HomeMy WebLinkAbout8.2 CivicCntrRevnov ExpCZTY CLERK FILE # 600-35
AGENDA STATEMENT
CZTY COUNCZL MEETZNG DATE: September 7,1999
SUBJECT:
Award of Bid- Contract 99-08,
Civic Center Renovation/Expansion
Report Prepared by: Henna Lichtenstein, Parks and Facilities
Development Manager
ATTACHMENTS:
1 ) Resolution of Award
2) Budget Change Form
3) Carpet selection information
RECOMMENDATIONj~L Lf
FINANCIAL STATEMENT:
1)
Funds Budgeted for Improvements:
Bids Received: NV Heathore
RGM
Howard Wright
-North American
Taber Construction
JK Merz
Adopt resolution awarding bid to NV Heathorn
Approve Budget Change Form
Decide .on' the preferred carpet selection
$1,232,100
$1,439,687
$1,478,984
$1,540,000
$1,608,119
$1,726,000
$1,749,200
DESCRIPTION: At the meeting of June 1,1999 the City Council authorized Staff to
solicit bids for the Civic Center Renovation/Expansion Project.
The Phase 1 project includes completing 4500-sq. ft. of unfinished space to provide additional office
space and remodel 12,500-sq. ft: of existing office areas. Site work will 'include additional police parking
and three new outbuildings totaling 2135-sq. ft. The outbuildings will house police evidence, bikes and
general storage. The project also includes new carpet4_'ng for the entire building with the exception of the
Council Chambers.
The proposed schedule for the project is 7 months.
BID RESULTS
A total of.six bids (JK Merz, $1,749,200; Taber .Construction, $1,726,000; North American, $1,608,119;
Howard Wright, $1,540,000and RGM, $1,478,984) were received with the low'bid of $1,439,687 being
submitted by NV Heathorn. Staff recommends adding a 10 percent contingency, which brings the total
funds needed to $1,583,656. This exceeds the amount available for improvements by $351,556. This can
be attributed to the following factors: The.bidding climate, increase in material costs, and increasing the
new carpeting to include all areas except for the Council Chambers. The overall increase in base bid cost
h:civiccentercip\cc9-7award2.doc
COPIES TO: Heathorn
ITEM NO.
is 17% plus the 10% contingency. Approximately 7% of the increase can be attributed to the increase
area to be carpeted. The remaining 10% is due to Overall increases in building material costs and t~
current bidding climate.
PROJECT BUDGET
In addition to increased improvement costs noted above, there are additional costs related to the project
that have increased as well. The two main areas of cost increase are in furnishings and cabling. The
original project budget for furnishings was predicated on 20 workstations, limited private office
improvements, one conference room, files and other storage items. There are now 29 workstations, five
private offices, three conference rooms and additional storage files, etc. The storage files will include
standard file cabinets, master plan files, hanging files, role drawing storage cubes, and general supply
cabinets.
The original cabling only accommodated the 20 workstations. The additional cabling will provide for
more printers / fax locations as well as additional private offices. In general, the cabling requirements for
the building are' more expensive due to the required use of a fire resistant sheathing that will not create
noxious fumes or smoke. Miscellaneous costs have increased as well due to the need for additional
h'temporary storage space, interim moving, and secUi-ity requirements for workers accessing the police
station.
The costs for the cabling and furnishings are estimates only and may increase or decrease depending on
the actual bids received. Both projects are anticipated to fold into the overall remodel and will
coordinated with the general contractor.
The 1998-2003 Capital Improvement ProWam includes $1,536,614 for Phase I of the Civic Center
Renovation/Expansion Project. The total estimated project budget is $2,069,473 resulting in a total
shortfall of $532,859. A comparison between the approved budget for the project and the revised budget
based on the estimated expenditures for the project is shown below.
