HomeMy WebLinkAbout4.7 - 3268 Fallon Sports Park Phase 3 - Environmental Page 1 of 3 STAFF REPORT CITY COUNCIL DATE: June 16, 2020 TO: Honorable Mayor and City Councilmembers FROM: Linda Smith, City Manager SUBJECT: Fallon Sports Park Master Plan Update and CEQA Addendum Prepared by: Rosemary Alex, Parks and Facilities Development Coordinator EXECUTIVE SUMMARY: The City Council will consider adopting an Addendum to the 2005 Mitigated Negative Declaration and approving an update to the Fallon Sports Park Master Plan to include a cricket field, sand volleyball courts, and a lighted five-bay batting cage in Phase 3 of park development. STAFF RECOMMENDATION: Adopt the Resolution Approving an Addendum to a Mitigated Negative Declaration and Approving an Update to the Fallon Sports Park Master Plan. FINANCIAL IMPACT: As approved in the updated 2020-2025 Capital Improvement Program, the total budget for Fallon Sports Park - Phase 3 is $10,598,000, funded by the Public Facility Fee Fund. There is no impact to the General Fund. DESCRIPTION: The 2020-2025 Capital Improvement Program (CIP) includes Fallon Sports Park - Phase 3 (CIP No. PK0119), which provides for the design and construction of the remaining 14 acres of the 60-acre Fallon Sports Park, in accordance with the Fallon Sports Master Plan Fallon Sports Park Master Plan On June 7, 2005, the City Council approved the Master Plan (Attachment 4) for a three - phased development of the 60-acre Fallon Sports Park. The Master Plan was subsequently amended on February 21, 2012 (Attachment 5) which included the following revisions: 1) a 90-foot illuminated baseball diamond; 2) eliminating sand volleyball courts; and 3) identifying the following amenities to be optional: baseball field restroom, baseball field synthetic turf infield, changing natural turf to synthetic turf f or Page 2 of 3 soccer fields, soccer field lighting, soccer field shade structure, soccer field wind breaks, soccer field practice walls and a recreation building. On February 18, 2014 , the Master Plan was revised a second time (Attachment 6) to include all the option al items identified in the 2012 update except for the following: baseball field restroom, soccer field practice walls, and the recreation building. Phase 3 Conceptual Design On December 17, 2019, the City Council approved the conceptual design for Fallo n Sports Park Phase 3 that included two little league fields, four sand volleyball courts, a cricket field, children’s play area, and a five-bay batting cage (Attachment 3). The conceptual design differs from the 2014 Master Plan in the following ways: 1. Eliminated two softball fields and a walkway access connection to Fallon Road in the northeast corner. 2. No further improvements to the BMX track. 3. Addition of one cricket field with three cricket pitches, a five-bay batting cage for both baseball and cricket, and four sand volleyball courts. In addition, the City Council directed Staff to complete an environmental review for inclusion of lighting for the batting cage. The environmental review included evaluation of the approved concept design, in which two previously planned softball fields were replaced with the cricket field, batting cages, and volleyball courts. Environmental Document Update On June 7, 2005, the City Council adopted a Mitigated Negative Declaration (MND) for a three-phased development of Fallon Sports Park (Attachment 7). The Master Plan and MND identified that lighting would only be located in Phase 1 of the park. On February 18, 2014, the City Council approved an Addendum to the MND to include lighting of two soccer fields and a 90 -foot baseball diamond in Phase 2 of the park (Attachment 8). During the public outreach process for Phase 3, sports interest groups requested that the batting cages be illuminated to allow for extended batting practice time. Upon approval of the Phase 3 concept plan, the City Council directed Staff to consider adding lighting to the batting cages during project design. Staff engaged an environmental consultant to review the Phase 3 concept plan, including the addition of lighting for the batting cages. The environmental review of the cricket field, sand volleyball courts, and batting cage with lights has shown that there would be no significant impacts beyond those identified in the original 2005 Mitigated Negative Declaration. Therefore, an Addendum (Attachment 2) to the Fallon Sports Park 2005 MND has been prepared to document this conclusion and complete the required environmental review for the current project. Finally, with approval of the Addendum to the MND, the Fallon Sports Park Master Plan can be amended for: the removal of two softball fields and the walkway access to Fallon; the addition of a cricket field with three pitches; the addition of four volleyball courts; and the addition of an illuminated five-bay batting cage. Page 3 of 3 STRATEGIC PLAN INITIATIVE: None. NOTICING REQUIREMENTS/PUBLIC OUTREACH: A public notice has been mailed to all the property owners within a 300-foot radius of Fallon Sports Park. ATTACHMENTS: 1. Resolution Approving an Addendum to a Mitigated Negative Declaration and Approving an Update to the Fallon Sports Park Master Plan 2. Exhibit A to Resolution - Addendum to 2005 Mitigated Negative Declaration 3. Exhibit B to Resolution - Master Plan Update 4. Fallon Sports Park Master Plan 2005 5. Fallon Sports Park Master Plan Update 02-21-2012 6. Fallon Sports Park Master Plan Update 02-18-2014 7. Fallon Sports Park Master Plan 2005 Mitigated Negative Declaration 8. Fallon Sports Park Mitigated Negative Declaration 2014 Addendum 9. CIP - PK0119 Fallon Sports Park Phase 3 ATTACHMENT 1 RESOLUTION NO. - 20 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF DUBLIN * * * * * * * * * * * APPROVING AN ADDENDUM TO A MITIGATED NEGATIVE DECLARATION AND APPROVING AN UPDATE TO THE FALLON SPORTS PARK MASTER PLAN WHEREAS, the project site is located in the eastern portion of the City of Dublin, for which the City adopted the Eastern Dublin General Plan Amendment/Specific Plan to provide a planning framework for land uses, including recreational facilities and community parks. In connection wi th this approval, the City of Dublin certified a Program Environmental Impact Report (EIR) pursuant to CEQA Guidelines, Section 15168 (SCH: 91103064, Resolution 51-93, and Addendum dated August 22, 1994; and WHEREAS, a Mitigated Negative Declaration (MND) was prepared to analyze the Fallon Sports Park Master Plan in 2005. The 2005 Mitigated Negative Declaration was approved by City Council Resolution No. 89-05 on June 7, 2005; and WHEREAS, on January 8, 2019, the City Council directed Staff to update the Fallon Sports Park Master Plan to include batting cages and a cricket field, and to look at the cost and location of adding sand volleyball courts, in lieu of two softball fields; and WHEREAS, on December 17, 2019 the City Council approved the Fallon Sports Park – Phase 3 Concept Plan to include four sand volleyball courts and to eliminate the group picnic area and stairway access, and the City Council directed Staff to complete an environmental review in order to consider the inclusion of lighting for the batting cages; and WHEREAS, Staff prepared an initial study checklist pursuant to Public Resources Code Section 21166, and CEQA Guidelines Sections 15162 and 15164, subdivision (a), to evaluate whether the proposed changes to the Fallon Sports Park Master Plan would result in any new impacts or impacts that would be more severe than were evaluated and disclosed in the 2005 Mitigated Negative Declaration; and WHEREAS, CEQA Guidelines Section 15164, subdivision (a) provides that the lead agency or a responsible agency shall prepare an addendum to a previously certified Environmental Impact Report (EIR) or MND if some changes or additions are necessary but none of the conditions describe d in CEQA Guidelines Section 15162 calling for preparation of a subsequent EIR or MND have occurred (CEQA Guidelines § 15164, subdivision (a)); and WHEREAS, the analysis provided in the initial study checklist confirms that the proposed changes to the Fallon Sports Park Master Plan would not result in any new impacts or impacts that would be more severe than were evaluated and disclosed in the 2005 Mitigated Negative Declaration; and WHEREAS, the Addendum, checklist, and attached documents constitute substantial evidence supporting the conclusion that preparation of a subsequent MND is not required prior to construction of Fallon Sports Park Phase 3 by responsible and trustee agencies and provides the required documentation under CEQA. ATTACHMENT 1 NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Dublin does hereby accept and approve the Addendum (attached as Exhibit A) as substantial evidence supporting the conclusion that preparation of a subsequent Mitigated Negative Declaration is not required and provides the required documentation under CEQA. BE IT FURTHER RESOLVED that the City Council of the City of Dublin does hereby approve an update to the Fallon Sports Park Master Plan (attached as Exhibit B). PASSED, APPROVED AND ADOPTED this 16th day of June 2020, by the following vote: AYES: NOES: ABSENT: ABSTAIN: ______________________________ Mayor ATTEST: _________________________________ City Clerk Fallon Sports Park Phase 3 (Upper Terrace) Addendum to the 2005 Fallon Sports Park MND May 28, 2020 Table of Contents Introduction 1 Background 2 Project Description 3 Environmental Checklist 6 Explanation of Environmental Checklist Responses 8 Appendices A Photometric Plan List of Figures Figure 1: Regional Location .......................................................................................................... 53 Figure 2: Project Location ............................................................................................................ 54 Figure 3: Phase 3 – Concept Plan .................................................................................................. 55 Note: All figures are included at the end of the document. City of Dublin Fallon Sports Park Phase 3 Addendum to the 2005 Fallon Sports Park MND | Page 1 Fallon Park Phase 3 (Upper Terrace) Addendum to the 2005 Fallon Sports Park MND Introduction This Addendum, checklist, and attached supporting documents have been prepared to determine whether and to what extent the 2005 Fallon Sports Park Mitigated Negative Declaration (MND)/Initial Study (2005 MND) prepared by the City of Dublin remains sufficient to address potential impacts of the proposed new cricket field, batting cages, sand volleyball courts, and walkway, or whether additional documentation is required under California Environmental Quality Act (CEQA) (Public Resources Code [PRC], § 21000, et seq.). For the purposes of this Addendum, Phase 3 (also known as the Upper Terrace) of the Fallon Sports Park (Park) is the proposed project and project site. Pursuant to Public Resources Code Section 21166, and CEQA Guidelines Sections 15162 and 15164, subdivision (a), the attached checklist has been prepared to evaluate the proposed project. The attached checklist uses the standard environmental checklist categories provided in Appendix G of the CEQA Guidelines. CEQA Guidelines Section 15164, subdivision (a) provides that the lead agency or a responsible agency shall prepare an addendum to a previously certified Environmental Impact Report (EIR) or MND if some changes or additions are necessary but none of the conditions described in CEQA Guidelines Section 15162 calling for preparation of a subsequent EIR or MND have occurred (CEQA Guidelines § 15164, subd. (a)). This Addendum, checklist, and attached documents constitute substantial evidence supporting the conclusion that preparation of a subsequent MND is not required prior to approval of the above-referenced permits by responsible and trustee agencies and provides the required documentation under CEQA. This Addendum addresses improvements and construction of the remaining 12.83 acres of Phase 3 of the Fallon Sports Park. Proposed changes to the Fallon Sports Park Master Plan include the substitution of cricket pitches, batting cages, and sand volleyball courts in place of the originally proposed softball diamonds in the Upper Terrace area. All other existing and proposed components of the Fallon Sports Park Master Plan would remain unchanged. Project Title Fallon Sports Park Phase 3 (Upper Terrace) Lead Agency Name and Address City of Dublin Community Development Department 100 Civic Plaza Dublin, CA 94568 City of Dublin Fallon Sports Park Phase 3 Addendum to the 2005 Fallon Sports Park MND | Page 2 Contact Person and Phone Number Rosemary Alex Parks & Facilities Development Coordinator Phone: 925/833-6630 rosemary.alex@dublin.ca.gov Background Project Location and Context The project site is in the City of Dublin, Alameda County, California (APN: 985-54-2) (Figure 1: Regional Location). The 60.58-acre Fallon Sports Park is located at the northwest corner of Fallon Road and Central Parkway in Eastern Dublin and currently consists of a variety of athletic fields, courts, and activity areas accommodating baseball, softball, soccer, tennis, basketball, and bocce ball, a jogging/walking loop, BMX course, and parking areas (Figure 2: Project Location). The Fallon Sports Park area has been graded to create a lower and upper terrace. Drainage improvements, entry roads, parking lots, and utilities have already been installed. This existing development covers 47.75 acres and was completed in two phases. Phase I developed 28 acres that opened in 2010, and included two Little League baseball diamonds, two lighted softball diamonds, four lighted basketball courts, two lighted soccer fields, four lighted tennis courts, a restroom/field office structure, two restroom/concession structures, a parking lot, picnic areas, and vehicle and pedestrian entryways. Phase II (also known as the Lower Terrace Phase) developed 19.75 acres that opened in 2018, and included a lighted baseball diamond, four lighted bocce ball courts, two lighted, turf soccer fields, a playground, parking lot, group picnic areas, and a vehicle entryway. The original Fallon Sports Park Master Plan for the entire 60.58 acres was approved by the City in June 2005. A Master Plan Update for Phase II was adopted in February 2012 which deleted the original proposed sand volleyball courts, added a lighted baseball diamond as well as lighting for the existing soccer field, and temporarily relocated an existing City preschool to the project site. (The preschool was never relocated to the Fallon Sports Park.) The Park is bound by single-family and medium-density residential development on all sides, in addition to a fire station and open space to the north, undeveloped parkland to the south, and a public elementary school to the west. Prior Environmental Review Documents The project has been included in two previous CEQA documents, as noted below: Eastern Dublin General Plan Amendment and Eastern Dublin Specific Plan (State Clearinghouse # 1991103064). A Program Environmental Impact Report for the Eastern Dublin General Plan Amendment (Eastern Extended Planning Area) and the Eastern Dublin Specific Plan City of Dublin Fallon Sports Park Phase 3 Addendum to the 2005 Fallon Sports Park MND | Page 3 (EDSP) was certified by the City Council in 1993 by Resolution No. 51-93. This document and its related Addenda collectively are referred to as the Eastern Dublin EIR (EDEIR.) It evaluated the following impacts: Land Use; Population, Employment and Housing; Traffic and Circulation; Community Services and Facilities; Sewer, Water and Storm Drainage; Soils, Geology and Seismicity; Biological Resources; Visual Resources; Cultural Resources; Noise; Air Quality; and Fiscal Considerations. The City adopted a Statement of Overriding Considerations (Resolution No. 53–93) for the following impacts: Cumulative loss of agriculture and open space land, cumulative traffic, extension of certain community facilities (natural gas, electric and telephone service), consumption of non - renewable natural resources, increases in energy uses through increased water treatment and disposal and through operation of the water distribution system, inducement of substantial growth and concentration of population, earthquake ground shaking, loss or degradation of botanically sensitive habitat, regional air quality, noise and alteration of visual character. The EDEIR was challenged in court and was found to be legally adequate. Fallon Sports Park Master Plan Mitigated Negative Declaration (2005 MND) A Mitigated Negative Declaration was prepared to analyze the Fallon Sports Park Master Plan in 2005. The 2005 MND was approved by City Council Resolution No. 89-05 on June 7, 2005. The 2005 MND assumed development of the Park consistent with the 2005 Fallon Sports Park Master Plan. Several mitigation measures were included in the adopted MND in the attachment to the Initial Study. Project Description The entire Fallon Sports Park is designated in the General Plan as Parks/Public Recreation, and in the Zoning Ordinance as Planned Development. The proposed project includes developing Phase 3 (Upper Terrace) of the Fallon Sports Park with the following components: • Installation of a new cricket field with three pitches • Installation of four sand volleyball courts approximately lining south end of BMX course • Installation of lighted batting cages south of proposed sand volleyball courts • Elimination of two softball diamonds originally proposed in the Master Plan, to be replaced with the new cricket field, sand volleyball courts, and batting cages The Master Plan already includes the following uses for the Upper Terrace Area. These uses would also be constructed, and were previously evaluated and approved as part of the 2005 MND: • Two Little League baseball diamonds adjacent to existing Little League diamonds City of Dublin Fallon Sports Park Phase 3 Addendum to the 2005 Fallon Sports Park MND | Page 4 • Activity area (children’s play area and picnic plaza) between Little League diamonds and proposed new improvements • Walkway along cricket field and sand volleyball courts Figure 3: Phase 3 – Concept Plan demonstrates locations of proposed improvements. Field Lighting. The City of Dublin is proposing to install up to 20 lighting fixtures in the proposed batting cages, to be located south of Fallon Road and the existing BMX course. A photometric plan is included as Appendix A. Lights would only be used when the Park is open until 10 p.m. each night; all lights would be turned off by 10:00 p.m. New lights would be sited to minimize spillover of unwanted light and glare on adjacent residential areas. Additionally, as described in the Fallon Sports Park Master Plan, all lighting would be “cut-off” style, directing light down, not out. Project Approvals The City proposes to amend the Fallon Sports Park Master Plan to accommodate the proposed revisions to Phase 3 Park improvements, as described in this Addendum. City of Dublin Fallon Sports Park Phase 3 Addendum to the 2005 Fallon Sports Park MND | Page 5 Lead Agency City of Dublin Community Development Department 100 Civic Plaza Dublin, CA 94568 Contact Person and Phone Number Rosemary Alex Parks & Facilities Development Coordinator Phone: 925/833-6630 rosemary.alex@dublin.ca.gov Project Location Fallon Sports Park, northwest corner of Fallon Road and Central Parkway in Eastern Dublin Project Sponsor City of Dublin General Plan Designation Parks/Public Recreation Zoning Planned Development Project Approvals The City proposes to amend the Fallon Sports Park Master Plan to accommodate the proposed project. City of Dublin Fallon Sports Park Phase 3 Addendum to the 2005 Fallon Sports Park MND | Page 6 Environmental Checklist The purpose of the checklist is to evaluate the categories in terms of any changed condition (i.e., changed circumstances, Project changes, or new information of substantial importance) that may result in an adverse change in the environmental result (e.g., a new significant impact or substantial increase in the severity of a previously identified significant effect) (CEQA Guidelines § 15162). The questions posed in the checklist come from Appendix G of the CEQA Guidelines. A “no” answer does not necessarily mean that there are no potential impacts relative to the environmental category, but that there is no adverse change in the condition or status of the impact since it was analyzed and addressed with mitigation measures in the 2005 MND. These environmental categories might be answered with a “no” in the checklist, since the proposed Project does not introduce adverse changes that would result in a modification to the conclusion of the previously approved CEQA document. This addendum addresses the conclusions of the 2005 MND. Explanation of Checklist Evaluation Categories (1) Conclusion in 2005MND and Related Documents This column summarizes the conclusion of the 2005 MND relative to the environmental issue listed under each topic. (2) Do the Proposed Changes Involve New Significant Impacts? Pursuant to CEQA Guidelines Section 15162, subdivision (a)(1), this column indicates whether the changes represented by the revised Project will result in new significant environmental impacts not previously identified or mitigated by the 2005 MND, or whether the changes will result in a substantial increase in the severity of a previously identified significant impact. (3) New Circumstances Involving New Significant Impacts? Pursuant to CEQA Guidelines Section 15162, subdivision (a)(2), this column indicates whether there have been substantial changes with respect to the circumstances under which the Project is undertaken that will require major revisions to the 2005 MND due to the involvement of new significant environmental effects or a substantial increase in the severity of previously identified significant effects. (4) New Information of Substantial Importance Requiring New Analysis or Verification? Pursuant to CEQA Guidelines Section 15162, subdivision (a)(3)(A-D), this column indicates whether new information of substantial importance, which was not known and could not have been known with the exercise of reasonable diligence at the time the 2005 MND was adopted, shows any of the following: City of Dublin Fallon Sports Park Phase 3 Addendum to the 2005 Fallon Sports Park MND | Page 7 (A) The Project will have one or more significant effects not discussed in the previous EIR or negative declaration; (B) Significant effects previously examined will be substantially more severe than shown in the previous 2005 MND; (C) Mitigation measures or alternatives previously found not to be feasible would in fact be feasible, and would substantially reduce one or more significant effects of the Project, but the Project proponents decline to adopt the mitigation measure or alternative; or (D) Mitigation measures or alternatives that are considerably different from those analyzed in the previous 2005 MND would substantially reduce one or more significant effects on the environment, but the Project proponents decline to adopt the mitigation measure or alternative. If the additional analysis completed as part of this environmental review were to find that the conclusions of the 2005 MND remain the same and no new significant impacts are identified, or identified impacts are not found to be substantially more severe, or additional mitigation is not necessary, then the question would be answered “no” and no additional environmental document would be required under section 15162 of the CEQA Guidelines. (5) Mitigation Measures Implemented or Address Impacts Pursuant to CEQA Guidelines Section 15162, subdivision (a)(3), this column indicates whether the IS/MND provides mitigation measures to address effects in the related impact category. Any previously adopted mitigation measures will be identified. The response will also address proposed revisions to previously adopted mitigation measures. These mitigation measures will be implemented with the construction of the Project, as applicable. If “NA” is indicated, the IS/MND has concluded that the impact either does not occur with this Project or is not significant, and therefore no additional mitigation measures are needed. Discussion and Mitigation Sections (1) Discussion A discussion of the elements of the checklist is provided under each environmental category in order to clarify the answers. The discussion provides information about the particular environmental issue, how the Project relates to the issue, and the status of any mitigation that may be required or that has already been implemented. (2) Mitigation Measures Applicable mitigation measures from the 2005 MND that apply to the Project are listed under each environmental category. (3) Conclusions A discussion of the conclusion relating to the analysis is contained in each section. City of Dublin Fallon Sports Park Phase 3 Addendum to the 2005 Fallon Sports Park MND | Page 8 Explanation of Environmental Checklist Responses Aesthetics ENVIRONMENTAL IMPACTS Issues Conclusion in IS/MND Do the Proposed Changes Involve New or More Severe Impacts? New Circumstances Involving New or More Severe Impacts? New Information Requiring New Analysis or Verification? Mitigation Measures 1. AESTHETICS. Would the project: a) Have a substantial adverse effect on a scenic vista? Less than significant No No No None b) Substantially damage scenic resources, including but not limited to, trees, rock outcroppings, and historic buildings within a state scenic highway? Less than significant No No No None c) Substantially degrade the existing visual character or quality of the site and its surroundings? Less than significant No No No None d) Create a new source of substantial light or glare which would adversely affect day or nighttime views in the area? Less than significant with mitigation No No No 2005 MND Mitigation Measure 1 Project Impacts and Mitigation Measures (a–c) Scenic vistas and resources, visual character The 2005 MND concluded that impacts associated with visual quality and resources would be less than significant because the implementation of Fallon Sports Park Master Plan would not significantly alter the appearance of the originally vacant site. Fallon Sports Park is not located within a scenic route, and the proposed improvements would provide street frontage landscaping that would improve the visual community landscape of the area. The proposed Phase 3 portion of the Fallon Sports Park is currently vacant and has been rough graded in connection with prior approvals and in anticipation of construction of a public park. City of Dublin Fallon Sports Park Phase 3 Addendum to the 2005 Fallon Sports Park MND | Page 9 The project would involve minor changes to the site plan proposed in the 2005 MND. Specifically, proposed changes to the Fallon Sports Park Master Plan include the installation of cricket pitches, batting cages, and sand volleyball courts in place of the two softball diamonds originally proposed in Phase 3 of the Master Plan. These proposed changes to the Master Plan would retain the athletic development originally proposed and would not significantly alter the visual characteristics of the site as analyzed in the 2005 MND. Therefore, the project would not result in any new or more severe impacts related to scenic vistas, scenic resources, or visual characteristics than were previously analyzed in the 2005 MND. (d) Create a new source of substantial light or glare The 2005 MND concluded that impacts associated with new light or glare because of nighttime park lighting in proximity to residential neighborhoods would be less than significant with mitigation. Mitigation Measure 1 required a photometric study for the Master Plan demonstrating low lighting prior to electrical permits for lighting installation. This mitigation measure applies to the proposed Phase 3 development. Daytime glare is not expected to be generated by any components of the Phase 3 development. The only proposed new lighting would be installed at the batting cages. Lighting was not originally proposed for Phase 3 development and was not analyzed in the 2005 MND. However, this lighting would be contained to a small area compared to field lighting for other parts of the Park. The lighted batting cages would be located in the interior of the park, not adjacent to neighboring residential uses. A photometric plan was prepared for the City by Associated Lighting Representatives on February 21, 2020 and is included as Appendix A of this Addendum. Proposed changes to the Master Plan include adding 20 light fixtures to the Phase 3 development area. The photometric study demonstrates that based on the location of the proposed batting cages in the interior of the Park, the lighting would dissipate sufficiently at the property line and not adversely affect any surrounding residences. Furthermore, the Park is surrounded by local roadways, which provide an additional buffer, and all lighting would be shut off at 10 p.m. Therefore, proposed changes to the Master Plan would not result in any light trespass during nighttime hours or new or more severe impacts from light and glare than were previously analyzed in the 2005 MND. Mitigation Measures 2005 MND MM 1 – A photometric study shall be provided with final construction drawings of the project prior to the issuance of an electrical permit for installation of any lighting. "Spill over" lighting shall be kept to a minimum to prevent disturbance and intrusion into residential areas using lower lighting, with light standards for fields and courts designed to minimize the light intrusion into residential areas. Implementation of this mitigation measure would reduce the impact of nighttime lighting to a level of less-than-significant. City of Dublin Fallon Sports Park Phase 3 Addendum to the 2005 Fallon Sports Park MND | Page 10 Agricultural and Forestry Resources Environmental Issue Area Conclusion in IS/MND Do the Proposed Changes Involve New or More Severe Impacts? New Circumstances Involving New or More Severe Impacts? New Information Requiring New Analysis or Verification ? Mitigation Measures 2. AGRICULTURE RESOURCES. In determining whether impacts to agricultural resources are significant environmental effects, lead agencies may refer to the California Agricultural Land Evaluation and Site Assessment Model (1997) prepared by the California Department of Conservation as an optional model to use in assessing impacts on agriculture and farmland. Would the project: a) Convert Prime Farmland, Unique Farmland, or Farmland of Statewide Importance (Farmland), as shown on the maps prepared pursuant to the Farmland Mapping and Monitoring Program of the California Resources Agency, to non-agricultural use? Less than significant No No No None b) Conflict with existing zoning for agricultural use, or a Williamson Act contract? Less than significant No No No None c) Involve other changes in the existing environment which, due to their location or nature, could result in conversion of Farmland to non- agricultural use? Less than significant No No No None Project Impacts and Mitigation Measures (a) Convert Prime Farmland, Unique Farmland, or Farmland of Statewide Importance (farmland) The 2005 MND concluded that the Fallon Sports Park Master Plan would have a less than significant impact associated with the conversion of farmland, unique farmland, or farmland of statewide importance. The project would involve minor changes to the site plan as proposed in the 2005 MND. Specifically, proposed changes to the Fallon Sports Park Master Plan are the substitution of cricket pitches, batting cages, and sand volleyball courts in place of softball diamonds. These minor changes would not result in any new or additional impacts in relation to agricultural resources. As such, the project would not result in a new or more severe impact to important farmland than were previously analyzed in the 2005 MND. City of Dublin Fallon Sports Park Phase 3 Addendum to the 2005 Fallon Sports Park MND | Page 11 (b) Conflict with existing zoning for agricultural use or a William Act contract The 2005 MND concluded that impacts associated with existing zoning conflicts or Williamson Act contracts would be less than significant because the Fallon Sports Park contains no agricultural zoning or farmland and is zoned for use as a community park, consistent with the General Plan and Specific Plan. According to the 2005 MND, no portion of the site is associated with a Williamson Act Land Conservation Agreement. The project would involve development of parkland with minor changes to the originally proposed plan that was analyzed in the 2005 MND. These minor changes would be consistent with existing zoning and would not conflict with agricultural use or a Williamson Act contract. As such, the project would not result in any new or more severe impact to important farmland than were previously analyzed in the 2005 MND. (c) Conflict with existing zoning The 2005 MND concluded that impacts associated with existing zoning conflicts would be less than significant because the Park is zoned for use as a community park. The project would fulfill the Fallon Sports Park Master Plan’s intended use of the land as a community park and is consistent with the existing zoning. The minor changes that are proposed would not necessitate a change of zoning or result in any new or more severe impacts than were previously analyzed in the 2005 MND. City of Dublin Fallon Sports Park Phase 3 Addendum to the 2005 Fallon Sports Park MND | Page 12 Air Quality ENVIRONMENTAL IMPACTS Issues Conclusion in IS/MND Do the Proposed Changes Involve New or More Severe Impacts? New Circumstan ces Involving New or More Severe Impacts? New Information Requiring New Analysis or Verification? Mitigation Measures 3. AIR QUALITY. Where available, the significance criteria established by the applicable air quality management or air pollution control district may be relied upon to make the following determinations. Would the project: a) Conflict with or obstruct implementation of the applicable air quality plan? No impact No No No None b) Violate any air quality standard or contribute to an existing or projected air quality violation? Less than significant with mitigation. No No No 2005 MND Mitigation Measure 2 c) Result in a cumulatively considerable net increase of any criteria pollutant for which the project region is non-attainment under an applicable federal or state ambient air quality standard (including releasing emissions which exceed quantitative thresholds for ozone precursors)? Less than significant No No No None d) Expose sensitive receptors to substantial pollutant concentrations? Less than significant No No No None e) Create objectionable odors affecting a substantial number of people? Less than significant No No No None Project Impacts and Mitigation Measures (a) Consistent with air quality plans The 2005 MND concluded that the Fallon Sports Park Master Plan would not conflict with the Clean Air Plan adopted by the Bay Area Air Quality Management District. The proposed amount of nonresidential development has been included in the City of Dublin's planned growth as part of the EDEIR since 1994 and would serve the existing community. The project would involve minor changes to the site plan as analyzed in the 2005 MND. Specifically, proposed changes to the Fallon Sports Park Master Plan are the substitution of cricket pitches, batting cages, and sand volleyball courts in place of softball diamonds. These minor changes would not alter the amount of nonresidential development as compared to the previously proposed plan, and therefore would not result in any new or additional impacts. As City of Dublin Fallon Sports Park Phase 3 Addendum to the 2005 Fallon Sports Park MND | Page 13 such, the project would not result in new or more severe impacts than were previously analyzed in the 2005 MND with respect to Clean Air Plan consistency. (b) Violate any air quality standard The 2005 MND concluded that, with implementation of Mitigation Measure 2, the Fallon Sports Park Master Plan would have a less than significant impact associated with air quality standard violations. The 2005 MND required the incorporation of Mitigation Measure 2 into future phases of project construction to reduce potential air quality impacts related to construction on the 60.58 acres of park development to a less than significant impact. Mitigation Measure 2 requires dust control for the project’s construction and earthwork to conform to the requirements of the stormwater pollution prevention plan (SWPPP) prepared by the City and to established City standards. This mitigation measure includes additional requirements for dust control, including daily watering of all active construction areas, covering all trucks hauling soil, sand or other loose materials; daily watering or application of nontoxic soil stabilizer on all unpaved access roads, parking area and staging areas; daily sweeping of all paved access roads, parking areas, and staging areas with water sweepers; and hydroseeding or application of nontoxic soil stabilizers to construction areas that have been graded. The project would involve minor changes to the site plan as proposed in the 2005 MND. Specifically, proposed changes to the Fallon Sports Park Master Plan are the substitution of cricket pitches, batting cages, and sand volleyball courts in place of softball diamonds. These changes would involve a similar level of construction as the previously proposed plan, and therefore would not result in any new or additional impacts. The proposed project would implement Mitigation Measure 2 from the 2005 MND, updated to reflect current BAAQMD guidance. As such, the project would not result in new or more severe impacts related to air quality standards violations than were previously analyzed in the 2005 MND. (c) Cumulatively considerable net increase of criteria pollutant The 2005 MND concluded that the Fallon Sports Park Master Plan would have a less than significant impact associated with cumulatively considerable net increases of criteria pollutants. The implementation of the Fallon Sports Park Master Plan would not generate significant amounts of additional traffic beyond that considered in previous environmental documents, and vehicular traffic emissions and stationary source emissions would not exceed regional air quality standards or thresholds. The project would involve minor changes to the site plan as proposed in the 2005 MND. Specifically, proposed changes to the Fallon Sports Park Master Plan are the substitution of cricket pitches, batting cages, and sand volleyball courts in place of softball diamonds. These minor changes would not increase vehicle trips associated with the Fallon Sports Park Master Plan as analyzed in the 2005 MND, and therefore would not result in any new or additional criteria pollutant impacts. As such, the project would not result in new or more severe impacts related to criteria pollutants than were previously analyzed in the 2005 MND. City of Dublin Fallon Sports Park Phase 3 Addendum to the 2005 Fallon Sports Park MND | Page 14 (d–e) Expose sensitive receptors to pollutant concentrations, or create objectionable odors The 2005 MND concluded that the Fallon Sports Park Master Plan would have less than significant impacts associated with the exposure of sensitive receptors to pollutant concentrations and the creation of objectionable odors. The project would involve minor changes to the site plan as proposed in the 2005 MND. Specifically, proposed changes to the Fallon Sports Park Master Plan are the substitution of cricket pitches, batting cages, and sand volleyball courts in place of softball diamonds. These minor changes would not result in an increase in pollutants or odors associated with the construction and operation of the project, and therefore would not result in any new or additional impacts. As such, the project would not result in new or more severe impacts related to pollutants or odors than were previously analyzed in the 2005 MND. Mitigation Measures 2005 MND MM 2 – Dust control for the construction and earthwork for the project shall conform to the requirements of the SWPPP prepared by the City and established City standards. All active construction areas shall be watered daily and more frequently, if necessary. All trucks hauling soil, sand or other loose materials shall be covered. Water shall be applied daily, or apply non-toxic soil stabilizers on all unpaved access roads, parking area, and staging areas at construction sites. All paved access roads, parking areas and staging areas at construction sites shall be swept daily with water sweepers. Hydroseed or apply non-toxic soil stabilizers to construction areas that have been graded. City of Dublin Fallon Sports Park Phase 3 Addendum to the 2005 Fallon Sports Park MND | Page 15 Biological Resources ENVIRONMENTAL IMPACTS Issues Conclusion in IS/MND Do the Proposed Changes Involve New or More Severe Impacts? New Circumstanc es Involving New or More Severe Impacts? New Information Requiring New Analysis or Verification ? Mitigation Measures 4. BIOLOGICAL RESOURCES. Would the project: a) Have a substantial adverse effect, either directly or through habitat modifications, on any species identified as a candidate, sensitive, or special- status species in local or regional plans, policies, or regulations, or by the California Department of Fish and Wildlife or U.S. Fish and Wildlife Service? Less than significant No No No EDEIR MM 3.7/1.0 – 5.0, 10.0, 14.0, 16.0, 17.0, and 19.0 b) Have a substantial adverse effect on any riparian habitat or other sensitive natural community identified in local or regional plans, policies, regulations, or by the California Department of Fish and Wildlife or U.S. Fish and Wildlife Service? Less than significant No No No None c) Have a substantial adverse effect on federally protected wetlands as defined by Section 404 of the Clean Water Act (including, but not limited to, marsh, vernal pool, coastal, etc.) through direct removal, filling, hydrological interruption, or other means? Less than significant No No No None d) Interfere substantially with the movement of any native resident or migratory fish or wildlife species or with established native resident or migratory wildlife corridors, or impede the use of native wildlife nursery sites? Less than significant No No No None e) Conflict with any local policies or ordinances protecting biological resources, such as a tree preservation policy or ordinance? No impact No No No None f) Conflict with the provisions of an adopted Habitat Conservation Plan, Natural Community Conservation Plan, or other approved local, regional, or state habitat conservation plan? No impact No No No None City of Dublin Fallon Sports Park Phase 3 Addendum to the 2005 Fallon Sports Park MND | Page 16 Project Impacts and Mitigation Measures (a) Substantial adverse effect on candidate, sensitive, or special-status species The 2005 MND concluded that the Fallon Sports Park Master Plan would have a less than significant impact regarding adverse effects on candidate, sensitive, or special-status species if the mitigation measures defined in applicable CEQA documents (including the EDEIR), and all applicable environmental permits, are implemented. Mitigation measures defined in the EDEIR to reduce significant impacts on biological resources are included in IM 3.7A through S. Mitigation measures that are applicable to the proposed project are listed below. The proposed project involves only minor changes to the site plan as proposed in the 2005 MND. Specifically, proposed changes to the Fallon Sports Park Master Plan are the substitution of cricket pitches, batting cages, and sand volleyball courts in place of softball diamonds. Additionally, the proposed project site is heavily degraded following implementation of previous phases of the Fallon Sports Park. No candidate, sensitive, or special-status species or signs thereof were detected during a field survey conducted on March 12, 2020, by FCS biologist Bernhard Warzecha. Therefore, the minor changes associated with the proposed project would not result in any new or more severe impacts to candidate, sensitive, or special-status species than were previously analyzed in the 2005 MND. (b) Substantial adverse effect on any riparian habitat or other sensitive natural communities The 2005 MND concluded that the Fallon Sports Park Master Plan would have a less than significant impact regarding adverse effects on riparian or other sensitive natural communities if the mitigation measures defined in the EDEIR are implemented. Based on the field survey conducted on March 12, 2020 by FCS biologist Bernhard Warzecha, no riparian habitat or other sensitive natural communities are present on the proposed project footprint covered under this Addendum. Therefore, the project would not result in any adverse effects to riparian or other sensitive natural communities and would therefore remain consistent with the conclusions of the 2005 MND. The proposed project would not result in any new or more severe impacts than were previously analyzed in the 2005 MND. (c) Substantial adverse effect on wetlands The 2005 MND concluded that the Fallon Sports Park Master Plan would have a less than significant impact regarding adverse effects on federally protected wetlands. Based on the field survey conducted on March 12, 2020 by FCS biologist Bernhard Warzecha, no aquatic features, including wetlands, are present at the proposed project site covered under this Addendum. Therefore, the project would not result in any adverse impacts to federally protected wetlands and would therefore remain consistent with conclusions and findings of the City of Dublin Fallon Sports Park Phase 3 Addendum to the 2005 Fallon Sports Park MND | Page 17 2005 MND. The proposed project would not result in any new or more severe impact than were previously analyzed in the 2005 MND. (d) Interfere or impede the movement of migratory fish or wildlife The 2005 MND concluded that the impacts of the Fallon Sports Park Master Plan would be less than significant in relation to interference or impediments to movement of migratory fish or wildlife. The proposed project involves only minor changes to the site plan as proposed in the 2005 MND. Additionally, the proposed project site is heavily degraded following implementation of previous phases of the Fallon Sports Park. Therefore, the proposed project would not result in new or more severe impacts regarding adverse effects to movement of migratory fish or wildlife than were previously analyzed in the 2005 MND. (e) Conflict with local policies or ordinance include tree preservation The 2005 MND concluded that the Fallon Sports Park Master Plan would not conflict with the EDSP, General Plan, or other adopted policies and ordinances including tree preservation, and that no heritage trees exist on-site. Approval and construction of the proposed project would not affect any protected trees on- site, since no mature trees currently exist where the cricket pitches, batting cages, or sand volleyball courts would be constructed. Therefore, the proposed project would not result in new or more severe impacts regarding conflicts with local policies or ordinance than were previously analyzed in the 2005 MND. (f) Conflict with adopted habitat conservation or natural community conservation plans The 2005 MND concluded that the Fallon Sports Park Master Plan would not conflict with the provision of an adopted Habitat Conservation Plan, Natural Community Conservation Plan, or other approved local, regional, or state Habitat Conservation Plan. The project site lies within the Eastern Alameda County Conservation Strategy (EACCS) planning area. The City of Dublin utilizes the EACCS as guidance for environmental permitting for public projects. Private development projects are encouraged to use the EACCS as a resource as well. The EACCS embodies a regional approach to permitting and mitigating wildlife habitat impacts associated with land development, infrastructure, and other activities. The EACCS is neither a Habitat Conservation Plan nor a Natural Community Conservation Plan, but is a document intended to provide guidance during the project planning and permitting process to ensure that impacts are offset in a biologically effective manner. Therefore, the proposed project would not result in new or significantly more severe impacts with respect to this topic than were previously analyzed in the 2005 MND. Mitigation Measures City of Dublin Fallon Sports Park Phase 3 Addendum to the 2005 Fallon Sports Park MND | Page 18 EDEIR MM 3.7/1.0 – Direct disturbance or removal of trees or native vegetation cover should be minimized and be restricted to those areas actually designated for the construction of improvements. EDEIR MM 3.7/2.0 – Vegetation enhancement/management plans should be prepared for all open space areas (whether held publicly or privately) with the intent to enhance the biologic potential of the area as wildlife habitat. The focus of such plans will be to reintroduce native species in order to increase the vegetative cover and plant diversity. EDEIR MM 3.7/3.0 – The City will require a detailed revegetation/restoration plan to be developed for all disturbed areas that are to remain undeveloped. The plan will be developed by a qualified revegetation specialist, and should incorporate stockpiling of native topsoils as appropriate, for later reapplication to cut slopes, shoulders, and pads. EDEIR MM 3.7/4.0 – Grazing management plans shall be developed by the City and implemented soon after approval of the General Plan Amendment and Specific Plan. Management plans shall favor protection of riparian and wetland areas, increased plant diversity, and the recovery of native plants, in particular, perennial grasses. EDEIR MM 3.7/5.0 – All areas of disturbance should be revegetated as quickly as possible to prevent erosion. Native trees (preferably those species already on site), shrubs, herbs, and grasses should be used for revegetation of areas to remain as natural open space. The introduction of non-native plant species should be avoided. EDEIR MM 3.7/10.0 – Establish a stream corridor system (see Specific Plan: Figure 6.1) which provides multi-purpose open space corridors capable of accommodating wildlife and pedestrian circulation. In order to facilitate the use of these corridors by both humans and wildlife, human activities (e.g., trails) should be limited to one side of the stream. EDEIR MM 3.7/14.0 – The City should enact and enforce an erosion and sedimentation control ordinance establishing performance standards to ensure maintenance of water quality and protection of stream channels. The ordinance should regulate grading and development activities adjacent to streams and wetland areas, and require revegetation of all ground disturbance immediately after construction to reduce erosion potential. Until such an ordinance is in place, the City shall require project applicants to provide a detailed erosion and sedimentation control plan as part of the project submittal. EDEIR MM 3.7/16.0 – Existing sensitive habitats shall be avoided and protected where feasible. EDEIR MM 3.7/17.0 – Construction near drainages shall take place during the dry season. EDEIR MM 3.7/19.0 – The use of rodenticides and herbicides within the Project area should be restricted to avoid impacts on wildlife. The City shall require any poisoning programs to be done in cooperation with and under supervision of the Alameda County Department of Agriculture. City of Dublin Fallon Sports Park Phase 3 Addendum to the 2005 Fallon Sports Park MND | Page 19 Cultural Resources Environmental Issue Area Conclusion in IS/MND Do the Proposed Changes Involve New or More Severe Impacts? New Circumstanc es Involving New or More Severe Impacts? New Information Requiring New Analysis or Verification ? Mitigation Measures 5. CULTURAL RESOURCES. Would the project: a) Cause a substantial adverse change in the significance of a historical resource pursuant to Section 15064.5? No impact No No No MM 3.9/1.0–4.0 of the EDEIR b) Cause a substantial adverse change in the significance of an archaeological resource pursuant to Section 15064.5? No impact No No No MM 3.9/5.0 of the EDEIR c) Directly or indirectly destroy a unique paleontological resource or site or unique geologic feature? No impact No No No None d) Disturb any human remains, including those interred outside of dedicated cemeteries? No impact No No No MM 3.9/5.0 of the EDEIR Project Impacts and Mitigation Measures (a) Historical resources The 2005 MND concluded that there were no impacts associated with historical resources because no resources were discovered on the Fallon Sports Park site in a site-specific survey. Unrecorded cultural resources that could be encountered on the site would be addressed as required by the mitigation measures contained in the EDEIR. These mitigation measures (3.9/1.0–4.0) mandate a program of mechanical and/or hand subsurface testing for the presence or absence of midden deposits, recordation of identified midden sites, collection and/or testing of resources, and development of a site-specific protection program for prehistoric sites. The Phase 3 development area has remained relatively unchanged since the implementation of Phase II and is still vacant. No new State or local historical resources have been designated on or adjacent to the site. The proposed minor changes to the Fallon Sports Park Master Plan would not result in any new or more severe impacts related to historical resources than were previously analyzed in the 2005 MND. City of Dublin Fallon Sports Park Phase 3 Addendum to the 2005 Fallon Sports Park MND | Page 20 (b, d) Archaeological resources, human remains The 2005 MND concluded that there were no impacts associated with archaeological resources or human remains because no resources or remains were discovered on the Fallon Sports Park site in a site-specific survey. It did, however, reference Mitigation Measure 3.9/5.0 of the EDEIR, establishing protocols for inadvertent discovery of archaeological resources found during site grading. The 2005 MND stipulated that these measures would continue to be followed during ongoing development of Fallon Sports Park, and so are incorporated in this Addendum. In addition, the cultural resource mitigation measures contained in the EDEIR would address impacts to human remains. The Phase 3 development area has remained relatively unchanged since the implementation of Phase II and is still vacant. The proposed minor changes to the Fallon Sports Park Master Plan would not result in any new or more severe impacts related to archaeological resources and disturbance of human remains than were previously analyzed in the 2005 MND. (c) Paleontological/unique geological resources The 2005 MND concluded that there were no impacts associated with paleontological resources because no resources were discovered on the Fallon Sports Park site in a site-specific survey. The Phase 3 development area has remained relatively unchanged since the implementation of Phase II and is still vacant. The proposed minor changes to the Fallon Sports Park Master Plan would not result in new or more severe impacts related to paleontological resources than were previously analyzed in the 2005 MND. Mitigation Measures EDEIR MM 3.9/1.0 – All locations of prehistoric resources will need a program of mechanical and/or hand subsurface testing to determine the presence or absence of midden deposits associated with the surface indicators of aboriginal presence. EDEIR MM 3.9/2.0 – All locations containing either midden components or concentrations of cultural materials located on the surface will be recorded on State of California site survey forms. The borders of any midden deposits or concentrations of cultural materials (other than single isolated artifact discoveries) will be staked so that accurate location maps can be produced by professional survey teams. EDEIR MM 3.9/3.0 – If it can be demonstrated that these recorded and mapped locations will be impacted in any manner by future construction or indirectly impacted as a result of increased access to the areas, a plan of evaluative testing of each resource will have to be devised in order to prepare responsive mitigation measures. Evaluative testing will consist of the collection and analysis of any surface concentration of cultural materials, and the hand excavation and analysis of the scientific content of any midden components discovered during presence or absence testing. City of Dublin Fallon Sports Park Phase 3 Addendum to the 2005 Fallon Sports Park MND | Page 21 EDEIR MM 3.9/4.0 – The City shall retain the services of a qualified archaeologist to develop a protection program for prehistoric sites which contain either a surface or subsurface deposit of cultural materials or information which qualify under Appendix K of CEQA as "significant", and which are located in areas of the Project site where development will significantly alter the current condition of the prehistoric resource. EDEIR MM 3.9/5.0 – The discovery of historic or prehistoric remains during grading and construction will result in the cessation of such activities until the significance and extent of those remains can be ascertained by a certified archaeologist. City of Dublin Fallon Sports Park Phase 3 Addendum to the 2005 Fallon Sports Park MND | Page 22 ENERGY Project Impacts and Mitigation Measures The topic of the project's energy use was not analyzed in the EDEIR or the 2005 MND. The project’s impacts related to energy use are not required to be analyzed unless they constitute new information of substantial importance that was not known and could not have been known at the time the previous EIR was certified as complete (Public Resources Code section 21166 and Guidelines, Sections 15162 and 15163). The impact of energy use was known at the time of the certification of the EDEIR and the 2005 MND. Under CEQA standards, it is not new information that requires analysis in a supplemental EIR or negative declaration. Therefore, no supplemental environmental analysis of the project's impacts on this issue is required under CEQA. (a–b) Wasteful consumption of energy resources, or conflict with local plans for renewable energy As discussed above, no additional environmental analysis is required under CEQA Section 21166. City of Dublin Fallon Sports Park Phase 3 Addendum to the 2005 Fallon Sports Park MND | Page 23 Geology and Soils Environmental Issue Area Conclusion in IS/MND Do the Proposed Changes Involve New or More Severe Impacts? New Circumstanc es Involving New or More Severe Impacts? New Information Requiring New Analysis or Verification ? Mitigation Measures 6. GEOLOGY AND SOILS. Would the project: a) Indirectly or directly cause potential substantial adverse effects, including the risk of loss, injury, or death involving: i) Rupture of a known earthquake fault, as delineated on the most recent Alquist- Priolo Earthquake Fault Zoning Map issued by the State Geologist for the area or based on other substantial evidence of a known fault? Less than significant No No No None ii) Strong seismic ground shaking? Less than significant No No No None iii) Seismic-related ground failure, including liquefaction? Less than significant No No No None iv) Landslides? Less than significant No No No None b) Result in substantial soil erosion or the loss of topsoil? Less than significant No No No None c) Be located on a geologic unit or soil that is unstable, or that would become unstable as a result of the project, and potentially result in on- or off-site landslide, lateral spreading, subsidence, liquefaction or collapse? Less than significant No No No MM 3.6/14.0 through 16.0 of the EDEIR d) Be located on expansive soil, as defined in Table 18-1-B of the Uniform Building Code (1994), creating substantial direct or indirect risks to life or property? Less than significant No No No MM 3.6/14.0 through 16.0 of the EDEIR e) Have soils incapable of adequately supporting the use of septic tanks or alternative waste water disposal systems where sewers are not available for the disposal of waste water? No impact No No No None City of Dublin Fallon Sports Park Phase 3 Addendum to the 2005 Fallon Sports Park MND | Page 24 Project Impacts and Mitigation Measures (a) Seismic hazards The 2005 MND concluded that impacts associated with seismic hazards would be less than significant because recommendations from previous area and site geotechnical evaluations were incorporated into development plans for the Fallon Sports Park. The location of the Phase 3 development would not change. Additionally, the proposed minor changes to the Master Plan would not change existing circumstances related to seismic hazards or result in any new or more severe impacts than were previously analyzed in the 2005 MND. (b) Erosion/topsoil loss The 2005 MND concluded that impacts associated with erosion or topsoil loss would be less than significant because standard City Conditions of Approval would be followed and incorporated into construction documents, including implementation of erosion control plans and a SWPPP. These conditions would also apply to the Phase 3 development. The proposed project is located within Fallon Sports Park, which had been analyzed for erosion and topsoil loss impacts. The proposed minor changes to the Fallon Sports Park Master Plan would not result in any new or more severe impacts related to erosion and loss of topsoil than were previously analyzed in the 2005 MND. (c–d) Soil stability, expansion The 2005 MND concluded that impacts associated with soil stability and expansive soils would be less than significant because Mitigation Measures 3.6/14.0 through 16.0 of the EDEIR were adopted to reduce shrink-swell potential. These mitigation measures require appropriate structural foundations, support for court and parking areas, and other methods to mediate impacts. These mitigation measures would be carried forward as applicable. The proposed project is located within Fallon Sports Park, which had been analyzed for unstable or expansive soil impacts. The proposed minor changes to the Fallon Sports Park Master Plan would not result in any new or more severe impacts related to unstable or expansive soils than were previously analyzed in the 2005 MND. (e) Soil capability to support alternative wastewater disposal The 2005 MND concluded that there were no impacts associated with supporting alternative wastewater disposal because the restroom facilities at Fallon Sports Park would be connected to the public sewer system. Restroom facilities are not part of the proposed changes to the Fallon Sports Park Master Plan, nor were they included in the originally proposed Phase 3 development. As such there would be no new or more severe impacts related to soil capability to support alternative wastewater disposal than were previously analyzed in the 2005 MND. Mitigation Measures City of Dublin Fallon Sports Park Phase 3 Addendum to the 2005 Fallon Sports Park MND | Page 25 EDEIR MM 3.6/14.0 – The potential impact of expansive soils and rock with respect to Project improvements can be significantly reduced, or in many cases prevented by the recognition and characterization of site-specific conditions, and the formulation of appropriate design criteria and mitigation measures during detailed design-level geotechnical investigation, conducted for each specific proposed project. EDEIR MM 3.6/15.0 – The potential for shrink and swell of expansive soils and rock can be reduced by controlling moisture and by treatment through measures listed below. Subsurface drainage alone is not generally effective against the effects of regional wet/drought cycles. Required measures for a specific project should be based on the recommendation of the project geotechnical consultant and approved by the City and include: • Moisture conditioning prior to construction; • Construction of surface and subsurface drainage to control infiltration after construction; • Lime treatment, which can be used to produce non-expansive fill; and EDEIR MM 3.6/16.0 – The potential effects of expansive soil and rock can be reduced by appropriate foundation and pavement design, including those design elements listed below. Adjustable foundation systems are not generally effective against the effects of regional wet/drought cycles and are considered undesirable because the systems require periodic maintenance, and their use should be discouraged. Appropriate design criteria should be developed by the project geotechnical consultant and approved by the City. • Founding structural foundations below the zone of seasonal moisture change; • Use of structurally supported floors; and • Removal and replacement with non-expansive fill beneath structure slabs and asphaltic concrete. City of Dublin Fallon Sports Park Phase 3 Addendum to the 2005 Fallon Sports Park MND | Page 26 Greenhouse Gas Emissions Project Impacts and Mitigation Measures Since the EDEIR and the 2005 MND were approved before greenhouse gas (GHG) emission analysis became a CEQA requirement in 2006, the determination of whether GHG emissions and climate change need to be analyzed for this proposed project is governed by the law on supplemental or subsequent EIRs (Public Resources Code section 21166 and Guidelines, Sections 15162 and 15163). The topic of the project's contribution to greenhouse gas (GHG) emissions was not analyzed in the EDEIR or the 2005 MND. However, these impacts are not required to be analyzed unless they constitute new information of substantial importance that was not known and could not have been known at the time the previous EIR was certified as complete (Public Resources Code section 21166 and Guidelines, Sections 15162 and 15163). The impact of GHG emissions was known at the time of the certification of the EDEIR and the 2005 MND. Under CEQA standards, it is not considered new information that requires analysis in a supplemental EIR or negative declaration. Therefore, no supplemental environmental analysis of the project's impacts on this issue is required under CEQA. (a–b) Generate greenhouse gas (GHG) emissions, or conflict with GHG plans or regulations. As discussed above, no additional environmental analysis is required under CEQA Section 21166. City of Dublin Fallon Sports Park Phase 3 Addendum to the 2005 Fallon Sports Park MND | Page 27 Hazards and Hazardous Materials Environmental Issue Area Conclusion in IS/MND Do the Proposed Changes Involve New or More Severe Impacts? New Circumstanc es Involving New or More Severe Impacts? New Information Requiring New Analysis or Verification ? Mitigation Measures 8. HAZARDS AND HAZARDOUS MATERIALS. Would the project: a) Create a significant hazard to the public or the environment through the routine transport, use, or disposal of hazardous materials? No impact No No No None b) Create a significant hazard to the public or the environment through reasonably foreseeable upset and accident conditions involving the release of hazardous materials into the environment? No impact No No No None c) Emit hazardous emissions or handle hazardous or acutely hazardous materials, substances, or waste within ¼ mile of an existing or proposed school? No impact No No No None d) Be located on a site which is included on a list of hazardous materials sites compiled pursuant to Government Code Section 65962.5 and, as a result, would it create a significant hazard to the public or the environment? No impact No No No None e) For a project located within an airport land use plan or, where such a plan has not been adopted, within two miles of a public airport or public use airport, would the project result in a safety hazard for people residing or working in the project area? No impact No No No None f) For a project within the vicinity of a private airstrip, would the project result in a safety hazard for people residing or working in the project area? No impact No No No None g) Impair implementation of or physically interfere with an adopted emergency response plan or emergency evacuation plan? No impact No No No None h) Expose people or structures to a significant risk of loss, injury or death involving wildland fires, including where wildlands are adjacent No impact No No No None City of Dublin Fallon Sports Park Phase 3 Addendum to the 2005 Fallon Sports Park MND | Page 28 Environmental Issue Area Conclusion in IS/MND Do the Proposed Changes Involve New or More Severe Impacts? New Circumstanc es Involving New or More Severe Impacts? New Information Requiring New Analysis or Verification ? Mitigation Measures to urbanized areas or where residences are intermixed with wildlands? Project Impacts and Mitigation Measures (a–d) Exposure to hazardous materials, upset/accident, near school, hazardous materials list, The 2005 MND concluded that the Fallon Sports Park Master Plan would have no impacts associated with exposure to hazardous materials, upset/accident, hazards near schools, or hazardous sites. The 2005 MND determined that no hazardous material has been transported to or from the site or is anticipated to be done in the future, as the site was planned to be developed into a public park. The 2005 MND concluded that there would be no impacts. The proposed project involves only minor changes to the site plan as proposed in the 2005 MND. Specifically, proposed changes to the Fallon Sports Park Master Plan are the substitution of cricket pitches, batting cages, and sand volleyball courts in place of softball diamonds. These proposed changes would not involve additional exposure to hazardous materials, or any other risks associated with upset or accident or exposure of hazards near schools. The proposed project would not be located on a hazardous materials site. Although Kolb Elementary School is located 500 feet west of the Park, given the nature of the proposed project, there would be no risk of exposure of hazardous materials to the school. There are no hazardous sites or other areas of concern listed on the State of California Department of Toxic Substances Control EnviroStor database.1 The nearest site of concern listed on EnviroStor is a former cleanup program site located about 500 feet east of the Fallon Sports Park at the Jordan Ranch at 4233 Fallon Street. The case was resolved and closed in January 2016. As such, the project would not result in new or more severe impacts associated with hazards or hazardous materials than were previously analyzed in the 2005 MND. (e–f) Proximity to a public or private airport The 2005 MND concluded that the site is not located within an airport land use plan or within the vicinity of a public airport. According to the 2005 MND, the Livermore Municipal Airport and the Airport Land Use Commission (ALUC) confirmed that the Area F Planning Area in 1 California Department of Toxic Substances Control. 2020. EnviroStor. Website: https://www.envirostor.dtsc.ca.gov/public/map/?myaddress=4605+Lockhart+St%2C+Dublin%2C+CA+94568. Accessed March 19, 2020. City of Dublin Fallon Sports Park Phase 3 Addendum to the 2005 Fallon Sports Park MND | Page 29 Eastern Dublin was outside the referral area for the airport, and the ALUC has no jurisdiction over the land uses. The 2005 MND concluded that there would be no impacts. The proposed project would involve only minor changes to the site plan as proposed in the 2005 MND. The proposed changes would not change the circumstances regarding proximity to public or private airports or regarding airport planning areas. As such, the project would not result in new or more severe impacts associated with hazards or hazardous materials than were previously analyzed in the 2005 MND. (g) Impair implementation of an emergency response plan or emergency evacuation plan The 2005 MND concluded that there would be no impacts associated with emergency evacuation plans. According to the 2005 MND, the site’s driveways with entry features from Lockhart Street and Central Parkway provide adequate emergency access, and the emergency access as shown on the Master Plan was approved by the Alameda County Fire Department. The proposed project would involve only minor changes to the site plan as proposed in the 2005 MND. The proposed changes would not involve any changes to emergency access, or to an emergency response plan, or to an emergency evacuation plan. As such, the project would not result in new or more severe impacts associated with an emergency response plan or emergency evacuation plan than were previously analyzed in the 2005 MND. (h) Expose people or structures to wildland fires The 2005 MND concluded that there would be no impacts due to exposure of people or structures to the risk of wildland fires. According to the 2005 MND, improvements to the Park as well as urbanization in the surrounding areas would minimize the risks of wildfires in the project area. The proposed project would involve only minor changes to the site plan as proposed in the 2005 MND. The proposed changes would not create any new risk of wildland fires or any increased exposure to such risks. The site is located within a State Responsibility Area and is currently located outside of the fire hazard severity zones as indicated on the applicable Fire Hazard Severity Zone Map provided by CalFire.2 As such, the project would not result in new or more severe impacts associated with wildland fires than were previously analyzed in the 2005 MND. 2 California Department of Forestry and Fire Protection. 