Loading...
HomeMy WebLinkAbout4.07 MAD 83-1 Prel Eng Rpt CITY CLERK _ File # a� Q-�_51I® AGENDA STATEMENT CITY COUNCIL MEETING DATE: July 7., 1998 SUBJECT: Citywide Street Lighting Maintenance Assessment District 83-1: Preliminary Engineer's Report Report Prepared by: Lee S.Thompson,Public Works Director EXIIIBITS.ATTACHED: 1) Resolution Approving Preliminary Engineer's Report 2) Resolution Appointing Time and Place of Hearing Protests of Proposed Assessments (July 21, 1998) 3) Preliminary Engineer's Report and Assessment Diagram RECOMMENDATION: Adopt resolutions approving preliminary engineer's report and 4,4i setting hearing date and time(July 21, 1998, 7:00 p.m.)for the 1998- 99 assessment. FINANCIAL STATEMENT: 1998-99 Sources And Use of Street Light Maintenance District Funds Revenues: Gross Amount Proposed to be Assessed: $147,664 Estimated Interest Revenue: -- - 5,500. Prior Year Collections and Penalties . 3,600 Reimbursement for Public Damage: 2,000 Less Estimated Collection and Delinquency Cost: (5.464) Net Total Revenues $153,300 Expenditures: • Contract Maintenance and Utilities: 130,987 Administration and Engineering: 6.024 Total Operating Expenses: $137,011 The $16,289 difference is proposed to be added to the reserve for future pole replacement. The proposed assessment. $13.26 per single family home, is the same as the 1997-98 assessment. COPIES TO: p ITEM NO. 4 g:\assessdist\83-1\agstpre - DESCRIPTION: In 1983, the City Council formed a Citywide Street Lighting Assessment District to replace the County of Alameda Lighting Service Area., On August 13, 1984, the City Council approved the annual Engineer's Report and ordered levy of assessments for the first time. In 1995-96, the City Of Dublin and other agencies in Alameda County took possession ofPG&E-owned street lights in order to reduce maintenance costs. The 1996-97 assessment was reduced from the 1995-96 level by.30%. For Fiscal Year 1998-99, no change is recommended with respect to the method of determining the assessments. The assessment for a single-family house is estimated to be$13.26, which is the same as the 1997-98 assessment. As shown on page 5 of the Engineer's Report,the assessment for a commercial property is a factor of 5.5 multiplied by the single family rate or$72.93 multiplied by the'acreage of the property. Vacant parcels pay one half the rate of developed parcels. • Over the past two years, a portion of the reserve in this District was utilized for the purchase of street lights from Pacific Gas and Electric Co. A reserve remains for future pole replacement funding. The City owns approximately 1,800 street lights, a number of which exceed 30 years of age. Staff recommends that the City Council adopt the resolutions approving the preliminary Report and setting a public hearing date of July 21, 1998. , • i Page 2 , / ' /0 • RESOLUTION NO. -98 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF DUBLIN APPROVING PRELIMINARY ENGINEER'S REPORT, CONFIRMING DIAGRAM AND ASSESSMENT CITY OF DUBLIN STREET LIGHTING MAINTENANCE ASSESSMENT DISTRICT 83-1 WHEREAS, by its Resolution No. 62-98, a Resolution Directing Preparation of Annual Report for City of Dublin Street Lighting Maintenance Assessment District No.-83-1 (the "District"),this Council designated the City Engineer as Engineer of Work and ordered said Engineer to make and file a report in writing in accordance with and pursuant to the Landscaping and Lighting Act of 1972; and WHEREAS, said Engineer of Work has made and filed with the City Clerk.a preliminary report in writing as called for in said Resolution No. 62-98 and under and pursuant to said Act, which report has been presented to this Council for consideration; and WHEREAS, said Council has duly considered said report and finds that each and every part of said report is sufficient; and that said report neither requires nor should be modified in any respect; NOW, THEREFORE, BE IT RESOLVED a) That the Engineer's estimate of the itemized and total costs and expenses of the acquisition of improvements and maintaining said improvements and of the incidental expenses in connection therewith, as contained in said report be, and each of them are hereby preliminarily approved and confirmed; b) That the diagram showing the assessment district, description of the improvements to be acquired and maintained, and the boundaries and dimensions of the respective lots and parcels of land within said District, as contained in said report be, and it is hereby preliminarily approved and confirmed; c) That the assessment of the total amount of the cost and expenses of the