Loading...
HomeMy WebLinkAbout7.3 InternetDesign&Install File # D~~01-[3]1QJ . AGENDA STATEMENT CITY COUNCIL MEETING DATE: DECEMBER 17,1996 Contract for Consultant Services for Internet Communications System Design and Installation ~ Report Prepared by: Steve Honse, Administrative Assistant ExmBITS ATTACHED: 1. Proposed Agreement 2. Proposal Excerpts 3. Budget Adjustment RECOMMENDATION: ~AuthOrize the City Manager to execute the Agreement 2. Approve the Budget Adjustment SUBJECT: FINANCIAL STATEMENT: A budget appropriation of $5,000 will allow the City to proceed with Phase 1, which will specify options available and cost estimates for proceeding with implementation. . DESCRIPTION: At the November 19, 1996 City Council meeting the City Council has instructed staff to accelerate the schedule for City utilization of the Internet. The fIrst step of the project is to evaluate proposals and award a contract for Communications System Design and Installation. Other proposals for Web site Design Services and equipment purchases will be considered at a future meeting. The RFP for consultant services is divided into two distinct phases, described below: PHASE ONE: SYSTEM DESIGN: The selected consultant will fIrst evaluate the City's existing local area network and communications equipment. Next, the consultant will meet with City Staff to determine the City's needs and objectives as related to the Internet. Based upon the evaluation of existing equipment and. Staff needs, the consultant will develop a list of options and prepare a report which describes the costs and benefIts of each option. Staff will report these fIndings to the City Council at a subsequent meeting. The purpose of this process is to gather reliable technical information and cost estimates to be used to develop recommendations as to the appropriate method to achieve Internet access and to improve computer links to systems outside the City network. . PHASE TWO: INSTALLATION AND CONFIGURATION: The selected 'consultant will install and confIgure the system that is selected by the City Council following the conclusion of Phase One. Staff believes that it is important to have the same fIrm design and install the system. Otherwise, there is the strong possibility that there could be disputes as to the cause of malfunctions. For example, the installer could claim that any problem is design related while the designer could claim that the problem lies with the installation. To avoid these conflicts, it is anticipated that both design and installation services will be performed by one fIrm. The RFP was modifIed to preclude the COPIES TO: ITEM NO.-M selected fIrm from bidding on the purchase of equipment. The selected fIrm will provide specifIcations which will be used to acquire the equipment and any necessary software in accordance with the City of Dublin Purchasing Ordinance. The time required to install and confIgure a system is a function of its complexity; therefore, the exact cost of Phase Two cannot be determined until the actual system is selected. The RFP only requires that the consultant state the maximum cost of all Phase Two tasks. Actual Phase Two costs will be determined, based upon the system selected, at the conclusion of Phase One. . RFP PROCESS: Staff distributed RFPs to a total of six fIrms and four responses were received. These responses are summarized below: Vendor Phase 1 Phase 2 Specification and Design Installation $29,000 $1 SO/hr $3,500 for Phase 1 and 2 (proposal did not itemize cost by phase) $9,600 $4,400 $S,OOO $10,000 PCS Infolane Cayuga Information Systems Advanced Micronet Solutions ANALYSIS OF PROPOSALS RECEIVED: The division of the project into phases allows the City to time the implementation of the project to correspond with fiscal years. Regardless of the project schedule, the information obtained in Phase One is vital to successfully complete the project at the lowest cost possible. The current scope of work requires only Phase One tasks. Therefore, the analysis of the proposals concentrates on costs associated with . Phase One only. PCS proposes to perform Phase 1 for $29,000 . The RFP provides that the cost of service is one criterion for evaluating proposals. The pes proposal is extraordinarily high when compared to proposals offered by other firms. Staff does not believe that PCS offers additional benefits that would justify an expenditure of this magnitude. Based upon cost, the PCS proposal is not recommended for further evaluation. Infolane is an industry leader in website design; however, their proposal fails to document any significant experience in Internet system design. The firm proposes to utilize a subcontractor to perform this task. The RFP provides that the experience of individuals assigned to the project is a criterion to be used in considering proposals. Since the. City was not provided with evidence of the subcontractor's qualifications, the Infolane proposal is not recommended, based upon lack of experience. Cayuga Information Systems (Cayuga) proposes to perform Phase 1 at a cost of $9,600. This cost is much higher than the proposal offered by AMS (discussed below). Although Cayuga has some experience with Internet systems, their experience is not as extensive as that of AMS. Additionally, Cayuga does not have a large support staff. Based upon the criteria of experience, cost, and support staff, the Cayuga proposal is not recommended. Advanced Micronet Solutions (AMS) is a Dublin-based firm which specializes in the installation and maintenance of local area networks and related communications systems. Generally, AMS provides . services for government agencies and school districts. The City has used AMS in the past to provide a variety of services, including computer installation and server maintenance. AMS has demonstrated a high degree of skill and