HomeMy WebLinkAbout4.7 Advertise ForBids 92-2 CITY OF DUBLIN AGENDA STATEMENT CITY COUNCIL MEETING DATE: JANUARY 27, 1992 SUBJECT: Authorization to Solicit Bids - Annual Street Overlay Contract, Dougherty Road Bike Path Phase III, and Street Subdrains - Contract No. 92-02 (Report by Public Works Director Lee Thompson) EXHIBITS: Plans And Specifications will be available at the meeting. RECOMMENDATION: Authorize Staff to advertise for bids on three combined 1991-92 Capital Improvement Projects as one contract~ FINANCIAL STATEMENT: BUDGETS: Street Overlay Project: Budgeted Expenditures Budget By Fund Source *Fund Source Revised (add'l SB140) Legal $ 300 General Fund (GIP) $ 30,500 Survey 5,000 Measure B 120,000 Design 3,500 SB 140 49,500 Inspection 20,000 General Fund 270~000 Const. Overlay 171,200 (Op. Budget) Const. Repair 250,000 Striping 20,000 0 $ 51,616 148,384 270~000 TOTAL $470,000 $470,000 $470,000 * (NOTE: Revision is due to a much higher SB140 match available) Dougherty Road Bike Path Phase III Budgeted Expenditures Budget By Fund Source Preliminary Engineering $ 7,000 Design 7,000 Inspection 5,000 Improvements 56,000 TDA (Article 3) $75,000 TOTAL $75,000 $75,000 ~-~ Street Subdrains Budgeted Budget By * Fund Expenditures Fund Source Revised General Fund $146,000 $30,000 Gas Tax 128~000 0 Design $ 12,000 Inspection 12,000 Improvements 250~000 TOTAL $274,000 $274,000 $30,000 * This project was scaled back as a result of the City Council's mid-year budget review. The only subdrains that are proposed to be installed will be in Stagecoach Road, which is proposed to be overlaid. No budget revisions are recommended until the City actually awards the bids. CITY CLERK DESCRIPTION: The annual overlay program consists of placing at least a 1 1/2" asphalt overlay on streets that are in a deteriorated condition. A special pavement fabric will also be placed over the travelway prior to the asphalt overlay. This fabric helps bridge the existing minor pavement cracks and prevents the reflection of cracks through the new asphalt. Before installing the overlay, the pavement failures are dug out to the base rock and replaced with a new section of asphalt. Repair is also done to the streets scheduled for the spring slurry seal program. The overlay program will receive funds from the State-Local Transportation Partnership Program (SB140 Gas Tax). Included in this annual project is the installation of subdrains in the medians on Stagecoach Road. The subdrains project was reduced this year during the mid-year budget review to provide drains in the street overlay area only. The other subdrains will be deferred to future year projects. The third and final phase of the Dougherty Road Bike Path is also included in the Overlay Project because of the cost savings generated by doing two asphalt-related programs together. This phase will complete the bike path from opposite Willow Creek Road to the City limits. The bike path is funded by a grant from the Transportation Development Act (TDA). Streets to be overlaid are: Bandon Drive (between Kimball Avenue and Davona Drive) Lucania Street (between Davona Drive and Brighton Drive) Bristol Road (between Brighton Drive and Tamarack Drive) Amador Plaza Road (between Amador Valley Blvd. and Dublin Blvd.) Golden Gate Drive (Dublin Blvd. to end) Stagecoach Road (Turquoise Street to Amador Valley Blvd.) Dublin Blvd. (south side, Alamo Canal to Dougherty Road) Dublin Court (Dublin Blvd. to end) Notices will be sent out prior to the beginning of work in order to advise the residents and businesses that construction will take place on their street. - 2 -