2020. Fire Hazard Severity Zones Maps: Alameda County. Website: https://osfm.fire.ca.gov/divisions/wildfire-planning-engineering/wildland-hazards-building-codes/fire- hazard-severity-zones-maps/. Accessed March 19, 2020. City of Dublin Fallon Sports Park Phase 3 Addendum to the 2005 Fallon Sports Park MND | Page 30 Hydrology and Water Quality Environmental Issue Area Conclusion in IS/MND Do the Proposed Changes Involve New or More Severe Impacts? New Circumstanc es Involving New or More Severe Impacts? New Information Requiring New Analysis or Verification ? Mitigation Measures 9. HYDROLOGY AND WATER QUALITY. Would the project: a) Violate any water quality standards or waste discharge requirements? Less than significant No No No No b) Substantially deplete groundwater supplies or interfere substantially with groundwater recharge such that there would be a net deficit in aquifer volume or a lowering of the local ground water table level (for example, the production rate of pre-existing nearby wells would drop to a level which would not support existing land uses or planned uses for which permits have been granted)? Less than significant No No No No c) Substantially alter the existing drainage pattern of the site or area, including through the alteration of the course of a stream or river, in a manner which would result in substantial erosion or siltation on- or off-site. Less than significant No No No EDEIR MM 3.5/49.0, 51.0, and 52.0 d) Substantially alter the existing drainage pattern of the site or area, including through the alteration of the course of a stream or river, or substantially increase the rate or amount of surface runoff in a manner which would result in flooding on- or off-site. Less than significant No No No EDEIR MM 3.5/49.0, 51.0, and 52.0 e) Create or contribute runoff water which would exceed the capacity of existing or planned storm water drainage systems or provide substantial additional sources of polluted runoff? Less than significant No No No EDEIR MM 3.5/49.0, 51.0, and 52.0 f) Otherwise substantially degrade water quality? Less than significant No No No EDEIR MM 3.5/49.0, 51.0, and 52.0 g) Place housing within a 100-year flood-hazard area as mapped on a federal Flood Hazard Less than significant No No No No City of Dublin Fallon Sports Park Phase 3 Addendum to the 2005 Fallon Sports Park MND | Page 31 Environmental Issue Area Conclusion in IS/MND Do the Proposed Changes Involve New or More Severe Impacts? New Circumstanc es Involving New or More Severe Impacts? New Information Requiring New Analysis or Verification ? Mitigation Measures Boundary or Flood Insurance Rate Map or other flood hazard delineation map? h) Place within a 100-year flood-hazard area structures which would impede or redirect flood flows? Less than significant No No No None i) Expose people or structures to a significant risk of loss, injury or death involving flooding, including flooding as a result of the failure of a levee or dam? Less than significant No No No None j) Inundation by seiche, tsunami, or mudflow? Less than significant No No No None Project Impacts and Mitigation Measures (a) Violate water quality or waste discharge requirements The 2005 MND concluded that the Fallon Sports Park Master Plan would have a less than significant impact regarding violations of water quality or waste discharge requirements. The proposed project involves only minor changes to the site plan as proposed in the 2005 MND. Specifically, proposed changes to the Fallon Sports Park Master Plan are the substitution of cricket pitches, batting cages, and sand volleyball courts in place of softball diamonds. These proposed changes would not violate water quality or waste discharge requirements. As such, the project would not result in new or more severe impacts associated with water quality or waste discharge requirements than were previously analyzed in the 2005 MND. (b) Substantially deplete or interfere with groundwater supplies The 2005 MND concluded that the Fallon Sports Park Master Plan would have a less than significant impact regarding groundwater supplies. The proposed project would involve only minor changes to the site plan as proposed in the 2005 MND. The proposed changes would not involve any additional demand to groundwater supplies. As such, the project would not result in new or more severe impacts associated with groundwater supplies than were previously analyzed in the 2005 MND. City of Dublin Fallon Sports Park Phase 3 Addendum to the 2005 Fallon Sports Park MND | Page 32 (c–f) Substantially alter existing drainage patterns re: erosion/siltation, re: flooding, or degrade water quality The 2005 MND concluded that the Fallon Sports Park Master Plan would have a less than significant impact regarding drainage patterns and water quality. According to the 2005 MND, an intermittent creek flows along the western boundary of the site. According to the 2005 MND, the project utilized a United States Army Corps of Engineers Section 404 wetland fill permit, a U.S. Fish & Wildlife Service Biological Opinion, a Regional Water Quality Control Board Section 401 Water Quality Certification, and a California Department of Fish and Game 1602 Lake and Streambed Alteration Agreement, and all other required permits from the appropriate State and federal agencies. The 2005 MND stated that the Park’s existing drainage patterns would be changed as a result of grading and contouring of the land. The 2005 MND noted that the creek would be improved and enhanced, and swales would be constructed to filter and absorb stormwater and runoff at the site. Mitigation measures requiring drainage and runoff control and the use of biodegradable pesticides and herbicide to reduce pollution were implemented. These include the following mitigation measures from the EDEIR: 3.5/49.0, 51.0, and 52.0. The 2005 MND determined that these mitigation measures would reduce impacts to water quality and drainage to a less than significant impact. The proposed project would involve only minor changes to the site plan as proposed in the 2005 MND. The project would be required to implement the applicable mitigation measures identified above. As such, the project would not result in new or more severe impacts associated with the alteration of drainage patterns, erosion, siltation, or degradation of water supply than were previously analyzed and mitigated in the 2005 MND. (e) Runoff exceed drainage capacity, or add pollution The 2005 MND concluded that the Fallon Sports Park Master Plan would have a less than significant impact regarding runoff, drainage capacity, and pollution. According to the 2005 MND, the grading plan that was prepared for the project conformed to the Alameda Flood Control and Water Quality District, Zone 7 requirements. The grading plan also met the water quality standards of the City of Dublin’s National Pollutant Discharge Elimination System (NPDES) Permit and the Alameda County Urban Runoff Clean Water Program. The City of Dublin’s Conditions of Approval included erosion control plans and preparation of a SWPPP. The City Public Works Department’s hydrology and drainage studies determined that there is sufficient capacity to accommodate the project’s stormwater and drainage facilities. The proposed project would involve only minor changes to the site plan as proposed in the 2005 MND. Existing drainage patterns may be slightly modified to accommodate the changes; however, the changes would not be significant. The project would be required to implement the mitigation measures as outlined above, which would reduce any changes to drainage patterns to a less than significant impact. The proposed changes would not cause additional City of Dublin Fallon Sports Park Phase 3 Addendum to the 2005 Fallon Sports Park MND | Page 33 pollution beyond what was analyzed in the 2005 MND. As such, the project would not result in new or more severe impacts associated with runoff than were previously analyzed in the 2005 MND. (f) Water Quality The 2005 MND concluded that the Fallon Sports Park Master Plan would have a less than significant impact on water quality. As discussed in Impact Question 9 (c–e), the project has complied with all requirements related to water quality and has implemented mitigation measures that were determined to reduce the project’s impacts on water quality to less than significant. The proposed project would involve only minor changes to the site plan as proposed in the 2005 MND. The proposed changes would not include changes that would impact water quality beyond what was analyzed in the 2005 MND. As such, the project would not result in new or more severe impacts to water quality than were previously analyzed in the 2005 MND. (g–h) Flood hazard The 2005 MND concluded that the Fallon Sports Park Master Plan would have a less than significant impact regarding flood hazards. According to the 2005 MND, the area is not located within a 100-year flood zone as identified on the Flood Insurance Rate Map published by the Federal Emergency Management Agency (FEMA).3 The proposed project would involve only minor changes to the site plan as proposed in the 2005 MND. The proposed changes would not involve any additional flood hazards beyond what was analyzed in the 2005 MND. The proposed changes would not alter the location of the site, which is currently designated an Area of Minimal Flood Hazard on the most recent FEMA flood maps. As such, the project would not result in new or more severe impacts related to flood hazards than were previously analyzed in the 2005 MND. (j) Inundation by seiche, tsunami, or mudflow The 2005 MND concluded that the Fallon Sports Park Master Plan would have a less than significant impact regarding seiche, tsunami, or mudflows. According to the 2005 MND and discussed in the previous impact question, the site is not located within a 100-year flood zone as identified on the Flood Insurance Rate Map published by FEMA. Additionally, the project site is not located near major bodies of water and is therefore not at risk of tsunami or seiche. The proposed project would involve only minor changes to the site plan as proposed in the 2005 MND, which would not include any changes to the site’s location or boundaries. As such, the project would not result in new or more severe impacts associated with seiche, tsunamis, or mudflows than were previously analyzed in the 2005 MND. 3 Federal Emergency Management Agency. 2009. Flood Map Number 06001C0328G. August 3. Website: https://msc.fema.gov/portal/search?#searchresultsanchor. Accessed March 19, 2020. City of Dublin Fallon Sports Park Phase 3 Addendum to the 2005 Fallon Sports Park MND | Page 34 Mitigation Measures EDEIR MM 3.5/49.0 – Plan facilities and select management practices in the Eastern Dublin Specific Plan area that protect and enhance water quality. EDEIR MM 3.5/51.0 – Water Quality Investigation. Require a specific water quality investigation be submitted with each development application to demonstrate existing water quality and impacts that urban runoff would have. The water quality investigation should address the quantity of runoff and the effects from discharged pollutants from surface runoff into creeks and detention facilities. EDEIR MM 3.5/52.0 – Develop community-based programs to educate local residents and businesses on methods to reduce non-point sources of pollution. Coordinate such programs with current Alameda County programs. Such programs should include: • Increased availability of liquid recycling centers (i.e.: oil, greases, etc.), to reduce potential/or dumping into storm drains. • Programs that educate the public that catch basins and storm drains flow to creeks, to potable groundwater basins, and to the San Francisco Bay, including a potential program to paint labels at each catch basin and storm drain to alert people to these facts. City of Dublin Fallon Sports Park Phase 3 Addendum to the 2005 Fallon Sports Park MND | Page 35 Land Use and Planning Environmental Issue Area Conclusion in IS/MND Do the Proposed Changes Involve New or More Severe Impacts? New Circumstanc es Involving New or More Severe Impacts? New Information Requiring New Analysis or Verification ? Mitigation Measures 10. LAND USE AND PLANNING. Would the project: a) Physically divide an established community? No impact No No No None b) Conflict with any applicable land use plan, policy, or regulation of an agency with jurisdiction over the project (including, but not limited to the general plan, specific plan, local coastal program, or zoning ordinance) adopted for the purpose of avoiding or mitigating an environmental effect? No impact No No No None c) Conflict with any applicable Habitat Conservation Plan or Natural Community Conservation Plan? No impact No No No None Project Impacts and Mitigation Measures (a) Physically divide an established community The 2005 MND concluded that the Fallon Sports Park Master Plan would have no impacts related to the physical division of an established community. As discussed in the 2005 MND, the project does not divide an established community because the Fallon Sports Park Master Plan designated the site to provide recreational facilities to new and existing developments in Eastern Dublin for use by residents and the surrounding community. The Master Plan is consistent with the EDSP and General Plan. The proposed project would involve only minor changes to the site plan as proposed in the 2005 MND. The proposed changes would not alter the location or boundaries of the Park. Therefore, the impacts of the proposed changes are consistent with the 2005 MND. The site would not physically divide an established community. As such, the project would not result in new or more severe impacts than were previously analyzed in the 2005 MND. (b) Conflict with general plan The 2005 MND concluded that the Fallon Sports Park Master Plan would have no impacts associated with conflicts with applicable land use plans, policies, or regulations. The Master Plan is consistent with the EDSP/General Plan EIR. These plans designate the Master Plan area City of Dublin Fallon Sports Park Phase 3 Addendum to the 2005 Fallon Sports Park MND | Page 36 as City Park and Park. Additionally, the Fallon Sports Park Master Plan is consistent with the City’s Parks and Recreation Master Plan. The proposed project would involve only minor changes to the site plan as proposed in the 2005 MND. The proposed changes would not cause any inconsistencies with the EDSP, the General Plan, the Fallon Sports Park Master Plan, the City’s Parks and Recreation Master Plan, or any other land use or zoning designations. As such, the project would not result in new or more severe impacts than were previously analyzed in the 2005 MND. (c) Conflict with any applicable habitat conservation plan or natural community conservation plan The 2005 MND concluded that the Fallon Sports Park Master Plan would have no impacts related to conflicts with a Habitat Conservation Plan or Natural Community Conservation Plan. According to the 2005 MND, there are no applicable Habitat Conservation Plans or Natural Community Conservation Plans for the project area. The proposed changes would occur within the Fallon Sports Park and would not be inconsistent with any applicable Habitat Conservation Plan or Natural Community Conservation Plan. As such, the project would not result in new or more severe impacts than were previously analyzed in the 2005 MND. City of Dublin Fallon Sports Park Phase 3 Addendum to the 2005 Fallon Sports Park MND | Page 37 Mineral Resources Environmental Issue Area Conclusion in IS/MND Do the Proposed Changes Involve New or More Severe Impacts? New Circumstanc es Involving New or More Severe Impacts? New Information Requiring New Analysis or Verification ? Mitigation Measures 11. MINERAL RESOURCES. Would the project: a) Result in the loss of availability of a known mineral resource that would be of value to the region and the residents of the state? No impact No No No None b) Result in the loss of availability of a locally- important mineral resource recovery site delineated on a local general plan, specific plan or other land use plan? No impact No No No None Project Impacts and Mitigation Measures (a–b) Loss of known mineral resource The 2005 MND concluded that there were no impacts associated with mineral resources because State mineral resource maps do not indicate mineral resources on-site, and the EDEIR does not indicate significant mineral deposits on-site. The proposed project would involve only minor changes to the site plan as proposed in the 2005 MND, which would not include any changes to the site’s location or boundaries. The proposed minor changes to the Master Plan would not change existing circumstances related to mineral resources or result in any new or more severe impacts than were previously analyzed in the 2005 MND. City of Dublin Fallon Sports Park Phase 3 Addendum to the 2005 Fallon Sports Park MND | Page 38 Noise Environmental Issue Area Conclusion in IS/MND Do the Proposed Changes Involve New or More Severe Impacts? New Circumstanc es Involving New or More Severe Impacts? New Information Requiring New Analysis or Verification ? Mitigation Measures 12. NOISE. Would the project result in: a) Exposure of persons to or generation of noise levels in excess of standards established in the local general plan or noise ordinance or applicable standards of other agencies? Less than significant No No No MM 3.10/4.0- 5.0 b) Exposure of persons to or generation of excessive ground borne vibration or ground borne noise levels? Less than significant No No No MM 3.10/4.0- 5.0 c) Substantial permanent increase in ambient noise levels in the project vicinity above levels existing without the project? Less than significant No No No MM 3.10/4.0- 5.0 d) A substantial temporary or periodic increase in ambient noise levels in the project vicinity above levels existing without the project? Less than significant No No No MM 3.10/4.0- 5.0 e) For a project located within an airport land use plan or, where such a plan has not been adopted, within two miles of a public airport or public use airport, would the project expose people residing or working in the project area to excessive noise levels? No impact No No No MM 3.10/4.0- 5.0 f) For a project within the vicinity of a private airstrip, would the project expose people residing or working in the project area to excessive noise levels? No impact No No No MM 3.10/4.0- 5.0 Project Impacts and Mitigation Measures (a–d) Exposure to or generation of noise exceeding standards, exposure to ground borne vibration or ground borne noise, permanently increasing ambient noise levels, or substantial temporary noise increase The 2005 MND concluded that with implementation of mitigation measures defined in the EDEIR and requirements in the City of Dublin’s standard conditions of approval, the Fallon Sports Park Master Plan would have a less than significant impact associated with exposure to or generation of noise levels in excess of standards, exposure of people to ground-borne vibration, or permanent increases in ambient noise levels. These mitigation measures and City of Dublin Fallon Sports Park Phase 3 Addendum to the 2005 Fallon Sports Park MND | Page 39 conditions of approval require preparation of a construction noise management plan to minimize noise and adherence to construction hour limitations. The project would involve minor changes to the Phase 3 development as analyzed in the 2005 MND. Specifically, proposed changes to the Fallon Sports Park Master Plan are the substitution of cricket pitches, batting cages, and sand volleyball courts in place of softball diamonds. These minor changes would not result in any new or additional noise impacts. Implementation of these changes are expected to result in similar levels of construction, trip generation, and spectator attendance. These changes would not introduce any new noise sources not previously analyzed. As such, the project would not result in new or more severe impacts than were previously analyzed in the 2005 MND for any impacts related to exposure to or generation of noise in excess of standards, exposure to ground-borne vibration or ground-borne noise, a permanent increase in ambient noise levels, or a substantial temporary noise increase. (e–f) Excessive noise level near a public or private airport The 2005 MND concluded that the Fallon Sports Park Master Plan would not expose people in the project area to excessive noise levels because the project is not located within an airport land use plan or within two miles of a public airport, public use airport, or private airstrip. The project would involve minor changes to the site plan as proposed in the 2005 MND. However, these minor changes would not alter the location of the project, and therefore would not result in any new or additional noise impacts related to proximity to airports. As such, the project would not result in new or more severe impacts than were previously analyzed in the 2005 MND. Mitigation Measures MM 3.10/4.0 – Developers shall submit to the City a Construction Noise Management Program that identifies measures to be taken to minimize impacts on existing planning area residents. The program will include a schedule for grading and other major noise-generating activities that· will limit these activities to the shortest possible number of days. Hours of construction activities shall be limited in keeping with Dublin ordinances. The Program for construction vehicle access to the site shall minimize construction truck traffic through residential areas. If construction traffic must travel through residential areas, then a mitigation plan should be developed. The Program may include barriers, berms or restrictions on hours. MM 3.10/5.0 – In order to minimize the impact of construction noise, all operations should comply with local noise standards relating to construction activities. When construction occurs near residential areas, then it should be limited to normal daytime hours to minimize the impact. Stationary equipment should be adequately muffled and located as far away from sensitive receptors as possible. City of Dublin Fallon Sports Park Phase 3 Addendum to the 2005 Fallon Sports Park MND | Page 40 Population and Housing Environmental Issue Area Conclusion in IS/MND Do the Proposed Changes Involve New or More Severe Impacts? New Circumstances Involving New or More Severe Impacts? New Information Requiring New Analysis or Verification ? Mitigation Measures 13. POPULATION AND HOUSING. Would the project: a) Induce substantial unplanned population growth in an area, either directly (for example, by proposing new homes and businesses) or indirectly (for example, through extension of roads or other infrastructure)? No impact No No No None b) Displace substantial numbers of existing housing, necessitating the construction of replacement housing elsewhere? No impact No No No None c) Displace substantial numbers of people, necessitating the construction of replacement housing elsewhere? No impact No No No None Project Impacts and Mitigation Measures (a) Population growth The 2005 MND concluded that there were no impacts associated with population growth because Fallon Sports Park was planned well in advance of actual development in the eastern area of the City to serve projected residential units and those already planned and approved. The proposed minor changes to the Master Plan would not be significantly different from the originally proposed softball diamonds regarding inducing population growth or result in any new or more severe impacts than were previously analyzed in the 2005 MND. (b–c) Housing and resident displacement The 2005 MND concluded that there were no impacts associated with displacement of housing or people because the site was planned for park uses and not residential uses, and there is also no housing on-site. The proposed minor changes to the Master Plan would not be significantly different from the originally proposed softball diamonds and would not result in any new or more severe impacts than were previously analyzed in the 2005 MND. City of Dublin Fallon Sports Park Phase 3 Addendum to the 2005 Fallon Sports Park MND | Page 41 Public Services Environmental Issue Area Conclusion in IS/MND Do the Proposed Changes Involve New or More Severe Impacts? New Circumstanc es Involving New or More Severe Impacts? New Information Requiring New Analysis or Verification ? Mitigation Measures 14. PUBLIC SERVICES. Would the project result in substantial adverse physical impacts associated with the provision of new or physically altered governmental facilities, need for new or physically altered governmental facilities, the construction of which could cause significant environmental impacts, in order to maintain acceptable service ratios, response times or other performance objectives for any of the public services: a) Fire protection? No impact No No No None b) Police protection? No impact No No No None c) Schools? No impact No No No None d) Parks? No impact No No No None e) Other public facilities? No impact No No No None Project Impacts and Mitigation Measures (a–e) Fire, police, schools, parks, and other public facilities The 2005 MND concluded that there were no impacts associated with public services because development of the Fallon Sports Park would not create a need for new services or facilities. Alameda County Fire Department and the City of Dublin Police Department had ensured that the Fallon Sports Park met the applicable safety criteria for public use. The City would provide maintenance of streets, roads, the Park itself, and other related governmental facilities. The project would involve minor changes to the Phase 3 development as analyzed in the 2005 MND. Specifically, proposed changes to the Fallon Sports Park Master Plan are the substitution of cricket pitches, batting cages, and sand volleyball courts in place of softball diamonds. These minor changes would not increase the demand of fire, police, parks, and other public facilities. In addition, these proposed changes would not induce population growth and thus would not impact nearby schools. Therefore, the proposed project would not result in new or more severe impacts related to public services than were previously analyzed in the 2005 MND. City of Dublin Fallon Sports Park Phase 3 Addendum to the 2005 Fallon Sports Park MND | Page 42 Recreation Environmental Issue Area Conclusion in IS/MND Do the Proposed Changes Involve New or More Severe Impacts? New Circumstanc es Involving New or More Severe Impacts? New Information Requiring New Analysis or Verification ? Mitigation Measures 15. RECREATION. Would the project: a) Increase the use of existing neighborhood and regional parks or other recreational facilities such that substantial physical deterioration of the facility would occur or be accelerated? No impact No No No None b) Include recreational facilities or require the construction or expansion of recreational facilities which might have an adverse physical effect on the environment? No impact No No No None Project Impacts and Mitigation Measures (a) Increase the use of existing recreation facilities causing deterioration The 2005 MND concluded that the Fallon Sports Park Master Plan would have no impacts associated with the use of existing recreational facilities. The 2005 MND determined that the project would provide much-needed recreational facilities, which would increase recreational resources for the community and thereby have a beneficial impact on the provision of park facilities with no adverse impacts on existing recreational facilities. The 2005 MND concluded that there would be no impacts. The project would involve minor changes to the Phase 3 development as proposed in the 2005 MND. Specifically, proposed changes to the Fallon Sports Park Master Plan are the substitution of cricket pitches, batting cages, and sand volleyball courts in place of softball diamonds. These minor changes would not result in any new or additional impacts regarding the use of existing recreational facilities. As such, the project would not result in a new or more severe impacts than were previously analyzed in the 2005 MND. (b) Propose, require new facilities that cause physical effect The 2005 MND concluded that the Fallon Sports Park Master Plan would have no impacts associated with the construction or expansion of recreational facilities that might have an adverse physical effect on the environment. The 2005 MND determined that a standard requirement of 2.5 acres of community parkland is needed per 1,000 residents and that the area needed approximately 10 acres to meet this standard. The Fallon Sports Park would add 60 acres, leading to beneficial impacts associated with parks and recreational facilities. City of Dublin Fallon Sports Park Phase 3 Addendum to the 2005 Fallon Sports Park MND | Page 43 The proposed changes to the Fallon Sports Park Master Plan are minor, and the total acreage of parkland would not change pursuant to the proposed changes. The project would fulfill the Fallon Sports Park Master Plan’s intended use of the land as a community park. The proposed changes to the Fallon Sports Park Master Plan would not result in any new or additional impacts regarding construction of new recreational facilities. As such, the project would not result in a new or more severe impacts than were previously analyzed in the 2005 MND. City of Dublin Fallon Sports Park Phase 3 Addendum to the 2005 Fallon Sports Park MND | Page 44 Transportation/Traffic Environmental Issue Area Conclusion in IS/MND Do the Proposed Changes Involve New or More Severe Impacts? New Circumstanc es Involving New or More Severe Impacts? New Information Requiring New Analysis or Verification ? Mitigation Measures 16. TRANSPORTATION/TRAFFIC. Would the project: a) Conflict with a program plan, ordinance or policy addressing the circulation system, including transit, roadways, bicycle and pedestrian facilities? Less than significant No No No None b) Would the project conflict or be inconsistent with CEQA Guidelines Section 15064.3, subdivision (b)? Not analyzed No No No None c) Substantially increase hazards due to a geometric design feature (e.g., sharp curves or dangerous intersections) or incompatible uses (e.g., farm equipment)? Less than significant No No No None d) Result in inadequate emergency access? Less than significant No No No None Project Impacts and Mitigation Measures (a) Conflict with applicable transportation plans standards, including bicycle and pedestrian facilities The 2005 MND concluded the Fallon Sports Park would have less than significant impacts regarding traffic. Several new traffic improvements and extensions of roadways were underway at the time of the 2005 MND preparation and would provide adequate transportation facilities and transit modes with sufficient capacity for the planned Fallon Sports Park. A traffic study was prepared for the 2005 MND to analyze the two intersections on Lockhart Street, one at the main entrance to the Park and the second across from the pedestrian bridge. Impacts related to transportation were anticipated to be less than significant with the construction of a driveway leading to the Lower Terrace area of the Park. A driveway was since constructed from Central Parkway into the Lower Terrace, which satisfied the 2005 MND mitigation measure. No impacts related to parking and pedestrian circulation were expected. Future traffic as part of the Phase 3 development was analyzed in the 2005 MND. The proposed project is generally consistent with the original Phase 3 development, with minor changes such as constructing cricket pitches, batting cages, and sand volleyball courts in place of softball diamonds. Traffic as analyzed in the 2005 MND is not anticipated to change as a result of the proposed changes. The proposed project also would not change parking or pedestrian City of Dublin Fallon Sports Park Phase 3 Addendum to the 2005 Fallon Sports Park MND | Page 45 circulation. Therefore, the proposed project would not result in new or more severe impacts related to transportation plans, ordinances, or policies than were previously analyzed in the 2005 MND. (b) Conflict with CEQA Section 15064.3 (b) The topic of the project's contribution to vehicle miles travelled (VMT) was not analyzed in the EDEIR or 2005 MND. This impact is not required to be analyzed unless it constitutes new information of substantial importance that was not known and could not have been known at the time the previous EIR was certified as complete (Public Resources Code section 21166 and Guidelines, Sections 15162 and 15163). The impact of increased traffic was analyzed using other methods at the time of certification of the EDEIR and 2005 MND. Under CEQA standards, it is not considered new information that requires analysis in a supplemental EIR or negative declaration. Therefore, no supplemental environmental analysis of the project's impacts on this issue is required under CEQA. (c) Substantially increase hazards due to a design feature The 2005 MND concluded that there were less than significant impacts associated with design hazards with the implementation of the independent roadway improvements that would be completed prior to the completion of Phase I of the Fallon Sports Park. In addition, a driveway was constructed from Central Parkway into the Lower Terrace, which satisfied the 2005 MND mitigation measure. No changes to vehicular access are proposed as part of the changes to the Master Plan. As such there would be no new or more severe impacts related to design hazards than were previously analyzed in the 2005 MND. (d) Result in inadequate emergency access The 2005 MND concluded that there were less than significant impacts associated with emergency access and that access roads would meet City of Dublin and Alameda County Fire Department design standards. Vehicular access to the Phase 3 development area is currently provided via one driveway on Lockhart Street connecting to a parking lot and providing emergency access. The driveway and parking lot were previously analyzed in the 2005 MND. No changes to vehicular access are proposed as part of the changes to the Master Plan, nor were they included in the originally proposed Phase 3 development. As such, the proposed minor changes to the Master Plan would not impact existing emergency access or result in any new or more severe impacts than were previously analyzed in the 2005 MND. City of Dublin Fallon Sports Park Phase 3 Addendum to the 2005 Fallon Sports Park MND | Page 46 Tribal Cultural Resources Project Impacts and Mitigation Measures (a, b) Listing in a Register of Historical Resources, or significant according to National Register of Historic Places criteria The topic of the Master Plan’s potential impacts to tribal cultural resources was not specifically analyzed in the EDEIR or the 2005 MND. However, the EDEIR and the 2005 MND analyzed prehistoric and historic resources and included mitigation measures related to historical and archaeological resources and human remains. These measures are listed in the cultural resources section of this Addendum. Additionally, Assembly Bill 52 does not require tribal consultation for Addendums. Therefore, the proposed minor changes to the Master Plan would not create significant impacts to tribal cultural resources. City of Dublin Fallon Sports Park Phase 3 Addendum to the 2005 Fallon Sports Park MND | Page 47 Utilities and Service Systems Environmental Issue Area Conclusion in IS/MND Do the Proposed Changes Involve New or More Severe Impacts? New Circumstanc es Involving New or More Severe Impacts? New Information Requiring New Analysis or Verification ? Mitigation Measures 18. UTILITIES AND SERVICE SYSTEMS. Would the project: a) Exceed wastewater treatment requirements of the applicable Regional Water Quality Control Board? No impact No No No None b) Require or result in the construction of new water or wastewater treatment facilities or expansion of existing facilities, the construction or which could cause significant environmental effects? No impact No No No None c) Require or result in the construction of new storm water drainage facilities or expansion of existing facilities, the construction of which could cause significant environmental effects? (V.4) No impact No No No None d) Have sufficient water supplies available to serve the project from existing entitlements and resources, or are new or expanded entitlements needed? No impact No No No None e) Result in a determination by the wastewater treatment provider which serves or may serve the project that it has adequate capacity to serve the project projected demand in addition to the provider’s existing commitments? No impact No No No None f) Be served by a landfill with sufficient permitted capacity to accommodate the project’s solid waste disposal needs? No impact No No No None g) Comply with federal, state, and local statutes and regulations related to solid waste? No impact No No No None City of Dublin Fallon Sports Park Phase 3 Addendum to the 2005 Fallon Sports Park MND | Page 48 Project Impacts and Mitigation Measures (a) Wastewater treatment requirements The 2005 MND concluded that there would be no impacts associated with wastewater treatment requirements. The 2005 MND determined that the project would not increase the need for additional wastewater services because the project was taken into consideration in the EDEIR. The project would involve minor changes to the site plan as proposed in the 2005 MND. Specifically, proposed changes to the Fallon Sports Park Master Plan are the substitution of cricket pitches, batting cages, and sand volleyball courts in place of softball diamonds. These minor changes would not result in any new or additional impacts regarding wastewater treatment requirements. As such, the project would not result in a new or more severe impacts than were previously analyzed in the 2005 MND. (b) Require construction of new facilities The 2005 MND concluded that there would be no impacts associated with the construction of new facilities. The 2005 MND determined that the project was taken into consideration when the water and wastewater facilities were planned for the Eastern Dublin area and were included in the EDEIR. The minor changes to the plan as proposed in the 2005 MND would not require the construction of new facilities. As such, the project would not result in a new or more severe impacts than were previously analyzed in the 2005 MND. (c) Stormwater drainage The 2005 MND concluded that there would be no impacts associated with stormwater drainage. As discussed in the response to Impact Question 9(e), the grading plan that was prepared for the project conformed to the Alameda Flood Control and Water Quality District, Zone 7 requirements. The grading plan also met the water quality standards of the City of Dublin’s NPDES Permit and the Alameda County Urban Runoff Clean Water Program. The City of Dublin’s Conditions of Approval included erosion control plans and preparation of a SWPPP. The City Public Works Department’s hydrology and drainage studies determined that there is sufficient capacity to accommodate the project’s stormwater and drainage facilities. The minor changes to the plan as proposed in the 2005 MND would not alter the stormwater drainage for the site or require new facilities. As such, the project would not result in a new or more severe impacts than were previously analyzed in the 2005 MND. (d) Sufficient water supply The 2005 MND concluded that there would be no impacts associated with water supply. According to the 2005 MND, the construction of the proposed recreational facilities would not increase the need for additional water services. The project was considered when the water facilities were planned for the Eastern Dublin area and were analyzed in the EDEIR. City of Dublin Fallon Sports Park Phase 3 Addendum to the 2005 Fallon Sports Park MND | Page 49 The minor changes to the plan as proposed in the 2005 MND would not increase the demand for water supply or require new facilities. As such, the project would not result in a new or more severe impacts than were previously analyzed in the 2005 MND. (e) Sufficient wastewater capacity The 2005 MND concluded that there would be no impacts associated with wastewater capacity. According to the 2005 MND, the construction of the proposed recreational facilities would not increase the need for wastewater services. The project was considered when the wastewater facilities were planned for the Eastern Dublin area and were analyzed in the Eastern Dublin Specific Plan/General Plan EIR. The minor changes to the plan as proposed in the 2005 MND would not increase the demand for wastewater services or require new facilities. As such, the project would not result in new or more severe impacts than were previously analyzed in the 2005 MND. (f–g) Adequate landfill and compliance The 2005 MND concluded that there would be no impacts associated with solid waste. According to the 2005 MND, the project would be served by a landfill with sufficient permitted capacity to accommodate the project’s solid waste disposal needs. The minor changes to the plan as proposed in the 2005 MND would not increase the demand for solid waste disposal services or require greater capacity or new facilities. As such, the project would not result in new or more severe impacts than were previously analyzed in the 2005 MND. City of Dublin Fallon Sports Park Phase 3 Addendum to the 2005 Fallon Sports Park MND | Page 50 Wildfire Project Impacts and Mitigation Measures (a–d) Impair an emergency response plan, exposure to wildfire, require installation or maintenance of infrastructure, exposure to flooding or landslides The EDEIR and the 2005 MND were certified prior to the mandatory analysis of wildfire impacts. However, wildfire risks were adequately discussed in impact question 8(h). The proposed minor changes to the Master Plan would not create significant impacts related to wildfire. City of Dublin Fallon Sports Park Phase 3 Addendum to the 2005 Fallon Sports Park MND | Page 51 Mandatory Findings of Significance Environmental Issue Area Conclusion in IS/MND Do the Proposed Changes Involve New or More Severe Impacts? New Circumstanc es Involving New or More Severe Impacts? New Information Requiring New Analysis or Verification ? Mitigation Measures 18. MANDATORY FINDINGS OF SIGNIFICANCE. Does the project: a) Have the potential to degrade the quality of the environment, substantially reduce the habitat of a fish or wildlife species, cause a fish or wildlife population to drop below self- sustaining levels, threaten to eliminate a plant or animal community, reduce the number or restrict the range of a rare or endangered plant or animal or eliminate important examples of the major periods of California history or prehistory? Less than significant with mitigation No No No EDEIR MM 3.7/1.0 – 5.0, 10.0, 14.0, 16.0, 17.0, and 19.0, EDEIR MM 3.9/1.0– 4.0 b) Have impacts that are individually limited, but cumulatively considerable? ("Cumulatively considerable" means that the incremental effects of a project are considerable when viewed in connection with the effects of the past projects, the effects of other current projects, and the effects of probable future projects.) Less than significant with mitigation No No No 2005 MND MM 1 and 2 c) Have environmental effects which will cause substantial adverse effects on human beings, either directly or indirectly? No impact No No No None Project Impacts and Mitigation Measures (a) Have the potential to degrade the quality of environment Potential impacts related to biological resources, including a reduction of fish or wildlife habitat, elimination of a plant or animal community, or elimination of an important example of major periods of California history or prehistory, were analyzed in the EDEIR and the 2005 MND. The proposed project would represent a similar development type that was previously analyzed. No new or more significant impacts are anticipated than previously analyzed. City of Dublin Fallon Sports Park Phase 3 Addendum to the 2005 Fallon Sports Park MND | Page 52 (b) Individually limited but cumulatively considerable impacts Although incremental increases in certain areas can be expected as a result of construction, including air emissions and light and glare, the Fallon Sports Park Master Plan is within an area with an approved specific plan that permits urbanized development and community facilities. Mitigation measures discussed in the 2005 MND and this Addendum would reduce any residual impacts on the surrounding community to less than significant levels. (c) Substantial adverse effects of human beings As detailed in this Addendum and in the 2005 MND, impacts to the environment and human beings are considered less than significant, and the proposed changes would not create new or more severe environmental impacts. City of Dublin Fallon Sports Park Phase 3 Addendum to the 2005 Fallon Sports Park MND | Page 52 (b) Individually limited but cumulatively considerable impacts Although incremental increases in certain areas can be expected as a result of construction, including air emissions and light and glare, the Fallon Sports Park Master Plan is within an area with an approved specific plan that permits urbanized development and community facilities. Mitigation measures discussed in the 2005 MND and this Addendum would reduce any residual impacts on the surrounding community to less than significant levels. (c) Substantial adverse effects of human beings As detailed in this Addendum and in the 2005 MND, impacts to the environment and human beings are considered less than significant, and the proposed changes would not create new or more severe environmental impacts. ! ·|}þ4 ·|}þ4 Alameda County Santa Clara County C o n tra C o s ta C o u n ty A la m e d a C o u n ty !"#$580 ·|}þ92 ·|}þ84 !"#$680 !"#$880 ·|}þ24 !"#$680 ·|}þ237 (/101 !"#$280 ·|}þ238 Mount DiabloState Park Brentwood Ala m e d a C o u nty S a n M ate o C o u nty Pittsburg Martinez Antioch Oakley PleasantHill WalnutCreekLafayette Orinda Moraga Danville SanRamon DublinCastroValleySanLeandro LivermoreSanLorenzoPleasanton Hayward UnionCity FremontNewarkRedwoodCity MenloPark NorthFairOaks EastPaloAlto Milpitas Stanford MountainViewPaloAlto Sunnyvale EastFoothills San Joa quinRiverCarquinez S t ra i t Sherm anLake Bi g Bre a k Br io n esReservoi r Up p er S a nLeandroReservoir Lak e C habot Lak e D elValleSan AntonioReservoir Ca l a vera sReservoir CliftonCourtForebayLos Va q u ero sReservoir Figure 1Regional Location Map 5 0 52.5 Miles ! Text Project Site Source: Census 2000 Data, The CaSIL. I CITY OF DUBLINFALLON SPORTS PARK PHASE III (UPPER TERRACE)ADDENDUM 37660008 • 03/2020 | 1_regional.mxd Project Site 37660008 • 03/2020 | 2_project_location.mxd Figure 2Project Location Source: Bing Aerial Imagery. CITY OF DUBLINFALLON SPORTS PARK PHASE III (UPPER TERRACE)ADDENDUM I 1,000 0 1,000500 Feet Legend Project Site - Phase III Fallon Sports Park I37660008 • 02/2020 | 3_phaseIII_concept_plan.cdr Figure 3 Phase III - Concept Plan CITY OF DUBLIN FALLON SPORTS PARK PHASE III (UPPER TERRACE) ADDENDUM Source: BFS Landscape Architects, 5/29/2020. PATHWAY ACRICKET BATTING CAGE_WorkplanePATHWAY BPATHWAY BPATHWAY APATHWAY APATHWAY AMATCHLINEXAXBXBXBXBXBXBXBXBXAXA1XA1XA1XA1XA1XA1XAXAXA0.01 0.02 0.02 0.02 0.010.01 0.02 0.03 0.03 0.02 0.02 0.02 0.02 0.010.02 0.03 0.04 0.04 0.03 0.03 0.02 0.02 0.02 0.02 0.02 0.01 0.01 0.01 0.01 0.01 0.01 0.010.02 0.02 0.02 0.02 0.02 0.020.02 0.03 0.05 0.06 0.06 0.05 0.04 0.03 0.03 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.020.01 0.02 0.05 0.09 0.10 0.10 0.08 0.06 0.05 0.04 0.03 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.03 0.02 0.02 0.02 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.02 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.020.01 0.02 0.03 0.09 0.14 0.16 0.15 0.12 0.10 0.07 0.05 0.04 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.04 0.04 0.04 0.04 0.04 0.04 0.03 0.03 0.03 0.03 0.03 0.03 0.02 0.02 0.02 0.02 0.020.01 0.01 0.02 0.03 0.08 0.15 0.22 0.24 0.22 0.18 0.14 0.11 0.07 0.04 0.04 0.03 0.03 0.04 0.04 0.04 0.04 0.04 0.04 0.05 0.05 0.05 0.05 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.05 0.05 0.05 0.05 0.05 0.05 0.04 0.04 0.04 0.04 0.04 0.03 0.03 0.03 0.02 0.02 0.02 0.020.03 0.03 0.030.01 0.01 0.02 0.02 0.03 0.06 0.14 0.27 0.35 0.36 0.32 0.26 0.20 0.14 0.08 0.05 0.04 0.04 0.04 0.04 0.05 0.05 0.05 0.05 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.05 0.05 0.05 0.05 0.04 0.04 0.04 0.05 0.05 0.06 0.06 0.06 0.06 0.07 0.07 0.07 0.07 0.06 0.06 0.06 0.05 0.05 0.04 0.04 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.04 0.04 0.04 0.05 0.04 0.04 0.03 0.030.01 0.02 0.02 0.02 0.03 0.05 0.12 0.24 0.40 0.49 0.49 0.43 0.35 0.26 0.16 0.09 0.07 0.05 0.05 0.05 0.06 0.06 0.07 0.07 0.08 0.08 0.09 0.09 0.09 0.09 0.08 0.07 0.08 0.07 0.06 0.06 0.05 0.05 0.05 0.06 0.07 0.07 0.08 0.08 0.09 0.09 0.10 0.10 0.10 0.09 0.08 0.08 0.08 0.07 0.06 0.04 0.04 0.03 0.03 0.03 0.03 0.03 0.04 0.04 0.05 0.05 0.06 0.06 0.06 0.05 0.04 0.03 0.03 0.030.01 0.02 0.02 0.02 0.03 0.04 0.07 0.22 0.41 0.61 0.69 0.66 0.55 0.43 0.30 0.18 0.12 0.08 0.06 0.06 0.06 0.07 0.08 0.10 0.11 0.11 0.12 0.13 0.14 0.14 0.13 0.12 0.11 0.11 0.10 0.08 0.07 0.06 0.06 0.06 0.07 0.08 0.10 0.11 0.12 0.12 0.14 0.15 0.15 0.14 0.13 0.12 0.11 0.10 0.09 0.07 0.05 0.04 0.04 0.03 0.03 0.04 0.04 0.05 0.06 0.07 0.08 0.09 0.09 0.08 0.06 0.05 0.04 0.04 0.03 0.030.01 0.02 0.03 0.03 0.04 0.07 0.15 0.38 0.67 0.90 0.97 0.87 0.70 0.52 0.34 0.21 0.15 0.11 0.09 0.08 0.08 0.08 0.10 0.14 0.16 0.17 0.18 0.20 0.22 0.22 0.20 0.18 0.17 0.15 0.13 0.10 0.08 0.07 0.07 0.07 0.08 0.10 0.13 0.16 0.18 0.19 0.21 0.23 0.23 0.22 0.20 0.18 0.16 0.14 0.11 0.08 0.06 0.05 0.04 0.04 0.04 0.04 0.05 0.06 0.09 0.11 0.12 0.13 0.13 0.11 0.09 0.07 0.05 0.05 0.04 0.030.01 0.02 0.02 0.03 0.04 0.05 0.09 0.28 0.60 1.00 1.28 1.33 1.15 0.88 0.60 0.36 0.26 0.19 0.15 0.13 0.10 0.10 0.10 0.13 0.17 0.23 0.26 0.29 0.33 0.36 0.36 0.33 0.29 0.26 0.22 0.17 0.12 0.09 0.08 0.08 0.08 0.09 0.12 0.16 0.22 0.27 0.30 0.34 0.38 0.38 0.35 0.31 0.28 0.24 0.18 0.13 0.09 0.07 0.06 0.05 0.04 0.04 0.05 0.07 0.09 0.13 0.17 0.19 0.19 0.18 0.16 0.13 0.10 0.08 0.06 0.05 0.04 0.030.01 0.02 0.03 0.04 0.05 0.07 0.15 0.45 0.89 1.42 1.73 1.74 1.46 1.06 0.68 0.44 0.31 0.26 0.22 0.18 0.15 0.13 0.13 0.16 0.22 0.30 0.39 0.46 0.54 0.60 0.60 0.53 0.45 0.38 0.29 0.21 0.15 0.11 0.10 0.10 0.10 0.11 0.15 0.20 0.29 0.38 0.46 0.55 0.62 0.64 0.58 0.49 0.41 0.32 0.23 0.16 0.12 0.09 0.07 0.06 0.05 0.05 0.07 0.11 0.16 0.21 0.26 0.28 0.28 0.26 0.22 0.17 0.14 0.11 0.08 0.05 0.04 0.030.01 0.02 0.02 0.04 0.05 0.06 0.10 0.29 0.67 1.29 1.92 2.29 2.21 1.78 1.23 0.76 0.49 0.40 0.37 0.34 0.30 0.24 0.21 0.21 0.24 0.28 0.42 0.55 0.70 0.84 0.94 0.93 0.82 0.69 0.54 0.40 0.27 0.24 0.19 0.15 0.13 0.15 0.19 0.24 0.29 0.39 0.55 0.71 0.85 0.97 1.00 0.90 0.75 0.59 0.45 0.29 0.25 0.18 0.13 0.09 0.09 0.08 0.09 0.11 0.18 0.27 0.34 0.40 0.41 0.40 0.36 0.31 0.25 0.20 0.15 0.10 0.06 0.04 0.040.01 0.02 0.03 0.04 0.06 0.08 0.16 0.48 1.00 1.80 2.52 2.93 2.77 2.13 1.36 0.80 0.56 0.52 0.54 0.54 0.51 0.48 0.43 0.41 0.48 0.67 0.90 1.10 1.32 1.57 1.72 1.72 1.53 1.31 1.08 0.87 0.64 0.47 0.40 0.35 0.34 0.36 0.42 0.51 0.66 0.93 1.18 1.42 1.65 1.85 1.89 1.73 1.48 1.25 1.01 0.74 0.52 0.39 0.29 0.22 0.17 0.14 0.15 0.19 0.30 0.42 0.50 0.57 0.58 0.56 0.50 0.43 0.35 0.28 0.20 0.13 0.07 0.05 0.040.01 0.02 0.02 0.04 0.06 0.07 0.10 0.28 0.73 1.41 2.42 3.22 3.70 3.43 2.53 1.46 0.84 0.67 0.69 0.75 0.79 0.78 0.78 0.78 0.86 1.05 1.36 1.78 2.27 2.67 3.03 3.28 3.28 2.99 2.62 2.22 1.74 1.33 1.02 0.79 0.65 0.60 0.65 0.79 1.02 1.36 1.78 2.27 2.69 3.07 3.38 3.40 3.19 2.81 2.42 1.92 1.46 1.06 0.76 0.53 0.38 0.29 0.25 0.28 0.39 0.52 0.64 0.73 0.79 0.79 0.76 0.67 0.58 0.49 0.37 0.26 0.15 0.08 0.05 0.040.01 0.02 0.03 0.04 0.06 0.08 0.16 0.51 1.05 1.99 3.19 4.144.754.29 2.82 1.46 0.88 0.85 0.93 1.02 1.10 1.12 1.15 1.20 1.31 1.48 1.80 2.29 2.89 3.40 3.81 3.98 3.98 3.77 3.35 2.83 2.24 1.76 1.41 1.16 0.98 0.92 0.98 1.15 1.39 1.73 2.19 2.78 3.34 3.75 4.01 4.00 3.88 3.47 2.98 2.35 1.81 1.39 1.05 0.77 0.56 0.43 0.40 0.47 0.62 0.77 0.90 0.98 1.04 1.05 1.02 0.90 0.76 0.62 0.47 0.31 0.16 0.08 0.06 0.05 0.050.01 0.02 0.02 0.04 0.05 0.06 0.10 0.28 0.74 1.51 2.65 4.125.456.08 5.01 2.83 1.38 1.02 1.07 1.22 1.34 1.40 1.46 1.53 1.63 1.73 1.78 1.95 2.31 2.93 3.41 3.82 3.93 3.93 3.77 3.37 2.87 2.28 1.87 1.61 1.42 1.25 1.17 1.24 1.41 1.60 1.84 2.22 2.77 3.31 3.69 3.89 3.89 3.81 3.42 2.97 2.34 1.87 1.53 1.25 0.96 0.71 0.59 0.62 0.74 0.89 1.05 1.15 1.23 1.30 1.39 1.34 1.17 0.97 0.77 0.56 0.35 0.18 0.09 0.06 0.05 0.050.01 0.02 0.03 0.04 0.05 0.07 0.17 0.50 1.05 2.02 3.41 5.08 6.71 7.15 5.28 2.52 1.28 1.18 1.29 1.51 1.67 1.68 1.74 1.84 1.98 2.09 2.15 2.10 2.24 2.61 3.06 3.34 3.44 3.43 3.31 3.01 2.56 2.15 1.93 1.80 1.60 1.39 1.30 1.38 1.58 1.78 1.90 2.09 2.47 2.91 3.23 3.35 3.37 3.28 3.03 2.59 2.16 1.83 1.67 1.39 1.07 0.84 0.76 0.85 1.03 1.18 1.35 1.44 1.49 1.58 1.74 1.65 1.44 1.17 0.92 0.65 0.41 0.20 0.10 0.07 0.06 0.06 0.060.01 0.02 0.03 0.04 0.05 0.10 0.30 0.73 1.44 2.56 3.95 5.65 7.28 7.024.471.92 1.30 1.29 1.46 1.71 1.96 1.94 2.01 2.12 2.26 2.32 2.22 2.10 2.09 2.26 2.49 2.64 2.69 2.69 2.63 2.45 2.17 1.91 1.71 1.64 1.56 1.40 1.32 1.38 1.53 1.61 1.68 1.85 2.10 2.36 2.54 2.60 2.61 2.57 2.43 2.16 1.87 1.63 1.46 1.33 1.13 0.99 0.98 1.13 1.31 1.50 1.66 1.78 1.83 1.91 2.02 1.91 1.71 1.41 1.06 0.75 0.44 0.20 0.11 0.08 0.07 0.06 0.06 0.060.02 0.02 0.03 0.04 0.06 0.16 0.48 1.00 1.86 2.89 4.065.446.39 5.49 2.93 1.46 1.21 1.31 1.57 1.84 2.14 2.24 2.34 2.42 2.43 2.39 2.26 2.11 2.05 2.00 2.01 2.03 2.03 2.03 2.02 1.95 1.80 1.64 1.51 1.44 1.37 1.29 1.25 1.27 1.35 1.41 1.48 1.59 1.74 1.88 1.95 1.96 1.96 1.95 1.90 1.78 1.59 1.42 1.28 1.18 1.11 1.12 1.29 1.40 1.63 1.84 2.05 2.21 2.29 2.33 2.30 2.26 2.06 1.67 1.25 0.84 0.49 0.25 0.14 0.08 0.08 0.07 0.07 0.07 0.070.02 0.02 0.03 0.04 0.11 0.30 0.68 1.31 2.13 2.99 3.88 4.72 4.65 3.23 1.59 1.04 0.99 1.21 1.63 2.04 2.37 2.63 2.76 2.77 2.68 2.52 2.33 2.18 2.01 1.83 1.69 1.60 1.54 1.53 1.56 1.52 1.47 1.38 1.30 1.23 1.19 1.13 1.10 1.13 1.16 1.21 1.27 1.34 1.42 1.47 1.50 1.48 1.49 1.50 1.47 1.42 1.33 1.22 1.15 1.15 1.22 1.37 1.52 1.76 1.93 2.21 2.54 2.79 2.92 2.92 2.84 2.77 2.43 1.91 1.42 1.01 0.59 0.29 0.13 0.10 0.08 0.08 0.08 0.08 0.080.01 0.02 0.03 0.05 0.16 0.43 0.88 1.50 2.18 2.81 3.27 3.40 2.84 1.65 0.88 0.75 0.73 0.93 1.54 2.25 2.76 3.17 3.32 3.22 2.96 2.64 2.41 2.17 1.98 1.76 1.51 1.34 1.22 1.17 1.17 1.16 1.13 1.10 1.04 1.01 0.94 0.91 0.91 0.90 0.92 0.98 1.01 1.07 1.09 1.11 1.12 1.10 1.13 1.11 1.10 1.09 1.06 1.03 1.07 1.19 1.40 1.64 1.85 2.05 2.33 2.67 3.11 3.49 3.62 3.60 3.45 3.20 2.66 2.18 1.72 1.19 0.68 0.30 0.16 0.11 0.09 0.09 0.09 0.08 0.080.01 0.02 0.04 0.10 0.25 0.56 0.99 1.51 1.99 2.31 2.41 2.20 1.51 0.80 0.56 0.52 0.52 0.69 1.24 2.17 3.05 3.59 3.78 3.70 3.29 2.86 2.45 2.18 1.93 1.66 1.40 1.14 0.93 0.83 0.80 0.81 0.79 0.77 0.75 0.71 0.69 0.66 0.66 0.65 0.67 0.69 0.71 0.74 0.74 0.76 0.73 0.70 0.74 0.73 0.75 0.76 0.79 0.90 1.09 1.36 1.62 1.89 2.15 2.44 2.78 3.23 3.73 4.08 4.13 3.99 3.84 3.41 2.90 2.56 2.05 1.37 0.73 0.35 0.17 0.12 0.11 0.10 0.10 0.09 0.090.01 0.03 0.05 0.12 0.30 0.60 0.98 1.35 1.62 1.72 1.61 1.26 0.75 0.44 0.38 0.40 0.45 0.55 0.83 1.69 2.84 3.70 4.13 4.02 3.67 3.11 2.60 2.20 1.85 1.59 1.28 1.00 0.76 0.59 0.48 0.46 0.47 0.45 0.46 0.44 0.43 0.43 0.41 0.42 0.42 0.42 0.43 0.41 0.42 0.40 0.38 0.36 0.39 0.39 0.41 0.52 0.65 0.90 1.21 1.55 1.89 2.17 2.47 2.82 3.26 3.80 4.234.454.48 4.09 3.78 3.60 3.48 3.11 2.37 1.52 0.81 0.34 0.18 0.14 0.12 0.11 0.11 0.10 0.10 0.100.01 0.02 0.06 0.16 0.35 0.60 0.85 1.07 1.21 1.19 1.01 0.71 0.41 0.29 0.29 0.33 0.39 0.50 0.68 1.09 2.14 3.41 4.07 4.12 3.89 3.38 2.75 2.25 1.83 1.54 1.25 0.99 0.74 0.53 0.37 0.28 0.26 0.24 0.25 0.22 0.24 0.25 0.23 0.23 0.23 0.20 0.21 0.19 0.18 0.17 0.17 0.17 0.19 0.24 0.30 0.48 0.73 1.09 1.44 1.80 2.14 2.42 2.74 3.13 3.63 4.144.554.59 4.27 3.76 3.79 4.34 4.29 3.59 2.66 1.61 0.82 0.37 0.19 0.15 0.13 0.12 0.11 0.11 0.11 0.120.01 0.03 0.08 0.20 0.37 0.53 0.68 0.79 0.83 0.77 0.58 0.40 0.25 0.20 0.22 0.26 0.32 0.42 0.58 0.86 1.42 2.64 3.62 4.06 3.92 3.46 2.85 2.28 1.88 1.59 1.34 1.11 0.89 0.68 0.50 0.38 0.30 0.22 0.18 0.15 0.14 0.15 0.14 0.14 0.13 0.12 0.11 0.10 0.11 0.10 0.11 0.12 0.19 0.28 0.47 0.74 1.06 1.40 1.77 2.10 2.38 2.64 2.96 3.33 3.81 4.18 4.42 4.30 3.70 3.20 4.35 5.51 5.17 4.03 2.85 1.65 0.82 0.37 0.20 0.16 0.15 0.13 0.12 0.12 0.12 0.130.01 0.02 0.04 0.10 0.21 0.33 0.44 0.52 0.57 0.56 0.47 0.32 0.22 0.16 0.14 0.16 0.19 0.25 0.33 0.48 0.71 1.04 1.60 2.68 3.40 3.57 3.31 2.77 2.26 1.90 1.65 1.46 1.31 1.10 0.92 0.79 0.63 0.51 0.42 0.34 0.25 0.19 0.18 0.14 0.11 0.10 0.11 0.09 0.10 0.10 0.13 0.16 0.25 0.38 0.56 0.83 1.07 1.41 1.76 2.12 2.42 2.65 2.87 3.16 3.46 3.69 3.97 3.93 3.44 2.70 3.01 5.29 6.77 6.05 4.52 3.01 1.67 0.83 0.35 0.20 0.17 0.15 0.14 0.14 0.13 0.14 0.140.01 0.02 0.06 0.11 0.19 0.26 0.33 0.38 0.39 0.36 0.27 0.19 0.13 0.11 0.10 0.12 0.14 0.19 0.26 0.37 0.55 0.77 1.01 1.48 2.36 2.93 2.86 2.46 2.14 1.92 1.72 1.59 1.45 1.33 1.18 1.06 0.95 0.84 0.74 0.64 0.53 0.41 0.36 0.26 0.23 0.19 0.16 0.15 0.15 0.18 0.25 0.34 0.51 0.70 0.90 1.14 1.46 1.77 2.11 2.46 2.74 2.96 3.19 3.40 3.34 3.38 3.39 3.05 2.37 2.12 3.04 6.01 7.73 6.82 4.86 3.08 1.67 0.82 0.31 0.20 0.17 0.16 0.15 0.14 0.15 0.15 0.16 0.170.01 0.03 0.06 0.10 0.15 0.19 0.23 0.26 0.27 0.23 0.15 0.12 0.08 0.07 0.08 0.09 0.11 0.15 0.20 0.27 0.39 0.53 0.67 0.83 1.29 1.97 2.22 2.08 1.88 1.88 1.83 1.65 1.53 1.47 1.39 1.31 1.24 1.19 1.09 1.00 0.89 0.76 0.68 0.60 0.49 0.45 0.37 0.35 0.32 0.36 0.49 0.65 0.81 1.02 1.26 1.51 1.79 2.11 2.49 2.85 3.09 3.24 3.28 3.20 3.03 2.89 2.53 2.00 1.60 1.76 2.79 5.86 7.66 6.78 4.85 3.06 1.65 0.82 0.32 0.20 0.18 0.16 0.16 0.15 0.16 0.17 0.17 0.191.05 1.12 1.18 1.24 1.31 1.37 1.41 1.420.01 0.02 0.03 0.05 0.08 0.10 0.13 0.16 0.17 0.17 0.13 0.09 0.07 0.05 0.05 0.06 0.07 0.09 0.11 0.15 0.20 0.27 0.35 0.45 0.54 0.65 1.05 1.46 1.62 1.58 1.59 1.61 1.58 1.56 1.57 1.55 1.51 1.50 1.49 1.45 1.37 1.27 1.18 1.03 0.96 0.86 0.76 0.71 0.65 0.65 0.69 0.80 0.95 1.13 1.35 1.59 1.87 2.18 2.57 2.98 3.35 3.53 3.51 3.27 2.97 2.65 2.22 1.63 1.18 1.17 1.35 2.26 4.83 6.53 5.94 4.46 2.97 1.64 0.82 0.35 0.20 0.18 0.17 0.16 0.16 0.17 0.18 0.19 0.211.03 1.10 1.18 1.27 1.36 1.44 1.53 1.62 1.72 1.80 1.84 1.85 1.80 1.71 1.52 1.320.01 0.02 0.03 0.04 0.05 0.06 0.08 0.10 0.11 0.10 0.07 0.06 0.04 0.04 0.04 0.05 0.06 0.07 0.09 0.11 0.14 0.18 0.24 0.31 0.36 0.38 0.49 0.76 1.06 1.20 1.28 1.34 1.40 1.52 1.67 1.71 1.70 1.75 1.82 1.84 1.77 1.65 1.57 1.43 1.34 1.23 1.13 1.05 1.01 0.99 1.04 1.13 1.24 1.41 1.64 1.92 2.28 2.68 3.14 3.59 3.90 3.94 3.79 3.29 2.75 2.14 1.49 0.98 0.75 0.80 0.98 1.69 3.57 5.08 4.94 3.89 2.77 1.60 0.80 0.36 0.21 0.18 0.18 0.17 0.17 0.18 0.20 0.21 0.231.14 1.24 1.33 1.44 1.56 1.67 1.77 1.87 1.99 2.12 2.23 2.30 2.33 2.35 2.37 2.30 2.11 1.81 1.45 1.050.02 0.02 0.02 0.03 0.04 0.05 0.06 0.06 0.06 0.04 0.04 0.03 0.03 0.03 0.04 0.05 0.06 0.07 0.08 0.10 0.13 0.17 0.21 0.24 0.24 0.24 0.36 0.59 0.79 0.93 1.07 1.22 1.42 1.67 1.90 1.91 2.04 2.20 2.32 2.29 2.16 2.00 1.86 1.73 1.59 1.46 1.35 1.31 1.28 1.33 1.39 1.49 1.62 1.86 2.19 2.65 3.20 3.69 4.05 4.29 4.16 3.75 3.08 2.22 1.42 0.79 0.57 0.52 0.57 0.70 1.21 2.56 3.76 3.96 3.39 2.54 1.54 0.79 0.37 0.20 0.18 0.18 0.18 0.18 0.20 0.21 0.23 0.261.23 1.35 1.47 1.59 1.72 1.85 1.99 2.11 2.24 2.38 2.52 2.65 2.76 2.83 2.88 2.90 2.98 3.00 2.87 2.53 1.97 1.37 1.09 0.920.01 0.02 0.02 0.02 0.03 0.04 0.04 0.03 0.03 0.02 0.02 0.02 0.02 0.03 0.03 0.04 0.05 0.06 0.08 0.09 0.12 0.15 0.16 0.16 0.16 0.20 0.30 0.48 0.63 0.79 1.00 1.25 1.52 1.78 2.06 2.34 2.67 2.92 2.96 2.83 2.63 2.42 2.19 1.94 1.73 1.59 1.54 1.53 1.54 1.58 1.65 1.76 1.98 2.35 2.91 3.51 4.02 4.24 4.25 3.92 3.15 2.22 1.35 0.76 0.47 0.39 0.39 0.42 0.52 0.91 1.82 2.72 3.10 2.90 2.26 1.46 0.79 0.35 0.21 0.18 0.18 0.19 0.20 0.21 0.23 0.25 0.281.26 1.44 1.60 1.76 1.90 2.06 2.21 2.34 2.48 2.61 2.76 2.95 3.11 3.24 3.34 3.38 3.42 3.49 3.62 3.71 3.67 3.37 2.65 1.85 1.41 1.11 0.95 0.870.01 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.01 0.02 0.02 0.02 0.03 0.03 0.04 0.05 0.06 0.07 0.09 0.10 0.11 0.10 0.10 0.12 0.14 0.26 0.38 0.54 0.75 1.02 1.34 1.70 2.10 2.60 3.15 3.47 3.61 3.54 3.35 3.05 2.63 2.24 1.95 1.76 1.70 1.65 1.62 1.67 1.78 1.90 2.06 2.39 2.94 3.49 3.85 3.97 3.65 3.00 1.98 1.19 0.76 0.52 0.40 0.33 0.31 0.33 0.38 0.65 1.30 1.98 2.39 2.38 1.97 1.34 0.74 0.38 0.21 0.18 0.19 0.20 0.21 0.23 0.25 0.28 0.311.36 1.62 1.83 2.04 2.24 2.41 2.59 2.75 2.90 3.04 3.18 3.38 3.58 3.77 3.91 3.93 3.95 3.98 4.05 4.22 4.43 4.43 4.21 3.43 2.52 1.87 1.36 1.16 1.05 0.96 0.880.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.02 0.02 0.03 0.03 0.04 0.04 0.06 0.07 0.07 0.08 0.07 0.07 0.08 0.10 0.14 0.22 0.32 0.48 0.71 1.05 1.50 2.06 2.67 3.29 3.75 4.03 3.95 3.87 3.50 3.05 2.49 2.11 1.92 1.86 1.72 1.61 1.64 1.77 1.86 1.95 2.21 2.65 3.08 3.13 2.90 2.34 1.63 1.12 0.81 0.59 0.44 0.35 0.29 0.26 0.26 0.33 0.51 0.94 1.47 1.82 1.90 1.66 1.21 0.72 0.36 0.23 0.19 0.19 0.20 0.22 0.24 0.27 0.30 0.34 0.381.37 1.70 2.02 2.26 2.50 2.73 2.94 3.15 3.37 3.54 3.71 3.92 4.13 4.344.544.61 4.584.54 4.574.64 4.79 4.96 4.99 4.87 4.23 3.35 2.46 1.69 1.44 1.29 1.19 1.09 0.980.02 0.02 0.03 0.03 0.04 0.04 0.05 0.05 0.05 0.05 0.05 0.05 0.06 0.07 0.11 0.16 0.23 0.37 0.59 0.96 1.50 2.18 2.83 3.44 3.88 3.98 3.97 3.60 3.16 2.53 2.11 1.88 1.75 1.58 1.45 1.43 1.48 1.55 1.66 1.89 2.12 2.18 1.90 1.47 1.17 1.00 0.80 0.60 0.43 0.34 0.28 0.25 0.23 0.22 0.28 0.42 0.71 1.11 1.40 1.51 1.37 1.05 0.68 0.38 0.21 0.19 0.20 0.21 0.24 0.26 0.29 0.32 0.37 0.421.28 1.71 2.14 2.50 2.75 2.99 3.23 3.47 3.74 4.02 4.28 4.51 4.81 5.09 5.33 5.46 5.44 5.35 5.28 5.28 5.33 5.41 5.43 5.34 5.25 4.86 4.19 3.13 2.13 1.82 1.67 1.52 1.36 1.19 1.060.02 0.02 0.03 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.05 0.07 0.09 0.13 0.20 0.30 0.45 0.69 1.14 1.66 2.32 2.97 3.31 3.30 3.16 2.85 2.36 1.93 1.63 1.46 1.32 1.21 1.16 1.16 1.19 1.26 1.33 1.26 1.09 0.87 0.77 0.73 0.66 0.54 0.42 0.32 0.25 0.22 0.20 0.19 0.19 0.23 0.35 0.56 0.87 1.09 1.19 1.13 0.92 0.61 0.37 0.24 0.20 0.21 0.23 0.25 0.28 0.31 0.35 0.40 0.46 0.531.14 1.57 2.11 2.68 3.06 3.30 3.51 3.73 3.98 4.29 4.66 5.06 5.50 5.91 6.25 6.55 6.63 6.52 6.38 6.31 6.23 6.22 6.08 5.99 5.77 5.62 5.42 4.94 3.82 2.80 2.51 2.23 1.96 1.78 1.60 1.35 1.10 0.900.02 0.02 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.04 0.04 0.05 0.07 0.09 0.13 0.20 0.30 0.44 0.63 0.86 1.15 1.47 1.75 1.90 2.02 1.99 1.79 1.52 1.30 1.11 0.99 0.90 0.84 0.82 0.80 0.77 0.66 0.57 0.45 0.49 0.50 0.47 0.42 0.36 0.29 0.23 0.19 0.17 0.16 0.15 0.17 0.20 0.30 0.47 0.72 0.89 0.98 0.97 0.83 0.58 0.35 0.24 0.22 0.22 0.24 0.27 0.30 0.34 0.38 0.43 0.50 0.59 0.70 0.85 1.27 1.87 2.61 3.28 3.67 3.88 4.04 4.23 4.50 4.84 5.31 5.87 6.53 7.16 7.63 7.95 8.02 7.94 7.81 7.68 7.53 7.30 7.12 7.04 6.89 6.69 6.56 6.00 5.10 4.16 3.53 3.08 2.84 2.53 2.12 1.69 1.32 1.06 0.890.02 0.02 0.02 0.02 0.02 0.03 0.03 0.03 0.03 0.04 0.05 0.06 0.08 0.11 0.17 0.25 0.34 0.45 0.59 0.75 0.89 0.92 0.89 0.87 0.87 0.89 0.83 0.78 0.71 0.64 0.59 0.54 0.50 0.45 0.37 0.31 0.26 0.29 0.33 0.33 0.30 0.27 0.24 0.20 0.18 0.16 0.14 0.13 0.13 0.14 0.19 0.28 0.43 0.66 0.81 0.89 0.89 0.79 0.58 0.35 0.24 0.23 0.24 0.26 0.29 0.32 0.36 0.41 0.47 0.54 0.64 0.78 0.96 1.35 2.13 3.08 3.88 4.32 4.52 4.63 4.81 5.12 5.52 6.12 6.84 7.68 8.45 9.02 9.36 9.50 9.52 9.44 9.30 9.09 8.93 9.02 9.15 9.11 8.97 9.01 8.51 7.35 6.07 5.07 4.49 4.02 3.45 2.76 2.12 1.64 1.31 1.07 0.890.02 0.02 0.02 0.02 0.02 0.02 0.02 0.03 0.03 0.04 0.05 0.07 0.10 0.15 0.19 0.25 0.30 0.39 0.49 0.57 0.58 0.55 0.52 0.44 0.34 0.37 0.32 0.35 0.35 0.32 0.29 0.27 0.22 0.18 0.18 0.18 0.20 0.23 0.23 0.20 0.18 0.17 0.15 0.14 0.13 0.12 0.12 0.12 0.13 0.18 0.27 0.42 0.64 0.80 0.89 0.90 0.79 0.58 0.35 0.25 0.23 0.25 0.28 0.31 0.35 0.39 0.45 0.51 0.59 0.69 0.84 1.09 1.45 2.34 3.45 4.38 4.82 5.04 5.21 5.46 5.87 6.45 7.20 8.08 8.96 9.74 10.28 10.66 10.95 11.19 11.31 11.30 11.48 12.04 12.40 12.37 12.37 12.36 12.44 11.79 9.74 7.87 6.71 6.02 5.31 4.40 3.47 2.67 2.02 1.58 1.27 1.04 0.840.02 0.02 0.02 0.02 0.02 0.02 0.02 0.03 0.04 0.05 0.07 0.09 0.11 0.14 0.16 0.20 0.25 0.30 0.34 0.35 0.35 0.34 0.30 0.24 0.19 0.18 0.16 0.14 0.16 0.16 0.13 0.11 0.11 0.11 0.12 0.14 0.16 0.16 0.14 0.13 0.13 0.12 0.11 0.11 0.11 0.11 0.11 0.13 0.18 0.28 0.44 0.67 0.84 0.93 0.92 0.81 0.59 0.37 0.27 0.26 0.27 0.30 0.34 0.38 0.43 0.49 0.56 0.65 0.76 0.91 1.19 1.68 2.51 3.74 4.83 5.14 5.40 5.69 6.13 6.73 7.54 8.47 9.45 10.38 11.17 11.77 12.30 12.87 13.48 14.00 14.64 15.88 17.02 16.94 16.52 16.42 16.26 16.01 14.63 11.76 9.56 8.05 7.05 6.21 5.17 4.08 3.10 2.37 1.85 1.49 1.19 0.96 0.750.01 0.01 0.02 0.02 0.02 0.02 0.03 0.03 0.04 0.05 0.07 0.08 0.09 0.11 0.13 0.16 0.19 0.21 0.22 0.22 0.23 0.21 0.17 0.13 0.11 0.09 0.08 0.08 0.07 0.07 0.07 0.07 0.08 0.09 0.11 0.12 0.12 0.11 0.10 0.10 0.10 0.10 0.10 0.10 0.11 0.11 0.13 0.18 0.30 0.49 0.77 0.97 1.07 1.04 0.88 0.62 0.39 0.29 0.27 0.29 0.32 0.36 0.41 0.47 0.54 0.62 0.72 0.86 1.02 1.26 1.85 2.77 3.98 4.95 5.35 5.68 6.25 6.93 7.76 8.77 9.88 11.04 12.24 13.26 14.14 14.85 15.85 17.01 18.07 19.03 20.39 21.79 21.59 21.10 20.77 19.84 19.54 17.68 13.71 10.93 9.04 7.78 6.84 5.76 4.53 3.44 2.64 2.07 1.65 1.33 1.08 0.840.01 0.01 0.01 0.02 0.02 0.02 0.02 0.03 0.04 0.04 0.05 0.06 0.07 0.08 0.10 0.11 0.12 0.13 0.14 0.14 0.15 0.15 0.12 0.10 0.08 0.07 0.06 0.05 0.05 0.05 0.05 0.06 0.06 0.07 0.08 0.09 0.09 0.09 0.08 0.09 0.09 0.09 0.09 0.10 0.11 0.12 0.14 0.20 0.35 0.61 0.96 1.22 1.32 1.24 1.00 0.66 0.43 0.30 0.28 0.31 0.35 0.39 0.45 0.51 0.60 0.69 0.81 0.96 1.15 1.40 1.85 2.94 4.26 5.11 5.75 6.43 7.38 8.50 9.73 11.20 12.67 13.95 15.33 16.75 17.74 18.52 19.64 21.07 22.18 23.03 24.96 26.86 25.85 24.56 23.37 22.04 22.05 20.68 16.25 12.81 10.24 8.44 7.30 6.13 4.85 3.72 2.88 2.27 1.82 1.46 1.19 0.94 0.740.01 0.01 0.02 0.02 0.02 0.03 0.03 0.04 0.04 0.04 0.05 0.06 0.07 0.08 0.09 0.09 0.09 0.09 0.10 0.10 0.09 0.08 0.06 0.05 0.05 0.04 0.04 0.04 0.04 0.05 0.05 0.06 0.07 0.07 0.07 0.07 0.07 0.08 0.08 0.08 0.09 0.10 0.11 0.13 0.16 0.24 0.43 0.79 1.25 1.58 1.67 1.50 1.13 0.74 0.44 0.30 0.31 0.33 0.37 0.42 0.49 0.56 0.66 0.78 0.92 1.10 1.32 1.61 2.03 2.88 4.35 5.62 6.84 7.99 9.50 11.06 12.93 15.20 17.51 18.78 19.50 20.51 22.06 23.60 25.04 26.10 27.02 27.71 29.32 30.22 27.0823.79 19.08 14.63 11.45 9.04 7.65 6.44 5.15 3.99 3.11 2.46 1.97 1.59 1.30 1.05 0.830.01 0.02 0.02 0.02 0.03 0.03 0.03 0.03 0.04 0.05 0.05 0.06 0.06 0.07 0.07 0.07 0.07 0.07 0.07 0.06 0.05 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.05 0.05 0.06 0.06 0.06 0.06 0.07 0.07 0.08 0.09 0.11 0.13 0.15 0.19 0.28 0.52 1.06 1.66 2.04 2.10 1.79 1.28 0.78 0.45 0.33 0.32 0.35 0.40 0.46 0.53 0.61 0.73 0.87 1.06 1.29 1.58 1.98 2.55 3.41 4.95 6.92 8.80 10.56 12.39 14.43 16.52 19.12 21.88 23.30 23.81 25.08 26.76 27.72 28.04 28.05 28.5826.42 21.55 16.26 12.83 9.74 7.97 6.72 5.47 4.27 3.34 2.64 2.12 1.71 1.40 1.14 0.91 0.720.02 0.02 0.02 0.02 0.02 0.03 0.03 0.03 0.04 0.04 0.05 0.05 0.05 0.05 0.05 0.06 0.05 0.05 0.04 0.04 0.03 0.03 0.03 0.03 0.03 0.04 0.04 0.04 0.05 0.05 0.05 0.06 0.06 0.07 0.07 0.08 0.10 0.12 0.15 0.19 0.23 0.33 0.69 1.48 2.25 2.66 2.58 2.09 1.39 0.81 0.45 0.31 0.33 0.37 0.42 0.48 0.56 0.66 0.79 0.96 1.18 1.48 1.87 2.40 3.16 4.35 6.17 8.68 11.43 13.79 15.67 17.97 20.41 22.87 25.81 28.18 28.80 28.99 28.9727.84 23.23 17.61 13.96 10.42 8.20 6.89 5.73 4.56 3.59 2.84 2.26 1.83 1.49 1.22 0.98 0.780.02 0.02 0.02 0.02 0.03 0.03 0.03 0.03 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.04 0.04 0.05 0.05 0.05 0.06 0.06 0.07 0.09 0.11 0.14 0.18 0.23 0.31 0.45 0.95 2.08 3.10 3.41 3.07 2.35 1.50 0.82 0.45 0.33 0.34 0.38 0.44 0.50 0.59 0.71 0.87 1.09 1.41 1.84 2.43 3.19 4.15 5.44 7.20 9.59 12.82 16.28 18.67 20.64 22.95 24.76 26.4923.83 18.60 14.57 11.12 8.39 6.98 5.90 4.83 3.85 3.05 2.42 1.94 1.57 1.27 1.03 0.83 0.670.02 0.02 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.04 0.04 0.05 0.05 0.05 0.06 0.08 0.10 0.12 0.16 0.21 0.29 0.41 0.61 1.30 2.94 4.27 4.29 3.52 2.58 1.55 0.84 0.41 0.33 0.35 0.39 0.45 0.52 0.61 0.74 0.93 1.20 1.60 2.19 3.00 4.01 5.19 6.53 8.05 10.07 13.15 17.74 21.03 22.0423.05 18.96 14.79 11.49 8.55 7.05 6.02 5.06 4.12 3.29 2.59 2.05 1.63 1.32 1.08 0.88 0.710.02 0.02 0.02 0.03 0.03 0.03 0.03 0.02 0.02 0.02 0.02 0.02 0.03 0.03 0.03 0.03 0.03 0.04 0.04 0.05 0.05 0.07 0.08 0.10 0.14 0.18 0.26 0.37 0.55 0.81 1.74 4.04 5.61 5.22 4.02 2.80 1.58 0.85 0.44 0.33 0.35 0.40 0.46 0.53 0.63 0.77 0.96 1.25 1.70 2.41 3.39 4.58 5.83 6.99 8.27 10.33 13.28 18.22 23.0321.12 19.03 15.29 11.80 8.77 7.14 6.09 5.20 4.34 3.52 2.75 2.14 1.70 1.37 1.13 0.93 0.76 0.600.