Loading...
HomeMy WebLinkAbout4.06 Award of Bid 99-03 CITY CLERK File # J'~J-~-----J~-~ AGENDA STATEMENT CITY COUNCIL MEETING DATE: April 6, 1999 SUBJECT: Award of Bid - Contract 99-03, Annual Street Repair and Overlay Report Prepared By: Lee S. Thompson, Public Works Director 'ATTACHMENTS: 1) 2) 3) 4) 5) 6) Resolution of Award Budget Change Form for additional SB300 Funding and for the addition of Darian Court Summary of Bid Results Financial Breakdown of Budget and Budget Revisions Map of Overlay Streets Darian Court Homeowners' Letter and Petition RE COMMENDATI ON~.~N~ i) 2) Adopt resolution awarding bid to Bay Cities Paving & Grading, Inc. and approve a Budget Change of $19,724 from New Revenues (from SB300 Funds) Approve homeowners' petition to overlay Darian Court and direct Staffto generate a Change Order to include Darian Court in Contradt 99-03 and approve a budget appropriation of $7,230 from Gas Tax reserves FINANCIAL STATEMENT: The project costs are budgeted in the Capital Improvement budget and in the Street Maintenance Operating Budget. Funding comes from the General Fund, Gas Tax, Measure B, and SB300 funds. The total'adopted project budget is $458,300 ($450,000 for this contract). The breakdowns of project costs and funding sources are shown on Attachment 4. The low bid received was $453,588.65. The final allowable percentage for SB 300 funding is 16.59%, instead of the 10% budgeted. This funding match will increase the SB300 funding by $19,724 based on the low bid. This, in mm, will increase the City's available construction funding to $469,724, which would allow $16,135 for construction contingencies (3.5%). COPIES TO: Bidders Signatories of Petition ITEM NO. g:\overlay\overlay\agstawrd The estimated cost to add the overlay of Darien Court is $7,230. If approved, funding for this extra work would come from Gas Tax reserves. DESCRIPTION: On February 16, 1999, the City Council authorized Staff to solicit bids for Contract 99-03, 1998~99 Annual Street Repair and Overlay. This contract consists of the overlay Capital Improvement Project, as well as the repair for the overlay streets and for the Annua! Slurry Seal program. The 1998-99 Annual Overlay consists of removing and replacing failed asphalt concrete to a depth of 4" and resurfacing the street with a 1-1/2-inch overlay of asphalt concrete. Reinforcing fabric will be used prior to the overlay in order to prevent cracks from reflecting through the new overlay. Streets to be repaired and overlaid under the 1998-99 program are: Avon Court Briarwood Lane Burnham Way Firebrand Drive Honey Court Ione Court Ironwood Drive Irving Way Donlon Way (Dublin Blvd. south to the end of Donlon Way) Stagecoach Road (Turquoise north to City Limit) San Ramon Road (west side, from Dublin Blvd. to north of Amador Valley Blvd. A total of 14 bids were received. The low bidder was Bay Cities Paving & Grading, Inc. with a bid of $453,588.65. Notices have been sent out advising residents and business owners of the work to be performed. In conjunction with the Annual Street Repair ~d Overlay Program, the City has received a petition letter