expertise on pnor City of Dublin projects and they.have direct experience with . projects of a similar nature. . AMS specializes in communications equipment and has a variety of product certifications and a long list of references. The proposed project manager has a Bachelor's degree in Computer Information Systems and the support staff consists of several system engineers. Based upon this experience of the project manager and support staff, AMS is ~learly the most qualified fIrm. In addition to the requisite expt':rience, the RFP provides that proposal will be judged based on cost. The AMS proposal offers to perform Phase One tasks for a fIxed fee of $5,000. One fIrm (Infolane) proposes to complete the project at a lower cost: however, Infolane fails to document adequate experience. AMS offers the lowest cost proposal by a consultant with adequate experience. Based upon the criteria of experience and cost, as specifIed in the RFP, Staff concludes that the AMS proposal clearly offers the most value to the City. . PROJECT PHASING: PHASE ONE: The consultant will evaluate Internet access options and prepare a written work product, to be presented to the City Council with recommendations from staff. According to the AMS bid, Task One will be performed at a fixed cost of $5,000. The work product will consist of the following elements for each Internet access option: . A description of' components and how they will integrate with the existing Civic LAN. . Written specification of all hardware and software to be used to secure the equipment through the competitive bid process as required by the Purchasing Ordinance. . Budget Cost Summary which shows the estimated costs to fully implement the project, including: hardware, software, installation, support agreements, ISP services, circuit installation, and all recurring costs. The costs will be broken down into one-time set-up costs and on-going operational costs. . Equipment required, if any, to achieve remote faxing capability and "Dial.up access." . Recommended network security devices and estimated costs. . Any recommended phasing to reduce initial cost. PHASE TWO: Following a decision to proceed with an Internet access option, the consultant will install and confIgure the equipment and ensure that it is fully operational. Per City Council instructions, the consultant is precluded from selling the City equipment for the project. The AMS proposal provides that the cost of Phase Two shall not exceed $10,000. However, this cost is a maximum amount. Actual Phase 2 costs will be determined based upon the type of system selected. Once the City Council has selected a system (at the conclusion of Phase 1) Staff will prepare an amendment to this Agreement for Council approval which will clearly defme the Phase 2 scope of work and costs. . RECOMMENDATION: . Staff recommends that the City Council authorize the City Manager to execute the Agreement (Exhibit 1) for "Internet Communication System Design and Installation" with Advanced Micronet SolutIons, in an amount not to exceed $5,000. Staff also recommends that the City Council approve the Budget Adjustment (Exhibit 3) in order to fund the initial phase of the Internet Project. STANDARD CONTRACTUAL SERVICES AGREEMENT e THIS AGREEMENT is made at Dublin, California, as of December 18, 1996, by and between the CITY OF DUBLIN, a municipal corporation (II CITYII), and ADVANCED MICRONET SOLUTIONS, (IICONTRACTORII), who agree as follows: 1. SERVICES. Subject to the terms and conditions set forth in this Agreement, CONTRACTOR shall provide to CITY the services described in Exhibit A. CONTRACTOR shall provide said services at the time, place and in the manner specified in Exhibit A. 2 . PAYMENT. CITY shall pay CONTRACTOR for services rendered pursuant to this Agreement at the time and in the manner set forth in Exhibit B. The payments specified in Exhibit B shall be the only payments 4IIto be made to CONTRACTOR for services rendered pursuant to this Agreement. CONTRACTOR shall submit all billings for said services to CITY in the manner specified in Exhibit B; or, if no manner be specified in Exhibit B, then according to the usual and customary procedures and practices which CONTRACTOR uses for billing clients similar to CITY. 3. FACILITIES AND EOUIPMENT. Except as set forth in Exhibit C, CONTRACTOR shall, at its sole cost and expense, furnish all facilities and equipment which may be required for furnishing services pursuant to this Agreement. CITY shall furnish to CONTRACTOR only the facilities and equipment listed in Exhibit C according to the terms and conditions set forth in Exhibit C. eAGREEMENT Page 1 of 2 12/18/96 L~~~\~\\ \ 4. GENERAL PROVISIONS. The general provisions set forth in Exhibit Dare part of this Agreement. In the event of any inconsistency between sai. general provisions and any other terms or conditions of this Agreement, the other term or condition shall control insofar as it is inconsistent with the general provisions. 5. EXHIBITS. All exhibits referred to herein are attached hereto and are by this reference incorporated herein. 6. CONTRACT ADMINISTRATION. This Agreement shall be administered by Steve Honse ("ADMINISTRATOR"). All correspondence shall be directed to or through the ADMINISTRATOR or his or her designee. 