HomeMy WebLinkAbout6.1 FeeScheduleBldgPrmts
;
.
.
.. .
~
CITY OF DUBLIN
AGENDA STATEMENT
CITY COUNCIL MEETING DATE: April 26, 1993
SUBJECT: PUBLIC HEARING Adoption of New Fee Schedule for Building
Permits
Report by: Victor Taugher, Building Official
EXHIBITS ATTACHED: 1) ~raft Resolution Fee Schedule for
~uilding Regulation Permits
2) ~~omparison of Fees Charged by Alameda
. County, City of Livermore, City of
Pleasanton, & city of San Ramon
RECOMMENDATION:
~
l.
2.
3 .
4.
5.
6.
Open Public Hearing
Receive Staff Report
Receive Public Testimony
Close Public Hearing
Deliberate
Adopt Resolution Approving New Fee
Schedule for Building Permits
FINANCIAL STATEMENT:
It is estimated that overall revenue will
increase 84%
DESCRIPTION: The city of Dublin is using the Building
Permit Fee Schedule originally adopted by Alameda County in 1981. It
is proposed to increase the fee schedule and revise it to simplify
administrative work.
A comparison was made of the fees charged by Alameda County, City of
Livermore, City of Pleasanton, and city of San Ramon. It is difficult
to make a direct comparison of fee schedules on a line by line basis
because of the many variables in each jurisdiction.
Livermore, Pleasanton and San Ramon use the fee schedule published in
the Uniform Building Code as the basis for their schedules. To this
they add a separate plan check fee; electrical, plumbing and
mechanical permit fees; and an energy surcharge.
Alameda County and the City of Dublin collect a single permit fee
which includes plan check; electrical, plumbing and mechanical work,
and an energy surcharge. The fee is based on the valuation of the
proposed work. .
"Exhibit 2" shows the total fees collected by each jurisdiction for
three hypothetical projects; a dwelling addition, a dwelling, and a
small commercial building. The following is a comparison of the
..
ITEM NO. ..6.1
COPIES TO:
CITY CLERK
FILE~
.
.
proposed Dublin fee with the average of Livermore, Pleasanton and San
Ramon.
Dwelling addition
New Dwelling
Commercial
Existing
Dublin
405
1,258
1,580
Proposed
Dublin
640
2,420
3,280
valley
city
Average
650
3,598
5,225
Difference
10
- 1,178
- 1,945
For these 3 examples the cost of obtaining a building permit in Dublin
would still be lower than the cost of obtaining the same permit in
adjacent cities.
Summarv of Chanqes
The proposed fee schedule:
I. Increases the minimum fee from $20.00 to $40.00.
2. Eliminates the energy surcharge (it is combined into the
final fee)
3. Establishes a fee for all permits based on valuation, except
minor work in single-family dwellings. These permit fees
are a flat fee for items indicated in Part 2 of the fee
resolution.
At the present
It is proposed
fee schedule.
time.
time a 25% energy surcharge is added to the permit fee.
that the energy surcharge will be incorporated into the
This eliminates a separate calculation and saves Staff
In the present fee schedule, fees for building construction work are
based on valuation. Where no building work occurs such as installing
a furnace, sink, electrical circuit or similar work the fees are based
on an itemized schedule. In order to simplify permit processing the
new fees for non-residential work will be based on valuation. In
order to encourage homeowners to obtain permits for minor work, the
itemized schedule has been retained for work in single-family
dwellings. Also, a flat fee for re-roofing a dwelling has been set at
$160.00 because the number of inspections is the same regardless of
the type of roof covering or the size of the roof.
Fees for demolition, underground tank removal and re-roofing other
than single-family dwellings will be 50% of the calculated fee based
on valuation of the work because there a~e only two inspections for
demolition and tank removal. In the case of re-roofing commercial
buildings the number of inspections are less than for other
construction.
Fiscal Impact
In the 1992-93 Budget, the estimated revenue was $152,000 and the
expenses (not including General city Overhead) are estimated to be
$254,801. If the fee schedule had been in effect July 1, 1992, the
estimated revenue would have been $279,680.
- 2 -
.
.
RESOLUTION NO.
- 93
A RESOLUTION OF THE CITY COUNCIL
OF THE CITY OF DUBLIN
FEE SCHEDULE FOR BUILDING REGULATION PERMITS
WHEREAS, section 7.2B.430 of the Dublin Municipal Code requires
this City Council to adopt a Schedule of Fees for permits,
reinspect ions , code compliance surveys, moved building inspections,
plan and specification storage fees, additional plan checking, and
hourly rates for inspection services not covered by specific fees; and
WHEREAS, it is necessary to adopt a new fee schedule to recover
those costs presently being incurred in the processing of the
aforesaid items; and .