dated March 29, 1999, from the residents and homeowners on Darian Court. The letter states that the residents and homeowners feel that Darian Court needs to be overlaid with asphalt concrete, instead of slurry sealed. Staff has inspected the street and has determined that the street does need an overlay, but the cost to perform this work is estimated at $7,230, which would exceed the budget for this year's Program. Staff is recommending approval of this additional work necessitating a budget increase in the amount of $7,230 (from unallocated Gas Tax reserves). A Change Order will also be required to include Darian Court in Contract 99-03. Staff has reviewed the bids, determined that the low bid contractor has satisfactorily performed projects for the City in the past, and recommends that the City Council adopt the resolution awarding Contract 99-03 to Bay Cities Paving & Grading, Inc. It is also recommended that City Council approve the request from the Darian Court residents to include their street in this year's Overlay Program. Page 2 RESOLUTION NO. -99 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF DUBLIN AWARDING CONTRACT 99-03 ANNUAL STREET REPAIR AND OVERLAY TO BAY CITIES PAVING & GRADING, INC. WHEREAS, the City of Dublin did, on March 30, 1999, publicly open, examine, and declare all sealed bids for doing the work described in the approved Plans, Specifications, and Modifications for Contract 99-03, Annual Street Repair and Overlay, author/zed by the City Council on February 16, 1999, wkich Plans, Specifications, and Modifications are hereby expressly referred to for a description of said work and for all particulars relative to the proceedings under the request for bids; and WHEREAS, said bids were submitted to the City Engineer, who has recommended that the bid hereinafter mentioned is the lowest and best bid for doing said work. NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Dublin does hereby award City of Dublin Contract 99-03 to the lowest responsible bidder therefor, to wit, Bay Cities Paving & Grading, Inc., at a bid of Four Hundred Fifty-Three Thousand, Five Hundred Eighty-Eight Dollars and Sixty-Five Cents ($453,588.65), the particulars of which bid are on file in the Office of the City Engineer. PASSED, APPROVED AND ADOPTED this 6th day of April, 1999. AYES: NOES: ABSENT: ABSTAINING: ATTEST: Mayor City Clerk g:loverlay~rojectlre$oawrd CITY OF DUBLIN BUDGET CHANGE FORM CHANGE FORM # New Appropriations (City Council Approval Required): Budget Transfers: From Unappropriated Reserves From Budgeted Contingent Reserve (1080-799.000) Within Same Department Activity From New Revenues Between Departments (City Council Approval Required) Other Name: Name: SB300 Funding for Construction $ 19,724 Account #: Account #: 220-9658-750-050 Name: Name: Revenue for AdditionaI SB300 Grant $19,724 Account #: Account#: 220-I000-555-016 Name: Name: Additional Gas Tax appropriation $ 7,230 Account #: for Darian Court Accounl #: 206-9658-750-050 Name: Name: Account #: a-ccount #: CiD' Manager: Date: Signature REASON FOR BUDGET CHANGE ENTRY: I ) Dublin is receiving 16.59% for the Overlay construction project ($59,724), rather than the 10% estimated and budgeted for this fiscal year ($40,000). 