7. NOTICES. Any written notice to CONTRACTOR shall be sent to: Advanced Micronet Solutions, Attn: Robert Tocci 6690 Amador Plaza Road, Suite 110 Dublin, CA 94568 Any written notice to CITY shall be sent to: . City of Dublin, Attn: Steve Honse 100 Civic Plaza Dublin, CA 94568 Executed as of the day first above stated: CITY OF DUBLIN a municipal corporation By "CITY" Attest: City Clerk By "CONTRACTOR" Approved as to form: . City Attorney AGREEMENT Page 2 of 2 12/18/96 EXHIBIT A . Phase 1 - Development of Alternatives, Including Cost Estimates and Specifications SCOPE OF SERVICES CONTRACTOR shall meet with CITY representatives in order to determine CITY needs as related to communications systems, specifically: Internet access, remote faxing, and dial-up access. Dial-up access is defined as electronic communications with organizations independent of the Internet. At a minimum, CONTRACTOR will be present for three meetings of approximately two hour for each meeting. CONTRACTOR shall complete said meetings within 30 days from the execution of this AGREEMENT. Following these meetings, CONTRACTOR shall engage in a thorough and comprehensive analysis in order to develop option(s) which will satisfy the needs of CITY. At a minimum, Contractor shall evaluate the following Internet access options: 1. Individual workstation access; 2. LAN access via shared modems; and 3. Direct Internet access achieved by connecting the City LAN directly to an ISP using a high speed data line and router. . As part of the analysis, Contractor will address the following issues: . Which type of high-speed data line is best suited to City needs (e.g. ISDN, 56K Frame Relay, T1)? . Which communications equipment is best suited to the CITY's needs (router, CSU/DSU, individual modem, modem bank)? . Which Internet Service Provider offers the most cost-effective service for LAN Internet Access? . Which LAN protocol (IP, TCP/IP) is best suited to Internet access and what configuration is required to make each workstation utilize the protocol? . What security measures are available to prevent downloaded files from affecting the network security? . Could access be phased in a beneficial manner. . How can external communications links , such as "dial-up access" and "remote faxing" be incorporated into the Internet project. Following the conclusion of the research and analysis, described above, CONTRACTOR shall prepare a written work product. Said work product shall be completed with 60 days of the execution of this AGREEMENT. The _ork product shall set forth the answers to the questions raised above. he work Exhibit A Page 1 of 2 12/18/96 product will consist of the following elements for each Internet access option: . A description of components and how they will integrate with the existing Civic LAN. ~ . Written specification of all hardware and software to be used to secure the equipment through the competitive bid process as required by the Purchasing Ordinance. . Budget Cost Summary which shows the estimated costs to fully implement the project, including: hardware, software, installation, support agreements, ISP services, circuit installation, and all recurring costs. The costs will be broken down into one-time set-up costs and on-going operational costs. . All costs to achieve remote faxing capability and "Dial-up access." . Recommended network security devices and estimated costs. . Any recommended phasing to reduce initial cost. CONTRACTOR's work product shall be submitted at a meeting of the Dublin City Council to be used to assist in the selection of an Internet access option. If requested, CONTRACTOR shall appear at said meeting to answer questions. Phase 2 - Installation CONTRACTOR shall assist with the installation of equipment selected by CITY. The precise scope and description of items to be installed shall b. subject to a subsequent written amended scope of work. The amendment wil specify the items to be installed and the assistance to be provided. ~ Exhibit A Page of 2 12/18/96 EXHIBIT B PAYMENT SCHEDULE ~ CITY shall pay CONTRACTOR at an amount not to exceed the total sum of FIVE THOUSAND dollars ($5, 000) for services to be performed pursuant to Phase 1 of the Scope of Services of this Agreement. CONTRACTOR shall submit invoices, not more often than once per month, during the term of this Agreement based on the work completed on each phase identified in EXHIBIT A "Scope of Work". CONTRACTOR's fees shall be calculated at an hourly rate of $115 per hour subject to the following not to exceed limits: Phase 1 Development of Alternatives, Including Cost Estimates and Specifications $5,000 Phase 2 Installation $10.000 ~ Total not-to-exceed Limit $15,000 CITY shall retain 20% of all billings for each phase, until CITY has determined that the Scope of Services, pursuant to this AGREEMENT, have been satisfactorily performed. The total sum stated above shall be the total which CITY shall pay for the services to be rendered by CONTRACTOR pursuant to this Agreement. CITY shall not pay any additional sum for any expense or cost whatsoever incurred by CONTRACTOR in rendering services pursuant to this Agreement. CITY shall make no payment for any extra, further or additional service pursuant to this Agreement unless such extra service and the price ~EXhibit B Page 1 of 2 12/18/96 therefor is agreed to in writing executed by the City Manager or other designated official of CITY authorized to obligate CITY thereto prior t_ the time such extra service is rendered and in no event shall such chang1l' order exceed twenty-five (25%) of the initial contract price. The services to be provided under this Agreement may be terminated without cause at any point in time in the sole and exclusive discretion of CITY. In this event, CITY shall compensate the CONTRACTOR for all outstanding costs incurred as of the date of written notice thereof and shall terminate this Agreement. CONTRACTOR shall maintain adequate logs and timesheets in order to verify costs incurred to date. The CONTRACTOR is not authorized to perform any services or incur any costs whatsoever under the terms of this Agreement until receipt of a fully Department of the City of Dublin.