NOW THEREFORE BE IT RESOLVED that this city Council hereby adopts
the following schedule of fees in accordance with Section 7.2B.430 of
the aforesaid Code.
SCHEDULE OF FEES
PART 1. For Permits for construction of, or for additions and/or
alterations to buildings or structures, electrical, plumbing or
mechanical installations the permit fee shall be determined as
follows:
TOTAL VALUATION *
$ 0 to $ 500
$ 501 to $ 1,000
$ 1,001 to $ 2,000
$ 2,001 to $ 3,000
$ 3,001 to $ 4,000
$ 4,001 to $ 5,000
$ 5,001 to $ 10,000
$ 10,001 to $ 50,000
$ 50,001 to $100,000
$100,001 to $500,000
$500,001 and up
* The determination of
Official.
FEE
$ 40
$ 90
$130
$170
$210
$250
$250 for the first $5,000 plus $30 for
each additional $1,000 or fraction
thereof to and including $10,000
$400 for the first $10,000 plus $20 for
each additional $1,000 or fraction
thereof to and including $50,000
$1,200 for the first $50,000 plus $12 for
each additional $1,000 or fraction thereof to
and including $100,000
$l,BOO for the first $100,000 plus $10 for
each additional $1,000 or fraction thereof to
and including $500,000
$5~BOO for the first $500,000 plus $5
for each additional $1,000 or fraction
thereof
the valuation shall be made by the Building
- 1 -
EXHIBiT 1
.
.
Demolition permits and removal of underground tanks the fee shall be
50% of the fee calculated based on the valuation of the work.
For reroofing other than single-family dwellings the fee shall be 50%
of the fee calculated based on the valuation of the work.
PART 2." Special Fees. The provisions of this part supersede the
provisions of PART I for the specific work involved in single-family
dwellings and appurtenant accessory structures where there is no other
construction work except the item listed herein.
1. For installation, relocation or replacement of any motor (not an
integral part of an electrical appliance, fan, heating appliance,
cooling appliance), generator, heater, electrical furnace,
welding machine, transformer, and rectified (includes all
necessary circuits, outlets, fixtures, switches, controls) .$40.00
2. For installation, alteration or replacement of an electrical
circuit (includes all necessary outlets, switches, receptacles,
and lighting fixtures) .$40.00 plus $20.00 for each additional
circuit.
3. For installation, relocation or replacement of any fixed or
stationary electrical appliance (includes all necessary circuits,
outlets, switches, receptacles, fixtures). $40.00
4. For installation, relocation or replacement of any electrical
appliance which requires plumbing installation such as.garbage
disposal, dishwasher, etc., (includes all necessary circuits,
outlets, switches, receptacles, fixtures, water piping, and waste
and vent piping) . $40.00
5. For installation, relocation or replacement of each plumbing
fixture or trap (includes all necessary water, drainage and vent
piping) . $40.00
6. For each installation or alteration of each water p~p~ng system,
gas piping system, or refrigerant piping system or portion
thereof where fixtures or appliances are not installed. $40.00
7.
For any lawn sprinkler or irrigation sprinkling system.
$40.00
8. For the installation, relocation or replacement of each heating,
cooling or refrigeration appliance (includes all necessary
electrical circuits, outlets, fixtures, switches, receptacles,
gas piping vents, water piping and duct work). $60.00
(a) For the installation, relocation or replacement of each gas
fired water heater (includes all necessary water and gas piping
and vents). $40.00
(b) For the installation, relocation or replacement of each
electrical water heater (includes all necessary water piping,
electrical circuits, outlets, fixtures, receptacles, and
switches). $40.00
- 2 -
.
.
9. For the installation, relocation or replacement of ventilation
fans connected to a single duct or outlet (includes all necessary
electrical circuits, outlets, switches, receptacles, fixtures and
duct work). $40.00
10. For the installation, relocation or replacement of each vent or
factory-built chimney. $40.00
11. For the installation of a solid burning fuel appliance (includes
all necessary electrical circuits, outlets, fixtures, switches,
receptacles, factory-built chimney). $40.00
12. For the installation, relocation or replacement of any spa/hot
tub; includes all necessary outlets, receptacles, gas piping
(only for spas supported on a slab - see PART I for spas located
on decking) $60.00
13. For correction of violations in any electrical, plumbing, or
mechanical installation which is required as the result of a code
compliance survey, lockout inspection, or other special
investigation. This fee shall be in addition to the fees for any
new installation made as part of the correction. $60.00
14. For reroofing a single-family dwelling.
$160.00
PART 3 Where the proposed work is not covered by the items listed in
this schedule, or where special investigations, evaluations .or
inspections are requested or required, the fee shall be based upon the
estimated time for processing, checking and inspecting set forth in
this schedule.
