Loading...
HomeMy WebLinkAbout4.10 Accept Work 89-7 CITY OF DUBLIN AGENDA STATEFiENT City Council Meeting Date: June 24, 1991 SUBJECT: Acceptance of Work - Contract No. 89-7 Shannon Park Renovation Report by Lee S. Thompson, Public Works Director EXHIBITS ATTACHED: 1) Change Order No. 9 2) Change Order No. 10 3) Copy of Subcontractor Stop Notice RECOMMENDATION: 1) Authorize approval of Change Order No. 9 for $26,381.08, and Change Order No. 10 in the amount of $17,785.29 as the total amount of Change Orders is over the amount which the the City Manager is authorized to approve. 2) Accept improvements under Contract 89-7 3) Authorize final progress and retention payment in the amount of $50,414.83 to A.V.& C. Construction. 4) Authorize Staff to release $15,383.44 which is being withheld due to a Subcontractor Stop Notice once the Stop Notice has been legally cleared. 5) Authorize Staff to release $20,000 which is being withheld as security for warranty items once those items have been fixed. 6) Authorize the transfer of $388,096.43 to this project from unallocated reserves. FINANCIAL STATEMENT: 88-89 & Prior 89-90 90-91 TOTAL Design $38,656.93 $ 22,257.83 $ 1,546.32 $ 62,461.08 Topography 4,178.64 2,727.97 0.00 6,906.61 Inspection 0.00 12,072.90 18,588.03 30,660.93 Printing 9.36 4,095.48 122.47 4,227.31 Improvements 0.00 408,917.79 ** 568,590.61 977,508.40 Soils Test 0.00 2,830.00 0.00 2,830.00 Legal 0.00 457.50 0.00 457.50 Other Improvements 0.00 * 12,105.17 0.00 12,105.17 TOTALS $42,844.93 $465,464.64 $588,847.43 $1,097,157.00 * Work not under A.V.& C. contract (includes emergency lighting work and parking lot pavement patching). ** $612,121.15 less $37,250.00 liquidated damages Since most of this project was planned to be completed last fiscal year, only $200,751 was budgeted for FY 90-91. It is necessary to authorize a transfer of $388,096~43 from unallocated reserves in order to complete this project. BUDGET ACTUAL Design $ 59,451 $ 62,461.08 Topography 6,744 6,906.61 Inspection 29,000 30,660.93 Printing 3,900 4,227.31 Improvements 975,626 977,508.40* Soils Test 2,830 2,830.00 Legal 428 457.50 Improvements by Others 0 12,105.17 TOTALS $1,077,979 $11097,157.00 *(including liquidated damages) ITEM NO. COPIES TO: A.V.& C. Construction DESCRIPTION: In October 1989, the City Council awarded Contract 89-7, Shannon Park Renovation, to A.V.& C. Construction. The project improvements included a complete renovation of the existing park with play areas for younger and older children, a shallow pond and spray pool, a plaza area and two fountains, landscaping and drainage improvements, an additional pedestrian bridge over the creek, and parking and lighting improvements. Council also approved Alternates for a railroad-tie path under the existing bridge, a demonstration garden on the slope behind Shannon Community Center, and the replacement of a concrete culvert headwall facing with a river rock culvert. A.V.