~ executed Purchase Order from the Finance Exhibit B Page 2 of 2 12/18/96 ~ EXHIBIT C . CITY shall furnish physical facilities such as desks, filing cabinets, and conference space, as may be reasonably necessary for CONTRACTOR'S use while consulting with CITY employees and reviewing records and the information in possession of CITY. The location, quantity, and time of furnishing said physical facilities shall be in the sole discretion of CITY. In no event shall CITY be obligated to furnish any facility which may involve incurring any direct expense, including, but not limiting the generality of this exclusion, long-distance telephone or other communication charges, vehicles, and reproduction facilities. . . Exhibit C Page 1 of 1 12/18/96 EXHIBIT D GENERAL PROVISIONS 1. INDEPENDENT CONTRACTOR. At all times during the term of this Agreement, CONTRACTOR shall be . independent contractor and shall not be an employee of CITY. CITY shall have the right to control CONTRACTOR only insofar the results of CONTRACTOR'S services rendered pursuant to this Agreement; however, CITY shall not have the right to control the means by which CONTRACTOR accomplishes services rendered pursuant to this Agreement. 2. LICENSES: PERMITS: ETC. CONTRACTOR represents and warrants to CITY that he has all licenses, permits, qualifications and approvals of whatsoever nature which are legally required for CONTRACTOR to practice his profession. CONTRACTOR represents and warrants to CITY that CONTRACTOR shall, at his sole cost and expense, keep in effect at all times during the term of this Agreement any licenses, permits, and approvals which are legally required for CONTRACTOR to practice his profession. 3. TIME. CONTRACTOR shall devote such time to the performance of services pursuant to this Agreement as may be reasonably necessary for satisfactory performance of CONTRACTOR'S obligations pursuant to this Agreement. 4. INSURANCE REQUIREMENTS. CONTRACTOR shall procure and maintain for the duration of the contract insurance against claims for injuries to persons or damages to property which may arise from or in connection with the performance of the work hereunder by the CONTRACTOR, his agents, representatives, employees or subcontractors. The cost of such insurance shall be included in the CONTRACTOR'S bid. (a) Minimum Scope of Insurance. Coverage shall be at least as broad as: 1. Insurance Services Office form number GL 0002 (Ed. 1/73) covering comprehensive General Liability and Insurance Services Office form number GL 0404 covering Broad Form Comprehensive General Liability; or Insurance Services Office Commercial General Liability coverage ("occurrence" form CG 0001.) Insurance Services Office form number CA 0001 (Ed. 1/78) covering Automobile Liability, code I "any auto" and endorsement CA 0025. Workers' Compensation Insurance as required by the Labor Code of the State of California and Employers Liability Insurance. Minimum Limits ofInsurance. CONTRACTOR shall maintain limits no less than: 1. General Liability: $1,000,000 combined single limit per occurrence for bodily injury, personal injury and property damage. If commercial General Liability Insurance or other form with a general aggregate limit.' used, either the general aggregate limit shall apply separately to this project/location or the general aggreg limit shall be twice the required occurrence limit. 2. Automobile Liability: $1,000,000 combined single limit per accident for bodily injury and property damage. 3. Workers' Compensation and Employers Liability: Workers' Compensation limits as required by the Labor Code of the State of Cali fomi a and Employers Liability limits of$I,OOO,OOO per accident. Deductibles and Self-Insured Retentions. Any deductibles or self-insured retentions must be declared to and approved by the CITY. At the option of the CITY, either the insurer shall reduce or eliminate such deductibles or self-insured retentions as respects the CITY, its officers, officials and employees; or the CONTRACTOR shall procure a bond guaranteeing payment of losses and related investigations, claim administration and defense expenses. Other Insurance Provisions. The policies are to contain, or be endorsed to contain, the following provisions: 1. General Liability and Automobile Liability Coverages. a. The CITY, its officers, officials, employees and volunteers are to be covered as insureds as respects: liability arising out of activities performed by or on behalf of the CONTRACTOR; products and completed operations of the CONTRACTOR, premises owned, occupied or used by the CONTRACTOR, or automobiles owned, leased, hired or borrowed by the CONTRACTOR. The coverage shall contain no special limitations on the scope of the protection afforded to the CITY, its officers, officials, employees or volunteers. The CONTRACTOR'S insurance coverage shall be primary insurance as respects the CITY, its officers, officials, employees and volunteers. Any insurance or self-insurance maintained by the CITY, its officers, officials, employees or volunteers shall be excess of the CONTRACTOR'S insurance and shall not contribute with it. Any failure to comply with reporting provisions of the policies shall not affect coverage provided to the CITY, its officers, officials, employees or volunteers. . The CONTRACTOR'S insurance shall apply separately to each insured against whom claim made or suit is brought, except with respect to the limits of the insurer's liability. Workers' Compensation and Employers Liability Coverage. 2. 3. (b) (c) (d) b. c. d. 2. Exhibit D Page 1 of2 12/18/96 The insurer shall agree to waive all rights of subrogation against the CITY, its officers, officials, employees and volunteers for losses arising from work performed by the CONTRACTOR for the CITY. 3. Professional Liability. . CONTRACTOR shall carry professional liability insurance in an amount deemed by the CITY to adequately protect the CONTRACTOR against liability caused by negligent acts, errors or omissions on the part of the CONTRACTOR in the course of performance of the services specified in this Agreement. 