2) Addition of Darian Court to 1998-99 Overlay Program, per Council Direction of April 6, 1999. As APProved at the city Council Meeting on: Date! Mayor: Date: Signature Posted By: Signature Date: ITEM DESCRIPTION I~' v~de :ailure Repairs 4" (Overlay) ?ailur ~-Re~)air ~-,~; (§l~i~) ~avemeflt Re(at. Fabric nslall 1 112" Overlay Adjust Monumenls ~lgnal Detector Loops ~lriping Removal ~" ~ite Line wirer Markers ~" ~dle Line (solid & broken) ~ne' Line w/Ref. Markers ~" ~i{~ ~r0ken w/Markers b~bl~ Y~II~ ~Ref. Ma~kers ~ea~a~¥sla~d ~i~l; ~arkers' ~efleclive Ma[~ers (Slue) end, Thermoplaslic STOP AHEAD, Thermo. ~yp~ IV Arrow, Thermo. type VIII (UR) Arr., Thermo. ~dju~t SI~ Or~i~ M~i0{~ie tOTAL: _ BAY CITIES PAVING TOT/~i_ UNIT PRICE TOTAL PRICE UNIT PRICI PRICE $ - 1.20 $ '32,0~0A0 $ $ 33,365.00 'S --i.20 $'ii21028:40 $ 1.20 -- ---i.20' $~.,481216.00 $--" $ 48,216:00' $ 32,68i.65 $--0.95 $ .... O.40 $ ~01,66680 $--013(~ '$176,720,95 $__ 336100 $ 31360.00 $ 277,00 2,770.00 .$ 400.00 $ --"912~30.00 $ 900.00 $ 900.00 _$. $ $- '0:70 $--~:89,{196 $ $ 2,977.70 $ ....... .... 0:25 $_~i,000.00 S-- ' 1,400.00 $ 060 $ 2,415.06 $ $ 1,408.75 s ..... o.55 $ .... 260:f~ :~ 14o-s ..... $___ 1.00 $ 1,097.66 $ 1.80 $ 1,23,1:~0' .$___0.70- $--'i;30~;06 $ $ 1,860.00 $___1:25' $-- ~837:00 $__. 2,205.00 $ 3.50' $ ...... 96100 $ 476.00 '$_-_-__-~9.o0 $-- ~,o92.o0 $-- ' _$ $ 100.00' $---'300~00 155.00 $ 465.00 $~' 47150' $---712150 .$ $_._.100.00 $~ 1.;960.00 $ 1,140.00 .~__600.00 $_ 1,200.00 555.00 O'GRADY PAVING, INC. ~ ~:OTAL UNIT PRICE PRICE $ .... 0:86 $ 21,353.60 S 1:4~9..~ 59,868.20 0,83 3h912.s7 $__ $171,671.78 375.00 8,625.00 8,800.00 $ 1.10 $ $_ 0:~5' 1,408.76 .$ 1.10 577.50 .$ 448.00 $ 155.00 465.00 $--'4~6 675.00 .~ 1,140.00 500.00 ilooo:oo- $ 455~52~,50 $459,342,13 · Totalcorrectod after tabulaNon II .... I JOE CARONE, INC. UNIT PRICE TOTAL PRICE 0.76 1.46 $ 136,301.22 .~ 1.77 71,118.60 0.77 29,605.73 0.33 166,622.6t 250.00 $ 2:500:0~ 300.00 $11,500.00 11,500.O0 _$ 1.00 2,707.00 0.32 1,260.00 0.32 1.oo ~__829.oo ~ 1,097.60 0.90 1,674.00 1.40 15.00 420.00 70.00 980.00 140.00 40.00 866~o' 55.00 ~ 1,045.00 350.00 REDGWICK CONST. UNIT PRICE TOTAL PRICE :~ 1.00 26,692.00 1.55 144,703,35 62,27g.00 .~ 0.80 30,759.20 161,573.44 270.00 2,700.00 365.00 8,395.00 7,000.00 7,000.00 _$ .~ 0.34 1,360.00 $ 0.34 '1,368.50 1.20 630.00 1.75 1,200.50 1.00 1,860.00 _~ 1.50 2,205.00 16.00 448.00 .$ 75.00 1,050.00 .~ 150.00 450.00 .~ 43.00 645.00 60.00 1,140.00 790.00 1,400.00, $ 459,626,68 460,836.69 Pauo 2. II'EM DESCRIPIlON PlaNe AC PWHt 0' WI(lo FaigNe Repairs 4" (Overlay) Failure Repa0s 4" (Slurly) Pavement Reinl. Fabric Inslall 1 112" Overlay A0just Monur.en~s 30iping Removal ]" While Line wirer Markers ~*'~fite Line (solid & broken) ~ane Line wirer. Markers ~" ~flle B~0ken wlMarke~ ~ 30~bie Yellow w/Roi. Ma~s Median Island w/Roi Malkers Re~eclive Ma~kers (Blue) STOP Legend, TheimopJasJJc ST0~ AHEAD~ ~helmo. my~ JV Ar~ow,~hem~o. Adjus{S Jarl D~ain Manhole _ Fralne Io Grade IOTAL: ITEM