& C. Construction did not complete the improvements until 149 days after the contract date of completion. The contractor was charged $37,250 ($250.00 per day) liquidated damages to defray the costs of the additional time for inspection and contract administration, and loss of public use of the park. During the course of construction, Change Orders were generated to correct the existing condition of underground spring water in the parking lot, change the water meter size, install a new park sign (the existing sign could not be recycled as intended), adjust field dimensions from design dimensions for crib retaining walls, and alter the wiring and lighting plan since the existing lighting electrical service proved to be unserviceable. Change Orders No. 9 for additional grading on the slope behind Shannon Center and items of work which were not included in the bid items (work under the bridge related to the path and to drainage, additional electrical work, and handrail), and Change Order No. 10 to balance the actual field quantities of work from the original estimated bid quantities are attached to this Agenda Statement for City Council approval. Approval by the City Council is required as the cumulative amount of the Change Orders exceeds the limit which can be approved by the City Manager. The total project is 5.2% over budget, partly due to Staff time for the project completion delays by the contractor, but mostly due to unforeseen items such as the lighting system having to be removed and replaced because of inadequate as-built plans, the parking lot requiring extensive subdrain work and patch paving, and due to items designed into the plans and not included in the contract pay items. The sum of $15,383.44 is being withheld from the final payment until the Stop Notice (Exhibit 3), which was filed by one of A.V. & C.'s subcontractors, has been released, and $20,000 is being withheld as a completion bond for warranty items. The project must be finaled out this fiscal year in order to maintain and collect outside park grant funds. The City Engineer has reviewed the work on the project and determined that it is complete and in accordance with the approved plans and specifications. Staff recommends that the City Council accept the improvements and authorize final progress and retention payment in the amount of $50,414.83 to A.V.& C. Construction. - 2 - CITY OF DUBLIN - EXHIBIT "B" CONTRACT CHANGE ORDER NO. 9 PROJECT/ROAD: SHANNON PARK RENOVATION PAGE 1 OF 1 PAGE ~'moERAL NO.(S) N/A CONTRACT NO. 89-7 A.V & C. onstruction, 240 Allen Drive, San Bruno CA 94066 1. REGRADE SLOPES NORTH AND WEST OF 'BUILDING (Compensation as per Section 9, Standard Specifications) Labor: 2 operators @ $24.44/hr each 24.44 x 2 x 80 hfs = $3,910.40 29% labor surcharge 1,134.02 5,044.42 33% mark-up 1,664.66 Labor Total 6-~-9.08 Equipment: 1 backhoe, 1 tractor @ $15.50/hr each 15.50 x 2 x 80 hrs = $2,480.00 15% mark-up 372.00 Equipment Total 2,~2.00 Item Total $ 9,561.08 2. CONSTRUCT RETAINING WALLS AT ENTRANCE TO BRIDGE 3. INSTALL WOODEN STAIRS, RETAINING WALL AND HANDRAIL IN PATIO AREA UNDER BRIDGE 4. INSTALL DRAIN UNDER BRIDGE 5. EXTRA ~qT.FCTRICAL WORK ON pARKING LOT LIGHTS, FOUNTAIN PUMPS, AND IRRIGATION cONTROIJ~R 6. INSTALL 108 if OF HANDRAIL AT STAIRS ACCORDING TO BUILDING CODE Lump Sum 2,700.00 Lump Sum 7,720.00 Lump Sum 500.00 Lump Sum 1,700.00 Lump Sum 4,200.00 ESTIMATED COST: Increase $26_~_381.08 BY REASON OF THIS ORDER, THE TIME OF COMPLETION WILL BE ADJUSTED AS FOLLOWS: i No additional days I DATE: May 22, 1991 ]SUB~4_I'I'f~LO BY: Don Santina, P.W. Inspector Thompsor~, Director DATE: May 23, 1991 %PPROVAL RECOY~ENDED: Lee S. ~ ~. APPROVED, CHIEF ENGINEER, BY: LST ~ J DATE: May 23, 1991 CITY OF DUBLIN - EXHIBIT "B" CONTRACT CHANGE ORDER NO. 10 PROJECT/ROAD: SHANNON PARK RENOVATION PAGE 1 OF 1 PAGE FEDERAL NO.