Loading...
HomeMy WebLinkAbout4.11 Accept Work 92-04 CITY OF DUBLIN AGENDA STATEMENT City Council Meeting Date: July 13, 1992 SUBJECT: Acceptance of Work - Contract 92-04 Dublin Blvd./Silvergate Drive Modification, Phase I Report by: Public Works Director Lee Thompson EXHIBITS ATTACHED: None RECOMMENDATION:~ 1) Accept improvements constructed under Contract 91-10 2) Authorize retention payment of $3,497.55 to East Bay Excavating Company, Inc. FINANCIAL STATEMENT: Complete budget information for both Phases I and II is as follows: ESTIMATED WORK AT BID AWARD FOR THE REDUCED SCOPE OF WORK BUDGETED IN *BUDGET PER 1991-92 CIP REVISIONS PHASE I PHASE II Topo Survey $ 5,000 $ 17,200 $ 2,000 $ 15,200 Print/Legal 1,500 1,500 1,000 0 Design 25,000 41,650 3,000 38,650 Permits 9,000 9,000 0 0 Inspection/Soil Testing 11,500 11,500 1,800~ 9,700 Improvements 230,000 230,000 32,834** 0 Staking 10,000 10,000 0 0 TOTAL $ 292,000 $ 320,850 $40,634 $ 63,550*** GRAND TOTAL $104,184 * On March 23, 1992, the City Council authorized an additional $28,850 for the inclusion of the Phase II (Dublin Blvd. Widening) design work by Bissell & Karn. ** Includes low bid plus 10% construction contingency and $5,400 for full berm relocation. *** The portion of Phase II costs being expended at this time is shown for information. ITEM NO. COPIES TO: East Bay Excavating ACTUAL COSTS AT ACCEPTANCE OF CONTRACT PHASE I ACTUAL PHASE II ACTUAL Topo Survey Print/Legal Design Plan Review Inspection Soils Investigation Improvements $ 2,000.00 $15,200.00 612.91 0.00 3,000.00 38,650.00 353.00 1,050.00 1,200.78 0.00 0.00 12,080.00 34,975.47 0.00 TOTAL $42,142.16 $66,980.00 TOTAL, BOTH COLUMNS $109,122.16 The actual improvement cost is slightly higher than estimated at bid award primarily due to additional failed pavement sections that were repaired prior to the slurry seal. The soils investigation work was increased due to additional borings needed on the south side of the roadway fill when uncompacted fill was encountered. DESCRIPTION: In April 1992, the City Council awarded Contract 92-04, the Dublin Blvd./Silvergate Drive Modification, Phase I, to East Bay Excavating Company, Inc. The project included removal of the existing island and striping, and the installation of new asphalt berms, signing, and striping to revise the intersection to a "T" configuration. At the City Council's direction, the asphalt berm was extended on the north side of Dublin Blvd. from Silvergate Drive to Hansen Drive to provide a safe access for pedestrians and wheelchairs around the three street light poles. The City Engineer has reviewed the project improvement and found it to be in compliance with the specifications and special provisions. Staff recommends that the City Council accept the improvements and authorize payment of $3,497.55 to East Bay Excavating Company, Inc. a: silverga\agstactp