HomeMy WebLinkAbout4.14 AmendAgmtZumwalt CITY CLERK
File #600-30
AGENDA STATEMENT
CITY COUNCIL MEETING DATE: July 6, 1999
SUBJECT:
Amendment to Agreement with Zumwalt Engineering Group for
Engineering Services
Report Prepared by: Lee S. Thompson, Public Works Director
ATTACHMENTS:
/
R
1)
2)
3)
4)
Resolution and Proposed Amendment (extension of term and
adjustment of rates)
Letter from James Zumwalt dated June ! 7, 1999
Comparison of current and proposed rates
currentAgreement and Amendments
Adopt resolution.
FINANCIAL STATEMENT:
The ~fim. at. ed_¢xpenditure for work to be performed by Zumwalt
Engineering Group for Fiscal Year 1999-2000 is approximately
$530,000; therefore, the not-to-exceed limit for Fiscal Year 1999-
2000 is proposed to be $550,000. The bulk of work performed by
Zumwalt Engineering is in the area of private development review
and plan checking, and the costs are paid by developers.
Zumwalt Engineering has proposed an adjustment of rates for 1999-
2000, the overall effect of which_is .a
DESCRIPTION: The City has contracted with Zumwalt Engineering Group since
1997 for general engineering services. The scope of work has primarily been in the area of private
development review, and, to a lesser degree, Capital Project design. The current agreement, which
expired June 30, 1999, was amended in April to extend the not-to-exceed limit o£~e agreement from
$500,000 to $615,000 for Fiscal Year 1998-99. It is recommend~¢~ ~_gL~.ggreement be extended for an
additional two-year period, with a not-to-exceed limit for Fiscal Year 1.999-2000 of $550,000.
Zumwalt Engineering's proposed rate schedule reflects incr~ases~.in,.~~.ranging from 2% to 3%
depending on persormel classification. The increased rates have bee~ applied to an analysis of hours
spent by classification for Fiscal Year 1998-99 in order.to determine the acm~_~, effe..g[~g~.~
the basis of 1998-99 hours, the overall effect of the increase is approximately 2.5%. The bulk of the work
performed by zumwalt Engineering is in the area of private development review; therefore, the cost of
their work is paid by developers.
COPIES TO: James Zumwalt, Zumwalt Engineering Group
ITEM NO. _~~
G:\engr-contractXzumwalt\agstamend99-00.doc
and comp,~tifive,
and Staff recommends that the Ci~- Co. Oil '~d6p-f'~the'i~e~oluti0n' approving the amendment to the
RESOLUTION NO. - 99
A RESOLUTION OF THE CITY COUNCIL
OF THE CITY OF DUBLIN
APPROVING AMENDMENT TO AGREEMENT
WITH ZUMWALT ENGINEERING GROUP
WHEREAS, the City of Dublin, State of Califomia, entered into an agreement with Zumwalt
-. Engineering Group on July 7, 1998; and
WHEREAS, City and Consultant are desirous of continUing the agreement for an additional two year
period; and
WHEREAS, Consultant has requested an adjustment of rates for Fiscal Year 1999-2000; and
NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Dublin does hereby
apprOve the amendment to the agreement with Zumwalt Engineering Group, which is attached hereto as
"Exhibit A."
PASSED, APPROVED AND ADOPTED this 6th day of July, 1999.
AYES:
NOES:
ABSENT:
ABSTAIN:
ATTEST:
Mayor
City Clerk
Glengrl~umwaliresoamend99-O0
EXHIBIT "A" OF RESOLUTION -99
AMENDMENT TO AGREEMENT
BETWEEN CITY OF DUBLIN AND ZUMWALT ENGINEERING GROUP
FOR ENGINEERING SERVICES
WHEREAS, the City of Dublin (hereinafter referred to as "CITY") and Zurnwalt
Engineering Group (hereinafter referred to as "CONSULTANT"), entered into an agreement on JUly 7,
1998, to provide en. gineering services to CITY: and
WHEREAS, said agreement was amended in April of 1999 to extend the not-to-exceed
limit for Fiscal Year 1998-99; and
WHEREAS, the City and the Consultant wish to extend the term of agreement for an
additional two years, terminating June 30, 2001 ;and
WlIEREAS, Consultant ha.s requested an adjustment of rates for Fiscal Year 1999-2000;
NOW, THEREFORE, the parties hereto agree as follows:
Extension of Term
The term of agreement shall be until June 30, 2001.
i Adiustment of Rates
The rate schedule attached hereto as Exhibit 1 shall be in effect for Fiscal Year 1999-2000.
Consultant shall be entitled to request a further adjustment of rates for the second year of the agreement
tenn. The a~eement shall have a not-to-exceed limit of $550,000 for Fiscal Year 1999-2000.
