCTION CO. WHEREAS, the City of Dublin did, on August 1 I, 1998, publicly opened, examined, and declared all sealed bids for doing the work described in the approved Plans, Specifications, and Modifications for Contract 98-07, Mape Memorial Park Pedestrian Bridge, authorized by the City Council on July 21, 1998, which Plans, Specifications, and Modifications are hereby expressly referred to for a description of said work and for all particulars relative to the proceedings under the request for bids; and WHEREAS, said bids were submitted tO the City Engineer, who has recommended that the bid hereinafter mentioned is the lowest and best bid for doing said work. NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Dublin does hereby award City of Dublin Contract 98-07 to the lowest responsible bidder therefor, to wit Biland construction Co. with a bid of Thirty-Five Thousand Seven Hundred Twenty Dollars and No Cents ($35,720.00), the particulars of which bid are on file in the Office of the City Engineer. PASSED, APPROVED AND ADOPTED this 18th day of August, 1998. AYES: NOES: ABSENT: ABSTAINING: ATTEST: Mayor City Clerk g:~rniscproj~edbrdge~resoawrd NO SCALE ~SHANNB CNTR, DP-., ~L HIGH DR. CAMP PARKS °ROJ~_.CT :IVIC \ % LOCATION 1-580 CITY OF DUBLIN PUBLIC ~,/DRKS DEPARTMENT IAPPROVAL MARE MEMORIAL PARK PEDESTRIAN BRIDGE LDCATI[ ~A~ KA$ ~ CHK ~AT~' 7/14/98