4. All Coverages. Each insurance policy required by this clause shall be endorsed to state that coverage shall not be suspended, voided, canceled by either party, reduced in coverage or in limits except after thirty (30) days' prior written notice by certified mail, return receipt requested, has been given to the CITY. (e) Acceptability ofInsurers. Insurance is to be placed with insurers with a Bests' rating of no less than A:VII. (f) Verification of Covera~e. CONTRACTOR shall furnish CITY with certificates of insurance and with original endorsements effecting coverage required by this clause. The certificates and endorsements for each insurance policy are to be signed by a person authorized by that insurer to bind coverage on its behalf. The certificates and endorsements are to be received and approved by the CITY before work commences. The CITY reserves the right to require complete, certified copies of all required insurance policies, at any time. (g) Subcontractors. CONTRACTOR shall include all subcontractors as insureds under its policies or shall furnish separate certificates and endorsements for each subcontractor. All coverages for subcontractors shall be subject to all of the requirements stated herein. (h) The Risk Manager of CITY may approve a variation in those insurance requirements upon a determination that the coverages, scope, limits and forms of such insurance are either not commercially available or that the CITY's interests are otherwise fully protected. 5. CONTRACTOR NO AGENT. Except as CITY may specifY in writing, CONTRACTOR shall have no authority, express or implied, to act on behalf of CITY in any capacity whatsoever as an agent. CONTRACTOR shall have no authority, express or implied, pursuant to this Agreement to bind CITY to any obligation whatsoever. 6. ASSIGNMENT PROHIBITED. No party to this Agreement may assign any right or obligation pursuant to this Agreement. Any attempted or purported assignment of any right or obligation pursuant to this Agreement shall be void and of no effect. .. PERSONNEL. CONTRACTOR shall assign only competent personnel to perform services pursuant to this Agreement. In the event that CITY, in its sole discretion, at any time during the term of this Agreement, desires the removal of any such persons, CONTRACTOR shall, immediately upon receiving notice from CITY of such desire of CITY, cause the removal of such person or persons. 8. STANDARD OF PERFORMANCE. CONTRACTOR shall perform all services required pursuant to this Agreement in the manner and according to the standards observed by a competent practitioner of the profession in which CONTRACTOR is engaged in the geographical area in which CONTRACTOR practices his profession. All instruments of service of whatsoever nature which CONTRACTOR delivers to CITY pursuant to this Agreement shall be prepared in a substantial, first class and workmanlike manner and conform to the standards of quality normally observed by a person practicing in CONTRACTOR's profession. 9. HOLD HARMLESS AND RESPONSIBILITY OF CONTRACTORS. CONTRACTOR shall take all responsibility for the work, shall bear all losses and damages directly or indirectly resulting to him, to any subcontractor, to the CITY, to CITY officers and employees, or to parties designated by the CITY, on account of the performance or character of the work, unforeseen difficulties, accidents, occurrences or other causes predicated on active or passive negligence of the CONTRACTOR or any subcontractor. CONTRACTOR shall indemnifY, defend and hold harmless the CITY, its officers, officials, directors, employees and agents from and against any or all loss, liability, expense, claim, costs (including costs of defense), suits, and damages of every kind, nature and description directly or indirectly arising from the performance of the work. This paragraph shall not be construed to exempt the CITY, its employees and officers from its own fraud, willful injury or violation of law whether willful or negligent. For purposes of Section 2782 of the Civil Code the parties hereto recognize and agree that this agreement is not a construction contract. By execution of this agreement CONTRACTOR acknowledges and agrees that he has read and understands the provisions hereof and that this paragraph is a material element of consideration. Approval of the insurance contracts does not relieve the CONTRACTOR or subcontractors from liability under this paragraph. 10. GOVERNMENTAL REGULATIONS. To the extent that this Agreement may be funded by fiscal assistance from another governmental entity, CONTRACTOR shall comply with all applicable rules and regulations to which CITY is bound by the . terms of such fiscal assistance program. 1. DOCUMENTS. All reports, data, maps, models, charts, studies, surveys, photographs, memoranda or other written documents or materials prepared by CONTRACTOR pursuant to this Agreement shall become the property of CITY upon completion of the work to be performed hereunder or upon termination of the Agreement. Exhibit D Page 2 of2 12/18/96 ~-, -- ,., "~ Chy of DubliN PROpOSAl fOR CONsulTATioN ANd DE5iqN SERVicE5 fOR mE INTERNET ANd ExTERNAl COMMUNiC4TioNS S}l5TEM . Advanced Micronet Solutions AMS is a network integration firm specializing in the following areas: Internet connections, Data Over Cable TV, System Design & Configuration, LANs, MANs, WANs, IBM SNA Integration, AS/400 connectivity, Windows NT, Novell NetWare, Installation, Training, and Support. Our Certifications as a Microsoft Solutions Provider, Novell Gold Reseller, and Cisco Enterprise Reseller are key to the design, implementation, and support for Wide Area Networking and Internet solutions. Our partnership with these manufacturers allows us the ability to work closely with their Engineers and Technical Support groups. This