CITY OF DUBLIN
ATTEST:
Mayor
City Clerk
ZUMWALT ENGINEERING GROUP
James W. Zurnwalt, Principal
Date:
EXHIBIT 1
page I of 2
ZUMWALT ENGINEERING GROUP
CHARGE RATE FEE SCHEDULE FOR FISCAL YEAR 1999-2000
The compensation of Zumwalt Engineering Group for work done will be on the basis of an hourly
charge rate, plus incurred expenses and will be the sum of all the items set forth below:
A. PERSONNEL SERVICES
PRINCIPAL $123.00
SUPERVISING ENGINEER $118.00
SENIOR ENGINEER $108.00
ASSOCIATE ENGINEER $ 97.00
ASSISTANT ENGINEER . $ 82.00
FIELD REPRESENTATIVE $ 77.00
TECHNICIAN/CAD OPERATOR $ 72.00
CLERICAL/OFFICE SUPPORT $ 46.00
TVVO-MAN SURVEY CREW $164.00
Rates for individuals may vary depending on the service performed.
EFFECTIVE THROUGH JUNE 30, 2000, AND SUBJECT TO REVISION ANNUALLY
TRANSPORTATION EXPENSES
Thirty-five cents ($0.35) per mile for use of vehicles. A minimum of six dollars ($6.00) per
hour will be charged for use of vehicles carrying field equipment or used for field
inspection and supervision.
OUTSIDE SERVICES
Invoice cost of services and expenses charged to Zumwalt Engineering Group by outside
consultants, professional, or technical firms engaged in connection with the order, plus
15% handling charge:
MISCELLANEOUS EXPENSES
The invoice cost of materials, supplies, reproduction work, and other services prOcured
by Zumwalt Engineering Group from outside sources, plus a handling charge of 15%. All
out-of-pocket expenses not included in Items A, B and C will be included in this category.
Co
EXHIBIT 1
page 2 of 2
ZUMWALT ENGINEERING GROUP
~;~' '. ~,~':: MUNICIPAL STAFF AUGMENTATION
CHARGE RATE FEE SCHEDULE FOR FISCAL YEAR 1999-2000
The compensation of Zumwalt Engineering 'GrouP'f(~: ;w~)rE ;dOne Wili'~be'0'~ .th~ basiS'of an hourly
charge rate, plus incurred expenses and will be the sum of all the items set forth below:
A. PERSONNEL SERVICES
PRINCIPAL
SENIOR ENGINEER
PROJECT ENGINEER/SURVEYOR
ASSOCIATE ENGINEER
SENIOR DESIGNER
STAFF ENGINEER
FIELD REPRESENTATIVE
CAD DESIGNER
TECHNICIAN/CAD OPERATOR
CLERICAL
$95.00
$90.00
$85. O0
$79.00
$79.00
$68.00
$68.00
$68.00
$51.00
$41.00
Rates for individuals may vary depending on the service performed.
.EFFECTIVE THROUGH JUNE 30, 2000, AND SUBJECT TO REVISION ANNUALLY
OUTSIDE SERVICES
-.. .~_. .,- : :- ~ .....
Invoice cost of services and expenses charged to zumwalt Engineering Group by outside
consultants, professional, or technical firms engaged in connection with the order, plus
15% handling charge. -
MISCELLANEOUS EXPENSES - .
The invoice cost of materials, supplies, reproduction work, and other services procured
by Zumwalt Engineering Group from outside sources, plus a handling charge of 15%. All
out-of-pocket expenses not included in Items A and B will be included in this category.
ZUMWALT ENGINEERING GROUP
Civ~ Engineering/Project Management
2680 Bishop Drive, Suite 150 - San Ramon. California 94583
Tel. (925) 830-5016 Fax (925) 830-5023
June 17. 1999
Mr. Ke~-in VanKa~'k
Senior Civil Engineer
CITY OF DTLTBLIN
P.O. Box 2340
Dub.t/ri, CA 94568
Sllbject."
Fiscal Year 1999-00
St-affAugmentation Charge Kate Fee Schedule
Dear Kevin:
,4 reque~ed, attached herewith is our Municipal Staff Au~m-nentation Charge Rate Fee Schedule for
the 1999-00 Fiscal Year. This fee schedule applies to assignments in which we serve as an ex-tension
of City ~affa.t the City offices or at our office in San Ramon on a rime and materials basis.
Also attached is a supplement to this fee schedule which provides for the classification of employees
anticipated to pro,4de services to the City of Dublin during the forthcoming fiscal year.
Furthermore, back-up documentation is provided in the form of spreadsheets show-lng the
classifications of employees along with the current and new hourly rates. Hours from July 1, 1998
through May 31, 1999 are provided along with estimated hours for the month of June. One
spreadsheet each is provided for Plan Check and CIP sen,ices.
