Loading...
HomeMy WebLinkAbout4.08 Award of Bid 96-02 CITY CLERK File # ~-][-~[~-[~[~ AGENDA STATEMENT CITY COUNCIL MEETING DATE: March 26, 1996 SUBJECT: Award of Bid - 1995/96 Annual Street Repair and Overlay, Contract 96-02 Report Prepared By: Lee S, Thompson, Public Works Director EXHIBITS ATTACHED: 1) 2) 3) 4) Resolution of Award Summary of Bid Results Financial Breakdown Map of Overlay Streets RECOMMENDATION: ~ Adopt resolution awarding bid to O'Grady Paving. FINANCIAL STATEMENT: The project costs are budgeted in the Capital Improvement budget and in the Street Maintenance Operating Budget. Funding is derived from the General Fund, Gas Tax, Measure B, and SB300 funds. The total project budget is $ 371,019 ($360,269 for this contract). A breakdown of project costs and funding sources is shown on Exhibit 3. The Iow bid received was $329,291.96. The final allowable percentage for SB 300 funding is 5.88% instead of the 10% budgeted. This smaller funding match will reduce the SB300 funding by $15,150 based on the low bid. This, in turn, will lower~ our available construction budget to $345,119, which still allows $15,827 for contingencies. DESCRIPTION: On February 27th, the City Council authorized Staffto solicit bids for Contract 96-02 Annual Street Repair and Overlay. This contract consists of the overlay Capital Improvement Project, as well as the repair for the overlay streets and for the Annual Slurry Seal program. g:\overlay\overlay\agsta~vrd COPIES TO: Bidders ITEM NO. The 1995-96 Aimual Overlay consists of removing and replacing failed asphalt concrete to a depth of 4" and resurfacing the street with a 1-1/2-inch overlay of asphalt concrete. Reinforcing fabric will be used prior to the overlay in order to prevent cracks from reflecting through the new overlay. Streets to be repaired and overlaid under the 1995-96 program are: Cedar Lane Eden Street Village Parkway Spruce Lane Hemlock Street King Way Prince Drive (between Dublin Blvd. and AVB) Poplar Way Post Road Hickory Lane Hyde Court This contract includes provisions to raise the median curb height along Village Parkway. This cqnstruction is necessary to keep from paving to the top of the curbs which allows motorists to drive up onto the medians. It will also help facilitate this and future overlay projects. A total of 10 bids were received. The low bidder was O'Grady Paving with a bid of $329,291.96. Staff has reviewed the bids and checked with references and recommends that the City Council adopt the resolution awarding Contract 96-02 to O'Grady Paving. Notices will be sent out prior to the begiiming of work in order to advise residents and business owners of the work to be performed. Page 2 RESOLUTION NO. - 96 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF DUBLIN AWARDING CONTRACT 96-02, ANNUAL