partnership, along with our vast experience, can only enhance our qualifications which we feel are crucial to a project of this magnitude. The departments within our company that would be working directly with the City on this proposed agreement include: . Sales and Engineering The AMS Sales Engineering team is composed of key personnel highly trained and dedicated to providing state-of-the-art solutions utilizing the latest technological advancements while taking into consideration budget constraints, current and future . goals, and existing equipment. We are proud to be authorized resellers for Microsoft, Cisco Systems, Hewlett Packard, Novell, Pacific Bell, and many more. These authorizations have provided AMS with extensive product and/or service training directly from the manufacturers. . Installation Our entire staff of System Engineers are highly trained and experienced with project implementation including all Desktop Operating Systems, Local Area Network topologies, Network Operating Systems, and Enterprise Wide Area Network routing technologies. . Service and Support Although we provide many services, a large portion of our company resources have been designated to provide continued networking support through our Annual Service Agreements. We offer several levels of coverage customized to meet the needs of each client. Our network support staff consists of highly educated, experienced, and certified Systems Engineers dedicated to providing high quality and professional service to our clients. It:. ADVANCED MICRONEr SOLUflONS 6690 AMAdOR PlAzA Rd., SUiTE # 1 10, DubliN, CA 9 4 ~ 6 8 (~ 10) ~ ~ l-H60+ FAX (510) 5 ~ 1.H 64+INTERNEf: UI\W/.AMS.NEf+ E-iWUI: SA!Es@AMS.NET . ......- --. '. "j'!' l" I c) Co .. ! C . , " . ~ ...... ~ Milll.l L't.-~1\ \ 2- . . . E'- >, ,'., -- One of our main goals at AMS has been to keep the knowledge of our entire staff up to date with the latest networking solutions the industry has to offer. In doing so, we are able to provide the most cost effective, expedient, and reliable solutions for our clients. Experience AMS has been involved in the consultation, design, implementation, and the ongoing support for Wide Area Networking solutions in the business, education, and government environments for several years. With the demand for Internet access on the rise in the recent two years, this too has become a focal point for AMS. Our Wide Area Networking experience includes utilizing technologies such as Frame Relay, dedicated Point-to-Point, ISDN, Data Over Cable TV, wireless, SMDS, and dial-up. AMS has extensive experience with the integration of WAN messaging systems (local and Internet) and Internet Servers (Web server, DNS server, FTP server, SMPT mail server). Anytime you connect multiple sites over a Wide Area Network, security becomes an issue. AMS has vast experience addressing these concerns through packet filtering, firewalls, etc. A couple of our most recent projects of a similar nature to what the City is requesting include Pittsburg Unified School District, Stanislaus County Office of Education, and Newark Unified School District, just to mention a few. Implementation of the above mentioned projects began with an initial meeting between AMS and the customer contact. During this meeting, project goals and priorities were established. AMS then conducted a site walk through noting the existing equipment and physical layout. Based on this information, a solution was designed. This solution was then presented to the customer through diagrams, written description in detail, and a hardware/software budget summary. AMS then began the installation process which included the following: . Configured and set-up the Exchange messaging system for internal and Internet mail for each user on the LAN. . Set-up the customer's own Domain Naming System (DNS) server . Installed the Cisco routers and configured for routing between sites and to the Internet Service Provider. Set-up the packet filtering feature for added security. . Set-up File Transfer Protocol (FTP) services so that users can FTP files from a Web site. . Integrated with customer selected Internet Service Provider for access and set-up TCPIIP addresses on desktops for e-mail and Internet browsing. . Installed client software on desktops for Internet browsing capabilities. A ADVANCED MICRONET SOLUTIONS 6 6 90 A.w>.dOR PlAzA Rd., SuiTE # 1 10, DubliN, CA 94:;; 6 8 (:;; 10) > > I-H 60+ FAX (> 10) > > ].H 64 + INTERNET: WWW.AM5.NET+E-MAil: WEs@AMS.NET 2 '.. ..j.......~ ~< td ~! t" ;". " I:~ .~ t+ '... r.a":; .' 1-L', . --~ -,. -.. Pro;ect Leaders . . Robert Tocci, President/Owner of Advanced Micronet Solutions Robert holds a Bachelor's Degree in Computer Information Systems as well as certifications for CNE (Certified NetWare Engineer), and MSP (Microsoft Certified Professional). Robert has been working in the industry for nine years. Robert will oversee the project from the initial designing stages through completion, with his main responsibility being the design. He will attend the meetings with city appointed personnel, assist in determining the City's immediate and future goals, establish a list of priorities for project implementation, present options, discuss pros/cons, answer questions etc. Robert's Sales Engineering Support Team will be responsible, under Robert's direction, for compiling design information into a clear and precise proposal format including budget numbers, written analysis, hardware bid specifications and diagrams. . Carl Boyd, Systems Engineer of Advanced Micronet Solutions Carl has been working in the networking industry for 5 years and specializing with Advanced Micronet Solutions on WAN connectivity and Intemet access for the past 4 years. Although Robert will oversee the entire project, Carl will be assigned the . responsibilities as Project Leader for