!; Approved Project Budget Estimated Expenditures" Difference
Prelim. Engineering $ 2,800 $ 2,800 $ 0
Design - $ 157,184 $ 159,684 $ (2,500)
Improvements $ 1,232,100 $ 1,583,656 $ (351,556)
Furniture/Fixtures $ 78,500 $ 215,701 $ (137,201)
Machinery/Equipment $ 19,000 $ 59,000 $ (40,000)
Inspection $ 38,966 $ 38,966 $ 0
Miscellaneous $ 8,064 $ 9,666 $ ( 1,602)
Total $ 1,536,614 $ 2,069,473 $ (532,859)
In order to award the bid and to complete construction of the
required. The table below compares the Fiscal Year 1999-2000
2000 estimated project expenditures; the difference is the amount
improvements, a budget adjustment is
project budget to the Fiscal Year 1999-
required for the budget change.
Page 2
Prelim. Engineering
Design'
'Improvements
Furniture/Fixtures
Machinery/Equipment
Inspection
Miscellaneous
Total
FY 99/2000
Approved Budget
2,800
39,700
1,232,100
78,500
19,000
29,480
8,000
1,409,580
FY 99/2000
Estimated Expenditures
$ 2,800
$ 40,224
$ 1,583,656
$ 215,701
$ 59,000
$ 29,420
$ 3,520
$1,934,321
Difference
$ 0
$ (524)
$ (351,556)
$ (137,201)
$ (40,000)
$ 60.
$ 4,480
$ (524,741)
PROJECT FUNDING
The Civic Center Renovation project funding was originally predicated upon the development community
funding, through the Public Facilities Fees that portion of the project that was needed to serve new
development. The portion of the project that was necessary to correct existing design problems or
improve customer service was to be funded by the General Fund.
Currently, the Public Facility Fee is the source off ands for project costs (approximately 81.8%) with the
balance of funding coming from the General Fund (18.2%). Staff would .recommend that the difference of
$524,741 be funded from the respective funds using the same percentage. Consequently, a budget
adjustment for $429,238 from the Public Facility Fee and for $95,503 from the General Fund is required.
Staff has prepared the appropriate Budget Change Forms (Attachment 2).
It should be noted that the Public Facilities Impact Fee will need to be adjusted by the City Council at a
later date in order to provide for the increased costs associated with the Phase I project. Staff will prepare
the necessary information for consideration by the City Council at a future meeting.
CARPET SELECTION
Attached is a breakdown of carpeting specifications forthe three carpet alternatives. The carpet selection
for the Civic Center is somewhat limited by the design of the building. Due to the radius the carpet could
not have a pattern or a significant amount of texture as this would create a "herringbone" effect at carpet
seams or in the case of the texture greater potential for unraveling. The carpet alternatives all meet the
requirements of high commercial traffic, are easily cleaned, and passed fire tests.
CONCLUSION
Staff has reviewed the bid results, checked with references, and recommends that the City Council adopt
the resolution in Attachment 1 awarding the bid to NV Heathorn. Further, Staff recommends that the City
Council adopt the Budget Change Form and decide on the preferred carpet selection for the Civic Center.
Page 3
RESOLUTION NO. -
A RESOLUTION OF TI-IE CITY COUNCIL
OF TI-IE CITY OF DUBLIN
AWARDING A CONTRACT TO N.V. HEAT1]ORN, INC. FOR CONSTRUCTION
SERVICES FOR TIlE CMC CENTER REMODEL
WI-W~REAS, the 1998-2000 Capital Improvement program includes funding for the
Civic Center Remodel; and
WHEREAS, the City sent out a Request for Bids to 28 construction finns and received
six bids in response; and
WHEREAS, N.V. Heathorn, Inc., prepared the lowest bid estimate and was determined
to be qualified to do the work; and
VdtEREAS, the bid estimate for the construction cost of the Civic Center Remodel is
higher than what was budgeted in the Capital Improvement Program; and
~REAS, the City Council understands and approves the reasons for this increase;
and
NOW, THEREFORE, BE IT RESOLVED that the City Council hereby approves the
contract with N.V. Heathorn, Inc., for Construction Services for the Civic Center Remodel.
PASSED, APPROVED AND ADOPTED, this 7th day of September, 1999.