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.03 0.03 0.03 0.03 0.04 0.04 0.05 0.05 0.07 0.09 0.11 0.15 0.21 0.29 0.44 0.67 1.02 2.23 5.23 6.95 6.19 4.53 2.92 1.62 0.86 0.42 0.33 0.35 0.39 0.45 0.54 0.66 0.81 1.03 1.34 1.83 2.58 3.60 4.79 6.05 7.17 8.41 10.54 13.63 18.26 23.9619.52 19.07 16.29 12.52 9.31 7.40 6.25 5.34 4.50 3.63 2.84 2.22 1.76 1.44 1.19 0.98 0.80 0.640.03 0.03 0.03 0.04 0.04 0.05 0.07 0.09 0.11 0.16 0.22 0.31 0.46 0.71 1.14 2.44 5.80 7.59 6.63 4.76 3.00 1.67 0.88 0.41 0.33 0.35 0.39 0.45 0.55 0.69 0.86 1.10 1.43 1.90 2.59 3.51 4.71 5.95 7.14 8.34 10.21 13.71 17.74 23.5719.25 17.34 13.51 9.99 7.74 6.46 5.53 4.63 3.69 2.87 2.25 1.81 1.49 1.24 1.02 0.83 0.670.03 0.03 0.03 0.04 0.04 0.05 0.07 0.08 0.11 0.15 0.21 0.30 0.44 0.67 1.03 2.27 5.31 7.04 6.26 4.56 2.93 1.63 0.86 0.42 0.33 0.35 0.38 0.45 0.55 0.70 0.89 1.14 1.48 1.93 2.53 3.34 4.39 5.63 6.90 8.09 9.85 13.20 16.73 22.20 26.9118.98 17.79 14.40 10.71 8.15 6.73 5.73 4.76 3.76 2.91 2.27 1.82 1.51 1.27 1.06 0.86 0.70 0.570.03 0.03 0.04 0.04 0.05 0.06 0.08 0.10 0.13 0.18 0.26 0.37 0.56 0.82 1.79 4.14 5.72 5.29 4.06 2.82 1.61 0.87 0.44 0.33 0.35 0.39 0.45 0.55 0.70 0.91 1.17 1.48 1.89 2.43 3.15 4.07 5.27 6.53 7.73 9.35 12.21 15.70 20.19 24.3118.88 18.22 15.14 11.76 8.78 7.08 5.98 4.91 3.83 2.94 2.28 1.83 1.53 1.29 1.10 0.88 0.72 0.590.03 0.03 0.03 0.04 0.05 0.06 0.07 0.09 0.12 0.16 0.21 0.30 0.42 0.62 1.34 3.02 4.38 4.37 3.57 2.61 1.57 0.85 0.43 0.33 0.35 0.39 0.45 0.54 0.69 0.89 1.16 1.45 1.84 2.33 2.97 3.82 4.92 6.15 7.25 8.66 11.23 14.47 17.97 21.5019.34 19.37 16.34 13.04 9.79 7.44 6.17 5.07 3.93 2.98 2.31 1.86 1.55 1.32 1.13 0.92 0.74 0.610.03 0.03 0.03 0.04 0.04 0.05 0.06 0.08 0.10 0.13 0.17 0.23 0.31 0.46 0.98 2.15 3.19 3.49 3.12 2.39 1.53 0.83 0.46 0.34 0.34 0.39 0.45 0.54 0.67 0.87 1.14 1.42 1.78 2.24 2.82 3.58 4.58 5.73 6.77 7.89 10.01 13.00 16.20 19.5021.32 18.24 14.39 10.84 8.00 6.33 5.19 4.02 3.03 2.34 1.89 1.57 1.35 1.15 0.96 0.77 0.630.02 0.03 0.03 0.04 0.04 0.05 0.06 0.07 0.09 0.11 0.14 0.18 0.23 0.34 0.71 1.52 2.32 2.72 2.63 2.13 1.42 0.82 0.44 0.32 0.34 0.39 0.45 0.54 0.67 0.86 1.11 1.38 1.71 2.12 2.66 3.38 4.30 5.33 6.31 7.29 8.84 11.61 15.10 18.37 19.2323.44 20.36 15.62 11.79 8.46 6.50 5.27 4.12 3.11 2.42 1.94 1.62 1.38 1.18 0.99 0.81 0.650.02 0.03 0.03 0.03 0.04 0.05 0.05 0.06 0.08 0.10 0.12 0.15 0.19 0.28 0.53 1.09 1.71 2.10 2.16 1.84 1.32 0.79 0.45 0.33 0.33 0.38 0.44 0.53 0.66 0.84 1.07 1.34 1.64 2.02 2.53 3.20 4.05 5.02 5.89 6.78 8.12 10.47 14.12 17.71 19.1424.59 21.69 16.66 12.80 8.89 6.60 5.35 4.24 3.25 2.53 2.02 1.67 1.42 1.21 1.01 0.83 0.68 0.540.03 0.03 0.03 0.04 0.04 0.05 0.06 0.07 0.08 0.10 0.12 0.15 0.23 0.44 0.81 1.29 1.63 1.73 1.56 1.19 0.77 0.44 0.31 0.32 0.36 0.43 0.51 0.64 0.81 1.03 1.28 1.56 1.92 2.40 3.05 3.84 4.70 5.54 6.41 7.60 9.69 13.00 16.83 18.9721.92 17.23 13.35 9.36 6.66 5.37 4.36 3.44 2.68 2.13 1.74 1.45 1.21 1.02 0.85 0.70 0.560.02 0.03 0.03 0.04 0.04 0.05 0.05 0.06 0.07 0.08 0.10 0.13 0.19 0.35 0.62 0.99 1.27 1.39 1.31 1.07 0.71 0.44 0.31 0.31 0.36 0.42 0.50 0.61 0.78 0.98 1.20 1.46 1.80 2.25 2.86 3.62 4.42 5.23 6.09 7.16 8.93 11.91 15.49 18.42 19.1520.97 17.12 13.14 9.66 6.68 5.35 4.43 3.62 2.88 2.28 1.82 1.47 1.20 1.01 0.86 0.71 0.570.02 0.03 0.03 0.03 0.04 0.04 0.05 0.06 0.06 0.07 0.09 0.12 0.16 0.29 0.49 0.78 1.00 1.13 1.12 0.98 0.70 0.44 0.32 0.31 0.34 0.40 0.48 0.59 0.74 0.92 1.12 1.36 1.66 2.08 2.63 3.31 4.09 4.93 5.82 6.82 8.29 11.14 14.48 18.28 20.6319.26 16.75 12.99 9.63 6.84 5.36 4.49 3.77 3.08 2.44 1.90 1.49 1.21 1.02 0.87 0.74 0.590.02 0.03 0.03 0.03 0.04 0.04 0.05 0.05 0.06 0.07 0.08 0.10 0.14 0.24 0.41 0.66 0.86 0.99 1.03 0.96 0.74 0.47 0.33 0.31 0.33 0.39 0.47 0.57 0.70 0.87 1.06 1.27 1.55 1.92 2.37 2.95 3.69 4.58 5.55 6.57 7.88 10.67 14.03 18.16 21.9717.44 16.79 13.66 9.99 7.12 5.47 4.56 3.89 3.23 2.56 1.97 1.54 1.24 1.05 0.89 0.75 0.610.02 0.03 0.03 0.03 0.03 0.04 0.04 0.05 0.05 0.06 0.07 0.09 0.13 0.21 0.35 0.58 0.78 0.93 1.01 0.99 0.81 0.54 0.36 0.32 0.32 0.38 0.45 0.54 0.66 0.82 1.00 1.21 1.46 1.75 2.12 2.62 3.30 4.16 5.18 6.21 7.46 9.95 13.67 17.65 22.2716.89 14.87 10.90 7.62 5.69 4.68 3.99 3.31 2.59 1.99 1.55 1.26 1.07 0.91 0.75 0.610.02 0.03 0.03 0.03 0.04 0.04 0.05 0.05 0.06 0.07 0.08 0.12 0.19 0.31 0.52 0.74 0.92 1.05 1.07 0.94 0.67 0.44 0.34 0.32 0.37 0.43 0.52 0.63 0.78 0.95 1.15 1.36 1.61 1.91 2.34 2.93 3.74 4.76 5.79 6.97 9.07 12.72 16.50 21.42 24.4216.27 15.33 11.66 8.22 6.06 4.87 4.12 3.38 2.61 1.97 1.54 1.25 1.07 0.91 0.76 0.610.02 0.03 0.03 0.03 0.04 0.04 0.04 0.05 0.06 0.07 0.08 0.11 0.16 0.28 0.46 0.72 0.97 1.17 1.26 1.15 0.86 0.56 0.36 0.33 0.36 0.42 0.50 0.60 0.73 0.89 1.08 1.28 1.49 1.75 2.09 2.59 3.30 4.26 5.31 6.42 8.21 11.31 15.01 19.43 22.5615.91 15.39 12.13 9.00 6.53 5.17 4.30 3.49 2.63 1.96 1.51 1.23 1.05 0.90 0.77 0.600.02 0.03 0.03 0.03 0.03 0.04 0.04 0.05 0.06 0.07 0.08 0.11 0.15 0.26 0.43 0.74 1.09 1.40 1.55 1.45 1.12 0.72 0.44 0.35 0.36 0.41 0.48 0.57 0.68 0.82 1.00 1.20 1.39 1.61 1.90 2.32 2.92 3.78 4.82 5.84 7.25 9.97 13.44 16.76 19.8716.00 15.86 12.81 10.25 7.48 5.51 4.54 3.62 2.67 1.96 1.50 1.21 1.02 0.88 0.760.02 0.03 0.03 0.03 0.03 0.04 0.04 0.05 0.06 0.07 0.08 0.10 0.14 0.22 0.43 0.77 1.25 1.68 1.92 1.82 1.43 0.90 0.54 0.36 0.36 0.40 0.47 0.54 0.64 0.76 0.92 1.13 1.30 1.50 1.76 2.13 2.65 3.39 4.35 5.31 6.34 8.47 11.64 14.42 17.5717.05 14.23 11.45 8.55 6.03 4.75 3.79 2.77 1.98 1.49 1.19 1.00 0.86 0.740.02 0.03 0.03 0.03 0.04 0.04 0.05 0.06 0.07 0.08 0.11 0.14 0.22 0.40 0.81 1.43 2.02 2.38 2.29 1.79 1.16 0.68 0.41 0.36 0.40 0.45 0.52 0.60 0.71 0.86 1.06 1.23 1.42 1.65 1.98 2.44 3.11 3.97 4.81 5.69 7.14 9.78 12.91 16.21 16.7918.74 15.86 12.22 9.26 6.51 4.93 3.91 2.90 2.07 1.52 1.18 0.97 0.84 0.730.02 0.03 0.03 0.03 0.04 0.04 0.05 0.06 0.07 0.09 0.11 0.15 0.21 0.39 0.85 1.66 2.48 2.96 2.85 2.27 1.47 0.84 0.45 0.37 0.39 0.43 0.49 0.56 0.66 0.80 0.98 1.16 1.35 1.56 1.86 2.29 2.90 3.66 4.41 5.16 6.34 8.53 11.92 15.51 16.4019.87 17.01 12.77 9.77 6.70 5.02 3.97 3.02 2.18 1.57 1.19 0.96 0.820.02 0.03 0.03 0.03 0.04 0.04 0.05 0.06 0.08 0.10 0.13 0.17 0.23 0.36 0.84 1.91 3.09 3.72 3.49 2.80 1.85 1.03 0.58 0.37 0.38 0.42 0.47 0.53 0.62 0.75 0.91 1.09 1.27 1.48 1.76 2.17 2.74 3.44 4.09 4.76 5.73 7.62 10.79 14.65 16.3819.35 17.26 13.04 9.76 6.73 4.93 3.88 3.04 2.26 1.64 1.23 0.96 0.800.02 0.03 0.03 0.03 0.04 0.05 0.05 0.07 0.08 0.11 0.14 0.19 0.27 0.41 0.81 2.10 3.87 4.77 4.35 3.46 2.31 1.31 0.75 0.41 0.37 0.40 0.45 0.50 0.58 0.71 0.85 1.00 1.17 1.36 1.64 2.04 2.60 3.24 3.86 4.48 5.31 6.89 9.59 13.04 15.6716.58 12.83 9.15 6.62 4.69 3.65 2.93 2.27 1.69 1.27 0.98 0.790.03 0.03 0.03 0.04 0.05 0.06 0.07 0.09 0.11 0.16 0.22 0.31 0.47 0.82 2.17 4.57 6.02 5.52 4.30 2.85 1.63 0.93 0.48 0.37 0.38 0.42 0.47 0.54 0.65 0.79 0.92 1.06 1.23 1.49 1.87 2.38 2.99 3.61 4.25 5.02 6.35 8.76 11.69 14.97 16.6914.22 14.86 12.30 8.67 6.21 4.37 3.32 2.69 2.16 1.70 1.30 1.000.03 0.03 0.03 0.04 0.05 0.06 0.07 0.09 0.12 0.17 0.24 0.35 0.55 0.88 2.05 4.94 7.05 6.77 5.12 3.46 2.03 1.12 0.61 0.37 0.36 0.39 0.44 0.50 0.60 0.73 0.86 0.98 1.14 1.37 1.69 2.11 2.66 3.33 4.04 4.81 5.97 8.50 11.35 14.54 17.6411.09 10.54 11.35 11.55 11.72 12.21 11.22 8.52 5.92 4.06 2.98 2.40 1.97 1.60 1.27 1.000.03 0.03 0.03 0.04 0.05 0.06 0.07 0.09 0.12 0.17 0.25 0.38 0.59 0.92 1.73 4.44 7.12 7.32 5.64 3.92 2.46 1.37 0.76 0.42 0.35 0.36 0.40 0.46 0.55 0.67 0.80 0.93 1.08 1.26 1.51 1.84 2.32 2.99 3.79 4.62 5.70 8.05 11.22 14.12 17.939.04 9.05 9.54 11.21 11.59 10.43 9.97 10.00 9.75 9.78 9.78 8.07 5.61 3.76 2.66 2.09 1.72 1.42 1.150.02 0.03 0.03 0.04 0.04 0.06 0.07 0.09 0.13 0.18 0.25 0.37 0.56 0.84 1.36 3.19 5.92 6.69 5.45 3.99 2.77 1.66 0.93 0.51 0.35 0.34 0.38 0.43 0.51 0.62 0.74 0.87 1.01 1.16 1.34 1.60 2.01 2.62 3.46 4.38 5.37 7.30 10.39 13.10 17.15 19.809.36 8.96 8.67 8.47 8.31 8.28 8.37 9.51 10.97 10.53 9.47 8.93 8.45 8.12 7.93 6.86 5.11 3.39 2.35 1.79 1.46 1.22 1.010.03 0.03 0.04 0.04 0.05 0.07 0.09 0.12 0.17 0.24 0.33 0.48 0.70 0.98 1.87 3.89 5.14 4.86 3.84 2.87 1.93 1.12 0.63 0.37 0.33 0.36 0.40 0.47 0.57 0.68 0.81 0.94 1.06 1.20 1.41 1.74 2.27 3.08 4.04 4.99 6.47 8.97 11.67 15.38 18.2910.64 11.94 10.48 8.76 8.30 7.96 7.70 7.59 7.54 7.51 7.88 8.80 9.05 8.50 7.87 7.32 6.76 6.18 5.49 4.48 3.22 2.05 1.52 1.22 1.020.03 0.03 0.03 0.04 0.05 0.07 0.09 0.11 0.15 0.20 0.27 0.38 0.52 0.68 1.04 2.26 3.55 3.84 3.47 2.81 2.04 1.29 0.76 0.46 0.34 0.34 0.37 0.43 0.51 0.61 0.73 0.86 0.96 1.08 1.25 1.52 1.98 2.71 3.64 4.53 5.62 7.52 10.00 12.99 15.83 15.03 12.88 11.99 10.52 10.57 11.50 9.87 8.12 7.64 7.33 7.10 6.97 6.94 6.81 6.75 6.87 6.76 6.53 6.12 5.76 5.30 4.75 4.41 3.91 3.26 2.07 1.28 1.03 0.850.02 0.03 0.03 0.04 0.05 0.06 0.08 0.10 0.13 0.17 0.21 0.27 0.36 0.45 0.62 1.24 2.19 2.75 2.82 2.54 2.01 1.41 0.89 0.53 0.36 0.33 0.35 0.39 0.46 0.54 0.65 0.78 0.88 0.99 1.13 1.36 1.75 2.38 3.21 3.98 4.79 6.15 8.19 10.59 13.25 12.96 11.26 10.39 9.84 10.17 10.76 9.00 7.52 7.01 6.83 6.63 6.51 6.40 6.25 5.99 5.65 5.24 4.92 4.60 4.38 4.16 3.94 3.88 3.69 3.13 2.11 1.25 0.860.03 0.03 0.04 0.04 0.05 0.07 0.08 0.10 0.13 0.16 0.20 0.25 0.31 0.39 0.69 1.29 1.85 2.11 2.08 1.82 1.40 0.97 0.63 0.42 0.34 0.33 0.36 0.42 0.48 0.58 0.72 0.80 0.90 1.02 1.21 1.56 2.11 2.79 3.41 4.02 4.95 6.56 8.66 10.92 10.87 9.66 9.14 9.07 9.27 8.94 7.63 6.70 6.43 6.31 6.18 6.05 5.91 5.70 5.38 4.91 4.45 4.10 3.85 3.71 3.67 3.69 3.77 3.70 2.89 1.91 1.21 0.780.02 0.03 0.03 0.04 0.05 0.06 0.07 0.09 0.10 0.13 0.16 0.19 0.22 0.26 0.42 0.76 1.19 1.51 1.62 1.54 1.30 1.00 0.69 0.49 0.37 0.33 0.34 0.38 0.44 0.53 0.64 0.74 0.82 0.92 1.10 1.39 1.84 2.39 2.88 3.30 3.95 5.23 7.05 8.94 9.03 8.28 8.08 7.89 7.54 6.86 6.15 5.84 5.78 5.74 5.67 5.60 5.45 5.20 4.84 4.39 4.02 3.71 3.54 3.46 3.51 3.62 3.68 3.60 2.71 1.71 1.030.03 0.03 0.04 0.04 0.05 0.06 0.07 0.08 0.10 0.12 0.14 0.16 0.19 0.27 0.47 0.75 1.05 1.22 1.22 1.14 0.97 0.77 0.57 0.42 0.35 0.33 0.36 0.41 0.49 0.58 0.67 0.74 0.84 0.99 1.25 1.62 2.04 2.39 2.70 3.13 4.06 5.54 7.01 7.37 6.85 6.64 6.25 5.70 5.22 4.95 4.94 5.05 5.15 5.19 5.18 5.07 4.81 4.44 4.05 3.75 3.49 3.37 3.32 3.36 3.45 3.43 3.18 2.51 1.600.03 0.03 0.03 0.04 0.04 0.05 0.06 0.07 0.08 0.10 0.11 0.12 0.14 0.20 0.30 0.46 0.71 0.89 0.97 0.99 0.94 0.85 0.71 0.55 0.40 0.34 0.34 0.37 0.45 0.53 0.60 0.67 0.76 0.90 1.12 1.42 1.72 1.96 2.17 2.47 3.07 4.17 5.20 5.57 5.29 5.08 4.72 4.39 4.17 4.16 4.26 4.40 4.57 4.71 4.77 4.70 4.46 4.16 3.81 3.55 3.33 3.21 3.15 3.15 3.17 3.06 2.73 2.15 1.440.02 0.03 0.03 0.04 0.04 0.05 0.05 0.06 0.07 0.08 0.09 0.10 0.11 0.15 0.21 0.32 0.48 0.66 0.80 0.88 0.92 0.91 0.84 0.69 0.51 0.40 0.34 0.35 0.41 0.48 0.55 0.61 0.69 0.81 1.01 1.22 1.42 1.58 1.72 1.91 2.27 3.23 4.09 4.27 4.12 4.03 3.85 3.73 3.63 3.68 3.80 3.92 4.11 4.28 4.34 4.23 4.08 3.86 3.58 3.35 3.15 3.01 2.90 2.82 2.76 2.63 2.31 1.760.03 0.03 0.03 0.04 0.04 0.05 0.05 0.06 0.07 0.07 0.08 0.09 0.11 0.15 0.23 0.34 0.50 0.66 0.80 0.90 0.98 0.98 0.90 0.70 0.51 0.37 0.34 0.38 0.44 0.50 0.56 0.63 0.74 0.88 1.02 1.15 1.26 1.35 1.47 1.72 2.66 3.55 3.81 3.76 3.70 3.59 3.47 3.43 3.42 3.49 3.61 3.73 3.86 3.86 3.73 3.59 3.41 3.23 3.05 2.87 2.72 2.59 2.45 2.31 2.14 1.830.02 0.03 0.03 0.03 0.04 0.04 0.05 0.05 0.06 0.06 0.07 0.08 0.09 0.11 0.17 0.25 0.38 0.54 0.71 0.89 1.06 1.19 1.17 0.98 0.72 0.47 0.38 0.37 0.41 0.46 0.52 0.58 0.66 0.75 0.84 0.93 1.00 1.06 1.14 1.34 2.15 3.00 3.54 3.78 3.68 3.55 3.39 3.28 3.24 3.25 3.33 3.40 3.39 3.32 3.22 3.07 2.90 2.77 2.64 2.49 2.35 2.22 2.06 1.89 1.710.03 0.03 0.03 0.03 0.04 0.04 0.05 0.05 0.06 0.06 0.07 0.08 0.09 0.13 0.18 0.29 0.42 0.64 0.91 1.20 1.45 1.52 1.35 1.01 0.65 0.43 0.37 0.39 0.43 0.48 0.53 0.58 0.63 0.69 0.75 0.79 0.83 0.89 1.03 1.60 2.27 3.03 3.58 3.55 3.44 3.26 3.11 3.03 3.02 3.04 3.02 2.93 2.81 2.66 2.52 2.40 2.29 2.17 2.04 1.92 1.81 1.66 1.500.02 0.03 0.03 0.03 0.04 0.04 0.04 0.05 0.05 0.06 0.06 0.07 0.08 0.11 0.14 0.22 0.36 0.56 0.92 1.34 1.72 1.92 1.80 1.39 0.93 0.56 0.40 0.38 0.40 0.44 0.47 0.50 0.53 0.57 0.60 0.63 0.66 0.70 0.82 1.14 1.59 2.36 3.04 3.21 3.15 2.97 2.84 2.76 2.70 2.65 2.57 2.47 2.32 2.17 2.03 1.93 1.84 1.73 1.63 1.53 1.430.02 0.03 0.03 0.03 0.04 0.04 0.04 0.05 0.05 0.06 0.07 0.08 0.10 0.13 0.18 0.28 0.50 0.90 1.46 2.02 2.40 2.35 1.92 1.30 0.80 0.46 0.37 0.38 0.40 0.41 0.43 0.45 0.47 0.49 0.51 0.54 0.57 0.66 0.82 1.10 1.73 2.29 2.57 2.66 2.59 2.46 2.38 2.33 2.22 2.12 2.00 1.88 1.74 1.63 1.54 1.45 1.35 1.260.02 0.03 0.03 0.03 0.03 0.04 0.04 0.04 0.05 0.06 0.06 0.07 0.09 0.11 0.15 0.24 0.41 0.84 1.54 2.35 2.94 3.00 2.56 1.80 1.09 0.66 0.40 0.36 0.36 0.37 0.38 0.39 0.40 0.41 0.43 0.45 0.46 0.52 0.61 0.78 1.23 1.63 1.92 2.07 2.10 2.03 1.96 1.90 1.79 1.69 1.58 1.48 1.38 1.30 1.21 1.13 1.060.02 0.03 0.03 0.03 0.04 0.04 0.04 0.05 0.05 0.06 0.07 0.09 0.11 0.14 0.20 0.35 0.70 1.55 2.69 3.59 3.77 3.30 2.50 1.56 0.93 0.50 0.36 0.33 0.33 0.33 0.34 0.34 0.35 0.36 0.37 0.39 0.43 0.47 0.57 0.86 1.11 1.35 1.55 1.60 1.59 1.54 1.49 1.41 1.31 1.23 1.15 1.08 1.01 0.940.02 0.03 0.03 0.03 0.03 0.04 0.04 0.05 0.05 0.06 0.07 0.09 0.11 0.15 0.20 0.30 0.59 1.40 2.94 4.42 4.84 4.29 3.38 2.20 1.29 0.77 0.39 0.32 0.30 0.30 0.30 0.30 0.30 0.31 0.32 0.33 0.35 0.38 0.44 0.61 0.76 0.91 1.08 1.16 1.20 1.19 1.130.02 0.03 0.03 0.03 0.04 0.04 0.05 0.05 0.06 0.07 0.09 0.12 0.16 0.22 0.31 0.51 1.15 2.84 5.08 6.22 5.68 4.40 3.01 1.80 1.04 0.57 0.33 0.28 0.27 0.27 0.26 0.27 0.27 0.27 0.28 0.30 0.31 0.35 0.45 0.540.02 0.03 0.03 0.03 0.03 0.04 0.04 0.05 0.06 0.07 0.09 0.12 0.16 0.23 0.33 0.52 0.93 2.35 5.20 7.19 6.96 5.43 3.81 2.46 1.44 0.81 0.43 0.28 0.25 0.24 0.23 0.23 0.24 0.24 0.24 0.25 0.26 0.28 0.34 0.400.02 0.03 0.03 0.03 0.04 0.04 0.05 0.06 0.07 0.09 0.12 0.16 0.23 0.34 0.55 0.87 1.68 4.11 6.84 7.42 5.97 4.30 3.03 1.94 1.13 0.64 0.35 0.24 0.22 0.21 0.21 0.21 0.21 0.21 0.22 0.23 0.24 0.27 0.31 0.340.03 0.03 0.03 0.03 0.04 0.05 0.06 0.07 0.09 0.11 0.16 0.23 0.34 0.53 0.79 1.24 2.48 4.91 6.17 5.68 4.39 3.28 2.37 1.52 0.90 0.51 0.30 0.22 0.19 0.18 0.18 0.18 0.19 0.19 0.19 0.20 0.23 0.25 0.270.02 0.03 0.03 0.03 0.04 0.04 0.05 0.07 0.08 0.11 0.15 0.22 0.31 0.45 0.65 0.91 1.32 2.62 4.12 4.56 4.03 3.29 2.55 1.79 1.15 0.69 0.39 0.23 0.19 0.17 0.16 0.16 0.16 0.17 0.17 0.18 0.19 0.21 0.220.03 0.03 0.03 0.04 0.04 0.05 0.06 0.08 0.10 0.14 0.20 0.26 0.36 0.49 0.65 0.78 1.21 2.20 3.01 3.11 2.87 2.44 1.89 1.34 0.88 0.54 0.33 0.22 0.17 0.15 0.15 0.15 0.15 0.15 0.16 0.17 0.18 0.19 0.190.03 0.03 0.03 0.04 0.05 0.06 0.07 0.10 0.12 0.17 0.21 0.27 0.34 0.42 0.49 0.61 1.06 1.71 2.10 2.18 2.05 1.76 1.39 1.01 0.67 0.43 0.27 0.18 0.15 0.14 0.13 0.13 0.14 0.14 0.14 0.15 0.16 0.160.02 0.03 0.03 0.04 0.04 0.05 0.06 0.08 0.10 0.13 0.16 0.20 0.24 0.28 0.32 0.36 0.52 0.88 1.27 1.51 1.57 1.48 1.27 1.03 0.80 0.56 0.38 0.23 0.16 0.14 0.13 0.12 0.12 0.13 0.13 0.13 0.13 0.14 0.1425.7026.6827.0228.7032.7431.9530.7030.4029.5728.5528.5229.5230.3830.6931.8632.8528.8827.0926.7625.7428.7128.7027.8327.4430.8730.2528.7129.0429.0428.3028.2829.0029.0528.7130.1831.0127.5227.8228.7628.7130.9730.2928.0225.7128.3527.8426.0426.7727.7228.2428.2827.7626.8126.0127.7328.4625.7427.8930.3130.9631.0131.1628.7324.9425.9724.7422.9524.1626.9630.1730.2427.1424.2222.9524.6526.0424.9028.6131.2031.0428.3228.8228.0726.1927.8425.9224.3225.4927.5429.5229.6027.6925.5824.3625.8427.8526.2327.9928.9028.3424.6124.3923.5823.7426.0023.8622.8123.3523.7223.9823.9623.7323.3622.8123.7926.0123.8023.5724.4424.6321.6221.4521.2622.4523.0620.5920.0620.6420.9921.1321.1321.0020.6520.0720.5423.0022.5421.2821.4821.6220.0720.3320.7821.8621.1919.5119.3519.6819.8219.7719.7719.8219.6919.3619.4921.1621.9020.8020.3520.1019.8520.2520.4620.2919.3918.7118.7018.8018.8218.6418.6318.8118.8018.7218.7119.3620.3020.4820.2719.8819.3519.7219.9719.9218.9018.0617.9417.9317.8817.7517.7517.8817.9417.9518.0518.8819.9119.9919.7519.3818.8318.9819.3420.4219.5917.4416.9917.0517.0817.0917.0917.0917.0517.0117.4219.5420.4719.3819.0018.8519.9319.3818.6819.4919.9217.2216.1416.2316.4216.5616.5616.4316.2516.1517.1719.9019.5618.7119.3819.9222.2721.0919.1018.0719.5917.0915.5215.5915.7916.0616.0715.8115.6015.5217.0119.6318.1319.0621.0822.2124.6822.6219.9017.1918.7516.9314.9014.9515.1715.4315.4315.1814.9614.8916.8418.8017.1619.8022.6224.6026.0323.2720.0816.6717.9716.5614.2814.3314.6214.8214.8314.6414.3314.2616.4718.0316.6719.9623.2525.9225.3822.6319.4216.0417.3415.9513.6813.7213.9614.2514.2513.9713.7213.6715.8617.4016.0419.3122.6125.2822.7420.6317.9415.3316.9915.1013.1113.1613.3313.5813.5813.3413.1613.0915.0017.0215.3317.8620.6222.6719.4918.1816.1815.3116.7814.1812.6112.6812.8312.9612.9612.8412.6912.6114.1016.8115.3416.1318.1919.4617.0716.2915.4516.0516.1713.3412.3112.2812.3012.3812.3812.3112.2912.3113.3016.1516.1415.4816.3517.1016.5116.3216.1416.5215.0812.8312.1712.0311.9511.8911.8911.9512.0312.1812.8215.0716.6016.2116.4016.6216.6316.7616.7116.2114.3512.4711.9811.8311.7411.5511.5411.7311.8312.0012.4814.3416.2816.8016.8416.7216.1215.8915.7415.9914.5512.3611.6811.5611.4711.4211.4211.4711.5611.6912.3414.5616.0515.7815.9516.2016.0715.2714.4315.0015.1212.3511.3011.2811.2911.3711.3711.3011.2911.3012.3015.0915.0614.4215.3016.1117.7316.3614.4513.6215.1312.5510.9911.0711.2111.3311.3311.2211.0810.9912.4615.1313.6314.4016.4217.7620.1918.0415.4712.8814.5912.7810.7510.7810.9611.2111.2110.9810.7810.7212.6614.6112.8915.3718.0620.1321.8819.1716.1412.8014.0812.8110.4510.4010.5610.8510.8610.5810.3910.4112.6514.1512.7615.9619.1421.7621.6418.9215.9412.5313.7712.5110.099.9610.0410.1510.1510.059.9510.0312.3313.8512.4415.7118.8521.4119.4217.4114.8612.1213.5711.859.619.419.329.319.319.329.399.5611.6813.6712.0414.6317.3119.16ASSOCIATED LIGHTING REPRESENTATIVES, INC7777 PARDEE LANEP.O. BOX 2265OAKLAND, CA 94621PHONE: (510) 638-3800 - FAX (510) 638-2908* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *ALL VALUES SHOWN ARE MAINTAINED HORIZONTAL FOOTCANDLES AT GRADEPHOTOMETRIC DATA USED AS INPUT FOR THESE CALCULATIONSIS BASED ON ESTABLISHED IES PROCEDURES AND PUBLISHEDLAMP, RATINGS. FIELD PERFORMANCE WILL DEPEND ON ACTUALLAMP, BALLAST, ELECTRICAL AND SITE CHARACTERISTICS.Calculations have been performed according to IES standards and good practice.Some differences between measured values and calculated results may occur due tomeasurement techniques and field conditions such as voltage and temperaturevariations. Input data used to generate the attached calculations such as roomdimensions, reflectances, furniture and architectural elements significantly affect thelighting calculations. If the real environment conditions do not match the input data,differences will occur between measured values and calculated values.REPORT FOR: AURUM CONSULTING ENGINEERSBY: APPLICATIONS ENGINEERING; GILBERTO J. RODRIGUEZSALES REPRESENTATIVE: ALR; JD STEPHENSAGI32 VERSION 19.11AGI (C) 1999-2020 LIGHTING ANALYSTS, INC.10268 W. CENTENNIAL ROAD, SUITE 202LITTLETON, CO 80127FALLON SPORTS PARK - PHASE 34605 LOCKHART ST. DUBLIN CADRAWING NO. / INPUT FILEPROJECT DESCRIPTION17734JDS - E2.2N.DWG /.AGISCALE1" = 16'SHEET1 OF 2DATE02.21.2020REV0***LIGHTING LAYOUT RECOMMENDATION*****PARTIAL SITE*** TWIN ROTATED ASSEMBLIES AS SHOWN ON THE PLANS.** HORIZONTAL FOOTCANDLE VALUES SHOWN AT 36" ABOVE FINISH GRADE.1.0FC0.5FCLuminaire ScheduleProject: FALLON SPORTS PARK - PHASE 3 - PARTIAL SITESymbolQtyLabelArrangementLum. LumensLLFLDDLLDDescriptionFilenameLum. Watts6XASINGLE66520.8500.9000.944SIGNIFY GARDCO GL13-XXX-1-2-70LA-6435-NW-VOLT-XXX - 15' POLEGL13-2-70LA-6435-NW.IES706XA1SINGLE67500.8500.9000.944SIGNIFY GARDCO GL13-XXX-1-3-70LA-6435-NW-VOLT-XXX - 15' POLEGL13-3-70LA-6435-NW.IES70.18XB *TWIN274320.8500.9000.944VISIONAIRE BLX-II-4-T4-128LC-5-4K-VOLT-XX-XX-(TWIN) - 25' POLEBLX-II_4_T4_128LC_5_4K.IES211Calculation SummaryProject: FALLON SPORTS PARK - PHASE 3 - PARTIAL SITELabelCalcTypeUnitsAvgMaxMinAvg/MinMax/Min# PtsCRICKET BATTING CAGE_Workplane **IlluminanceFc18.5632.859.311.993.53560PATHWAY AIlluminanceFc2.575.010.882.925.69238PATHWAY BIlluminanceFc3.027.730.634.7912.27263 CRICKET BATTING CAGE_WorkplanePATHWAY BPATHWAY BPATHWAY BMATCHLINEXBXBXBXBXBXBXBXBXA1XAXAXAXA1.611.641.771.861.952.212.653.083.132.902.341.631.120.810.590.440.350.290.260.260.330.510.941.471.821.901.661.210.720.360.230.190.190.200.220.240.270.300.340.381.371.702.022.262.502.732.943.153.373.543.713.924.134.344.544.614.584.544.574.644.794.964.994.874.233.352.461.691.441.291.191.090.981.451.431.481.551.661.892.122.181.901.471.171.000.800.600.430.340.280.250.230.220.280.420.711.111.401.511.371.050.680.380.210.190.200.210.240.260.290.320.370.421.281.712.142.502.752.993.233.473.744.024.284.514.815.095.335.465.445.355.285.285.335.415.435.345.254.864.193.132.131.821.671.521.361.191.061.211.161.161.191.261.331.261.090.870.770.730.660.540.420.320.250.220.200.190.190.230.350.560.871.091.191.130.920.610.370.240.200.210.230.250.280.310.350.400.460.531.141.572.112.683.063.303.513.733.984.294.665.065.505.916.256.556.636.526.386.316.236.226.085.995.775.625.424.943.822.802.512.231.961.781.601.351.100.900.900.840.820.800.770.660.570.450.490.500.470.420.360.290.230.190.170.160.150.170.200.300.470.720.890.980.970.830.580.350.240.220.220.240.270.300.340.380.430.500.590.700.851.271.872.613.283.673.884.044.234.504.845.315.876.537.167.637.958.027.947.817.687.537.307.127.046.896.696.566.005.104.163.533.082.842.532.121.691.321.060.890.590.540.500.450.370.310.260.290.330.330.300.270.240.200.180.160.140.130.130.140.190.280.430.660.810.890.890.790.580.350.240.230.240.260.290.320.360.410.470.540.640.780.961.352.133.083.884.324.524.634.815.125.526.126.847.688.459.029.369.509.529.449.309.098.939.029.159.118.979.018.517.356.075.074.494.023.452.762.121.641.311.070.890.320.290.270.220.180.180.180.200.230.230.200.180.170.150.140.130.120.120.120.130.180.270.420.640.800.890.900.790.580.350.250.230.250.280.310.350.390.450.510.590.690.841.091.452.343.454.384.825.045.215.465.876.457.208.088.969.7410.2810.6610.9511.1911.3111.3011.4812.0412.4012.3712.3712.3612.4411.799.747.876.716.025.314.403.472.672.021.581.271.040.840.160.160.130.110.110.110.120.140.160.160.140.130.130.120.110.110.110.110.110.130.180.280.440.670.840.930.920.810.590.370.270.260.270.300.340.380.430.490.560.650.760.911.191.682.513.744.835.145.405.696.136.737.548.479.4510.3811.1711.7712.3012.8713.4814.0014.6415.8817.0216.9416.5216.4216.2616.0114.6311.769.568.057.056.215.174.083.102.371.851.491.190.960.750.080.070.070.070.070.080.090.110.120.120.110.100.100.100.100.100.100.110.110.130.180.300.490.770.971.071.040.880.620.390.290.270.290.320.360.410.470.540.620.720.861.021.261.852.773.984.955.355.686.256.937.768.779.8811.0412.2413.2614.1414.8515.8517.0118.0719.0320.3921.7921.5921.1020.7719.8419.5417.6813.7110.939.047.786.845.764.533.442.642.071.651.331.080.840.050.050.050.050.060.060.070.080.090.090.090.080.090.090.090.090.100.110.120.140.200.350.610.961.221.321.241.000.660.430.300.280.310.350.390.450.510.600.690.810.961.151.401.852.944.265.115.756.437.388.509.7311.2012.6713.9515.3316.7517.7418.5219.6421.0722.1823.0324.9626.8625.8524.5623.3722.0422.0520.6816.2512.8110.248.447.306.134.853.722.882.271.821.461.190.940.740.040.040.040.040.050.050.060.070.070.070.070.070.080.080.080.090.100.110.130.160.240.430.791.251.581.671.501.130.740.440.300.310.330.370.420.490.560.660.780.921.101.321.612.032.884.355.626.847.999.5011.0612.9315.2017.5118.7819.5020.5122.0623.6025.0426.1027.0227.7129.3230.2227.0823.7919.0814.6311.459.047.656.445.153.993.112.461.971.591.301.050.830.040.040.040.040.040.040.050.050.060.060.060.060.070.070.080.090.110.130.150.190.280.521.061.662.042.101.791.280.780.450.330.320.350.400.460.530.610.730.871.061.291.581.982.553.414.956.928.8010.5612.3914.4316.5219.1221.8823.3023.8125.0826.7627.7228.0428.0528.5826.4221.5516.2612.839.747.976.725.474.273.342.642.121.711.401.140.910.720.030.030.030.030.040.040.040.050.050.050.060.060.070.070.080.100.120.150.190.230.330.691.482.252.662.582.091.390.810.450.310.330.370.420.480.560.660.790.961.181.481.872.403.164.356.178.6811.4313.7915.6717.9720.4122.8725.8128.1828.8028.9928.9727.8423.2317.6113.9610.428.206.895.734.563.592.842.261.831.491.220.980.780.030.030.030.030.030.030.040.040.050.050.050.060.060.070.090.110.140.180.230.310.450.952.083.103.413.072.351.500.820.450.330.340.380.440.500.590.710.871.091.411.842.433.194.155.447.209.5912.8216.2818.6720.6422.9524.7626.4923.8318.6014.5711.128.396.985.904.833.853.052.421.941.571.271.030.830.670.030.030.030.030.030.030.030.040.040.050.050.050.060.080.100.120.160.210.290.410.611.302.944.274.293.522.581.550.840.410.330.350.390.450.520.610.740.931.201.602.193.004.015.196.538.0510.0713.1517.7421.0322.0423.0518.9614.7911.498.557.056.025.064.123.292.592.051.631.321.080.880.710.020.020.020.030.030.030.030.030.040.040.050.050.070.080.100.140.180.260.370.550.811.744.045.615.224.022.801.580.850.440.330.350.400.460.530.630.770.961.251.702.413.394.585.836.998.2710.3313.2818.2223.0321.1219.0315.2911.808.777.146.095.204.343.522.752.141.701.371.130.930.760.600.020.020.020.020.030.030.030.030.040.040.050.050.070.090.110.150.210.290.440.671.022.235.236.956.194.532.921.620.860.420.330.350.390.450.540.660.811.031.341.832.583.604.796.057.178.4110.5413.6318.2623.9619.5219.0716.2912.529.317.406.255.344.503.632.842.221.761.441.190.980.800.640.030.030.030.040.040.050.070.090.110.160.220.310.460.711.142.445.807.596.634.763.001.670.880.410.330.350.390.450.550.690.861.101.431.902.593.514.715.957.148.3410.2113.7117.7423.5719.2517.3413.519.997.746.465.534.633.692.872.251.811.491.241.020.830.670.030.030.030.040.040.050.070.080.110.150.210.300.440.671.032.275.317.046.264.562.931.630.860.420.330.350.380.450.550.700.891.141.481.932.533.344.395.636.908.099.8513.2016.7322.2026.9118.9817.7914.4010.718.156.735.734.763.762.912.271.821.511.271.060.860.700.030.030.040.040.050.060.080.100.130.180.260.370.560.821.794.145.725.294.062.821.610.870.440.330.350.390.450.550.700.911.171.481.892.433.154.075.276.537.739.3512.2115.7020.1924.3118.8818.2215.1411.768.787.085.984.913.832.942.281.831.531.291.100.880.720.030.030.030.040.050.060.070.090.120.160.210.300.420.621.343.024.384.373.572.611.570.850.430.330.350.390.450.540.690.891.161.451.842.332.973.824.926.157.258.6611.2314.4717.9721.5019.3419.3716.3413.049.797.446.175.073.932.982.311.861.551.321.130.920.740.030.030.030.040.040.050.060.080.100.130.170.230.310.460.982.153.193.493.122.391.530.830.460.340.340.390.450.540.670.871.141.421.782.242.823.584.585.736.777.8910.0113.0016.2019.5021.3218.2414.3910.848.006.335.194.023.032.341.891.571.351.150.960.770.020.030.030.040.040.050.060.070.090.110.140.180.230.340.711.522.322.722.632.131.420.820.440.320.340.390.450.540.670.861.111.381.712.122.663.384.305.336.317.298.8411.6115.1018.3719.2323.4420.3615.6211.798.466.505.274.123.112.421.941.621.381.180.990.810.020.030.030.030.040.050.050.060.080.100.120.150.190.280.531.091.712.102.161.841.320.790.450.330.330.380.440.530.660.841.071.341.642.022.533.204.055.025.896.788.1210.4714.1217.7119.1424.5921.6916.6612.808.896.605.354.243.252.532.021.671.421.211.010.830.030.030.030.040.040.050.060.070.080.100.120.150.230.440.811.291.631.731.561.190.770.440.310.320.360.430.510.640.811.031.281.561.922.403.053.844.705.546.417.609.6913.0016.8318.9721.9217.2313.359.366.665.374.363.442.682.131.741.451.211.020.850.020.030.030.040.040.050.050.060.070.080.100.130.190.350.620.991.271.391.311.070.710.440.310.310.360.420.500.610.780.981.201.461.802.252.863.624.425.236.097.168.9311.9115.4918.4219.1520.9717.1213.149.666.685.354.433.622.882.281.821.471.201.010.860.020.030.030.030.040.040.050.060.060.070.090.120.160.290.490.781.001.131.120.980.700.440.320.310.340.400.480.590.740.921.121.361.662.082.633.314.094.935.826.828.2911.1414.4818.2820.6319.2616.7512.999.636.845.364.493.773.082.441.901.491.211.020.870.020.030.030.030.040.040.050.050.060.070.080.100.140.240.410.660.860.991.030.960.740.470.330.310.330.390.470.570.700.871.061.271.551.922.372.953.694.585.556.577.8810.6714.0318.1621.9717.4416.7913.669.997.125.474.563.893.232.561.971.541.241.050.890.020.030.030.030.030.040.040.050.050.060.070.090.130.210.350.580.780.931.010.990.810.540.360.320.320.380.450.540.660.821.001.211.461.752.122.623.304.165.186.217.469.9513.6717.6522.2716.8914.8710.907.625.694.683.993.312.591.991.551.261.070.910.020.030.030.030.040.040.050.050.060.070.080.120.190.310.520.740.921.051.070.940.670.440.340.320.370.430.520.630.780.951.151.361.611.912.342.933.744.765.796.979.0712.7216.5021.4224.4216.2715.3311.668.226.064.874.123.382.611.971.541.251.070.910.020.030.030.030.040.040.040.050.060.070.080.110.160.280.460.720.971.171.261.150.860.560.360.330.360.420.500.600.730.891.081.281.491.752.092.593.304.265.316.428.2111.3115.0119.4322.5615.9115.3912.139.006.535.174.303.492.631.961.511.231.050.900.020.030.030.030.030.040.040.050.060.070.080.110.150.260.430.741.091.401.551.451.120.720.440.350.360.410.480.570.680.821.001.201.391.611.902.322.923.784.825.847.259.9713.4416.7619.8716.0015.8612.8110.257.485.514.543.622.671.961.501.211.020.880.020.030.030.030.030.040.040.050.060.070.080.100.140.220.430.771.251.681.921.821.430.900.540.360.360.400.470.540.640.760.921.131.301.501.762.132.653.394.355.316.348.4711.6414.4217.5717.0514.2311.458.556.034.753.792.771.981.491.191.000.860.020.030.030.030.040.040.050.060.070.080.110.140.220.400.811.432.022.382.291.791.160.680.410.360.400.450.520.600.710.861.061.231.421.651.982.443.113.974.815.697.149.7812.9116.2116.7918.7415.8612.229.266.514.933.912.902.071.521.180.970.840.020.030.030.030.040.040.050.060.070.090.110.150.210.390.851.662.482.962.852.271.470.840.450.370.390.430.490.560.660.800.981.161.351.561.862.292.903.664.415.166.348.5311.9215.5116.4019.8717.0112.779.776.705.023.973.022.181.571.190.960.820.020.030.030.030.040.040.050.060.080.100.130.170.230.360.841.913.093.723.492.801.851.030.580.370.380.420.470.530.620.750.911.091.271.481.762.172.743.444.094.765.737.6210.7914.6516.3819.3517.2613.049.766.734.933.883.042.261.641.230.960.800.020.030.030.030.040.050.050.070.080.110.140.190.270.410.812.103.874.774.353.462.311.310.750.410.370.400.450.500.580.710.851.001.171.361.642.042.603.243.864.485.316.899.5913.0415.6716.5812.839.156.624.693.652.932.271.691.270.980.790.030.030.030.040.050.060.070.090.110.160.220.310.470.822.174.576.025.524.302.851.630.930.480.370.380.420.470.540.650.790.921.061.231.491.872.382.993.614.255.026.358.7611.6914.9716.6914.2214.8612.308.676.214.373.322.692.161.701.301.000.030.030.030.040.050.060.070.090.120.170.240.350.550.882.054.947.056.775.123.462.031.120.610.370.360.390.440.500.600.730.860.981.141.371.692.112.663.334.044.815.978.5011.3514.5417.6411.0910.5411.3511.5511.7212.2111.228.525.924.062.982.401.971.601.271.000.030.030.030.040.050.060.070.090.120.170.250.380.590.921.734.447.127.325.643.922.461.370.760.420.350.360.400.460.550.670.800.931.081.261.511.842.322.993.794.625.708.0511.2214.1217.939.049.059.5411.2111.5910.439.9710.009.759.789.788.075.613.762.662.091.721.421.150.020.030.030.040.040.060.070.090.130.180.250.370.560.841.363.195.926.695.453.992.771.660.930.510.350.340.380.430.510.620.740.871.011.161.341.602.012.623.464.385.377.3010.3913.1017.1519.809.368.968.678.478.318.288.379.5110.9710.539.478.938.458.127.936.865.113.392.351.791.461.221.010.030.030.040.040.050.070.090.120.170.240.330.480.700.981.873.895.144.863.842.871.931.120.630.370.330.360.400.470.570.680.810.941.061.201.411.742.273.084.044.996.478.9711.6715.3818.2910.6411.9410.488.768.307.967.707.597.547.517.888.809.058.507.877.326.766.185.494.483.222.051.521.221.020.030.030.030.040.050.070.090.110.150.200.270.380.520.681.042.263.553.843.472.812.041.290.760.460.340.340.370.430.510.610.730.860.961.081.251.521.982.713.644.535.627.5210.0012.9915.8315.0312.8811.9910.5210.5711.509.878.127.647.337.106.976.946.816.756.876.766.536.125.765.304.754.413.913.262.071.281.030.850.020.030.030.040.050.060.080.100.130.170.210.270.360.450.621.242.192.752.822.542.011.410.890.530.360.330.350.390.460.540.650.780.880.991.131.361.752.383.213.984.796.158.1910.5913.2512.9611.2610.399.8410.1710.769.007.527.016.836.636.516.406.255.995.655.244.924.604.384.163.943.883.693.132.111.250.860.030.030.040.040.050.070.080.100.130.160.200.250.310.390.691.291.852.112.081.821.400.970.630.420.340.330.360.420.480.580.720.800.901.021.211.562.112.793.414.024.956.568.6610.9210.879.669.149.079.278.947.636.706.436.316.186.055.915.705.384.914.454.103.853.713.673.693.773.702.891.911.210.780.020.030.030.040.050.060.070.090.100.130.160.190.220.260.420.761.191.511.621.541.301.000.690.490.370.330.340.380.440.530.640.740.820.921.101.391.842.392.883.303.955.237.058.949.038.288.087.897.546.866.155.845.785.745.675.605.455.204.844.394.023.713.543.463.513.623.683.602.711.711.030.030.030.040.040.050.060.070.080.100.120.140.160.190.270.470.751.051.221.221.140.970.770.570.420.350.330.360.410.490.580.670.740.840.991.251.622.042.392.703.134.065.547.017.376.856.646.255.705.224.954.945.055.155.195.185.074.814.444.053.753.493.373.323.363.453.433.182.511.600.030.030.030.040.040.050.060.070.080.100.110.120.140.200.300.460.710.890.970.990.940.850.710.550.400.340.340.370.450.530.600.670.760.901.121.421.721.962.172.473.074.175.205.575.295.084.724.394.174.164.264.404.574.714.774.704.464.163.813.553.333.213.153.153.173.062.732.151.440.020.030.030.040.040.050.050.060.070.080.090.100.110.150.210.320.480.660.800.880.920.910.840.690.510.400.340.350.410.480.550.610.690.811.011.221.421.581.721.912.273.234.094.274.124.033.853.733.633.683.803.924.114.284.344.234.083.863.583.353.153.012.902.822.762.632.311.760.030.030.030.040.040.050.050.060.070.070.080.090.110.150.230.340.500.660.800.900.980.980.900.700.510.370.340.380.440.500.560.630.740.881.021.151.261.351.471.722.663.553.813.763.703.593.473.433.423.493.613.733.863.863.733.593.413.233.052.872.722.592.452.312.141.830.020.030.030.030.040.040.050.050.060.060.070.080.090.110.170.250.380.540.710.891.061.191.170.980.720.470.380.370.410.460.520.580.660.750.840.931.001.061.141.342.153.003.543.783.683.553.393.283.243.253.333.403.393.323.223.072.902.772.642.492.352.222.061.891.710.030.030.030.030.040.040.050.050.060.060.070.080.090.130.180.290.420.640.911.201.451.521.351.010.650.430.370.390.430.480.530.580.630.690.750.790.830.891.031.602.273.033.583.553.443.263.113.033.023.043.022.932.812.662.522.402.292.172.041.921.811.661.500.020.030.030.030.040.040.040.050.050.060.060.070.080.110.140.220.360.560.921.341.721.921.801.390.930.560.400.380.400.440.470.500.530.570.600.630.660.700.821.141.592.363.043.213.152.972.842.762.702.652.572.472.322.172.031.931.841.731.631.531.430.020.030.030.030.040.040.040.050.050.060.070.080.100.130.180.280.500.901.462.022.402.351.921.300.800.460.370.380.400.410.430.450.470.490.510.540.570.660.821.101.732.292.572.662.592.462.382.332.222.122.001.881.741.631.541.451.351.260.020.030.030.030.030.040.040.040.050.060.060.070.090.110.150.240.410.841.542.352.943.002.561.801.090.660.400.360.360.370.380.390.400.410.430.450.460.520.610.781.231.631.922.072.102.031.961.901.791.691.581.481.381.301.211.131.060.020.030.030.030.040.040.040.050.050.060.070.090.110.140.200.350.701.552.693.593.773.302.501.560.930.500.360.330.330.330.340.340.350.360.370.390.430.470.570.861.111.351.551.601.591.541.491.411.311.231.151.081.010.940.020.030.030.030.030.040.040.050.050.060.070.090.110.150.200.300.591.402.944.424.844.293.382.201.290.770.390.320.300.300.300.300.300.310.320.330.350.380.440.610.760.911.081.161.201.191.130.020.030.030.030.040.040.050.050.060.070.090.120.160.220.310.511.152.845.086.225.684.403.011.801.040.570.330.280.270.270.260.270.270.270.280.300.310.350.450.540.020.030.030.030.030.040.040.050.060.070.090.120.160.230.330.520.932.355.207.196.965.433.812.461.440.810.430.280.250.240.230.230.240.240.240.250.260.280.340.400.020.030.030.030.040.040.050.060.070.090.120.160.230.340.550.871.684.116.847.425.974.303.031.941.130.640.350.240.220.210.210.210.210.210.220.230.240.270.310.340.030.030.030.030.040.050.060.070.090.110.160.230.340.530.791.242.484.916.175.684.393.282.371.520.900.510.300.220.190.180.180.180.190.190.190.200.230.250.270.020.030.030.030.040.040.050.070.080.110.150.220.310.450.650.911.322.624.124.564.033.292.551.791.150.690.390.230.190.170.160.160.160.170.170.180.190.210.220.030.030.030.040.040.050.060.080.100.140.200.260.360.490.650.781.212.203.013.112.872.441.891.340.880.540.330.220.170.150.150.150.150.150.160.170.180.190.190.030.030.030.040.050.060.070.100.120.170.210.270.340.420.490.611.061.712.102.182.051.761.391.010.670.430.270.180.150.140.130.130.140.140.140.150.160.160.020.030.030.040.040.050.060.080.100.130.160.200.240.280.320.360.520.881.271.511.571.481.271.030.800.560.380.230.160.140.130.120.120.130.130.130.130.140.140.030.030.030.040.050.060.070.090.100.120.140.170.200.210.230.290.430.710.971.121.141.080.980.860.730.550.340.200.150.120.120.110.120.120.120.120.120.120.120.030.030.030.040.050.060.070.080.090.110.120.140.150.160.180.250.410.560.750.860.910.920.900.840.720.520.320.210.130.120.110.110.110.110.110.100.100.110.020.030.030.040.040.050.060.070.070.080.100.110.110.120.120.160.240.330.480.640.760.850.920.950.910.760.520.320.160.120.110.110.110.100.100.090.090.090.090.030.030.030.040.040.050.050.060.070.070.080.090.090.090.110.140.220.320.460.630.790.941.081.161.070.820.510.270.140.110.110.100.100.090.080.080.080.080.030.030.030.040.040.050.050.060.060.070.070.070.070.080.100.150.220.330.500.720.991.261.461.451.210.790.440.200.130.110.100.100.090.080.080.080.070.070.020.030.030.030.040.040.040.050.050.050.060.060.060.070.080.100.150.240.390.651.031.441.781.891.691.200.720.360.160.120.110.100.090.080.070.070.070.070.020.030.030.030.030.040.040.040.050.050.050.050.060.070.080.120.160.310.561.021.592.132.422.271.771.080.610.270.140.110.100.090.080.070.060.060.060.060.020.030.030.030.030.040.040.040.040.050.050.050.060.070.100.140.230.470.941.702.493.012.972.451.650.940.480.200.130.110.090.080.070.060.060.060.050.020.030.030.030.030.030.040.040.040.050.050.060.070.090.120.190.360.801.722.873.733.793.272.411.440.800.370.160.110.090.080.070.060.060.050.050.050.020.020.030.030.030.030.030.040.040.040.050.060.070.090.130.180.280.631.543.144.624.954.373.372.161.260.650.270.130.100.080.070.060.060.050.050.040.040.020.020.020.030.030.030.030.040.040.050.060.070.100.130.190.280.511.192.975.246.405.834.493.031.841.010.520.210.110.080.070.060.050.050.040.040.040.020.020.020.030.030.030.030.040.050.060.070.100.140.200.310.490.912.355.177.217.065.513.912.551.510.820.400.170.090.070.060.050.050.040.040.040.030.020.020.020.030.030.030.040.050.060.070.100.140.200.310.510.821.563.836.527.205.894.323.092.071.220.660.300.130.080.060.050.040.040.040.030.030.020.020.020.020.030.030.040.040.050.070.090.130.200.300.480.731.142.114.245.635.444.363.302.431.620.950.490.220.090.060.040.040.040.030.030.030.020.020.020.030.030.030.040.050.070.090.130.180.270.400.580.811.112.063.414.063.753.172.531.861.230.720.370.160.080.050.040.030.030.030.030.030.020.020.020.030.030.040.050.060.080.120.170.230.320.430.560.670.901.672.432.692.582.261.821.330.860.480.230.110.060.040.030.030.030.020.020.020.020.020.020.030.030.040.060.070.100.140.180.230.290.350.410.460.721.241.671.811.761.561.250.900.570.310.140.060.040.030.030.020.020.020.020.020.020.030.030.040.050.060.080.110.130.160.190.230.260.270.320.540.901.151.251.191.020.800.580.370.200.090.040.030.020.020.020.020.020.020.020.020.030.030.040.050.070.080.100.110.130.150.170.170.190.280.460.640.790.820.760.650.510.380.240.130.060.030.030.020.020.020.020.020.020.020.030.030.040.050.060.070.080.090.100.110.110.120.160.230.340.460.530.540.490.420.330.230.150.080.050.030.020.020.020.020.020.020.020.030.030.040.050.050.060.070.070.080.080.080.090.110.190.240.330.370.360.310.250.190.140.090.050.030.020.020.020.020.020.020.020.020.030.030.040.040.040.050.050.050.050.050.060.070.100.140.190.240.240.210.180.140.110.080.050.030.020.020.020.010.020.020.020.020.030.030.030.030.040.040.040.040.040.040.050.050.080.100.140.150.140.120.100.070.050.040.030.030.020.020.010.020.020.020.020.020.030.030.030.030.030.030.030.030.030.030.050.060.070.090.090.080.060.050.040.030.030.020.020.020.010.010.020.020.020.020.020.020.020.020.020.020.020.020.020.020.030.040.040.050.060.050.040.030.030.020.020.020.020.010.010.010.010.020.020.020.020.020.020.020.020.020.020.020.020.020.020.030.030.030.030.030.020.020.020.020.010.010.010.010.010.010.010.010.020.020.020.020.020.020.020.020.020.020.020.020.020.020.020.020.020.020.010.010.010.010.010.010.010.010.010.010.010.010.010.010.010.010.010.010.010.010.010.010.020.020.020.010.010.010.010.010.010.010.010.010.010.010.010.010.010.010.010.010.010.010.010.010.010.010.010.010.010.010.010.010.010.010.010.010.010.010.010.010.010.010.0125.7026.6827.0228.7032.7431.9530.7030.4029.5728.5528.5229.5230.3830.6931.8632.8528.8827.0926.7625.7428.7128.7027.8327.4430.8730.2528.7129.0429.0428.3028.2829.0029.0528.7130.1831.0127.5227.8228.7628.7130.9730.2928.0225.7128.3527.8426.0426.7727.7228.2428.2827.7626.8126.0127.7328.4625.7427.8930.3130.9631.0131.1628.7324.9425.9724.7422.9524.1626.9630.1730.2427.1424.2222.9524.6526.0424.9028.6131.2031.0428.3228.8228.0726.1927.8425.9224.3225.4927.5429.5229.6027.6925.5824.3625.8427.8526.2327.9928.9028.3424.6124.3923.5823.7426.0023.8622.8123.3523.7223.9823.9623.7323.3622.8123.7926.0123.8023.5724.4424.6321.6221.4521.2622.4523.0620.5920.0620.6420.9921.1321.1321.0020.6520.0720.5423.0022.5421.2821.4821.6220.0720.3320.7821.8621.1919.5119.3519.6819.8219.7719.7719.8219.6919.3619.4921.1621.9020.8020.3520.1019.8520.2520.4620.2919.3918.7118.7018.8018.8218.6418.6318.8118.8018.7218.7119.3620.3020.4820.2719.8819.3519.7219.9719.9218.9018.0617.9417.9317.8817.7517.7517.8817.9417.9518.0518.8819.9119.9919.7519.3818.8318.9819.3420.4219.5917.4416.9917.0517.0817.0917.0917.0917.0517.0117.4219.5420.4719.3819.0018.8519.9319.3818.6819.4919.9217.2216.1416.2316.4216.5616.5616.4316.2516.1517.1719.9019.5618.7119.3819.9222.2721.0919.1018.0719.5917.0915.5215.5915.7916.0616.0715.8115.6015.5217.0119.6318.1319.0621.0822.2124.6822.6219.9017.1918.7516.9314.9014.9515.1715.4315.4315.1814.9614.8916.8418.8017.1619.8022.6224.6026.0323.2720.0816.6717.9716.5614.2814.3314.6214.8214.8314.6414.3314.2616.4718.0316.6719.9623.2525.9225.3822.6319.4216.0417.3415.9513.6813.7213.9614.2514.2513.9713.7213.6715.8617.4016.0419.3122.6125.2822.7420.6317.9415.3316.9915.1013.1113.1613.3313.5813.5813.3413.1613.0915.0017.0215.3317.8620.6222.6719.4918.1816.1815.3116.7814.1812.6112.6812.8312.9612.9612.8412.6912.6114.1016.8115.3416.1318.1919.4617.0716.2915.4516.0516.1713.3412.3112.2812.3012.3812.3812.3112.2912.3113.3016.1516.1415.4816.3517.1016.5116.3216.1416.5215.0812.8312.1712.0311.9511.8911.8911.9512.0312.1812.8215.0716.6016.2116.4016.6216.6316.7616.7116.2114.3512.4711.9811.8311.7411.5511.5411.7311.8312.0012.4814.3416.2816.8016.8416.7216.1215.8915.7415.9914.5512.3611.6811.5611.4711.4211.4211.4711.5611.6912.3414.5616.0515.7815.9516.2016.0715.2714.4315.0015.1212.3511.3011.2811.2911.3711.3711.3011.2911.3012.3015.0915.0614.4215.3016.1117.7316.3614.4513.6215.1312.5510.9911.0711.2111.3311.3311.2211.0810.9912.4615.1313.6314.4016.4217.7620.1918.0415.4712.8814.5912.7810.7510.7810.9611.2111.2110.9810.7810.7212.6614.6112.8915.3718.0620.1321.8819.1716.1412.8014.0812.8110.4510.4010.5610.8510.8610.5810.3910.4112.6514.1512.7615.9619.1421.7621.6418.9215.9412.5313.7712.5110.099.9610.0410.1510.1510.059.9510.0312.3313.8512.4415.7118.8521.4119.4217.4114.8612.1213.5711.859.619.419.329.319.319.329.399.5611.6813.6712.0414.6317.3119.16CRICKET BATTING CAGE_WorkplaneXBXBXBXBXBXBXBXB6.566.005.104.169.029.159.118.979.018.517.356.0711.3111.3011.4812.0412.4012.3712.3712.3612.4411.799.747.8712.3012.8713.4814.0014.6415.8817.0216.9416.5216.4216.2616.0114.6311.769.5611.0412.2413.2614.1414.8515.8517.0118.0719.0320.3921.7921.5921.1020.7719.8419.5417.6813.7110.939.048.509.7311.2012.6713.9515.3316.7517.7418.5219.6421.0722.1823.0324.9626.8625.8524.5623.3722.0422.0520.6816.2512.8110.245.626.847.999.5011.0612.9315.2017.5118.7819.5020.5122.0623.6025.0426.1027.0227.7129.3230.2227.0823.7919.0814.6311.452.553.414.956.928.8010.5612.3914.4316.5219.1221.8823.3023.8125.0826.7627.7228.0428.0528.5826.4221.5516.2612.839.743.164.356.178.6811.4313.7915.6717.9720.4122.8725.8128.1828.8028.9928.9727.8423.2317.6113.9610.424.155.447.209.5912.8216.2818.6720.6422.9524.7626.4923.8318.6014.5711.126.538.0510.0713.1517.7421.0322.0423.0518.9614.7911.496.998.2710.3313.2818.2223.0321.1219.0315.2911.808.777.178.4110.5413.6318.2623.9619.5219.0716.2912.529.318.3410.2113.7117.7423.5719.2517.3413.519.998.099.8513.2016.7322.2026.9118.9817.7914.4010.717.739.3512.2115.7020.1924.3118.8818.2215.1411.768.787.258.6611.2314.4717.9721.5019.3419.3716.3413.049.797.8910.0113.0016.2019.5021.3218.2414.3910.847.298.8411.6115.1018.3719.2323.4420.3615.6211.796.788.1210.4714.1217.7119.1424.5921.6916.6612.808.896.417.609.6913.0016.8318.9721.9217.2313.359.367.168.9311.9115.4918.4219.1520.9717.1213.149.666.828.2911.1414.4818.2820.6319.2616.7512.999.636.846.577.8810.6714.0318.1621.9717.4416.7913.669.997.126.217.469.9513.6717.6522.2716.8914.8710.907.626.979.0712.7216.5021.4224.4216.2715.3311.668.226.428.2111.3115.0119.4322.5615.9115.3912.139.006.535.847.259.9713.4416.7619.8716.0015.8612.8110.257.486.348.4711.6414.4217.5717.0514.2311.458.555.697.149.7812.9116.2116.7918.7415.8612.229.265.166.348.5311.9215.5116.4019.8717.0112.779.776.704.765.737.6210.7914.6516.3819.3517.2613.049.766.735.316.899.5913.0415.6716.5812.839.156.625.026.358.7611.6914.9716.6914.2214.8612.308.676.214.815.978.5011.3514.5417.6411.0910.5411.3511.5511.7212.2111.228.525.924.064.625.708.0511.2214.1217.939.049.059.5411.2111.5910.439.9710.009.759.789.788.075.613.765.377.3010.3913.1017.1519.809.368.968.678.478.318.288.379.5110.9710.539.478.938.458.127.934.996.478.9711.6715.3818.2910.6411.9410.488.768.307.967.707.597.547.517.888.809.058.504.535.627.5210.0012.9915.8315.0312.8811.9910.5210.5711.509.878.127.647.337.106.976.946.813.984.796.158.1910.5913.2512.9611.2610.399.8410.1710.769.007.527.016.836.634.024.956.568.6610.9210.879.669.149.079.278.947.633.303.955.237.058.949.038.288.082.703.134.065.5425.7026.6827.0228.7032.7431.9530.7030.4029.5728.5528.5229.5230.3830.6931.8632.8528.8827.0926.7625.7428.7128.7027.8327.4430.8730.2528.7129.0429.0428.3028.2829.0029.0528.7130.1831.0127.5227.8228.7628.7130.9730.2928.0225.7128.3527.8426.0426.7727.7228.2428.2827.7626.8126.0127.7328.4625.7427.8930.3130.9631.0131.1628.7324.9425.9724.7422.9524.1626.9630.1730.2427.1424.2222.9524.6526.0424.9028.6131.2031.0428.3228.8228.0726.1927.8425.9224.3225.4927.5429.5229.6027.6925.5824.3625.8427.8526.2327.9928.9028.3424.6124.3923.5823.7426.0023.8622.8123.3523.7223.9823.9623.7323.3622.8123.7926.0123.8023.5724.4424.6321.6221.4521.2622.4523.0620.5920.0620.6420.9921.1321.1321.0020.6520.0720.5423.0022.5421.2821.4821.6220.0720.3320.7821.8621.1919.5119.3519.6819.8219.7719.7719.8219.6919.3619.4921.1621.9020.8020.3520.1019.8520.2520.4620.2919.3918.7118.7018.8018.8218.6418.6318.8118.8018.7218.7119.3620.3020.4820.2719.8819.3519.7219.9719.9218.9018.0617.9417.9317.8817.7517.7517.8817.9417.9518.0518.8819.9119.9919.7519.3818.8318.9819.3420.4219.5917.4416.9917.0517.0817.0917.0917.0917.0517.0117.4219.5420.4719.3819.0018.8519.9319.3818.6819.4919.9217.2216.1416.2316.4216.5616.5616.4316.2516.1517.1719.9019.5618.7119.3819.9222.2721.0919.1018.0719.5917.0915.5215.5915.7916.0616.0715.8115.6015.5217.0119.6318.1319.0621.0822.2124.6822.6219.9017.1918.7516.9314.9014.9515.1715.4315.4315.1814.9614.8916.8418.8017.1619.8022.6224.6026.0323.2720.0816.6717.9716.5614.2814.3314.6214.8214.8314.6414.3314.2616.4718.0316.6719.9623.2525.9225.3822.6319.4216.0417.3415.9513.6813.7213.9614.2514.2513.9713.7213.6715.8617.4016.0419.3122.6125.2822.7420.6317.9415.3316.9915.1013.1113.1613.3313.5813.5813.3413.1613.0915.0017.0215.3317.8620.6222.6719.4918.1816.1815.3116.7814.1812.6112.6812.8312.9612.9612.8412.6912.6114.1016.8115.3416.1318.1919.4617.0716.2915.4516.0516.1713.3412.3112.2812.3012.3812.3812.3112.2912.3113.3016.1516.1415.4816.3517.1016.5116.3216.1416.5215.0812.8312.1712.0311.9511.8911.8911.9512.0312.1812.8215.0716.6016.2116.4016.6216.6316.7616.7116.2114.3512.4711.9811.8311.7411.5511.5411.7311.8312.0012.4814.3416.2816.8016.8416.7216.1215.8915.7415.9914.5512.3611.6811.5611.4711.4211.4211.4711.5611.6912.3414.5616.0515.7815.9516.2016.0715.2714.4315.0015.1212.3511.3011.2811.2911.3711.3711.3011.2911.3012.3015.0915.0614.4215.3016.1117.7316.3614.4513.6215.1312.5510.9911.0711.2111.3311.3311.2211.0810.9912.4615.1313.6314.4016.4217.7620.1918.0415.4712.8814.5912.7810.7510.7810.9611.2111.2110.9810.7810.7212.6614.6112.8915.3718.0620.1321.8819.1716.1412.8014.0812.8110.4510.4010.5610.8510.8610.5810.3910.4112.6514.1512.7615.9619.1421.7621.6418.9215.9412.5313.7712.5110.099.9610.0410.1510.1510.059.9510.0312.3313.8512.4415.7118.8521.4119.4217.4114.8612.1213.5711.859.619.419.329.319.319.329.399.5611.6813.6712.0414.6317.3119.16ASSOCIATED LIGHTING REPRESENTATIVES, INC7777 PARDEE LANEP.O. BOX 2265OAKLAND, CA 94621PHONE: (510) 638-3800 - FAX (510) 638-2908* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *ALL VALUES SHOWN ARE MAINTAINED HORIZONTAL FOOTCANDLES AT GRADEPHOTOMETRIC DATA USED AS INPUT FOR THESE CALCULATIONSIS BASED ON ESTABLISHED IES PROCEDURES AND PUBLISHEDLAMP, RATINGS. FIELD PERFORMANCE WILL DEPEND ON ACTUALLAMP, BALLAST, ELECTRICAL AND SITE CHARACTERISTICS.Calculations have been performed according to IES standards and good practice.Some differences between measured values and calculated results may occur due tomeasurement techniques and field conditions such as voltage and temperaturevariations. Input data used to generate the attached calculations such as roomdimensions, reflectances, furniture and architectural elements significantly affect thelighting calculations. If the real environment conditions do not match the input data,differences will occur between measured values and calculated values.REPORT FOR: AURUM CONSULTING ENGINEERSBY: APPLICATIONS ENGINEERING; GILBERTO J. RODRIGUEZSALES REPRESENTATIVE: ALR; JD STEPHENSAGI32 VERSION 19.11AGI (C) 1999-2020 LIGHTING ANALYSTS, INC.10268 W. CENTENNIAL ROAD, SUITE 202LITTLETON, CO 80127FALLON SPORTS PARK - PHASE 34605 LOCKHART ST. DUBLIN CADRAWING NO. / INPUT FILEPROJECT DESCRIPTION17734JDS - E2.2N.DWG /.AGISCALEAS NOTEDSHEET2 OF 2DATE02.21.2020REV0**PARTIAL SITE**1" = 16'1" = 8'1.0FC0.5FC***LIGHTING LAYOUT RECOMMENDATION**** TWIN ROTATED ASSEMBLIES AS SHOWN ON THE PLANS.** HORIZONTAL FOOTCANDLE VALUES SHOWN AT 36" ABOVE FINISH GRADE.Luminaire ScheduleProject: FALLON SPORTS PARK - PHASE 3 - PARTIAL SITESymbolQtyLabelArrangementLum. LumensLLFLDDLLDDescriptionFilenameLum. Watts6XASINGLE66520.8500.9000.944SIGNIFY GARDCO GL13-XXX-1-2-70LA-6435-NW-VOLT-XXX - 15' POLEGL13-2-70LA-6435-NW.IES706XA1SINGLE67500.8500.9000.944SIGNIFY GARDCO GL13-XXX-1-3-70LA-6435-NW-VOLT-XXX - 15' POLEGL13-3-70LA-6435-NW.IES70.18XB *TWIN274320.8500.9000.944VISIONAIRE BLX-II-4-T4-128LC-5-4K-VOLT-XX-XX-(TWIN) - 25' POLEBLX-II_4_T4_128LC_5_4K.IES211Calculation SummaryProject: FALLON SPORTS PARK - PHASE 3 - PARTIAL SITELabelCalcTypeUnitsAvgMaxMinAvg/MinMax/Min# PtsCRICKET BATTING CAGE_Workplane **IlluminanceFc18.5632.859.311.993.53560PATHWAY AIlluminanceFc2.575.010.882.925.69238PATHWAY BIlluminanceFc3.027.730.634.7912.27263 Dublin, California LITTLE LEAGUE LITTLE LEAGUE PLAY AREA WITH ADJACENT SEATING SCORE KEEPING BOOTHS NEW WALKS BATTING CAGES WITH TURF LAWN SAND VOLLEYBALL COURTS CRICKET FIELD CONCRETE TERRACE SEATING 3–PITCHES SIGHT SCREEN SIGHT SCREEN Fallon Sports Park - Phase 3 Concept Plan BATTING CAGE LIGHTING: 25' HIGH POLE LIGHTS 5/29/2020 Tr 1i i\ -tn2{<FALLON SPORTS PARK A!'DUBtIN, C :\ I I '{ I IFORNIA I wr ; ' T.Tf,z:s* I ( I I I I I il tItf 1 fl 1 'Ifl :ffi L -_,..__:r]:--- I 1 {o I ii."lf ir '\''' \ I I > .I ,.' l-, I ./q I I'ttlf "' .s ''U: tl 4 l. il. ilt. tv. V. vt. vil. vilt lx. TABLE OF CONTENTS EXECUTIVE SUMMARY INTRODUCTION MASTER PLAN PROGRAM SITE CONTEXT AND ANALYSIS PROC ESS MASTER PLAN DESIGN COMPONENTS PHASING ACKNOWLEDGMENTS APPENDICES a. Task Force Meeting Agenda b. Task Force Meeting Minutes c. Task Force Design Concepts d. Task Force Meeting Handouts e. lrrigation and Recycled Water Demand Analysis f. Cost Estimate CARDUCCI & ASSOCIATES SAN FRANCISCO, CATIFORNIA rNc .},(, 7 t B tI t t I lt ,,.'9 L.- \. \ E I il'ts I ./I \ { d ,J - {r.:.l. t \ \-z.\. ,{- .i UBL!|l,r CAtIFORNI SECTION I. EXECUTIVE SUMMARY EXECUTIVE SUMMARY ln 2004 the City of Dublin included funding for development of the Master Plan for the 60-acre Fallon Sports Park. This Master Plan Report outlines the desires, intentions, and objectives of the City of Dublin for the development of Fallon Sports Park. The basis for the programming of the 60-acre sports park is the "City of Dublin: Parks and Recreation Master Plan, lr/arch 2004 Update" (PRITIP) which was developed to assure the future development of parks throughout the City. The PRMP identified this 60-acre parcel on Fallon Road in eastern Dublin as a "park facility developed to accommodate the majority of competition ball fields in the City".r As part of the master plan process the Fallon Sports Park project was initiated in March of 2004 and the City Council appointed a 22-person Task Force, to represent the interests of particular groups, users, and residents. The program for the Fallon Sports Park as contained in the Parks and Recreation Master Plan includes the following amenities: baseball fields, soccer fields, softball fields, tennis courts, basketball courts, Blt/X track, children's play area, jogging or walking loop, fam- ily and group picnic areas, shade structures, restrooms, concession/ scoreboard areas, lighting for sporls fields and parking lots. Through input received from the Fallon Sports Park Task Force additional amenities have been identified including bocce ballcourts, cricket fields, and water play areas. The Sports Park will also create link- ages to adjacent open space, establish a focal element for the Dublin Community, and provide competition sports fields for tournament play. Throughout the design process the Task Force has taken part to help assure the Master Plan's acceptance by City residents and its relevance with current trends and future demands. MASTER PLANNING DESIGN PROGESS The Design Team worked closely with the Task Force members to incorporate their participation in the design process. The meetings allowed the participants to guide the design and have a primary role in the decision-making process. The Task Force members were included in a series of six meetings which were held to solicit input into the process. They included an lntroductory hleeting - outlining the parameters of the program and the physical make up of the site; a Srte Vrsff - where the task force members actually hiked the site and gained a sense of the scale of the projecl; Design Arleeting #1 - where the task force prepared a series of potential layouts for the park; Desrgrn Arleeting #2 - took the potential layouts and refined them to six viable plans and the task force narrowed these down to three options to be refined further; Design fu|eeting #3 - the three refined plans were presented and a preferred alternative was selected; De- sign Meeting tt4 - lhe preferred alternative and phasing plans were presented to the Task Force for approval and recommendation to the Parks and Community Services Commission; and Design Mleeting #5 - discussed the comments and recommended changes from the Parks Commission and asked for direction from the Task Force. 1. "City of Dublin: Parks and Recreation l\4aster Plan, March 2004 Update,'' (Nrarch 2004): 50. Task Force lntroduction Meeting (0U2U2004). Design Meeting #1 Design Meeting #2 Existing aeial photo Sile views Site yiews of hillside and distance I CARDUCCI & ASSOCIATES, I ALTON SPORTS PARK SAN FRANCISCO, CAI.IFORNIA NC F DUBTIN, CAI-IFOR,NIA t-l I 3iae -#.# L-\".d \..d -1i t r''I SECTION I. EXECUTIVE SUMMARY ln June of 2004 the Parks & Community Services Commission was presented the three master plan alternatives and the preferred scheme of the Task Force. The Commission selected Scheme B as the preferred design with the recommendation that the design be referred back to the Task Force to reevaluate the space requirements of the two 90' baseball diamonds and to consider removal of the baseball diamonds to allow for program flexibility in the future. Staff returned to the Task Force and looked at options for the base- ball field area which included a revised Master plan with updated engineering information. The updated engineering information adjusted the grades leaving space for only one 90' baseball field and reconfigured the parking to allow for access per Traffic Engineer- ing requirements. The Task Force was in favor of retaining one 90, baseballfield in the plan. This is supported by the standards for baseball fields in the Parks and Recreation Master plan which shows the need for two additional 90' baseball fields within the City. As the Parks and Recreation Master Plan designated both 90'baseball fields for the Fallon Sports Park, it would be necessary to identify another location for the remaining g0' baseball field in order to meet the standards for City build-out. The Final Draft Master Plan was presented to the Parks and Com- munity Services Commission at the June 2005 meeting. The Com- mission received the presentation and public comment, including comments from Task Force members. The Commission deliberated on elements of the plan and commented on the baseball field and the option of removing it from the plan. The discussion included the overall programming requirements of the Parks and Recreation Master Plan and limitations for future locations should the field be removed. Further, the JVaster Plan is meant as a template and simi- lar to other master planned parks it is flexible given future recreation needs. Upon completion of deliberations the Commission voted unanimously to recommend approval of the Master Plan, as present- ed to the City Council. The Final Draft Fallon Sports Park Master Plan was presented to the City Council. The City Council was in favor of the majority of the design elements in the overall Master Plan. The City Council dis- cussed the need for flexibility for future recreation needs and chose to eliminate the remaining 9O-foot baseballfield and leave the space open as a future study area. The Final Master Plan and cost estimates have been revised to re- flect these changes. The Master Plan follows the Executive Summa- ry and the cost estimates are included in the Appendix of this report. DESIGN ELEMENTS Based on input received from the Task Force and Parks and Com- munity Services Commission meetings, a final list of park elements was developed to incorporate into the park. These elements are listed on the following page: CARDUCCI & ASSOCIATES, INC Master plan with baseball fteld Master plan with future study area fucce Basketball FAttON SPORTS PARK Scheme B Little League /' fllr,l.5- SAN FRANCISCO, CAI.ITORNIA Baseball DUluN, CAr.ttoRNtA t-2 n )u aa ta aa f SECTION I. EXECUTIVE SUMMARY Sport Facilities. 4-60'Little League fields. 4 softballfields (2lighted). 4 soccer fields (2 lighted) 2 natural turf fields with a cricket field overlay 2 natural turf fields with synthetic turf option. 4 tennis courts (lighted). 4 basketballcourts (lighted). 4 bocce courts (lighted). 2 additional courts optional (lighted). 4 sand volleyballcourts. BMX course Other Park Facilities. Activity hubs/staff offices (200-300 sf). Restrooms. Concessions. Picnic plazas. Play areas. Art and water features (optional). Loop jogging trail (one mile). Family picnic areas with barbecues. On-site parking for 459 cars (259 upper terrace parking spaces, and 200 lower terrace parking spaces). Lockable bicycle parking distributed throughout the park. Shade structures Sport Field Lighting. 2 softball fields. 2 soccer fields. 4 tennis courts. 4 basketballcourts. 4 bocce courts. 2 additional bocce courts optional Other Lighted Facilities. Vehicular entry lighting. Parking lot lighting. Pathway lighting. Security lighting. Arrival/Drop-offlighting. Activity hub lighting. Pedestrian bridge lighting SITE CHARACTER!STICS The site has an overall elevation change of approximately 100 feet, from the Fallon Road/Gleason Drive intersection (+/490 feet) to the Lockhart StreeVCentral Parkway inter- section (+/-ggO feet). This 10O-foot drop occurs over a length of 2,500 feet, creating an overall 4% slope across the site; it should be noted that much of the site exceeds 5%, which is considered to be the maximum slope for park usability. The site is bordered to the north and northwest by housing devel- Nafural turf soccer field soccer field Restroom / cn,ncessrbn Sport field lighting area Water and aft features Pedestrian circulation Sile Wslf (05n1/04) CARDUCCI & ASSOCI ATES, INC tON SPORTS PAR,K --a {- SAN FRANCISCO, CAI.IFORNIA FAL DUBL!N, CATIFORNIA l-3 L il-Iil-- I C. t' I ) E SECTION I. EXECUTIVE SUMMARY opments and a golf course. To the south and east, additional housing and a school site are planned for future development. On the west- ern edge of the park and parallel to Lockhart Street is a continuous 7O-foot-wide stream corridor that is being developed for environmen- tal mitigation purposes. This stream corridor defines this western and northwestern edge of the park and will be reinforced with a series of riparian zone plantings. City of Dublin Fire Station #18 is located along Fallon Road approximately 20 to 30 feet higher than the park's existing finish grade and is supported by a large retaining wall. The overall site topography consists of rolling hills with two small val- leys that create drainage channels across the site from its northern to southwestern boundary. The grass-covered, treeless rolling hills create attractive views to the east and to the south. The prevailing western winds often dominate the park environment. The existing soil is classified as being predominately of the Tassajara formation characterized by a high-clay content and poor drainage. GRADING CONCEPT ln order to create usable, level surfaces for the facilities, and to accept .5 million to 1 million cubic yards of fill from adjacent devel- opments, two main terraces (upper and lower) have been created. These terraces create a dramatic grade change of 30 feet between each level and significant embankments at the northwest and south- west corners of the park. These terraces provide many opportunities for views and topographic interest throughout the park. The terracing also allows for two main vehicular entries, one off of Lockhart Street at the upper level on the western edge of the park, and the second off of Central Parkway on the southern edge of the lower level. SITE DRAINAGE All site drainage will connect to the perimeter storm drainage system running along Fallon Road and Central Parkway. Each field, hub, and parking lot will serve as its own watershed and will connect to the perimeter storm drainage system. Further, each terrace will be a closed drainage system that directs all water into the storm drainage system. No park drainage will enter the stream corridor, which will be controlled and maintained by the Home Owners'Association from the adjacent residential development. The stream corridor is only meant to accept drainage from northerly developments and is intended to be a wildlife corridor as it runs along the sports park. PARK FEATURES The park is designed to include memorable identification features and signage clearly directing visitors to specific facilities. Fallon Sports Park will be an identifiable and memorable park through the use of a ranch theme. This theme is exemplified by the split-rail-style fencing running the perimeter of the park and large, traditional "ranch gates" at the two main entrances. Other park elements such as play areas, trellis, and restrooms will incorporate colors and elements that reinforce the ranch theme. Site Charactenstrbs "l R@d Grading Plan (Red lines indicate contour lines) cARDUccI & -ASsocIAIEs, INC , P. i FAttON SPOR.TS PAR.K sAN FRANcrsco, cAuFoRNrA DUltlN, CALIFOINIA I l-4 :tq Foit* Rad 1 , l.J Pork Site SECTION I. EXECUTIVE SUMMARY { Activity hubs, located at the end of the entry drives and at the heart of each terrace, will create a sense of place and arrival. ln addition, a series of sport and activity hubs will organize uses throughout the park. The circulation system will provide accessible paths throughout the park connecting the park facilities and providing neighborhood access. These neighborhood connections will link the park to the surrounding areas so that residents can easily walk to the park. The multiuse trail, located within the stream corridor, links the park to the Tassajara bike trail via the continuation of the stream corridor north along Fallon Road and south along the proposed extension of Lock- hart Street across Central Parkway. Sports facilities will be lighted to allow for tournament play and safety at night. Park hours will be dawn to dusk and lighted facilities will be open and lighted until 10 p.m. PHASING The park will be divided into Phase 1, and Subsequent Phases to be subdivided in the future. Phase 1 will follow the development of Lockhart Street giving the park vehicular access for the upper ter- race where a variety of facilities will be constructed. The Subsequent Phases will be subdivided in the future and will provide uses that remain current with budgeting, community use demands, and sur- rounding road development. J\ i. ..;'\ I .l HAII 8', SITEET 70'wrDE STtEAXcottt00t Slream aridor at upper terrace entry I O' ? IH Existing stream conidor along Fallon Road Dublin Ranch entry Existing ranch fencing Fencing at Fire Statbn #18 t0,3:l SLO?E 3rl sto?E CARDUCCI & ASSOCIATES, INC ttON SPORTS PAR,K SAN FRANCISCO, CAI.IFORNIA FA DUBtIN, CATIFORNIA l-5 I-- i J 8' v ! SECTION II. INTRODUCTION The Master Plan is intended to guide the park development by defining the goals and establishing the design elements to be used at the Fallon Sports Park. The park is a 60-acre parcel located in the fast-growing eastern portion of Dublin. lt was identified in the PRMP to contain the majority of competition sports fields; the PRMP lays the framework for all future park development in Dublin and has identified the need for 299.5 acres of land for public park use at build-out of the City. ln addition, the City of Dublin will protect existing open space and provide linkages through trails, streets, and bikeways to connect these parks and open space resources. Fallon Sports Park has been identified as the site to provide the core of competition sports fields to serve the communitywide recreation needs in the City of Dublin. Master Plan Goals Seven major goals were established to lead the Master Plan. These goals are as follows: 1. Create a focal and destination point in the City of Dublin, and create a regional attraction that welcomes users from surrounding communities. 2. Create a premier sports park with a wide range of fields and courts to be used for competitive and tournament play. 3. Provide lighted facilities for extended use and tournament play. Position lighted facilities in the center of the park to reduce glare impact on surrounding neighborhoods. 4. Develop the park adjacent to the 7O-foot-wide (4-acre) stream corridor so that the park and the stream corridor complement each other and provide a large open space resource. 5. Provide a park like experience and recreational opportunities for non-sport users, such as picnic, play, walking trails, relaxation, etc. Promote nature appreciation through native plantings, stream corridor interaction, distant views, and open space connections. 6. Provide linkages to the regional bike system, other parks within the City, neighborhoods, and the adjacent private open space. 7. Create a clear traffic pattern with descriptive signage to allow visiting teams and out-of-town users ease in finding the site. ln addition, provide clear descriptive signage giving directions to speciflc facilities on site. 2. "City of Oublin: Parks and Recreation Master Plan, March 2oo4 Update," ltr,larctr 2004): 23. ld v\q.EHra aswk IJUDIIJI KaIICI] . rw.qu urrJrla.Fa 'i;-- AkrPhndcomm0i rrrlM r. rkb' Duilin Ranch futurc development location map (Cowtesy d MacKay & Somps) Site location map D ,!-.. ! I I II I 1 I :l I I i -- CARDUCCI & ASSOCIATES FALTON SPORT S PARK ;\itE;\ il r\it-B*\ C o rU{Br\il @ SAN FRANCISCO, CAI.IFORNIA tNc DU!TIN, CATIFOTNIA lt- l SECTION III. MASTER PLAN PROGRAM The City appointed a 22-person Task Force, representing the interests of particular groups, users, and residents, to help guide and give input for the Master Plan design process. Through the Master planning process the original list of proposed park elements and components, as specified in the PRMP, has been adjusted. The following list of site elements and components will be integrated into the park. SPORT FACILITIES. 4-60'Little League fields. 4 softballfields (2lighted). 4 soccer fields (2 lighted) 2 natural turf fields with a cricket field overlay 2 natural turf fields with synthetic turf option. 1-90'baseballfield (lighted). 4 tennis courts (lighted). 4 basketball courts (lighted). 4 bocce courts (lighted) 2 additional bocce courts optional (lighted). 4 sand volleyballcourts. BN/X course OTHER PARK FAC!LITIES. Activity hubs. Restrooms. Concessions. Picnic plazas. Play areas. Art and water features (optional). Loop jogging trail (one mile). Family picnic areas with barbecue. On-site parking for 459 cars (259 upper terrace parking spaces, 200 lower terrace parking spaces). Lockable bicycle parking distributed throughout the park. Shade structures SPORT FIELD LIGHTING. 1 baseballfield. 2 softball fields. 2 soccer fields. 4 tennis courts. 4 basketballcourts. 4 bocce courts 2 additional bocce courts optional OTHER LIGHTED FACILITIES. Vehicular entry lighting. Parking lot lighting. Pathway lighting. Security lighting. Arrival/Drop-offlighting. Activity hub lighting. Pedestrian bridge lighting Task Force Meeting (06/18n4) Liftle League BMX course \ Crickel field ba*bafrfield FAttON SAN f RANCISCO, CAI.IFORNIA )CARDUCCI &SSOCIATES c K DUBLIN, CATIFORNIA lll- l l tr q E o )-I -,- -- SECTION IV. SITE CONTEXT AND ANALYSIS This 60-acre parcel is located approximately lz mile north of l-580 along the western edge of Fallon Road. Fallon Road, Gleason Drive, Lockhart Street, and Central Parkway will define the park boundary. Currently, residential developments and a golf course exist to the north and there are proposed residential developments to the west and to the south of the park. ln addition, an elementary school is slated for development across from the park along Lockhart Street on the western edge of the site. The site's major landmark is City of Dublin Fire Station #18, which is positioned along the park's border on Fallon Road with a 20- to 30- foot-tall retaining wall on its eastern edge. Otherwise, the topography embodies the classical Northern Californian rolling hills. Natural waterways and drainage channels cross the site from the northeast to southwest. The site has significant grade changes with a 100-foot vertical drop over a 2,500-foot horizontal distance from the most northerly point at the Fallon Road/Gleason Drive intersection to the most southerly point at the Lockhart StreeUCentral Parkrruay intersection. This grade change results in an overall slope of 4o/o. The existing soil is classified as being predominately of the Tassajara formation, which is characterized by a high clay content and poor drainage. The stream corridor is being constructed by the developer of the adjacent housing project as part of the mitigation of environmental impacts from the surrounding developments. The existing stream corridor will enter the park site atthe Gleason Drive/Fallon Road intersection and continue along the western border of the site parallel to Lockhart Street. There are strict design guidelines for the stream corridor. lt will be 70 feet wide and will incorporate a multi-use trail along its western edge. The streambed will have a 1S-foot-wide flat bottom and 3H:1V (Horizontal: Vertical) maximum-sloped sides. lt will be planted with a mixture of native grasses, trees and shrubs. No park drainage will enterthis stream corridor along the western edge of Fallon Sports Park. It T @ LEGEND N tl,6dimoenslyResi.dstid MH tlecliLnn HW Oen:fiy Residf,nlial ES EbrentarySdwl MS Middbsch@l L LN Derelty Resldentid OS qpenspac€ NP NeightothoEdPe,, NS NogtrbodioodSqmm /rc fis'gtborrroodCanedoa R&4 Rtrd ResUsr,ab, Agtidllwel P/SP PublicsentPtbllc GC GenedCoaw*il CO CmffirciCo,frc€ Existing Fire Station #18 Dublin Ranch future de- velopment location map (Couftesy of MacKay & Somps) --t- FALLON SPORTS PARK GTE E a a East view of lhe hills CARDU cct & Assoc|ATEs, INC SAN FRANCISCO, CATIFORNIA DUBtIN, CATIFORNIA lv- I .:,1'-=-I South.view-of the SECTION IV. SITE CONTEXT AND ANALYSIS I I I I I \ \J I I /i\r u'{il I I h) w, w HYDROLOGY ?-- S1rVAl-E - - - RIDGE Wind Speeds (Colms: 7.5%) TOPOGRAPHY N slorrssroRGREArER , (4 rra: 1q SPOT ELEVAnONS ln7.7r PRoPosEo RoAD spor ELEVATIONS GEOLOGY o ARTIFICIAL FItT TA\DSUDE DEBRS COLLUVIUM ALLUVIUM TASSAJARA FORMATION BORING LOCATION N EQUINOXT DAY = NlGl{I N AlARCH EQUINOX: DAY = NIGHT N SEPTEA,IBER ,'-f\otcwlE S .IUNE HIGHEST SUN ALTITUDE SOLSTICE: LONGEST DAYS N SOLSTICE: SHORTEST OAYS N E EW iq rarm 505.r.a r,5?.9 J.o4.9 .9 AO 12 (,ry!t C.lr! 0.+1.1 a.a-1.4 0..'1.1 0.+!,{ C5-1.. (il,A.! DECEMEER LOWESI SUN ALTIIUDE JN FEB A{A? APf, &AY JLN JT' ^UG SEP O.I I{OVOTYTAI WIND/SUN -), pREvAluNG wrND TEilFEUTURf MNGE Rcro,. Hish Hich Raaerc Lox 80 ,lEnthtMecn - Avs. lr*tfih Ex i sting site con d itio n s 10 "F ffi -lfiH tl,-f-|.l' -n:+ffi Iit i,I,1 sl a?t SAN FRANCISCO, CATIFORNIA rNCCARDUCASSOCIATES FALTON S ORTS PAR DUBLIN, CATIFORNIA lY -2 t't F?'Va 1 ...:' .//WMl.*i!a t>{i.t4 fv' j q 5 f' E l l SECTION V. PROCESS The Design Team worked closelywith the Task Force members to garner extensive input into the design process. This lrlaster Planning resulted in an accurate assessment of the community's needs and a prioritization of facilities that offer the highest value to the entire community while appealing to all ages of Dublin residents. TASK FORCE MEETINGS During the course of the project, seven Task Force meetings were held, including informal introductions, site visits, and formal design meetings. The Task Force meetings are summarized as follows: lntroductory Task Force Meeting Prior to beginning substantive work on the park, an initial informal introductory meeting with City Staff and Task Force members was held to discuss project scope, schedule, site characteristics, design elements, budgetary goals, master planning process, and meetings. The Task Force members were also asked about their interests, needs, concerns, ideas, and suggestions. lnformalTask Force Site Visit A site visit with the City Staff and the Task Force was conducted to assess the site characteristics, discuss site opportunities, constraints, views, natural systems, and contextual setting. Task Force Meeting #1 A design charrette was held to give the Task Force members an opportunity to offer input and ideas into the park design. They were given grading plans and site element templates and created their own layouts for the park design. The Task Force members created seven conceptual options and then chose three preferred schemes. Task Force Meeting #2 The Task Force responded to three refined Master Plan alternatives and chose their preferred plan. This plan was a combination of options from all three preferred schemes and incorporated add itional comments from the meeting. Task Force Meeting #3 The preferred Master Plan was presented and approved by the Task Force. The plan was then brought before the Parks and Community Services Commission. lntroductory Meeting lnformal Site Meeting rt Task Force Meeting #1 Task Force Meeting #2 P ref ene d sch e m e se I e ction a I rI.(:ab . SCNEMC PI'FEru 'i"ffi[',''.J, a- ,,'+*I rl.i CARDUCCI &.AS CIA,TES. INC FATLO N SPO RTS PAR,K 3ettt i Scheme I DUBtIN, CATIFOR.NIASAN FRANCISCO, CALIFORNIA v-l ? lJ.u ,,* f I T rT Lj \ r SECTION V. PROCESS Task Force Meeting #4 This meeting further refined elements such as sports field lighting and a parking concept. ln addition, a final phasing plan was selected. Task Force Meeting #5 The Master Plan and Phasing Plan were presented to the Task Force for review and comment. Budgetary constraints were also discussed. Parks and Community Services Commission Meeting #1 After the third Task Force lt/eeting the three master plan alternatives and preferred Master Plan were presented to the Parks and Community Services Commission. The Commission voiced concern with some of the items of the preferred plan, primarily that the site might not comfortably accommodate all of the elements and that not enough parking had been provided. They recommended that one 90'baseball field be dropped from the Jvlaster Plan to provide a better fit with the site and allow for additional parking. Parks and Community Services Gommission Meeting #2 The Master Plan, Lighting Plan, Phasing Plan and cost estimates were presented to the Parks and Community Services Commission for review and comment. Gity Council Meeting The lvlaster Plan, Lighting Plan, Phasing Plan, and cost estimates were presented to the City Council for review and comment. Throughout the Master Plan Process, Task Force members gave input and direction into the sports park development, allowing the design to meet the interests of the community. Task Force Meeting 1t3 t" r-at,.-''-' isairl 1(.. (-) Lt Task Force Meeting ll4 t I -.r!_ .i; Task Force Meeting #4 FALTON SPORTS PARKCCI & ASSOCIATES, INC SAN FRANCISCO, CATIFORNIA CARDU DUBLIN, CAI.ITORNIA Y-2 I t I I t / tL SECTION VI. DESIGN COMPONENTS ln order to serve the needs and vision of the growing community and the vision of the City of Dublin, Fallon Sports Park will be the premier sports facility for all Dublin residents. The park will feature two terraces, with pedestrian and vehicular entries on each. The entries will have strong axial connections to the internal Park Activity hubs, which will provide a sense of place and arrival. The following section describes the specifics of the site and design elements. GRADING AND DRAINAGE The site will be graded into two main terraces to fit the sports fields within the 100-foot overall elevation change from the Gleason Drive/Fallon Road intersection (+/-490 feet) to the Lockhart StreeUCentral Parkway intersection (+/-390 feet). This 100-foot drop occurs over a 2,500-foot horizontal distance creating a 4% slope across the site. ln addition, the terraces will be graded to allow vehicular entrances on both the upper and lower terraces. The grading will conform to all proposed edge conditions and will create "level" surfaces for the proposed field layouts. Approximately .5 million to 1 million cubic yards of import fill from adjacent developments will be used to create these terraces and will provide the majority of imported fill needed. A geotechnical report, created by Kleinfelder, lnc., states that slopes should be no steeper than 2H:1V (Horizontal: Vertical), and where feasible, slopes should be no steeperthan 3H:1V (Horizontal:Vertical).3 ln order to capitalize on the import fill and respond to the overall 1O0-foot elevation change on site, two main terraces with a 25- to 30-foot grade change will create level surfaces for sport fields, accessible pathways, and proper drainage. A48-inch storm main drainage system will run the perimeter of the site along Fallon Road and Central Parkway. This storm drainage system will handle drainage from adjacent developments, roadways, and accommodate all of the park drainage. Existing site aeial photograph Site character E ru 3 .9o! oo o .sE o =upper I terrace Upper temce vehicular eny Drive Upper lenace I Upper lowr tem@ Lowr temce Paftway 3.'Geotechnicl Grading and Drainage Recommendations Proposed Fallon Sports ParkDublin, Calilomia,' (September 29, 20041: 12. Central Lower terrace CARDUCCI & ASSO CIATES, INC LtON SPORTS PARK SAN TRANCISCO, CAI.IFORNIA FA vl- l I DUBLIN, CAI,IFORNIA q tflL ! Upper ternce tenace cgnidor section below : F, tE \ "a J I ! SECTION VI. DESIGN COMPONENTS The existing drainage swales and channels that run across the site from the northerly to the southerly border will be put into subsurface drains. Due to the highly expansive nature of the clay soils, the natural turf fields will require additional subsurface drainage systems. This subsurface drainage will also connect to the perimeter storm drainage lines. The overall drainage concept creates individual watersheds that connect to the perimeter storm drainage system. Specifically, each field, hub, and parking lot will serve as its own watershed and will connect to the perimeter storm drainage system. Further, each terrace will be a closed drainage system that directs allwater into the storm drainage system. No water from the terraces will drain over the embankments below the terraces. The upper terrace parking lot will either have a fossil filter system or a small bioswale and biobasin to filter and drain the parking lot water before it reaches the storm drainage system. ln addition, the lower terrace will have a bioswale that will filter water from the parking lot along Central Parkway. The park drainage will not drain into the stream corridor, as on-site water used for irrigation will be recycled water and recycled water is not compatible with the stream corridor habitat mitigation. FALTON SPORTS PARK GRADING PtAN I\)\\.<tti \- :{ \,Yd..\ ( r\ h: foflon ;Rood .a t, atrrr*rp?. - @6aa|a --rr'.ilr*(a|u5'i@tr ril'*.d@n @/u lt I q,lsEAl.