DESCRIPTION Plmm AC Pvmt. B' Wide Failure Repairs 4" (Oveday) ~ailure ~epaJr~ ~';iSlurry) [~avern~ni R~Jni. ~' ~bric Adjust Monumenls ~loplng ~moval ¢' ~,iie [ii'4 (~Oiid & b;oken) .age Line WiRer. Mmkers D~ubJe Yelrow WiReL ~.d~a~ island ~iReL ~ar~ers Refiecl~ve Ma&ers (Dlue) STOP AHEAO, Thermo. Type iV Arrow, ~0eHno. - Frame ~o Grade tF UNIT MEASURE LF SF SF SY SF EA EA - LS LINI1 PRICE TOIAL PRICE 1 00 $ 20,00200 1,54 $ t43,70078 154 $ 61.877.20 0.70 $ 29,22124 034 $ 171,671.78 250 O0 2,500 O0 270,00 6,210~00 '8,90540 8.905.40 100 2,707.00 032 1,280 gO 0 32 1,288 O0 $ 1.00 525.00 $ 1.60 5. i,O97.60 $ O90 $ 1,67400 $ 1.40 $ 2,060.00 $ 15OO $ 420.00 $ '70.00 $ 98000 $ 140.00 5 420.00 $ 40.00 $ 60000 $ '~ 5500 5 i.045.O0 $ 50000 $, 1,O00.00 $ 465,942.00 ROYAL SEAL ASPliALT UNIT PRICE TOTAL PRICE $ 1.51 $ i40,06901 $ 1.72 $' 09.109.6d $~- 0.90 $-3416041{0 $ 0.35 $ {76,720.95 $ -' 2~5.O0 $ 2,750.00 $ _'.'374.00 $~'_8,602.O0 $ _9.927.50 $.__9.927.50 $ _. 1.10 $ 2,977.70 $ 0.35 $ 1,40OOO 035 $ 1,408.75 1.10 S 577.50 1.76 $ -I,207.39 1.54 $ - 2,26~.60 1650 $ 462.00 5 77.00 $ i,07800 $' i5400 $ 462.00 $ 44 go $ 60000 $ 60.50 $ i,14950 $ 600.00 1,2OOOO 487,664,75 ~,02500 $ 9,O25.00 100 $. 2,70700 1.oo S -' 525.oo .- igo S 1,o97~o $ 090 $' i.67460 $ -'-i.40 5~,o58.o0 $ - 7o0o: $--- 98000 $ - ~4000 420.00 $ -4ooo s-_- .~00.oo $ ~00.O0 _.1,400 O0 $470,310,08 dAnON~ k Sb~§2 il~C. 000 ~ 25,159.io -- 1.~9 5{48,437.63 ~.88 $ ~5.538.40 ---0.85 $-132.68i165 - 034 $ ~7i,67i.70 26255 $ ~,6~550 5 -341.31 $--7,850.i3 5 ~135i.38 063 026 $ 1,o40 oo' ' o5~ 5 Zog3.o0 -063 $- 330175 2.09 $ ¥1982154 1.o5 $--i1953.00 ~10 4.20 $- 11~.60 78.77 $-i,i02.78 "~57.53 i $--' 472.~g $ i0502 ~,995 35 GALEDRIGE coNSl R. I TOTAL URIr PRICE PRICE 70487 $ 20,949~5 i.30697 $122.01400 1 30697 $ 52,5i4 05 .94127 $ 36,19009 .395562 $201,25053 27500 $ 2,750~00 ,100.00 $ 9,;304,00 ~,05OO0 $ 9.95000 1.10 $ 2,971,70 .352 5 1,40§oo .352 $ i1416.~0 ' 1i0 $ 577160 1.70 $ ' .99 $ 1,841.40 1.54 $ ~1263.80 16.50 $ 77.00 $ i,o7800 154.00 $ 462,00 44.0C $ '- 060100 60~c $ _1,i4§.50 7150c $ 1,43000 $4~,9~ UESILVA G~TES COtlST. tmlr PRICE TOt,AL PRICE 100 $ 26,692.00 140 $ 130.69980 $ 140 $ 50,25200 $ 0 80 $ 30,759.20 $ 0.38 $ i911868.46 $ ~o.oo 5 2,50000 $ 40000 9,20000 $ i6,ooo.oo ~ al,goo.go' $ 1.00 $' 2,70700' 5 040 s ' 1.60o.00 $ 0.40 $ I.OO $-- 52~]o0 $ 200 $ i~;372.00 $ __ lOO $ <900.00 $ 2.00 15.00 $ 420.00 s_..75oo $--1.o~o00 s 15000 $ 450.00' 4ooo $ 600]06 $--6000 $--'-~i4060 S --66000 ~113oo go GRANITE CONS1 R. URIT PRICE $ 0.80 $ 1 65 $ 1.65 $ 050 $ 0.33 $ 300.00 $"- 350.00 TOTAL PRICE $ 21.353.60 $ 154,03905 $ 60,297,00 $ 30,759.20 $ 100,62261 $' 3,oo0.oo $ 8,050.00 ~,945.20'$ 8,045]29 i00 S 2,707100 0.50 $ 12.oo01oo 0.50 S--2.oi~190 i.o0'$-- S2L00 i.50 $~1,0~§.oo 110o $--1o6o.oo 15.00 420.00 $---?6.0o $~;d6~.o0 $--i6o.0o 46o,oo ~&0o ..... 60.0o' 5- 0~.60 $-'-0o0,oo $ --60o.00 Total corroc{od ail0r BRUCE CAROii~- TEICIIERT CONSTR. C. F, ARCUIBALD 'TOTAL UNIT PRICE PRICE UNIT PRICE ___ 1,00 $' 26,692.011 $ 1.20 $ 1.75 $163,37417~ S i]60 $ 1.i5 $ 70,3i5.00 $ 1.60 $ 0,36 $181,770.12 $ 040 $ 2,000.60 $~11o.oo $--71475.110 $ 400.00 s--615001o0 $-6~0oo.0o s-2.07~30 S-' i7o0 $ - 1,4o6100 S ....0:35 $_!14o5.T~i._. 