I. For moved buildina inspection fee:
$20.00 for each 100 square feet.
2. For code compliance surveY:
$20.00 for each 100 square feet or portion thereof.
3. Reinspection fee:
$40.00 for each reinspection. In the case of multi-family
buildings the fee is $40.00 per unit.
4. Fee for additional plan checkina and for plan revisions:
Actual cost plus 25% rounded to the nearest dollar.
5. For services where there is no specific fee:
Actual cost plus 25% rounded to the nearest dollar. When
services are requested outside of regular working hours
there shall be a 4-hour minimum.
6. In-plant inspections:
Actual costs including costs of meals, lodging, and
transportation plus 25% rounded to the nearest dollar.
7. Plan storaqe fee:
$10.00 (applies to plans required to be prepared by a
professional engineer or architect).
8. Fees for reviewina aeoloqic reports required bv the Alauist-
Priolo Special studies Zones Act:
Actual cost plus 25% rounded to the nearest dollar.
- 3 -
.
.
BE IT FURTHER RESOLVED that a public hearing was properly noticed
and held; and
BE IT FURTHER RESOLVED that all previous Building Regulation
Schedule of Fees shall be superseded by this Resolution which shall
become effective April 26, 1993.
PASSED, APPROVED AND ADOPTED THIS 26th day of April 1993.
AYES:
NOES:
ABSENT:
ABSTAIN:
Mayor
ATTEST:
City Clerk
- 4 -
.
.
COMPARISON OF PERMIT FEES
260 Square Foot Dwelling Addition (Bedroom & Bath)
Dublin
proposed
Dublin
Valuation
21,424
21,424
Bldg. Permit
Energy surchg
Bldg. Plan
Check
Energy plan
Check
Elec. Permit
Elec. Plan
Check
Plb. Permit
Mech. Permit
SMIP
324.00
81. 00
640.00
Canst. Tax 1 3/4% value
Bedroom Tax
Planning Fee 15% Bldg Permit
City Beautification Fee .1% Valuation
TOTAL
405.00
640.00
Livermore Pleasanton
13,000 21,419
173.00 281. 25
138.40 182.81
30.40 24.10
41. 00 33.00
30.00 26.50
1.30
227.50
125.00
San
Ramon
21,424
225.00
56.25
146.25
36.56
45.00
22.50
25.00
25.00
2.14
33.75
21.42
641.60
672.66
638.87
. ~~. ~",!.:;x'~i\::-:~
e- y ~~J ~ ~~ ~ l
_' ^ '.1 ~ c. li",l.a "
:;t
1
.
.
COMPARISON OF PERMIT FEES
1,850 Square Foot - 3 Bedroom, 2 Bath Dwelling with 440 square Foot with Attached
Garage
Dublin proposed Livermore pleasanton San
Dublin Ramon
valuation 161,548 161,548 141,145 161,502 161,548
Bldg. Permit 1006.00 2420.00 743.20 1145.83 693.50
Energy surchg 252.00 173.35
Bldg. Plan
Check 594.56 744.79 450.78
Energy plan
Check 293.00
Elec. Permit 94.00 64.75 173.38
Elec. Plan
Check 86.68
Plb. Permit 118.00 74.25 69.35
Mech. Permit 46.00 40.00 62.42
SMIP 14.11 16.16
Canst. Tax 1 3/4% value 2470.04
Residential Canst. Tax 2150.00
Planning Fee 15% Bldg Permit 104.25
City Beautification Fee .1% Valuation 161. 55
Childcare 210.00
TOTAL 1258.00 2420.00 4079.91 4219.62 2494.42
2
.
.
COMPARISON OF PERMIT FEES
6,000 Square Foot - Commercial Building
Dublin Proposed Livermore Pleasanton San
Dublin Ramon
Valuation 247,800 247,800 251,400 248,795 247,500
Bldg. Permit 1264.00 3280.00 1369.50 1451. 02 1080.50
Energy Surchg 316.00 270.13
Bldg. Plan
Check 1095.60 943.16 702.33
Energy Plan
Check 175.58
E1ec. Permit 270.13
Elec. Plan
Check 200.00 57.00 135.06
Plb. Permit 137.00 38.00 108.05
Mech. Permit 76.00 67.50 97.25
SMIP 52.79 51. 98
Const. Tax 1 3/4% value 4382.00
Commercial Const. Tax (40<: sq. ft.) 2400.00
Planning Fee 25% Bldg Permit 270.13
City Beautification Fee .1% valuation 247.40
TOTAL 1580.00 3280.00 7312.89 4956.68 3408.54
3