&nA , tt, SPORTS FIELDS As noted in the PRMP, Fallon Sports Park is intended to be "a park facility developed to accommodate the majority of competition ball fields in the City"a that could be utilized for tournament play. The PRMP specifies two 90' baseball fields for the sports park, but one field was omitted due to site spatial and grading constraints. Through meetings with the Task Force and the Parks and Community Services Commission, a final list of park components was created. o to tao 4. "City of Dublin: Parks and Recreation Master Plan, March 2004 Update,'(March 2004): 50 CARDUCCI & ASSdCIATES, INC FALLON SPORTS PARK /-\ rs{rro ll lrl It ll 'lri I "l.5Ilro {}-) t 'tt , t .mt i&EiE 3 + SAN FRANCISCO, CATIFORNIA DUtUN, CAUTOtNtA vl-2 ,ra,, a SECTION VI. DESIGN COMPONENTS The list of sport fields and uses is as follows: 4-60' Little League fields 4 softballfields (2 lighted) 4 soccer fields (2 lighted) 2 natural turf fields with a cricket field overlay 2 natural turf fields with a synthetic turf option* 1 -90' baseball (lighted) 4 tennis courts (lighted) 4 basketball courts (lighted) 4 bocce courts (lighted) 2 additional bocce courts optional (lighted) 4 sand volleyball courts All baseball and softball fields will have perimeter warning tracks and will be fully fenced allowing them to accommodate premier tournament play. "See Appendix lX - Section f. for further discussion on synthetic fields. PARK IDENTITY FEATURES Fallon Sports Park was designed to be a memorable park utilizing a ranch theme. This theme is exemplified by the ranch-style fencing running the perimeter of the park and the large, traditional "ranch-gate" entryways at the two main entrances. ln addition, on the four surrounding intersections, thematic signage will identify the park. lt is important that the park create a memorable arrival experience, as it will be used by residents from Dublin and surrounding communities. PARK ENTRIES The entries to the park, celebrated by the large entryways, will welcome visitors into an exciting sports destination. The entryways distinguish the park from other facilities in the City of Dublin, as a "focal element for (the) Dublin Community."s The upper terrace will have a vehicular "bridge" crossing the stream corridor and the lower terrace vehicular entry will be on grade. There will be a pedestrian bridge on the southern portion of Lockhart Street providing access from the proposed school and on-street parking. AII entries will provide visitors with a sense of place and arrival as they enter the park. 5. "City of Dublin: Parks and Recreation Master Plan, March 2004 Update,' (lvlarch 2004): 50. CARDUCCI & ASSOCIATES, INC .,.'11, i.r':,.t,\\.' 1, FAttON SPORTS PARK SAN FRANCISCO, CAIITORNIA DUBtIN, CATIFORNIA vl-3 tON SPOR.T ri:t- I [, I l,l -l I ) o to tao ,/o -+ ()r SECTION VI. DESIGN COMPONENTS The October 23, 2003 TJKM Traffic Study proposed one four-way intersection on Lockhart Street at the entrance to the park.6 The current plan shows two intersections on Lockhart Street: one at the park entrance, which will remain a four-way intersection with one lane in and two lanes out, and one three-way intersection across from the pedestrian bridge. Both these intersections will connect with streets from the adjacent neighborhoods. At the time of the report no study had been completed on the lower terrace entry off Central Parkway. Although a preferred entry location for the park site is shown, further study of this entrance is needed as a housing development is planned directly across from the park on Central Parkway. lt is expected that the lower terrace vehicular entry will also have one lane in and two lanes out, but a new traffic study or intersection requirement confirmation is needed. AUTOMOBILE PARK!NG The entries lead the visitors to tree-shaded parking areas located in the heart of the park, close to the facilities. As indicated in the PRMP, it was projected that the park would need roughly 500 parking spaces to serve its proposed facilities. Through the Master Planning process, and due to tight spatial and grading restrictions, a total of 459 parking spaces are located within the park. These spaces will be divided into two main lots with one off of each entry. An additional 84 on-street parking spaces will be directly related to the park on Lockhart Street and Central Parkway, as well as possible overflow parking at the proposed school across Lockhart Street. This provides for a total of 459 on-site parking spaces and 84 on-street parking spaces, adding up to 543 total parking spaces related to the park (See parking analysis table). PEDESTRIAN CIRCULATION A system of pathways provides access to all areas and activities. The pathway system provides neighborhood connections to promote community use and access from all sides of the park. These neighborhood connections allow community residents to go forwalks in the park on a loop pathway system. All pathways on site are accessible and connect to perimeter sidewalks. Pedestrian circulation pathways take advantage of the unique site characteristics such as views from the upper terrace, axial views from the main entry points, and interaction with the stream corridoredges. ln particular, the pathways provide connections between facilities and will clearly direct and guide the visitors throughout the 60-acre park. There is an internal pathway system that connects the facilities and a p'erimeter loop system for exercise and walking. These pathways connect to the local neighborhood, the Dublin community, and the regional Tassajara bike trail. 6. "Traffic lmpact Study for Proposed Lockhart Street in Eastem Dublin," (October 23,2003):4' Lower tenace entry and parking FACILITY / USE UPPER TERRACE Facilitv,l SDaces LOWER TERRACE Facility / SDases Baseball Field Little League Field Softball Field S@cer Field Basketball Court Tennis Court Picnic Area Play Area Bocce Court Volleyball court BMX Couse 4120 4110 1 129 1t5 1115 't 124 4t100 1 141 115 4t15 4l't5 Subtotal 259 oarkinq spaces 200 oarkino soaces 459 Parking Spaces Lockhart Street Central Parkway fotal On-street Parkinq 23 44 17 6l Subtotal w/ On.street 282 Parkinq Spaces 261 Parkinq SDaces Total 543 Parking Spaces Pa*ing analysis table ItrE! t(Gmol Upper tenace entry and pafting I !." 1i- FALLON SP ORTS PARKCARDUCCr& ASSOCIATES, INC DUBLIN, CATIFORNIA V I.4 SAN FRANCISCO, CAIIFORNIA 4i90 4i90 1n-citr Perkind Total SECTION VI. DESIGN COMPONENTS NEIGHBORHOOD AND COMMUNITY CONNECTIONS It is essential to link the park to the surrounding neighborhoods and to the Dublin community through pathways and bike trail connections. There will be Class 2 Bike Lanes along Fallon Road, Gleason Drive, and Central Parkway and a multiuse trail along the stream corridor on Lockhart Street that connects Fallon Sports Park to the Dublin community. BICYCLE PARKING To encourage bicycling to and from the park, the Master Plan includes lockable bicycle parking distributed throughout the park at locations convenient to the park facilities and activity areas. SEATING AND PICNIC AREAS The Master Plan provides opportunities for sitting, viewing, picnicking, and barbecuing at various locations throughout the park. Although the park will be a premier sports park, it also provides activities for non-sport users. A series of small picnic areas are dispersed throughout the site along the pathway system. At each of the two picnic plazas, there is group picnic seating for 100 people with an expansion area for 200. Each terrace will have approximately equal picnicking capacities, as there is an even distribution of tables at each terrace. The Little League and softball plazas are located within the sport hubs, each with a large picnic plaza to allow for tournament or end-of-season celebrations. ln addition, smaller picnic plazas and picnic areas are dispersed throughout the park. HUBS Separate hubs or concentrated use groupings are the concepts behind organizing and defining spaces and activities throughout the park. The activity hubs, defined with special paving and planting, will create a sense of place for the arrival on each terrace. ln addition, the sport hubs will group each sport type and related facilities to create gathering and viewing places for the user. Each hub includes some enclosed dry and lockable storage for use by leagues and similar organizations. ACTIVITY HUBS These activity hubs will be composed of the following activities Upper Terrace Activity Hub. Restroom/staff offices (200-300 sf). Picnic plaza (covered with overhead arbor). Play area. Shade trees. Water or art feature (optional) Lower Terrace Activity Hub. Restroom. Adventure play area. Shade trees. Water or art feature (optional) Lower tenace group picnic area FAttON SPOR,TS PARK Pedestrian circulation diagram N e igh borh ood con n e ction Pedestrian path Contour rtAIA coNcEst roN sorr0ail Upper tenace group picnic area I I last!at lLlGHrtt CARDUC ct & AssoclATEs, INC ( i t m DUBUN, CALlfonNlASAN FRANCISCO, CAIIFORNIA v t-5 t t- t SECTION VI. DESIGN COMPONENTS SPORT HUBS There will be a softball hub, a Little League hub, and a soccer hub, a smalltennis center, and baseball, basketball, volleyball, and bocce ball area. These areas are composed of the following activities: Softball Hub. 4 softball fields (2 lighted). Restroom/concession. Picnic plaza. Shade trees Little League Hub. 4-60'Little League fields. Restroom/concession. Picnic plaza. Shade trees Baseba!!Area. 1-90'baseballfield (lighted). Terraced seating. Picnic area. Shade trees Soccer Area. 4 soccer fields (2 lighted) 2 natural turf fields with a cricket field overlay 2 natural turf fields with a synthetic turf option. Viewing areas. Picnic areas. Shade trees Tennis Center. 4 tennis courts (lighted). Restroom and smalltennis center. Viewing area BasketballArea. 4 basketball courts (lighted). Seating areas VolleyballArea. 4 sand volleyball courts. Picnic area Bocce Ball Center. 4 bocce courts (lighted) 2 additional bocce courts optional (lighted). Shaded seating area. Picnic area Upper tenace softball hub with restroom/ concessrbn Lower tenace baseball with terraced seating seafing li tlg, CARDUCCI & ASSOCIATES, IN c LtON SPORTS PARK SAN FR,ANCISCO, CAI.IFORNIA FA DUBI-IN, CALIFORNIA vl-6 t rl rY I l' ,.t I Y4, It Z rt il! { o I-' i SECTION VI. DESIGN COMPONENTS LIGHTING Lighting requirements in the park differ between sports, vehicular and pedestrian. The vehicular and pedestrian lighting will identify the entries and provide orientation for parkvisitors. ln orderto minimize any potential impacts to the surrounding developments, the sports lighting will be concentrated at the center of the park and across from the proposed school site. All lighting will be designed with "cut-offl'style lights, which direct illumination down and not out. Lighting Criteria:. Light required areas only. Light only paths that connect lighted facilities to parking lots. Light pathways to minimum requirements to discourage nighttime use. Light parking lots for nighttime safety. Light entries to distinguish park from street and to welcome USETS. Park hours will be dawn to dusk and until 10 p.m. for lighted facilities. Provide specific lighting types for specified facilities (as noted in the Lighting Table) Sport Field Lighting. 1 baseballfield. 2 softball fields. 2 soccer fields. 4 tennis courts. 4 basketball courts. 2 bocce courts (2 additional courts optional) Mounting Height and Foot Gandle Table As seen in the tt/ounting Height and Foot Candle Table, sports lighting depends on the desired level of play. Competition play demands greater illumination while lighting for recreation purposes reduces the illumination and the cost. To be a premier sports park, the competition level lighting should be provided. LI TIN DI RAM FAttON SPORTS PARKCARDUCCI & ASSOCIAT FALLON SP o DUBtIN, CATIFORNIASAN f RANCISCO, CATIFORNIA ES. rNC v t-7 aQ. .. .:l t *re - F"ir--J ot Fi:' 1 +a /t c o "9 q U PARKW A.l \\1s c 0 80 16()!0(} SECTION VI. DESIGN COMPONENTS PLANTING Due to the varying terrain and park uses, different plant materials will be used to define park elements; the planting will reinforce the use and reflectthe landforms. ln addition the park will be irrigated with recycled water that will limit some types of planting. The Master Plan identifies seven tree types for Fallon Sports Park: Street Trees (perimeter street trees consistent with the Planning Department requirements and the overall planned development) Entry Trees (formal trees identifying the entries) Accent Trees (attractive, seasonal, colorful trees reinforcing areas of interest) Deciduous Shade Trees (lining parking lots and pathways at sport hubs) Evergreen Screen Trees (as backdrops to baseball, Little League, and softballfields) Native Riparian Edge Trees (to relate to stream corridor and provide wildlife habitat) Native Oak and Sycamore Groves (on slopes to provide shade, add interest, and frame views) !RRIGATION The irrigation system should be designed for water conservation, flow management, energy efficiency and interface with any future Central lrrigation System. The irrigation system will use recycled water in accordance with the Dublin San Ramon Services District standards. Where the facilities such as softball, Little League, baseball, soccer, picnic, and play areas will have users in potential contact with the water, any irrigation will need to be done after 10 p.m. and before dawn. Nonrecycled water will be used specifically for washing down areas, field hoses, watering of synthetic fields for cooling, water features, etc. The recycled water is not to be used in areas where there will be human contact. lt is also mandatory that recycled water does not drain into the stream corridor and instead drains into the perimeter storm drainage system. The recycled water system will run during non-use times between the hours of 10 p.m. and dawn. Refer to irrigation and recycled water demand analysis and DSRSD water flow and pressure information in Appendix lX-Section e. Mounting height and foot candle table I fI Accent trees at entry activity hub CARDUCCI & ASSOCIATES, INC FAttON SPORTS PAR,K FACILITY / USE MOUNTING HEIGHT MAINTAINED FOOT CANDLES ' Commlition/Recreation 2 Softball Fields lnfield Ouffield I Baseball Field lnfield Outfield 2 Soccer Fields 4 Tennis Courts 4 Basketball Courts 4 Bo@ Courts Sport Hubs Activity Hubs Vehicular Entdes Arival/Drop-ofi Pedestrian Bridge Parking Lighting Path Lighting Security Lighting Perimeter Sidewalks 60' 80L sideline / 70L outfield 80' 90L sldellne / 80L oumold 70' 30' 30' 30' 1{ 11 20, 20' 30' 20' 11'. Detemlned by pollce dept. Llt by public street 50r30 30t20 50/30 30/20 30/20 30t20 30/20 10/5 1 1 1 1 1 0.5 at perimeiet and 1 fc average 0.5 Determined by police dept. SAN fRANCISCO, CATIFORNIA DUBI. IN, CATITORNIA vl-8 N a aru I i I t, , I JrE..r= >,1 . ,..'f'', Lit bv oublic street a SECTION VI. DESIGN COMPONENTS \..'.ffi1 l+l-i,l ,t: FAttON SPOR,TS PAR,K SCHEMATIC I tEGEND - aKYCGOW ItI - lllrc^Idw Et .At l o+ ( ao ta0 ,ao -lrJr o BmdcolMd BMdCOrcil tuG^nqcmrut I i1 \r.J o*, \. I :; !l :l I j :l' I 1 \ n I b I SSOCIATES, INC SPORTS PARKCARDUCCI & A DUBLIN, CATIFORNIASAN FRANCISCO, CAI.IFORNIA FATTON v t-9 UT!LITIES Stub-ins from perimeter street utilities should be provided at each vehicularentry (one on each terrace). The stub-ins should provide the park with the following utilities:. Electricity. Telephone. Sanitary sewer. Recycled water. lrrigation water. Domestic water. Fire water (centrally locate one fire hydrant for each terrace - final location to be approved by the Fire Department). Storm drainage system (stub- ins from Fallon Road and Central Parkway) of DUTUN I I :.r.- it I It\ H !ON PTAN c c I I c c c I I l! I I i c SECTION VI. DESIGN COMPONENTS t: +- =-E +. t EiiFlr;t'! /i' '..ltf,IIEI3B\Dr -IE+, i r-i: 'rll 'lFATLON RANCH PARK . . \\ \, SCHEMATIC \ TEGEND I ?oTAttt yAIar.lq.b.ot kl*rElAirlatY !tw!tfrlE wAItt EY CONNECTION TItE iYDIANI a rEsrloor ol corcErsroN ..? t: \,o I lrl .c] lE r,lEl ,J ii rl t ',i \>..-r't ..:r/ -r, --h,II] t. \ -:l I -l I rl o to lao 2ao -i# () ) FALLON SPORTS PARKCARDUCCI &ASSOCIATES, INC SAN FRANCISCO, CAIIFORNIA DUBtIN, CATIFORNIA vl-l0 & EWER r"l I ')! .' .,/ I l j I l -..-t.,. I SECTION V!. DESIGN COMPONENTS (El 2.' It \ l-,t E -.:: w-'- \i 'l ,l t1 .t:, rQ,t r r- l.E -t:l,l- , E iI !'' I 1,. I I I \ -\ \.. B[ffiW!-+ i: .-iil It FATTON SPORTS PARK \. ,\i-", \ HEMATICs \. - TECEND - nlI&srcI&NSEI &.&d.J o pd cl d. rF!fuDhwmlout$m&'ftda *Ft-Fd a urc$aff BrcSru{ II U&lNrNalrclmAXU*'0') o \ ,l i' o l I ilt -t.F {}tao 7ao 59 CARDUCCI & AS OCIATES FATTON S ORTS PARK UBtIN, CATITORNIASAN FRANCISCO, CATIFORNIA lNc vl-lI INAGE I I _ttl_l lit \ i \ I I I I , I \ SECTION VI. DESIGN COMPONENTS l,t\\ IEG EN D ?OMtr CONNSIq l1 I I CARDUCCI & ASSOCIATES, INC FALLON SPORTS PARK sAN FRANCISCO, cAtlFoRNlA DUBLIN, CALIFORNIA l_-:l I -'\-- - vr-12 c (. . c l1 T I (,it 'i IE HONE PtA FATLO sPo c i; i I ll'r-:'._1 ill o aa rao ,ao /\ -f.F 'aD I SECTION VII. PHASING PHAS!NG Fallon Sports Park phasing will provide a variety of facilities that serve a wide range of users. ln addition, proposed road construction dates may also influence park development. Therefore, the park will be developed in phases that include Phase 1, and Subsequent Phases that will be subdivided, if needed, as the project evolves. Phase 1 Phase 1 developments will provide a variety of activities and uses while developing the core of the upper terrace to create a cohesive and self-contained park. A significant portion of the upper terrace facilities are shown in Phase 1 because it is projected that Lockhart Street will be completed first, allowing for vehicular access. ln addition, all lighted fields or courts, except the baseball field, are to be constructed in Phase 1. Phase 1 will also include the two lighted soccer fields, with a synthetic turf option. A list of Phase 1 facilities follows:. Upper terrace park identifi cation featu res. Upper terrace parking lot. Pedestrian bridge. 2-60'Little League fields with hub. 2 lighted softball fields with hub. 4 lighted basketball courts. 4 lighted tennis courts. 2 lighted soccer fields. Loop walking trail (connects upper and lower terrace) I ro.'(\t ',, fl\,!f i.;l li FALLOh.I RANCH SPORTS PARK PHAS!NG D!AGRAM +.i r \l \' ?HAilNC CONCE'IMruMM[AV [frqf&m5sou$s rurD ffil@ irErE a0 c@r3 rnt rc MCEUilU'YMOT ErcIAIY CNIT'CrcN ECEST ffi 'Mmuslffifr&ffi roAo ANo sIlEAll colrtDol D EYETO ?M ENT -1nuwu1ffiw!.coMffiotcxul st, coMm 2@5/26sw cdlrcr.cilffi{dGW rGffiNllNquqNc snilc*md ffi ilntrlfM t@- NOtnilHMqto&,5r. rca, N .: \ : -i - -! a a tta N -corm 2@/2@5.msocffi;Mru2q/2WGNrut&av-com &/2o7 \i .,-i(- PH t PPER, TER P HAS tr.-t.-.t!-! IHASE I o too 200 loo -'llr'{) rc lm tffi nsswem nrz^ m{c,NrttE^vc*tsNrcreHEMAED6WMMUTA rcNrc, aD tEsn@N/coresoNru.WTEENSCSIEruargBN(ruc@nsm rffi NATUUgCEt fffiw ffiruElomul 7-a lmEtrcNKSPTlmIrcLOOWUtrcrulmmrc?axtffiuIilauEsIitlttu@E.EreAGUOIrcNrc I tI ACE ,.i 3" *'i SUISEAUENI ?HASES lmflof rnorEMrc[mEtil€l UMlM.mXUl lrudrc Iffi traz^ uYM,aot6n6usl .coMruEUElAmLffaErc MErc . P^IKNG NO mvn X6ltl@m, mE nlz^ uY {tA N ffreUsl . rc MIU Uf gct ftbt wn ctEG ftruY.OMffilNUlft$.UHEODcGc@rB rc^DorulJmEccmslotrcul.mNrcuIruCOUiR . AIIND WA]A ENES.WDToCONXtOOS ( o aa a aot* t.. .rcUrutffirus.rcmnG.WCrc .€qW@CGmS .mrlfffiffitltm{csffiff fMNt@t lt I , erl row ItIIIItII I I I ,t, }}o,a Phasing plan FATTON SPORTS PARKCARDUCCI & ASSOCIATES SAN FRANCISCO, CAI.IFORNIA rNc DUIUN, CAUFOtNtA vil- r ctTY of t l' r '\.. I( o L , PlrasE r ,.,'I rlpl I :,IIiIII SECTION VII. PHASING Subsequent Phases. The order of the remaining phases will be determined in the future and will provide uses current with budgeting, community use demands, and surrounding road completion.. Subsequent phases will be developed to allow for efficient staging and access.. Subsequent phases will be designed so as not to impact prior phase improvements. Tentative Schedule for Road Completion Dates:. Gleason Road - Completed. Lockhart Street- Complete 2005/2006. Stream Corridor - Will be constructed along with Lockhart Street (including stream corridor on Gleason Drive). Fallon Road - Northern half of road, storm drainage, southern half of mass grading, plus two lanes - Complete 200412005. Widen and complete Fallon Road - Complete 200612007. Central Parkway - Complete 200612007 CALIFORN IA ENVIRONMENTAL QUALITY ACT The Dublin Ranch Specific Plan Environmental lmpact Report (ElR) included Fallon Sports Park. The EIR did not identify specific park uses, which will require the City to file a Mitigated Negative Declaration of lmpact (Neg. Dec.). Staff has prepared the Neg. Dec. in conjunction with this li/aster Plan report to allow for all future design and construction to move forward without further environmental review The exception would be if any of the uses addressed in the Master Plan are changed or added to, as this may require the environmental review to be reopened. Task Force Meeting- 0A06/04) c IDU CCI & ASS OCilAI SP PA ORNIA SAN TRANCIS co,CATITORNIA ES INC AL DUBLIN, C Yll-2 caaaF*rr ( L-a. A L --I v 'fatr'\ \ '\ f\ \'i!'/ iil 'l; SPORTS PARK PHASING DIAGRAMFAttON RANCH \ PHASING CONCEPT FOTI.OW ROAD DEVEI.OPMENT PROVIDE A VARIETY Of FACII.ITIES AND USES EUII.D I.IGHTED FIEI.DS AND COURTS fIRSI IO INCREASE USAIIUTY PROVIDE TEMPORARY CONSTRUCNON ACCESS OFF fAI.tON ROAD fOT SUBSEOUENI PHASE DEVEI.OPMENT ROAD AND STREAM COR,RIDOR D EV E tO PM E NT . (FrscAr.YEARI GIEAsON DRIVE . COMPI,EIEO LOCKHARI tANE - COMptEIE 200512006 SINEAM CORRIDOR. CONSTRUCT AIONG wlIH TOCKHATT LANE {lNCl.UDtNG SnEAM CORRTDOR ON ctEASON OflVE} TAIION ROAO. NORTHERN HAU OF ROAD, 5'' ICP, AND SOUTHERN HAIf MA5S GRADING, PIUS 2 TANES - coMPtErE 2OOal2O05 -wrDEN AND COMPTETE FAIION ROAD 2@6/2007 CENTRA| PARKWAY. COMPIEIE 2006/2007 PHASE I PEDESTRIAN BRIDGE IUIO UIIE EAGUE FIEI.DSwlIH ASSOCIATED PtAZA, PICNIC. AND RESnOO^VCONCESSTON N\O IIGHTED SOfIIAU FI€I,DS wlIH ASSOCIATED PIAZA, PrcNrC. AND RESInOOM/CONCESS|ON FOUR TIGHIED IENNIS COURTS FOUR I.IGHTED IASXEIBAI,I. COURTS TWO I.IGHTED NATURAL TURf SOCCER FIEI.DS WiITI SYNIHEnC ruRF (omoNAtl ARI AND WAIER TEAruRES UPPET IERIACE PARKING IOT UPPER IERTACE I.OOP WATXING TRAII. UPPET IERRACE PARK IDENTIFrcANON FEATUTES IIAX COURSE . ROUGH GRADING IN PHASE I SUBSEAUENT PHASES (ORDER OF DEVEIOPMENT TO BE DEIERMINEDI UPPEN IETTACT . ACnv[Y HUi (tNctuDtNG ncNtc PtAzA, PIAY AREA, ANO RESTROOMSI .IWO UmE IEAGUE tlELDs . tWO SOFTBAlI FlEl-DS .8MX COURSE . NEI@IBORHOOD CONNECTIONS . PROVIDE IEMPoTARY coNsTRt clloN AccEss off of TATION ROAD TOWEETETTACI . PARKING A}{D ACIIVITY HUB (tNctuDtNG, PtcNtc ?tAzA, PIAY At€A, AND R8STiOOMS),/ . IWO NATURA. ruRf SOCCER flEtDS wlIH CIICKEI OVERIAY,/ .ONE UGHIEO SASETAU.FIELD r' . FOT,T UGHIED IOCCE COURTS ,, TWO ADDTnONAT UGHTED IOCCE COUITS (OmONAr,l . fOUl SAND VO|IEYBAII COURTS ,/ . All AND WAIER FEAruRES / a lo tt a) ,i ,'lJII a w AY . NEIGHSORHooD coNNEcTloNS . PARK IOENTIIICATION FEATURES . COMPTEIE UPPER AND IOWER IERRACE o too 200 300 \ 1\\ -f I o CITY OF LtN !,-rl jt ; (.i4ftr I soo^nl ria ' ouaolor rrlor/qN ri 'lt I _lq : -'l) I :t \\i \l|(l . d I l \(\ I \ .iI )-,j\ PHAS E {, "4 D,It o ry e \o --1.7 VI q{ av IJ o P'HASE r I 'I a ACE I t PPER TERRAC PHASE SECTION VIII. ACKNOWLEDGMENTS CITY COUNCIL Janet Lockhart - Mayor George Zika - Vice Mayor Claudia tt/cCormick - Councilmember Tony Oravetz - Councilmember Kasie Hildenbrand - Councilmember Tim Sbranti - Councilmember (Former) PARKS AND COMMUNITY SERVICES COMMISSION Sue Flores - Chairperson Steve Jones - Vice Chairperson Burr Cain - Commissioner Richard Guarienti - Commissioner Angela Muetterties - Commissioner Kasie Hildenbrand - Commissioner (Former) Erik Smith - Student Representative ClTY STAFF Diane Lowart - Parks and Community Services Director Herma Lichtenstein - Parks and Facilities Development [Manager Rosmary Alex - Parks and Facilities Development Coordinator Rich Jochner - Recreation Supervisor Paul Kruger - City Civil Engineer Consultant lvlelissa lr/orton - Director of Public Works TASK FORCE Anthony Casadonte lgnatus Chinn Roy Chowduri Greg Duncan Alan Elias David Galli Richard Guarienti Michele Haubert Diane Hudson Jim North Arlene Elizabeth Raffo Kimberly Roth Ellen Silky Anupam Singh Karen Y. Wang Eric Weinhagen Dave Chadbourne Jeff Lawrence Shane Huntoon Connie Mack Paul Silvas Brandon Chapin CARDUCCI & ASSOCIATES r _- I *riaIfr ,.i AUtORNt I Ii I I SAN FRANCISCO, CATIFORNIA tNc o P vlrr-l 7 I I (\, t.'lr ,t-' t\i\' I i SECTION VIII. ACKNOWLEDGMENTS MASTER PLAN CONSULTANTS Carducci & Associates, lnc. (Landscape Architects) Bill Fee - Principal Vince Lattanzio - Principal Yi Jin Kim - Associate Jim Bensman - Associate Tony Esterbrooks - Associate Dave Andrews - Associate Zeiger Engineers (Electrical Engineers) Ron Zeiger Bohley Consulting, !nc. (Civil Engineers) Pete Bohley DEVELOPER REPRESENTATIVES MacKay & Somps Dave Chadbourne Jeff Lawrence Matt Jenson CIATE SAN FRANCISCO, CAI.IFORNIA r A o t i\ \ t R 1\](\ l, :ilr',i. ' B l Ilrr , ..n. I { I I T , S DUBUNi ATIFORN o vil l-2 ) ar""rq { .-w4!* ill fr 3 n :-\.-_- ,qt -i'\I U c 'rru -:l I. (7-'\' r rlii tiI ,'r IL' x ,' h,:t.;t:,1.E.-*4 ) t7 IiI q ( ! FI I I I I i :I.W SECTION IX. APPENDICES A. TASK FORCE MEETING AGENDAS . TNTRODUCTORy MEETTNG (04_28_04) . DEStcN MEETTNG 1 (05-26-04) . DESIGN MEETTNG 2 (06-16-04) . DEStcN MEETTNG 3 (09-08-04) . DEStcN MEETTNG 4 (10-06-04) . DEStcN lvtEETtNG 5 (11-03-04) ARD OCIATES SAN FRANCISCO, CATIFORNIA tNc f I ,' \tl\(, l, llt','1.' B tiit' }r"ir; x;lrl't t. _{ - I { tII I .i \.i-.'iXr. -- :t P DUBUNI I.!FORNI lXo-I CAR ARC April28,2004 Meeting Agenda Fallon Sport Park Introductory Task Force Meeting 7:00 PM Dublin Citv Hall - Council Chambers 100 Civic Plaza.94568 Welcome and Project Overview - Diane Lowart, City of Dublin, Director of Parks and Community Services Department II Introductions - Vince Lattanzio, Carducci Landscape Architects Task Force Members Input A. Interests B. Needs C. Concerns D. Ideas E. Suggestions Review of Project Program - Bill Fee, Carducci Landscape Architects . F. Distribution of program, site plan and program templates Review of Site Conditions - Yi Jin Kim, Carducci Landscape Architects A. Context, traffrc patterns, neighborhood, physical constraints, grading, drainage, natural syste: opportunities, views, etc. Review of Task Force Planning Process - Vince Lattanzio A. Discussion of meeting schedule Discussion of Next Steps - Vince Lattanzio A Next meetings: Site Walk, 5ll/04,10:00 AM at corner of Fallon Road and Bent Tree Design Meeting # l: 5126104,7:00 PM at Dublin City Hall, Regional MeetingRmm VII. - CARDUCCT & ASSOCTATES,INC. 555 BEACH STREET .SAN FRANCISCO, CAg4l33 (415) 674-0990 FAX (415) 674-0999 LANDSCAPE ARCHITECTURE ..IRRIGATION DE,SIGN . PLANNING ' URBAN DESIGN I. m IV V. VI. CAR !,AN AGENDA Fallon Ranch Sports Park Task Force Meeting #1 7 PM Dublin City Hall - Regional Room N{ay 26,2004 L Summarize Introductory Meeting and Site Walk Design Workshop - Vince Lattanzio, Carducci Landscape Architects A. Distribution of Grading Plan (basic template) and new sports field templates B. Group Formation (3 Groups) C. Design Charrette (3 Groups) III Design Workshop Review A. Review of group design concepts Next Steps Meeting Schedule Final presentation to Council for adoption of Master Plan - December 7,2004 - CARDUCCI & ASSOCIATES,INC.555 BEACH STREET . SAN FRANCISCO, CA 94133 (415) 674-0990 FAX (415) 674-0999 LANDSCAPE ARCHITECTURE . IRRIGATION DESIGN . PLANNING ' URBAN DESIGN II. IV V. Meeting Date & Time Place Meeting Purpose Introductory Meeting April28, 2004,7:00 PM,City Hall Council Chambers Introductory Meeting Site Visit Meeting May 1,2004, 10:00 AM Intersection of Bent Tree & Fallon Rd Site Familiarity Design Meeting #1 May26,2004 7:00 PM,City Hall - Regional Room Design Charrette Design Meeting#2 June 16,2004,7:00PM Library Community Room Review 3 Alternative Plans Design Meeting #3 Sept 8, 2004,7:00PM City Hall - Regional Room Review Preferred Plan Design Meeting fi4 Oct 6,2004,7:00 PM City Hall - Regional Room Presentation Confirmation & Phasing Design Meeting #5 Nov 3,2004,7:00 PM City Hall - Regional Room Review Final Plan & Phasing CAR l,lN AGENDA Fallon Ranch Sports Park Task Force Meeting #2 Dublin Library Community Room 7 PM, June 16,2004 I. SummarizeLast Meeting Present 3 Alternative Plans to Task Force Members Review & Comment of 3 Altemative Plans by Task Force Members A. Review of each plan by Task Force Members B. Record Comments C. Task Force Members vote for preferences IV. Summarize Comments & Preferences V. Next Steps VI. Meeting Schedule Meeting Date & Time Place Meeting Purpose Introductory Meeting April28, 2004,7:00 PM,City Hall Council Chambers Introductory Meeting Site Visit Meeting May 1,2004, 10:00 AM Intersection of Bent Tree & Fallon Rd Site Familiarity Design Meeting #1 May 26,2004, 7:00 PM City Hall - Regional Room Design Chanette Design Meeting #2 June 16, 2004, 7:00 PM Library Community Room Review 3 Alternative Plans Design Meeting #3 Sept 8, 2004,7:00PM City Hall - Regional Room Review Preferred Plan Design Meeting #4 Oct 6, 2004, 7:00 PM City Hall- Regional Room Presentation Confirmation & Phasing Design Meeting #5 Nov 3,2004, 7:00 PM City Hall- Regional Room Review Final Plan & Phasing Final presentation to Council for adoption of Master Plan - December 7 ,2004 CARDUCCI & ASSOCIATES, INC. 555 BEACH STREET . SAN FRANCISCO, CA 94133 (415) 674.0990 FAX (415) 674-0999 LANDSCAPE ARCHITECTURE . IRRIGATION DESIGN ' PLANNING ' URBAN DESIGN il. m. m. ry. V. VI. cAR PA Af,CII AGENDA Fallon Ranch Sports Park Task Force Meeting #3 City Hall - Regional Room 7 PM, September 8,2004 I.Summarize Progress since Last Meeting A. Grading B. Parks & Community Services Commission input II. Present Preferred Plan & Supporting Documents to Task Force Members Review & Comment of Preferred Plan & Supporting Documents by Task Force Members A. Record Comments Summarize Comments Next Steps Meeting Schedule Final presentation to Council for adoption of Master Plan - December 7,2004 CARDUCCI & ASSOCIATES, INC. 555 BEACH STREET . SAN FRANCISCO, CA 94133 (415) 674.0990 FAX (415) 6'14-0999 LANDSCAPE ARCHITECTURE . IRRIGATION DESIGN . PLANNING ' URBAN DESIGN Meeting Date & Time Place Meeting Purpose Introductory Meeting April28, 2004,7:00 PM,City Hall Council Chambers Introductory Meeting Site Visit Meeting May 1,2004, 10:00 AM Intersection of Bent Tree & Fallon Rd Site Familiarity Design Meeting #1 May 26,2004, 7:00 PM City Hall - Regional Room Design Charrette Design Meeting#Z June 16, 2004, 7:00 PM Library Community Room Review 3 Altemative Plans Design Meeting #3 Sept 8,2004, 7:00 PM City Hall- Regional Room Review Preferred Plan Design Meeting fl4 Oct 6, 2004, 7:00 PM City Hall - Regional Room Presentation Confirmation & Phasing Design Meeting #5 Nov 3, 2004,7:00PM City Hall - Regional Room Review Final Plan & Phasing cAR AGENDA Fallon Ranch Sports Park Task tr'orce Meeting #4 City Hall - Regional Room 7 PM, October 612004 Summarize Progress since Last Meeting A. Incorporate revisions based on TF comments B. Coordinate with MacKay & Somps Engineers il.Presentation to Task Force Members A. Plan Revisions B. Phasing Options Review & Comment of Phasing Options by Task Force Members A. Record Comments Summarize Comments Next Steps Meeting Schedule Meeting Date & Time Place Meeting Purpose Introductory Meeting April28, 2004,7:00 PM,City Hall Council Chambers Introductory Meeting Site Visit Meeting May 1,2004, 10:00 AM Intersection of Bent Tree & Fallon Rd Site Familiarity Design Meeting #1 May 26,2004,7:00 PM City Hall - Regional Room Design Charrette Design Meeting #2 June 16, 2004, 7:00 PM Library Community Room Review 3 Alternative Plans Design Meeting #3 Sept 8, 2004, 7:00 PM City Hall - Regional Room Review Preferred Plan Design Meeting *i4 Oct 6, 2004, 7:00 PM City Hall - Regional Room Presentation Confirmation & Phasing Design Meeting #5 Nov 3,2004,7:00 PM City Hall - Regional Room Review Final Plan & Phasing Final presentation to Council for adoption o f Master Plan - December 7,2004 CARDUCCI & ASSOCIATES, INC. 555 BEACH STREET . SAN FRANCISCO, CA94I33 (415) 674-0990 FAX (415) 674'0999 LANDSCAPE ARCHITECTURE ' IRRIGATION DESIGN ' PLANNING ' URBAN DESIGN I. III. IV. V. VI. CAR ARCTI AGENDA Fallon Ranch Sports Park Task Force Meeting #5 7 PM Dublin City Hall - Council Chambers November 3,2004 il. Summarize Introductory Meeting and Site Walk Design Workshop - Vince Lattanzio, Carducci Landscape Architects A. Distribution of Grading Plan (basic template) and new sports field templates B. Group Formation (3 Groups) C. Design Charrette (3 Groups) Design Workshop Review A. Review of group design concepts Next Steps Meeting Schedule - CARDUCCI & ASSOCIATES,INC. 555 BEACH STREET . SAN FRANCISCO, CA 94133 (415) 674-0990 FAX (415) 674-0999 LANDSCAPE ARCHITECTURE . IRRIGATION DESIGN ' PLANNING ' URBAN DESIGN I m. IV. V. Meeting Date & Time Place Meeting Purpose Parks Commission November 22,2004 Adoption of Master Plan City Council December 7,2004 Adoption of Master Plan SECTION IX. APPENDICES b. TASK FORCE MEETING TVIINUTES . TNTRODUCTORy MEETTNG (04-28_04) . stTE vtstT MEETTNG (05-1-04) . DESTGN MEETTNG 1 (05-26_04) . DEStcN MEETTNG 2 (06-16_04) . DEStcN MEETTNG 3 (09-08-04) . DEStcN MEETTNG 4 (10-06-04) . DEStcN TUEETtNG 5 (11-03_04) CARDUCCI & ASSOCIATES ll :tttr,.+.' ,1, j I { I J i{ I l' 'u B, E SAN FRANCISCO, CATIFORNIA rNc I a BU AtIF CAR LAN Date: To: Job Name Job # Re By MEETING NOTES 04-28-04 Herma Lichtenstein Fallon Ranch Sports Park DUB03-02 lnformal Task Force Meeting Jin Kim On Wednesday, April 28,2004 an informal meeting was held with the Task Force to review the project and get initial input from the Task Force members. Refer to attached Agenda. Attendees CARDUCCI & ASSOCIATES,INC. 555 BEACH STREET. SAN FRANCISCO, CA 94133 (415) 674-0990 FAX (4I5) 6]4-0999 www.carducciassociates.com jin@carducciassociates'com LANDSCAPE ARCHITECTURE o PLANNING O URBAN DESIGN O IRRIGATION DESIGN Name Affiliation X Diane Lowart (DL)City of Dublin X Herma Lichtenstein (HL)City of Dublin X Rich Jochner (RJ)City of Dublin X Anthonv Casadonte (AC)Dublin Ranch HOA (President) lsnatus Chinn (lC)Summer Glen HOA Roy Chowdhuri (RC) Greq Duncan (GD)Summer Glen HOA X Alan Elias (AE)Dublin Ranch X David Galli (DG)Dublin Ranch, Dublin United Soccer League X Michele Haubert (MH)Dublin Ranch X Diane Hudson (DH)Bocce, Dublin Little League X Jim North (JN)Dublin Little League X Arlene Elizabeth Raffo (AR)Summer Glen HOA (CFO) X Kimberly Roth (KR)Dublin Green X Ellen Silky (ES)Dublin Ranch, Dublin Little League X Anupam Sinsh (AS)Northern California Cricket Association l!!qe President) Karen Y. Wang (KW)Greenbriar Eric Weinhagen (EW)Dublin Ranch X Mary Senior Center X Dave Chadbourne (DC)Devel & Jeff Lawrence (JL)Devel raddock &an X Shane Huntoon (SH)Special lnterest Group (BMX) X Richard Guarienti (RG)Parks and Commun Services Commission X Connie Mack (CM)e and CulturalArts CommissionH X Paul Silvas (PS)Senior Center committee Brandon Chapin (BC)Youth Advi Committee X Vince Lattanzio (VL)Carducci Architects X Bill Fee (BF)Carducci Landsca Architects X Jin Kim (EM)Carducci Landsca Architects Fallon Sports Park The following were initial comments from individual members: Mary: Dublin Senior Center Paul Silvas: Dublin Senior Center Get input 4:00 sun, keep sun out of 3'd base persons eyes Wind Sahde Arlene Elizabeth Raffo: Summer Glen HOA Sports input Shane Huntoon: non-residenU BMX group advocate Wants to introduce BMX to Dublin. lt is a sport for everyone 3-60 yrs old. Kimberly Roth Real estate value Toll Brothers, Orchard HOA representative David Galli: Soccer advocate Soccer 1500 kids 30% annual increase in annual participation Diane Hudson: Bocce, everyone can play, low impact, provide 2 courts Anupam Singh: Sybase employee, VP of Northern Cricket Association, Cricket advocate Cricket ground here in Dublin 32 teams Anthony Casadonte: Dublin Ranch HOA Balanced interest of community Richard Guarienti: Parks and Community Services Commissioner Represent Western Dublin Was an EGP Master Plan Task Force Member Dogs? Trails walking Balance Here for input and to integrate Here for input and to listen Alan Elias: Dublin Ranch, writes for the Valley Times Has 3 kids, likes baseball and organized sports Like to see Dublin get ahead of the curve to meet recreation needs Rich Jochner: Recreation Supervisor Dave Chadbourne: MacKay & SomPs Lin Family representative and worked on planning for Lin family for 12yrs No precohceived ideas, relate park to context, circulation, lighting, earthwork Michele Hauber: a parent Shade, restrooms, cover Jim North: Dublin Little League Baseball Board Member, Little League Baseball advocate Balance of faci lities, appropriate adjacencies Ellen Silky: Dublin Little League, a parent Shade, parking, restrooms Connie Mack: Heritage and CulturalArts Commissioner Open Comments and euestions During Review of Program, Site Gonditions and the Planning Process: CARDUCCI & ASSOCIATES, INC. 555 BEACH STREET. SAN FRANCISCO, CA 94133 (415) 674-0990 FAX (415) 674'0999 www'carducciassociates'com jin@carducciassociates'com LANDSCAPE ARCHITECTURE o PLANNING o URBAN DESIGN O IRRIGATION DESIGN Why move Fallon Road? Need to meet requirements for safe road geometric standards of City Good to have activity for seniors, walking Plants: lnclude opportunity to make park a demonstration garden and would like nametags of planting for educational value. Use of native plants a good idea. lnfrastructure: does this include drainage? Need better drainage than at other parks. Will there be a master plan review of the citywide plan to look at the allocation of the facilities? Yes, at the next meeting. What parks are now are on hills in Dublin? Dolan, Ted Fairfield Trees: take 25 years to grow, wind blows them sideways; why not plant mature trees? Need to have shade Process timeline: What is the process and timeline? It will be similar to Emerald Glen Park, 1O-year development process to be completed in phases Type ofgrass: Have soccer grass, baseball grass Do not overlay baseball and soccer fields Have permanent fences for baseball 4 adult softball and 2 adult baseball fields will generate revenue How is this project funded? Developer fees Annual review of revenues Build in phases as the money comes in, as population & needs grows, as tax revenue grow, etc. Consider Synthetic Turf here to minimize maintenance and maximize year-round use. What is time frame for phase 1? Unknown at this time Have Snack bar/ concession stand Coordinate with EGP develoPment Sept 8 meeting may be conflict with Labor Day holiday? Can be rescheduled if necessary Can we look at ideas and drawings together? Yes Develop 2 or 3 options for the task force to review Yes Lighting concerns: Lack of light or too much light. From Dublin Ranch the Pleasanton Sports Park is visible and dominates the valley at night CARDUCCI & ASSOCIATES,INC.555 BEACH STREET. SAN FRANCISCO, CA 94133 (415) 674-0990 FAX (415) 674-0999 www.carducciassociates.com jin@carducciassociates'com LANDSCAPE ARCHITECTURE o PLANNING o URBAN DESIGN O IRRIGATION DESIGN Usability concerns: lf its dark people cannot use the facilities. People have jobs and can't play until the evening when it is dark. They come home and evenings are the only time for them to use. 7 to 7:30pm is a common time for recreation and it is usually dark therefore you need lighting for sports. But not too much light Understand surrounding development and the effect sports lights will have Too much light can be detrimental to property values Try to minimize impacts How do we get in touch with you guys? Send all pictures and emails to Herma (the gate keeper) What is BIVX? BlVlX, all unique in response to site, 80' by 200'area Shane will provide info on BIMX course design (see original flip chart notes page 8) ls roller hockey a consideration? New Pleasanton park: At Val Vista east of 680 @ Stone ridge is a good model to look at. Think out of the box for the stream corridor Consider waterfalls Responsible dog owners Provide dog area and maybe dog waste bag dispenser posts throughout the park Drinking fountains throughout the project for convenient use near sports facilities 1st phase should provide adequate parking and restroom facilities for visitors Consider family restrooms Place restrooms convenient to small children's play areas For Saturday meet at 10 am at the site There is a park in Colorado on a hillside End of Meeting Notes Attendees are to notify Garducci & Associates, lnc., in writing, of discrepancies in these minutes. CARDUCCI & ASSOCIATES, INC. 555 BEACH STREET. SAN FRANCISCO, CA 94133 (415) 674-0990 FAX (4I5) 674-0999 www-carducciassociates.com jin@carducciassociates'com LANDSCAPE ARCHITECTURE o PLANNING T URBAN DESIGN E IRRIGATION DESIGN MEETING NOTES 05-01-04 Herma Lichtenstein Fallon Ranch Sports Park DUB03-02 lnformalTask Force Site Visit Jin Kim CAR LAN ARCH Date: To: Job Name Job # Re By On Saturday, May 1, 2004 an informal meeting was held with the Task Force to review the project and get initial input from the Task Force members. Refer to attached Agenda. Attendees CARDUCCI & ASSOCIATES, INC. 555 BEACH STREET. SAN FRANCISCO, CA 94133 (415) 674-0990 FAX (415) 674-0999 www.carducciassociates.com jin@carducciassociates'com LANDSCAPE ARCHITECTURE o PLANNING o URBAN DESIGN O IRRIGATION DESIGN Name Affiliation Diane Lowart (DL)City of Dublin X Herma Lichtenstein (HL)CiW of Dublin Rich Jochner (RJ)City of Dublin Anthony Casadonte (AC)Dublin Ranch HOA (President) lgnatus Chinn (lC)Summer Glen HOA Roy Chowdhuri (RC) Greq Duncan (GD)Summer Glen HOA X Alan Elias (AE)Dublin Ranch David Galli (DG)Dublin Ranch, Dublin United Soccer League Michele Haubert (MH)Dublin Ranch Diane Hudson (DH)Bocce, Dublin Little League Jim North (JN)Dublin Little League Arlene Elizabeth Raffo (AR)Summer Glen HOA CFO Kimberly Roth (KR)Dublin Green Ellen Silky (ES)Dublin Ranch Dublin Little ue Anupam Sinqh (AS)Northern California Cricket Association President Karen Y. Wang (KW)Greenbriar Eric Weinhagen (EW)Dublin Ranch Mary Senior Center Dave Chadbourne (DC)ac & Som Jeff Lawrence (JL)Develo ock & Shane Huntoon (SH)lnterest Grou X Richard Guarienti (RG)Parks and Commun Services Commission X Connie tMack (CM)He e and CulturalArts Commission X Paul Silvas (PS)Senior Center Advi committee Brandon Chapin (BC)Youth Advi Committee X Vince Lattanzio (VL)Carducci Landsca Architects X Bill Fee (BF)Carducci Landsca Architects X Jin Kim (EM)Carducci Landsca Architects I nnan\ Fallon Sports Park The following were comments from the members: VL: lntroduction to fassajara formation, which is the soil that will be imported to the site. The overview of the soil condition of the site and his recommendations. We might need to take the top (e) layer of the site soil aside then fill with import soil (Tassajara formation) then relay (e) soil on top. 54" RCP the third knoll will get cut back quite a bit due to fallon rd Water feature near Gleason End of Meeting Notes Attendees are to notify Carducci & Associates, lnc., in writing, of discrepancies in these minutes. CARDUCCT & ASSOCTATES, TNC.555 BEACH STREET. SAN FRANCISCO, CA 94133 (415) 674-0990 FAX (415) 674-0999 www.carducciassociates.com jin@carducciassociates'com LANDSCAPE ARCHITECTURE o PLANNING o URBAN DESIGN O IRRIGATION DESIGN cAR LAN MEETING NOTES 06-07-04 Herma Lichtenstein Fallon Ranch Sports Park DUB03-02 Task Force t\4eeting #1 David Andrews ARCH Date: To: Job Name Job # Re By On Wednesday, May 26,2004 a meeting with the Task Force was held at the City Hall Regional Room to provide the members with an opportunity to participate in a design charette that lead to the creation of three preferred design schemes. Refer to attached Agenda. Attendees Name Affiliation X Diane Lowart (DL)City of Dublin X Herma Lichtenstein (HL)City of Dublin X Rich Jochner (RJ)City of Dublin Anthonv Casadonte (AC)Dublin Ranch HOA (President) lqnatus Chinn (lC)Summer Glen HOA Roy Chowdhuri (RC) Greg Duncan (GD)Summer Glen HOA X Alan Elias (AE)Dublin Ranch X David Galli (DG)Dublin Ranch, Dublin United Soccer League Michele Haubert (MH)Dublin Ranch X Diane Hudson (DH)Bocce, Dublin Little League X Jim North (JN)Dublin Little League Arlene Elizabeth Raffo (AR)Summer Glen HOA (CFO) Kimberly Roth (KR)Dublin Green Ellen Silkv (ES)Dublin Ranch, Dublin Little League X Anupam Sinqh (AS)Northern California Cricket Association (Vice President) X Karen Y. Wang (KW)Greenbriar Eric Weinhagen (EW)Dublin Ranch X Dave Chadbourne (DQ)Developer (Mac Kay & Somps) Jeff Lawrence (JL)Developer (Braddock & Logan) X Shane Huntoon (SH)Special lnterest Group (BMX) Richard Guarienti (RG)Parks and Community Services Commission X Connie tMack (CM)Heri and Cultural Arts Commission X Paul Silvas (PS)Senior Center Advi committee X Brandon Chapin (BC)Committee X Danny Wanq X Kasie Hildenbrand PCSC CARDUCCI & ASSOCIATES, INC. 555 BEACH STREET. SAN FRANCISCO, CA 94133 (415) 614.0990 FAX (415) 674-0999 www.carducciassociates.com david@carducciassociates.com LANDSCAPE ARCHITECTURE o PLANNING O URBAN DESIGN O IRRIGATION DESIGN Youth Advisory X Vince Lattanzio (VL)Carducci Landscape Architects X Bill Fee (BF)Qqrdgccj Landscape Architects X Jin Kim (JK)Carducci Landscape Architects X David Andrews (DA)Carducci Landscape Architects X Chunqpo Fanq (CF)Card ucci Landscape Architects Fallon Sports Park The following is a review of the meeting content: VL: Description of the park and the site constraints as well as the review of the Program Elements. The Task Force was then divided into three groups where base maps and cutouts of the prograrn elements were provided for the members to design the layout of the park. Carducci Associates lead the groups and assisted the members in creating seven design schemes for the park. The designs were posted on the wall and the schemes were reviewed to identify what issues were most important to the members. A rating system was used to identify the members' design scheme preferences. Members were asked to place colored stickers on the drawings to identify their preferred scheme; the sticker identification is as follows: Red-3 points, Green- 2 points, Blue-1 point. The following Table displays the points given to each scheme. Fallon Sports Park - May 26,2004 Preference Matrix for Design Charette Schemes SCHEME A B c D E F G RED (multiply x 3)5 1 2 2 2 0 0 GREEN (multiply x 2)2 6 1 1 0 1 1 BLUE (multiply x 1)0 3 2 1 3 3 0 TOTAL (weighted value)19 18 10 I I 5 2 All schemes are listed in order of preference as chosen by the Task Force members. Schemes A and B were the favorites while Schemes C, D, and E closely followed. Because there is no clear third preference, we will develop a composite of Schemes C, D, and E identifying the best components and layouts of each. Attachment: Seven Design Schemes End of Meeting Notes Attendees are to notify Carducci & Associates, lnc., in writing, of discrepancies in these minutes CARDUCCI & ASSOCTATES, rNC. 555 BEACH STREET. SAN FRANCTSCO, CA 94r33 (415) 674-0990 FAX (415) 674-0999 www.carducciassociates.com david@carducciassociates.com LANDSCAPE ARCHITECTURE o PLANNING . URBAN DESIGN O IRRIGATION DESIGN CATD LAND MEETING NOTES 06-16-04 Herma Lichtenstein Fallon Ranch Sports Park DUB03-02 Task Force Meeting #2 Tony Esterbrooks ARCH Date: To: Job Name Job # Re By On Wednesday, June 16,2Q04 a meeting with the Task Force was held at the City Hall Library Community Room to review three design schemes while receiving input from the Task Force Committee. See attached meeting agenda. Attendees Name Affiliation Diane Lowart (DL)City of Dublin Herma Lichtenstein (HL)City of Dublin X Rich Jochner (RJ)City of Dublin Anthony Casadonte (AC)Dublin Ranch HOA (President) lgnatus Chinn (lC)Summer Glen HOA Rov Chowdhuri (RC) Greq Duncan (GD)Summer Glen HOA Alan Elias (AE)Dublin Ranch David Galli (DG)Dublin Ranch, Dublin United Soccer League X Michele Haubert (MH)Dublin Ranch Diane Hudson (DH)Bocce, Dublin Little League X Jim North (JN)Dublin Little League Arlene Elizabeth Raffo (AR)Summer Glen HOA (CFO) X Kimberlv Roth (KR)Dublin Green X Ellen Silky (ES)Dublin Ranch, Dublin Little League X Anupam Singh (AS)Northern California Cricket Association (Vi ce President) X Karen Y. Wans (KW)Greenbriar X Eric Weinhasen (EW)Dublin Ranch X Dave Chadbourne (DC)Mac &So Jeff Lawrence (JL)Braddock &r X Shane Huntoon (SH)Special lnterest Group (BIUX) X Richard Guarienti (RG)Parks and Community Services Commission X Connie Mack (CM)and Cultural Arts Commission X Paul Silvas (PS)Senior Center committee Brandon Chapin (BC)Youth Advisory Committee Danny Wang Kasie Hildenbrand PCSC CARDUCCI & ASSOCIATES,INC. 555 BEACH STREET. SAN FRANCISCO, CA 94133 (415) 674-0990 FAX (415) 674'0999 www.carducciassociates.com tony@carducciassociates.com LANDSCAPE ARCHITECTURE o PLANNING o URBAN DESIGN O IRRIGATION DESIGN Fallon Sports Park The following is a review of the meeting content: Comments on Scheme A: BMX Course Comments: 1. Possibility of axis terminating at the BMX course 2. Parking, restroom, and playground at BMX 3. A portion of BMX should have a lower level of difficulty for younger kids 4. Location of BMX near fire station 5. Would be nice to have a level viewing area at the starting point Lighting lssues: 1. Prefer that lighting is further away from residential areas 2. Consider lighting at BIMX course 3. Concerns with the light at baseball fields 4. Light the central parking areas 5. Turn sports fields at 45 degree angle for better lighting Playgounds: 1. Would like to have two large playgrounds, one in the upper terrace, one at lower terrace 2. Incorporate a gated play area for younger children 3. Have playgrounds located further away from bocce Sports Fields: 1. Association between bocce and tennis is preferred 2. Keep picnic and viewing areas associated with bocce courts. 3. Consider possibility of having a sand volleyball court 4. Prefer to have the cricket overlay located in the synthetic turf area. Locate the overlay away from parking for safety reasons 5. lncorporate synthetic turf into softball fields Misc. Design lssues: 1. lntegrate walking/exercise into the park 2. A shorter walkway circulation route is preferred. 3. A portion of the park could be reserved for a picnic/trellis area Comments on Scheme B: BIMX Course Comments: 1. Prefer to have BIVX course located at lower terrace where it will become less visible 2. Do not like location of BMX. Would prefer to have it near the fire station Lighting lssues: l.Light sports field away from housing Sports Fields: 1. Take out one baseball field and replace with fifth soccer field 2. Locate sand volleyball and bocce courts near soccer fields for possible expansion 3. Prefer to have a larger single level soccer for flexibility 4. Sand volleYball over turf 5. Flexible ballfields between 80 and 90 feet 6. Possibility of replacing softballwith roller hockey 7. Move basketball away from Little League fields 8. Prefer to have broken, terraced soccer fields to help reduce wind CARDUCCI & ASSOCIATES, INC. 555 BEACH STREET. SAN FRANCISCO, CA 94T33 (415) 674'0990 FAX (415) 6"74-0999 www.carducciassociates.com tony@carducciassociates'com LANDSCAPE ARCHITECTURE o PLANNING o URBAN DESIGN O IRRIGATION DESIGN X Vince Lattanzio (VL)Carducci Landscape Architects X Bill Fee (BF)Carducci Landscape Architects X Jin Kim (JK)Carducci Landscape Architects 9. Possibility of having neither hockey or tennis courts Misc. Design lssues: 1. Locate parking near Little League, softball, and baseball fields 2. Concession and play areas located centrally to baseball complexes 3. Water fountains near fleld areas and restrooms4. Prefer more organic layout to orthogonal layout 5. Spread parking out away from street 6. Place the restrooms adjacent to play areas 7. Place drop-off areas in parking lots near sports fields Comments on Scheme C: BMX Course Comments: 1. Prefer this BMX location over scheme A or B 2. BMX needs 20 parking spots close by (50'to 60' away) 3. Locating BMX at fire station will help block wind4. Provide temporary parking at BttIX for two vehicles Restroom lssues: 1. How many restrooms and where should they be located? 2. Consider unisex restrooms Sports Fields: 1. Practice areas for cricket should be like a pitch layout 2. Softball outfield fence is too close 3. Two task force members prefer to have four soccer fields versus three, while one member prefers three instead of four 4. Variety of adult sports is good to have 5. Could be difficult to schedule Little League and adult baseball leagues 6. Prefer grouped sports activity to mixed sports activity 7. Prefer sand volleyball courts 8. ldea of having hockey overlay tennis courts is not possible 9. Like artificial turf-ls cheaper in long run Misc. Design lssues: 1. Cluster layout could be good and bad. Look and pro's and con's 2. Like this playground layout. Prefer to have main playground at the upper level and smaller play area at lower level. Group play areas according to age. 3. Love the surrounding water 4. Look at ft/emorial Park in San Ramon Gonclusions: The task force members preferred Scheme B over Scheme A or C CARDUCCI & ASSOCIATES, INC. 555 BEACH STREET. SAN FRANCISCO, CA 94133 (415) 674-0990 FAX (415) 674-0999 www.carducciassociates.com tony@carducciassociates'com LANDSCAPE ARCHITECTURE o PLANNING o URBAN DESIGN O IRRIGATION DESIGN End of Meeting Notes Attendees are to notify Carducci & Associates, lnc., in writing, of discrepancies in these minutes. 1 MEETING NOTES ARCI Date: To: Job Name Job # Re By 09-10-04 Herma Lichtenstein Fallon Ranch Sports Park DU803-02 Task Force Meeting #3 Dave Andrews On Wednesday, September 8,2004 a third public meeting was held with the Task Force to review the preferred scheme and get input from the Task Force and approval to continue with proposed plan. Refer to the attached Agenda. Attendees Name Affiliation X Diane Lowart (DL)Citv of Dublin X Herma Lichtenstein (HL)City of Dublin X Rich Jochner (RJ)City of Dublin X-ALT Anthony Casadonte (MC)-X- MARY-ALT.Dublin Ranch HOA (President) lgnatus Chinn (lC)Summer Glen HOA Roy Chowdhuri (RC) Greq Duncan (GD)Summer Glen HOA X Alan Elias (AE)Dublin Ranch David Galli (DG)Dublin Ranch, Dublin United Soccer Lea X [Vichele Haubert (MH)Dublin Ranch Diane Hudson (DH)Bocce, Dublin Little League Jim North (JN)Dublin Little Leaque Arlene Elizabeth Raffo (AR)Summer Glen HOA (CFO) Kimberly Roth (KR)Dublin Green X Ellen Silky (ES)Dublin Ranch Dublin Little Lea e X Anupam Singh (AS)Northern California Cricket Association P Karen Y. Wang (KW)Greenbriar Eric Weinhagen (EW)Dublin Ranch lr/ary Senior Center X Dave Chadbourne (DC)Develo & Som Jeff Lawrence (JL)Develo raddock & X Shane Huntoon (SH)Special lnterest Group (BMX) X Richard Guarienti RG Parks and Commun Services Commission X Connie tVack (CM)Herita and Cultural Arts Commission X-ALT Paul Silvas .X. MARY SUE.ALT.Senior Center Advi committee X Brandon Chapin (BC)Youth Advi Committee X Vince Lattanzio Carducci Landsca Architects X Bill Fee (BF)Carducci Landsca Architects X Jin Kim (JK)Carducci Land Architects X Dave Andrews (DA)Carducci Land Architects CARDUCCI & ASSOCIATES, INC. 555 BEACH STREET SAN FRANCISCO, CA 94133 (415) 614-0990 FAX (415) 674-0999 www.carducciassociates.com david@carducciassociates'com LANDSCAPE ARCHITECTURE o PLANNING o URBAN DESIGN O IRRIGATION DESIGN 2 TURF Fallon Sports Park The following were initial comments from individual Task Force members in attendance: o Synthetic turf is a great idea, promotes water conservation, no irrigation needed.. Bring synthetic turf samples next time DRAINAGE o Stream corridor is not used for site drainage.. Be careful when draining the terraces - do not drain upper terraces to lower terraces, specifically the soccer fields as there are clay soils which will create subsurface sheet drainage possibly to lower terraced fields. Ted Fairfield Park drainage is terrible.. Field drainage options: - Sand channel - Sand field - Synthetic turf. Each field to be a separate watershed. Drainage to be accepted and directed to major storm drainage system at Fallon Road and Central Parkway BMX. Need electricity to BMX course, but not necessarily for lighting, as lighting is not required. 1 inch water hook-ups (aCVs) needed at the inside of each turn. Drainage should occur at the inside of each turn. Linear drains (French drains) could also line the track in between the straight-aways (said either could be done). ls the BMX a fully open area or is it fenced? - will be fenced all around, minimum 4' high chain link fence . Need sedimentation and erosion control at BIVX LIGHTING . Light only major connector paths consistent with other city parks . Keep lighting at perimeter entries and parking lots, but keep to minimum where possible (ie. parking lots) -do not light in park . Provide lighting for nighttime events (therefore might need some path lights from/to specific areas that would be used at night r Operation times for park lighting - Games start as late as 7:45 or 8:30 - Possibly have field lights go off at 10:00pm - Existing city park rules have operation times dawn to dusk - Existing city park rules have field lights turn off at 10:00pm - Keep in mind that sports are seasonal . KeeP lighting in center of Park - Concerned with light glare - Use glare reduction systems if possible . Light the parking lots and especially the pedestrian bridge CARDUCCI & ASSOCIATES, INC. 555 BEACH STREET SAN FRANCISCO, CA 94133 (415) 614-0990 FAX (415) 674-0999 www.carducciassociates.com david@carducciassociates'com LANDSCAPE ARCHITECTURE o PLANNING o URBAN DESIGN C IRRIGATION DESIGN 3 NEIGHBORHOOD CON NECTIONSo Would like to see access points from all around (likes what is shown on plans), but would specifically like connection of open spaces at southern edge (across Central Parkway). Possibly make a second pedestrian bridge connection at Gleason/Lockhart intersection. Provide pedestrian street crossings by fire station and at all neighborhood connection points WATER/ART FEATURESr Are there any water features anywhere?o Would like to see art features and water features throughout the park - Water features possibly at entry - Possibly misting water features at the trellis and picnic areas as comfort optionso Would like to see water features and restrooms at picnic areas. Have "special" things/places/objects outside of sport field items to promote attraction to other parts/facets of park and to create non-sporting areas of interest. ls it possible to take advantage of slopes for water elements, surrounding sporting areas? FENCINGo Are the fields fenced? - fences needed for tournaments - softball and baseball needs fences for big games or tournaments or teams - fences are needed to attract teams and tournaments, they will not come without the fences PARK DEVELOPMENT. The city has new standards for soil amendment o What is the financial reality of Fallon, especially, in terms of Emerald Glen Park, if the money is not available yet for Emerald Glen Park what is supposed to help pay for its construction costs - developers pay through impact fees - neighborhood park fees - community park fees - the city has taken everything into account, and the park will happen - problems at EGP are becauie they need more manpower, not because the funds are not available - each phase takes at least 3 years to plan, design, and build . The City sees Fallon as a premier sports park . See ground-breaking to potentially be in 2-3 years after first phase funding is approved by the council o Private development west of Fallon Park is working from west to east - tr/ight be able to make interim intersection of Fallon and Central if new Fallon alignment is not constructed yet - pedestrian bridge axis/location is adjustable dependent upon elementary school and intersection locations . Stream corridor to continue on south side of Central Parkway (tt4acKay & Somps to provide plans) o At Lockhart 12' or 16' walkway adjacent to corridor? Sidewalk becomes corridor walkway ADDITIONAL ITETMS. ls it possible to have shade structures in play area itself? r Would like pathways to be large enough to allow for bikes. Strollers, and people to move easily . provide shade trees/areas by soccer fields and other fields for viewing . Use embankments for seating opportunities . provide equipment sheds for each sport where possible (maybe the 8' x 20" containers) . Can we make the soccer goals permanent? - This might be a conflict with the cricket fields r Walking/runiing path could have a softer surface for jogging, possibly DG, resin paving, or dirt CARDUCCI & ASSOCIATES, INC. 555 BEACH STREET SAN FRANCISCO, CA 94133 (415) 614-0990 FAX (415) 614-0999 www.carducciassociates.com david@carducciassociates'com LANDSCAPE ARCHITECTURE o PLANNING o URBAN DESIGN O IRRIGATION DESIGN 4. Provide areas for celebratory gathering (BBQ, parties, sports team awards, jamborees, team/league award ceremonies, parades, etc). Bike racks throughout (allow for bike racks at major hubs and at Little League, softball, baseball, and soccer hubs). Provide for separate toddler (2-5yrs) playground areas as well as older kid (school age) playgrounds - Try to fence in toddler areas or at least have them secured for safety - Have places for parents to sit within or around these toddler playground areas (shaded) - Adult areas within play areas - No rocks/granite or dangerous objects in play areas - Provide form of immediate shade while large/planted trees are growing in (plant larger trees). Recommend to use sand opposed to wood fiber or rubber because it is a bit too hard sometimes. Make sure there are BBQ pits at picnic areaso Provide stainvays between landings of sloped walks at Gleason Drive and Fallon Road. For east vs. west town league games, would want to have 2 batting cages for Little League. Are the Little League batting cages owned by LL or by city? - They are not a commercial ventureo Cricket needs batting cages too (net cages that are removable and will be installed and removed each time), but would like sleeves for its placement and possibly have electrical connections for bowling machine which they will provide PHASING Lin Family responsibility for Fallon Road [\4ass grading and stream bed corridor may happen in 2 years time Stream corridor might get built first due to permit obligations, so would make sense to build Lockhart or part of Lockhart along with it a a a Possible phasinq considerations per Carducci & Associates: . Roadso Utilities into hubs. Perimeter trees and stream corridor planting . fvlass grading. Soccer fields. Parking as needed (build-out sooner than later) o Restrooms along with needs. Meet community needs. Soccer growing at30% Per Year. Coordinate with developers concerning their responsibilities to build roads as soon as possible o Consider perimeter roads paths and access as 1't Phase and develop from perimeter into park area Phasinq requests per Task Force . picnic areas, small areas, walks, for immediately surrounding residents . Build pathways in first Phase. North side, then work southward . Perimeter work . BMX in first stages as it is new to area . It should be a community park first, then can grow to complete its sport park needs . lnfrastructure first . Litfle League first as it is on the north side where the roads are already built, plus there is no Little League at Emerald Glen Park so have the need to build them first CARDUCCI & ASSOCIATES, INC. 555 BEACH STREET SAN FRANCISCO, CA 94133 (415) 614-0990 FAX (415) 674-0999 www.carducciassociates.com david@carducciassociates'com LANDSCAPE ARCHITECTURE o PLANNING o URBAN DESIGN O IRRIGATION DESIGN 5 Possibly have the section of Lockhart from Gleason to upper entry be built, as to provide access to upper terrace and Little League fields Because Central Parkway might happen first, then maybe use lower parking with sloped walks or roads leading up to upper terrace (Little League Fields), then fill in as if in north/south halves(build eastern half first) Just make it usable whatever parts are possible End of Meeting Notes Attendees are to notify Carducci & Associates, lnc., in writing, of discrepancies in these rninutes. CARDUCCI & ASSOCIATES, INC. 555 BEACH STREET SAN FRANCISCO, CA 94133 (415) 614-0990 FAX (415) 674-0999 www.carducciassociates.com david@carducciassociates'com LANDSCAPE ARCHITECTURE o PLANNING o URBAN DESIGN O IRRIGATION DESIGN a a a 1 MEETING NOTES cAx Date: To: Job Name Job # Re By 10-8-04 Herma Lichtenstein Fallon Ranch Sports Park DU803-02 Task Force Meeting #4 Tonv Esterbrooks On Wednesday, October 6, 2004 a fourth public meeting was held with the Task Force to review the preferred scheme and get input from the Task Force and approval to continue with the proposed plan. Refer to the attached Agenda. Attendees Name Affiliation X Diane Lowart (DL)City of Dublin X Herma Lichtenstein (HL)Citv of Dublin X Rich Jochner (RJ)City of Dublin Anthony Casadonte (MC)Dublin Ranch HOA (President) lgnatus Chinn (lC)Summer Glen HOA Rov Chowdhuri (RC) Greq Duncan (GD)Summer Glen HOA X Alan Elias (AE)Dublin Ranch David Galli (DG)Dublin Ranch, Dublin United Soccer League Michele Haubert (tMH)Dublin Ranch X Diane Hudson (DH)Bocce, Dublin Little League Jim North (JN)Dublin Little Leaque Arlene Elizabeth Raffo (AR)Summer Glen HOA (CFO) X Kimberlv Roth (KR)Dublin Green X Ellen Silky (ES)Dublin Ranch, Dublin Little League X Anupam Sinsh (AS)Northern California Cricket Association (Vice President) Karen Y. Wanq (KW)Greenbriar Eric Weinhasen (EW)Dublin Ranch [Varv Senior Center X Dave Chadbourne (DC)Developer (Mac Kay & Somps) Jeff Lawrence (JL)Developer (Braddock & Logan) X Shane Huntoon (SH)Special Interest Group lPtvlX) X Richard Guarienti (RG)Parks and Community Services Commission x Connie t\4ack (CM)and Cultural Arts Commission Paul Silvas (PS)Senior Center Ad committee X Brandon Chapin (BC)Youth Advisory Committee X Vince Lattanzio (VL)Carducci Landscape Architects X Bill Fee (BF)Carducci Land Architects X Jin Kim (JK)Carducci Architects X Tony Esterbrooks(TE)Carducci Landscape Architects CARDUCCI & ASSOCIATES,INC. 555 BEACH STREET SAN FRANCISCO, CA 94133 (415) 614-0990 FAX (415) 674-0999 www.carducciassociates.com tony@carducciassociates'com LANDSCAPE ARCHITECTURE o PLANNING o URBAN DESIGN O IRRIGATION DESIGN 2Fallon Sports Park The following were comments from individualTask Force members in attendance: DRAINAGE . Ensure that drainage is effective on ball fields. Subsurface drainage will be used that ties into a main storm drain lineo Concern with Ted Fairfield Park and the fact that it does not drain well. Task force does not want this situation at Fallon Sports Park. Synthetic turf is a permeable surface and will work well with drainage plan BtMX . A rough grade for the BMX course can be used initially LIG ING Most of the lighted sports fields lighting would be constructed during Phase 1. There is concern that adjacent future neighbors would be upset with construction of sports lighting after the purchase their property. lt is better for lights to already be present before new developments are finished near lighted sports fields a NEIGHBORHOOD CONNECTIONS. Toll Brothers will start development on the west side of the site. They will be responsible for the curb and stream corridor along Lockhart linking Lockhart Lane from curb to stream corridor PLAY AREA The consideration of a tot lot near the Little League and softball hubs may be dangerous due to balls flying into the play areas a ADDITIONAL ITEMS. lncorporation of a space or opportunity for on-site staff to manage park facilities. Due to large size of park, it may be important for someone to be present to monitor the park. Need to understand that the park stays on track as a sports park before considering other items PHASING . Phase 1 to include 2 Little League fields and 2 lighted softball fields. Two lighted and synthetic turf Soccer fields should be included in Phase 1 due to a high demand as well r Most lighted fields should be built first o lnclude the priority of demand/need for Phase 1. For example phasing must meet demands for Dublin and East Dublin Little League. There is currently high demand for Little League and that demand will most likely continue to grow. Little league can use softball fields as a temporary solution . BMX course can be a rough graded area included in Phase 1 . The time frames for each should be determined by next meeting. Mostly depends on the funding available, but are probably look at 2-3 years for each phase . Come to final conclusions on Phase 1 without having to be locked into Phases 2 and 3, leave the rest open for future phases . Phasing for alternative 1 looks good End of Meeting Notes Attendees are to notify Garducci & Associates, lnc., in writing, of discrepancies in these rninutes. CARDUCCT & ASSOCTATES, rNC. 555 BEACH STREET SAN FRANCISCO, CA 94133 (415) 674-0990 FAX (4r5) 674-0999 www.carducciassociates.com tony@carducciassociates.com LANDSCAPE ARCHITECTURE o PLANNING o URBAN DESIGN O IRRIGATION DESIGN 1 MEETING NOTES AACH Date: To: Job Name Job # Re By 1 1-03-04 Herma Lichtenstein Fallon Ranch Sports Park DUB03-02 Task Force Meeting #5 Dave Andrews On Wedn esday, November 11,2004, a fifth public meeting was held with the Task Force to review the final plan Phasing Plan and provide an opportunity for them to select their preferred design components that they would like to see in the park if there are budget restrictions that may call for their deletion. Attendees Name Affiliation X Diane Lowart (DL)City of Dublin X Herma Lichtenstein (HL)City of Dublin Rich Jochner (RJ)City of Dublin Anthony Casadonte (MC)Dublin Ranch HOA (President) lqnatus Chinn (lC)Summer Glen HOA Roy Chowdhuri (RC) Greg Duncan (GD)Summer Glen HOA X Alan Elias (AE)Dublin Ranch David Galli (DG)Dublin Ranch, Dublin United Soccer League Michele Haubert (MH)Dublin Ranch X Diane Hudson (DH)Bocce, Dublin Little Leaque Jim North (JN)Dublin Little Leaque Arlene Elizabeth Raffo (AR)Summer Glen HOA (CFO) X Kimberly Roth (KR)Dublin Green X Ellen Silky (ES)Dublin Ranch, Dublin Little League X Anupam Singh (AS)Northern California Cricket Association (Vice President) Karen Y. Wanq (KW)Greenbriar Eric Weinhagen (EW)Dublin Ranch Mary Senior Center X Dave Chadbourne (DC)Developer (Mac Kay & Somps) Jeff Lawrence (JL)Developer (Braddock & Logan) X Shane Huntoon (SH) X Richard Guarienti (RG)Parks and Community Services Commission X Connie t\tlack (Ct\4)Heritaqe and Cultural Arts Commission Paul Silvas (PS)Senior Center Advisory committee Brandon Chapin (BC)Youth Advisory Committee X Vince Lattanzio (VL)Carducci Landscape Architects X Bill Fee (BF)Carducci Landscape Architects X Jin Kim (JK)Carducci Landscape Architects X Dave Andrews (DA)Carducci Landscape Architects CARDUCS & ASSOCIATES,INC. 555 BEACH STREET SAN FRANCISCO, CA 94133 (415) 674-0990 FAX (415) 6'74-0999 tony@ carducciassociates. comwww.carducciassociates.com LANDSCAPE ARCHITECTURE o PLANNING O URBAN DESIGN O IRRIGATION DESIGN Special lnterest Group (BtVX) 2 Trellis Expansion refers to the expansion at the soccer area, the bocce area, and the volleyball area Little League and softballwill have shade structures What are the parameters to make something cost effective (i.e. scale of item's price)?. More an issue of what the needs and wants are.. For example - synthetic soccer fields may be one of the most expensive items, but the budget will be adjusted if people really want it Why is synthetic important or wanted?. Can play in rain...the field does not get damaged as natural turf does and is ready to use immediately The City will find a way to make budget happen if people want it SH - Water Features are very important (particularly for summer) Some items could be added later but some can't be. But could add bocce or par course latero But special paving it would be best to add now. Could add trellis later. Water feature might be able to be piped and added later, but still may not be best ideao Synthetic turf needs to be done now...not later Other par courses have been taken out...people not really using. How big would this be...would it be strung out along the trail or concentrated. Long courses typically don't get used as much...concentrated equipment seem to be bettero This one would be concentrated CARDUCCT & ASSOCTATES,INC. 555 BEACH STREET SAN FRANCISCO, CA 94133 (4t5) 614-0990 FAX (415) 674-0999 www.carducciassociates.com tony@carducciassociates.com LANDSCAPE ARCHITECTURE o PLANNING o URBAN DESIGN O IRRIGATION DESIGN SECTION IX. APPENDICES C. TASK FORCE DESIGN CONCEPTS ccr & Assocl :t -.'] I i SAN FRANCISCO, CATIFORNIA \-r a t 1 ltl ,r'. 'ra rf-..l-l . r .-il': -\\ \ ;tIt .i " '^"t*ot \ UBtI cAr-ORNI lXc-l / BLUE TOTAI. (weighted) $ uraera e, az. at) *t) ffi ffi oo o - o SCHEME A -.rr) a- l-..fP BtUE RED TOTAT (rveighred) 3 t8 Sa,.u TENN(9 W€tWd- wx ffis-wffi & ffi o & & ffi SCHE'I'IE B RED BtUE IOTAL (weighred) 2 ro L' @ o4ffio 'ffi SCHEME C I l(l o RED GREEN 2 t BLUE TOIAL (weighted) offi$ffi SCHEME D t GREEN BLUE o 3 2RED @ (weighted) o & o ,\lJ4 ffi ;.i;$irw 1 ,ffi SCHEME E I RED GREEN TOTAT o 3 5 t BtUE (weighted) -r7 $ =,ooN-o € --,i{l .ffi @& SCHEINE F RED GREEN BLUE TOTAT (weighted) ow &SCHEME G d. TASK SECTION IX. APPENDICES FORCE MEETING HANDOUTS coNTEXT (TNTRODUCTORY MEETTNG) srTE ANALYStS (tNTRODUCTORy MEETTNG) IIVIAGERY 1&2 (MEETING 1) MASTER PLAN (MEETING 5) IMAGERY PLAN (tvlEETtNG 5) LTGHTTNG DTAGRAM (rvlEETrNG 5) GRADTNG PLAN(MEETTNG s) srrE SECTToNS (MEETTNG 4) PHASTNG PLAN (MEETTNG 5) ARDUCCI & A TES SAN FRANCISCO, CATIFORNIA tNc (4 #\\b(\l! t , lll'rl.':ra tI tar({'Ar : FOR,N I ( t .^- a ryr'1;,. ,- I { i It a T a:i .-_n\. :l' ' "'\'\ DUBTI lxd-r VICINITY AND EXISTING CONDITION mEiSiI FUTURE DEVELOPMENT LOCATION AAAP FALLON SPORTS PARK SITE ANALYSIS,.aq,R\.i'Jl\v^iul!.:,\.2^\./rl'r\H#Dublin, Colilornio H .fu. l i I :- Et tI ir W Pork Site ar.o t -.,, Streom (ror w''d5l {.aACr t\i\ '.i ,: {E} Follon Rod (E) TOPOGRAPHY ffi lortssxororernn r16.r.r F sPoTafv^TtoNs @ aroFo*oroaostot ETATloI{S GEOLOGY ITTICAL FIII LAIOSUO€ D€16 cou.ww AIIJVIUM TASSUTi FOIMAIE| o 60R|NG rocATroN g e!4 'd..r.e !@ - @ L.!r*.aqAn<< 60' Pio. SITE PLAN i l DlMuNq HYDROLOGY r-- SlV U --- IEE WIND/SUN -.-j) pcrvruro vaNo E-Oaq ffi EQUINO}L DAY . NIGIII N SOI.STICE: tolr6Es' 0AY3 N *l-i\s JUNE HIG}I€sI $JN AIIITI,OI URCH /, a EOUnOft OAY - l{lGlfl N SOISIKE: S}IORIESI o^YS N DECEilt T rowEsr sl.r [rmro€ Wnd Sts.dr {Colmt: 7.5fl cd.r o5 a r.tr., rJU 5rr.l aO12 t, Gbr ol a :1r.. o.lr.r o! r ,r-r.. ld6 | .^. ll@s ADJACENT LAND USE AND VIEWS SOUTH VIEW OT ItlE MOUNTAINS )**ltru $msEx FALLON SPORTS PARK Dublin, Colilornio JI I I \ il il J I I I filidq ffi F kl -l--= -l# flfrr[ I-il 9-.1 T .t+ !