We appreciate ~e opportunity to pro'~Sde continued service.
Very truly yours,
ZI_IM~A. LT ENGLNrEERING GROUP
.-~ CaJifornia Corporation
Principal
· ':~' ..... · ".$IJPpLEMENT TO
MIIN]CIPAL STAFF AUGMENTATION
1999-00 CHARGE RATE FEE SCI:t[EDULE
Classification of Employees anticipated to provide services to the Ci.ty of Dublin durin,, the
1999-00 Fiscal Year:
Employee
M. Lander
I. Enke
G. Antkowiak
A..D. Dopson
L. Hemandez '
,J 995-99 Classification
Senior En~neer
Project Surveyor
Associate En=~in~r
Senior Designer
~ .:: cAD Designer
T. Bartunek StaffEngineer
· B. Srratton Senior Designer
999-00 CI,,as$i~cati0n
Senior Engineer
Senior Engineer
Associate Engineer
Senior Designer
Ve i_=er
StaffEngineer
SeniOr Designer
Employees other than those Ii'ed above are available to the CiD, upon request. Clerical staff support
are available to assi~ the technical staffwith the preparation of deVelopment rexSes' doCUments.
P. 2
RESOLUTION NO. 70 - 99
A RESOLUTION OF THE CITY COUNCIL
OF THE CITY OF DUBLIN
APPROVING AMENDMENT TO CONTRACT
WITH ZUM~¥ALT ENGINEERING GROUP
FOR FY1998-99
WHEREAS, the City of Dublin, State of California, entered into a contract with Zumwalt En~neering
Group for fiscal year 1998-99 on July 7, 1998; and
WHEREAS, said contract contained a not-to-exceed amount equal to $500,000; and
WHEREAS, said services are primarily for private development plan review and costs are charged to
developers; and
WHEREAS, City anticipates that, due to the current workload, the total projected charges for the
fiscal year will exceed said not-to-exceed amount of $500,000; and
WHEREAS, City desires to amend said contract to increase the not-to-exceed amount to $615,000
~der the existing terms of said contract.
NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Dublin does hereby
app. rove the amendment to the agreement with Zumwalt En~neering Group, which is attached hereto as
PASSED, APPROVED AND ADOPTED this 20th day of April, 1999.
AYES: Councilmembers t-Im~,ard, Lockhctrt, McCormick, Zikct & 3leo,or Houston
NOES: None
ABSENT: None
.~d3STAIN: None
t~Cterk
Mayor
..: 1LDLrBLIJxr~2[CaW';CC-M'JTJ~.99-QT'~2~4auP. JLt4-20-99'wes°-zumwalt'd°c
FOR ENGINEERING SERVICES ,
I WHEREAS, the City of Dub. lin (hereinafter referred to as 'CITY") and Zumwalt
Engineering Group (hereinafter referred to as 'CONSULTANT"), entered into an agreement on Jul>, 7,
1998, to provide engineering services to CITY: and
WlIEREAS, said agreement was amended in April of 1999; and
WHEREAS, the City's current worldoad requires an increase in the not-to-exceed amount;
NOW, THEREFORE, the parties hereto agree as follows:
Increase of Not-to-Exceed Amount
Paragraph One of Exhibit B of the Agreement is amended to revise the not-to-exceed
amount to $615,000.
CITY OF DUBLIN
'Mayor
ZUMWALT ENGiNEERING GROUP
RESOLUTION NO. 10S - 95
' A' RESOLUTION OF TIIE CITY COUNCII,
OF TItE CITY OF DUBLIN
_4_PPROVlSNG-43t-END~fENT TO.AGREEMlgNT FOR F-2{GIN=EERING SERVICES
WITtt ~;b-'BIS¥.< ENGINEERING GROUP
W'AiEREAS, zhe CiW Council of tM CiD' of Dublin approved an z_m-=~ment for enggn=~ring
senders with Zumwatt Engln~ring G--roup, on May 20, 1997; and
V,'Tt-~R.F. AS, said _a_D-~mcnt was amenclcd in March of 1998 to tx-tend the term of ~_o-recment and
incrczse thc Not To Exceed Iimig ad
i~ ~r~.~RE.~.q, Zumwalt Ez~neering has proposed an zdj ,uranent of rates for l~sczl Year 199g-99;
~W_r-~'-P,~AS, the tm--m of~.~eem~t is proposed to be ex-tended for an addi4onal one-year penoa;
NOW, Ti~FORE, BE I'f RESOLVED that thc CiW Council ofthz City of DubEn does herd=y
avvrove thc amendment to ~e acm-_ cement w~& Zumwa!t Enginca~ng Group, wNch is anachcd hereto as
BE iT ~'-u-R.TI-~- ~K RESOLVW2D ~t the .Mayor is au~or:~ed to exezute the mmmndment.