(S) N/A CONTRACT NO. 89-7 TO: A.V. & C. Construction, 240 Allen Drive, San Bruno CA 94066 ~OT£: This change order ~s not e~;ve u.til a~pr~ved by Th~ Ch~f Engineer. INCREASE AbD DECREASE ON BID ITEM QUANTITIES Item ~ Description Bid Actual Amount 14. Concrete 975 if 1,259 if $ 2,272.00 15. Concrete Curb/Gutter 487 if 902 if 4,150.00 16. Concrete Swale 30 if 23 if (350.00) 17. Concrete Steps 295 if 474.5 if 7,180.00 18. Interlocking Pavers 6,890 sf 5,645 sf (5,722.40) 19. Colored Concrete 10,875 sf 12,488 sf 5,242.25 20. Concrete Paving 5,250 sf 3,264 sf (5,362.20) 21. Concrete Walkways 16,110 sf 18,503 sf 8,375.50 25. Crib Walls 16,000 ls 18,503 ls (1,824.15) 28. 6" Concrete Mow Band 120 if 237 if 1,872.00 31. A.C. Paving - Price change on C.O. 1 Item #1 (1,252,56) 42. New Drinking Fountain 1 ea 2 ea 3,500.00 43. Re-use Fountain 1 ea 0 ea (500.00) 45. Trash Receptacles 7 ea 8 ea 600.00 54. Annual Color Item deleted (395.00) ESTIMATED COST: Increase Paid in Previous Progress Payments $17,785.44 BY REASON OF THIS ORDER, THE TIME OF COMPLETION WILL BE ADJUSTED AS FOLLOWS: Ne Additional Days SUBMITTED BY: Don Santina, PW Inspector APPROVAL RECOMMENDED: Lee S. Thompso~,~ ~W APPROVED, CHIEF ENGINEER, BY: LST~/~3 DATE: June 21, 1991 Director DATE: June 21, 1991 DATE: June 21, 1991 EXHIBIT "A" CHANGE ORDER FORM DATE: 6/21/91 PROJECT NAME: PROJECT CIP #: 9593 PROJECT FINANCE CONTROL #: ENGINEERING CONTRACT #: PERCENT COMPLETED: 100 COUNCIL-APPROVED CONTRACTOR: APPROVED BUDGET AMOUNT: Shannon Park Renovation 9593 89-7 % A. V. & C. Construction $971,400 (adiusted amount) COUNCIL-APPROVED CONTRACT AMOUNT: CMANGE AMOUNT (+/-) CHANGE ORDER CHANGE ORDER CHANGE ORDER CHANGE ORDER CHANGE ORDER CHANGE ORDER CHANGE ORDER CHANGE ORDER CHANGE ORDER CHANGE ORDER TOTAL OF ALL NO. 1 NO. 2 NO. 3 NO. 4 NO. 5 NO. 6 NO. 7 NO. 8 NO. 9 NO. 10 $ CURRENT AND PRIOR CHANGE ORDERS: $ 20,208.70 $ 5,082.00 $ (6,068.97) $ o.oo $ 6,800.00 $ 51980.90 $ 10,900.00 $ 2,551.00 $ 26,381.08 17~785.44 LESS LIQUIDATED DAMAGES ADJUSTED CONTRACT AMOUNT: PROGRESS PAYMENTS MADE: PAYMENT NO. 1 PAYMENT NO. 2 PAYMENT NO. 3 PAYMENT NO. 4 PAYMENT NO. 5 PAYMENT NO. 6 PAYMENT NO. 7 PAYMENT NO. 8 PAYMENT NO. 9 PAYMENT NO. 10 PAYMENT NO. 11 PAYMENT NO. 12 PAYMENT NO. 13 PAYMENT NO. 14 PAYMENT NO. 15 $ 69,046.72 $ 1501526.75 $ 691499.40 $ 61,878.66 $ 57,966.26 $ 11,044.59 $ 17,730.00 $ 531464.56 $ 28,877.60 $ 106,478.36 $ 441020.39 $ 29,710.40 $ 131~850.00 $ 49,151.51 $ 10,464.93 TOTAL PROGRESS PAYMENTS: REMAINING BALANCE ON CONTRACT: RECOMMENDATION: ~ APPROVED DENIED S'~ip e rv~i~ng Dept. Head APPROVED DENIED City Manager $ 925,138.25 $ 89,620.15 $ 1,0141758.40 $ (37,250.00) $ 977,508.40 $ 891,710.13 $ 851798.27 APPROVED DENIED Mayor