HomeMy WebLinkAbout8.2 ApprvPlygrndDsgn 91-10 CITY OF DUBLIN AGENDA STATEMENT CITY COUNCIL MEETING DATE: October 10, 91-10 Nielson School & Wells-Cronin School Play Area Improvements 1991 SUBJECT : Cronin Play Area Renovation EXHIBITS ATTACHED : Cost estimate Preliminary plan will be available for review at the meeting RECOMMENDATION : 1. Receive presentation from Singer & Hodges 2. Receive public comment 3. Approve design; direct consultant to proceed with preparation of construction documents FINANCIAL STATEMENT : The budget for this project is as follows: Design/Inspection : $13,800 Improvements : $45,000 TOTAL : $58,800 DESCRIPTION : Included in the Fiscal Year 91-92 Budget are funds for the renovation of the play area at the former Cronin Park. The City has contracted with the landscape architectural firm of Singer and Hodges, Inc. to prepare the design and construction documents for the project. Singer & Hodges, Inc. has prepared a preliminary design for the play area for review by the City Council and the public. The proposed equipment for the play area includes a modular play system with metal components finished with a powder-coat paint. The equipment will be installed within the confines of the existing play area and the base material will be sand. The preliminary cost estimate of $45,737 is approximately $737 over the budgeted funds available for this project. However, Staff and the consultant feel that the estimate can be refined and modified during preparation of the construction documents in order to fall within the funds available. The preliminary design was reviewed and approved by the Parks and Recreation Commission on September 24, 1991. It is, therefore, recommended that the City Council take the following action: 1. Receive presentation from Singer & Hodges, Inc. 2. Receive public comment 3. Approve design and direct consultant to proceed preparation of construction documents with ITEM N0.~~__ COPIES TO: Singer & Hodges, Inc. Dublin Unified School District CRO~IH SCHOOL - PLAY AAEA pRELIM[~AR¥ COST EST[I~TE SEPTEMBER 20, 199[ Bt___d Item Oescrtptton% ~ ~ Unit Cost ~tem,,T°ta[ Removal of Sand and 5,847 $,F. .?0 $ 4,093, Asphalt .25 1,461, 5,847 S.F. Grading 2,200, 40 L.P. 55.00 Concrete Wall ~35 L.F, t6,00 2,160, Drain Line 900. 2 EA, 450,00 Cleanouts Connection to Drain 2 EA. 350.00 700, Inlets ... 19,786. play Equipment Allow -" 217 C.¥. 40.00 _ 8~6B0~,, Sand Subtotal: $ 39,980. 4% Mobilization ---l~599t- Subtotal: $ 41,579, 10% Contingency: .. 4,~58~ TOTAL: ~