PA. SS?~, .A2PROV-~> A.ND A.DOPTED zhis7~ day of July, 1998.
AYES: Couneitmembers SarT~ex, ~,urton, f-forward, Lockhart and.~rayor f~ozzx~o?;
NOES: None
None
None
Mayor
K" lG/7- 7- 9 $irex =~amZ do:
~,tflEEEREAS, the Ciw of Dublin (hereinm.C~er referred to as "CITY") and ZumwJt
Engineering Group (hereina~er referred to as "CONSLrLTANT"), entered into an a~esrn,~'' on May
1997, to pro~4de en_~n~ering s~nqc~$ to CITY: mad
W_WI~REAS, said agrgement was mmenaccl in March of 1998; and
VeWERE.-kS,. an adjustment of rates and e~ension often-n are proposed;
' N.OW, TWE~REFORE, the pm-Jes hereto a~ee ~s follows:
· 'o' o= ,~ ' the z.::a~hgd E:"-Jbit
2'ne sch~aule of rotes for Fiscal Ye~ 1998--°P sha!l be as a.tm._t.zI m
~'.~k" (Stanaarrl Rzt~s and Mu~=ipal Au_m-nentatJon Rates). The total e×mendkure zor .:h~s~
sen4~es for Fiscal Ye~ 199g-99 shaIl not ex~ed $500,000.
Ex-tension of Te~ ~'rn
The term of the z~eement shall be ex-tended to coincide with ~e end of.:he 199~-~9 lz~.sz~
Year, i.e., until Iune 30, I999.
CITY O~ DUBLiN
ZUMWA.LT ENGIN'EE~G GR. OL?
Jmes \V. Zumwalt, Principal
Dale:
ST.~N'DA.RD
GROD? ~ Co~.~m]~, ), who a=~_-
2. PA-~.IC6~. C],.-y s5,--_!/ p~y Co~,---,~t for sm-,.%=s z:aim-=i .~.;_~,,-?, :~ -.'.~:.:
On: A-~,~z.~:] Lz~:, $~ ] ] 0
?. O..Ssx 7_~-'.,0
iCiT':f 07'
':~c~.~- -,.3 - ·
$ COPE OF SERVI C~$ _~-D ~ C~DL~E
E.'X-~TB IT C
~, ~ ~ay b= z~oa~iy n~m3' for Condor's ~ ~;~
~d r:~d='a~g r:sor~ ~d ~: ~o~on ~ po~=s~on of Civ-
~: of~:~bi~ s~a ~n)'~ ~fi:s sh~ ~: ~ ~= sot:
CiD' bz ~=E~a ~o ~h ==--y lasSO ~zh ~y ~vo]vz ~z~
G~P,_AL PR O1rlrsIoNs
O)
c'>) :
LisbOn,. :od: ] ,,==v zmo" =_nd _=ndo.~:m:m CA 0025.
¢)
-:_=,jzs'y =_2d pm?=,-y
O)
(2}
(e
::<.2:"
{4) ~.]]
no 1=~ ~'?¼.4zl,nTr.,. ..
3
]0.
]].
' " _ . ' m' ~of~n~~s'~= --. -
5:':-.'.-1
.:.:_.:.:.,
E.I.U:FI~iT "_&" OF RESOLUTION -95
.~-D. _MiE_ ~NT TO AGREF--M-EN~r
CITY OF DUBLIi~ .A ND ZUNfW.tsLT ENGLTx-EERL~G GROUI'
FOR ENGIN-EERING SERVICES
zUMWALT ENGINF~RING GROUP
CHARGE RATE FEE SCHEDULE
FOR FISCAL Y=_AR
A. pERSONNEL SE.RV]CES
!. T~,-?frv= =-~-z (3>-) ==' ,~. '-'= z=r == oz v:===~ A m:,,~;=,,-n =f s-~ 8=1t_~-~ (~=.00) p--- 5~'~ b:
Do
ZUMWALT ENGINEERING GROUP
MUNICIPAL STAFF AUGMENTATION
19.98-99 CHARGE RATE FEE SCHEDUI!=
-A. MUNIC:tPAL STAFF AUGIVIENTATIDN SERVICES
~.-_~Ciiv_- .~_--:_~OUGH.ru-Jx~ 30, 1P.%°~_N""D
=__. 'T,qANSPD~TATIDN =-X,PENS=S
OUTSIDE
!. lnvoi== =am ofs:,wi:=s
prof=-:=-io.-.=_=~, or ,~'.::=i=.-,t ,5~_s =?-=z:d in =o.~..~.=don wSt. h ~= ora=, pt,.s 15% h=~g zEro-g:.
Do
'I/,~!SC-7.LL-%N =D US =_.X.F'EIgS -iS