proposed acquisition and maintenance of said improvements upon the several lots and parcels of land in said District in proportion to the estimated benefits to be received by such lots and parcels, respectively, from said acquisition and 'Kerr I maintenance, and of the expenses incidental thereto, as contained in said report be, and they are hereby preliminarily approved and confirmed. PASSED, APPROVED AND ADOPTED this 7th day of July, 1998. AYES: NOES: ABSENT: ABSTAIN: Mayor ATTEST: City Clerk g_(assessdist)183-Ilresopre RESOLUTION NO. -98 A RESOLUTION OFTHE.CITY COUNCIL OF'IIfl CITY OF DUBLIN • APPOINTING TIME AND PLACE OF BEARING PROTESTS IN RELATION TO PROPOSED ASSESSMENTS CITY OF DUBLIN STREET LIGHTING MAINTENANCE ASSESSMENT DISTRICT 83-1 WHEREAS, by its Resolution No. 62-98, a resolution directing preparation of annual report for City of Dublin Street Lighting Maintenance Assessment District(the "District")this Council designated the City Engineer as Engineer of Work and ordered that Engineer to make and file a report in writing in accordance-with and pursuant to the Landscaping and Lighting Act of 1972; and WHEREAS, said Engineer of Work has made and filed with the City Clerk a preliminary report in writing as called for in said Resolution No. 62-98, and under and pursuant to said Act, which report has been presented to this Council for consideration; and WHEREAS, said Council has duly considered said report and each and every part thereof, and finds that each and every part of said report is sufficient; NOW, THEREFORE,BE IT RESOLVED that a public hearing shall be held on July 21, 1998, at 7:00 p.m. at the Dublin Civic Center, 100 Civic Plaza, Dublin, California, at which time the City Council will hear protests and will consider and finally act upon the Engineer's Report. BE IT FURTHER RESOLVED that the City Clerk is hereby directed to give notice of said hearing by the following means: publishing a notice once a week for two weeks in a local newspaper published and circulated in the City, and conspicuously posting a notice at not less than three public locations, said noticing to be completed at least ten (10) days prior to the date herein set for hearing or protests and action on the Engineer's report. BE IT FURTHER RESOLVED that said notices shall contain the following information: the estimated assessment per parcel, the general description of the purpose or improvements the assessment ....•i: to tis4:,eai 1 will fund, the address to which a protest may be mailed, and the date, hour, and place set for the above described public hearing: PASSED, APPROVED, AND ADOPTED this 7th day of July, 1998. AYES: • NOES: ' ABSENT Mayor ATTEST: City Clerk g:(ad)183-llresotime 1 47 -2. . , CITY OF DUBLIN STREET LIGHTING MAINTENANCE ASSESSMENT DISTRICT NO. 1983-1 FISCAL YEAR 1998-99 ENGINEER'S REPORT (C. t.OF C> -0 CONTENTS 1. Assessment: Including Estimate of Costs, and Method of Apportioning (Assessment Roll Under Separate Cover) 2. Assessment Diagram 0.4 - • ASSESSMENT WHEREAS, on May-19, 1998, the City Council of the City of Dublin; California, pursuant to the provisions of the Landscaping and Lighting Act of 1972, adopted its Resolution Directing Preparation of Annual Report for Maintenance Assessment District 1983-1 for the acquisition and maintenance of improvements more particularly therein described; and WHEREAS, said Resolution directed the undersigned to prepare and file a report pursuant to Section 22565, et. seq., of said Act; NOW, THEREFORE, the undersigned, by virtue of the power vested in me under said Act and the order of the Council of said City, hereby make the following assessment to cover • the portion of the estimated cost of acquisition of and maintenance of said improvements and the cost and expenses incidental thereto, to be paid by said District. ESTIMATE OF COSTS (1) (2) (3) As Preliminarily As Finally As Filed Approved Approved Cost of Maintenance $134,901 Incidental Expenses 127,815 TOTAL COST $262,716 Estimated 1998-99 Interest - Income Applied to 1998-99 Operating Costs $5,500 Prior Year Collections and Penalties 3,600 Reimbursement for Public Damage 2,000 Estimated Surplus from 1997-98 Fiscal Year 103,952 NET TO BE ASSESSED FOR FISCAL YEAR 1998-99 S147,664 Assessment per factor rate of"1" $13.26 $13.26 $13.26 2 As required by said Act, a diagram is hereto attached showing the exterior boundaries of said street light maintenance assessment district and also the lines and dimensions of each lot or parcel of land within said landscaping maintenance assessment district as the same existed as of January 1, 1998, each of which