Loading...
HomeMy WebLinkAbout4.08 Award of Bid 98-14AGENDA STATEMENT CITY CLERK File # I-1 -II o CITY COUNCIL MEETING DATE: February 2, 1999 SUBJECT: Award of Bid - Contract 98-14, Heritage Center I-IVAC System Report Prepared by: Lee S. Thompson, Public Works Director ATTACHMENTS: 1) Resolution of Award 2) Budget Change Form RECOMMENDATION: 1) Adopt resolution awarding bid to Breeze Air Systems Approve Budget Change in the amount of $11,994 from Unallocated General Fund Regerves FINANCIAL STATEMENT: Budgeted for Improvements: $13,000 Low Bid: $17,988 Expenditures for Design and Consultation Services Low Bid, plus 10% Contingency Estimated Inspection Costs Estimated Gas Service from PG&E 2,407 $19,787 500 2.300 TOTAL: $ 24,994 To complete this project, a budget appropriation is necessary in the amount of$11,994 from Unallocated General Fund Reserves. This amount is substantially over.the funds budgeted; however, Staff believes that rebidding the project will adversely affect operations of the Old Murray Schoolhouse in the Dublin Heritage Center and the City will not receive lower bids. DESCRIPTION: At the City Council meeting of October 20, 1998, City Council authorized Staffto solicit bids for Contract 98-14, Heritage Center HVAC System. This project will provide for the replacement of the existing inadequate HVAC system at the Murray Schoolhouse located at the Heritage Center on Donlon Way. The two existing units are obsolete, require continual repairs, and do not provide enough heat to utilize the Murray Schoolhouse in the winter. COPIES TO: Breeze Air Systems 4, 8 ITEM NO. g:hniscproj~hvac\agstawrd The work in this contract includes the demolition of existing concrete pads and construction of new pads, removal of two existing HVAC units and installation ora 3-ton capacity unit and a 5-ton unit, removal of the existing duct system and installation of a new duct system, modification offiae building to accept new ducting, plumbing of gas lines, and installation of electrical connections, computerized thermostat and a condensate drain. Breeze Air Systems submitted the only bid for this project, in the amount of $17,988. Staff has reviewed the proposal, checked with references and recommends that the City Council adopt the resolution awarding Contract 9844 to Breeze Air Systems and approve a Budget Change in the amount of $11,994 to complete the work for the Heritage Center HVAC System. Page 2 RESOLUTION NO. -99 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF DUBLIN AWARDING CONTRACT 98-14 HERITAGE CENTER HVAC SYSTEM TO BREEZE AIR SYSTEMS WHEREAS, the City of Dublin did, on January 26, 1999, publicly open, examine, and declare one sealed bid for doing the work described in the approved Plans, Specifications, and Modifications for Contract 98-14, Heritage Center HVAC System, authorized by the City Council on October 20, 1998, which Plans, Specifications, arid Modifications are hereby expressly referred to for a description of said work and for all particulars relative to the proceedings under the request for bids; and WHEREAS, said bid was submitted to the City Engineer, who has recommended that the bid hereinafter mentioned is the lowest and best bid for doing said work. NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Dublin does hereby award City of Dublin Contract 98-14 to the lowest responsible bidder therefor, to wit Breeze Air Systems with a bid of Seventeen Thousand Nine Hundred Eighty-Eight Dollars and No Cents ($17,988.00), the particulars of which bid are on file in the Office of the City Engineer. PASSED, APPROVED AND ADOPTED this 2nd day of February, 1999. AYES: NOES: ABSENT: ABSTAINING: ATTEST: Mayor City Clerk g:~iscprojlhvac~resoawrd CITY OF DUBLIN BUDGET CHANGE FORM CHANGE FORM # New Appropriations (City Council Approval Required): X From Unappropriated Reserves Budget Transfers: From Budgeted Contingent Reserve (1080-799.000) Within Same Department Activity From New Revenues Between Departments (City Council Approval Required) Other Name: Name: Engineering Design Heritage Center HVAC System $ 2,407 Account#: Account#: 001-9555-740-078 Name: Name: Improvements, Not Buildings Heritage Center I-IVAC System $ 6,787 Account#: Account#: 001-9555-750-050 Name: Name: General Inspection/Construction Mgmt Heritage Center HVAC System $ 500 Account#: Account#: 001-9555-740-075 Name: Name: Filing Fees Heritage Center HVAC System $ 2,300 Account#: Account#: 001-9555-730-000 ~-~ City Manager: Date: Signature REASON FOR BUDGET CHANGE ENTRY: The Project bid was in excess of the amount budgeted and there was no provision for the additional amount required for design, inspection and additional utility cost of the Heritage Center HVAC System. Mayor: Date: Signature Posted By: Date: Signature