+ {6^68}OW#? SITE ANALYSIS il ff: I {i GY'fli \ EAST VIEW OF THE HIII.S I I I DUBI. IN FIRE STATION SITE IMAGERY PEDESTRIAN PATH I PAVILION WATER BRIDGE STREAM CORRIDOR IAAAGERYFALLON SPORTSfABK Dublin, Coli{omio EAST VIEW OF THE HIttS OF THE [1 OUNT.A,I Ii5 ry SO UT H VI,EW *ffi ffi::l;l h L 1'n u I RANCH H 7 s -l n€ r I * E fl', e rf ra BASEBALL TERRACE SEATING CIRCULATION SOFTBALL LITTLE LEAGUE SOCCER BMX II VOLLEYBALL f,ffi BASKETBALL FALLON S BOCCE PLAY AREA IAAAGERY w4 I.,# sffi7- ,@ Dublin, Colifornio RTS PARK ffi'::[:ll:_:lt- "ll r- f r . ;l - NATURAL SYNTHETIC * I a ) t t { a t{ t p \) \ flta )r^rhl tlstNTHaTtc t\,I ! lStNTHaTtC i1 Vr'l FAttON SPORTS PARK lli -_-lll l[,,,.,,-,, MASTE i.i \1' ' ':; 1t1 PLAN T ',l l. ! ,\ ""A \,r' !1.I 9 Y o*f t, o vi ,rrrr, "ro,!f..oaN3rrr raroaN7l^L I o!"rr' rrsroEI,,^L ,rttEr t t' <-dNNt.rr 0 80 160 210 ,I \i oExrrTY rtIlDrNrAr -lf, (} I I I , I ',I T] l -t(\ .t FATTON SPORTS PARK IMAGERY TERRACED SEATING iI ooD ECTION IASEIAII. FIEID \ INTERACTIVE WATER FEAIURE \ HN PI.AY EAUIPMENI CITY OT DUBTIN { \ .- fr rl 1 !['K . ..1 .t t rf H|tt ZZI t \", -l t ar I +€F TERTACE o1I\ I I a- A AI?H ITH EAI EI L \ '*{u t at. \ L ?lcNlc tr'I I Ilr I oL !,lI:T I -t ilcNrc ART -- rt =!* FATTON SPORTS PARK TIGHTING DIAGRAM {LroHra0, Ir6Hrlol tn6nr.0l rE(tra <axEt I16ifto) aocc!t IIYNftaia a !rchrrDl tsrNrHllrc a TENNII CITY OF DUBTIN i.r! cc(r r sro(rlri 0< | /ta .ra ,r7t . at, ara t* |outc!c, rD/o./0r t1 A ) a Iilr\ \ Ui uJ d Y !f) ra!at ltrlaaa tNlaY/. rrEiDrioci) j lrrrrlr 'l I t i,o."tr"ooo ti",lfiti' A- q tv ()I I I A16roi il:;;f/ I 4 d PARKW I IU6XitOl -:aZ I \ \ C e,o 80 160 2lo o FALTON SPORTS PARKRANCH SITE"PERIMETER SECTIONS /8'-1 o o CENTRAI. PA R KWAY l8'.d' BtoswAtE 3: I 5l,OPEl RIPARIAN PTANTING PARKING TOT PTAZA/FtELDS KEY MAP 1/8"-1 l-:'. --j l I LOCKHART LA NE I O' ATH i2'wrDE MULTI.USE PAIH 7O'WIDE STREAM CORRIDOR 1/8"-1', I,OCKHART tAN E 6 I O' PATH 12'WtDE MUtTI.USE PATH 70'WIDE STREAM COR RI DOR 1i-] *( lr <.- (. ..-'r .ll -.'r "t /a"-1 !1 ZO'WIDE STREAM CORRIDOR 3:l SLOPE/RIPARIAN PLANTING 10'3:l TITTTE TEAGUE STOPE 3:l SI.OPE 15',3:1 sr.oPE 3rl SLOPE 153r'l SLOPE SLOPE GTEASON DRIVE 8',t2 PATH SLOPE FIETDS @ ffi F:!F^ d o 1 .J ('\ ) 6', L)\./ ,) l5' i FALLON sEcTtoNs ,. ,1 i,tt-' 2-.\ ":/i utPEtranAcE ler, ,a5 -----rffiE&18.r ,DS LEAGUE CONCESSION coNcEsstoN/ R EsTR O OIA IITTLE TEAGUE ?INES SOfIBAtL FIETDS STREAM CORRIDOR 8'TX IR,ACK FA LLO N R,OA D GLEASON DRIYE rALtO N ROAD CENT*,AL PA R T VfAY --:= L -J- C E NTNAI PARKWA '-t0' DR.oP-orF/ [AWN PANKlNG PtAY AREA RE5T. ROOH SAN D vottEY- BAtL CITY OF DUSTIN "r^ TRET.LlS BOCCE TRErrlS BOCCE rRErLrS TRELI.IS 3: I SI,OFE WALT REST. nooM CIIY OF DUBTIN FALLON SPOR S,PARK GRADING PtAN Y.V ->/', / I , llon frr fo + ,B*d I s tt" rtll !rl lll I trrrl l ' uMtf oF €Rsrio (a ca{qR, -----<' FtNtg{ canraR 6', rxiRvAli FlNrgtr co[tano ${IERVAL) r rN|g{ lfOT EwAi1ON PAI|,{AY ; l:'l Rolv EAsElGllr AeEA LocAnotl I EAgEt'tNrREo.EgrAREALo/-Aaor , !f , , /l :- . w I t( I tffiffi1ffi ,o '/ \\:-// \.J '/ ::" I 'l 65 lr0 + T I ,t = 6s tr r0 I IU @ !^4 al ,, tr rrarirlrr, 0 a0 160 \ I I I I I I I \, aBsro a rl36rE Nc ra! [Gi:l@ ar. rrd u nsrrc u a.rtrr.rr ataar.ot arr at. o.a ocaltar ro a/0. e )-' -i ( , ,,-.- I -- ll .rt FATTON RANCH SPORTS PARK PHASING DIAGRAM N \\ \'\' PHASING CONCEPT TOU.OW ROAD DEVEI.OPMENT PRcllr'IDE A VARIEIY OT fACII-ITIES AND USES 8UII.D TIGHTEO fIEI.DS AND COURTS fIRSI TO INCREASE usAlLlIY PROVIDE TEMPORARY CONSIIUCNON ACCESS Off fAIION ROAD FOR SUBSEOUENT P}IASE DEVEI.OPMENT ROAD AND STREAM CORRIDOI D EV E tO P M E NT . (FrscAr.YEAnl GI.EASON DRIVE . COMPIEIED tocxHART tANE. COMPIETE 2005/2006 SNEA,M CORRIDOR. CONSIRUCT AI.ONG WIIH I"OCKHART I.ANE ONCIUDING SIREAM CORRIDOR ON GI,EASON DRI\ FAI.I,ON ROAD. NORTHERN HATf Of ROAD, 54' RCP, AND SOUTHERN HAlf MASS GTADING, PI.US 2 IANES . coMPtEIE 2OOal2005 .wtDEN AND COMptETE FAU"ON ROAD 200,6/2007 CENTRA| PARKWAY. COMptEIE 200612007 PHASE I PEDESIf,IAN BRIDGE TWO I.ITNE EAGUE FIETDS WTH ASSOCIATED PTAZA, PICNIC, AND RESIROOM/CONCESSTON TWO TIGHTED SOFIIAU TIEIDS wlIH ASSOCIATED PIAZA, PlcNrc, AND RESTnOOM/CONCESSTON FOUR TIGHIED IENNIS COURTS FOIJR I.IGHTED IASKEIBAI COURIS IWO I.IGHTED NATURAT TURF SOCCER FIEI-DS WITH SYNTHEN( ruRF (oPTtoNArl ART AND WATET TEATURES UPPER IERRACE PARKING IOT UPPER IERRACE IOOP WALXING IRAII UPPET IERRACE PARK IDENTIFICATION FEATURES aMx couRst . ROUGH GIADING IN PHASE I SUBSEQUENT PHASES (ORDER OF DEVEI.OPMENt IO BE DETERMINEDI UPPET IETNA€I . ACnVIIY HUB (rNcLuDlNG PlcNtc PtAzA, PtAY AREA, AND RESInOOMSI . TWO l.lTrG TEAGUE tlEtDS . TWO SOFIBATI tlELDS . BMX COURSE . NEIGHIORHOOD CONNECIIONS . PROVIDE TEMPORARY CONSTRUCIION ACCESS OfF OF fAI.I.ON ROAD lowElrERn cE . PARKING AI.ID ACIIVITY HU8 [NCtUD|NG, nCNtC PIAZA, PIAY AREA, AND RESInOOMS . TWO IIATU&A| TURF SOCCER flEIDS Wlfi CRICKEI OVERT/ . ONE IIGHTED lAsElALL tlELD . FOUI I.IGHIED BOCCE COURIS TWO ADDTTTONAI UGHIED BOCCE COUTTS (OPflONAI . FOUI SAND vOl.l,EYBAtl COURTS . AlI AND WATER fEATRES . NEGHSORHOOD CONNECNONS . PATK IDENN'ICATION FEAruRES . COMPTETE UPPER AND TOWER TERRACE o too 2oo 300 I I R TER,R,AC PHAS E \: r:ATUla a aoxxacTron I,l-\ ( I a ,{ tl a, *a P AR rwA Y i^.. c rLF o CITY OF N \\,ax0!6 asso(l^frt,r(trt*.cnnrrEral{rtooi llrrr^x<rtco c...lI utol.or D/0rl0.I f-- -l -i-- ,i\ E lr lli t\ II L.I \.o 1t {o , o 4o ASE I q{ i.,,\i VI-!, uttat tatlaca txtat .I'i tttltl i ?**r-rjlt E t.tr 1 SECTION !X. APPENDICES E. IRRIGATION AND RECYCLED WATER DEMAND ANALYSIS DUBLIN SAN RAMON SERVICES DIS- TRICT WATER FLOW AND PRESSURE INFORMATION CARDUCCI & I I i I I SAN FRANCISCO, CAI.IFORNIA J, ::-+.k i,,=-:- -)t? l. t,-/ t B (r J' 1 ra ! i. "l 'i - I { i T t 'i !atiwAl ,.t; l,i\\. ''. -..,L- P DUBI. I CAtiFORNI lXe-l Analysis of the lrrigation Water Requirements Fallon Sports Park CAR I-AN The following is an analysis of the irrigation water requirements for the Fallon Sports Park. The analysis is based on the following data: Approximate park area: 62.44 acres Approximate turf area: 40.00 acres Approximate unplanted area: 22.44 acres 1 cubic feet of water = 7 .48052 gallons Irrigation water will be recycled water. Recycled water static pressure is approximately 130 psi at the corner of Fallon Road and Gleason Drive and 74 psi at the corner of Central Parkway and Lockhart Street according to the memos dated 3-22-OS from Rudy Portugal of the Dublin San Ramon Services District. This analysis ignores the use of synthetic turf for two soccer fields (3.67 acres). Synthetic turf would save water consumption and optimize maintenance resources and reduce impacts of overuse of the other turf fields. Park Acres Street Frontage Acres Turf Acres Phase 1 26.42 0 17.00 Upper Terrace Phase 1 4.4 1 0.68 11.00 Lower Terrace Phase 1.18 12.00 Total 60.58 1.86 40.00 The maximum evaporation rate would be approximately 0.25 inches per day or 7 .75 inches per month (July). The plant factor for turf would be 80% of the maximum evaporation rate. The irrigation efficiency would be B0%. The watering window would be 10 PM to 6 AM or B hours. I;HH[:I[:B?ti:H:331?T5l% 80 prant factor divided by 0 80 irrisation efficiency x27,1?4sailons per acre inch = 271,154 gallons per day. 8-hour window requirements: 271,154 gallons per day divided by 480 minutes = 565 GPM or approximately 600 GPI\/ provide two irrigation water connections, two at the upper terrace to make use of the static water pressure for recycled water of approximately 130 Psi. Phase 1 and Upper Terrace Turf summer irrigation requirements: 2g.00 acres x O.2S inches per day x 0.80 plant factor divided by 0.80 irrigation efficiency x 27 ,154 gallons per acre inch = '190,078 gallons per day. CARDUCCI & ASSOCIATES,INC. 555 BEACH STREET SAN FRANCISCO, CA 94133 (415) 614'0990 FAX (4I5) 674-0999 www.carducciassociates.com bill@carducciassociates'com LANDSCAPE ARCHITECTURE o PLANNING o URBAN DESIGN O IRRIGATION DESIGN 19.75 8-hour window requ irements: 190,078 gallons per day divided by 480 minutes = 396 GPIVI or approximately 400 GPM Lower Terrace Turf summer irrigation requirements: 12.00 acres x 0.25 inches per day x 0.80 plant factor divided by 0.80 irrigation efficiency x 27 ,154 gallons per acre inch = 81,462 gallons per day. B-hour window requirements: 81,462 gallons per day divided by 480 minutes = 170 GPM or approximately 200 GPM CARDUCCI & ASSOCIATES, INC. 555 BEACH STREET SAN FRANCISCO, CA 94133 (415) 674-0990 FAX (415) 674'0999 www.carducciassociates.com bill@carducciassociates'com LANDSCAPE ARCHITECTURE o PLANNING o URBAN DESIGN O IRRIGATION DESIGN a.n p.nURGENT Need By: Request Taken By: Dublin San Ramon Services District 7051 Dublin Blvd., Dublin, CA 94568 Telephone: (925) 828-0515 FAX: (925) 829-1T80 RCP Initials FACSIMILE INFORMATION TRANSMITTAL WATER FLOW AND PRESSURE INFORMATION REQUEST No. of Pages (incl. transmittal page): I Date of Request: Date of Response: 3-22-05 To: Name Herma Lichtenstein Company City of Dublin Response Rudy Portugal Phone 833-6645 by:Assistant Engineer FAx 833-6651 Location (Address & Cross Streets): 925-875-2251 Fallon Sports Park - Fallon Road & Gleason Drive - Potable Water Pressure Zone 2 Recycled Water Pressure Zone 2 In response to your request, we ran our hydraulic model to determine water pressures at the above noted location. The results are as follows: Potable Water: Static Pressure Residual Pressure Recycled Water: Static Pressure Residual Pressure 90 psi psi at a flow of psi psi at a flow of 1500 gpm gpm 87 130 Actual water pressures may vary depending on delivery pressures from water wholesaler (Zone 7), system demands, and the dYnamic status of facilities. This information does not relieve Requestor of to due Actual field test is recommended. Should you have additional questions, please contact us at the above number- A dditio n al n otes/com m ents : HTUSERS\BIAGTANSOWS\I-irenoW Requst Fom.doc 3-23-05 a.m, p.m. URGENT Need By:Request Taken By: Dublin San Ramon Services District 7051 Dublin Blvd., Dublin, CA 94568 Telephone: (925) 828-0515 FAX: (925) 829-1180 RCP InitialsDate FAC SIMILE INFORMATIOI\ TRAI{SMITTAL WATER FLOW AND PRESSURE INFORMATION REQUEST No. of Pages (incl. transmittal page): I Date of Request: Date of Response: 3-22-05 Herma Lichtenstein 3-23-05 City of Dublin Response Rudy Portugal 833-664s by Assistant Engineer 833-66s 1 925-875-2251 Fallon Sports Park - Central Pkwy & Lockhart St - Potable Water Pressure Zone 2 Recycled Water Pressure Zone I To: Name Company Phone FAX Location (Address & Cross Streets): In response to your request, we ran our hydraulic model to determine water pressures at the above noted location. The results are as follows: Potable Water: Static Pressure Residual Pressure Recvcled Water: Static Pressure Residual Pressure 13s psr psi at a flow of psl psi at a flow of 1500 gpm gpm t28 74 Actual water pressures may vary depending on delivery pressures from water wholesaler (Zone 7), system demands, and the dynamic status of facilities. This information does not relieve Requestor of to due Actual field test is recommended. Should you have additional questions, please contact us at the above number. Additio n al n otes/c o mm ents : H:\USERSBhGTAN$ORMS$ireoow Rquest Fom.doc SECTION IX. APPENDICES f. COST ESTITUATE ASSOCIA SAN FRANCISCO, CAI.IFORNIA (r{\ E tI ra I I \ t_ { j f ; ;I fr I rt : rix\ .r, ._.':\ DUBUf.+' CAUFORNI..Y txf-l OPINION OF PROBABLE COSTS . Fallon Sports Park Cost Estimate Summary Item Cost Estimate Summary Phase 1 $9,531,468 Upper Terrace Phase $4,970,293 Lower Terrace Phase $5,636,530 Total Park Construction Costs $20,138,291 1 OPINION OF PROBABLE GOSTS - Fallon Sports Park PHASE 1 Item Qty Unit Cost T"t"il Phase 1 Construction (26.42 acres) 1. Little League Field (2) Backstop Grading lnfleld Mix & Warning Track Lawn & lrrigation Score Keeper's Booth Scoreboard Dugouts Bullpens Foul poles Bleachers Trench Drain Perimeter Fencing & Mowband Subsurface Drainage 2. Softball (2) Backstop Grading lnfield Mix & Warning Track Lawn & Irrigation Score Keeper's Booth Scoreboard Dugouts Bullpens Foul poles Bleachers Trench Drain Perimeter Fencing & Mowband Subsurface Drainage Softball Field Lighting 3. Basketball Court Fencing AC Paving w/ Color Course Backboard / HooPs Basketball Court Llghts 4. Soccer Field( Natural Turf) (80,000 SF) Grading, Lawn & lrrigation Sand Drainage Goals Soccer Field Lighting 5. Tennis Tennis Center Striping AC Paving w/ Color Course Fencing Nets Tennis Court Lighting 2 91,000 26,000 65,000 2 2 4 4 4 4 350 1,300 2,200 2 174,000 46,000 128,000 2 2 4 4 4 4 350 2,000 2,200 1 4 $100,000 $91,000 $52,000 $130,000 $40,000 $40,000 $40,000 $40,000 $12,000 $16,000 $17,500 $52,000 $66,000 $100,000 $174,000 $92,000 $256,000 $40,000 $40,000 $40,000 $40,000 $12,000 $16,000 $17,500 $80,000 $66,000 $200,000 $200,000 EA EA EA EA EA EA EA EA EA EA LF LF LF EA EA EA EA EA EA EA EA EA EA LF LF LF LS EA LS EA LS EA 1 2 1 4 $s0,000.00 $1.00 $2.00 $2.00 $20,000.00 $20,000.00 $10,000.00 $10,000.00 $3,000.00 $4,000.00 $50.00 $40.00 $30.00 $50,000.00 $1.00 $2.00 $2.00 $20,000.00 $20,000.00 $10,000.00 $10,000.00 $3,000.00 $4,000.00 $50.00 $40.00 $30.00 $200,000.00 $50,000.00 $46,000.00 $320,000.00 $332,400.00 $60,000.00 $46,000 $640,000 $332,400 $240,000 1 LS $90,000.00 $e0,000 1 OPINION OF PROBABLE COSTS - Fallon Sports Park PHASE 1 00,000 7. Restroom / Concession Structure -Prefabricated 8. Shade Structure 9. Conc Curb at Parking Lot '10. Parking Lot (259 cars) Striping & Signage Wheel Stops Accessible Parking Grading 11. Conc Paving 12. Conc Paving 13. Upper Entry Drive Asphalt Paving Concrete Paving 14. Upper Terrace Entry Feature 15. Signage / ldentity Feature 16. Conc Steps & Handrails 17. Upper Terrace Culvert Entry Gateway / Railing AC Paving 18. LowerPedestrian Entry Pedestrian Brid ge-Prefabricated Special Conc Paving Conc Paving Pilasters 19. Conc Paving for paths due to slopes 20. BBQ Grills--Small 21 . Picnic Table--Square (Upper Terrace) 22. Seatwalls 23. Bench 24. Bike Rack 25. Storage Container 26. Drinking Fountain 27. Fire Hydrant 28. Drain lnlet 29. Storm Drainage 30. Sanitary Sewer 31. Electrical Service 32. Underground Electrical Work 33. Pathway Lights 34. Concession/ Restroom Building (Electrical/ Lights) 35. Restroom Building (Electricau Lights) 36. Parking Area Lights 37. Potable Water Service (1 Connection) 38. Potable Water SYstem 39. Fire Service (1 Connection) 40. Recycled Water Service (1 Connection) 41. Telephone Service 2EA 2EA 2,625 LF 94,835 SF 15,288 SF 119,707 SF $200,000.00 $25,000.00 $20.00 $4.50 $400,000 $50,000 $52,500 $426,758 $99,372 $658,389 $21,740 $45,078 $50,000 $100,000 $59,625 $150,000 $200,000 4,831 $6.50 $5.50 $4.50 $6.50 $50,000.00 $50,000.00 $75.00 $150,000.00 1 LS $200,000.00 SF SF LS EA SF LS 6,935 1 2 795 1 3,200 sF 4EA 8EA 75 CY 50 EA 6EA 3EA 6EA 1EA 24 EA 1LS 1LS 1LS 1LS 1LS 1LS 1LS 1LS 1LS 1LS 1LS,I LS 1LS $6.50 $300.00 $1,500.00 $1,000.00 $1,500.00 $1,500.00 $4,000.00 $s,000.00 $10,000.00 $1,500.00 $300,000.00 $50,000.00 $67,500.00 $200,000.00 $65,000.00 $22,580.00 $6,000.00 $54,400.00 $20,000.00 $28,000.00 $15,000.00 $20,000.00 $10,000.00 $20,800 $1,200 $12,000 $75,000 $75,000 $9,000 $12,000 $30,000 $10,000 $36,000 $300,000 $50,000 $67,500 $200,000 $65,000 $22,580 $6,000 $54,400 $20,000 $28,000 $15,000 $20,000 $10,000 2 OPINION OF PROBABLE COSTS - Fallon Sports Park PHASE 1 Item Unit 1LS 375,332 SF 1,049 EA 1LS 1LS 375,332 SF Cost 1.00 $50,000.00 $1.00 $2s0.00 $10,000.00 $46,000.00 $0.15 Total $375,332 $50,000 $37s,3s2 $262,250 $10,000 $46,000 $56,300 42. Lawn (Excludes Fields) 43. lrrigation Controllers 44. lrrigation 45. 24" Box tree 46. SWPPP/Erosion Control 47. Basketball Court Lights 48. Maintenance (90 days) Subtotal Bonding & lnsurance (2%) Mobilization & General Conditions (5%) Continqency (10% $8,146,554 $162,931 $407,328 $814,6s5 Phase 1 Park Construction Cosfs TOTAL Phase 1 Cost Per Acre $9,531,468 $360,767 Phase 1 Optional ltems Not lncluded in Estimate 1. Soccer Field (Change to Synthetic Tufi (80,000 SF) (Refer to enclosed Operating Cost Analysis) 2 EA $750,000.00 Subtotal Bonding & lnsurance (2%o) Mobilization & General Conditions (5%) Contingency (10%) $1,500,000 $1,500,000 $30,000 $75,000 $150,000 Total Phase 1 Optional ltems Not lncluded in Estimate $1,755,000 Notes: 1) This Estimate excludes utility provider connection fees, Construction Contingency, changes due to unforeseen conditions, work related to hazardous materials, Design Fees, Engineering, Inspection, Testing, and Etc. 2) Unit Costs for elements include a 17o/o mark up for general contractor overhead and profit. 3) All costs shown are 2004/05 costs, 4) Public Art to be determined per phase in conjunction with Council and Heritage and Cultural Arts Commission. 5) ln Providing the Estimate, the Client understands that the Landscape Architect has no control over costs or the price of labor equipment or materials, or over the Contractor's method of prlcing, and that the budget analysis provided herein are to be made on the basis of the Landscape Architect's qualifications and experience. The Landscape Architect makes no warranty, expressed or implied as to the accuracy qualifications and experience. The Landscape Architect makes no warranty, expressed or implied as to the accuracy of such opinions as compared to bid or actual costs. 3 Fallon Sports Park Future Phase - Upper Terrace n Cost $50,000.00 $1.00 $2.00 $2.00 $20,000.00 $20,000.00 $10,000.00 $10,000.00 $3,000.00 $4,000.00 $50.00 $40.00 $30.00 $50,000.00 $1.00 $2.00 $2.00 $20,000.00 $20,000.00 $10,000.00 $10,000.00 $3,000.00 $4,000.00 $50.00 $40.00 $30.00 $200,000.00 $100,000 $91,000 $52,000 $130,000 $40,000 $40,000 $40,000 $40,000 $12,000 $16,000 $17,500 $52,000 $66,000 $100,000 $174,000 $92,000 $256,000 $40,000 $40,000 $40,000 $40,000 $12,000 $16,000 $17,500 $80,000 $66,000 $200,000 $100,000 $100,000 $25,000 $38,000 $4,100 $106,990 $480,348 $121,950 $45,500 $127,500 $6,000 $1,500 $e00 $10,000 Upper Terrace Phase - Park Construction (14.41 acres) 1. Little League Field (2) Backstop Grading lnfield Mix & Warning Track Lawn & lrrigation Score Keeper's Booth Scoreboard Dugouts Bullpens Foul poles Bleachers Trench Drain Perimeter Fencing & Mowband Subsurface Drainage 2. Softball (2) Backstop Grading Infield Mix & Warning Track Lawn & lrrigation Score Keepe/s Booth Scoreboard Dugouts Bullpens Foul poles Bleachers Trench Drain Perimeter Fencing & Mowband Subsurface Drainage 3. BMX Course (62,858 SF) Earthwork Starting Pavilion Bleachers Conc Paving Drainage Fencing Soil Amendments 4. Upper Adventure Playground (2,260 SF) 5. Restroom Structure (2 Fixtures) -Prefabricated 6. Shade Structure 7. Seatwalls 8. Conc Curb 9. Conc Paving (Special Paving Optional) 10. Conc Paving 11. Conc StePs & Handrails 12. Conc Paving for paths due to slopes 13. Trellis-Picnic PlaY Area 14. Tree Wells 15. BBQ Grills--Large 16. BBO Grills--Small 17. Picnic Table--Rectangular (Upper Terrace) 2EA 91,000 EA 26,000 EA 65,000 EA 2EA 2EA 4EA 4EA 4EA 4EA 350 LF 1,300 LF 2,200 LF 2EA 174,000 EA 46,000 EA 128,000 EA 2EA 2EA 4EA 4EA 4EA 4EA 350 LF 2,000 LF 2,200 LF 1LS 1LS 1EA 1EA 38 CY 205 LF 16,460 SF 87,336 SF 1,626 SF 7,000 sF 1,275 SF 30 EA 1EA 3EA 4EA $100,000.00 $100,000.00 $25,000.00 $1,000.00 $20.00 $6.50 $5.50 $75.00 $6.50 $100.00 $200.00 $1,500.00 $300.00 $2,500.00 1 Fallon Sports Park Future Phase - Upper Terrace Item 18. Picnic Ta 19. Bench 20. Bike Rack 21. Storage Container 22. Drinking Fountain 23. Drain lnlet 24. Storm Drainage 25. Sanitary Sewer 26. Underground Electrical Work 27. Pathway Lights 28. Potable Water System 29. Lawn (Excludes Sport Fields) 30. lrrigation Controllers 31. lrrigation 32. 24" Box tree 33. 15 Gallon tree (Slope Planting 34. SWPPP/Erosion Control 35. Maintenance (90 days) Unit 00 $1,500.00 $1,500.00 $4,000.00 $5,000.00 $1,500.00 $150,000.00 $25,000.00 $41,000.00 $35,500.00 $25,000.00 $1.00 $25,000.00 $1.00 $250.00 $100.00 $7,000.00 $0.15 Subtotal Bonding & lnsurance (2%) Mobilization & General Conditions (5%) Contingency (10%) Total 18,000 $19,500 $4,500 $8,000 $1s,000 $18,000 $150,000 $25,000 $41,000 $35,500 $2s,000 $275,039 $25,000 $275,039 $78,750 $30,000 $7,000 $41,256 r Terrace)12 EA 13 EA 3EA 2EA 3EA 12 EA 1LS 1LS 1LS 1LS 1LS 275,039 SF 1LS 275,039 SF 315 EA 3OO EA 1LS 275,039 SF $4,129,372 $82,587 $206,469 $412,937 Upper Terrace Phase - Park Construction Costs Upper Terrace Phase - Street lmprovements (0.68 Acres) Construction 1. 24" Box tree 2. Concrete Paving 3. Lawn 4. lrrigation 5. [\tlaintenance (90 days) Subtotal Upper Terrace Phase Gost Per Acre 37 EA 11,736 SF 16,960 SF 16,960 SF 16,960 SF Subtotal Bonding & lnsurance (2%) Mobilization & General Conditions (5%) $4,831,36s $335,279 $9,250 $64,548 $16,960 $25,44o $2,544 $250.00 $5.50 $1.00 $1.50 $0.15 $118,742 $2,375 $5,e37 $11,8741 D. Upper Terrace Fallon Rd. Street lmprovement Construction Costs Subtotal tJpper Terrace Phase Park & Sfreef lmprovements Construcfion Cosfs Total Itpper Terrace Phase Park & Street lmprovements Cosfs Acre 38,928 $4,970,293 $329,377 2 Fallon Sports Park Future Phase - Upper Terrace Item Qty Unit Cost r"E Upper Terrace Optional ltems Not lncluded in Estimate 1. Par Course - UpperTerrace 2. Upper Water Feature 3. Add Special Conc Paving 4. Trellis--Picnic Play Area 5. BBQ Grills--Large 6. Concrete Fence along Fallon Road 7. Picnic Table--Square (Upper Terrace) Total Terrace Subtotal Bonding & lnsurance (2%) hrlobilization & General Conditions (5%) Contingency (10%) Items Not lncluded in Estimate 1EA lLS 16,460 SF 3,825 SF 3EA 1,467 LF 12 EA $30,000.00 $50,000.00 $3.50 $100.00 $1,500.00 $28.00 $1,500.00 $30,000 $50,000 $57,610 $382,500 $4,500 $41,076 $18,000 583,686 $11,674 $29,184 $5436e $682,913 Notes: 1) This Estimate excludes utility provider connection fees, Construction Contingency, changes due to unforeseen conditions, work related to hazardous materials, Design Fees, Engineering, lnspection, Testing, and Etc. 2) Unit Costs for elements include a 17oh mark up for general contractor overhead and profit. 3) All costs shown are 2004/05 costs. 4) Public Art to be determined per phase in conjunction with Council and Heritage and Cultural Arts Commission. 5) In Providing the Estimate, the Client understands that the Landscape Architect has no control over costs or the price of labor equipment or materials, or over the Contractor's method of pricing, and that the budget analysis provided herein are to be made on the basis of the Landscape Architect's qualifications and experience. The Landscape Architect makes no warranty, expressed or implied as to the accuracy qualifications and experience. The Landscape Architect makes no warranty, expressed or implied as to the accuracy of such opinions as compared to bid or actual costs. J Fallon Sports Park Future Phase - Lower Terrace Item 94,082 EA 94,082 EA 1LS 2,200 LF 4EA 1LS 4EA 1EA 1LS 2EA 1EA 77 CY 3,423 LF 67,941 SF 24,690 SF 138,930 SF 510 SF 5,000 sF Cost $1.00 $2.00 $50,000.00 $30.00 $20,000.00 $28,000.00 $35,000.00 Total $94,082 $188,164 $50,000 $66,000 $80,000 $28,000 $140,000 $700,000 $160,485 $764,1 15 $38,2s0 $32,500 Lower Terrace Phase - Park Construction Costs (-19.75 acres) 1. Future Study Area (1) Grading Lawn & lrrigation Drainage Subsurface Drainage 2. Bocce Court Bocce Court Lights 3. Volleyball Court Sand Subdrainage Fine Grading Conc Border w/ Resilient Paving Nets 4. Soccer Field (Natural Turf) (80,000 SF) Lawn & lrrigation Sand Drainage Goals 6. Cricket Overlay 7. Lower Adventure Playground (1 1,175 SF) 8. Restroom Structure (2 Fixtures) -Prefabricated 9. Shade Structure 10. Seatwalls 11. Conc Curb at Parking Lot 12. Parking Lot (200 cars) Striping & Signage Wheel Stops Accessible Parking Grading 13. Conc Paving (Special Conc Paving Optional) 14. Conc Paving 15. Conc Steps & Handrails 16. Conc Paving for paths due to slopes 17. Lower Entry Drive Asphalt Paving (Special Conc Paving Optional) Concrete Paving 18. Lower Terrace Entry Feature 19. Signage / ldentity Feature 21. Trellis-Lower Entry Plaza 22. Tree Wells 23. BBQ Grills--Large 24. BBO Grills--Small 25. Picnic Table--Rectangular (Lower Terrace) 26. Picnic Table--Square (Lower Terrace) 27. Bench 28. Bike Rack 29. Drinking Fountain 30. Fire HYdrant 31. Drain lnlet 32. Storm Drainage 33. Sanitary Sewer 34. Storage Container 35. Bioswale 36. Underground Electrical Work 37. PathwaY Lights 38. Parking Area Lights 39. Potable Water Service (1 Connection) 40. Potable Water SYstem $5,000.00 $150,000.00 $100,000.00 $25,000.00 $1,000.00 $20.00 $4.50 $5,000 $150,000 $200,000 $25,000 $77,000 $68,460 $305,73s 2 EA $350,000.00 6,808 SF 4,812 SF 1LS 2 EA. 1,275 SF 79 EA 1EA 3EA 4EA 20 EA 38 EA 3EA 3EA 1EA 12 EA 1LS 1LS 5EA 660 LF 1LS 1LS 1LS 1LS 1LS $6.50 $5.50 $75.00 $6.50 $4.50 $6.50 $50,000.00 $50,000.00 $100.00 $200.00 $1,500.00 $300.00 $2,500.00 $1,500.00 $1,500.00 $1,500.00 $5,000.00 $10,000.00 $1,500.00 $150,000.00 $25,000.00 $4,000.00 $40.00 $41,000.00 $35,500.00 $40,000.00 $20,000.00 $25,000.00 $30,636 $31,278 $50,000 $100,000 $127,500 $15,800 $1,500 $900 $10,000 $30,000 $57,000 $4,500 $15,000 $10,000 $18,000 $150,000 $25,000 $20,000 $26,400 $41,000 $35,500 $40,000 $20,000 $25,000 1 Fallon Sports Park Future Phase - Lower Terrace 1 LS $15,000.00 $15,000 42. Recycled Water Service (1 Connection) 1 LS $20,000.00 $20,000 43. Lawn (Excludes Sport Fields) 220,229 SF $1.00 $220,229 44. lrrigation Controllers 1 LS $50,000.00 $50,000 45. lrrigation 220,229 SF $1.00 $220,229 46. 24" Box tree 645 EA $250.00 $161,250 47. 15 Gallon tree (Slope Planting) 300 EA $100.00 $30,000 48. SWPPP/Erosion Control 1 LS $10,000.00 $10,000 49. Maintenance (90 days)220,229 SF $0.15 $33,034 Subtotal Bonding & lnsurance (2%) Mobilization & General Conditions (5%) Contingency (10%) $4,817,547 $96,351 $240,877 $481,755 Lower Terrace Phase - Park Construction Costs Subtotal Lower Terrace Phase Cost Per Acre Lower Terrace Phase - Street lmprovements Fatlon & Central (-.1 .18 Acres) Construction 1. 24" Box tree 115 EA 2. Concrete Paving 17,152 SF 3. Lawn 33,160 SF 4. lrrigation 33,160 SF 5. SWPPP/Erosion Control 1 LS 6. Maintenance (90 days) 33,160 SF $250.00 $5.50 $1.00 $1.50 $7,500.00 $0.15 Subtotal Bonding & lnsurance (2%) Mobilization & General Conditions (5%) $5,636,530 $285,394 $28,7s0 $94,336 $33,160 $49,740 $7,500 $4.974 $218,460 $4,369 $10,923 0% Lower Terrace Phase - Street lmprovements Fallon & Central Subtotal Lower Terrace Phase - Park & Street lmprovements Construcfion Cosfs TOTAL Lower Terrace Park & Street lmprovements Construction Gosts /Acre $21 $5,892,128 281,516 , Total 1. Add Bocce 2. Par Course - Lower Tenace 3. Add Special Conc Paving 4. Lower Water Feature 5. Lower Entry Drive Special Conc Paving 6. Trellis-Lower Entry Plaza 7. Trellis-- Volleyball Area 8. Trellis--Natural Soccer Field Area 9. Trellis-Bocce Area 10. BBQ Grills--Large 1 1. Picnic Table--Rectangular (Lower Terrace) 12. Picnic Table--Square (Lower Terrace) 13. Concrete Fence at Fallon Road 14. Concrete Fence at Central Parkway Total $1 527 Terrace Items Not lncluded in Estimate 2EA 1EA 24,690 SF ,tS $40,000 $30,000 $86,415 $100,000 $20,000.00 $30,000.00 $3.50 $100,000.00 $2s,828 $300,000 $s30,000 $520,000 $210,000 $4,500 $20,000 $48,000 $26,124 $36,400 $1,775,267 $35,505 $88,763 Subtotal Bonding & lnsurance (2%) Irlobilization & General Conditions (5%) Contingency (10%d Items Not lncluded in Estimate 6,808 3,000 3,304 5,200 2JA0 3 I 32 9s3 1,300 SF SF SF SF SF EA EA EA LF LF $3.50 $100.00 $100.00 $100.00 $100.00 $1,500.00 $2,500.00 $1,500.00 $28.00 $28.00 Fallon Sports Park Item Future Phase - Lower Terrace Notes: 1) This Estimate excludes utility provider connection fees, Construction Contingency, changes due to unforeseen conditions, work related to hazardous materials, Design Fees, Engineering, lnspection, Testing, and Etc. 2) Unit Costs for elements include a 17o/o mark up for general contractor overhead and profit. 3) All costs shown are 2004/05 costs. 4) Public Art to be determined per phase in conjunction with Council and Heritage and Cultural Arts Commission. 5) ln Providing the Estimate, the Client understands that the Landscape Architect has no control over costs or the price of labor equipment or materials, or over the Contractor's method of pricing, and that the budget analysis provided herein are to be made on the basis of the Landscape Architect's qualifications and experience. The Landscape Architect makes no warranty, expressed or implied as to the accuracy qualifications and experience. The Landscape Architect makes no warranty, expressed or implied as to the accuracy of such opinions as compared to bid or actual costs. J 1o-Year Cost comparison between a NATURAL GRASS field and a SYNTHETIC TURF field. Natural Grass (sand drainage) lnitial Capital Cost Excavate existing site, install drainage & irrigation systems, install & grow grass (seed/sod) Provide equipment to maintain grass Contractor to maintain field during growing SUATOIAIS Future Capital Costs Field replacement of irrigation & turf, etc. (1 0 years) Periodic equipment replacement SUBTOTALS 't0 yr. Annualized Operation Cost Water and PG & E (Approxiamtely $3,2001 acrelyearl Labor to apply materials, mowing, aerating, divot replacement, area sod replacement (Approxiamtely $1 1,ooo/acre/year) SUBTOTALS TOTALS* of costs for 1 0 with an Local Area Cost f- $rropoo'l l----Tru,ooo1 foot field Syntetic Turf lnitial Capital Gost Excavation, drainage, installation of FieldIufi (2-112" Pro Series) Operating equipment required-roller brush, sweeper and cart SUBTOTALS Future Capital Costs Field replacement is done determining the useful seruice life interval (10 years) Operating maintenance equipment replacement SUBTOIALS 10 yr Annualized Operation Cost Water and PG & E Labor to sweep fleld (Approxiamtely $5,000/year or $100 per week) suaroTALs TOTALS' Area Cost $10,000 s760.000 l--- $s-iool f $4.oool tThese totals do not reflect any income garnered from field rental fees, nor the income lost in rental fees when natural grass fields are closed due to inclement weather, maintenance or time down for repairs; such revenue losses do not occur with a FieldTurf field. |--- $2o.oool |-sr4opool T-J- $ro,ooo'l f-- $$r--ir6o,oool l--- $?5o.oool l---- $4osnool l-- $s4,ood fJ-r-r1r-oool 10-Year Cost comparison between a NATURAL GRASS field and a SYNTHETIC TURF field Both Fields have sports lighting and are available till 10:00 pm each day Natural grass fields are closed in the winter due to rain EItrItrTE]EEre@ 80 weekend days x 1 0 hours per day 800 1 00 weekend days x 'l 0 hours per day 1 000 120 Sorino & Fall weekdavs x 6 hours per dav 720 120 Sprinq & Fall weekdays x 6 hours per day 720 60 Summerweekdays x 10 hours perday 600 60 Summer weekdays x 10 hours per day 600 60 Winter weekdavs x 6 hours per dav 360 TOTALS 2120 Annually 2680 Annually 21200 Over't0 Years 26800 Over 10 Years Athletic Surface Costs Over 10-Year Periot Revenue Data: City of Roseville $135for1-112hours,$325for4hours,$750forfull day(uptol0hours). Useoflightsisanadditional chargeof$15perhour,min1-1/2hours' City of Petaluma The City of Petaluma has told us that their field is rented 360 out of 365 days per year. Their rental rate is $75lhour without lights and $95/hour with lights for "out of towners," $4s/hour without lights and $65/hour with lights to "in-towners" and the local Petaluma soccer club, which may be the majority of their use. City of Folsom The City of Folsom rents their field as well, and it is constantly in use, with rates of $60/hour without lights and $75lhour with lights for "out of towners," $48/hour without lights and $60/hour with lights to "in-towners." Marin Academy The Marin Academy rents out their field to youth groups and the last rental rate I heard was $1 0O/hour per third of the field, adding up to $300/per hour. And I understand they have had waiting lists to rent field time in the winter. Expense Natural Grass Synthetic Turf lnstallation Costs $370,000 $760,000 Replacement Cost $260,000 $405,000 IVaintenance $284,000 $54,000 Total Cost Over 10 Years $914,000 $1 ,219,000 Hours Supportec 21,204 26,800 Cost Per Hour $43 $4s I Fallon Sports Park Electrical Work City of Dublin Est. Description QnW Unit Unit Cost Total Cost Electrica! Service and Equipment: 480 Volt Electrical Service Enclosure and Controls 1 ls 34000.00 34000.00 Transformer pad 1 ea 2000.00 2000.00 Switchboard pad 1 ea 2500.00 2500.00 Access control system and enclosure 1 ea 8000.00 8000.00 Site telephone service 1 IS 3000.00 3000.00 Scoreboard connections and grounding 1 ls 14000.00 14000.00 Scorekeepers booths - light, switch and receptacle 5 ea 800.00 4000.00 $67,500 Underground Electrical Work Underground trenching, backfill and compaction 7500 tf 5.00 37500.00 Concrete sports field pull boxes and ground rods 42 ea 500.00 21000.00 Concrete pull boxes and ground rods 40 ea 300.00 12000.00 Waterproof receptacles outlets 16 ea 500.00 8000.00 I rrigation controller connections 1 ls 1000.00 1000.00 I rrigation booster pump connections 1 ls 9000.00 9000.00 Conduit: 2" PVC sch 40 14000 rf 3.00 42000.00 3" PVC schd 40 't600 tf 5.00 8000.00 4' PVC schd 40 2800 tf 6.00 16800.00 5' PVC schd 40 300 tf 15.00 4500.00 PVC elbows large radius 1 ls 1000.00 1000.00 Special conduit elbows at sports light poles 60 ea 400.00 24000.00 Conductors: No.12 AWG CU THWN No.8 AWG CU THWN 12 CLF 56.00 672.00 135 CLF 85.00 11475.00 No. 6 AWG CU THWN 300 CLF 103.00 30900.00 No.4 AWG CU THWN 300 CLF 112.OO 33600.00 No. 4/0 AWG CU THWN 50 CLF 150.00 7500.00 terminations and 1 ls 6000.00 6000.00 Grou cond and connections 1 ls 7000.00 7000.00 $281,947 Note: u ll boxes, and wi tol is covered round Electrical Worl Little Softball ht Poles: 50/30 fc illumination wheel dual use with I hts banked on both sides of to two fie Pole fu 8 luminaires and bases/concrete 4 21000 84000.00 Pole B/ 16lum and bases/concrete 4 ea 28000.00 1 12000.00 on 8 ea 900.00 7200.00 N tests and of ballfield hts 1 ls 2000.00 2000.00 Softball Poles: 50/30 illumination wheel des dual use with banked on both sides of to ht two acent fields tu8 and bases/concrete 4 ea 2't000.00 B/ 16 luminai and bases/concrete 4 ea 28000.00 1 12000.00 Pole C/ l2luminaires,and bases/concrete I ea 24000.00 192000.00 on I ea 900.00 7200.00 tests and re-aimi of ballfield 1 ls 2000.00 2000.00 $397,200 Baseball Poles: 50/30 fc illumination Pole fu 4 luminai and bases/concrete 2 ea 13000.00 26000.00 Pole B/ 8 luminai and bases/concrete 10 ea 19000.00 190000.00 Pole C/ 9 lumi and bases/concrete 2 ea 22000.00 44000.00 N httime tests and of ballfield 1 ls 2000.00 2000.00 $262,000 Field Poles: 30 fc illumination s1/'t0 and bases/concrete 4 ea 23000.00 92000.00 Pole s2t 20 and bases/concrete 2 ea 31000.00 62000.00 Pole s3t 12 and 4 ea 24000.00 ea ooles 84000.0( 9601 Pote Type 54/ 24 luminaires, poles and bases/concrete 2 ea 36000.00 72000.00 Security lights on poles 12 ea 700.00 8400.00 Nighttime tests and re-aiming of ballfield lights 1 ls 2000.00 2000.00 $332,400 Pathway Lights 20' pole, luminaire and footing 34 ea 3000.00 102000.00 Parking Area Lights 25' pole, single luminaire and footing 14 ea 3400.00 47600.00 25'pole, twin luminaire and footing 12 ea 3900.00 46800.00 Tennis Court Light Poles: 50' pole heiqht - 50 fc illumination Pole Type T1l 4 luminaires, poles and bases/concrete 4 ea 1 3000.00 52000.00 Pole Type T2i 8 luminaires, poles and bases/concrete 2 ea 17000.00 34000.00 $86,000 Basketball Court Light Poles: 30' pole height - 20 fc illumination Pole Type B't/ 2 luminaires, poles and bases/concrete 4 ea 7000.00 28000.00 Pole Tvpe B2l 4 luminaires, poles and bases/concrete 2 ea 9000.00 18000.00 $46,000 Bocce Court Light Poles: 30' pole height - 20 fc illumination Pole Type B 1/ 2 luminaires, poles and bases/concrete A ea 7000.00 28000.00 Vollevball Court Liqht Poles: 30' pole height - 20 fc illumination Pole Tvpe V1/ 2 luminaires, poles and bases/concrete 4 ea 7000.00 28000.00 Concession/Restroom Building lnterior lights 16 ea 300.00 4800.00 Exterior lights 8 ea 400.00 3200.00 Receptacles 14 ea 150.00 2100.00 Switches 7 ea 140.00 980.00 25 kva transformer 480v-2401120v 1 ea 3000.00 3000.00 Telephone Service, conduit, box, terminal board & outlet 1 ea 3000.00 3000.00 Panelboard 1 ea 2000.00 2000.00 A/C unit connection 1 ea '1000.00 1000.00 Water heater, hand dryer connections 5 ea 500.00 2500.00 $22,580 Restroom Building - small, prefabricated Panel feeders, connections and grounding 4 ea 1500.00 6000.00 Total subcontractor cost 1953227.00 � I I IL w FALLON SPORTS PARK , ,AS19 TER P_4Aly rA.�7F'•�RNS' FEATURE & �+ P NEIGH OR O II T- EEY .. �` `'�`'� � ,�, f a'�1' \ ��.° 'Y ��`��g[q}B •�R--�jllk // T7 t S o D`_c s f 1 1 a I R Q r � 4CONNECTION D. Y LITTLE LEAGUE „r. .,VERLO.OIt. A 10 /J [ J IAK R O nE C� PTO Pri D S ° LEAGUE / ADv N RE, y, s +I � R kCR yF l LE E O E) 1. ER cN PLAZA c 1 � '1; '9.MX@E - _ IEE" LEAGUELITTLE I E A�h o R7 ESTROOM'/ V K Fo ,, FUTURE fDNCEs ION DENSITY RESIDENTIAL �'+ �.LITTLE LE TG i t EVERGREEN 1 SOFTBALL M UTAREA T 7' A BASKETBALLIE CE 1t ¢IGe D) i ALLEN T } - _ �7 VEHICULAR G T EES - So S�H:�LL (HIGH UPPER TERRACE ENTRY bG RRHO'O-D �NNECTHQN EIGND ART OPQ NAZANIcPLTE CON ECH O ,I{ a 4- 5 r y _lk � r. r ti 4 r LLB �rREEIl f EEs,: ' y ✓.a �pT4. SOFTBALL SCHOOL R + $ is ♦yr�, e d as x D raaos as x EVERGRESCREEEN D raaos ` HGHTED SOCCER LIGHTED SOCCER ` 1 1. THL STREETs, THL B*#T)B.NOPETONuYNET SLOE TI- NG)6Z)! I , �� x AL TERR NEIGN O HOOD ♦I �bT ',� GR fir. „ 5 Do N _ PLAz CONNECTION � `, r LIIPD+YE ti :WAHPI TER. [ESSION .T ., B LOWERf' y]�'� f TDRE 1. PEDESTRIAN' j�F' • IPljl' + ARi� ' ENTRY WGEs.. _PR. ' REEST + H HY D ' '' .CON ON '+ . J 'tY--.. ;+ 4- a� }-- RE `m tl �' FUTURE STUDY AREA 6ZA s 6 s _-�REEs Z. iI Y. E 1 :RY Ti SOCCER SOCCER R _ PP jIC �1y4J Y A �TRF - KR: E'*w .ew STREET f� — i 1 j c.R cKETPARK IDENTITY � . oV ERLAY lll��4gC ; P =a ii aWORM 1r - DENSITY BCONNE TON TAELSLI� Ap �1 NNECTI VO LL BY BA LL ,.s� 1`S- FUTUR MULTI `yy+FAMILY HOMES 9� 'PLANT ENTR T BEE 3 REET TREESIL R v OPEN SPACE AREA �. PARK IDENTITY FEATURE 3 NEIGHBORHOOD C.NNE A FUTURE MEDIUM DENSITY RESIDENTIAL CONNECTION iOFUTURE HEIGHBCRHOO.D , SQUARE CON N —1 ONPft xaoxi 000 ^.;r T�,b'ninex .. - svz sorTea��c�exreoi %+ " sorTea�� .a 1 F A L L 0 N S P O R T S P A R K R E V I S E D M A S T E R P L A N/ L O W E R T E R R A C E IC I DUBLIN I.1 0Eacx Ix I I T .T I I a.91n'JIM >':>>� j1 1'TINNO��xTroi .. r�',€w,aESTwonM � ,, � •,. o , - r SETT Eg 4 6 . �sTw E. Y� Txoo, M a�u.,o.awo„�xTEn,ocIEw a�x„o.awo„�xTEo,oaEw r, uT,eTCToxn � uruTxeTCToxn -I - t As 4 Icy[ LOWER TERRACE • ENTRY ROAD AND PARKING (145 CARS) • PEDESTRIAN CIRCULATION • UTILITIES • LANDSCAPING (EROSION CONTROL) • 2 NATURAL TURF SOCCER FIELDS (80X120AND 65X110) LIGHTED 90' BASEBALL DIAMOND (NATURAL GRASS ONLYI • RESTROOMICONCESS I ON BUILDING • ADVENTURE PLAYGROUND • BASEBALL FIELD TERRACED SEATING SCORE KEEPER'S BOOTH • B ASE B AL L .SCOREBOARD • BOCCE COURT • BOCCE COURT LIGHTS • GROUP PICNIC (100 PEOPLEI • PARK IDENTITY AND DIRECTIONAL SIGNS • SITE FURNISHINGS OPTIONAL PARK AMENITIES • 2 SYNTHETIC TURF SOCCER FIELDS (2-65X110) OR 2 SYNTHETIC TURF SOCCER FIELDS (80X120 AND 65X110) • BASEBALL FIELD RESTROOM • BASE B ALL Sy NTHETIC TURF INFIELD •. RECREATION BUILDING • SOCCER FIELD LIGHTING • SOCCER FIELD SHADE STRUCTURES • SOCCER FIELD WIND BREAKS • SOCCER PRACTICE WALLS - E k t Nf ,xaox, 000 ` i`` sorraa��(�sxreol N�AsoFrea�� R �l'^. ' Tl � Y1 eP F A L L 0 N S P O R T S P A R K 1 S T P H A S E 0 P T 1 0 N S L 0 W E R T E R R A C E DUBLIN "I —1H ITREE. ITH F 99 ' T 211,1 wsxTeoi 4 xnr y -tl r I of —Taa <<n sx Teo, a w i Y I— 1ILIMI-11 NTxETIIx„T "x. soTTt� � ,,.T—, 1111THIT11 TlwT, HI L u` i w � a 414 411 �o aE n—.:: 11 Yl TUTae,o. "ee,o 41— \ �t I � I I r T Es I. s,oTTEw � ,�wF �T I a 1E Gxso w o00 V II 0. WARa�o11 A Ea .I411 �'�� 1ST PHASE LOWER TERRACE y e �pa 1i[5'k j+„_F �, ENTRY ROAD AND PARKING (145 CARS) I 4 — '^�— jj • PEDESTRIAN CIRCULATION 1 U1ILITIES LANDSCAPING (EROSION CONTROL) 2 NATURAL TURF SOCCER FIELDS (BOX120 AND 65X110) 90' BASEBALL DIAMOND (NATURAL GRASS ONLY) qppq�� • RE STROOM/CONCESSION BUILDING 4 6 ru.uae o>ex s>ace , p MINIMAL SITE FURNISHINGS ii + _ , . -ETTwF qq ryy I 90 t9N i o e MlbIUl x Gx iv k-l—IAL � N � N O O O — N � N • O co � W d d' N bW UJ � z o o o a W W - __ o J Wes' CW a U . +I�HauJtn U lklll►� - e 11 -4�-- 1b llq� Fallon Sports Park Mitigated Negative Declaration / Initial ;Study File No.: PA 05-0 1 Lead Agency; City of Dublin 100 Civic Plaza Dublin, CA 94568 April 26, 2005 ATTACHMENT 3 CITY OF DUBLIN 100 Civic Pizza, Dublin, C:alifcrriia 94568 Website: http://vvww,ci,dubliri.c`,a.us (Prepared pursuant to City of Dublin Environmental Guidelines and the California Environmental Quality Act Guidelines) Mitigated Negative Declaration For: PA 05-021 Fallon Sports Park Master Plan — Park Development flan Description of Project: The project consists of the construction of recreational features and facilities on the Fallon Sports Park property located In the Eastern Dublin Specific Plan area. The park development encompasses approximately 60 acres of property, and improvements to the land consist of baseball, softball and soccer fields; tennis and bocce courts; group picnic areas and play areas, pathways, and associated parking lots to serve the park. The park development will serve as a major sports field recreational facility for the City and is consistent with the parks and Recreation Master Plan adopted by the City in 2004, the Eastern Dublin Specific Plan/General Plan EIR, and the City of Dublin General Plan. Project Location: Generally located southwest of the Intersection of Fallon Road and Gleason Drive Eastern Dublin Specific Plan Area Name of Proponents: City of Dublin Parks & Community Services 100 Civic Plaza Dublin, CA 94556 Public Hearings: A public hearing will be held before the City Council on the Mitigated Negative Declaration and the Project on Tuesday, May 17, 2005, at 7:00 P.M. in the Civic Center Council Chambers, 100 Civic Plaza, Dublin. I hereby find that the above project will not have a significant effect on the environment with the mitigation measures incorporated in the project. A copy of the Initial Study ("Environmental Information ForMn and "Environmental Checklist Form") documenting the reasons to support the above finding is available for review at the City of Dublin Community Development Department, Planning Division, at 100 Civic Plaza, Dublin. lI Dated: April 26, 2005 Date Published: April 27, 2005 Date Posted; April 27, 2005 Date Notice Mailed: April 26, 2005 Considered by: City Council on: Action on Mitigated Negative Declaration: Approved __ __ Disapproved Notice of Determination filed: Resolution No. Harbin, Senior Planner Council 833-6659 RVRWMAW!WgIRP6omic Development 833.6650 Finance 833.Ge;40 • Public Works/Fnginearing 833.6630 . Parks & Community Services 833-6645 • police 833-6670 Planninq/Code Enforcement 833.6610 • Building Inspection 833-6620 • Fire prevention Bureau 833-6606 Printed on Recycled Paver TABLE OF CONTENTS Introduction.. ............................................ ....................................... 3 Project Description and Context.............................................................. .. 4 Exhibits......................... . ................... , , ,........................................... 8 Environmental Factors Potentially Affected ..... ..................................... • . • .....14 Determination................. ........................................... . ......................14 Evaluation of Environmental impacts ........ . .................... . .................. . ...15 Attachment to Initial Study ............... . ..................... . ................... . .......... 26 Discussion of Checklist .............. . . . ........................................................ 2 I. Aesthetics.......................................................... ..............26 H. Agricultural Resources ................... , , .................... , ............... 27 III. Air Quality ... . . .......................................... . . . ................ . . 28 IV. Biological Resources ...........................................................33 V. Cultural. Resources................................................................34 VI. Geology and Soils.. ............................................................... 34 VIL Hazards and Hazardous Materials .............. . .............................. 36 VIII. Hydrology and Water ........... ................................................. 37 IX. Land Use Planning ................................ . . . ................. . ....... 38 X. Mineral Resources .................................................... .......... 39 XI. Noise ......................................... . ................... . .............. 39 XII. Population and Housing .................... . ................... , .............. 40 )III. Public Services.................................................................41 XIV. Recreation..........................................................................41 XV. Transportation/Traffic................................................. . ..... 41 XVI. Utilities and Service Systems ........................................ • ....... 43 XVII. Mandatory Findings of Significance.... ...... . ..................... . ........ 44 Background Information ..... . ............................................. . . . .................. 45 References................. . ........................ . .. . .................. . ................. . ... 45 City of Dublin Initial Study & Mitigated Negative Declaration Fallon Sports Park PA 05-021 Page 2 April 26, 2005 114 INTRODUCTION This Initial Study and associated Mitigated Negative Declaration have been prepared in accordance with the provisions of the California Environmental Quality Act (CEQA) and the 2005 CEQA Guidelines adopted by the City of Dublin. The Initial Study assesses the potential environmental impacts of implementing the proposed project described below. The Initial Study consists of a completed environmental checklist, and a brief explanation of the environmental topics addressed in the checklist, 1. Project Title: 2. Lead Agency Name and Address: City of Dublin Fallon Sports Park, PA 05-021 City of Dublin Community Development 101 Civic Plaza Dublin, CA 94568 3. Contact Person and Phone Number: Janet Harbin, Senior Planner Community Development Department (925) 833-6610 4. Project Location: Southwest of the intersection of Gleason Drive/Fallon Road APN: 985-0027-008 5. Project Sponsor's Name and Address: City of Dublin Parks & Community Services Dept. 100 Civic Plaza Dublin, CA 94568 Contact Person: Herma Lichtenstein, Parks and Facilities Development Manager 6. General/Specific Plan Designation: Parks/Public Recreation, Open Space (Stream Corridor) & City Park 7. Zoning: PD -- Community Park 9. Public agency required approvals: Building and Grading Permits (City of Dublin) Utility, Sewer and Water Service Permits (DSRSD) Encroachment Permits (City of Dublin) City of Dublin Initial Study & Mitigated Negative Declaration Fallon Sports Park PA 05-021 Page 3 April 26, 2005 Nip PROJECT DESCRIPTION AND CONTEXT The development of Fallon Sports Park and conceptual plan for the Park was approved by the Dublin City Council, with funding provided through the Capital Improvement Program CIP Budget for fiscal year 2001 to 2002. The basis for creation of the Park was the City's Parks and Recreation Master Plan updated in 2004, which also outlined the specific program elements to be included in Fallon. Sports Park. As there was a need for a large competition ball field park to serve the growing community in the eastern portion of Dublin, and also the rest of the Dublin community, the Master Plan directed such facilities to be located on the subject 60-acre parcel (see Exhibit A). The City Council appointed a 22- member task force to study these program elements and design options beginning in March 2004. Working with City staff, a design consultant, Carducci & Associates, and other members of the community, various design options and associated park elements and features were refined for the inclusion in the final Fallon Sports Park Master Plan, presented to the City Council in December 2004. The Master Plan for the Park includes such recreational facilities to serve the community as sports fields, play areas, plazas, restrooms and concession buildings, trails and associated parking areas, with linkages to large open space areas. It is anticipated that the Park will be built in three phases as shown in the diagram in Exhibit E. Location, Fallon Sports Park is located near major transportation corridors such as Fallon Road, Gleason Drive, Central Parkway and Lockhart Street within the Eastern Dublin Specific Plan and General Plan Amendment planning area of the City, ensuring convenient access for all members of the Dublin community (see Exhibit B). Its location in east Dublin is in an area experiencing a great deal of growth at this time based on the implementation of the Specific Plan adopted in 1994. The existing land use development pattern and projected land uses in the east will likely double the size and population of the City within the next 20 years. .Recreational Features and Facilities: The Eastern Dublin Specific Plan directs the growth of infrastructure, community centers and parks such as the Fallon Sports Park and other park sites to meet the future demands of the Dublin community under the projected land uses in Specific Plan. The Specific Plan provided the necessary land use framework for development of the 60-acre parr site by establishing the goals and priorities for development of parklands and recreational spaces in the eastern portion of the City, in a portion of an area known as Dublin Ranch, Area F. With consideration to the land use established by the Specific Plan for the property, and based on the various elements and features identified in the Parks and Recreation Master Plan with input from the Task Force and Parks and Community Services Commission meetings, the Fallon Sports Park Master Plan has been designed to include the following recreational features and facilities as shown in Exhibit C: S qrt Facilities: a. 4-60' Little League Fields; City of Dublin Page 4 Initial Study & Mitigated Negative Declaration Fallon Sports Park PA 05-021 April 26, 2005 III b. 4 Softball Fields (2 lighted); c. 4 Soccer Fields (2 lighted), 2 natural turf fields with cricket field overlay 2 natural turf fields with synthetic turf option; d. 1-90' Baseball Field (lighted); e. 4 Bocce Courts (Iighted), 2 additional courts optional (lighted); f. 4 Basketball Courts (lighted); g. 4 Sand Volleyball Courts; and., h. BMX Course. Other Park Facilities: i. Activity Hubs j. Picnic Plazas and Family Picnic Areas (with barbeques); k. Play Areas; 1. Orr -Site Parking and street frontage improvements; m. Loop Jogging Trail; n. Connecting Trails to adjacent open space; o. Art and Water Features (optional); p. Lockable Bicycle Parking throughout Park; q. Restrooms & Concessions; and, r. Shade Structures. OTHER RELATED ACTIONS The Fallon Sports Park is the eastern portion of Area F, in the original 186-acre Jordon property presently being developed for residential use. Grading activities have commenced on the future park site in conjunction with the development of Area F in Dublin Ranch in the Eastern Dublin Specific Man area, along with preliminary infrastructure improvements. These activities were analyzed and evaluated in the Mitigated Negative Declaration (March 2000) adopted by the Dublin City Council for Area F (PA 98-068, Reso. No. 34-00), and also in the Addendum (PA 01-037) adopted by the City Council (Reso. No. 43-04) in March 2004 for the Area F North Project. Subsequently, a preliminary grading plan (see Exhibit D) for the park land area was prepared as part of the Area F overall grading plans. On the western edge of the park property, running parallel to Lockhart Street and its intersection with Gleason Drive, is a continuous 70-foot wide open channel stream corridor being enhanced for environmental mitigation purposes related to development of Area F. The park site topography consists of rolling hills and two small valleys, with an overall 4 to slope over the entire property. Construction of site improvements requires grading with related cut and fill to balance the soil on the property, thereby facilitating the improvements and recreational uses planned. Stormwater drainage on the site City of Dublin Fags 5 Initial Study & Mitigated Negative Declaration Fallon Sports Park PA O5-021 April 26, 2005 h will be provided through a series of swales and filtration methods, to eventually channel stormwater to connections with the existing on -site facilities. Dublin San Ramon Services District (DSRSD), in accordance with DSRSD's Eastern Dublin Facilities Master Plan, will provide water, sewer and recycled water services. Sewer service for the project will be accommodated through a connection to the existing sewer system owned and maintained by the Dublin San Ramon Services District (DSRSD). Recycled water from DSRSD will be used for irrigation purposes, reducing the need for potable water. Additionally, irrigation and drainage requirements are provided and planned for all on -site improvements. PREVIOUS ENVIRONMENTAL DOCUMENTS Approval of the General Plan / Eastern Dublin Specific Plan Amendments, Planned Development Rezoning / Development Plans, future Tentative Map and amendment to the Development Agreement for Area F of Dublin Ranch are within the Dublin General Plan's Eastern Extended Planning Area and the Eastern Dublin Specific Plan Area, which was the subject of an Environmental Impact Report, certified by the City of Dublin in 1993 (Addenda to the EIR were also approved, elated May 4, 1993 and August 22, 1994). The General Plan/Specific Play EIR is a program EIR, which anticipated several subsequent actions related to Future development in Eastern Dublin. The EIR did identify some impacts from implementation of the General Plan/Specific Plan that were not able to be mitigated. Upon certification of the EIR, the City adopted a Statement of Overriding Considerations for several impacts, some of which relate to this project. The City also adopted a mitigation -monitoring program, which included measures intended to reduce impacts from the development of Eastern Dublin area. These mitigation measures apply to project approvals and actions at various stages in the development process, and will be applied to this project as applicable. The timing of the mitigation measures was indicated in the City's EIR mitigation monitoring matrix (City Council Resolution No.53-93) and was to be incorporated into the timing of the development of Area F. Through the Initial Study process discussed above, several issues presented themselves requiring additional analysis, and, ultimately, mitigation measures which resulted in an additional Mitigated Negative Declaration to be prepared for Area F. The Mitigated Negative Declaration was published for review on November 9, 1999, for the mandatory 30-day review period. Based on discussions with the project applicants, measures to mitigate loss of on -site breeding and movement (estivation) habitat for both species within Planning Area F, including the portion of the corridor on the Fallon Sport Park site, were refined and included in the original Initial Study/Mitigated. Negative Declaration. Mitigation for the impacts consists of permanently creating suitable red -legged frog and California tiger salamander habitat and preserving a minimum 63-acre site in the northern drainage area of the Dublin Rauch property. Other mitigations have also been included. The amended mitigation measures reduced impacts to biological resources to a less -than -significant level (document is incorporated by reference). City of Dublin Page 6 initial Study & Mitigated Negative Declaration Fallon Sports Park PA 05-021 April 26, 2005 The park site has been the subject of subsequent environmental reviews as applications for various phases of the Dublin Ranch development were submitted to and approved by the City. The park site was once included within Areas B and E of Dublin Ranch (known as the "Area F/B/E Project"), and the City approved a Negative Declaration for that project on November 18, 1997 through Resolution 140-97. The Negative Declaration evaluated an area of approximately 453 acres, consisting of Dublin Ranch Areas B through E, and proposed for a variety of residential and non-residential uses, as well as a community park site of approximately 42 acres, The portions of Areas B and E analyzed at that time included residential uses and the conununity park site configured to be approximately 65 acres. For the portions of the project within Area F, the City approved a Mitigated Negative Declaration on February 15, 2000 through Resolution 34-00. Following the approval of the Mitigated Negative Declaration in 2000, the City prepared an Initial Study dated February 9, 2004, for the Area F area to determine whether supplemental environmental impacts would occur as a result of this project beyond or different from those already addressed in the Program EIR and the previous Negative Declaration and Mitigated Negative Declaration, incorporated by refernnce. The Initial Study reviewed the proposed reconfiguration of uses, including the use of 60 acres for a community park, and recent environmental studies prepared for the Area F project. These studies included a TJKM traffic report containing projected traffic volumes based on the various land uses proposed with the project. Since the prior reviews, the applicant also has obtained permits from state and federal agencies for alteration of wetlands and has implemented related offsite mitigation, as anticipated in the prior reviews and further described in the Initial Study for the project, and incorporated here by reference. The Initial Study determined that the Area F project would cause no environmental impacts beyond those previously identified in the Eastern Dublin EIR, the subsequent Mitigated Negative Declaration, and Negative Declaration based on the project description and the minor nature of the changes proposed by the project, evaluation of the prior reviews, and evaluation of recent reports. Linder these circumstances, a CEQA Addendum was prepared pursuant to CEQA Guidelines section 15164, and adopted by the City Council on March 16, 2004. Additionally, the proposed Fallon Sports Park was included in the Parks and Recreation Master Plan 2004 Update (PA 04-035) and the acreage used in determining City community park acreage along with the type of facilities to be included in the park, for which the City Council adopted a Negative Declaration on March 16, 2004 (Reno. No. 48-04). An Initial Study was prepared for the Master Plan 2004 Update in accordance with City environmental guidelines and CEQA Guidelines. The Initial Study concluded that implementation of the specific changes to park lands and open space in the Parks and Recreation Master Plan 2004 Update would not pose any significant environmental impacts and a Negative Declaration was prepared. A copy of City Council Resolution No. 48-04 and associated information is included as incorporated in this document by reference. As the various sports fields, courts and other facilities pertinent to the development and successful future of the Master Plan for Fallon Sports Park were not analyzed in depth in previous environmental documents noted here, but only as a general land use category of community parr, this Mitigated City of Dublin Page 7 Initial Study & Mitigated Negative Declaration Fallon Sports Park PA 05-021 April 26, 2005 i ID documents noted here, but ❑nly as a general land use category of cormnunity park, this Mitigated Negative Declaration and Initial Study analyzes the development and design of the specific types of activity and passive areas to be developed within the boundaries of Fallon Sports Park. City of Dublin Page S Initial Study & Mitigated Ncgative Declaration Fallon Sports Park PA 05-021 April 26, 2005 ASSESSOR'S MAP 98 27 30 II Rp 4 31 i t f r � i AmF t i DES IMAM) RFWAI VQ GR AREA roe • 4 y ((NOT A PARTI F1a0,14 AG•e .g (Id4.4C A0•aI - errs 4� I �b c�wAk —75 Code Area Nos, z6-024 26-025 64-005 64-004 29 RANCHO SANTA RITA (John Younix) PAT.8K.•A-fra.le1. t i 2E (ow TR. 59�5 a41/aG 28 S2 32 'l,a' r I III I + IV 0 I75,37 AC.* f � 0 IlS.14 AC•t 133.0. AC.A _ b119L ltJ '� ly l xrarN/I��,O� an �M�+��M4.WfMWIMIINmrrvr A INTERSTATE 941 I I Y6 N++ 946 +Ixa 248 II$¢ 946 y 112$ 904 tlja .ey DETAIL 'Sr ¢CALEi 1"-240' 1 - 1 946 446/ 112a 446 � ( 1 1 � Q qp N G � IY 1•is Aii-t 94a 4a I EXHIBIT A — Assessor Parcel Map City of Dublin Initial Study & Mitigated Negative Declaration Fallon Sports Park PA 05-021 9d5� 2 SEE .II 904/1 {i DETAP- -A- SCALb I'•RD6' Aly � 1 r SIC •• ■ ORpAK �I8 ............. «w NTErRSTATE ------- - 5B6 Page 9 April 26, 2005 `l-Lr EXHMIT B - Vicinity Map City of Dublin Initial Study & Mitigated Negativc Declaration Fallon Sports Park PA 05-021 1:17V k2LABLIN MI I. I',.III II", 1 1!.41 jj . ALK, V. a."WS— % T�n .. d MIT I. ZIA Q fL AI L." 1116.,'r j I 4V Ak x�, IT, J. :J: 4. 4's J ON WW11 A Me T A W .74 - i Y4 77,M)7W 4:1 1 ps L.1 15 HIS !114=1 T .0. ..'PT 1, IT, lowy. a Ono o M! j In III SIL M- 1 . .... .. j W X, ji 4 �VO r' 3 �,, FALLON SPORTS PARK GRADING PLAN ! ✓ � ' �ji ,�' {*�r � J` J +.f �J {�',, / I` / ��" V��' � k .•Y'J I ��'�•' y 1���J --1 i�/ IN ♦. .. I i Y {� -`1 iyl - y � rf.F' .g� r '' _ Y`t M!t �rro•„ ' ,w' �1r'� r /� �� / �`Jj/ / i ^.a' �; ,4 pl I} `� y,r�., � r �,�.rC `�•✓_ R+�, lr 1 fir. r f A /u on w� _.ti,, k4 � • r ,pn�« i' 4 1��11, 1','l4yL,,� ICI"rill 1 , / / `IS 'r➢, A L 'I ramrt • LI Lq � ;f�� ar' I� I 65Xtto � 651¢�10 I /- _ ��•�� I ! L.1..I I T' r 1r i i I I ►rl in � i`1;1k � �,��4 y ' # i f�' 4yr„ =r',' � w 1 � � r y It / ! I i ^\� ;<•,-F' i 4'r%F' �'F•I rr /ii' let 61;;ltXwef t•� \ �* PUSH [CHTOUR Ill rrrftvn l w �l1 +d11111 Raysem-,MAI-,.Y,-k',M 6 M9 Is4 } 1 I ; i'i 1� C,uAi?I' lEO�9r /RCA LOCAfbN l�t EXHIBIT D - Preliminary Grading Puri City of Dublin Page 12 Initial Study & Mitigated N'89ative Declaration Fallon Sports Park PA 05-021 April 26, 2005 A, Pt4lASING DIAGRAM 44 Pq Lq f!*. PROVIDIPAI, .ARI . lmO,Y.P F!I�F. N Aqr, 33 OFf PFIABE DEYEIApmE eR A'D AND 5 T !" RE K .'' .0 RIVO I Am C 0P-IFISCALMEA . ',WLEN T Ek Environmental Factors Potentially Affected The environmental factors cllecked below would be potentially affected by this project, involving at least one impact that is a "potentially significant impact" as indicated by the checklist on the following pages. - Aesthetics - Agricultural Resources - Air Quality Biological Resources - Cultural Resources - Geology/Soils - Hazards and Hazardous Materials - HydrologylWater Quality - Land Use/ Planning Mineral Resources - Noise - Population/Housing - Public Services - Recreation - Transportation/ Circulation - Utilities/Service Systems - Mandatory Findings of S ia ificance D>TERMINATION (TO RE COMPLETED SY LEAD AGENCY): On the basis of this initial evaluation: I find that the proposed project COULD NOT have a significant effect on the environment, and a NEGATIVE, DECLARATION will be prepared. I find thatthaugh theraposeclro ec# caul. have'a sgtu idant effect on the environmetxt;'tlleret11 ` riot tie a significant efie�ct tia'tfits. ease because revisions in thervject k�aye been made;by or agreed taiby t'beioect propont IT ATE A AZID hIRGA'NE I LAk e prep EC UN will; b ared I find that the proposed project MAY have a significant effect on the environment, and an ENVIRONMENTAL IMPACT REPORT is required. I find that the proposed project MAY have a "potentially significant impact" or "potentially significant unless mitigated" impact on the environment, but at least one effect 1) has been adequately analyzed in an earlier document pursuant to applicable legal standards, and 2) has been addressed by mitigation measures based on the earlier analysis as described on attached sheets. An ENVIRONMENTAL IMPACT REPORT is required, but it must analyze only the effects that remain to be addressed, I find that although the proposed project could have a significant effect on the environment, because all potentially significant effects (a) have been analyzed adequately in an earlier EIR or NEGATIVE DECLARATION pursuant to applicable standards, and (b) have been avoided or mitigated pursuant to that earlier EIR or NEGATIVE DECLARATION, including revisions or mitigation measures that are imposed upon the 2roposed project, nothing further is required. Date: Ayril 26, 2005 : Janet Harbin, Senior Planner For: City of Dublin City of Dublin Initial Study & Mitigated Negative Declaration Fallon Sports Park PA 05-021 Page 14 April 26, 2005 o'j Environmental Impacts (Note. Source of determination listed in parenthesis. See listing of sources used to determine each potential impact at the end of the checklist.) Now,, A full discussion of each item is found following the checklist. I, Aesthetics. Would the project: a) Have a substantial adverse impact on a scenic vista? (Source. 1-8) b) Substantially damage scenic resources, including but not limited to trees, rock outcroppin gs, and historic buildings within a state scenic highway? (Source: I - 7) c) Substantially degrade the existing visual character or quality of the site and its surroundings? (Source: 1 - 7) d) Create a new source of substantial light or glare that would adversely affect day or nighttime views in the area? (Source: 1-5,7) II. Agricultural Resources. Would the project: a) Overt Prime Farmland, Unique Farmland or Farmland of Statewide Importance, as showing on the maps prepared pursuant to the Farmland Mapping and Monitoring Program of the California Resources Agency, ton non-agricultural use? (Source: 2-5,7,S) b) Conflict with existing toning for agriculture use, or a Williamson Act contract? (Source: 6,7,8) c) Involve other changes in the existing environment which, due to their location or nature, could result in conversion of famlar d to a non -agricultural use? (Source: 2-5,7,8,11,12) 111. Air Quality (Where available, the significance criteria established by the applicable air quality management district may be relied on to make the following determinations). Would the project; a) Conflict with or obstruct implementation of the applicable air quality plan? (Source: 4,5,7,11,12) b) Violate any air quality standard or contribute substantially to an existing or projected air quality violation? (Source: 5.7,11-13) City of Dublin Initial Study & Mitigatcd Negative Declaration Fallon Sports Park PA 05-021 PotentidI6 .'Less thttre:- 1, ss tha►i� N 1 ct t" Stgrijicmir sigrufacrtrit slgnZcunt Impost Wthrpact .. lkrrti sari X X X X X X aY � X X Page 15 April 26, 2005 Note: A full discussion of each item is found following the checklist. c) Result in a cumulatively considerable net increase of any criteria pollutant for which the project region is non -attainment under an applicable federal or state ambient air quality standard (including releasing emissions which exceed quantitative thresholds for ozone precursors? (Source: 5,7,11-13) d) Expose sensitive receptors to substantial pollutant concentrations? (Source: 5,7,11-13) c) Create objectionable odors affecting a substantial number of people? (Source: 0,54,11-13) W. Biological Resources. Would the project: a) Have a substantial adverse effect, either directly through habitat modif ications, on any species identified as a candidate, sensitive, or special status species in local or regional plans, policies or regulations, or by the California Department of Fish and Game or the U.S. Fish and Wildlife Service? (Source: 1-3,5,7,9,11-13,15-20) b) Have a substantial adverse effect on any riparian habitat or other sensitive natural community identified in local or regional plans, policies or regulations or by the California Department of Fish and Came or the U.S. Fish and Wildlife Service? (Source: 1-3,5,7,9,11-13,15-20) c) Have a substantial adverse impact on federally protected wetlands as defined by Section 404 of the Clean Water Act (including but not limited to marsh, vernal pool, coastal, etc.) through direct removal, filling, hydrological interruption or other means? (Source: 1-3,5,7,9,11-13,15-20) d) Interfere substantially with the movement of any native resident or migratory fish or wildlife species or with established native resident or migratory wildlife corridors, or impede the use of native wildlife nursery sites? (Source: 3,5,7,9,11-13,15- 20) e) Conflict with any local policies or ordinances protecting biological resources, such as tree protection ordinances? (Source, 3,5,7,9,11-13,15- 20 ) City of Dublin Initial Study & Mitigated Negative Declaration Fallon Sports Park PA 05-021 l� � Leis t ... Less thari� No ampaCt si rat cruet s S.lf ..., g,� g.f . { nr ��ret se ni cunt �Xrri�act ; � With � �, Impact; X X X X X X X X Page 16 April 26, 2005 Note: A full discussion of each item is found following the checklist. f) Conflict with the provision of an adopted Habitat Conservation Plan, Natural Community Conservation Plan or other approved local, regional or state habitat conservation plan? (Source* 3-5, 7,9,11-13) V. Cultural Resources. Would the project: a) Cause a substantial adverse impact in the significance of a historical resource as defined in Sec. 15064.57 (Source: 1,2,4,5,9,11-14) b) Cause a substantial adverse change in the significance of an archeological resource pursuant to Sec. 15064.5 (Source: 1,2,4,5,9,11-14) c) Directly or indirectly destroy a unique paleontological resource or unique geologic feature? (Source: 1,2,4,5,9,11-14) d) Disturb any human remains, including those interred outside of a formal cemetery? (Source: 1,2, 4,5,9,11-14) VI. Geology and Soils. Would the project: a) Expose people or structures to potential substantial adverse effects, including the risk of loss, injury, or death involving: i) Rupture of a known earthquake fault, as delineated on the most recent Alquist-Priolo Fault Zoning Map issued by the State Geologist or based on other known evidence of a known fault (Source: 1-9,11- 13) ii) Strong seismic ground shaking (Source: 1-9,11-13) iii,) Seismic -related ground failure, including liquefaction? (Source: 1-9,11-13) iv) Landslides? (Source: 1-9,11-13) b) Result in substantial soil erosion or the loss of topsoil? (Source: 1-9,11-13) c) Be located on a geologic unit or soil that is unstable, or that would become unstable as a result of the project and potentially result in on - and off - site landslide, lateral spreading, subsidence, liquefaction or similar hazards (Source: 1-9,11-13) City of Dublin Initial Study & Mitigated Negative Declaration Fallon Sports Park PA 05-021 Potertd4oy .Less than ,Less -that Igo a ol,.: ttt cantst Sig f t cant st ni c ...,. Intpaei'`: Iyttla ! ..,Imp�ct;fl X X X X X rN X X X X X Page 17 April 26, 2005 Note: A full discussion of each item is found following the checklist. d) Be located on expansive soil, as defined in Table 13-1-B of the Uniform Building Code (1.994), creating substantial risks to life or property? (Source. 1-9,11-13) e) Have soils capable of adequately supporting the use of septic tanks or alternative wastewater disposal systems where sewers are not available for the disposal of waste? (Source: 1-3,6-9,11,12,13 ) V11. Hazards and Hazardous Materials. Would the project: a) Create a significant hazard to the public or the environment through the routine transport, use or disposal of hazardous materials? (Source.1-3,6, 7,10) b) Create a significant hazard to the public or the environment through reasonably foreseeable upset and accident conditions involving the release of hazardous into the environment? (Source: 1-3,6,7, 10-13) c) Emit hazardous emissions or handle hazardous materials, substances, or waste within one -quarter mile of an existing or proposed school? (Sourc e: 1- 3,6,7,1043) d) Be located on a site which is included on a list of hazardous materials sites complied pursuant to Government Code Sec. 65962.5 and, as a result, would it create a significant hazard to the public or the environment? (Source: 1-7,10-13) e) For a project located within an airport land use plan or, where such plan has not been adopted., would the project result in a safety hazard for people residing or working in the project area? (Source: 1- 7,10-13) f) For a project within the vicinity of private airstrip, would the project result in a safety hazard for people residing or working in the project area.? (Source: 1,2,4,6,7,11-13) g) Impair implementation of or physically interfere with the adopted emergency response plan or emergency evacuation plan? (Source: 1,2,6,7,10-13) City of Dublin initial Study & Mitigated Negative Declaration Fallon Sports Park PA 05-021 Potenti�llx cut- ess than- No ampact 5! txt ccrr sa 'gna,�aciuit `sl�7tajieatat Im�'1 � Wz#h I �Pnpaet :. .. �att,�aaYon ►.i X X X X X X X X Page 18 April 26, 2005 Note: A full discussion of each item is found following the checklist. b) Expose people or structures to a significant risk of loss, injury or death involving wildland fires, including where wildlarids are adjacent to urbanized areas or where residences are intermixed with wildlands? (Source: 1-7,11-13) VIQ. Hydrology and Water Quality. Would the project: a) Violate any water quality standards or waste discharge requirements? (Source: 1 -7,11-13,18,19) b) Substantially deplete groundwater supplies or interfere substantially with groundwater recharge such that there would be a net deficit in aquifer volume or a lowering of the local groundwater table level (e.g. the production rate of existing nearby wells would drop to a level which would not support existing land uses or planned uses for which permits have been granted? (Source; 1.