lots or parcels having been given a separate number upon said diagram. • I do hereby assess the net amount to be assessed upon all assessable lots or parcels of land within said street light maintenance assessment district by apportioning that amount among the several lots or parcels in proportion to the estimated benefits to be received by each such lot or parcel from the acquisition and maintenance of said improvements, and more particularly set forth in the list hereto attached and by reference made a part hereof. Said assessment is made upon the several lots or parcels of land within said street light maintenance assessment,district in proportion to the estimated benefits to be received by said lots or parcels respectivelyfrom the acquisition and maintenance of said improvements. The diagram and assessment numbers appearing herein are the diagram numbers appearing on said diagram,to which reference is hereby made for a.more particular description of said property. The scope of work includes the cost of energy and maintenance of street lights within the City of Dublin. The scope of work shall also include the cost of purchase of street lights. Each lot or parcel of land assessed is described in the assessment list by reference to its parcel number as shown on the Assessor's Maps of the County of Alameda for the Fiscal Year 1998-99 and includes all of such parcels excepting those portions thereof within existing public roads or rights of way to be acquired in these.proceedings for public road purposes. For a more particular description of said property,reference is hereby made to the deeds and maps on file and of record in the office of the County Recorder of said County. Because-the names of the several owners are unknown to me,I hereby place The word "unknown" opposite the number of each lot of parcel of land assessed, the amount assessed thereon, and the number of the assessment. Dated: July 1, 1998 City En.'-OM 3 ENGINEER'S COST ESTIMATE FISCAL YEAR 1998-99 The estimated cost for the maintenance of improvements described in this Report for Fiscal Year 1998-99 is as follows: Maintenance (1) Electric Energy $74,592.00 (2) Contract With Caltrans 370.00 (3) Contract With Alameda County 33,000.00 (4) California Street Light Association 1,125.00 (5) Other Repairs and Maintenance Costs including pole painting 21,900.00 (6) Administration 3,914.00 $134,901.00 Incidentals (1) Engineer's Report and Proceedings $2,110.00 (2) Cost of Collection (County of Alameda) 2,510.00 (3) Delinquencies 2,954.00 (4) Contingencies/Reserve 120,241.00 $127,815.00 TOTAL: $262,716.00 4 METHOD OF APPORTIONMENT OF ASSESSMENT The assessments shall be spread using a method of"factor rates" assigned to different land uses. The establishment of the apportionment of a factor rate of"1" will be calculated by dividing the total assessment of the year by the sum of factor rate numbers assigned wherein the factor rates are assigned as follows: Use (x = any single digit.number) •. Factor Rate (x 1/2 if vacant) Ox Exempt 0 lx& 73 Single Family Residential & Condo 1 22 Duplexes 2 23 Tri-Plexes 3 24 Four-Plexes 4 3x Commercial . 5.5/ac. 4x Industrial 5.5/ac. 5x Rural 0.5 6x(except 65) Institutional 5.5/ac. 7x (except 73) Apartments 6 8x Commercial 5.5/ac. 9x Commercial 5.5/ac. 65 Cemeteries 0 xx9 Common Open Space 0 The assessment of each parcel shall be established by multiplying the factor rate for that parcel by the apportionment for a factor rate of 1. 5 i CITY OF DUBLIN LANDSCAPING AND LIGHTING MAINTENANCE ASSESSMENT DISTRICT 83-1 CERTIFICATIONS FISCAL YEAR 1998-99 I, the City:Clerk of the City of Dublin, California, hereby certify that the foregoing Engineer's Report, including Assessment, in the amounts set forth in Column(1), with the diagram thereto attached, was filed with me on July 1, 1998. I,the City Clerk of the City of Dublin, California, hereby certify that the foregoing Assessment, with the diagram thereto attached, was preliminarily approved and confirmed by the City Council of said City by its Resolution No. -98 duly adopted by said Council on July 7, 1998. I, the City Clerk of the City of Dublin, California, hereby certify that the foregoing Assessment, with the diagram thereto attached, was finally approved and confirmed by the City Council of said City by its Resolution No. -98 duly adopted by said Council on July 21, 1998. I,the City Clerk of the City of Dublin, California, hereby certify that a certified copy of the Assessment and diagram was filed in the office of the County Auditor of the County of Alameda, California, on , 1998. g:(ad)18 3-1183-I engr 6