Loading...
HomeMy WebLinkAbout7.1 Median on Dublin Blvd. �6Z� -ZC� CITY OF DUBLIN AGENDA STATEMENT MEETING DATE: April 11 , 1983 SUBJECT Request from Bedford Properties for Median Break on Dublin Boulevard EXHIBITS ATTACHED Letter from Daniel G. Summers , Bedford Properties dated April 4, 1983 RECOMMENDATION Authorize Traffic Engineer to undertake stud and g Y report back to City Council FINANCIAL STATEMENT: No cost to the City DESCRIPTION At a previous City Council meeting, Daniel Summers , representing Bedford Properties , requested that the City consider construction of a median break on Dublin Boulevard in front of the Orchard Supply Hardware Store , to provide better access to the . property presently occupied by Orchard Supply Hardware Store and Ross Department Store . The City Council asked the City Engineer to determine if this request could be reviewed apart from an overall study of Dublin Boulevard. The City Engineer has indicated that this request can be studied separately and that such a study could be completed in approximately three weeks . Mr . Summers has indicated that Bedford Properties would pay the cost of the study, approximately $1 , 300, and also the cost of constructing a median break, if the study indicated that such construction would be desirable . RECOMMENDATION It is recommended that the City Council authorize the City Traffic Engineer to undertake such a study , provided that Bedford Properties deposits sufficient funds with the City to cover the cost of the study. --------------------------------------------------------------------------- COPIES TO: Daniel G. Summers ITEM NO. 7- / BEDFORD PROPERTIES RECEIVED APR 61983 April 4 ; 1983 CITY OF DUBLIM Mayor Pete Snyder DUBLIN. CITY ;:COUNCIL P.O Box '2340 Dublin, CA, 94568 Dear Council Members As .the.-new -owners of the ,former Liberty House,Properties ,`. Bedford .Properties has .encountered' difficulties `with the traffic flow, or . lack ;thereof, on. Dublin Blvd.,", In prior' meetings,..with the council , I have expressed a desire for a median cut .of Dublin Blvd in`front of ,the 'Orchard Supply Hardware'.'Store: Mr. .Lee •Thompson, Dublin City Engineer, `has been very helpful in .helping :us to expedite this matter. He informs. me .that a study ',and .report on the median cut .would . cost approximately $1 ,300 . "- We •will pay for such a study and the cost of the construction .of the median break, should it .be an acceptable .: alternate method of handling traffic, if we'-could advance our study in time and proceed immediately. . Should the median cut .be constructed; traffic flow would be increased drastically -and would assist us ..in marketing the vacant .space, leading to a 'fu11 and prosperous center to the . benefit of Bedford Properties , the tenants of the center and the City of Dublin and its constituents . Thank you for :your time and consideration. Si 'c rely y urs Daniel ,G. ' Summers Project Manager DGS/cz Bedford Properties,Inc. Mailing Address 3470 Mt.Diablo Blvd. Telephone A Diversified P.O.Box 1267 Suite 200 415 Real Estate Company Lafayette,California Lafayette,California 2838262 94549 94549