-7,11-13, 18) c) Substantially alter the existing drainage pattern of the site or area, including through the aeration of the course of a stream or river, in a manner which would result in substantial erosion or siltation on or off -site? (Source: 1-7,11-13, 18) d) Substantially alter the existing drainage pattern of the site or areas, including through the alteration of a nurse or stream or river, or substantially increase the rate or amount of surface runoff in a manner which would result in flooding on- or off -site? (Source: 1-7,11-13, 18,20) e) Create or contribute runoff water which would exceed the capacity of existing or planned stormwater drainage systems or provide substantial additional sources of polluted runoff? (Source: 1- 7,11-13, 18) f) Otherwise substantially degrade water quality? (Source: 1-7,11-13,18,19) g) Place housing within a 100-year flood hazard area as mapped on a Flood Hazard Boundary or Flood Insurance Rate Map or other flood delineation map? (Source: 1,2,3,4,5,6,7,11-13) h) Dace within a 100-year flood hazard area structures which impede or redirect flood flows? (Soutce:l- 7,11-13, 18) City of Dublin Initial Study & Mitigated Negative Declaration Fallon Sports Park PA 05-021 1N Pvtentidldy tta►i- mess than- Naito .S .1� lgnajicciiat s„ ni c . , 7tttpact' With ;7rrapiict: , . X X X X X X X X Page 19 April 26, 2005 X Note: A jiall discussion of each item is found following the checklist. i) Expose people or structures to a significant risk of loss, injury, and death involving flooding, including flooding as a result of the failure of a levee or dam? (Source: 1-7,11-13,18) J) Inundation by seiche, tsunami or mudflow? (Source: 14,9,11-13,18) IX. Land Use and planning. Would the project: a) Physically divide an established community? (Source: 1-7,11-13) b) Conflict with any applicable land use plan, policy, or regulation of an agency with jurisdiction over the project (including but not limitedto the general plan, specific plan, or zoning ordinance) adopted for the purpose of avoiding or mitigating an environmental effect? (Source: 1-8,11-13,16-20) c) Conflict with any applicable habitat conservation plan or natural community conservation plan? (Source: 1-8,11-13) X. htineral Resources. Would the projecl: a) Result in the loss of availability of a known mineral resource that 'would be of value to the region and the residents of the state? (Source: 1,2,6,7,11-13) b) Result in the loss of availability of a locally important mineral resource recovery site delineated on a local general Plan, specific plan or other land use plan? (Source: 1,2,6,7,11-13) XL Noise. Would the project result in: a) Exposure of persons to or generation of noise levels in excess of standards established in the general plan or noise ordinance, or applicable standards of otber agencies? (Source: 1-8,11-13) b) Exposure of persons to or generation of excessive groundborne vibration or groundbornea noise levels? (Source: 1-8,11-13) c) A substantial permanent increase in ambient noise levels in the project vicinity above existing levels without the project? (Source: 1-8,11-13) d) A substantial temporary or periodic increase in ambient noise: levels in the project vicinity above levels without the project? (Source: 1-8, 11-13) City of Dublin Initial Study & Mitigated Negative Declaration Fallon Sports PaTk PA 05-021 j p Y ot�ritl�l! Sz �dr�t $�, ft, ..Ir�paci'. Less rht� . r�- s;gt2ijtc nt with �4att' atinn Liss thuit� .: . sa •g�tufxCcrJ2t '1ct. o t77R�L�Et X 1 X X X X X X X X X Page 20 April 26, 2005 Note: A full discussion of each item is found following the checklist. e) For a project located within an airport land use plan or, where such a plan has not beets adapted, within two miles of a public airport or public use airport, would the project expose people residing or working n the project area to excessive noise levels? (Source: 1-8,11-13) t) For a project within the vicinity of a private airstrip, would the project expose people residing or working in the project area to excessive poise levels? (Source: X11. Population and Housing . 'Would the project: a) Induce substantial population growth in an area, either directly or indirectly (for example, through extension of roads or ether infrastructure)? (Source: 1-4,7,8,10) b) Displace substantial numbers of existing housing, necessitating the construction of replacement housing elsewhere? (Source:l-4,7,8,10) c) Displace substantial numbers of people, necessitating the replacement of housing elsewhere? (Source: 1- 4,7,8,10) X111. Public Services. a) Would the project result in substantial adverse physical impacts associated with the provision of new or physically altered governmental facilities, the construction of which could cause significant environmental impacts, in order to maintain acceptable service ratios, response times or other performance objectives for any of the public services: Fire protection? (Sources: 1,3,5,7,11-13) Police protection? (Sources: 1,3,5,7,11-13) Schools? (Sources: 1;3,5,7,11-13) Parks? (Sources: 1,3,5,7,11-13) Other public facilities? (Sources: 1-5,7,11- 13,18,21) Potentially Less'tltan. Lest %n- No ura r Signif cant ;sfgnicant tttti►at Impiut Wilk Tnxpltet 'ltircti�tatic►n , . . City of Dublin Page 21 Initial Study & Mitigated Negative Declaration Fallon Sports Park PA 05-021 April 26, 2005 X ►4 94 X F X M Me; A full discussion of each item is found fWlawing the checklist. XIV. Recreation a) Would the project increase the use of existing neighborhood or regional facilities such that substantial physical deterioration of the facility would occur or be accelerated (Sources. 1,3-5,7,11- 13) b) Does the project include recreational facilities or .require the construction or expansion of recreational facilities that might have an adverse physical effect on the environment? (Sources: 1,2,4,5,7,11-13) XV. Transportation and Traffic, Would the project: a) Cause an increase in traffic that is substantial in relation to the existing traffic load and capacity of the street system (i.e. result iti a substantial increase in either the number of vehicle trips, the volume to capacity ratio on roads or congestion at intersections)? (Sources: 1,3,4,7,11-13,21) b) Exceed, either individually or cumulatively, a level of service standard established by the County Congestion Management .Agency for designated roads or highways? (Sources. 1,3,4,6,7,11 13,21) c) Result in a change in air traffic patterns, including either an increase in traffic levels or a change in location that results in substantial safety risks? (S=ces. 1,3,4,6,7,11-13,21) d) Substantially increase hazards due to a design feature (e.g. sharp curves or dangerous intersections) or incompatible uses, such as farm equipment? (Sources: 1,2,4,7-10) e) Result in inadequate emergency access? (Sources; 1-4,7-11) f) Result in inadequate parking capacity? (Sources: 1-5,8) g) Conflict with adopted policies, plans or programs supporting alternative transportation (such as bus turnouts and bicycle facilities)? (Sources: 1,3-8,21) XVI. Utilities and Service Systems, Would the ,project a) Exceed wastewater treatment requirements of the applicable Regional Water Quality Control Board? (Sources: 1,4-6,9,11-13,19) Y n- No impact PDterurall Z�ess-thart Zess Chi signtcdnt s;gttifiodltd signrfi ec�nt :I�rtpa�'1'`; With ; I7rnpact X X X X X X X X X City of Dublin Page 22 Initial Study & Mitigated Negative Declaration Fallon Sports Park PA 05-021 April 26, 2005 Note: A full discussion of each item is found fallowing the checklist. b) Require or result in the construction of new water or wastewater treatment facilities of expansion of existing facilities, the construction of which could. cause significant environmental effects? (Sources: 1,2-7,11-13,18-20) c) Require or result in the construction of new storm water drainage facilities or expansion of existing facilities, the construction of which could cause significant environmental effects? (Sources: 1-7,11- 13,18-20) d) Have sufficient water supplies available to serve the project from existing water entitlements and ;resources, or are new or expanded entitlements needed? (Sources; 1-7,11-13,18-20) e) Result iii a determination by the wastewater treatment provider which serves or may serve the project that it has adequate capacity to serve the project's projected demand in addition to the provider's existing cornmrtments? (Sources: 1-7,11-13,18-20) fj Be served by a landfill with sufficient permitted capacity to accommodate the project's solid waste disposal needs? (Sources: 1-7,11-13,18-20) g) Comply with federal, state and local statutes and regulations related to solid waste? (Sources: 1-7,11- 13,18-20) XV1. Mandatory Madings of Significance. a) Roes the project have the potential to degrade the quality of the environment, substantially reduce the habitat of a fish or wildlife species, cause a fish or wildlife population to drop below self-sustaining levels, threaten to eliminate a plant or animal community, reduce the number of or restrict the range of a rare or endangered plant or animal or eliminate important examples of the major periods of California history or prehistory? b) Does the project have impacts that are individually limited, but cumulatively considerable? ("Cumulatively considerable" means that the incremental effects of a project are considerable when viewed in connection with the eff ects of past projects, the effects of other current projects and the effects of probable future projects). City of Dublin Initial Study & Mitigated Negative Declaration Fallon Sports Park PA 05-021 Potendaly Less�rhan- I:esS than= No impuet... Significant stgttt,�Zcctnt significant Zm actt%F ''; : ;'Impact , `ll�iti�c7lton I;. , Page 23 April 26, 2005 M X X R. X X Note: A full discussion of each item is found following the checklist. c) noes the project have environmental effects that will cause substantial adverse effects on human beings, eithet directly or indirectly? City of Dublin Initial Study & Mitigated Negative Declaration Fallon Sports Park PA 05-021 .Potentially. :Iess than: L1 -than- Nn itnpr�ct agntt sigrttficail sagnjicant : II igct `With pia aticit� X Page April 26, 2005 13-7 Sources used to determine potential environmental-,im�acts= 1.. project location & Preliminary Grading Plan, prepared by MacKay & Somps, March 10, 2005 2. Field/Site Review of project area 3. Master Plan for Fallon Sports Park, prepared by Carducci & Associates, November 30, 200-1 4. Initial Study & Mitigated Negative Declaration for the Parks and Recreation Master Plan (2002) 5, Parks and Recreation Master Plan Update (2004) 6. City of Dublin. General Plan ( updated 2002) 7. Eastern Dublin Specific Plan/General Plan Amend ment Environmental Impact Report and Addendum (1994)* 8. City of Dublin Zoning Ordinance 9. Geomchnical Investigation for Lin Property, prepared by Bergolar Geotechnical Consultants, November 1999 10. Environmental Assessmentavestigation for Hazardous Materials, Phase I &_II, prepared by Kleinfelder Engineering, November 2004 11. Individual Negative Declaration and Mitigation Monitoring PTograrn - Area B-E (1997) 12. Individual Mitigated Negative Declaration for Dublin Ranch Area F (2000) 13. Initial Study and Addendum for Dublin Ranch Area B/F/E-, PA 0 1 -037 (2004) 14. Cultural Resource Survey, Dublin Ranch, Holman & ,Associates (June 1999) 15. Special ,,Status Strecies Survey, Pao Yeh Lin Property , H.T. Harvey Associates (October 1999) 16. U.S Army Corps of Engineers Wetland Fill Permit , dated May 23, 2003 17. U.S. Fish & Wildlife Service Biological Opinion, dated July 1, 2002 18, Drainage and Hydrology Study for Dublin Ranch, MacKay & Somps (November 2003) 19. regional Water Quality Control Board Water Quality Certification Order , dated April 22, 2003 20, California Departamerit of Fish & Game 1603 lake and Streambed Alteration Agreerneat, dated June 5, 2003 21. Project Traffic Impact Analysis prepared by TJKM Associates (October 1999 w/2003 update) 22. Discussion with City Staff or affected Special Districts *Portions of the environmental setting, project impacts and mitigation measures for this Initial Study refer to environmental information contained in the 1994 Eastern Dublin Specific Plan/General Plan Amendment Environmental Impact Report. (SChi 91103064). Phis document is referred to in the Initial Study as the 'Final Eastern Dublin EIR. " Copies of this document, and all other documents referenced here, are available for public review at the City of Dublin Planning Department, 100 Civic .Plaza, Dublin, CA, d uring normal business hours. City of Dublin Initial Study & Mitigated Negative Declaration Fallon Sports Park PA 05-021 Page 25 April 26, 2005 ATTACHMENT TO INITIAL ,STUDY: DISCUSSION OF CHECKLIST Proiect Impacts and Mitigation Measures I. Aesthetics a-c) Significant impact on scenic vista, damage to scenic resource, degrade visual character of' the site or create light or glare? Less -than -significant The project site is vacant and consists of gently rolling hills and 'valleys. Historically, grazing and cultivation of agricultural crops took place on the subject 60-acre parcel. The visual image of the land is formed by patterns of the soil that have been furrowed. The improvements proposed with the development of the sports fields and the other recreational amenities will, naturally, alter the appearance of the undisturbed farmland, but not to a potential significant level. The park use will continue to be an open space type use and be enhanced with landscaping and provide trail links to other open space acres, The development of the property as a park will provide scenic and landscaped views from Central Parkway to Lockhart Street and the trail along the creek corridor adjacent to the street and Gleason Drive. The parking lot areas accessed from Lockhart Street and Central Parkway will be screened with improved landscaped areas and vegetation, as will the tennis courts and bail fields. From the residential areas west of the creek alignment and Lockhart Street, and those to the southwest and northeast of Fallon Road, the most prominent visual features will be the enhanced creek corridor along the park's western edge and the landscaping surrounding the park. The active recreational features and areas will be several hundred feet and across roadways fforn the homes. Views of the site are limited to the immediate area and from the I-580 freeway. Although, the proposed park is located one mile north of 1-580 freeway, which is a designated scenic highway, the park is not within a scenic route. Visual impacts were addressed in the Eastern Dublin EIR (Impact IM 3.8/C. Obscuring of Distinctive Native Features) and it was determined that no measures would reduce the impacts to a less -than -significant degree. Other mitigation measures (3.8/4.0 through 4.5, 5.0 and 5,1) have been included in the Eastern Dublin EIR to reduce the impacts of hillside development. The EIR concluded this impact would be a potentially significant irreversible change and a Statement of Overriding Considerations was adopted by the City Council. The parcel of land where the park development is proposed is slightly hilly with an overall 4% slope and is at a lower elevation than much of the surrounding land. Specifically, the construction of park features and landscaping will benefit the existing visual character of the park. These improvements wouldprovide street frontage landscaping, ranging from lawn areas to annual grasses, garden areas and trees, and improve the visual. community landscape of the area. As visual quality was discussed in the earlier analyses of the community park site and addressed in the Final Eastern Dublin Specific Plan EIR, any development of urban uses in Eastern Dublin would inalterably change the character of the area. The development of a community park at this location was addresser) by the previous documentation related to Area F, cited as references, and City of Dublin initial Study & Mitigated Negative Declaration Fallon Sports Paris PA 05-021 Page 26 April 26, 2005 I BO found to have a less -than -significant effect on visual quality in the area, basedon the resulting visual benefits to the community provided by the newly landscaped areas and the presence of the open space and recreational use. No impacts not previously analyzed in the Eastern Dublin Specific Plan EIR (EDSP EZR) and the subsequent documents related to Area F of Dublin Ranch will occur as a result of the proposed project. Additionally, measures to maintain the visual quality of the area, especially from views along scenic corridors in Eastern Dublin. Mitigation measures. 3.8/1.0 through 3.8/8.1 of the EDSP EIR require that grading be done sensitively to reduce visual impacts. These mitigation measures have been incorporated into the project. d) Les. -than -significant with Mitigation. The Master Plan for Fallon Sports Parr contains information on the lighting needs for the uses at the park. The park will generally be open from dusk to dawn; however, the various sports Melds, courts and associated parking lots will be lighted. The project may create additional light and glaze for surrounding single-family residential neighborhoods. Low-level lighting will be used along walkways and trail. Sensor lighting lamps with low wattage are proposed for the parking area. New street lights and other security lighting combined with the night lighting for the courts and fields at the park could create a "spill over" effect oflight in the residential areas closest to the site, and may operate as late as 10:00 PM, The following mitigation measure will be added to the project to ensure that the lighting is adequate for the use and unobtrusive to surrounding residences: Mitigation Measure X: A photometric study shall be provided with final construction drawings of the project prior to the issuance of an electrical permit for installation of any lighting. "Spill over" lighting shall be kept to a minimum to prevent disturbance and intrusion into residential areas through the use of lower lighting, with light standards for fields and courts designed to minimize the light intrusion into residential areas. Implementation of this mitigation measure would reduce the impact of nighttime lighting to a level of less -than -significant II. Agricultural Resources a-c) Convert Prime Farmland, conflict with agricultural zoning or convert prime farmland to a non- agricultural use? Less-than-signifkan4 Historically, grazing and cultivation of agricultural crops tools place on the subject 60-acre parcel when it was part of the greater Dublin Ranch area. Surrounding areas near the park have been planned for conversion from agricultural use to urban and residential uses since 1994. The Eastern Dublin Specific Plan/General Plan Amendment EIR, the Master Platt for Fallon Sports Park, the Negative Declaration prepared for the Parks and Recreation Master Plan, and other environmental analysis of Dublin Ranch and Area F in 1997, 2000 and 2004 have concluded that the area will be urbanized during the next five years. The park land contains no current agricultural zoning or farmland, and is zoned for use as a community park, consistent with the General Plan and Specific Plan designation of Parks/Public Recreation & City Parr. Approval and construction of the proposed project would allow further City of Dublin Page 27 Initial Study &]Mitigated Negative Declaration Fallon Sports Park PA 05-021 April 26, 2005 development of land for a much needed sports field park to provide recreational activity areas for surrounding residents and the community. Discontinuation of agricultural use or loss of farmland of local importance were considered less -than -significant impacts in the Eastern Dublin Specific Plan/General Plan Amendment EIR. and previous environmental analyses for Dublin Rauch Area F. Therefore, less -than -significant impacts are anticipated with regard to prime farmland or loss of agricultural production for the sports park property. Based on information contained in the Eastern Dublin Specific Plan/General Plan Amendment BIR, no portion of the site is nor has been encumbered with a Williamson Act Land Conservation Agreement. Similarly, No impacts not previously analyzed in the Eastern Dublin Specific Plan/General Plan Amendment FIR are expected to occur as a result of the proposed project. M. Air Quality Environmental 5ettiag The project is within the Amador Valley, a part of the Livermore sub -regional air basin distinct from the larger San Francisco Bay Area Basin. The Livermore sub -area basin is surrounded on all sides by high hills or mountains. Significant breaks in the hills surrounding the air basin are Niles Canyon and the San Rat -non Valley, which extends northward into Contra Costa County. According to the Eastern Dublin Specific Plan EIR and other environmental studies, the terrain of the Arnador Valley influences both the climate and air pollution potential of the sub -regional air basin. As an inland, protected valley, the area has generally lighter winds and a higher frequency of calm conditions when compared to the greater Bay Area. The occurrence of episodes of high atmospheric stability, known as inversion conditions, severely limits the ability of the atmosphere to disperse pollutants vertically. Inversions can be found during all seasons in the Bay Area, but are particularly prevalent in the summer months when they are present about 90% of the time in both morning and afternoon. Additionally, during the winter, the sheltering effect of terrain and its inland location results in frequent surface -based inversions. Under these conditions pollutants such as carbon monoxide from automobiles and particulate matter generated by fireplaces and agricultural burning can become concentrated. According to the Bay Area Quality Management District, air pollution potential is high in the Livermore-Amador Valley, especially for ozone in the summer and fall. High temperatures increase the potential for ozone, and the valley not only traps locally generated pollutants but can be the receptor of ozone and ozone precursors froin upwind portions of the greater Bay Area. Transport of pollutants also occurs between the Livermore Valley and the San Joaquin Valley to the east. Ambient air quality standards Both the I.T.S. Environmental Protection. Agency and the California Air Resources Board have City of Dublin Initial Study & Mitigated ].Negative Declaration Fallon Sports Park PA 05-021 Page 28 April 26, 2005 141 established ambient air quality standards for common pollutants. These ambient air quality standards are levels that avoid specific adverse health effects associated with each pollutant. The ambient air quality standards cover what are called "criteria" pollutants because the health and other effects of each pollutant are described in criteria documents. The federal and California ambient air. quality standards are summarized in Table 1 for important pollutants. The federal and state ambient standards were developed independently with differing purposes and methods, although both federal and state standards are intended to avoid health -related effects. As a result, the federal and state standards differ in some cases. In general, the California state standards are more stringent. This is particularly true for ozone and PM10. Table 1. Federal and State Ambient Air Quality Standards Pollutant Averaging Time Federal State Primary Standard Standard Ozone 1-Hour 0.12 PPM 0.09 PPM S-Hour Carbon Monoxide 8-Hour 9 PPM 9.0 PPM 1-Hour 35 PPM 20 PPM Nitrogen Dioxide Annual Average 0.05 PPM -- 1-Hour -, 0.25 PPM Sulfur Dioxide Annual Average 0.03 PFM - 24-Hour 0.14 PPM 0.25 PPM 1-Hour PM10 Annual Average 50 ug/m3 30 uWm3 24-How' 150 ug/m3 50 ug/m3 PM2,5 Annual 15 ug/m3 -T 24-Hour 65 ug/m3 -- PPM = Parts per Million -g/m3 = Microgmus per Cubic Meter Source: Bay Area Air Quality Management Distract The U.S. Environmental Protection Agency in 1997 adopted new national air quality standards for ground -level ozone and for fine Particulate Matter, The existing 1-hour ozone standard of 0.12 PPM will be phased out and replaced by an S-hour standard of 0.08 PPM. New -national standards were retained, but the method and form for determining compliance with the standards were revised. Implementation of the new ozone and Particulate Matter standards has been complicated by a lawsuit. On May 14, 199 the Court of Appeals for the District of Columbia Circuit issued a decision ruled that the Clean Air Act as applied in setting the public standards for ozone and particulate matter, was unconstitutional as an improper delegation of legislative authority to the Environmental Protection Agency. The decision has been appealed, but the legal status of the new City of Dublin Initial Study & Mitigated Negative Declaration Fallon Sports Park PA 05-021 Page 29 April 26, 2005 I q-�, standards will probably remain uncertain for some time. Ambient air quality The project is within the nine -county Bay Area Basin. The Bay Area Quality Management District (BAAQMD) operates a network of air quality monitoring sites in the region, including one in central Livermore on Old First Street. Table 2 shows a summary of air quality data for this monitoring site for the period 1995-1999. Data are shown for ozone, carbon monoxide, PM10 and nitrogen dioxide. The numbers of days exceeding each standard are shown for each year. Table 2. Air Quality Data for Livermore,1995-1999 Pollutant Standard Days Exceeding Standard In: 1995 1996 1997 1998 1999 Ozone Federal 1-Hour 7 8 0 6 2 Ozone State 1-Hour 20 22 3 21. 14 Ozone Federal 8-Hour 11 10 0 10 5 Carbon Monoxide State/Federal 8 Hour 0 0 0 0 0 PM10 State 24-Hour 6 6 12 12 18 PM10 Federal 24-Hour 0 0 0 0 Nitrogen Dioxide State 1-Hour 0 0 0 0 Source: Air Sources Board Aerometric Data Analysis and Management System (ADAM) Table 2 shows that concentrations of carbon monoxide and nitrogen dioxide at the Livermore monitoring site meet state/federal standards. Ozone concentrations exceed both the state and federal standards, and exhibit wide variations from year-to-year related to -meteorological conditions. Years where the summer months tend to be warmer than average tend to have higher average ozone concentrations while years with cooler than average temperatures tend to have lower average ozone concentrations. Levels of PM10 at Livermore meet the federal ambient standards but exceed the more stringent state standard. Attainment status The Federal Clean Air Act and the California Clean Air Act of 1988 require that the State Air Resources Board, based on air quality monitoring data, designate air basins within the state where the federal or state ambient air quality standards are not met as "nonattainment areas." Because of the differences between the federal and state standards, the designation of nonattainment areas is different under the federal and state legislation. The Bay Area is currently a nonattainment area for the federal 1-hour ozone standard. Under the City of Dublin Initial Study & Mitigated Negative Declaration Fallon Sports Park PA 05-021 Page 30 April 26, 2005 California Clean Air Act the Bay Area is a nonattainment area for ozone and PM10. To meet federal Clean Air Act requirements, the District has adopted an Ozone Attainment Demonstration Plan. In addition, to meet California Clean Air Act requirements, the District has adopted and updated a Clean Air Plan addressing the California ozone standard. The control strategies contained into these plans include new limits on emissions from industry, prohibitions on sources of hydrocarbons, and buyback programs for older vehicles and educational programs. The California Legislature, when it passed the California Clean Air Act in 1988, recognized the relative intractability of the PM10 problem with respect to the state ambient standard and excluded it from basic planning requirements of the Act. The Act did require the Glean Air Resources Board to prepare a report to the Legislature regarding the prospect of achieving the State ambient air quality standard for PM 10. This report recommended a menu of actions, but did not recommend imposing a planning process similar to that for ozone or other pollutants for achievement of the standard within a certain period of time. Sensitive receptors The Bay Area Air Quality Management District defines sensitive receptors as facilities where sensitive receptor population groups (children, the elderly, the acutely ill and the chronically ill) are likely to be located. These land uses include residences, schools, playgrounds, child-care centers, hospitals and medical clinics. This project would involve construction and development of new park and recreational Facilities where children would play and gather for recreation. a) Would the project conflict or obstruct implementation of an air quality plan? No impact, The proposed project would not conflict with the local Clean Air Plan adopted by the Bay Area Air Quality Management District, since the proposed amount of non-residential development has been included in Dublin's planned growth as part of the Eastern Dublin Specific Plan/General Plan EIR since 1994, and would serve the existing community, Therefore, such impacts would be less -than -significant. b) Would the project violate any air quality standards? Less- than -significant with Mitigation. Short-term construction impacts related to implementation of the project, including grading and excavation, could result in exceeding air quality standards established by the Bay Area Air Quality Management District. Adherence to Mitigation Measures nos. 3.11/1.0, 3.11/3.0, 3.11/4.0 and 3.11/12.0 of the Eastern Dublin Specific Plan/General Plan Amendment EIR has been included in the plans for the preliminary and subsequent grading of the property to reduce short-term air quality impacts to a less -than -significant level. These measures minimize the creation of fugitive dust during grading and construction activities with frequent watering of those areas, and also mandate that construction equipment be kept in proper running order at all times during construction. Additionally, certain mitigation measures for the control of fugitive dust are incorporated into the preliminary grading plans to be implemented as part of the responsibility of the contractor, and monitored by the Inspector for the project. These measures should be incorporated into the construction plans for the park project. The Eastern Dublin Specific City of Dublin Initial Study & NUtigated Negative Declaration Fallon Sports Park PA 05-021 Page 31 April 26, 2005 144 Plan/General Plan Amendment EIR concludes that potential air quality impacts related to construction equipment could not be mitigated to a less -than -significant impact, and a Statement of Overriding Considerations was adopted for this impact. However, potential air quality impacts related to construction on the 60-acres of park development will be mitigated to a less -than - significant impact with the following measures related to air duality impacts incorporated into the future phases of project construction. Mitigation Measure 2: Dust control for the construction and earthwork for the project. shall conform to the requirements of the SWPPP prepared by the City and established City standards. All active construction areas shall be watered daily and more frequently, if necessary. All trucks hauling soil, sand or other loose materials shall be covered. Water shall be applied daily, or apply non -toxic soil. stabilizers on all unpaved access roads, parking area, and staging areas at construction sites. All paved access roads, parking areas and staging areas at construction sites shall be swept daily with water sweepers. Hydroseed or apply non -toxic soil stabilizers to construction areas that have been graded. c) Would the project result in cumulatively considerable airpollutants? Less -than -significant: The Eastern Dublin Specific Plan/General plan Amendment EIR identifies Mobile Source Emissions and Stationary Source Emissions as significant irreversible impacts. A Statement of Overriding Considerations was adopted with certification of the EIR in 1994 and with subsequent environmental documents related to development of the Dublin Ranch Area F. Generally, such impacts are based on vehicular emission from future traffic within the sub -region as well as stationary sources. Similarly, potential air quality impacts related to vehicular traffic emissions on roadways of Reactive Organic Gasses and Nitrogen Oxide, both precursor indicators of smog, and stationary source emissions would not exceed regional air quality standards or thresholds. This project will not generate significant amounts of additional traffic beyond that considered in previous environmental documents, as it serves the existing community with a planned transportation network and roadways engineered to support the development. Therefore, vehicular emissions are estimated to be minimal and impacts would be less -than -significant. d, e) Expose sensitive receptors to significant pollutant concentrations or create objectionable odors? Less -than -significant: Proposed uses in the park will include softball, baseball and soccer fields; tennis and bocce courts; play areas, parking and street frontage improvements with landscaping; an enhanced stream/creekbed corridor; and, connecting trails. Air quality impacts associated with the proposed project are expected to be less- than -significant, as no significant pollutant concentration or creation of objectionable odors are anticipated from the park use and the improvements proposed for project. The only source of pollutants would be vehicles using the roadways adjacent to the park. These items were previously addressed in the Eastern Dublin Specific Plan/Gmeral Plan Amendment EIR, the Negative Declaration in 1997 for Areas B-E, the Mitigated Declaration in 2000 and the Addendum (2004) for Area F of Dublin Ranch. No further impacts not previously analyzed in the Eastern Dublin Specific Plan/General Plan Amendment EIR are expected to occur as a result of the proposed project. City of Dublixi Initial Study & Mitigated Negative Declaration Fallon. Sports Park PA 05-021 Page 32 April 26, 2005 I4 TV. Biological Resources a-d) Have a substantial.adverse impact on special -status species, riparian features, movement offish or wildlife species, or conflict with California Fish & Game or UI S, Wildl(fe Service policies or regulations? Less -than -significant. Impacts from the project upon biological resources were thoroughly addressed in the earlier analysis of the Eastern Dublin Specific Plan/General Plan Amendment EIR, the Negative Declaration in 1997 for Areas B-E, the Mitigated Declaration in 2000 and the Addendum (2004) for Area F of Dublin Ranch, and mitigation measures are currently being undertaken by the Developer of Dublin Ranch Area F (Toll Brothers) to enhance the stream/creek corridor along Lockhart Street and a portion of Gleason Drive, with some filling of wetlands and relocation of species such as tiger salamander and red. -legged frog pursuant to USAGE (United States Army Corps of Engineers) and DFG (California Department of Fish and Game) permits (copies of permits are contained in Appendices Q. Biological analyzes and wetland delineations were conducted for the Eastern Dublin Specific P1an/Gencral Plan Amendment EIR, the Negative Declaration in 1997 for Areas 13-E, as well as the Mitigated Declaration (2000) and the Addendum (2004) for Area F of Dublin Ranch, prior to the development of the preliminary grading plan and issuance of the USAGE and DFG permits, describing both habitat and species present on the project site. Walking trails and other pathways proposed within the park boundaries, as well as proposed structures, are located on the site plan for Fallon Sports Park in accordance with setbacks and buffers approved by the USAGE and DFG permits. A number of mitigation measures are included in the Eastern Dublin Specific Plan/General Plan Amendment EIR to reduce significant impacts on biological resources, IM 3.7A through S, which still apply to the project site and reduce all such impacts to a less -than -significant level. Additionally, the Mitigated Declaration in 2000 for Area F contained two Supplemental Mitigation Measures 2 and 3 to protect special -species and wetlands in this planning area. There would be a less -thane -significant impact on biological resources with the measures and the mitigation measures allowed under agency permits, currently underway at the project site. e, f) Conflict with any local policies or ordinances protecting biological resources, such a.s tree protection ordinances. No impact The Fallon Sports Park project's preliminary plan has been designed to be consistent with all Eastern Dublin Specific Plan, General Plan and other adopted policies and mitigation measures related to preservation and protection of biological resources. Mitigation measures are currently underway in accordance with USAGE and DFG permits. Few trees are located on the Sports Park site due to the past agricultural cultivation of the land, and a substantial amount of landscaping and plantings will be installed on the site to enhance the appeal of the area and upgrade the present vegetation along the creek. Additionally, landscaping and vegetation will be installed around manmade structures and improvements proposed for the site. No known Heritage trees exist on the site. Additionally, the proposed project is not located within the boundaries of any Habitat City of Dublin Initial Study & Mitigathd Negative Declaration Fallon Sport4 Park FA 05-021 Page 33 April26, 2005 16+0 IV, Biological Resources a-d) Have a substantial adverse impact on special -status species, riparian features, Movement offish or wildlife species, or conflict with California Fish & Game or U.S. Mildlife Service policies or regulations? Lees-than-signheart. Impacts from the project upon biological resources were thoroughly addressed in the earlier analysis of the Eastern Dublin Specific Plan/General Plan Amendment EIR, the Negative Declaration in 1997 for Areas B-E, the Mitigated Declaration in 2000 and the Addendum (2004) for Area F of Dublin Ranch, and mitigation measures are currently being undertaken by the Developer of Dublin Ranch Area F (Toll Brothers) to enhance the stream/creek corridor along Lockhart Street and a portion of Gleason Drive, with some filling of wetlands and -relocation of species such as tiger salamander and red -legged frog pursuant to USAGE (United States Army Corps of Engineers) and DFG (California Department of Fish and Game) permits (copies of permits are contained in the 2004 Addendum and incorporated here by reference). Biological analyzes and wetland delineations were conducted for the Eastern Dublin Specific Plan/General Plan Amendment EIR, the Negative Declaration in 1997 for Areas B-E, as well as the Mitigated Declaration (2000) and the Addendum (2004) for Area F of Dublin Ranch, prior to the development of the preliminary grading plan and issuance of the USAGE and DFG permits, describing both habitat and species present on the project site. Walking trails and other pathways proposed within the park boundaries, as well as proposed structures, are located on the site plan for Fallon Sports Park in accordance with setbacks and buffer's approved by the USAGE and DFG permits. A number of mitigation measures are included in the Eastern Dublin Specific Plan/General Plat- Amendment EIR to reduce significant impacts on biological resources, 1M 3.7A through S, which still apply to the project site and reduce all such impacts to a less -than -significant level. Additionally, the Mitigated Declaration in 2000 for Area F contained two Supplemental Mitigation Measures 2 and 3 to protect spacial -species and wetlands in this planning area. There would be a less -than -significant impact on biological resources with the measures and the mitigation measures allowed under agency permits, currently underway at the project site. e, f) Conflict with any local policies or ordinances protecting biological resources, such as tree protection ordinances. No impact: The Fallon Sports Park project's preliminary plan has been designed to be consistent with all Eastern Dublin Specific Plan, General Plan and other adopted policies and mitigation measures related to preservation and protection of biological resources. Mitigation measures are currently underway in accordance with USAGE and DFG permits, Few trees are located on the Sports Park site due to the past agricultural cultivation of the land, and a substantial amount of landscaping and plantings will be installed on the site to enhance the appeal of the area and upgrade the present vegetation along the creek. Additionally, landscaping and vegetation will be installed around manmade structures and improvements proposed for the site. No known Heritage trees exist on the site. Additionally, the proposed project is not located within the boundaries of any Habitat City of Dublin Page 33 initial Study & Mitigated Negative Declaration Fallon Sports Park PA 05-02 ] April 26, 2005 IL41 Conservation Plan. No biological resource impacts not previously analyzed in the Eastern Dublin Specific Plant/General Plan Amendment EIR, the Negative Declaration in 1997 for Areas B-E, as well as the Mitigated Declaration (2000) and the Addendum (2004) for Area F of Dublin Ranch, are expected to occur as a result of the proposed project. In accordance with the approval conditions of the USAGE wetland fill permit dated May 23, 2003; U.S.Fish &Wildlife Service Biological Opinion dated July 1, 2002; RWQCB 'Water Quality Certification Order dated April 22, 2003; and, DFG 1603 lake and Streambed Alteration Agreement dated June 5, 2003, mitigation measures applicable to the park site addressing impacts on candidate, sensitive or special status species have already been implemented, and the Developer has obtained all necessary permits from the appropriate State and Federal agencies. Based on implementation of these measures, species impacts are no longer considered to be applicable to this project, V. Cultural Resources a-d) Cause substantial adverse change to significant historic, archeological or paleontological resources or human remains? No impact. The Eastern Dublin Specific Plan/General Platt Amendment Elk identified a number of potentially significant impacts associated with development in East Dublin, including disruption or destruction of prehistoric resources, and disruption to historic resources. In May 1999, Holman and Associates performed an additional survey of the properties in Area F of Dublin Ranch, and no potentially significant prehistoric archaeological materials or indicators were found on the proposed park site. Although there are no historic structures/resources or known archeological or paleontological resources on this site, Mitigation Measure 3.9/5.0 contained in the Eastern Dublin Specific Plan/General Plan Amendment EIR establishes procedures in the event archeological resources are encountered during grading for development of the park. These measures have been incorporated into the grading project currently underway, and will be followed in the event that subsurface deposits are discovered during the continuing development of the Fallon Sports Park. No impacts not previously analyzed in the Eastern Dublin Specific Plan/General Plan Amendment EIR, the Negative Declaration in 1997 for Areas B-E, as well as the Mitigated Declaration (2000) and the Addendum (2004) for Area F are expected to occur as a result of the proposed project. Therefore, No impacts are anticipated related to cultural resources because of implementation of the Park development. VI. Geology and Soils a) Expose people or structures to potential substantial adverse impacts, including lass, injury or death related to ground rupture, seismic ground shaking, groundfiailure, landslide,, substantial erosion, unstable soils, or liquefaction? ,I ess-than-significant. Preliminary geotechnical reports were prepared for Area F in Eastern Dublin, including the subject Project site, as part of the environmental review for the properties with both the Negative Declaration in 1997 and the Mitigated Negative Declaration in 2000. A follow-up geotechnical survey for the Fallon Sports Park site was prepared by Berlogar Geotechnical Consultants prior to the development of the preliminary grading plan prepared by MacKay & Somps in 2004 for the site. The recommendations of the geotechnical report have City of Dublin Initial Study & Mitigated Negative Declaration Fallon Sports Park PA 05-021 Page 34 April 26, 2005 14% been incorporated into the preliminary plans for development of the site. The site is subject to groundshaking caused by a number of regional faults such as the Calaveras, Greenville, Hayward and San Andreas Faults. The Eastern Dublin Specific Plan/General Plan Amendment EIR identifies several potential impacts to soils and geology, including earthquake and ground shaking, ground rupture, seismic ground shaking, impacts to groundwater resources, shrink -swell potential due to expansive soils, slope stability, erosion and sedimentation, in many locations in the Specific Plan planning area and established mitigation ieasures to be incorporated into projects in the area. As the site is not within a Special Study Zone for faults as identified by the State of California under the Alquist-Priolo Special Studies Zayre legislation, the potential for ground rupture is expected to be minimal. However, under moderate to severe seismic events which are probable in the Bay Area over the next 30 years, buildings, utilities and other improvements constructed at the Project site could be subject to damage caused by groundshaking. Mitigation Measures 3.611.0 through 8.0 contained in the Eastern Dublin EIR were adopted to ensure that new structures built within Area F will comply with generally recognized seismic safety standards to reduce groundshaking impacts to a level of less -than-significant. The mitigation measures referred to also are consistent with the recommendations of the last geotechnical study for the site. b) Is the site subject to substantial erosion and/or loss of topsoil? Less-than-signiflcant! The Eastern Dublin EIR notes that the impact of constructing all the land uses identified in the Eastern Dublin Specific Plan/General Plan would be an increase of erosion and sedimentation caused by grading activities. Consistent with adopted Mitigation Measures 3.6/27.0 of the EIR, the Conditions of Approval require preparation and implementation of interim erosion plans as part of grading plans and permitting. These requirements will be reflected in the plans prepared by MacKay & Somps in conjunction with City Public Works Department Staff. As noted in the 2000 Mitigated Declaration for Area F and the 2004 Addendum for Areas B-E, standard City of Dublin development Conditions of Approval require erosion control plans and preparation of a Stormwater Pollution Prevention flan to minimize the impacts of erosion and loss of soil. Project construction documents will reflect these conditions, and also ensure that all improvements to the park will comply with generally recognized seismic safety standards so that ground shaking or ground failure impacts would be reduced to a level of less -than -significant. Additionally, less -than -significant impacts are anticipated in the park phase related to soil or geotechnical hazards as the recommendations of the geotechnical engineer have been incorporated into the Project. c-d) Is the site located on soil that is unstable or expansive, or result in potential lateral spreading, liquefaction, landslide or collapse? Less -than -significant; The Project site is located on the T'assajara Formation and contains areas of colluvium soil, and a small amount of landslide debris near the intersection of Lockhart Street and Central Parkway. The soil has a high shrink -swell potential, and Mitigation Measures 3.6/14.Othrough 16.0 of the Eastern Dublin EIR were adopted to reduce potential shrink -swell impacts to a level of less -than -significant by requiring appropriate structural foundations, underlying support for court and parking areas, and other related techniques to overcome the City of Dublin Initial Study & Mitigated Negative Declaration Fallon Sports Park PA 05-021 Page 35 April 26, 2005 1417 adverse effects. No additional mitigation measures are required. Additionally, less -than - significant impacts are anticipated in the development of the park related to soil or geotechnieal hazards as the recommendations of the geotechnical engineer have also been incorporated into the Project. e) Does the site have soils capable of supporting on -site septic tanks if sewer,e are not available? No impact. The park property is in the process of being connected to the sewer system with service provided by the Dublin San Ramon Services District. Therefore, there will be No impact related to septic tanks or systems. VIl. Hazards and Hazardous Materials a-d) Create a significant hazard through transport of hazardous materials or release or emission of hazardous materials, andlor listed as a hazardous materials site? No impact. The proposed use of the site would include construction of recreational facilities for the Fallon Sports Park, and street frontage improvements along Central Parkway, Fallon Road and Lockhart Street. Recreational improvements on this site were discussed in the Eastern Dublin Specific Plan/General Plan Amendment EIR, and have always been planned for this property. No hazardous material has been transported to or from the site, nor is anticipated to be done in the future as the site will be a public park. Phase I and 11 hazardous materials studies were completed for the site by Berlogar Geotechnical Consultants in 1996 and. 1997, which found no hazardous materials on the site. The site has not been listed as containing a historical hazardous site, hazardous material generator or transporter location, nor is it known to contain underground storage tanks according to the site assessments. Additionally, there is no change in the conclusion in the previous environmental documents for the site that only minor and .less -than -significant quantities of potentially hazardous materials would be associated with the park use. Materials would include normal and customary substances such as lawn chemicals, household solvents and similar items in minimal quantities. Therefore, the project would not involve the use or transportation of hazardous material, and there would be No impact with regard to the release of hazardous materials. e, f) Is the site located within an airport laud use plan of a public airport or private airstrip? No impact. The site is not located within an airport land use plan or within the vicinity of a public airport. The Livermore Municipal Airport and the ALUC confirmed in 1999 that the Area F Planning Area in Eastern Dublin was outside the referral area for the airport, and the ALUC has no jurisdiction over the land uses. Therefore, No impacts are anticipated regarding airport noise and crash hazard zones. g,h) Interference with an emergency evacuation plan, expose people and structures to a significant risk involving wildland fires, and are nearby residences intermixed with wildlands? City of Dublin Initial Study & Mitigated Negative Declaration Fallon Sports Park PA 05-021 Page 36 April 26, 2005 No impact. Since the project would convert undeveloped laud to a paved parking lot, and recreational facilities with associated structures, the proposed driveways with entry features from Lockhart Street and Central Parkway will provide adequate emergency access. Adequate emergency access as shown on the Master Plan for the park has been approved by the Alameda County Fire Department which provides services to Dublin. Additionally, a Fire Station is located adjacent to the park with access from Fallon Road. Due to the provision of adequate access to and from the site, there would be No impact with regard to any emergency evacuation. plans. Additionally, the project site is presently vacant grassland, but in the future, based on plans approved by the City and ensuing construction, the adjacent lands will soon be an urbanized area. The park will be improved with irrigation from new water lines and services that will be regularly maintained, as will the surrounding future developed area. Therefore, the risk of wildland fire is anticipated to be minimal, and No impact is expected relative to wildfires in the project area.. VIII. Hydrology and Water Quality a-i) Violate any water quality standards or waste discharge requirements, depute groundwater resources, alter drainage patterns, effect surface or subsurface water quality, result in placing housing in a flood plain? Less -than -significant. Portions of the Project site are characterized by slopes above 5%, An intermittent creek flows along the west boundary of the site and proceeds to the east slightly across the northwest corner of the property neat` the intersection of Lockhart Street and Fallon Road. Improvements and preliminary grading is currently in process at the site as part of the larger Area F project. In accordance with the approval conditions of the USACE wetland fill permit dated May 23, 2003; U.S.Fish &Wildlife Service Biological Opinion dated July 1, 2002; RWQCB Water Quality Certification Cyder dated April 22, 2003; and, DFG 1603 Lake and Streamhed Alteration Agreement dated June 5, 2003, mitigation measures applicable to addressing impacts on creek on the park site and water quality provisions have already been implemented, and the Developer of Area F has obtained all necessary permits from the appropriate State and Federal agencies. Additionally, the project preliminary grading plan conforms to Alameda County Flood Control and Water Quality District, Zone 7 requirements and meets the water quality standards of the City of Dublin's NPDES permit and the Alameda County Urban Runoff Clean Water Program. The contractor selected by the City to develop parr project will be responsible for obtaining all permits necessary from Zane 7 prior to construction, and follow all provisions of the City's SWPPP and the Water Quality Control Board requirements. These requirements will he reflected by the plans prepared by MacKay & Somps in conjunction with City Public Works Department Staff. As noted in the 2000 Mitigated Declaration for Area F and the 2004 Addendum for Areas B-E, standard City of Dublin development Conditions of Approval require erosion control plans and preparation of a Stormwawr Pollution Prevention Plan. No additional water quality impacts are anticipated. City of Dublin Page 37 Initial Study & Mitigated Negative Declaration Fallon Sports Paris PA 05-021 April 26, 2005 Although the Eastern Dublin EIR acknowledges that grading and recontouring of the land for. the park will change existing natural drainage patterns, the existing creek on the site will be improved and enhanced, and swales will be constructed to filter and absorb stormwater and run- off at the site. Diagrams of the utility systems, including pipes, culverts, drainage and stormwater systems are included in the Master Plan for the Fallon Sports Park, and are currently being installed at the site with the appropriate permits under the development plan for Area F, Adherence to mitigation measures nos, 3.5/20.0, 3.5/44.0, 3.5/47.0 through 3.5/55.0 of the Eastern Dublin Specific Plan/General Playa Amendment EIR requiring proper drainage and run-off control, and the use of biodegradable pesticides and herbicides, will reduce surface water quality pollution and provide the proper drainage facilities for the site, thereby reducing the impacts on water quality and drainage to a level of less-than-signifzcame, Additionally, the City Public Works Department has performed extensive hydrology and drainage studies to insure that all stormwater and drainage facilities constructed for the park contain sufficient capacity to service the projected development of the Master Plan for the Parr. The site is not located within a 100-year flood plain as identified on the applicable Flood Insurance Rate Map published by the Federal Emergency Management Agency. Construction of the Fallon Sports Park recreational facilities will be consistent with all the previous actions and environmental documentation approved by the City of Dublin for east Dublin. No impacts not previously analyzed in the Eastern Dublin Specific Plan/General Plan Amendment EIR are expected to occur. IX. Land Use and Planning a) Physically divide an established community? No impact. The project is consistent with the General Plan and planned recreational and open space uses in the Eastern. Dublin Specific Plan/General Plan Amendment EIR and in the plans for Area F. As this property has always been planned to be an open space type use, it is a consolidated open area consisting of 60 acres on the eastern edge of Area F, adjacent to Fallon Road. Residential development exists across Fallon Road, and is currently being constructed by Toll Brothers adjacent to the future extension of Lockhart Street. To the east of the park site, additional urbanization, predominately residential, is anticipated to occur in the fixture in the East Dublin property Owners development. No residential subdivision or community is divided by the park as all the uses have been master planned in an orderly fashion. Therefore, there would be no disruption of any established community because the proposed facilities for Fallon Sports Park are designed to serve new and existing development in east Dublin, providing recreational facilities within walking distant to residents and community access routes. Therefore, the park development will result in no negative or adverse impact on land use or the community. b) Conflict with any applicable land use plan, policy or. regulation? City of Dublin Page 38 Initial Study & Mitigated Negative Declaration Fallon Sports Park PA 05-021 April 26, 2005 1 No impact. The Fallon Sports Park Phase project is consistent with the goals and policies contained in both the Eastern Dublin Specific Plan and General Plan, which indicate that these facilities are needed to serve the growing population in east Dublin and the other growing areas of the community. The Specific Plan and General Plan land use maps include the designation for this park site as a City Park and Park, and refer to the Dublin Parks and Recreation Master Plan, recently updated in 2004, for a description of the land use activities and types of facilities to be provided in the park. Additionally, the Master Plan for the Fallon Sports Park is a comprehensive plan for the development of the recreational facilities to serve the activity needs of the surrounding community, and proposes ballfields and sports courts consistent with the projected uses in the Parks and Recreation Master Plan. The park site is also located near a planned school site, and will be used by schools as needed for recreational activities and events. The City presently does not have a recreational facility of this size that will serve the organized sports popular in a growing community. Therefore, the park development is consistent with all land use plans, policies and regulations of the City, and will result in no negative or adverse impact on land use. c) Conflict with a habitat conservation plan or natural community conservation plats? No impact. No such plan has been adopted within the Eastern Dublin Specific Plan area. There would, therefore, be No impact to a habitat conservation plan or natural community conservation plan for the existing site. X. Mineral Resources a, b) -Result in the lass of availability of regionally or locally significant mineral resources? No impact. The Eastern Dublin Specific Plan/General Plan Amendment EIR does not indicate that significant deposits of minerals exist on the site. Additionally, the site is not shown as a location for mineral or aggregate resources on State Mineral Resource maps. No impacts related to the loss of mineral resources would occur as a result of the project. X1. Noise a-d) Would the project expose persons or generation of noise levels in excess of standards established by the General Plan or other applicable standard, expose people to groundborne vibration, or result in permanent increases in ambient noise levels? Less -than -significant. Major sources of noise on and adjacent to the Project site include distant noise generated by vehicles traveling through the Eastern Dublin planning area on I-580, traffic sources on Tassajara Road and from aircraft flyovers. The Eastern Dublin Specific Plat/General Plan Amendment EIR addressed potential noise impacts of adopting and implementing the Eastern Dublin Specific Plan/General Plan, which included the development of Area F and the Fallon Sports Park. Short-term noise -related impacts were identified in the EIR which included exposure of residents to increased levels of noise from construction of proposed residential, park and improvernent development in east Dublin. City of Dublin Initial Study & Mitigated Negative Declaration Fallon Spouts Park PA 05-021 39 April 26, 2005 Mitigation measure nos. 3.10/4.0 and 3.10/5.0 contained in the Eastern Dublin EIR require individual project builders to prepare construction noise management plans to minimize noise as well as adhere to construction hour limitations. City of Dublin standard Conditions of Approval required by the Public Works Department for all projects constructed in the City also include preparation of a construction noise management plan and construction hour limitations. Including these measures in all construction phases for the project will mitigate or minimize construction noise impacts to a level of less -than -significant. I4owever, short-term construction related noise could be expected which would be considered significant depending on the specific type of equipment used in the grading process for the parking lot and various sports courts and paved areas. The City has adopted common practices for all construction and grading operations, and which are included in the construction documents for the Project, to limit the hours of construction to 7:30 a.m. to 5 p.m., Monday through Friday, including the idling of equipment, unless the Director of Public Works approves alternative hours. Additionally, all equipment used on the construction site is to be in good, well -maintained condition, and mufflers, to minimizenoise generation that could affect the residents in the area of the park. Therefore, noise -related impacts of the project will be reduced to a less -than -significant impact. e, f) No impact The project is not located within an airport land use plan or within two miles of a public airport, public use airport, or a private airstrip. Therefore, the project will not expose people in the project area to excessive noise levels. X11. Population and Housing a) ,induce substantial population growth in an area, either directly or indirectly? No impact. Implementation of planned recreational facilities will not induce additional growth in Eastern Dublin that has not been projected for in the Eastern Dublin Specific Plan/General Plan Amendment EIR, and subsequent environmental documents. The proposed recreational facility and community park were planned well in advance of actual development in the eastern area of the City to serve projected residential units and those already planned and approved. Therefore, no population growth impacts are anticipated as a result of this project. b, c) Would the project displace substantial numbers of existing housing units or people? No impact. The project site is designated as a park on the Dublin General Plan, and a City Park in the Eastern Dublin Specific Plan and the Parks and Recreation Master Plan for residents in the immediate and surrounding areas of Dublin, The site is currently being developed as parkland with preliminary grading underway with appropriate permits as part of the approved and permitted development of Area F. The property has never been designated for housing nor previously developed for such use. Displacement of housing units or people, therefore, would not occur. Additionally, the site was vacant and undeveloped prior to construction of other development in the area. EDSP Mitigation measures 3.4/20.0 through 3.4/35.0 are designed to ensure that adequate parks and recreational facilities are provided in the community near residential development to serve the growing population of Dublin. This project is planned to serve the residential growth and residents City of Dublin Page 40 Initial Study & Mitigated Negative Declaration Fallon Sports Park PA 05-021 April 26, 2005 �-t in the immediate area based on the park standards in the Parks and Recreation Master plan. Therefore, No impacts related to displacement of housing units or people are anticipated. XYII. Public Services a-c) Potential impacts related to: fire protection, police protection, schools, maintenance, or solid waste generation? No impact. Construction and operation of the proposed recreational facilities will not create a need for new public services or facilities. The Alameda County Fire Department and the Dublin Police Department have reviewed the project to ensure that the facility meets their criteria for public use. An additional fire station has been built in the east Dublin area adjacent to the Park site to serve the planning area. Additionally, the park plan has been designed in conjunction with security criteria provided by the Police Department. The Eastern Dublin Specific Plan, as a basis for the provision of the Fallon Sports Park at this location, included sufficient fire safety resources to serve the projected growth and facilities in the area. The City of Dublin will provide maintenance of streets, roads, the park and other related governmental facilities. Solid Waste service will be provided by the Livermore Dublin Disposal Company. As these services will already be extended to the Area F planning area; no significant impacts related to public services is anticipated. XIV. Recreation a, b) Would the project increase use of existing neighborhood or regional parks or require the construction of new recreational facilities? No impact. The proposed project does not include residential development, so there would be no increase in the need for or impact on recreational facilities. The project would add a much needed recreational facility with various types of active recreational uses to the east Dublin area, thereby increasing the City's recreational resources and facilities to serve the community. No adverse impact related to recreational facilities will result, but rather, the park development will provide more recreational activities and facilities and opportunities for the neighborhoods being developed in east Dublin and for the public's use, Based on the criteria of the updated Parks and Recreation Master Plan (2004), a standard requirement of 3.5 acres of community parkland is needed per 1,000 residents. Area F is anticipated to have a population of 2,725 residents in the planning area at build -out. Approximately 10 acres of community parkland would be needed for Area F, and the Fallon Sports Park at 60 acres well exceeds the community parkland requirement for the planning area. Therefore, the Project will have a beneficial impact on the provision of parr facilities, and not have an adverse impact on park or recreational facilities. XV. Transportation/Traffic a-g) Cause an increase in traffic which is substantial to existing traffic load and street capacity, exceed LOS standards for CMA roadways, change of stir traffic patterns, increase traffic safety hazard, provide for inadequate emergency vehicle access, inadequate parking, provide hazard City of Dublin Page 41 Initial Study & Mitigated Negative Declaration Fallon Sports Park PA 05-021 April 26, 2005 ism or barrier to alternative transportation modes? Less -than -significant. To implement the transportation and circulation aspects of the Eastern Dublin Specific Plan/General Plan based on future land use projections with existing, the City has undertaken a comprehensive program of transportation improvements in the community. The purpose of this program is to accommodate anticipated traffic from the Eastern Dublin area. Overall, the program includes upgrades to the I-580 freeway intersections, construction of new roads and improvements to existing roads. These improvements are required to be installed by the developer of a specific project which will be generating additional traffic in the area, or through the Capital Improvement Program (CIP). Improvements are primarily funded from fees collected from new development in eastern Dublin. Traffic Impacts & Improvements: An extensive traffic analysis was prepared for the original Eastern Dublin Specific Plan/General Plan EIR approved in 1994 to establish this program. That analysis identified 16 potentially significant and potentially cumulatively significant impacts related to the development of the Specific Plan. Although many of these impacts could be reduced to a level of less -than -significance, a Statement of Overriding Consideration was adopted for impacts to mainline I-580 and I-680 freeways, cumulative freeway impacts; Santa Rita & I-580 eastbound freeway ramps due to existing level of traffic; and, cumulative impacts on Dublin Boulevard. Additionally, the 1997 Mitigated Negative Declaration for Planning Areas B-E, in which the Fallon Sports Park property was included for community parr use, did not identify new or supplemental impacts or mitigation measures in addition to those already identified in the early environmental document. The 2000 Mitigated Negative Declaration identified a number of supplemental mitigation measures to be implemented with the Dublin Ranch Area A project as a result of changes to the Land Use Plan of the Specific Plan, but not as a result of proposed community park use. Less -than -significant impacts are anticipated with regard to traffic and parking for the proposed recreational improvements at the Fallon Sports Park site. Several new traffic improvements and extensions of roadways are underway at the present time to facilitate the overall development scheme for Area F. The existing and proposed roadway improvements in Area F have been designed, sized and approved to provide adequate transportation facilities and transit modes with sufficient capacity for the park use. The following extensions and improvements will be completed prior to the completion of Phase 1 of the Fallon Sports Park (see Exhibit E for phasing); • Lockhart Street is proposed for extension with the development underway for Area F, and is projected to be completed in 2005; • Central parkway is proposed for extension in fiscal year 2005-2006; • Fallon Road will be improved in fiscal year 2005-2006; • A traffic signal will be installed at the Gleason Drive/Fallon Road intersection in fiscal year 2005-2006; and, • A second traffic signal may be installed at the main entry to the Park on Lockhart Street if CalTraus warrants are met. City of Dublin Initial Study & Mitigated Negative Declaration Fallon Sports Park PA 05-021 Page ,42 April 26, 2005 An October 23, 2003 Traffic Study prepared by TJ M for the design of Lockhart Street proposed on four-way intersection on Lockhart Street at the entrance to the park. The current plan for the Park shows two intersections on .Lockhart Street: one at the main entrance to the Park and the second across from the pedestrian bridge. Both these intersections will connect with streets from the adjacent neighborhoods. At the present time, there has been no study of the entry location off Central Parkway. Although this is the preferred location of the Central Parkway entrance, further study of this entrance is needed to determine the optimum location as future multi -family development is planned across from the Park on Central Parkway. A mitigation measure is proposed as follows: 1ll&xigutinn Measure ; Future study of specific location of the entrance to the Park from Central Parkway shall he completed prior to development of the Lower Terrace Phase of the Project, with consideration given to the potential multi -residential land use across Central Parkway from the Parr. Impacts related to transportation are anticipated to be reduced to a less -than -significant level with the mitigation measure above and those included in the mitigation for the development of Area F, in process at this time. Parking Analysis/Study_ No impact. Additionally, a parking study was prepared for the Master Plan for the sports park by Carducci &. Associates which analyzed the parking needs for the various recreational activities and sports fields planned for the Park. The parking study anticipated the parking needs for each type of recreational facility, activity, court, or field proposed for the Park, and determined that approximately 500 parking spaces would be needed to serve park users. The Park is also designed with pedestrian connections to the various surrounding neighborhoods and the school site across Lockhart Street. Due to spatial and grading constraints, and the location of environmentally sensitive areas adjacent to the creek, a total of 459 spaces are proposed for location within the boundaries of the park, and divided between the two proposed parking lots accessed by Lockhart Street and Central Parkway (see Master Plan Exhibit B). An additional 84 on -street parking spaces will also be available for a total of 524 parking spaces. Overflow parking on late afternoons, evenings and weekends will be able to park in the lots of the school on Lockhart Street. Therefore, no adverse impacts relative to parking areas are anticipated. Pedestrian_ Circulation &Pathways: No impact. A system of pathways will provide access for pedestrians to all areas of the Park. The pathway system also provides neighborhood connections to promote community use of the facility from all sides of the Park. All pathways on the site are accessible and connect to perimeter sidewalks along the Park boundaries, and to the Tassajara bike trail. A pedestrian bridge on the southern portion of Lockhart Street will provide access from the proposed school and on -street parking. As this system of pathways and walkways will provide complete access to all areas of the Park and surrounding neighborhoods and trails, there are no adverse impacts related to pedestrian and bike access. Uity of Dublin Initial Study & Mitigated Negative Declaration Fallon Sports Paris PA 05-021 Page 43 April 26, 2005 I t5l XVI. Utilities and Service Systems a-g) Exceed wastewater treatment requirements of the RWQCB, require new or expanded water or wastewater treatment facilities, require new storm drain facilities, require additional water supplies, require new or expanded wastewater treatment facilities, or require new solid waste facilities? No impact. Since the subject site is within an area where the extension of urban services is underway, and in adjacent areas already available, the construction of the proposed recreation facilities will not increase the need for additional water or wastewater services. Some service connections are anticipated prior to opening the facilities for public use. The project was taken into consideration when the water and wastewater facilities where planned for the,east Dublin area, and considered in the previous environmental documents prepared for Area F. Therefore, there will be no need for additional mitigation measures than those already established by the Eastern Dublin Specific Plan/General Plan Amendment EIR. XV. Mandatory Findings of Significance a) Does the project have the potential to degrade the quality of the environment, substantially reduce the habitat of a fish or wildlife species, cause a fish or wildlife population to drop below self-sustaining levels, threaten to eliminate a plant or animal community, reduce the number of or restrict the range of a rare or endangered plant or animal or eliminate important examples of the major periods of California history or prehistory? No impact. The preceding analysis indicates that the proposed project will not have a significant adverse impact on overall environmental quality, including biological resources or cultural resources, with the implementation of mitigation measures included in the Eastern Dublin Specific Plan/General Plan Amendment EIR, as discussed in this document. %) Does the project have impacts that are individually limited, but cumulatively considerable? ("Cumulatively considerable " means that the incremental effects of a project are considerable when viewed in connection with the effects of past projects, the effects of other current projects and the effects of probable future projects), No impact. Although incremental increases in certain areas can be expected as a result of constructing this project, including air emissions, light and glare, the project site lies within an area with an approved specific plan which permits urbanized development and community facilities. Mitigation measures are included in an approved EIR that would reduce any residual impacts on the surrounding residential community to less -than -significant levels. c) Does the project have environmental effects that will cause substantial adverse effects on human beings, either directly or indirectly? No impact, No such impacts have been discovered in the course of preparing this Initial Study. City of ]>Ublin Page 44 initial Study & Mitigated Negative Declaration Fallon Sports park PA 05-021 April 26, 2005 BACKGROUND INFORMATION INITIAL STUDY PREPARER Janet Harbin, Senior Planner City of Dublin Community Development Department AGENCIES AND ORGANIZATIONS CONSULTED The following agencies and organizations were contacted in the course of this Initial Study: City of Dublin Community Development Department City of Dublin Parks and Community Services Department City of Dublin Public Works Department City of Dublin Police Department Alameda County Fire Department, Dublin Division REFERENCES City of Dublin General Plan, updated November 2002. City of Dublin Zoning Ordinance. 