HomeMy WebLinkAbout4.08 Award of Bid 97-13 CITY CLER File # ~--~-~-~[--~-~-~ AGENDA STATEMENT CITY COUNCIL MEETING DATE: December 16, 1997 SUBJECT: Award of Bid - Shannon Community Center Floor Replacement Project, Contract 97-13. Report by: Diane Lowart, Parks & Community Services Director EXHIBITS ATTACHED: A. Resolution of Award B. Budget Change Form RECOMMENDATION: 1) Adopt resolution awarding contrfict in the amount of $17,917 to Flooring Solutions 2) Approve Budget Change Form in the mount of $4,849 3) Authorize Mayor to execute agreement FINANCIAL STATEMENT: Base Bid $10,965 Additive Alternate # 1 $ 2,519 Additive Alternate #2 $ 2,850 Additive Alternate #3 TOTAL ~ $17,917 $14,860 The base bid and alternates plus a 10% contingency is $19,709 which exceeds the funds budgeted for the improvements by $4,849. In order to award the bid, an additional appropriation in this amount from the Budgeted Contingent General Fund Reserve is required. DESCRIPTION: Funds have been included in the Fiscal Year 1997-98 Budget for the replacement of flooring at the Shannon Community Center. The proposed project consists of removal and replacement of vinyl tile flooring in the entry areas, hallways, stairway and Preschool Room; removal and replacement of vinyl sheet flooring in the kitchen; removal and replacement of carpeting in the Preschool Room; and refinishing of the hardwood floor in the East Room. The bid specifications identified a base bid which included replacement of vinyl tile in the upper level entry area and hallway, lower level hallway and staircase and Preschool Room. In addition, three additive alternates were identified: Additive Alternate #1 was for vinyl sheet flooring in the kitchen; Additive Alternate #2 was for refinishing of the hardwood floor in the East Room; and Additive Alternate #3 was for carpeting in the Preschool Room. G:\parks~scfloor\ccawdflr. doc COPIES TO: Bidders ITEM NO. The City received two bids for the project which are summarized below. FLOORING SOLUTIONS: CALIFORNIA CUSTOM CARPET: Base Bid: Additive Altemate# 1 Additive Alternate #2 Additive Alternate #3 $10,965.00 $14,500.00 2,519.00 1,790.00 2,850.00 3,015.00 1.583.00 1,780.00 TOTAL BID: $17.917.00 The low bidder was Flooring Solutions with a base bid of $10,965 and additive alternates totaling $6,952. The total bid amount including the alternates is $17,917. Staff recommends including a 10% contingency, which brings the total funds needed to $19,708. The total budgeted for the project is $14,860 which would result in a funding shortfall in the amount of $4,849 if the base bid and alternates were approved. Approximately two years ago, a portion of the tile flooring and carpeting at the Shannon Community Center were replaced. The remaining areas of flooring in the facility are now in poor condition and are in need of replacement. Staff recommends that the contract be awarded for the base bid including all additive alternates. Staff has reviewed the low bidder's proposal and checked with references, and recommends that the City Council adopt the resolution awarding Contract 97-13 to Flooring Solutions. Further, it is recommended that the City Council approve the Budget Change Form attached in Exhibit B which will provide for an additional appropriation from the Budgeted Contingent General Fund Reserve in the amount of $4,849. RESOLUTION NO. - 97 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF DUBLIN AWARDING CONTRACT NO. 97-13 SHANNON COMMUNITY CENTER FLOOR REPLACEMENT PROJECT TO FLOORING SOLUTIONS WHEREAS, the City of Dublin did, on December 9, 1997, publicly open, examine, and declare ail seaied bids for doing the work described in the approved Specifications for Contract No. 97-13, which Specifications are hereby expressly referred to for a description of said work and for all particulars relative to the proceedings under the request for bids; and WHEREAS, said bids were submitted to the City Engineer, who has reviewed the bids to determine the lowest bid which was responsive to the requirements of the bid documents; and NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Dublin does hereby award Contract No. 97-13 to the lowest responsible bidder therefor, to wit, Flooring Solutions, at a base bid of Ten Thousand, Nine Hundred, Sixty Five Dollars and no cents ($10,965.00), and additive alternates totaling Six Thousand, Nine Hundred, Fifty Two Dollars and no cents ($6,952.00), the particulars of which bid are on file in the office of the City Engineer. PASSED, APPROVED, AND ADOPTED this 16th day of December, 1997. AYES: NOES: ABSENt: ABSTAIN: Mayor ATTEST: City Clerk CITY OF DUBLIN BUDGET CHANGE FORM CHANGE FORM # New Appropriations (City Council Approval Required): From Unappropriated Reserves From New Revenues Required) Budget Transfers: _~ From Budgeted Contingent Reserve (1080-799.000) Within Same Department Activity Between Departments (City Council Approval Other Name: Name: Improvements Not Buildings $4,849 Account #: 001-9547-750-050 Account #: Name: Name: Account #: Account #: Name: Name: Account #: Account #: Name: Name: Account #: Account #: Name: Name: Account #: Account #: REASON FOR BUDGET CHANGE ENTRY: The bids for the Shannon Community Center Floor Replacement Project exceeded the budget by $4,849. Consequently it is necessary to appropriate additional funds in order to award the contract for the project. City Manager: Date: Signature Mayor: Date: Signature Posted By: Date: Signature