AYES:
NOES:
ABSENT:
ABSTAIN:
Mayor
ATTEST:
CiD' Clerk
G:XEGP\CCRES-CM
CITY OF DUBLIN
BUDGET CHANGE FORM
CHANG E FORM #
New Appropriations (City Council Approval Required):
Budget Transfers:
From Unappropriated Reserves From Budgeted Contingent Reserve (1080-799.000)
Within Same Department Activity
From New Revenues Between Departments (City Council Approval Required)
Other
Name: Printing <$2900> Name: Operating Supplies $100
Account #: 310-93931-716 Account #: 310-9393 1-713
Name: Rentals <$1680> Name: Contract Services - General $2500
Account #: 310-9393 1-719
Name: Contract Services - Eng. Design
Account #: 310-93931-740-000
<$1976> Name:
Account #: 310-93931-740-078
Name: Contract Services - Cont. Admin <$60>
Account_#: .....
Name: Improvements - Bldg $95,503
Account #:
Name:
Account #: 001-93931-750-030
Name: Improvements - Bldg
$256,053
Account #: Account #: 310-93931-750-030
Name: Name:
Account #:
REASON FOR BUDGET CHANGE ENTRY:
Account #:
In order to award the bid and proceed with the Civic Center Renovation/Expansion Project, additional fundi~
is required.
City Manager: Date:
Si~m'mture
Mayor: Date:
Signature
Posted By: Date:
Signature
CITY OF DUBLIN
BUDGET CHANGE FORM
CHANGE FORM #
New Appropriations .(City Council Approval Required):
Budget Transfers:
From Unappropriated Reserves From Budgeted Contingent Reserve (1080-799.000)
Within Same Department Activity
From New Revenues Between Departments (City Council Approval Required)
Other
Name: Name: Equipment-Fumiture-GFAAG $137,201
Account#: Account#: 310-93931-750-062
Name: Name: Equipment - Machinery - Exp $40,000
Account #: Account ~' 310-9393 1-750-071
Name: Name:
ACcou_nt
Name:
........ Accoum#:
Naxfle:
Account #: Account #:
Name: Name:
Account #: Account #:
Name: Name:
Account #:
REASON FOR BUDGET CHANGE ENTRY:
Account#:
Contract Management Services fo_r Interim Personnel in the Finance Department due to personnel vacancy.
City Manager: Date:
Signature
Mayor: Date:
Signature
Posted By: Date:
Signature
forms~budgchng
ATTACHMENT #3
CARPET SELECTION CI~dTERIA
Product Name
Ihting
Construction
Fiber Content
Yarn Weight
Pile Height
Gauge
Backing
Second Backing
Flareinability
Comments
#i Design Weave
Candidate
lleavy Commercial
Dense Tufted Cut Pile
Monsanto LXI Nylon
Yarn Dyed
44 oz/sq. yd.
.34"
1/10
Reinforced woven polypropylene
"Action Back" polypropylene
Acceptable-passes pill test
#2 Bremworth Carpets
Karatex
l leavy Commercial
Level Loop Pile
100% Wool
Yarn Dyed
40 oz/sq. yd.
.20"
1/10
woven polypropylene
Jute
Acceptable-passes pill test
#3 World Carpets
Chelsea
ltcavy Commercial
Cut Pile
BASF Zeftroh Nylon
Solution Dyed
38 oz/sq. yd.
1/10
woven polypropylene
woven polypropylene
Acceptable-passes pill test
Warranties
Comments
Limited Secondary backing only
Heavy weight carpet. Similar to
existing. Will wear and show traffic
more than the lower cut pile.
Reasonable track record for cleaning /
scotch guard available.
Action Back has a ten year limited'
warranty against delaminating
none
Very durable, natural fiber, less toxins.
Easy to clean.
Jute backing is more flexible and less
likely to bubble at sealns. Will not mar or
scratch walls.
No warranty.
Limited 10yr warranty
Similar to existing carpet. Pattern is
more forgiving for installation.
Solution dye will allow for strong
cleaning solutions to be used but may
attract more day to day dirt.
Secondary backing not as good as Ju~e
or the Action Back.