2000. Construction Project Plans for Fallon ,Sports Park, prepared by MacKay & Somps, dated November 10, 2004. Geotechnical Investigation for Fallon Park, prepared by Kleinfelder Engineering, November 22, 2004. Eastern Dublin Specific Plan with u dates Eastern Dublin Specific Plan/General Plan Amendment Environmental Irr1 act Report, Wallace Roberts and Todd, 1994, and subsequent Negative Declarations & Mitigated Negative Declarations. Parks and Recreation Master Plan. 1994, with update in 2004. Final Eastern Dublin Specific Plan. Wallace Roberts and Todd, 1998. Master Plan for Fallon Sports Park, prepared by Carducci &.Associates, November 30, 2004 City of Dublin Page 45 initial Study & Mitigated Negative Declaration Fallon Sports Park PA 05-021 April 26, 2005 FALLON SPORTS PAR DEVELOPMENT & MITIGATED NEGATIVE DECLARATION PA 05-021 FETTERS OF COMMENT RECEIVED WITH RESPONSES A) ,Alameda County Flood Control & Water Conservation District - Zone 7 $) City of Livermore I sm #� I I 4� Al"FACHMENT 4 CITY OF DL BLIN 100 Chic Plaza, DUblin, California 9,1566 Website: http;llwww.c:i.dublin.c.a.us May 26, 2005 Jim Horen, Principal Engineer Advance Planning Section Alameda County Flood Control and Water Conservation District Zone 7 100 North Canyons Parkway Livermore, CA. 94551 RE: Comments on Initial Study/Mitigated Negative Declaration Fallon Sports Park (PA 05-021) Dear Mr. Horen: The City appreciates your Comments of May 13, 2005 on the Fallon Sports Park (PA 05-021) project proposed in eastern Dublin. The Master Plan for the Fallon Sports Park was approved in November 2004, and implemented the park established by the East Dublin Specific Plan and General Plan Amendment adopted in 1994. Since the original conception of the plan for the Park, the City Council. has also adopted a new barks and Recreation Master Plan (2004), which addressed the features and locations of the proposed facilities for the Sports Park. Regarding your first comment relative to the fees that the Applicant will be required to pay for Zone Ts review of the project, the City of Dublin collects the Zone 7 fees at the Building Permit stage, and then forwards the funds to Zone 7. In this case, because the sportsfield park project is a City sponsored project on land dedicated to the City through. the agreement related to Dublin Ranch Area F, the City intends to pay any and all required fees to the various peniiitting agencies prior to development and improvement of the Fallon Sports Park. Payment of these fees Was included as a mitigation measure in the Eastern Dublin General Plan/Specific Plan E1R and the Mitigation Monitoring Program applicable to this Project. In response to DSRSD's second comment, the project does not propose to improve or enhance the stream corridor as it is not within the boundaries of the park area, The improvement and enhancement of the corridor is underway as part of the development of Area I~ of Dublin Ranch and was analyzed in previous environmental documents for that project (1997 Negative Declaration, 2000 Mitigated Negative Declaration, and 2004 Addendum), as stated in the Fallon Sports Park Development Initial Study on page 33 and 34. DSRSD reviewed the environmental documents and improvement plans, including the hydrology study, in their review of the Dublin Ranch Area F and Dublin Ranch Area F North Projects prior to issuance of grading permits for that project. This information is on file with the District. All appropriate permits from USACE, CDF&G and RWQCB were obtained prior to the commencement of the grading and improvement activities for the Area F projects, as detailed on page 33 of the Fallon Sports Parr Development Initial Study. Any site -specific mitigation measures relative to Fallon Sports Park such as landscaping around manmade structures, parking areas, and sportsfields and courts are contained in the Initial Study for PA 05-021. Other potential impacts of the project will be reduced to a Area Cade (925) - City Manager 833-6650 - City Council 833-6654 - Personnel 833-6605 - Economic Development 833-6650 Finance 83.'i-664❑ • PubflC Works/£rvneering 833-6630 - Perks e. Cornmuiflly Servious 833-6845 • Police 833-6670 Planning/Code Enforcement 833-6610 - BuiUng Inspection 833.6620 - Fire Prevention Bureau 833.6606 Prinfed on Recycled Paper Letter to Zane 7 — Mitigated Negative Declaration Page 2 Fallon Sports Park Development PA 05-021 level of insignificance with the mitigation measures contained in the Initial Study and Mitigation Monitoring Program for the Fallon Sports Park project will not result in significant effects on the environment. Should you have any further comments or questions, please contact me at (925) 833-6610. Sin ely, anet Harbin Senior Planner Cc: Mayor & City Councilrnem.bers Rich Ambrose, City Manager Diane Lowart, Parks and Community Services Dir. Herma Lichtenstein, Park and Facilities Dev. Mngr. Paul Kruger, Consulting Engineer 1P ALAMEDA COUNTY FLOOD CONTROL AND WATER CONSERVATION DISTRICT 100 NORTH CANYONS PARKWAY, LIVERMORE, CA 94551 * . PHONE (925) 454-9000 May 13, 2005 Ms. Janet Harbin, Senior Planner City of Dublin Planning Department 100 Civic Plaza Dublin, CA 94568 Re. Initial study/mitigated Negative Declaration for Fallon Sports Park Dear Ms. Harbin,: ,Zone 7 has reviewed the referenced CEQA document and we have several comments, which are made in the content of Zone 7's mission to provide drinking water, non -potable water for agriculture and irrigated turf, flood protection, and groundwater and stream management in the Livermore-Amador Valley. Our comments are as follows; • Mitigation for the creation of new impervious surface areas within the Livermore-Amador Valley is addressed through the collection of Special Drainage Area (SDA) 7-1 Drainage Fees. These fees are collected for Zone 7 by the appropriate local governing agency upon approval of the vesting tentative or ,final map for now streets/developments and/or upon approval of any new building/grading/use permit required of any public agency/cornmer6al/residential/ industrial/agricultural user. Collection of the drainage fees is dependent upon whether post - project impervious surface area, conditions are greater than pre -project conditions and/or whether fees have previously been paid for that particular site. The current fee is S0.662 per square feet of new impervious surface area. • The project proposes to enhance an existing stream corridor located along the western edge of the project site for environmental mitigation purposes in the development of "Area F." The Hydrology and Water Quality section of the Initial Study, page 37, states that the "project preliminary grading plan conforms to Alameda County Flood Control and Water Quality District, Zone 7 requirements and ...." Please be advised that this creek is not currently designated as a Special Drainage Area 7-1 Authorized Project Line, nor is it currently owned/maintained by Zone 7. The jurisdiction of this creek does not belong to Zone 7. Therefore, at this time, there are not any Zone 7 permits and/or other Zone 7 requirements placed on this .project. Also, note that Zone 7 is part of Alameda County Flood Control and Water Conservation District and is not a Water Quality District. For our future use, we would very much appreciate it if you could provide us information on where this creek drains to and provide a copy of the hydrology study, 'AY i 6 n �ANMIKL� Ms. Janet Harbin City of Dublin Planning Department May 13, 2005 Page 2 'We appreciate the opportunity to comment on this document. If you have any questions, please feel free to contact Jack Fong at (925) 454-5035 or myself at (925) 454-5019 at your earliest convenience. Sincer 1.y, . I X, im Boren Principal Engineer Advance Planning Section JH:JF:arr cc: Joe Seto, Zone 7 Jack pang, Zone 7 Mary Lim, Zane 7 P; 'vt dvpdaro i�xlacklCFsA-F�dlon5potsPark doe ILO CITY OF DUBLIN 100 Givic Plaza, Dublin, California 9,1568 VV00sitc" httF)://www.ci.dublin.ca.uB May 26, 2005 Jennifer Craven Associate Planner City of Livermore 1052 S. Livermore Ave. Livermore, CA 94550 RE: Comments on InitialStudy/Mitigated Negative Declaration Fallon Sports Park (PA 05-021) Dear Ms. Craven: The City appreciates your cox=ents elated May 12, 2005 on the Fallon Sports Park (PA 05-021) project proposed in eastern Dublin. As stated in the initial Study/Mitigated Negative Declaration for the Project, the Master Plan for the Fallon Sports Park was approved in November 2004, to implement the park established by the East Dublin Specific Plan and General Plan Amendment adopted in 1994. Since the original conception of the plan for the Park, the City Council has also adopted a new Parks and Recreation Master Plan (2004), which addressed the features and locations of the proposed facilities for the Sports Park. Below are the City of Dublin's responses to your comments. The numbered paragraphs below correspond to the comment sections in your letter: 1) Rcgarding your first comment related to the connection between the description of a "community park" and a "sports park," and whether a "sports park" is indeed a "community park," the Parks & Recreation Master Plan was done in concert with the East Dublin Specific Plan and General Plan Amendment and the associated Environinental Impact Deport adopted in 1994 and subsequent Suppleineiatal E1R's and Addendums. The Community Park that is referred to in the East Dublin Specific flan and General Plan Amendment adopted in 1994 is referred to in the Parks and Recreation Master Plan as a Sports Park. There is a prototype in the Parks and Recreation Master Plan which identifies the types of facilities that were to be in the park. The Fallon Sports Park Master Plan used this prototype as a basis for the plan adopted in November 2004. Furthermore, the Fallon Sports Park at approximately 60 acres exceeds the minimum acreage required for a community park in the Parks and Recreation Master Plan. 2) Comment noted. On page 27 of the initial Study for the development of the Fallon Sports Park, it is stated that: Low-level lighting will be used along walkways and trail. Sewer lighting lamps with low wattage are proposed for the parking area. New street lights and other security lighting combined with the night lighting for the courts crud, fields at the park could create a "spill Area Code (925) • City Manager 833-6650 • City Coumil 833-6650 - Personnel 833.6605 - Economic Development 833-6650 Fingnoo 833-6640 - Public Works/Engineering 8336630 - Parks & Community Services 833-6646 - Polioo 833-6670 Pianning/Code Entorcemont 833-6610 - Building Inspection 833-6G20 • Fire Prevention Bureau 833-6606 Printed on Rec'yf, gPd Paper Letter to City of Livermore -- Mitigated Negative Declaration Page 2 h,0 Fallon Sports Park Development PA 05-021 over" effect of light in the residential areas closest to the site, and may operate as late as 10: 00 PM. The following mitigation measure will be added to the project to ensure that the lighting is adequate for the use and unobtrusive to surrounding residences: Mitigation Measure 1. A photometric study shall be provided with final construction drawings of the project prior to the issuance of an electrical permit for installation of any lighting. "Spill over" lighting shall be kept to a minimum to prevent disturbance and intrusion into residential areas through the use of lower lighting, with light standards forfields and courts designed to minimize the light intrusion into residential areas. Implementation of this mitigation measure would reduce the impact of nighttime lighting to a level of less -than -significant. This mitigation measure is included as a mitigation measure in the Eastern Dublin General Plan/Specific Plan EIR and the Mitigation Monitoring Program applicable to this Project (see attached Exhibit). The assumption used in the environmental document regarding the effects of the park lighting on aircraft flying approximately 700 feet or higher above the ground is that if "spill over" lighting is kept to a minimum so it does not intrude on the nearby residences, based on the photometric study, and is directed toward the playing fields and courts, itwould not have adverse effects on aircraft above the park. There is absolutely no reason to direct lighting for the park toward aircraft in the sky. However, the study will include verification that this assumption is indeed correct. 3) It is acknowledged that aircraft fsorn the Livermore Airport regularly flies over a portion of Eastern Dublin where the Fallon Sports Park is located. This was discussed in regard to the expansion of the Livermore Airport and the use of larger, heavier aircraft related to the expanded airport in the correspondence from the City of Dublin to the Livermore Airport District and the City of Livermore earlier this year and in 2004. It was not identified as a significant hazard related to the present airport use type. The Livermore Airport Master Plan Advisory Committee's Negative Declaration document for the airport expansion stated that overflights contribute little to alubient noise levels in Livermore where they originate, and did not evaluate the noise resulthig from the larger aircraft to be used at the expanded facility. The previous Dublin environmental documents which evaluated the enviromnental and noise impacts of development of a park on the subject property, the Eastern Dublin General Plaza/Specific Plan EIR and the associated Mitigation Monitoring Program adopted in 1994, the Negative Declaration for Areas B and E of Dublin Ranch approved on November 18, 1997, the Mitigated Negative Declaration for Area F of Dublin Ranch approved on February 15, 2000, and the Mitigated Negative Declaration for Area F in 2004, were incorporated by reference in the Initial Study for the Fallon Sports Park development (page 7 of the Initial Study). The Initial Study for the 2004 Mitigated Negative Declaration for Area F of Dublin Ranch in 2004 reviewed the proposed reconfiguration of uses, including the use of 60 acres for a community park. Included in the Initial Study was a detailed analysis of the existing noise sources in the vicinity of the project site, and identification of areas subject to unacceptable noise levels exceeding 60 decibels. The major sources of noise identified in the documents were the traffic on 1-580, some local streets in Area F of Dublin Ranch, and aircraft flyovers. Mitigation Measures for noise (Mitigation Measures 3.10/1.0 and 3.10/3.0-5.0), which was determined to be a less -than -significant impact in the area with mitigation, were addressed by Letter to City of Livermore — Mitigated Negative Declaration Page 3 1 LP to Fallon Sports Park Development PA 05-021 these documents and are included in the Mitigation Monitoring Program in the attached Exhibit matrix. Relative to the park use, short-term constructions noise was an issue of concern and Mitigation Measures incorporated into the park project will reduce the level of short-term construction noise to a less -than -sign f cant level. The proposed park area was not identified as a location subject to excessive long -terra noise exceeding 60 decibels, unlike some residential subdivisions which are surrounded by sound walls due to traffic noise. Therefore, no further mitigation for noise impacts, including those resulting from aircraft: ilyovers, is necessary. Please refer to Response under Comment 2, above, related to hazards resulting from park lighting on aircraft. 4) Comment acknowledged regarding distances from the Project site to the Livermore Airport. Please refer to Response under Comment 3, above, regarding noise impacts. Based on the environmental documents prepared by Dublin for the project site, and those prepared to the Livermore Airport Expansion project, there is no need to disclose noise hazards to potential park users. Should you have any further comments or questions, please contact me at (925) 833-6610. Sincerely, anet Harbin senior Planner Cc: Mayor & City Councilmembers Rich Ambrose, City Manager Diane Lowart, Parks and Community Services Dir. Hernia Lichtenstein, Park and Facilities Dev. Mngr. Paul Kruger, Consulting Engineer ADM I N I44TRATIO N' ELVILD1NC 105Z S, I-ivenmore Avcl,ue I,.ivtmiore. CA 94550.4899 Ph; (925) 960-4000 Fax: (925) 960.4056 TDD (91 5) 960-4104 vrww.gi.Iivarmore Ua,us MAV OR i CCIUNCIL Ph; 960-4010 - Fax 966-4025 CCTV MANAGER Ph: 960,404() . Fax: 960-4045 CITY ATTORNEY Ph: 960-4150 - Fax; 960-4190 TIISK ftAANAGEMENT Ph: 960-4170 - Fax: 960.4196 CITY CI ,ICRK Ph: 960-4zW o Fax: 960-4i05 COMMUNITY DMILLOPMENT Ph: �)0-4400 - Fax: 960,4450 6iaildmg DIMsGrn Ph: 960-4410. Fax: 960- 419 ,EnKinaering Division Ph: 960-4500 - Ft,X: 960-4505 Housing & Human Services Division ?h: 960-4590 - Fax, 960.4149 Planning lyi„4rrrrn Ph; 960.4450. Fax: 960-4459 ECONON41(7 PEWTi)PMENT 1'h: 06(1-4140. Fmk; 960-4149 I-1NANC.'E DEPARTMEN I Ph; 960-,;100 - Fax: 960-4309 FIRE, pltl'AW1'NI16NT 4550 Fan Avenue Ph; 454-2361 . Fax: 454-2367 LIBRARY 1000 s. Livgmore Avenue Ph: 373-5500 - Fax: 373-5iO3 IiUMAN RE,5OIIRCES Ph: 960-4100. I-axt %04I05 POLICE DEPARTMENT I 1 .I0 '�. Liv.rmS,re AV nuc PSI: 371-4900- Fax: 37t-4M Tbi) :571-4982 PUBLIC SERVICES 3500 Rohe.rteon Park Rd Ph: 96U-8000 - Fax; 960-800$ 4irperl j3ivi, — 636 -I'errnmal Cireie Ph: 373-5260. Fax: 373-5042 Grr(f CRiIPBe Dilvvinn 909 (:.IkLhhnuae Diivc. Ph: 373-5239 . Fax: 373-5,703 Mai tenance DiviRinn .35M Ro6crosan I'nrk Rd. Ph: 960-802C * Fax: 960-8025 WiiAr ,Reronrces Div&mn 101 W. Jack I.-ondon Blvd. Ph; 960-5I00 . Fax: 960-9I0S AF-CEIVE MAY 1 6 M DUBUtl PLA"'KGOTY DF LI vmmoR ' CouatD tiSitl.ee 1849" May 12, 2005 Janet Harbin, Senior Planner City of Dublin 100 Civic plaza Dublin, CA 94568 RE: Initial Study and Mitigated Negative Declaration for proposed City of Dublin Fallon Sports 1arlc Development (PA 05-021) Dear Ms. Harbin: Thank for you providing the City of Livermore the opportunity to review and comment on the Initial Study/Mitigated Negative Declaration USWND) for the proposed Fallon Sports Park. Livermore's concerns with the environmental analysis and proposed sports park generally focus on the location of the sports park, and the subsequent interplay of sports park operations with aircraft operations, as described below. Pro'ect Descri tion an — From the project description, it appears that this enviromn.enta1 analysis is being tiered from the 1993 EIR prepared for the East Dublin General flan Amend-ment/Specific Plan, as well as a number of subsequent tiered TS/MN'D's for the Bast Dublin planning area. It is not clear, however, that the previous environmental doculnents planned for and analyzed th.e proposed sports park, because the references in the prior analysers were far a "COMI-11tMity" park, and not a "sports" parr (see paragraph 1 and 2, page 7 of IS/MND). If the proposed sports park is indeed the previously analyzed conununity parr, please provide additional discussion indicating how the connection from "community" park to "sports" park was determined appropriate to enable CEQA tiering (e.g., the description, intended uses, and acreage range standards for community parks are consistent with and appropriate for the proposed sports park). Aesthetics — Section I, Aesthetics, response "d," indicates that lighting sources utilized at the sports park will create new light and glare impacts for the surrounding single-family residential areas. 'Phis response, however, neglects to aokiiowledge that the project site is located under the FAA established traffic pattern for aircraft utilizing the primary runway (25R-7L) at the Livermore Airport, and that any new lighting source added to the project site could potentially create lighting and glare impacts for pilots. Tljis impact could create a new hazard for pilots, arid, as such, it is discussed further under the following Hazards comment section. I toys Hazards — Section VII, Hazards and Hazardous Materials, response "e, f ' indicates that there are no anticipated impacts related to aircraft noise and crash zone hazards. The project site; however, is located under the FAA established traffic pattern for the primary runway (25R-7L) at the Livermore Airport, indicating that the site will be frequently over -flown by aircraft. Secondly, this hazards response indicates that in 1999, the ALUC had no jurisdiction over land uses within the project site, Since that time, however, the ALUC airport influence area boundary has expanded, and now encompasses the southern half of the project site, indicating that the ALUC now has jurisdiction over land uses within the project. Finally, Livermore requests that additional mitigation be incorporated into the IS/MND that will ensure that all lighting sources utilized at the sports park are designed to direct light downward so as .to prevent upward spill- over or create glare into the FAA designated aircraft traffic pattern. Livermore requests that this IS/MND response be amended to disclose the potential of these aircraft related conflicts, and to add additional mitigation to control lighting source impacts from the project on pilots. Noise — Section XI, Noise, response "e, f' Indicates that the project is not located within two - miles of a public airport, finding that project would not expose people in the project area to excessive noise levels. This response is incorrect because the western boundary of the Livermore Airport is located (.83)-mile from the project site, and the western end of the primary runaway is located 1,52-miles from the project site, Additionally, as discussed under the hazards conunent, the project site is located under the FAA designated aircraft traffic pattern for the primary runway, and, as such, will be frequently over -flown by aircraft, therefore exposing sports parks users to some amount of aircraft noise. During consideration of the draft Airport Master Plan Update in 2004, Livermore received. 21 letters from Dublin residents indicating that aircraft operations were problematic for d)eir business and residential activities, as well as two letters from the City of Dublin echoing these same concerns (attached). Livermore requests that this response be amended to disclose the potential for sports park users to be exposed to aircraft noise. Once again, Livermore appreciates the opportunity to review and comment on this project. Livenmore requests that Dublin respond to our concemg with this project, and indicate how these concerns will be incorporated into the project's design, use, and operation. Please contact n1e, or Principal Planner Susan. Frost, at 925-960-4450, if you have any questions, Sincerely, CA4��� Jtifer Craver► Associate Plan-ner cc: Marc Roberts, Co=unity Development Director Eric Brown, Planning Manager Leander H.auri, Airport Manager Susan Frost, Principal Planner CITY of DUI LIN 100 Civic Plaza, Dublin, California 9455$ January 6, 2005 Leander Hauri, Airport Manager Livermore Municipal Airport 636 Terminal Circle Livermore, CA 94551-9609 Website: httP://www,ol,dublin.ca•us RECEIVED JAN i p 2006 LIVERMORE AIRPORT Re: Livermore Airport Master plan Advisory Comrrrittee Item for January 31, 2005 Doss Mr. Hauri: I have appreciated the opportunity to participate in the Livermore Airport Master Plan Advisory Committee; (Advisory Committee), as the City of Dublin City Council RepTesentative. -•'The Advisory Committee has developed recommendations for the Draft Livermore Airport 2004 Master Plan Update (2004 Update) and the projeet's Initial tudy/hEtigated Negative Declaration (Negative -.Declaration), prepared in vonforrnanee with State of California law. I aria writing to express my concern that mazy of the important issues raised by myself and by earlier correspondence from the City of Dublin have not been addressed by the Advisory Committee's recoil=mdatioris. r I believe that the following issues should be addressed in the revisions to the Airport Master Plan and in future envirmmental documentation, which should be in the form of an Enviromp nt , . pact deport (EIR) consistent with the CahfoTnia Environmental Quality Act (CEQA) Guidelines and pm -visions: Project Site The Negative Declaratioa does not discuss existing or approved noise sensitive uses within the City of Dublin that are located in close proximity to the Aiipott. This information should be used in, the documenis, snob as in the Airspace Plana. The Eastc-rin Dublin Spcci5c Plan and Gei]eral Y'hm Amndrnent and the: subsequent iinpletncnting approvah have been corisistent with AJ,UC policies regarding the Airport and specifically recognized the existiig Airporrt Protection .Area. likewise, existing and approved dc'vvlop:irrent within the City of Dublin should be recognized.. in the Airport Master Plain and the resulting effects should be addressed. Aircraft MIT, The changes in aircraft mix that will result from the proposed changes to hangar space, runway design (length anal pavement strength), and .Airport Business Plan will create noise impacts that have not been adequately addressed in the previous' Negative Declaration. The changes to hangars will ,accorxuxaodate larger and noisier aircraft and these additional impacts should be studied and mitigated in the environmental documentation under. CEQA•. Cinder a "Reduced Project" scmari.o, typically found in the Alterx>atives section of an MR, the LiveTmo1,e Municipal Airport would have an opportunity to review the Airport's goals and impacts without the changes brought about by the proposed new hangars, new runway design, and new leaseholds. ■ Flight Patterns A roach Patterns Insufficient information is provided in the 2004 Update on the ay rnaeh,i�nd takeoff patterns and fli ,t_aths, I am concemcd that the flight paths and flight patterns resulting tram changes it thi Livermore Municipal Airport will permit the flight of larger and noisier aircraft above the eastern Dublin community. Area Code (925) • CRy Manager 833-6650 - City Council 833-6650 • Personnel 833-6606 • Economic Development 833-6650 Finance 833-8640 - Public WorksiEngineertng 833-6630 • Parks & Comrnunity Servioss 833-6645 - Po Ice 833-6570 Planning/Code Enforcement 83s-6010 - Building Inspection 833-6620• Fire Prevention Bureau 833-6eoe printed on Pacycled Paper Noise The Livermore General Plan EIR stated that over flights contribute little to ambient noise levels in Livermore, however, the General Plaza EIR did not assume a shift in aircraft mix resulting fxom the proposed changes to the Airport as a result of the 2004 Update project or assume that planes operate as low as 700 feet above existuag and planned residential uses in the eastern Dublin'area. At this distance, over flights do have the potential to increase noise impacts to residences located vvithin these flight paths, Additionally, the General Plata EIR and Mitigated Negative Declaration do not inglude any discussion of single poise ev_entR from aircraft flyovers to sensitive rcceptczs located in Dublin. Further analysis and disolosure of existing and potential impacts are needed to .provide full disclosure of the potential adverse impacts of the 2004 Update project. ■ A' art usincss Plan The Airport Business Plan attached to the Master Flan Update recommends that a buffer.be, created .S to I mile beyond the Airport Protection Area due to perceived conflicts with residential, uses,, These conflicts should be fully disclosed and identified in greater detail to adequately address the pmajeet impacts. Qoerationa�l Limits Without operatimal lzinits and noise buffering, as required for new uses in the Livermore General Plan (Volley N-1. IP4), the im-aacts of the airport have not been adequately predicted ;or contr Iled. Far example, the proposed rtuaway lights would incrtwe nighttime aitcra$ Operations, unless, operationbl cmirols such as restrictions on flight tunes during the night and restrictions on the number' of aircraft :operations were implemehted. Although the airport is not a new use, tlm proposed changes in operations activity would change the FAA classification of the airport, resulting in - us new typ6 of airport use and increased intensity at the site. For ',casts Lastly, the Master Plan 2004 Update's stated intent is to accommodate the forecasts ,for growth in aircraft operations. It'is essential that the operations forecast tiled in the 2004 update (370,000 operations annually by the year 2020) be accornpanied by supporting data such as ttae source a of the forecast's conohl slota5. I believe that the 2004 Update has not established the basis for, or need for, the r.ivermorc A.ipolt's expallaion. I urgc the Liver naorc City Council to work with its neighboring canummities to resolve I' c$ important issues for the mutual benefit of the Livcrtriore Municipal ,Airport at)d all of the businesses and residcnta in the Tri-Valley Region. Sincerely, ear c FF,� City of D lirr Vicayor cc: Members of the Dublin City Council Richard C. Ambrose, City Manager Eddie Peabody, Jr., Community Development Director file QTY oF DUBLI 1Go Civic Plaza, Dublin, California 94568 April 7, 2004 Ms, Jvnnifer Craven, Associate. Planner City. of Livermore Planning Division 1052 S. Livermore Avenue Livermore, CA 94550-4899 Wobsite: http://www,ci,dublin.ca.LJS F—IVD APR - $ ZU04 PLANNING DIVISION Fie-_ Review of the Livermore Municipal Airport 2004 Master Plan Update and initial Study/Mitigated Negative Declaration Dear Ms. Craven' The City bf Dublin appreciates the opportunity to provide oorx�rnent5 on the Initial Study/Mitigated Negative Declaration ;for the City of Livermore Municipal Airport 2004 Master Plan Update (hereafter "Master Plan" &TO "Mitigated Negative Declaration") The City zecagnizes the importance the Livermore Airport provides to the local coz-imunity, however as an adjacent, jurisdiction, the City of Dublin is concerned about the potentially significant impacts of the proposed project from associated noise impacts from the Airport. Specifically, the City is concemed that the expanded airport operation will result in additional noise impacts to the existing and planned residential uses located. within Eastern Dublin. In the past, the City has receivcd complaints from Eastern Dublin. ,residents regarding flight activities f` om existing operation of thx - L. vc;rmoxe Airport. Dublin is concerned that the scope and content of; the Mitigated Negative Declaration is not adequate. The City's co3i. nmcnts arf, suimnarized below: fmti L Sire The Mitigated Negative Declaration does not mention uses within, the City of Dublin as a.diacent to the project site. The Mitigated Negative Declaration does not discuss existing or approved noise sensitive uses within the City of Dublin that are located in close proximity to the Akport. The City of Dublin is located less than '/2 mile away from the 7L425R Runway and the General Plain shows residential land uses that are located lcss than 1 mile from the existing runway. Additionally, existing single-family residential land uses are located approximately L 8 miles away from the existing Runway. Additionally, the Master Plan should recognize existing development approval within adjacelit cities. The Eastern Dublin Specific Flan and General flan Amendment and the subsequent implementing approvals (i.e, prezoning and annexation) were consistent with the ALUC policies regarding the Airport and specifically recognized the existing Airport Protection Ayea surrounding the Airport. Likewise the Master Plan should recognize existing and approved development within the City of Dublin. Area Code (925) - City Manager 833-C)650 • City Councii 833-6650 • Personnel 833-5605 • Economic Deveiopment 833-6650 Finance 833-0640 • Pub{io WorkslEngine9fing 833-603P ' Parks & Community Services 533.6645 • Police 833-5670 Planning/Code Bntorcernent 3$3-6610 • $Uhding Inspection 833-6620 • Fire Prev®ntion BWragu 833-6606 prrrlted on Recycled Paper The Map contained in the Master Platt, labeled Airspace Plana, is inadequate in that it utilizes an out of date US S base map and does not show current or approved land uses qr nearby jurisdictional lines. The City would be happy to share the most current data in our GIS library to facilitate the preparation of a new map. froiecl Description The project description states the plan does not encourage increased operations, however changes to airport including runway lengthening and strengthening, new taxiway, and additional hanger space will result in increased utilization of the Airport. The Project Description section on page 7 includes the statement that "implementation of the plan does not encourage inoreased operations." This statement is contradicted by a statement iri the Master Plan, found on page 2-9, which reads: "The availability of reasonably priced bougar units will largely govem the amount of increase in single -engine aircraft based at the airport. Hangar availability will also shape the growth in other aircraft types. ...Growth in multi -engine aircraft (i.e. both piston and jet) will also be affected by the ability of comnxercial Ie-aseholds." According to the Master Plan the aircraft mix is projected to change significantly in the future. The proposed modifications to the Airport will facilitate these changes to the aircraft mix, which will in tarn result in a higher percentage of larger and noisier aircraft utilizing the Airport. The table below is from the Master Plan, which demonstrates that the largest percentage increase in aircraft type occurs in the twin -engine and small business jet aircraft. These planes tend to produce the highest levels of noise. Without the proposed changes to the Airport, the increased utilization of these types of aircraft could not be accommodated. The change in aircraft mix would result is additional noise impacts, Which were not addressed or studied, zior mitigation measures ide.n.tified. Aircraft type Single Engine Fixed Single Engine Variable Twin -Engine Piston Twin -Engine Turbo Prop Small Fan Jet Med Fan Jet Aviation Activity 2001 149,980 55,000 45, 000 3,800 1,100 Boo Large Fanjet 100 Vo increase 2020 v. 2001 14.3% . 63.6% 77.8% 110.5% 809.1 % $37.5% 900.0% Small Turbojet 200 ' Large Turbo Fan 26 _ - Heiico tern 1,500 2.000 33.3% total 257,500 370,000 43. 7% Protected Activity_ L02d 171,500 9o,000 80,000 8,000 10,000 7,500 1,000 sOurcG:Uvr3rmoro Mur7icipal Airport MaMf;r Plan Update March P004 Flight Patterns andZyj2roach Patterm Insufficient infomation is provided in patterns and flight paths. The City is the Master Plan Update on the one-Prnerl that the flight paths regularly place larger and noisier aircraft above Area. approach and take -off and flight patterns will sensitive receptors within the Eastern Dublin Noise The Mitigated Negative Declaration does not contain an adequate discussion or analysis on potential noise impacts. Aircraft noise around airports consists of a series of single -events from individual aircraft flyovers. The methodology utilized in the Mitigated Negative Declaration was an average of noise levels (CNEL). This methodology does not quantify the maximum instMtaneous noise levels (Lmax) from individual aircraft flybys, therefore, the utilization of CNEL alone can make it difficult for the public -and decision makers to fully evaluate noise effects, The Livermore General Plan EIR stated that over flights contribute little to ambient noise levels in Livermore. However, according to information from the Airport Manager, aircraft operate as low as 700 feet above existing and planned residential uses within Eastern Dublin. At this distance, over flights do have the potential to increase noise impacts to residences located within flight paths. Additionally, the General Plan EIR and Mitigated Negative Declaration do not include any discussiou of single noise events frorA aircraft flyovers to sensitive receptors located in Dublin. The General flan EIR projected axi additional 113,000-flight increase from 2000. to 2020, However, the General Plan EIR did not assume a shift in aircraft mix resulting from the proposed changes to the Airport. As a result of this shift, larger airdafts would be introduced and additional potential noise impacts would result that were not studied Md mitigation measures were not identified in either the Livermore General Plan, EIR or the Mitigated Negative Declaration. Therefore the sole reliance upon Mitigation Measure Noise GP-2 to fully mitigate noisz impacts is inappropriate given the proknuamatic-nature of the Livermore General Plan EIR and the proposed changes to the .Airport as a result of the Master Plan update. The Airport Business ,Pleat The AR -port Busianess flan attached to the Master Plain Update suggests that a buffer be created .5 to 1 mile bayond the Airport Protection Area due to conflicts with residential uses, Please clarity if it is intended to extend this buffer beyond jurisdictional lines, into nearby cities. Operational L units The Di7aft City of Uvorrnore General Plan contains Policy (N-I-LP4) that the City shall require operational limitations and feasible noise buffering for new uses that generate significant noise impacts near sensitive uses. Although the, airport is trot a new use, changes in operations activity would change the FAA classification of the airport, the Airport Deference Code, The City of Dublin is coTkoerned that without specific operational limitations, the impacts of the airport expansion cannot be adequately predicted or controlled. Thank you again for the opportunity to provide these comments. The City of Dublia looks forward to working with Livermore representatives to craft appropriate .mitigation measures that ensure the impacts from the proposed expansion of the Airport are fully mitigated. The City respectfully requests that this Mitigated Negative Declaration not be adopted until sucks time that adequate mitigation measures can be identified that fully mitigates the impacts resulting from the Master Plan implementatiotx. The City believes that cooperation between Livermore and Dublin on this issue can result in a solution that is beneficial to the citizens ❑f both communities. Should you need clarification on any of the comments provided in this letter, phase feel free to contact Ms. Jeri Ram, Dublin Planning Manager, at 925-833-6610. Sincerely, A r Eddie Peabody Jr, AZCP Community Developmx -nt Director cc: Mayor and City Council •Richard Ambrose City Manager Jeri Ram, Plaming Manager } Melissa Morton, Public Works Director ROE LDBER DE R Consultants in Acoustics 31 March 2004 ' Pierce Macdonald City of Dublin 100 Civic Plaza Dublin, CA 94568 Subject: initial Study/Mitigated Negative Declaration for the Livermore Municipal Airport Master Plan RCD Projeut ##: 04-012-1 Dear Pierce: We have completed our review of the noise impacts that were identified in the initial study/mitigated negative declaraflan (I IMND) for the Livermore Municipal Airport. In summary, we found three areas that need additional analysis to allow a reader to acquire a complete understanding of the project's impacts. They are: 1. Increase. in ambient noise due toproiect — The I.S/MND does not provide an analysis of the change in aircraft noise levels that would occur as a result of the project implementation. 2. Single event noise levels — The ISUND does not discuss single event noise levels from individual plane flyovers. The California Division of Aeronautics and a recent court derision both identify the need to discuss singly event noise and potential effects. 3. Outdoor noise levels in excess of City standards The IS/MND states that existing .residences east of the airport will be exposed to a potentially significant impact since outdoor noise levels will be in excess of a CNEL of 60 dBA, the City's normally acceptable noise level. Air-conditioning is proposed to mitigate the impact by allowing windows to remain closed. Is the impact mitigated if outdoor levels remain over 60 dBA? Discussion The IS/MND identifies impacts that are associated with the impiernentation of the master plan. Impacts associated with the plan are primarily based on the findings of the E1R on the Livermore General Plan Update. The noise related sections of the following documents were consulted during our review: 1100 Larkspur Landing Circle #254 1 Larkspur CA 94939 1 Tel 415 464 0150 1 Fax 415 464 0165 Pierce Macdonald 31 March 20b4 I ( Page 2. Livermore Municipal Airport Master Plan Update, Public Review Draft, March 2004 • Initial Sturdy and Mitigated Negative Declaration for the Livermore Municipal Airport Draft Master Plait, February 2004 • City of Livermore General Plan 2003 — 2026 • The Draft/Final EIR on the City of Livermore General Plan (except Appendix F — Noise) • Noise Impact Analysis, Livermore Airport, Livermore California, Prepared by LSA Associates, June 2002 1. No "INCRF-ASE IN NOISE" DiscussION Page 51 of the 1S/MND, section Xi(c) addresses increase in ambient noise levels. The IS/MND states that the implementation of the Airport Master Plan Update would not lead to any greater or different noise impacts related to substantial permanent increases in ambient noise levels than those identified in the 2003 EIR for the General Man Update and refers the reader to pages 165 to 174 in Volume II of the 2003 EIR, ' According to the 2003 FIR, a project would have significant noise impact if the project would increase noise levels by over 4 dBA above existing levels without the project. The ihccreasa in noise from the airport, however, is not assessed with respect to -this . standard. Instead it is assessed only with respect to the City of Livermore's standard for outdoor noise, a CNEL of 60 d13A- This approach ignores the guidance of the State of California's Airport Land Use Planning Handbook' which states that, "... consideratlon needs to be glven to 170tjust the absolute level of noise, but also tho amount of noise increase resulting from the project." Examination of the existing and future airport noise contours indicates that areas near the airport would experience increases in aircraft noise of up to 5 dBA, An analysis of noise increases should be conducted for the noise sensitive areas in the airport vicinity including those in the City of Dublin. 2, No SINGLE EVENT NoisE LEvFL ❑IscUSSION Aircraft noise around airports consists of a series of singie events from individual aircraft flyovers. Federal and State regulations require that the noise exposure from airports be quantified in terms of cumulative (or average) noise level descriptors such as CNEL or Ldn. These descriptors, however, do not quantify the maximum Instantaneous noise levels from individual aircraft flybys and, therefore, can make it difficult for the public and decision makers to fully evaluate noise effects, 1 "California Airport Land Use Planning Handbook," State of California Lepartment of Transportation Division of Aeronautics, January 2002, prepared by Shutt Moen Associates, page 7-40. Pierce Macdonald 31 March 2004 Page 3 Litigation over an EIR on the Airport Development Plan at the Oakland International Airport resulted in a recent court decision that required a supplemental E ..Ili addressing single event noise levels. Similarly, the State of California recognizes the limitation of the CNEL metric and suggests the use of other noise metrics such as Lmax as is evidenced by'the following excerpt from the State's Airport Land Use Planning Handbook. "A final consideration with respect to reviews of airport development proposals is that the issue involves not only a matter of policy (how much noise is acceptable?), but also, as previously noted, communication of the information in a form that the general public can comprehend, Consequently environmental impact documents prepared for airport - related projects may need to make use of supplemental noise metrics to explain the impacts even though the determination of significance relies upon criteria related to cumulative noise metrics."2 The inclusion of information regarding single event noise and flight tracks would help the public understand the effects of the project and allow adjacent communities to adopt appropriate land uses and planning policies. Disclosure of flight tracks and a discussion of single event noise levels and their effects could reduce the potential for future noise complaints. 3. MITIGATION OF OuTDoorz NOISE The IWMND refers to page 173 of the 2003 EIR which has the sole impact statement regarding aircraft noise (NOISE GP-2).3 It identifies that homes, east of the airport, will be exposed to a CNEL greater than 60 dBA, a significant irnpact. The adopted mitigation measure requires that the City purchase and installing air conditioning units for the affected residences so that their windows can be closed when it would otherwise be too hot to do so. Although the Elie states that this mitigation measure will reduce the ihnpact to a less than significant level, the air conditioning will not improve the noise environment in thQ backyards of the homes. The backyards would still have a CNEL which is greater than the "normal]'y acceptable" noise level of 60 dBA for residential land use (General Plan Table 9-7). The Negative Declaration should explain how, the installation of air conditioning will fully mitigate the significant noise impact. 2 Same as foatnota 1. 3 Livermore Draft General Plan and Downtown Specific Plan Environmental Impact Report Public Review Draft, Volume 11, June 2003, page 174 Uall '; Sports INITIAL STUDYI CFQA ADDENDUM Lead Agency: City of Dublin Prepared By: Jerry Haag, Urban Planner February 7,2014 Table of Contents Introduction...................................................................................................................2 Applicant............................................................. ........................................................... 2 Project Location and Context......................................................................................3 Prior Environmental Documents................................................................................3 ProjectDescription........................................................................................................5 Environmental Factors Potentially Affected.............................................................15 Determination............................................ ....................................................................15 Evaluation of Environmental Impacts .............................. Attachment to Initial Study.........................................................................................30 1. Aesthetics...............................................................................................30 2. Agricultural and Forestry Resources .... ............................................. 32 3. Air Quality.............................................................................................33 4. Biological Resources.............................................................................35 5. Cultural Resources................................................................................37 6. Geology and Soils................................................................................39 7. Hazards and Hazardous Materials....................................................41 & Hydrology and Water Quality .......................... ....42 9. Land Use and Planning........................................................................44 10. Mineral Resources.................................................................................46 11. Noise.......................................................................................................46 12. Population and Housing ................................................. ...........47 13. Public Services.......................................................................................49 14. Recreation ...................... ........................................ ............ ..................... 49 15. Transportation/Traffic.........................................................................51 16- Utilities and Service Systems...............................................................52 17. Mandatory Findings of Significance..................................................54 InitialStudy Preparers.................................................................................................57 Agencies and Organizations Consulted....................................................................57 References.............................................................................................................. .......57 City of Dublin Environmental Checklist/ Initial Study Introduction This Initial Study has been prepared in accord with the provisions of the California Environmental Quality Act (CEQA) and assesses the potential environmental impacts of approving and implementing Phase II (the Lower Terrace) of the Fallon Sports Park located in Eastern Dublin. The Initial Study consists of a completed environmental checklist and a brief explanation of the environmental topics addressed in the checklist. Because the proposed project is generally based on the land use designations, circulation patterns etc. assigned to the project by the City of Dublin General Plan, the Initial Study relies on a Program EIR certified by the City in 1993 for the Eastern Dublin General Plan Amendment and Specific Plan (the "Eastern Dublin General Plan Amendment and Specific Plan Environmental Impact Report, State Clearinghouse No. 91103064). That EIR, also known in this Initial Study as the "Eastern Dublin EIR," evaluated the following impacts: Land Use, Population, Employment and Housing, Traffic and Circulation, Community Services and Facilities, Sewer, Water and Storm Drainage, Soils, Geology and Seismicity, Biological Resources, Visual Resources, Cultural Resources, Noise, Air Quality and Fiscal Considerations. In 2005, the Dublin City Council adopted Resolution No. 89-05 that approved a Mitigated Negative Declaration for the Fallon Sports Park Master Plan. This will be referred to as the "2005 MND." The 2005 MND analyzed the environmental impacts of approving a Master Plan for the development of the Fallon Sports Park, located on the northwest corner of Fallon Road and Central Parkway and constructing recreational improvements envisioned in the Master Plan. The subject of this Initial Study is a proposed change to the Master Plan to install night lighting on one sports field located on the northeast corner of Central Parkway and Lockhart Street that was not previously considered for night lighting and to relocate an existing City preschool center from Emerald Glen Park to Fallon Sports Park .for approximately five years. Applicant: City of Dublin Parks and Community Services Department 100 Civic Plaza Dublin CA City of Dublin Page 2 Initial Study/Fallon Sports Park/Phase 11 February 2014 Attn: Rosemary Alex Parks and Facilities Development Coordinator (925) 833-6646 Project Location and Context Fallon Sports Park consists of approximately 60 acres of land devoted to a range of active sports recreational uses, including baseball and softball diamonds, soccer fields, basketball and tennis courts. Other uses include group picnic areas, play areas, sports paths, restrooms and vehicle parking lots. Phase I improvements, encompassing approximately 27 acres of land, was completed in 2010 and is open for public use. Two additional phases, generally located in the north, east and south, remain to be constructed. This Initial Study addresses improvements in Phase II, also known as the "Lower Terrace." A Master Plan For the entire 60-acre Fallon Sports Park was approved by the City of Dublin in June 2006. The park is located on the northwest corner of Fallon Road and Central Parkway in the Eastern Extended Planning area of the City of Dublin as identified in the Dublin General Plan. It is generally located along the west side of Fallon Road, north of Central Parkway and approximately one-half mile north of the I-580 freeway. Exhibit I shows the regional location of the City of Dublin. Exhibit 2 shows the location of Fallon Sports Park in relation to surrounding features in Eastern Dublin.. Exhibit 3 depicts the Lower Terrace area, the focus of this Initial Study, as well as the location of proposed site improvements (discussed below), Existing land uses adjacent to the project site includes residential development and a fire station north of the park, residential development and undeveloped land to the east, residential development to the west and undeveloped land to the south. Prior Environmental Review Documents The project has been included in two previous CEQA documents, as noted below: Eastern Dublin General Plan Amendment and Eastern Dublin Specific Plan (State Clearinghouse #91103064). A Program Environmental Impact Report for the Eastern Dublin General Plan Amendment (Eastern Extended Planning Area) and the Eastern Dublin Specific Plan (EDSP) was certified by the City Council in 1993 by Resolution No. 51-93. This document and its related Addenda collectively are referred to as the "Eastern Dublin EIR" or "EDEIR." It evaluated the Following impacts: Land Use; Population, Employment and Housing; Traffic and Circulation; Community Services and Facilities; Sewer, Water and Storm Drainage; Soils, Geology and Seismicity; Biological Resources; Visual Resources; Cultural Resources; Noise; Air Quality; and Fiscal Considerations. City of Dublin Page 3 Initial Study/Fallon Sports Park/Phase 11 February 2014 The City adopted a Statement of Overriding Considerations (Resolution No. 53-93) for the following impacts: Cumulative loss of agriculture and open space laud, cumulative traffic, extension of certain community facilities (natural gas, electric and telephone service), Consumption of non-renewable natural resources, increases in energy uses through increased water treatment and disposal and through operation of the water distribution system, inducement of substantial growth and concentration of population, earthquake ground shaking, loss or degradation of botanically sensitive habitat, regional air quality, noise and alteration of visual character. The Eastern Dublin EIR was challenged in court and was found to be legally adequate. Fallon Sports Park Master Plan Mitigated Negative Declaration (2005 MND) A Mitigated Negative Declaration was prepared to analyze the Fallon Sports Park Master Plan in 2005. The MND was approved by City Council Resolution No. 89-05 on May 15, 2005. The MND assumed development of the park Consistent with the Fallon Sports Park Master Plan. A number of mitigation measures were included in the adopted MND in the attachment to the Initial Study. City of Dublin Page 4 Initial Study/Fallon Sports Park/Phase 11 February 2014 Project Description The proposed project includes approving and developing the Lower Terrace of the Park. Overall improvements envisioned for this phase include but are not limited to: ■ Constructing an on -site entry road at the existing curb cut along the north side of Central Parkway; ■ Building an approximately 145-space vehicle parking lot. ■ Constructing a combination restroom and concession building. + Extending existing on -site pedestrian pathways from the existing park. • Constructing a 90' lighted baseball field. ■ Construction of a 2,000 square foot building for public use, including but not limited to community meetings, rentals, etc.) * Constructing two synthetic turf lighted soccer fields plus a warm up area. • Extending utility lines. + Temporarily relocating a City preschool center for a five-year period. ■ Related improvements, such as site grading and water quality features, to facilitate the above improvements. Details regarding the proposed field lighting and temporary preschool center relocation are discussed below. Field Lighting. The City of Dublin is proposing to install up to S lighting fixtures (still correct number?) adjacent to existing lighted soccer fields similar to existing lights that were constructed as part of the initial phase of the park. The planned athletic fields are located on the southwest con-ier of Fallon Sports Park. The approximate locations of the light fixtures are shown on Exhibit 4a. An alternative location is shown on Exhibit 4b. Exhibit 5 shows the design of a typical lighting fixture_ Lighting standards (poles) are proposed to be up to 80 feet tall to illuminate soccer and rugby fields. All light fixtures would be 1500-watt metal halide lamps. Lights would only be used when the field is in use up until 10 pm each night and all lights would be turned off at 10:10 p.m. New lights would be sited so as to minimize spill over of unwanted light and glare on adjacent residential areas to the south and west of the park. To achieve this, lights are proposed to be installed using the following criteria to limit spill over of light from the site. Lights near Lockhart Street shall have a maximum vertical illumination of 0.20 foot-candles at a distance of 260 horizontal distance from the west side of the proposed soccer field. A foot-candle is a unit of illumination equivalent to the light produced from 1 candle at a distance of 1 foot. Prior to using the lights, a photometric analysis will be completed by the City's lighting consultant to confirm this standard is achieved. ■ Lights near Central Parkway would be limited to a maximum vertical illumination of 0.40 foot-candles at a distance of 260 horizontal feet from the south side of the baseball field. A photometric analysis will also be completed by the City to ensure this lighting standard is achieved. City of Dublin Page 5 Initial Study/Fallon Sports Park/Phase 11 February 2014 Preschool Relocation. The City proposes to relocate Emerald Glen preschool from its current location in Emerald Glen Park to a portion of the existing (Phase 1) Fallon Sports Park while Emerald Glen Aquatic facility is under construction for up to a 5-year period. Exhibit 6 shows the approximate location of the proposed preschool, which would be immediately north of the existing parking lot in the approximate north central of the park. The preschool enrolls a maximum of 50 students per session with two sessions operated per day. The morning session would begin at approximately 8:45 to 9:15 a.m. and end at 11:00 to 11.45 a.m. The afternoon session would extend from approximately 12.45 to 1:45 p.m. to 3:15 to 3:45 p.m. Each session would have a maximum staff of six staff people at the school would arrive approximately 15 minutes before the start of the session and depart approximately 15 minutes following the close of the session. Proposed preschool facilities include installing modular classrooms totaling 2,300 square feet on a portion of the existing park as described above. Water, wastewater, electrical and other utilities would be extended to the buildings. School staff and visitors would use the existing parking lot, Requested City approvals. The City is proposing to amend the Fallon Sports Park Master Plan to accommodate the proposed project. City of Dublin page 6 Initial Study/Fallon Sports Park/Phase 11 February 2014 f El Schranrr vacn a G�nCUrd BfacJr PraRgnd '- n❑r[11 Richmond SAN FRANCISCO Berna�,yr f ; FrafOh[ , Harlew roa Part _ T❑ck,r Vallry . Amar❑n Ivt nrr.na an Fran in- h .al4 t o. ' ter i _�• �.�. MtIIL1fa 'Peek;; �".:"'_ blfatwr❑trph San Mh s Mrrnm{a7 York ... el 1 (L Ifelf A{o❑n Rnr .k ' Eukergh Murray Y �T� .. y+'+'1 nrrnrs Rrg,Anar:,: •i T ns�rl'nd - .qy� Prrarrre - , b Plea Hill An - $unKr Park _ �j W+ki y❑n hiriones Sda+ y2 Claylvn Afhfrlie CvrrrWrF `- Irryr P rk Regioaef Yrvk a r4 �' &lntwprvd rMtrcz vnllfi' Cari3 cr. nlrr 9albKr[y Apple I[.nomgtm Walnut Firl1 Part er cherry • . �ryr'M* rant' I{as Lafayette Saranap Cac[k-. Uri nda Rork Park M. Oiabia y Berkeley'' wn,� Srnrlrmk h" al �a,� F In `� Ala ❑ 1iDW1d Vork-y I FIF.. cnnrvn k+orege �6ry ,.. Prr¢rnr - RrQmenl mvr9AR IerPrery' :oavu•n .L a Dam €e 0xhherk Req,wrM Park [ v '. �. L,k, Pr'k OAKLAND' _ lirdwDnE ia�•w` Tana 06 • runralr �Ir,�, SAN RAMON . s Ala` a .San f{errtvn ... R,�`• Eact Saln Sli SITE , r811Leand rrc'p. ❑ i. LOCATION ari Le� DUBLIN M alley �°""i06'n w . sen nro. Frrirvirw . 1.Ikrn.r �� LIVERMORE a7.; 3c . Hayward `'N -- w• Rkis❑Ariobr PLEASANTON f�fffspn ie,l. Rd ` � Cartsmlrn,A-AmL _ a4 v�h. g:V��'i�l" Perk tl V Via' //::� it n�; � � .�•r�'F P rk ivn CilY � � 7yrwl � OA F Y- FREMONT 4wark ro� _ Eae3woo 1 �.: kwth-- y� MA awn faw U,lrx Eaef. `� rrnclyvy {rrz<reld la� 7 z MILES prr 1{ars. elpwty `rtds;Helwa may, a � Mfa Park {9 $, ereddur r�at - 7re Eeni f � f CITY OF DUBLIN Exhibit 1 FALLON SPORTS PARK PHASE 11 REGIONAL CONTEXT INITIAL STUDY 0 0.5 Miles STREAM CORRIDOR SITE LOCATION SCHOOL q) FIRE STATION RURAL RESIDENTIAL/ AGRICULTURE LOW -DENSITY RESIDENTIAL F-IMED-DENSITY RESIDENTIAL MEDIF€IGH-DENSITY RESIDENTIAL A `.HIGH -DENSITY RESIDENTIAL .OPEN SPACE x .PUBLIC J SEMI-PUBLIC MGENERAL COMMERCIAL .GENERAL COMMERCIAL I CAMPUS OFFICE CAMPUS OFFICE ®INDUSTRIAL PART( u MIXED USE 2 / CAMPUS OFFICE Ej PARK HIGHWAY 580 EXIT 48 AT FALLON ROAD CITY OF DUE3LiN Exhibit 2 FALLON SPORTS PARK PHASE If SITE CONTEXT INJTIAL STUDY EXISTING SYNTHETIC TURF SQCCfR FIELDS - -J - 1� 90' BASEBALL DIAMOND (NATURAL GRASS ONLY) Q BOX 120 YARD LIGHTED SYNTHETIC TURF SOCCER FIELD 65X100 YARD LIGHTED SYNTHETIC TURF SOCCER FIELD ® RESTROOM I CONCESSION BUILDING i RECREATION BUILDING CITY OF DUBLIN FALLON SPORTS PARK PRASE it INITIAL STUDY EXISTING LIGHTED r SOFTBALL FIELD .14 250' t — --- APPROXIMATE LIMIT OF WORK 7D LIGHTED BOCCE COURTS (4) ADVENTURE PLAY AREA [9 GROUP PICNIC AREA 16 ENTRY ROAD AND PARKING (--145 CARS) Exhibit 3 PROPOSED LOWER TERRACE IMPROVEMENTS EXISTING LIGHTED 'LIGHTED ~� I ��,k SOFTBALL FIELD EXISTING r f !1 SYNTHETIC TURF r SO FIE I'Ll1 CCR . LDS �r Q SPORTS POLE LIGHT APPROXIMATE LOCATION LIGHTED BOCCE BALL COURTS CITY OF DUBLIN FALLON SPORTS PARK PHASE II INITIAL STUDY 250' f N Exhibit 4 LOCATION OF FIELD LIGHTING POLETOP LUI ASSEMBLY WIRE HARNESS i*6X POW ELECTRICAL COMPONENTS — ENCLOSURE _gwsm -a pACM46 _fttmc —PPiyIR LANOM wcs —ow Mmdw PER cowl PER lfW[ IRE r A"7EI1 GALVANIZED STEEL POLE I{ � I} 1,3 PUSL ROX IN r t t_T i i 07 14' LONG PRECAST CONCRETE. BASE I CENTRIFUGALLY SPUN. PRESTRESSED i SEE STRUCTURAL DWGS PROVOED BY MANUFACTURER FOR DESIGN OF CONCRETE WE i I i a i EXTENDED GLARE CONTROL VWRS BP15-s ADJACENT PAVEMENT PULL BOX CONCRETE PAD �3 REBAR '' CAISSON RECASI 30' i8. - 'f , CL COONCRETTE BASE LIGHT FIXTURE F3 4. 27 1/2. I ON POLES 53 & 54 TOP VIEW CL - 15.75' LIGHT POLE BASE PULL BOX OWBAND �3 REBAR I GROUND LEVEL 291-E" CONCRETE _i ATTACHMENT 9 M BACKFILL • JACKING EAR -DETAIL •A� GROUND LEVEL SSD FOR BASE AND REINFORCEMENT DETAILS 30' DiA MIN. 3000 PSI CONCRETE BACKF}LL. S51) ELEVATKIN NEW DETAIL 'A' SCALE: NTS NOTE: DIMENSIONS SHOWN ARE MINIMUM REQUIRED 1O•-0' I 2'-p' CUSTOMER �CpNTFUCTOR SUPPLIES: GRL' �J -OUNDI G ROD AND CONNECTION + TO SYSTEM GROUNDING LUG -CONCRETE BACKFILL I ' -UNDERGROUND WIRING N -SWVIDE ENTRANCE PRECAST BASE 51DE VIEW KNUCKLE ' C F3 ON POLES S1 & S2 HL BRACKET WIRE ACCESS HUB HAMDHOLE WITH GROUNDING LUG ACCESS INTEGRATED POLE GROUNDING FITTINGS LIFTING BAR HOLE ABOVE GROUND ACCESS HOLE UNDERGROUND ACCESS HOLE INTEGRATED GROUNDING ELECTRODE CITY OF DUBLIN Exhibit 5 FALLON SPORTS PARK PHASE II TYPICAL LIGHT FIXTURE INITIAL STUDY . __ _i 3 0v a, �_ rn U wz a� X s ��F 8 �21ME WFA rr R�:�• jti�xl�/1 P 6� zF r W 1-0, z z � wiz n a W Y � aU a = LLJ a z 0 ® c3 LU N J 0 J a 0 ui 0 CC _ cn LU cc Ll] a 2 a cc Q CL 2 G] r M cc = a r ❑ {A ❑ LL Z N 00 J Q H r U LL 1. Project description: Approval of Phase fX improvements to the existing Fallon Sports Park, would include lighted baseball field, two lighted soccer fields, a temporarily relocated preschool, a 2,000 square foot building and other park and recreation improvements. 2. Lead agency: City of Dublin Community Parks & Community Services Department 100 Civic Plaza Dublin CA 94568 3. Contact persons: Rosemary Alex Parks & Facilities Development Coordinator (925) 833 6646 4. Project location: Fallon Sports Park, northwest corner of Fallon Road and Central Parkway in Eastern Dublin 5. Project sponsor: City of Dublin 6. General Plan designation: Communi ty Park 7. Zoning: PD-Planned Development S. Other public agency required approvals: Amendment to City of Dublin Parks and Recreation Master Plan (probable) City of Dublin Page 14 Initial Study/Fallon Sports Park/Phase 11 February 2014 Environmental Factors Potentially Affected The enviroiunental factors checked below would be potentially affected by this project, involving at least one impact that is a "potentially significant impact" as indicated by the checklist on the following pages_ _ Aesthetics _ Agricultural - Air Quality Resources - Biological _ Cultural Resources - Geology Soils Resources _ Hazards and - Hydrology/ Water _ Land Use/ Hazardous Quality Planning Materials _ Mineral Resources -- Noise -- Population./ Housing -- Public Services _ Recreation - Transportation/ Circulation -- Utilities/Service - Mandatory Systems Findings of Significance Determination (to be completed by Lead Agency): On the basis of this initial evaluation: I find that the proposed project could not have a significant effect on the environment and the previous Negative Declaration certified for this project by the City of Dublin adequately addresses potential impacts. I find that although the proposed project could have a significant effect on the environment, there will not be a significant effect in this case because the mitigation measures described on an attached sheet have been added to the project. A Negative Declaration will be prepared. I find that although the proposed project may have a significant effect on the environment, but at least one effect 1) has been adequately analyzed in an earlier document pursuant to applicable legal standards, and 2) has been addressed by mitigation measures based on earlier analysis as described on the attached sheets, if the effect is a "potentially significant impact" or "potentially significant unless mitigated." A Environmental Impact Report is required, but must only analyze the effects that remain to be addressed. X I find that although the proposed Project could have a significant effect on the environment, there will not be any new or substantially more severe significant effect in this case because all potentially significant effects: a) have been analyzed adequately in an earlier EIR and MND pursuant to applicable standards; and (b) have been avoided or mitigated pursuant to that earlier EIR and MND, including revisions or mitigation City of Dublin Initial Study/Fallon Sports Park/Phase II Page 15 February 2014 measures that are imposed on the proposed Project, except for those impacts which were identified as significant and unavoidable and for which a Statement of Overriding Considerations was previously adopted by the City. An Addendum to the Eastern Dublin Environmental Impact Report and the 2005 Fallon Sports Park Mitigated Negative Declaration will be prepared. Signature: ! Bate: Printed Name: &qV`"I For: City of Dublin Page 16 Initial Study/Fallon Sports Park/Phase 11 February 2014 Evaluation of Environmental Impacts 1.) A brief explanation is required for all answers except "no impact" answers that are adequately supported by the information sources a lead agency cites in the parenthesis following each question. A "no impact" answer is adequately supported if the referenced information sources show that the impact simply does not apply to projects like the one involved (e.g. the project falls outside a fault rupture zone). A "no impact" answer should be explained where it is based on project -specific factors as well as general factors (e.g. the project will not expose sensitive receptors to pollutants, based on a project -specific screening analysis). 2) All answers must take account of the whole action involved, including off -site as well as on -site, cumulative as well as project -level, indirect as well as direct, and construction as well as operational impacts. 3) Once the lead agency has determined that a particular physical impact may occur, then the checklist answers must indicate whether the impact is potentially significant, less -than -significant with mitigation, or less -than -significant. "Potentially Significant Impact" is appropriate if there is substantial evidence that an effect may be significant. If there are one or more "Potentially Significant Impact" entries when the determination is made, an EIR is required. 4) "Negative Declaration: Less -than -Significant With Mitigation Incorporated" applies where the incorporation of mitigation measures has reduced an effect from "Potentially Significant Impact" to a "Less -than -Significant Impact." The lead agency must describe the mitigation measures and briefly explain how they reduce the effect to a less -than -significant level (mitigation measures from Section 17, "Earlier Analysis," as described in (5) below, may be crass -referenced). 5) Earlier analyses may be used where, pursuant to the tiering, program EIR, or other CEQA process, an effect has been adequately analyzed in an earlier EIR or negative declaration. Section 15063 (c) (3) (D). The checklist will include a response "no new impact" in these circumstances_ In this case, a brief discussion should identify the following: a) Earlier Analysis Used. Identify and state where they are available for review. b) impacts Adequately Addressed: Identify which effects from the above checklist were within the scope of and adequately analyzed in an earlier document pursuant to applicable legal standards, and state whether such effects were addressed by mitigation measures based on the earlier analysis. c) Mitigation Measures. For effects that are "Less -Than -Significant with Mitigation Measures Incorporated," describe the mitigation measures which were incorporated or refined from the earlier document and the extent to which they address site -specific conditions for the project. City of Dublin Page 17 Initial Study/Fallon Sports Park/Phase 11 February 2014 6) Lead Agencies are encouraged to incorporate into the checklist references to information sources for potential impacts (e.g. general plans, zoning ordinances, etc.). Reference to a previously prepared or outside document should, where appropriate, include a reference to the page or pages where the statement is substantiated. 7) Supporting Information Sources: A source list should be attached and other sources used or individuals contacted should be cited in the discussion. 8) This is a suggested form and lead agencies are free to use different formats; however, lead agencies should normally address the questions from this checklist that are relevant to a project's environmental effects in whatever format is selected. 9) The explanation of each agency should identify the significance criteria or threshold, if any, used to evaluate each question and the mitigation measures identified, if any, to reduce the impact to a less than significant level. City of Dublin Page lg Initial Study/Fallon Sports Park/Phase 11 February 2014 Environmental Impacts (Note: Source of determination listed in parenthesis. See listing of sources used to determine each potential impact at the end of the checklist) Note: A full discussion of each item is found following the checklist. 