5 577.50 $ 1.20 s ~.~60250 $-- i10o $ i,~6600 $ -1.oo $ 25000 $ 325,00 S 0,500100 S- 1:10 $ 0.35 $ 0.35 $ 1.10 $ 1.75 $-- i100 $ - i.5o $ ;~.20~.bo $ lOOO $ 448.00 $- 7500 $--1,050.00 $_~ 15000 $ 450.00 $ 4400 $' 00000 $ ' 6000 $ i,14000 $ ' 55000 $ 1,10000 $661.78~.97 TOTAL PRICE UNIT PRICE TOTAL PRICE 32,0~0.40 ~4,288o~- S~6119do.sd- Z6oo.0b' $--01o1161o6' s--'i12011~66 ' ' S .... 0.35 $--i14011.00 :-'i.408.75 s---'0,35 $--11468175 $---"6~0100 $ ....1140 S 57~:96 '$-~,30;3.4o- $---- i.76 ' S S 1050 $ 462.O0 ~54.O0 $ ..... 462~0~ $ 4400 $ -~ 60,50 S~,~49.50' - 500.00 ~;o0o.0o' --_-~ i:~o ' $ -- ~,49~:06 $__ 17.0o $'- 476]00 62.00 $ i~i48.00 16OllO $ 400.00' 4~oo $ 70506' $-"-'o4.oo $'- <2i616o $"-54o0o $ i.O~o.oo APPROVED 1998-99 OVERLAY AND SLURRY REPAIR BUDGET CONTRACT 99-03, 1998-99 OVERLAY FINANCIAL BREAKDOWN PROJECT/WORK DESCRIPTION FUNDING SOURCES GAS TAX GEN'L FUND MEASURE B SB 300 TOTAL (206) (001) (217) (220) FUNDING 1998-99 OVERLAY PROGRAM OVERLAY C.I.P. OVERLAY REPAIR (OP. BUDGET) OVERLAY STRIPING (OP. BUDGET) SLURRY SEAL PROGRAM REPAIR (OPERATING BUDGET) $50,000 $27,500 $191,500 $40,000 $259,000 $130,000 $130,000 $11,000 $11,000 $50,000 TOTAL CONSTRUCTION COST: $50,000 $168,500 $191,500 $40,000 $450,000 ENGINEERING/INSPECTION/MISC. OVERLAY C.I.P. TOTAL PROJECT BUDGET/FUNDING: $8,300 $8,3OO $58,300 $168,500 $191,500 $40,000 $458,300 MODIFIED BUDGET WITH PROPOSED REVISIONS CONTRACT 99-03, 1998-99 OVERLAY FINANCIAL BREAKDOWN PROJECTNVORK DESCRIPTION FUNDING SOURCES GAS TAX GEN'L FUND MEASURE B SB 300 TOTAL (206) (001) (217) (220) FUNDING 1998-99 OVERLAY PROGRAM OVERLAY C.I.P. OVERLAY REPAIR (OP. BUDGET) OVERLAY STRIPING (OP. BUDGET) SLURRY SEAL PROGRAM REPAIR (OPERATING BUDGET) $27,500 $130,000 $11,000 $191,500 $130,000 $11,000 $50,000 $50,000 TOTAL CONSTRUCTION COST: ~i'i $168,500 ENGINEERING/INSPECTION/MISC. OVERLAY C.I.P. $8,300 $8,300 TOTAL PROJECT BUDGET/FUNDING: ~6-,~ 0'-~ $168,$00 $191,$00 ~~ (1) Additional $7,230 Gas Tax appropriation for Darian Court (2) Revision to add $19,742 in additional SB300 Grant ~'~ Revisions t OAf Al. D 0 U GI-II!I~,'I'y/ · II]LI.S ~ PAI(I(~ ;:'. :: ';.~ MEMO FROM THE PEACEABLE KINGDOM/ . . ~ ,. fl ~,~ I,.~ I/~ Attention: Lee Tomson City of Dublin Public works Dept. I00 Civic Plaza, Dublin Ca. 94568 We, the residents and homeowners on Darian Court, are issuing this petition to request that you re-assess the repair work on ofir street The'last time we had any maintenance work, it was slurry sealed. We have two serious chug holes that keep returning and many serious cracks. We also have (3) locations where water sits after even a short rain. #1) between 6982 & 6974 #2) in front of 6958, and #3) is at the corner in front of 6981. We again urge you to RE-ASSESS our street. It is a very small cul-de-sac, but we take pride in our homes as do those of more major streets. Our automobiles also pay the toll of driving up and down our poor beat up street every day. ADDRESS PRI2qTED NAME SIGNATURE We sincerely appreciate your time and consideration in this matter.