STREET REPAIR ANDOVERLAY TO O'GRADY PAVING WHEREAS, the City of Dublin did on March 19, 1996, publicly open, examine, and declare all sealed bids for doing the work described in the approved Plans, Specifications, and Modifications for Contract 96-02 Annual Street Repair and Overlay/Street Monuments, authorized by the City Council on February 27, 1996, which Plans, Specifications, and Modifications are hereby expressly referred to for a description of said work and for all particulars relative to the proceedings under the request for bids; and WHEREAS, said bids were submitted to the City Engineer, who has reviewed the bids to determine the lowest bid which was responsive to the requirements of the bid documents; NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Dublin does hereby award Contract 96-02 to the lowest responsible bidder therefor, to wit, O'Grady Paving, at a bid of Three Hundred Twenty Nine Thousand Two Hundred Ninety One Dollars and Ninety Six Cents ($329,291.96), the particulars of which bid are on file in the office of the City Engineer. PASSED, APPROVED AND ADOPTED this 26th day of March, 1996. AYES: NOES: ABSENT: ABSTAIN: Mayor ATTEST: City Clerk gqoverlayloverlaylresomvrd SUMMARY OF BID RESULTS CONTRACT 96-02 ANNUAL STREET REPAIR AND OVERLAY ENGINEER'S ESTIMATE O'GRADY PAVING GALEDRIGE CONST. JOE CARONF, INC. BID UNIT ITEM ITEM DESCRIPTION MEASURE QTY UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICI UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE ,, 1 Plane AC Pvmt. 6' LF 22,564 $ 0.70 $ 15,794.80 $-- 0.58 $ 13,087.12 $ 0.58 $ 13,087.12 $ 0.62 $ 13,989.68 ~.~ 2 Pavement Failure Repa rs 4" SF 63,507 $ 1.20 $ 76,208.40 $ 1.18 $ 74,938.26 $ 1.28 $ 81,288.96 $ 1.35 $ 85,734.45 '~31Pavement Reinforcing Fabric SY 30,381 $ 0.72 $ 21,874.32 $ 0.78 $ 23,697.18 $ 0.695 20,962.89 $ 0.79 $ 24,000.99 4~lnstall 1 1/2"Overlay SF 401,977 $ 0.27 $108,533.79 $ 0.30 $120,593.10 $ 0.29 i $118,181.24 $ 0.27 $108,533.79 ';~ Adjust Monuments EA 30 $ 190.00 $ 5,700.00 $ 150.00 $ 4,500.00 $ 195.00 $ 5,850.00 $ 150.00 $ 4,500.00 6 Signal Detector Loops EA 42 $ 257.00 $ 10,794.00 $ 325.00 $ 13,650.00 $ 288.40 $ 12,112.80 $ 297.00 $ 12,474.00 7 Repair Outside Overlay Area, 4" SF 21,428 $ 1.40 $ 29,999.20 $ 1.20 $ 25,713.60 $ 1.38 $ 29,656.35 $ 1.35 $ 28,927.80 8 Raise Median Curb LF 2,930 $ 11.00 $ 32,230.00 $ 9.75 $ 28,567.50 $ 11.54 $ 33,818.06 $ 11.09 $ 32,493.70 9 12" Line LF 870 $ 2.30 $ 2,001.00 $ 2.00 $ 1,740.00 $ 1.96 $ 1,705.20 $ 2.10 $ 1,827.00 10 STOP Legend EA 6 $ 200.00 $ 1,200.00 $ 70.00 $ 420.00 $ 65.00 $ 390.00 $ 70.00 $ 420.00 11 Double Yellow LF 460 $ 1.10 $ 506.00 $ 1.65 $ 759.00 $ 1.55 $ 713.00 $ 1.65 $ 759.00 12 Type IV Arrow EA 14 $ 75.00 $ 1,050.00 $ 45.00 $ 630.00 $ 41.20 $ 576.80 $ 44.00 $ 616.00 13 8" Line LF 560 $ 1.60 $ 