on-site implementation. Carl will lead his team of Engineers on-site and will be the city's key contact for project implementation status reports. Estimated Time of Completion The initial meeting between AMS and the City can be scheduled within one week after the award of the contract and receipt of a Purchase Order. Once a determination of the City's goals have been established and all pertinent information is available, AMS would require two to three weeks to provide the City with the completed proposal packages. References . Empire Union School District Contact: Don Kiger / Business Manager Phone: 209-521-2800 District-wide Area Networking project linking six remote sites to the District Office via Frame Relay. Linking the District Office to the County Office Of Education for Internet and AS/400 access. Implemented a District-wide messaging system for both internal A ADVANCED MICRONET SOLUTIONS . 6690 AJwv.lOR PWA Rd., SuiTE # 110, DubliN, CA 94568 (5 10) 55 1.} 660. FAX (5 10) 55 1.} 664+INlCRNET: \WIW.AMS..NET+E-MAiI: SA!ES@AMS.NET 3 I... --. '. ,; J,i,: J . ,,-.., 1,;:.;. ~ ~~.,..(.... !~ . - . . . . 1[- - - , -i .~ and Internet mail. Integrated a District-wide Internet server with Web, DNS, FTP, and SMTP mail services. Configured approximately 500 workstations for Internet browsing and mail. This has been an ongoing project for the past two years as funds become available for the District. . Pittsburg Unified School District Contact: Lori Anzini I Network Engineer Phone: 510-473-4221 District-wide Area Networking project linking 13 remote sites to the District Office via Frame Relay at 56K. Linking the District Office to the County Office Of Education (Frame Relay 3841<) for Internet and Mainframe access. We are currently in the process of upgrading the WAN connection from the Frame Relay solution to dedicated Point~to-Point T1. We are also upgrading the District-wide messaging system for both internal and Internet mail from GroupWise to Microsoft Exchange Server as well as Windows 95 on all the Administrative desktops. AMS previously installed a District-wide Internet server which provides the District with Web, DNS, FTP, and SMTP mail services. AMS began working with Pittsburg approximately 3 years ago and continues to work with them on upgrading to current technologies. . Newark Unified School District Contact: Art Cipriano I Data Processing Manager Phone: 510- 794-2121 Ext. 197 We are currently in the process of completing a District-Wide Area Network project connecting a total of 13 sites over a Primary Rate ISDN link. We have also implemented a messaging system for both internal and Internet mail. AMS installed a District-wide Internet server which provides the District with Web, DNS, FTP, and SMTP mail services. Implementation of this project began the second week in November and we currently have 6 of the 13 sites up. . City of Tracy Contact: Bo Barker I Information Systems Manager Phone: 209-831-4108 The City of Tracy has recently contracted with AMS for Internet consulting and installation on their current project which includes integrating an Internet server for Web, DNS, FTP, and SMTP mail services into their current network. Implementation of this contract is tentatively scheduled to begin within the next two weeks. Pricinq: Consultation and Desiqn Services Advanced Micronet Solutions is proposing to provide consultation and design services for the City of Dublin's Internet and external communications system. Under this agreement, AMS will provide a written summary explaining the recommended solution. This summary will include a detailed description of the key components (routers, Web server, A ADVANCED MICRONET SOLUTIONS 6690 AMAdOR PlAzA Rd., SUiTE # 1 10, DubliN, CA 945 6 8 (510) 55 J.H60+FAX(51O) 55 J.H64+INTERNEr. WWW.AMS.NEf+E-MAi1: WB@AMS.NEf 4 ~1I- --:.- '_~ .~' ~~.. )1 ,-~ ~ ''':,.. . "I; ", .......;. t. ~. ~ r I... '-'-. , , . I. ~ I '. .~ - DNS server, mail server, FTP server, etc.) in the design and how they will integrate with each . other. A computerized diagram of the physical layout of the building illustrating existing and proposed equipment locations will be provided as well as a second diagram to illustrate the logical connectivity of the hubs, servers, routers, etc. Written specifications of all hardware and software, per our design, will be included in our proposal package as well. A summary showing the estimated costs, for budget purposes, to implement the project "turn key. will be provided. This will include hardware, software, installation, support agreement, ISP (Internet Service Provider) recommendations and estimated costs, and Circuit installation outlining recurring costs. The costs that will be incurred by the City for the consultation and design services will be five thousand dollars ($5,000.00). Estimated Pricinq: Pro;ect Implementation Our estimated cost for labor to implement a solution as described in your bid is approximately ten thousand dollars ($10,000.00). This would include the following: . Configuration of all workstations (58) for Internet access for browsing, Internet mail, internal mail, and desktop faxing capabilities. . . Configuration of an Internet server with Web services, DNS server, FTP server, and SMTP mail server. This includes creating one opening Web page for the City. . Installation and configuration of a desktop faxing solution. . Installation and configuration of a messaging system for internal and Internet mail. . Installation and configuration ofthe routing equipment and establish connectivity. . Configuration and implementation of the extensive security features from the desktop to the router. Our estimated time to complete such a project is one to two weeks after the City has possession of all hardware and software and the circuits are installed. Please note: Delivery of the routing hardware, software, and the circuits can take up to six weeks. In closing, AMS would like to thank the City of Dublin for their consideration of our proposal. For further information, please do not hesitate to contact our Sales Engineering Department. A ADVANCED MICRONET SOLLmONS 6690 Ar.w:IOR PlAzA Rd., Suire # 110, DubliN, CA 94568 (510) 551.H60+FAX(51O) 551.