896.00 $ 1.10 $ 616.00 $ 1.03 $ 576.80 $ 1.10 $ 616.00 14 Reflective Markers EA 164 $ 3.50 $ 574.00 $ 3.00 $ 492.00 $ 2.99 $ 490.35 $ 3.20 $ 524.80 15 Non-Reflective Markers EA 408 $ 3.50 $ 1,428.00 $ 2.90 $ 1,183.20 $ 1.70 $ 693.60 $ 1.80 $ 734.40 16 Raise Signal Poles and -- Pedestrian Push Button Posts EA 4 $ 500,00 $ 2,000.00 $ 400.00 $ 1,600.00 $ 412.06 $ 1~648.24 $ 431.00 $ 1,724.00 17 Install Paving Stones SF 3,110 $ 7.50 $ 23,325.00 $ 5.50 $ 17,105.00 $ 3.78 $ 11,755.80 $ 7.50 $ 23,325.00 TOTAL: $ 334,114.51 ** $ 329,291.96 ** $ 3331507.22 $ 341,200.61 Ii ~:: i ** Totalcorrected after tabulation GALLAGHER & BURK BAY CITIES PAVING GRANITE CONST. REDGWICK CONST. BID UNIT ITEM ITEM DESCRIPTION MEASURE QTY UNiT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE 1 Plane AC Pvmt. 6' LF 22,564 $ 0.65 $ 14,666.60 $ 0.81 $ 18,276.84 $ 1.00 $ 22,564.00 $ 0.75 $ 16,923.00 2 Pavement Failure Repairs 4" SF 63,507 $ 1.15 $ 73,033.05 $ 1.25 $ 79,383.75 $ 1.20 $ 76,208.40 $ 1.60 $101,611.20 3 Pavement ReinforcingFabric SY 30,381 $ 0.85 $ 25,823.85 $ 0.80i$ 24,304.80 $ 0.85 $ 25,823.85 $ 0.77 $ 23,393.37 4 install 1 1/2" Overlay SF 401,977 $ 0.35 $140,691.95 $ 0.30 $120,593.10 $ 0.32 $128,632.64 $ 0.30 $120,593.1(3 5 Adjust Monuments EA 30 $ 275.00 $ 8,250.00 $ 116.00 $ 3,480.00 $ 300.00 $ 9,000.00 $ 40.00 $ 1,200.00 6Signal Detector Loops EA 42 $ 285.00 $ 11,970.00 $ 270.00 $ 11,340.00 $ 250.00 $ 10,500.00 $ 300.00 $ 12,600~00! 7 Repair Outside Overlay Area, 4" SF 21,428 $ 1.15 $ 24,642.20 $ 1.25 $ 26,785.00 $ 1.20 $ 25,713.60 $ 1.60 $ 34,284.80 8 Raise Median Curb LF 2,930 $ 10.00 $ 29,300.00 $ 10.55 $ 30,911.50 $ 12.00 $ 35,160.00 $ 10.00 $ 29,300.00 9 12" Line LF 870 $ 2.00 $ 1,740.00 $ 2.10 $ 1,827.00 $ 1.90 $ 1,653.00 $ 1.90 $ 1,653.00 10 STOP Legend EA 6 $ 66.00 $ 396.00 i $ 70.00 $ 420.00 $ 63.00 $ 378.00 $ 63.00 $ 378.00 11 Double Yellow LF 460 $ 1.60 $ 736.00 ~ $ 1.65 $ 759.00 $ 1.50 $ 690.00 $ 1.50 $ 690.00 12 Type IV Arrow EA 14 $ 42.00 $ 588.00 $ 44.00 $ 616.00 $ 40.00 $ 560.00 $ 40.00 $ 560.00 13 8" Line LF 560 $ 1.05 $ 588.00 $ 1.10 $ 616.00 $ 1.00 $ 560.00 $ 1.00 $ 560.00 14 Reflective Markers EA 164 $ 3.05 $ 500.20 $ 3.20 $ 524.80 $ 2.90 $ 475.60 $ 2.90 $ 475.60 15 Non-Reflective Markers EA 408 $ 1.75 $ 714.00 $ 1.85 $ 754.80 $ 1.65 $ 673.20 $ 1.65 $ 673.20 16 Raise Signal Poles and Pedestrian Push Button Posts EA 4 $ 415.00 $ 1,660.00: $ 392.00 $ 1,568.00 $ 400.00 $ 1!600.00 $ 500.00 $ 2,000.00 17 Install PavingStones SF 3,110 $ 3.85 $ 11,973.50 $ 11.50 $ 35,765.00 $ 7.50 $ 23,325.00 $ 7.25 $ 22,547.50 TOTAL: $ 347,273.35 $ 357,925.59 ** $ 3631517,29 $ 369,442.77 / ** Total corrected after tabulation. O.C. JONES & SONS C.F. ARCHIBALD PAVING DE SILVA-GATES .... BID UNIT ITEM ITEM DESCRIPTION MEASURE QTY UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE I PlaneAC Pvmt. 6' LF 22,564 $ 1.00 I $ 22,564.00 $ 0.60 $ 13,538.40 $ 0.98 $ 22,112.72 -- 2 Pavement Failure Repairs 4": SF 63,507 $ 1.75 $111,137.25 $ 1.60 $101,611.20 $ 1.42 $ 90,179.94 3 Pavement Reinforcing Fabric SY 30,381 $ 0.84; $ 25,520.04 $ 0.80 $ 24,304.80 $ 0.71 $ 21,570.51 4 install 1 1/2" Overlay SF 401,977 $ 0.30 $120,593.10 $ 0.35 $140,691.95 $ 0.42 $168,830.34 . 5 Adjust Monuments EA 30 6 Signal Detector Loops EA 42 $ 270.00 $ 11,340.00 $ 270.00 $ 11,340.00 $ 280.00 $ 11,760.00 7 Repair Outside Overlay Area, 4" SF 21,428 $ 1.75 $ 37,499.00 $ 1.70 $ 36,427.60 $ 2.07 $ 44,355.96 8 Raise MedianCurb LF 2,930 $ 12.00 $ 35,160.00 $ 12.00 $ 35,160.00 $ 12.00 $ 35,160.00 9 12" Line LF 870 $ 3.00 $ 2,610.00 $ 2.00 $ 1,740.O0 $ 2.00 $ 1,740.00 10 STOP Legend EA 6 $ 75.00 $ 450.00 $ 100.00 $ 600.00 $ 65.00 $ 390.00 11 Double Yellow LF 460 $ 1.00 $ 460.00 $ 0.70 $ 322.00 $ 1.50 $ 690.00 12 Type IVArrow EA 14 $ 60.00 $ 840.00 $ 60.00 $ 840.00 $ 40.00 $ 560.00 13 8" Line LF 560 $ 0.50 $ 280.00 $ 0.90 $ 504.00 $ 1.00 $ 560.00 14 Reflective Markers EA 164 $ 4.49 $ 736.36 $ 3.00 $ 492.00 $ 3.00 $ 492.00 15 Non-Reflective Markers EA 408 $ 3.25 $ 1,326.00 $ 2.00 $ 816.00 $ 2.00 $ t816.00 16 Raise Signal Poles and Pedestrian Push Button Posts EA 4 $ 392.00 $ 1,568.00 $ 420.00 $ 1,680.00 $ 400.00 $ 1 60000 17 install Paving Stones SF 3,110 $ 7.30 $ 22,703.00 $ 10.00 $ 31,100.00 $ 7.30 $ 221703.00 TOTAL: $ 404,266.75 $ 408,367.95 $ 431;470.47 Pan~ 3 CONTRACT 96-02 1995-96 OVERLAY AND STREET REPAIR FINANCIAL BREAKDOWN FUNDING SOURCES BUDGET GAS TAX GENERAL FUND MEASURE B SB300** TOTAL PROJECT/WORK DESCRIPTION THIS PROJECT (206) (001) (217) (220) FUNDING 1995~96 OVERLAY PROGRAM Overlay~ Raise Median Curb (CIP) $ 186,039.00 * $ $ 27,789.00 $ 125,250.00 $ 33,000.00 $ 186,039.00 Overlay- Repair (Op. Budget) $ 126,230.00 $ $ 126,230.00 $ $ $ 126,230.00 Overlay Striping (Op. Budget) $ 18,000.00 $ $ 18,000.00 $ $ $ 18,000.00 Slurry Seal Program Repair (Operating Budget) $ 30,000.00 $ 30,000.00 $ $ $ $ 30,000.00 ~TOTAL CONSTRUCTION COST: $ 360,269.00 $ 30,000.00 $ 172,019.00 $ 125,250.00 ¢$ 33,000.00 $ 360,269.00 E NGINEERING/INSPECTION/MISC. Overlay CIP $ 10,750.00 $ $ $ 10,750.00 $ $ 10,75000 TOTAL PROJECT BUDGET/FUNDING , $ 371,0~9.00 $ 30,000.00 $ 172,019.00 $ 136,000.00 $ 33,000.00 $ 37f,0~9.00 * Note that the overlay of the east side of Dougher~, Road is to be constructed with the Dougherty Road Widening ISTEA project, and is not included in this budget. The Dougherly Road overlay is estimated at $70,000. *° Actual SB300 funding has been set at 5.88% instead of the 10% budgeted. The eligible project cost for SB300 matching is $330,269 (excludes the slurry project and engineering). The actual SB300 money available is now $303,578 x 5.88% = $17,850 based on the Iow bi~J. *ti