}664+INTERNET: W\WI.AMS.NET+E-MAiI: SAlB@AMS..NET . 5 E; ',' - \ : ,:, ;" :! i' r: Dec-04-96 12:30P P.02 . . . . Chy of DubLiN INTERNET PROjECT INSTAllATioN SUMMARY Pricin(l: Consultation and Desian Services Advanced Micronet Solutions has proposed to provide consultation and design services for the City of Dublin's Internet and external communications system. Under this agreement, AMS will provide a written summary explaining the recommended solution. This summary will include a detailed description of the key components (routers, Web server, DNS server, mail server, FTP server, etc.) in the design and how they will integrate with each other. A computerized diagram of the physical layout of the building illustrating existing and proposed equipment locations will be provided as well as a second diagram to illustrate the logical connectivity of the hubs, servers, routers, etc. Written specifications of all hardware and software, per our design, will be included in our proposal package as well. A summary showing the estimated costs, for budget purposes, to implement the project "turn key. will be provided. This will include hardware, software, installation, support agreement, IS? (Internet Service Provider) recommendations and estimated costs, and Circuit installation outlining recurring costs. The costs that will be incurred by the City for the consultation and design services will be five thousand dollars ($5,OOO.OO). Estimated ProJect Implementation Pricing Summary: Our estimated cost for labor to implement a solution as described in your bid is not to exceed ten thousand dollars ($1 O,OOO.OO). This would include the following: . Configuration of all workstations (58) for Internet access for browsing, Internet mail, internal mail, and desktop faxing capabilities. . Configuration of an Internet server with Web services, DNS server, FTP server, and SMTP mail server. This includes creating one opening Web page for the City. . Installation and configuration of a desktop faxing solution. . Installation and configuration of a messaging system for internal and Internet mail. . Installation and configuration of the routing equipment and establish connectivity. . Configuration and implementation of the extensive security features from the desktop to the router. ..... ADVANCED MICRONET SOLlmONS 6690 AMAdoR PWA Rrl., 5uilF # 1 10, DubliN, CA 94568 (510) 5 51-} 660+FAX (51 0) 5 51.} 664+IMERNET: www.AMS.NEr+E--iI: SA!Es@IIMS.NEr Dec-04-96 12:30P This project can be implemented in phases or the City may decide not to implement all features, The following summary provides pricing based on services implemented, . Installation and configuration of a messaging system for internal and Internet mail. This includes configuration of all workstations (58) for internal and Internet mail. $2.450,00 . · Installation and configuration of the routing equipment and establish connectivity, Based on either a Frame Relay, Point-to-Point T1, or ISDN connection, $1.200.00 . . Configuration of an Internet server with Web services, DNS server, FTP server, and SMTP mail server (if applicable). This includes creating one opening Web page for the City. $2,000.00 . Installation and configuration of a desktop faxing solution, This includes the configuration of all workstations (58) for desktop faxing capability. $1,700.00 . Configuration of all workstations (58) for Internet browsing access, $1.450.00 . . Configuration and implementation of the extensive security features from the Internet to the LAN. $1,200,00 . Indicates hardware. software, and Instal/atlon necessary to provide the City with Internet presence, ... ADVANCED MICRONET SOlunONS 6690 AMAdOR plAzA Rd., SUiTE # 110, DubliN, CA 94568 (510) 55 1-'660+FAX(51O) 551-}664.INTERNET: WIlIW~.NET.E-MAiI: SAlES@IIMS.NET 2 P.03 . . . . . . . " CITY OF DUBLIN BUDGET CHANGE FORM CHANGE FORM # New Appropriations (City Council Approval Required): Budget Transfers: ~x_ From Unappropriated Reserves __~ From Budgeted Contingent Reserve (1080-799.000) Within Same Department Activity From New Revenues Between Departments (City Council Approval Required) Other fffiJ)EeitltAslflt.'Uil'ij}JtltKcco:Uto.t?(::::::::(((:::':tAMOUtitf?::(::::((:F:::fmCtdtiSltBWGE.1k&CCaUN1V((((((:::f:::::mou&It:::''(':':'::: ........',.,.,',.,'.',',',.,','..,.. .. "...,...".....,. .. .,." ,',',',','. ','.',',.,..'......,'....,',. ,','..,'.'.'..,'....,.,',.,.,.,.,.........,." .,.,',.,...,..',',',.,.,.,.,'.....',.,.,.,.....,.,.....,.....,...,.,.,.,.,.'..,...,'..,'.-.....',',.. -----..----............................................................................... .... ...,. _,n . ......... ."..""."."" .. ..............................................................".".........,."".",.", Name: Name: Internet Project $5,000.00 Account #: Account #: Name: Name: Account #: Account #: Name: Name: Account #: Account #: Name: Name: Account #: Account #: Name: Name: Account #: Account #: Name: Name: Account #: Account #: REASON FOR BUDGET CHANGE ENTRY: An appropriation to fund Phase One of the proposed Internet Capital Improvement Project. The project is not part of the approved Fiscal Year 1996-97 CIP. If the City decides to proceed with procurement of equipment, an additional budget change will be required for equipment and installation. City Manager: Date: 12/17/96 Signature ..<it\.~~pp~q;ieaatt11.~OltYCo1lH9UM~tingQij:Pate: ............ .... ...... Mayor: Date: Signature Posted By: Date: Signature E.xl~~~ t ,3 jorm.,\blMigrhng