1. Aesthetics. World the project: a) Have a substantial adverse effect on a scenic vista? (Source: 2,3,5) b) Substantially damage scenic resources, including but not limited to trees, rock outcroppings, and historic buildings within a state scenic highway? (Source: 2,3,4) c) Substantially degrade the existing visual character or quality of the site and its surroundings? (Source: 2, 5) d) Create a new source of substantial light or glare which would adversely affect day or nighttime views in the area? (Source: 2, 4, 6) 2. Agricultural Resources Would the project: a) Convert Prime Farmland, Unique Farmland or Farmland of Statewide importance, as shown on the maps prepared pursuant to the Farmland Mapping and Monitoring Program of the California Resources Agency, to a non- agricultural use? (Source: 2, 3, 5) b) Conflict with existing zoning for agriculture use, or a Williamson Act contract? (Source: 1,2,3) c) Involve other changes in the existing environment which, due to their location or nature, could result in conversion of farmland to a non- agricultural use? (Source: 2,3,5) 3. Air- Quality (Where available, the significance criteria established by the applicable air quality management district may be relied on to make the following determinations). Would the project: a) Conflict with or obstruct implementation of the applicable air quality plan? (Source: 24) b) Violate any air quality standard or contribute substantially to an existing or projected air quality violation? (Source: 2,4) City of Dublin Initial Study/Fallon Sports Park/Phase II Potentially Significant Impact Less Than Significant With Mitigation Less than Significant Impact No New Impact X X X X X X X X X Page 19 February 2014 c) Result in a cumulatively considerable net increase of any criteria pollutant for which the project region is non-attaimnent under an applicable federal or state ambient air qua] ity standard (including releasing emissions which exceed quantitative thresholds for ozone precursors? (2, 4,6) d) Expose sensitive receptors to substantial pollutant concentrations? (Source: 4, 5) e) Create objectionable odors affecting a substantial number of people? (Source: S, 6) 4. Biological Resources. Would the project a) Have a substantial adverse effect, either directly through habitat modifications, on any species identified as a candidate, sensitive, or special status species in local or regional plans, policies or regulations, or by the California Department of Fish and Game or the U.S. Fish and Wildlife Service?(Source: 2,3 ,4) b) Have a substantial adverse effect on any riparian habitat or other sensitive natural community identified in local or regional plans, policies or regulations or by the California Department of Fish and Game or the U.S. Fish and Wildlife Service? (Source: 2,3,4) c) Have a substantial adverse effect on federally protected wetlands as defined by Section 404 of the Clean Water Act (including but not liar ted to marsh, vernal pool, coastal, etc.) through direct removal, filling, hydrological interruption or other means? (Source: Source: 2,3,4) d) Interfere substantially with the movement of any native resident or migratory fish or wildlife species or with established native resident or migratory wildlife corridors, or impede the use of native wildlife nursery sites? (Source: 2, 3,4) e) Conflict with any local policies or ordinances protecting biological resources, such as tree protection ordinances? (Source: 1, 2, 4) City of Dublin Initial Study/Fallon Sports ParkJPhase 11 Potentially Significant Impact Less "Chan Significant With Mitigation Less than Significant Impact No New Impact X X X X X X X X Page 20 February 2014 f) Conflict with the provision of an adopted Habitat Conservation Plan, Natural Community Conservation Plan or other approved local, regional or state habitat conservation plan? (Source: 1,2) 5. Cultural Resources. Would the project a) Cause a substantial adverse impact in the significance of a historical resource as defined in Sec. 15064.5? (Source: 2,4,5) b) Cause a substantial adverse change in the significance of an archeological resource pursuant to Sec. 15064.5 (Source: 2,4,5) c) Directly or indirectly destroy a unique paleontological resource, site or unique geologic feature? (Source: 2,3,5) d) Disturb any human remains, including those interred outside of a formal cemetery? (4) G. Geology and Soils. Would the project a) Expose people or structures to potential substantial adverse effects, including the risk of loss, injury, or death involving: i) Rupture of a known earthquake fault, as delineated on the most recent Earthquake Fault Zoning Map issued by the State Geologist or based on other substantial evidence of a known fault (Source: 2, 4) ii) Strong seismic ground shaking (2, 5) iii) Seismic -related ground failure, including liquefaction? (2, 4) iv) Landslides? (2, 4) b) Result in substantial soil erosion or the loss of topsoil? (Source: 2,4,5 ) c) Be located on a geologic unit or soil that is unstable, or that would become unstable as a result of the project and potentially result in on - or off -site landslide, lateral spreading, subsidence, liquefaction or similar hazards (Source: 2, 4) d) Be located on expansive soil, as defined in Table 18-1-B of the Uniform Building Code (1994), creating substantial risks to life or property? (Source: 2,4) City of Dublin Initial Study/Fallon Sports Park/Phase II Potentially Significant Impact Less Than Significant With Mitt ation Less than Significant Impact No New Impact X X X X X X X X X X X X Page 21 February 2014 e) Have soils incapable of adequately supporting the use of septic tanks or alternative wastewater disposal systems where sewers are not available for the disposal of wastewater? (Source: 2,4) 7. Hazards and Hazardous Materials. Would the project: a) Create a significant hazard to the public or the environment through the routine transport, use or disposal of hazardous materials (Source: 2, 4, 5) b) Create a significant hazard to the public or the environment through reasonably foreseeable upset and accident conditions involving the release of hazardous materials into the environment? (Source: 2, 4, 5) c) Emit hazardous emissions or handle hazardous materials or acutely hazardous materials, substances, or waste within one -quarter mile of an existing or proposed school? (Source: 2, 3, 4) d) Be located on a site which is included on a list of hazardous materials sites compiled pursuant to Government Code Sec. 65962.5 and, as a result, would it create a significant hazard to the public or the environment? (Source: 6) e) For a project located within an airport land use plan or, where such a plan has not been adopted within two miles of a public airport of public use airport, would the project result in a safety hazard for people residing or working in the project area? (Source: 2, 3) f) For a project within the vicinity of private airstrip, would the project result in a safety hazard for people residing or working in the project area? (Source: 2, 4) g) Impair implementation of or physically interfere with the adopted emergency response plan or emergency evacuation plan? (Source: 2,6) City of Dublin Initial Study/Fallon Sports Park/Phase lI Potentially Significant Impact Lcss Than Significant With Mitigation Less than Significant Impact No New Impact X X X X X X - X X Page 22 February 2014 h) Expose people or structures to a significant risk of loss, injury or death involving wildland fires, including where wildlands are adjacent to urbanized areas or where residences are intermixed with wildlands? (Source: 2, 4,5) 8. Hydrology and Water Quality. Would the project. a) Violate any water quality standards or waste discharge requirements? (Source: 2,4) b) Substantially deplete groundwater supplies or interfere substantially with groundwater recharge such that there would be a net deficit in aquifer volume or a lowering of the local groundwater table level (e.g. the production rate of existing nearby wells would drop to a level which would not support existing land uses or planned uses for which permits have been granted? (2,4) c) Substantially alter the existing drainage pattern of the site or area, including through the alteration of the course of a stream or river, in a manner which would result in substantial erosion or siltation on- or off -site? (Source: 2, 4, 5) d) Substantially alter the existing drainage pattern of the site or areas, including through the alteration of the course of a stream or river, or substantially increase the rate or amount of surface runoff in a mariner which would result in flooding on- or off -site? (Source: 2, 4, 5) e) Create or contribute runoff water which would exceed the capacity of existing or planned stormwater drainage systems or provide substantial additional sources of polluted runoff? (Source: 2, 4, 5) f) Otherwise substantially degrade water quality? (Source: 2,4) g) Place housing within a 100-year flood hazard area as snapped on a federal Flood Hazard Boundary or Flood Insurance Rate Map or other flood delineation map? (Source: 4, 6) City of Dublin Initial Study/Fallon Sports Park/Phase II Potentially Significant Impact Less 'Phan Significant With Mitileation Less than Significant Impact No New Impact X X X X X X X X Page 23 February 2014 h) Place within a 100-year flood hazard area structures which would impede or redirect flood flows? (Source: 4,6) i) Expose people or structures to a significant risk of loss, injury, and death involving flooding, including flooding as a result of the failure of a levee or dam? (4) j) Inundation by seiche, tsunami or rnudf€ow? (5) 9. Land Use and Planning. Would the project: a) Physically divide an established community? (Source: 1) b) Conflict with any applicable land use plan, policy, or regulation of an agency with jurisdiction over the project (including but not limited to the general plan, specific plan, or zoning ordinance) adopted for the Purpose of avoiding or mitigating an environmental effect? (Source: 1, 2,3,6) c) Conflict with any applicable habitat conservation plan or natural community conservation plant? (1,2,3,6) 10. Mineral Resources. Would the project a) Result in the loss of availability of a known mineral resource that would be of value to the region and the residents of the state? (Source: 1, 2,4) b) Result in the loss of availability of a locally important mineral resource recovery site delineated on a local general Plan, specific plan or other land use plan? (Source: 1, 2, 4) l I. Noise. World the proposal result in: a) Exposure of persons to or generation of noise levels in excess of standards established in the local general plan or noise ordinance, or applicable standards of other agencies? (2, 4) b) Exposure of persons or to generation of excessive groundborne vibration or groundborne noise levels? (Source: 2,4) c) A substantial permanent increase in ambient noise levels in the project vicinity above existing levels without the project? (2, 4, 5) City of Dublin Initial Study/Fallon Sports Park/Phase 11 Potentially Significant Impact Less Than Significant With Mitigation Less than Significant Impact No New Impact X X X X X X X X X X X i Page 24 February 2014 d) A substantial temporary or periodic increase in ambient noise levels in the project vicinity above levels existing without the project? (2,4, 5) e) For a project located within an airport land use plan or, where such a plan has not been adopted, within two miles of a public airport or public use airport, would the project expose people residing or working n the project area to excessive noise levels'? (2, 4, 5) f) For a project within the vicinity of a private airstrip, would the project expose people residing or working in the project area to excessive noise levels? (Source: 2, 4, 5) 12. Population and Housing. World" the project a) Induce substantial population growth in an area, either directly or indirectly (for example, through extension of roads or other infrastructure)? (Source: 2, 4, 5) b) Displace substantial numbers of existing housing, necessitating the construction of replacement housing elsewhere? (4, 5) c) Displace substantial numbers of people, necessitating the construction of replacement of housing elsewhere? (Source: 4, ) 13. Public Services. Would the proposal: a) Would the project result in substantial adverse physical impacts associated with the provision of new or physically altered governmental facilities, need for new or physically altered government facilities, the construction of which could cause significant environmental impacts, in order to maintain acceptable service rations, response times or other performance objectives for any of the public services? (Sources: 2, G) Fire protecti on Police protection Schools Parks Other public facilities Solid Waste City of Dublin Initial Study/Fallon Sports Park/Phase 11 Potentially Significant Impact Less Than Significant With Mitigation Less than Significant impact N0 New Impact X X X X X X X X X Page 25 February 2014 14. Recreation: a) Would the project increase the use of existing neighborhood and regional parks or recreational facilities such that substantial physical deterioration of the facility would occur or be accelerated (Source: 2, 4, 5) b) Does the project include recreational facilities or require the con stniction or expansion of recreational facilities which might have an adverse physical effect on the environment? (Source: 2, 4, 5) 15, Transportation and Traffic. Would the pro jeer: a) Cause an increase in traffic which is substantial in relation to the existing traffic load and capacity of the street system (i.e, result in a substantial increase in either the number of vehicle trips, the volume to capacity ratio on roads or congestion at intersections)? (2, 4, 5) b) Exceed, either individually or cumulatively, a level of service standard established by the County Congestion Management Agency for designated roads or highways? (4,5) c} Result in a change in air traffic patterns, including either an increase in traffic levels or a change in location that results in substantial safety risks? (4,5) d) Substantially increase hazards due to a design feature (e.g. sharp curves or dangerous intersections) or incompatible uses, such as farm equipment? (5) e) Result in inadequate emergency access? (5) f) Result in inadequate parking capacity? (5) g) Conflict with adopted policies, plans or programs supporting alternative transportation (such as bus turnouts and bicycle facilities) (1,2,4) City of Dublin Initial Study/Fallon Sports Park/Phase 11 PotentiallyFSignificani Significant ImpactImpact Less than Significant No New Impact X X X X X X X X X Page 26 February 2014 16. Utilities and Service Systems. Would the project a) Exceed wastewater treatment requirements of the applicable Regional Water Quality Control Board? (4, 5) b) Require or result in the construction of new water or wastewater treatment facilities or expansion of existing facilities, the construction of which could cause significant environmental effects? (4,5) c) Require or result in the construction of new storm water drainage facilities or expansion of existing facilities, the construction of which could cause significant environmental effects? (4,5) d) Have sufficient water supplies available to serve the project from existing water entitlements and resources, or are new or expanded entitlements needed? (5) e) Result in a determination by the wastewater treatment provider which serves or may serve the project that it has adequate capacity to serve the project's projected demand in addition to the providers existing commitments? (5) f) Be served by a landfill with sufficient permitted capacity to accommodate the project's solid waste disposal needs? (5) g) Comply with federal, state and local statutes and regulations related to solid waste? (5) 71.7. Mandatory Findings of Significance. a) Does the project have the potential to degrade the quality of the environment, substantially reduce the habitat of a fish or wildlife species, cause a fish or wildlife population to drop below self-sustaining levels, threaten to eliminate a plant or animal community, substantially reduce the number of or restrict the range of a rare or endangered plant or animal or eliminate important examples of the major periods of California history or prehistory? City of Dub{in Initial Study/Fallon Sports Park/Phase II Potentially Significant Impact Less Than Significant With Mitigation Less than Significant Impact No New Impact I X I X X X X X X X Page 27 February 2014 b) Does the project have impacts that are individually limited, but cumulatively considerable? ("Cumulatively considerable" means that the incremental effects of a project are considerable when viewed in connection with the effects of past projects, the effects of other current projects and the effects of probable future projects). c) Does the project have environmental effects which will cause substantial adverse effects on human beings, either directly or indirectly? Potentially Significant Impact Less Than Significant With Mitigation Less than Significant Impact No New Impact X X Sources used to determine ootential environmental imi)acts 1. Eastern General Plan AmendinentlSpecific Plan 2. Eastern Dublin General Plan AtnendinentlSpeeific Plan EIR 3 2005 Fallon Sports Park Mitigated Negative Declaration 4. Discussion with City staff or service provider 5. Site Visit G. Other Source XVIL Earlier Analyses a) Earlier analyses used. Identify earlier analyses and state where they are available for review. Portions of the environmental setting, project impacts and mitigation measures for this Initial Study refer to environmental information contained in. the 1993 Eastern Dublin General Plan Amendment and Specific Plan Environmental Impact Report (State Clearinghouse No_ 91103064), hereinafter referred to as the Eastern Dublin EIR or EDEIR. The Eastern Dublin EIR is a Program EIR which was prepared for the Eastern Dublin General Plan Amendment and Specific Plan of which this Project is a part. It was certified by the Dublin City Council on May 10, 1993. Following certification of the EIR, the Council adopted a Statement of Overriding Considerations for impacts including but not limited to: cumulative traffic, extension of certain community facilities (natural gas, electric and telephone service), regional air quality, noise and visual. The Eastern Dublin EIR contains a large number of mitigation measures which apply to this project and which would be applied to any development within the project area. Specific mitigation measures identified in the certified Eastern Dublin EIR for potential impacts are referenced in the text of this Initial Study. City of Dublin Page 28 Initial Study/Fallon Sports Park/Phase 11 February 2014 This Initial Study also relies on the adopted Mitigated Negative Declaration adopted in 2Da5, previously cited, that analyzed the impacts of approving the Fallon Sports Park Master Plan and constructing the park. Pursuant to CEQA Guidelines Section 15162 and 15163, this Initial Study is intended to identify the potential for any new or substantially increased significant impacts on or of the project which were not evaluated in the Eastern Dublin EIR or the 2035 MND for the park and which would require additional environmental review. City of Dublin Page 29 Initial Study/Fallon Sports Park/Phase 11 February 2014 Attachment to Initial Study Discussion of Checklist 1. Aesthetics Previous CEOA documents Eastern Dublin EIR. The Eastern Dublin EIR contains a number of mitigation measures to reduce anticipated visual resource impacts from the General Plan and EDSP project. These include: Mitigation Measure 3.8/ 1.0 reduced project impacts related to standardized tract development (IM 3.8 / B) to a less -than -significant level. This mitigation requires future developers to establish visually distinct communities which preserves the character of the natural landscape by protecting key visual elements and maintaining views from major travel corridors. Mitigation Measure 3.8 f 2.0 reduced the impact of converting the rural and open space character of the General Plan Amendment and Specific Plan area (IM 3.8/B) but not to a less -than -significant level. The mitigation measure requires implementation of the land use plan that emphasizes retention of predominant natural features. Even with adherence to this measure, IM 3.8/B would remain significant and unavoidable on both a project and cumulative level. Mitigation Measure 3.8/3.0 would reduce the impact of obscuring distinctive natural features of the General Plan Amendment and Specific Plan area (IM 3.8 f Q but not to a less -than -significant level. The mitigation measure requires implementation of the land use plan that emphasizes retention of predominant naturalfeatures. Mitigation Measures 3.8/4.0-4.5 reduced the impact of altering the visual quality of hillsides (IM 3.8/D) to a less -than -significant level. These mitigation measures require implemtation of appropriate Eastern Dublin Specific Plan policies including but not limited to use of sensitive grading design to miniinize grading, use of existing topographic features, limiting use of flat pads for construction, using building designs that conform to natural land forms, recontouring hillside to resemble existing topography and minimizing the height of cut and fill slopes. Mitigation Measures 3.8 / 5.0-5.2 reduced the impact of altering the visual quality of ridges (IM 3.8 / E) to a less -than. -significant level. These mitigation measures limit development on main ridges that border the Specific Plan area to the north and east but are allowed on foreground hills, and would limit development in locations where scenic views would be obscured or would extend above a ridgetop. City of Dublin Page 30 initial Study/Fallon Sports Park/Phase fl February 2014 ■ Mitigation Measure 3.8 j 6.0 reduced the impact of altering the visual quality of watercourses (IM 3.8/ G) to a less -than -significant level. This mitigation measure protects Tassajara Creek and other stream courses from unnecessary alteration or disturbance, and adjoining development should be sited to maintain visual access to stream corridors. • Mitigation Measures 3.817.0 and 7/ 1 reduced impacts on scenic vistas (lM 3.811) to a less -than -significant level. These mitigation measures require protection of designated open space areas and directs the City to conduct a visual survey of the EDSP area to identify and map viewsheds. 2005 MND Mitigation Measure 1 required a photometric study with final construction drawings prior to the issuance of an electrical permit for the installation of any lighting. Lighting "spill -over" shall be kept to a minimum to disturbance and intrusion into residential areas through the use of lower lighting, with light standards for fields and courts designed to minimize light intrusion into residential areas. The proposed project will be required to adhere to applicable mitigation measures identified above. Project Impacts a) Have a saubstantial adverse iinpact on a scenic vista? No New Impact, The Lower Terrace area is located on a downslope area generally facing Central Parkway. Although planned for a major park, the site is vacant and does not contain any existing scenic vistas or public gathering places. Proposed development of an additional phase of the Fallon Sports Park under the auspices of the Eastern Dublin Specific Plan and Fallon Sports Park Master Plan was analyzed in the 2005 MND. The proposed day care facility would be located within a developed portion of the existing park and there would be limited visibility of school buildings from surrounding streets. No new or more severe impacts are anticipated for the added field lighting and temporary preschool with respect to substantial adverse impacts on a scenic vista. b) Substantially damage scenic resources, including state scenic highway? No New Impact. The project site has been rough graded in connection with prior approvals and in anticipation of construction of a public park. The site is located approximately one-half mile north of the 1-580 freeway, a designated scenic highway. No major stands of trees or other similar scenic resources are present on the site that would be significantly impacted. The site for the proposed day care facility has already been graded as part of Phase I improvements for the park. No new or more severe impacts are anticipated with respect to this topic than have been previously analyzed. c) Substantially degrade existing visual character or the quality of the site? No New Impact. The proposed project includes the consideration developing an City of Dublin Page 31 Initial Study/Fallon Sports Park/Phase 11 February 2014 additional, second phase of the Fallon Sports Park. Aesthetic impacts would include disturbance of existing vegetation and grading of undeveloped land to create generally flat pads for sports fields, parking areas, walkways and other recreational improvements. This second phase of park development was considered and analyzed in the 2005 MND and no new or more severe impacts are anticipated with approval of the second phase of park development. d) Create a new source of substantial light or glare that would adversely affect day or nighttime views in the area? No New Impact. The proposed project would include the installation of sports field lighting as described in the Project Description section of this Initial Study. To ensure that there would be rnh-dirial and less - than. -significant "spill over" of unwanted light and glare off of the park site, the City will require that field lighting plans and specification conform to a maximum maintained vertical illuminance level for spill light that does not exceed 0.8 foot-candles (FC) (initial 1.1 FQ when measured 150 feet from edge of the soccer field. Measurements are to be taken facing the lights and at heights that may be of most concern (i.e. 5 feet, 10 feet and 15 feet above grade). The lighting designer shall prepare initial vertical illuminance calculations on the line to establish compliance with 0.8 FC level and indicate maintenance factor used to convert initial values to maintained values. At 200 feet from edge of soccer field spill light design specifications shall not exceed 0.1 FC measured at finished grade level. 2. Agricultural and Forestry Resources Previous CE A documents Eastern .Dublin EIR. The Eastern Dublin EIR identified several potential impacts related to agricultural resources. Impact IM 3.1/C stated that discontinuation of agricultural uses would be an insignficant impact due to on -going urbanization trends in Dublin and the Tri-Valley area. Impact 3.1 /D identified a loss of Iands of Farmlands of Local Importance with approval and implementation of the General Plan and Specific Plan. This was also noted as an insignificant impact. Impact 3.1 / F stated that buildout of Specific Plan land uses would have a significant and unavoidable impact on cumulative loss of agricultural and open space lands. Finally, Impact IM 3.1 / E noted indirect impacts related to non -renewal of Williamson Act contracts. This impact was also identified as an insignificant impact. 2005 MND. No impact to agricultural or forestry resources were identified in this document. Project Impacts a-d) Convert prime farmland to a non-agricultural use or involve other changes which could result in conversion of farinland to a non-agricultural use, conflict with existing zoning for agricultural use or a Willia)nson Act contract, result in the loss of forest land use conversion of forest Iand to ca non forest use or involve of other changes that could result in the conversion of forest land to a non forest use? No New Impact. No significant City of Dublin Page 32 Initial Study/Fallon Sports Park/Phase 11 February 2014 impacts were identified with respect to agricultural resources in previous CEQA documents listed above. No new conditions have been identified in this Initial Study with respect to conversion of prime farmland or forest land to a non-- agricultural or non -forest use and no new or more severe impacts would result than were analyzed in previous CEQA documents for this site. The site is not zoned for agricultural use nor is there a Williamson Act contract in effect on the property. No new or more severe impacts are therefore anticipated than were previously analyzed n the 2005 MND. 3. Air Quality Previous CEQA documents Eastern Dublin £IR. The Eastern Dublin EIR contains a number of mitigation measures to reduce anticipated air quality impacts from the General Plan and EDSP project. These include: Mitigation Measures 3.11/2.0-4.0 reduced project and cumulative impacts related to vehicle emission from construction equipment (IM 3.11/B) but not to a less - than -significant level. These mitigations require emission control from on -site equipment, completion of a construction impact reduction plan and others. Even with adherence to these mitigations, this impact would remain significant and unavoidable. Mitigation Measures 3.11 / 5.0-11.0 reduced mobile source emission from RGG and Nax (IM 3.11 C) but not to a less -than -significant level. Mitigation measures require coordination of growth with transportation plans and other measures. Many of which are at a policy (not a project) level. Even with adherence to adopted mitigations, IM 3.11 / C would remain significant and unavoidable. Mitigation Measures 3.11 / 12.0-13.0 reduced project and cumulative impacts related to stationary source emissions (IM 3.11/E) but not to a less -than - significant level. The two adopted mitigations require reduction of stationary source emissions to the extent feasible by use of energy conservation techniques and recycling of solid waste material. Even with adherence to the two measures, stationary source emissions would remain significant and unavoidable. 2005 MND. This document did not identify and significant air quality impacts or mitigation measures. The proposed project will be required to adhere to applicable mitigation measures related to air quality. Project Im,�acts a) Would the project conflict or obstruct implementation of an air quality plan? No New Impact. Approval and construction of the Phase ll portion of the Fallon Sports Park would be consistent with growth projections included in the Dublin General City of Dublin Page 33 Initial Study/Fallon Sports Park/Phase 11 February 2014 Plan, which is used as the basis of the Regional Clean Air Plan, No new or more severe impacts would occur result with respect to this topic than was previously analyzed. b) Would the project violate any air quality standards? No New Impact. Grading and construction activities associated with Phase II would generate fugitive dust into the environmental, potentially exceeding Bay Area Air Quality Management District air quality standards. Adherence to Mitigation Measure 2 contained in the 2005 MND and other applicable Eastern Dublin EIR air quality mitigation measures will reduce this impact to a less -than -significant level by requiring a number of dust control measures, including frequent watering of graded areas, covering of haul trucks, stabilizing graded areas with non -toxic soil stabilizers, sweeping of paved areas and hydroseeding or stabilizing graded areas. Therefore, no new or more severe impacts would result than have been previously analyzed in other CEQA documents. c) Would the project result in cumulatively considerable air pollutants? No New Impact. The Eastern Dublin EIR found that Mobile Source and Stationary Source air emissions as significant and irreversible impacts. Accordingly, a Statement of Overriding Considerations was approved when the EDSP was approved and the EDSP EIR certified in 1994. The proposed park expansion is not anticipated to generate additional vehicle trips beyond those analyzed in the EDSP EIR and the 2005 MND. Therefore, new or more severe impacts would occur and no additional analysis is required for this topic. d) Expose sensitive receptors to significant pollutant concentrations No New Impact. The same level of park use is anticipated than was anticipated in the 2005 MND in terms of sensitive receptors. Adherence to mitigation measures contained in the 2005 MND and Eastern Dublin EIR reduced impacts to sensitive receptors to a less -than -significant level. No new or more severe impacts have been identified in this Initial Study than were previously analyzed. e) Create objectionable odors affecting a substantial number of people? No New Impact. Since the proposed project does not include manufacturing or similarusesuses, no significant amounts of objectionable odors would be created. The Eastern Dublin EIR identified this impact as a potentially significant cumulative impact which could not be mitigated to achieve the eight -fold reduction in stationary source emissions needed to meet the less -than -significant threshold and, pursuant to CEQA, the City of Dublin adopted a Statemment of Overriding Consideration for this impact. No new impacts are identified in this Initial Study beyond those identified in the Eastern Dublin EIR and other CEQA documents. City of Dublin Page 34 Initial Study/Fallon Sports Park/Phase 11 February 2014 4. Biological Resources Previous CEOA documents Eastern Dublin EIR. The Eastern Dublin EIR contains a number of mitigation measures to reduce anticipated impacts to biological resources from the General Plan and EDSP project. These include: • Mitigation Measures 3.7/ 1.0-4.0 reduced impacts related to direct habitat loss (IM 3.7/A) to a less -than -significant level. These mitigations require minimization of direct habitat loss due to development, preparation of vegetation management and enhancement plans and development of a grazing management plan by the City of Dublin. • Mitigation Measure 3.7/5.0 reduced impacts related to indirect loss of vegetation removal (IM 3.7/S) to a less -than -significant level. Mitigation Measure 3.7/5.0 requires revegetation of graded or disturbed areas as quickly as possible. Mitigation Measures 3.7/6.0-17.0 reduced impacts related to loss or degradation of botanically sensitive habitats (IM 3.7/ Q to a less -than --significant level. These measures require a wide range of steps to be taken by future developers to minimize impacts to sensitive habitat areas, including preserving natural stream corridors, incorporating natural greenbelts and open space into development projects, preparation of individual wetland delineations, preparation of individual erosion and sedimentation plans and similar actions. • Mitigation Measures 3.7/ 18.0-19.0 reduced impacts related to the San Joaquin kit fox (IM 3.7/1)) to a less -than -significant level. These measures require Consultation with appropriate regulatory agencies regarding the possibility of lit fox on project sites and restrictions on use of pesticides and herbicides. • Mitigation Measures 3.7/20.0-22.0 reduced impacts related to the tri-colored blackbird (IM 3.7/I) to a less -than -significant level. These measures require preconstruction surveys for this species and protection of impacted habitat areas. These measures also apply to burrowing owl and badger species. • Mitigation Measures 3.7/23.0-24.0 reduced impacts related to destruction of Golden Eagle nesting sites (IM 3.7/r) to a less -than -significant level. These measures require preconstruction surveys for this species and protection of impacted habitat areas. • Mitigation Measure 3.7/ 25.0 reduced impacts related to loss of Golden Eagle foraging habitat (IM 3.7/K) to a less -than -significant level. This measure requires the identification of a Golden Eagle protection zone within the Eastern Dublin planning area. City of Dublin Page 35 Initial Study/Fallon Sports Park/Phase 11 February 2014 ■ Mitigation Measure 3.7j26.0 reduced impacts related to Golden Eagle and other raptor electrocution (IM 3.71 L) to a less -than -significant level. This measure requires undergrounding of electrical transmission facilities. ■ Mitigation Measure 3.7 J 27.0 reduced impacts related to American badger (IM 3.7/N) to a less -than -significant level. This measure mandates a minimum buffer of 300 feet around burrowing owl nesting sites and American badger breeding sites during the breeding season. ■ Mitigation Measure 3.7J 28.0 reduced impacts related to special status invertebrates (IM 3.7JS) to a less -than --significant level. This measure requires follow-on special surveys for these species during appropriate times of the year. The Eastern Dublin EIR also addresses potential impacts and mitigation measures regarding bald eagle, peregrine falcons, red -legged frog, California tiger salamander, western pond turtle the prairie falcon, northern harrier, black -shouldered kite, sharp - shinned hawk, Cooper's hawk, short -eared owl and California horned lizard. 2005 MND. No significant biological resource impacts were identified in this document. The proposed project will be required to adhere to applicable biological resource mitigation pleasures contained in the previous CEQA documents prepared for the site. Project Im12acts a) Have a substantial adverse impact on a candidate, sensitive, or special -status species? No New Impact. The Eastern Dublin EIR, contains numerous mitigation measures to reduce impacts to candidate, sensitive and special -status species to a less - than significant level. These are listed above. As noted above, the project site was analyzed in multiple previous CEQA documents and the site has been previously disturbed as part of a rough grading plan. Proposed construction of the Phase 11 portion of Fallon Sports Park will be required to comply with applicable mitigation measures to protect candidate, sensitive and special - status plant and wildlife species. Therefore, no new or more severe impacts with respect to candidate, sensitive or special -status species would occur than have been analyzed in previous CEQA documents. The proposed project would continue to contribute to cumulative loss or degradation of botanically sensitive habitat, wluch was identified as a significant and unavoidable impact (IM 3.7/C) in the Eastern Dublin EIR. b, c) Have a substantial adverse impact on riparian habitat or federally protected wetlands? No New Impact. Although no wetlands and waters of the United States have been identified on the project site, mitigation measures are included in the Eastern Dublin EIR to reduce such impacts to a less -than -significant level. No new or more severe impacts would occur than have been previously analyzed with respect to this topic. City of Dublin Paga 36 Initial Study/Fallon Sports Park/Phase 11 February 2014 d) Interfere with movement of native fish or wildlife species? No New Impact. Mitigation measures contained in the Eastern Dublin EIR contain mitigation measures that reduced this impact to a less -than -significant level. No new or more severe impacts would occur than have been previously analyzed with respect to potential interference with fish or wildlife movement. e, f) Conflict with local policies or ordinances protecting biological resources or any adopted Habitat Conservation PIans or Natural Community Conservation Plans? No New Impact. Approval and construction of the proposed project would not affect any trees on the site, since no mature trees are found there. The project site lies within the Eastern Alameda County Conservation Strategy (EACCS) planning area. The City of Dublin utilizes the Conservation Strategy as guidance for environmental permitting for public projects, and private development projects are encouraged to use the EACCS as a resource as well. The Conservation Strategy embodies a regional approach to permitting and mitigation for wildlife habitat impacts associated with land development, infrastructure, and other activities. The Conservation Strategy is neither a Habitat Conservation Plan nor a Natural Community Conservation Plan, but is a document intended to provide guidance during the project planning and permitting process to ensure that impacts are offset in a biologically effective manner. There would therefore be no new or significantly more severe impacts with respect to this topic than previously analyzed in the Eastern Dublin EIR. 5. Cultural Resources Previous CEOA documents Eastern Dublin EIR. he Eastern Dublin EIR contains a number of mitigation measures to reduce anticipated impacts to cultural resources from the General Plan and EDSP project. These include: Mitigation Measures 3.9/1.0-4.0 reduced impacts related to disruption or destruction of identified prehistoric resources (IM 3.9/A) to a less -than - significant level. These mitigations mandate a program of mechanical and/or hand subsurface testing for the presence or absence of midden deposits, recordation of identified midden sites, collection and/or testing of resources and development of a site -specific protection program for prehistoric sites. Mitigation Measures 3.9/ 5.0-5.0 reduced impacts related to the disruption or destruction of unrecorded prehistoric resources (IM 3.913) to a less -than - significant level. Mitigation Measures 3.9 / 7.0-12.0 reduced impacts related to disruption or destruction of identified historic resources to a less -than -significant level. These measures would include preparing site -specific archival research for individual resources, encourage adaptive reuse of historic resources, recordation of historic City of ❑ubNn Page 37 Initial Study/Fallon Sports Park/Phase 11 February 2014 sites on local state and federal registers, as appropriate and development of preservation programs for significant resources. 2005 MAID. No significant impacts or mitigation measures were included in the 2005 MND. The proposed project will be required to comply with the above cultural resource mitigation measures. Project Impacts a) Cause substantial adverse change to significant historic resources? No New Impact. No historic resources have been identified in the project area in either the Eastern Dublin EIR or the 2005 MND. Urwecorded cultural resources that could be encountered on the site will be addressed as required by mitigation measures contained in the Eastern Dublin EIR. No new or more severe supplemental impacts have therefore been identified for the proposed project than were disclosed in previous CEQA documents. b, c) Cause a substantial adverse impact or destruction to archeological or paleontological resources? No New Impact. The Eastern Dublin EIR identifies a remote but potentially significant possibility that construction activities, including site grading, trenching and excavation, may uncover significant archeological and/or paleontological resources on development sites. The Eastern Dublin EIR categorized these resources as pre -historic cultural resources. The Eastern Dublin EIR assumed that all pre -historic sites would be disturbed or altered in some manner. This potential impact was identified and addressed in the Eastern Dublin EIR (Impact 3.9 / A) and mitigation measures 3.911.0 through 3.9 J 4.0 (page 3.9-6 — 3.9-7) that require subsurface testing for archeological resources; recordation and mapping of such resources; and development of a protection program for resources which qualify as "significant" under Section 15064.5 of the CEQA Guidelines. Mitigation Measures 3.9 / 5.0 and 3.9 J 6.0, described above, also were adopted to address the potential disruption of any previously unidentified pre -historic resources and would apply to the project as may be appropriate. The Eastern Dublin Specific Plan also contains policies (Policies 6-24 and 6-25) requiring research of archaeological resources prior to construction and determination of the significance and extent of any resources uncovered during grading and construction. Therefore, no new or more significant impacts with respect to cultural resources have been identified that have been previously analyzed in other CEQA documents for the project area and no additional analysis is required. d) Disturb any human reniains, including those interred outside of a formal cemetery? No New Impact. Existing cultural resource mitigation measures contained in the Eastern Dublin EIR and the 2005 MND reduced impacts to human remains to a City of Dublin Page 38 Initial Study/Fallon Sports Park/Phase 11 February 2014 less -than -significant level. No new or more severe impacts with respect to cultural impacts are anticipated beyond those previously analyzed. 6. Geology and Soils Previous CEQA documents Eastern Dublin EIR. The Eastern Dublin EIR contains a number of mitigation measures to reduce anticipated impacts related to Soils, Geology and Seismicity from the General Plan and EDSP project. These include: • Mitigation Measure 3.6 / 1.0 reduced impacts related to primary effects of earthquake ground shaking (IM 3.6 / B) but not to a less -than --significant level. This mitigation measure requires that future structure and infrastructure facilities be designed to applicable local and state building codes. Mitigation Measures 3.9/ 2.0-6.0 reduced impacts related to the secondary effects of earthquake ground shaking (IM 3.9/C) to a less -than -significant level. Mitigation measures mandate building setbacks from landslides, stabilization of unstable land forms, removal and reconstruction of unstable soils, use of engineered retaining structures, use of appropriately designed and engineered fill, and design of structures to account of potential soil failure. Mitigation Measures 3.6/ 9.0-10.0 reduced impacts related to substantial alteration to landforms to a less -than significant level (IM 3.6/1)). Mitigations require minimal grading plans with minimal cuts and fills and careful siting of homes and improvements to avoid excessive grading. ■ Mitigation Measures 3.6/ 14.0-16.0 reduced impacts related to expansive soils (IM 3.6/ H) to a less -than -significant level. Mitigation measures require forrnulation of site -specific designs to overcome expansive soils, reducing the amount of moisture in the soil and by appropriate foundation and pavement design. Mitigation Measures 3.6/ 17.0-19.0 reduced impacts related to natural slope stability GM 3.6/I) to a less -than --significant level. Mitigation measures mandate formulation of use of site -specific designs based on follow-on geotechnical reviews of individual developments, limiting the location of improvements on downslopes of unstable soils, removal / reconstruction of potentially unstable slope areas and installation of surface and subsurface slope drainage improvements. • Mitigation Measures 3.6/20.0-26.0 reduced impacts related to cut and fill slope stability (IM 3.6 / J) to a less -than -significant level. These measures include developing grading plans for hillside areas that minimize grading and associate cuts and fills, ensuring that grading plans comply with appropriate building codes, utilizing keys and benches as part of grading to ensure slope stability and City of Dublin Page 39 Initial Study/Fallon Sports Park/Phase II February 2014 minimizing use of unreinforced fill slopes, appropriate compaction of fill areas and on -going maintenance of slope drainage areas. • Mitigation Measure 3.6/27.0 reduced the impact related to short-term construction -related erosion and sedimentation (IM 3.6/K) to a less -than - significant level. This measure includes limiting timing of construction to avoid the rainy season and implementing a number of other specific erosion control measures. ■ Mitigation Measure 3.6/28.0 reduced the impact related to long-term erosion and sedimentation (IM 3.6/L) to a less -than -significant level. This measure includes installation of erosion control facilities into individual development projects, including sediment catch basins, creek bank stabilization, revegetation of graded areas and similar measures. 2005 MND. No supplemental impacts or mitigation measures were identified in this MND. The proposed project will be required to comply with applicable soil, geologic and seismic mitigation measures. Protect Impacts a) Expose people or structures to potential substantial adverse iinpacts, including Ions, injury or death related to ground rupture, seismic ground shaking, ground failure, or landslides? No New Impact. The Eastern Dublin EIR identified that the primary and secondary effects of ground -shaking (Impacts 3.6 / B and 3.6 / C) could be potentially significant impacts. With implementation of Mitigation Measure 3.6 / 1.0 the primary effects of ground -shaking are reduced but not to a less -than - significant level by using modern seismic design for resistance to lateral forces in construction, which would reduce the potential for structure failure, major structural damage and loss of life. Mitigation Measures 3.6 / 2.0 through 3.6 / 7.0 contained in the Eastern Dublin EIR will be implemented to reduce the secondary effects of ground -shaking on proposed project improvements but not to a less -than -significant level. Impact 3.6 / B found that impacts related to seismic action in the Eastern Dublin area could damage structures and infrastructure and would be significant and unavoidable. This finding also applies to the proposed Fallon Sports Park Phase II as well. Adherence to Mitigation Measures 20 through 23 by the City will ensure that infrastructure facilities built on the project site will comply with generally recognized seismic safety standards so that effects due to ground shaking and ground failure will be less -than -significant Overall, no new or more severe impacts would occur with respect to ground rupture, ground shaking, ground failure or landslides than have been previously analyzed. City of Dublin Page 40 Initial Study/Fallon Sports Park/Phase It February 2014 bj Is the site subject to substantial erosion andlor the Ioss of topsoil? No New Impact. Construction of the roposed project improvements on the Fallon Sports Park site would modify Te existing ground surface and alter patterns of surface runoff and infiltration and could result in a short-term increase in erosion and sedimentation caused by grading activities. Long-term impacts could result from modification of the ground -surface and removal of existing vegetation (Eastern Dublin EIR Impact 3.6 / Q. With implementation of Mitigation Measures 3.6 / 27.0 and 28.0 contained in the Eastern Dublin EIR and re -stated above, both of these impacts would be less -than -significant. The Eastern. Dublin Specific Plan also contains a policy (Policy 6-43), which requires that new development be designed to provide effective control of soil erosion as a result of construction activities. This policy will be applied to the proposed project. Overall, with adherence to previous mitigation measures, there would be no new or more severe impacts than have been previously analyzed in other CEQA documents for this site. c,d) Is the site located on soil that is unstable or expansive or result in potential lateral spreading, liquefaction, landslide or collapse? No New Impact. The 2005 MND notes that the project site is located on the Tassajara Geologic Formation and contains colluvium soils with a high shrink -swell potential. With adherence to Eastern Dublin EIR mitigation measures, Eastern Dublin Specific Plan policies that require appropriate building foundations, underlying supports for sports fields and other related techiuques, no new or more severe impacts have been identified related to lateral spreading, liquefaction and other soil hazards than have been analyzed in previous CEQA documents. e) Have soils incapable of supporting on -site septic tanks if sewers are riot available? No New Impact. Proposed restroom facilities on the site would be connected to sanitary sewers provided by DSRSD, so there would be no new or more severe impacts with regard to septic systems. 7. Greenhouse Gas Emissions Environmental Setting Since certification of the Eastern Dublin EIR in 1993 and follow-on CEQA documents, the issue of contribution of greenhouse gasses to climate change has become a more prominent issue of concern as evidenced by passage of AB 32 in 2006. On March 18, 2010, amendments to the State CEQA Guidelines took effect which set forth requirements for the analysis of greenhouse gasses. The topic of the project's contribution to greenhouse gas emissions and climate change was not analyzed in the Eastern Dublin EIR or the 2005 MND. Since the Eastern Dublin EIR and the 2005 MND have been approved, the determination of whether greenhouse gasses and climate change needs to be analyzed for this proposed project is governed by the law on supplemental or subsequent EIRs (Public Resources Code section 21166 and City of Dublin Page 41 Initial Study/Fallon Sports Park/Phase 11 February 2014 Guidelines, Sections 15162 and 15163). Greenhouse gas and climate change is not required to be analyzed under those standards unless it constitutes "new information of substantial importance, which was not known and could not have been known at the time the previous EIR was certified as complete (CEQA Guidelines Sec. 15162 (a) (3).) Greenhouse gas and climate change impacts is not new information that was not known or could not have been known at the time the Eastern Dublin EIR was certified and the 2005 MND was adopted. The issue of climate change and greenhouse gasses was widely known prior to the certification of these EIRs. The United Nations Framework Convention on Climate Change was established in 1992. The regulation of greenhouse gas emissions to reduce climate change impacts was extensively debated and analyzed throughout the early 1990s. The studies and analyses of this issue resulted in the adoption of the Kyoto Protocol in 1997. In the early and mid 2000s, GHGs and climate change were extensively discussed and analyzed in California. In 2000, SB 1771 established the California Climate Action Registry for the recordation of greenhouse gas emissions to provide information about potential environmental impacts. In 2005, the Governor issued Executive Oder # S-03-05 establishing greenhouse gas emission reduction targets in California. AB 32 was adopted in 2006. Therefore, the impact of greenhouse gases on climate change was known at the time of the certification of the Eastern Dublin EIR in May 1993 or the 2005 MND. Under CEQA standards, it is not new information that requires analysis in a supplemental EIR or negative declaration. No supplemental environmental analysis of the projects impacts on this issue is required under CEQA. Project Impacts a,b Generate greenhouse gas emissions, either directly or indirectly, that array have a significant iinpact on the environment or conflict with an applicable plan, policy or regulation adopted for the purpose of reducing the emissions of greenhouse gases? As discussed above, no additional environmental analysis is required under CEQA Section 21166. S. Hazards and Hazardous Materials Previous CEQA documents 2005 MND. No significant impacts were identified with respect to hazards or hazardous materials in the 2005 MND. The topic of hazards and hazardous materials was not analyzed in the Eastern Dublin EIR. Project Impacts a) Create a significant hazard to the public or the environinent through the routine transport, use or disposal of hazardous materials? No New Impact. There would be no impact with regard to transport, use or disposal of hazardous materials, since the proposed project involves construction of an additional phase of a recreational park adjacent to existing phases of the park. There would be no use, storage or transport of significant quantities of hazardous materials associated with the City of Dublin Page 42 Initial Study/Fallon Sports Park/Phase 11 February 2014 proposed park. No new or more severe impacts would therefore occur on the site than have been previously analyzed. b) Create a significant hazard to the public or the environment through reasonably foreseeable upset and accident conditions involving the release of hazardous materials into the environment? No New impact. Based on the discussion in subsection "a," above, no new impacts are anticipated with respect to the release of hazardous materials than were analyzed in the 2005 MND. c) Emif hazardous materials or handle hazardous materials or acutely hazardous materials, substances, or waste within one -quarter mile of an existing or proposed school? No Impact. Approval and implementation of the proposed project would have no impact with regard to this topic, since no schools exist or are planned near the project area. No new or more severe impact with respect to emission or handing of hazardous materials within one -quarter of an existing or planned school. d) Is the site Iisted as a hazardous materials site? No New Impact. No properties comprising the project area are listed on the State of California Department of Toxic Substances Control as an identified hazardous site as of October 28, 2013. There is therefore no new or more severe impacts impact with respect to this topic than have been previously analyzed. e,f) Is the site located within an airport land use plait of o public airport or private airstrip? No New Impact. The project site is not located near a public or private airport, airfield or airstrip. No new or more severe impacts are anticipated regarding airport safety issues than were discussed in the 2005 MND. g) Interference with an emergency evacuation plan? No New Impact. The proposed park expansion would be located on land owned by the City of Dublin, purchased for park purposes. No emergency evacuation plan would be affected since no roadways would be blocked. No new or more severe impacts would result than have been previously analyzed. h) Expose people and structures to a significant risk of loss, injury or death involving wildland fires or where residences are intermixed with wildlands? No New Impact. The project area is located in a partially undeveloped area with residential development approved to the north and east (Moller Ranch and Mission Peak) and west (Dublin Ranch West). However, significant natural areas remain to the west (Tassajara Creek and adjacent open space easement area) and south (Moller Creek), Adherence to mitigation measures contained in previous CEQA documents will reduce impacts to wildland fire risk to a less -than -significant level. City of Dublin Page 43 Initial Study/Fallon Sports Park/Phase 11 February 2014 3. Hydrology and Water Qualify Previous CEQA documents Eastern Dublin EIR. The Eastern Dublin EIR contains a number of mitigation measures to reduce anticipated impacts related to hydrology and storm drainage from the General Plan and EDSP project. These include: ■ Mitigation Measures 3.5 j 44.0-48 reduced impacts related potential flooding (IM 3.51 Y) to a less -than -significant level. These mitigation measures require new storm drainage facilities as part of new development, requires developers to prepare storm drain plans for individual development projects and requires new flood control facilities to alleviate downstream flooding potential. Mitigation Measures 3.5 j 51.0 and 52.0 reduced impacts related to non --point source pollution (IM 3.51 AA) to a less -than -significant level. These mitigation measures mandate that specific water quality investigations be submitted as part of development projects and that the City should develop community -based programs to educate residents and businesses to reduce non -point source pollution. 2005 A4ND. No significant hydrology or water quality issues or mitigation measures were identified in this document. The proposed project shall adhere to all of the applicable above previous mitigation measures. Pro ect Impacts a) Violate any water quality standards or waste discharge requireMents? No New Impact. Approval and construction of the proposed development project would add impervious surfaces, including but not limited to a paved parking lot, building areas and pedestrian walkways, to the essentially undeveloped site that would increase the amount of stormwater runoff and potentially degrade water quality. Mitigation Measure 3.5151.0 contained in the EDSP EIR requires each project developer to prepare and submit a water quality investigation. Adherence to the existing EDSP EIR mitigation measures will ensure that no new or more sigrficant impacts with respect to water quality violations or wastewater discharges would result than have been previously analyzed. b) Substantially deplete groundwater recharge areas or lowering of zoater table? No New Impact. No new or more significant impacts are anticipated with regard to depletion of groundwater resources than have been analyzed in previous CEQA documents. Although a new parking area would be constructed on the site as well as paved pathways and a number of small buildings, much of the site would remain as open play fields or landscaped areas that would allow recharge of the underground aquifer. Based on discussions with City staff, recycled water from DSRSD would be used for irrigation and a synthetic surface would be used for City of Dublin Page 44 Initial Study/Fallon Sports Park/Phase 11 February 2014 playfields, significantly reducing potable water use (source: A. Alex, Dublin Parks and Community Services Department, 10/ 29/ 13). No new or more significant impacts would therefore result than previously analyzed. c} Substantially alter drainage patterns, including streambed courses such that substantial siltation or erosion would occur? No New Impact. Limited new impervious surfaces would be added to the park expansion project site to accommodate a parking lot, r, driveways, pathways, sinall buildings and similar surfaces. Existing drainage patterns may be slightly modified based on proposed development. However adherence to Mitigation Measure 46.0 contained in the Eastern Dublin EIR would reduce changed drainage patterns to a less -than --significant level. No new or more severe impacts would result with respect to changed drainage patterns than have been previously analyzed. d) Substantially alter drainage patterns or result in flooding, either on or off the project site? No New Impact. No impacts or significant changes to drainage patterns are anticipated as part of the project. Based on the 2005 MND, the project site outside of a FEMA 100--year flood hazard area. No new or more significant impacts are anticipated than have been previously analyzed. e) Create stormwater runoff that would exceed the capacity of drainage systems or add substantial amounts of polluted runoff? No New Impact. Adherence to Eastern Dublin EIR Mitigation Measures 3.5 / 44.0-48.0 will reduce drainage and pollution impacts to a less -than -significant level. These mitigation measures require new storm drainage facilities as part of new development and requires developers to prepare storm drain plans for individual development projects. No new or more significant impacts have been identified in this Initial Study regarding increases in stormwater runoff than have been previously analyzed. f) Substantially degrade water quality? No New Impact. This is a potentially significant issue and has been addressed above in items "a" and "e." g} Place housing within a 106-year flood hvzard area as mapped by a Flood Insurance Rate Map? No New Impact. No portions of the project site are located within a 100-year flood plain, as documented in the 2005 MND. No new or more significant impacts are anticipated than have been previously analyzed. It, 0 PIcace within a 100-year flood hazard boundary structures that impeded or redirect flood flow, including dam failures? No New Impact. Refer to item "g," above. j} ResuIt in inundation by seiche, tsunami or mudf2ows? No New Impact. The project site is located well inland from San Francisco Bay or other major bodies of water to be impacted by a tsunami or seiche. No new or more significant impacts would therefore result than have been previously analyzed. City of Dublin Page 45 Initial Study/Fallon Sports Park/Phase 11 February 2014 10. Land Use and Planning Project Impacts a) Plzysically divide an established community? No New Impact. The project site is located immediately south of the first phase of Fallon Sports Park, which has been developed as a recreation park. The project site is included as Phase II of the Fallon Sports Park Master Plan, which depicts future recreational uses on the site, as currently proposed. Therefore, no existing, established community would be physically divided. No new or more significant impacts have been identified in this Initial Study than have been previously analyzed. b) Conflict with any applicable land use plan, policy or regulation? No New Impact. No changes are proposed to any regulation regulating environmental protection. No new or more significant impacts are anticipated with regard to land use regulations than have been previously analyzed in previous CEQA documents. c) Conflict with a habitat conservation plan or natural corninunity conservation plan? No New impact. The project site lies within the Eastern Alameda County Conservation Strategy (EACCS) planning area. The City of Dublin utilizes the Conservation Strategy as guidance for environmental permitting for public projects, and private development projects are encouraged to use the EACCS as a resource as well. The Conservation Strategy embodies a regional approach to permitting and mitigation for wildlife habitat impacts associated with land development, infrastructure, and other activities. The Conservation Strategy is neither a Habitat Conservation Plan nor a Natural Community Conservation Plan, but is a document intended to provide guidance during the project planning and permitting process to ensure that impacts are offset in a biologically effective manner. There would therefore be no new or significantly more severe impacts than previously analyzed in the Eastern Dublin EIR and other CEQA documents prepared for this site. 11. Mineral Resources Project Impacts a, b) result in the loss of availability of regionally or Iocally significant rnineral resources? No New Impact. Neither the Eastern Dublin EIR nor the 2005 MND indicates that significant deposits of minerals exist in the project area, so no new or more severe impacts would occur than have been previously analyzed. City of Dublin Page 46 initial Study/Fafion Sports Park/Phase 11 February 2014 12. Noise Previous CEOA documents Eastern Dublin EIR. The Eastern Dublin EIR notes that major noise sources within Eastern Dublin include traffic noise from arterial roadways, helicopter overflights from Camp Parks RFTA, west of Tassajara Road, noise generated by development of land uses under the Specific Plan and General Plan and construction noise. No specific significant future noise sources are identified on the project site. The Eastern Dublin EIR contains a number of mitigation measures to reduce anticipated noise impacts frown the General Plan and EDSP project. These include: ■ Mitigation Measures 3.10/ I.0 reduced impacts related to exposure of proposed housing to future roadway noise (IM 3.10 / A) to a less -than -significant level. This mitigation measure require that all future development projects within a future CNEL 60 noise contour have an acoustic analysis prepared to ensure that future dwelling units meet City noise exposure levels. ■ Mitigation Measures 3.10/4.0 and 5.0 reduced impacts related to construction noise (IM 10 / E) to a less -than -significant level. These mitigation measures require developers to submit construction noise management plans and to limit hours of construction operations. 2005 M.ND. No significant noise impacts or mitigation measures were identified in the 2005 MND. The proposed project will be required to comply with applicable noise mitigation measures identified above. Project Impacts a) Would the project expose persons or generation of noise revels in excess of standards established by the General Plan or other applicable standard? No New Impact. The 2005 MND found that exposure of persons to excessive noise levels in above City exposure levels to be less -than -significant. Major source of noise on the Phase II site include distant noise generated by vehicles traveling the 1-580 freeway to the south, traffic noise from Fallon Road and Central Parkway and occasional aircraft flyovers. Table I., belwv, shows the current exterior noise exposure levels included in the Noise Element of the General Plan_ City of Dublin Page 47 Initial Study/Fallon Sports Park/Phase 11 February 2014 Table 1. City of Dublin Land Use/Noise Compatibility Standards (decibels) Land Use l Normally Acceptable Conditionally Acceptable Normally Clearly Unacceptable Unacceptable Residential 60 or less 60-70 70-75 75+ Lodging Facilities 60 or less 61-80 71-80 Over 80 Schools, churches, nursing homes 60 or less 61-70 71-80 Over 80 Neighborhood arks 60 or less 61-65 66-70 Over 70 Office/Retail 70 or less 71-75 76-80 Over 80 Industrial 70 or less 71-75 Over 75 -- Source: Dublin General Plan Noise Element, Table 9-1, 2013 Noise impacts to the proposed relocated day care facility would be less -than - significant by the requirement for the school to meet interior and exterior noise exposure levels as set forth in the Noise Element of the General Plan. Noise impacts for proposed sports fields would be minimized by having future playfields elevated above Central Parkway and out of the "line of sight" of noise transmissions. No new or more significant noise impacts have been identified than have previously analyzed. b) Exposure of people to excessive groundborne vibration or groundborne noise levels? No New Impact. The proposed project would not include construction or operational elements that would result in significant groundborne vibration levels to nearby residents (source: R. Alex, Dublin Parks and Community Services Department, 10130113). No new impacts would result with respect to vibration or groundborne vibration than was analyzed in previous CEQA documents on the project site. c) Substantial increases in permanent in ambient noise levels? No New Impact. h-icreased levels of permanent noise on the project that would occur based on project construction would be reduced to a less -than significant level through adherence to applicable mitigation measures contained in the Eastern Dublin EIR and the Dublin Noise Ordinance. No new or more significant impacts have been identified in this Initial Study than have been previously analyzed. d) Substantial temporary or periodic increase in ambient noise Ievels in the project vicinity above levels without the project? No New Impact. Increased levels of short-term construction noise generated on the project site would be reduced to a less -than - significant level through adherence to applicable mitigation measures contained in the Eastern Dublin EIR and the Dublin Noise Ordinance. These measures require project developers to limit hours of construction activity and to prepare construction noise management plans. No new or more significant impacts have been identified in this Initial Study than have been previously analyzed. e, f) For a project located within an airport land use plan, would the project expose people to excessive noise levels? No New Impact. No portions of the site are located within the City of Dublin Page 48 Initial Study/Fallon Sports Park/Phase 11 February 2014 airport referral area for Livermore Municipal Airport. No new or more significant impacts are therefore anticipated in terms of this topic than was previously analyzed in previous CEQA documents. 13. Population and Housing Project Impacts a) fndl[ce substantial population growth in an area, either directly or indirectly? No New Impact. Approval of the proposed project would not induce substantial additional population growth in the Eastern Dublin area, since development of the Fallon Sports Park has been envisioned in the Eastern Dublin Specific Plan and Dublin General Plan. In addition, the proposed project would not contain any residences. No new or more severe impacts than were previously analyzed are therefore anticipated with respect to this topic. b,c) Would the project displace substantial nranibers of existing housing units or people? No New Impact. The proposed expansion area is vacant and no impact would result with respect to displacement of housing units or people. No new or more severe impacts than were previously analyzed are therefore anticipated with respect housing displacement. 14. Public Services Previous CEQA documents Eastern Dublin EfR. Applicable mitigation measures contained in Eastern Dublin FIR addressing fire and police protection include: • Mitigation Measure 3.4/7.0: Establish appropriate funding mechanisms to cover up- front costs of capital fire improvements. • Mitigation Measure 3.4/ 9.0: Incorporate Fire Department recommendations on project design relating to access, water pressure, fire safety and prevention into the requirements of development approval. • Mitigation Measure 3.4/ 10.0: Ensure, as a requirement of project approval, that an assessment district, homeowners association or other mechanism is in place that will provide regular long-term maintenance of the urban/ open space interface. • Mitigation Measure 3.4 / 12.0: The City shall work with the Fire Department and qualified biologists to prepare a wildfire management plan for the project area. Mitigation Measure 3.4/1.0: Provide additional personnel and facilities and revise beats as necessary in order to establish and maintain City standards for police protection service in Eastern Dublin. City of Dublin Page 49 Initial Study/Fallon Sports Park/Phase 11 February 2014 Mitigation Measure 3.4/3.0-5.0: Incorporate into the requirements of project approval Police Department recommendations on project design that affect traffic safety and crime prevention. 2005 MND. No significant public utility impacts or mitigation measures were identified in the 2005 MND. The project will be required to comply with the above mitigation measures. Prpject Impacts a) Fire protection? No New Impact. Approval and implementation of the proposed project would increase the number of fire and emergency medical calls for service that would need to be responded to by the Alameda County Fire Department, the City of Dublin's contract fire department, as a result of increased recreational use of Phase II of Fallon Sports Park. Consistent with Eastern Dublin EIR Mitigation Measure 3.4 / 9.0, proposed development of the park will be reviewed by the Fire Department to meet Fire Department requirements including but not limited to maintaining minimum water pressure and fire flow, providing adequate site access, using fire retardant building materials and similar features. Proposed development on the site will also be conditioned to be consistent with the City's adopted Wildfire Management Plan (Eastern Dublin EIR Mitigation Measure 3.4/ 12.0). Based on discussions with Alameda County Fire Departi- ent staff, there would be no new or substantially more severe significant impacts with respect to fire service beyond that analyzed in previous CEQA documents (source: Bonnie Terra, Alameda County Fire Department, 10/ 28 / 13) and no new or expanded fire stations would be needed to provide fire and emergency service For the proposed project. bj Police protection? No New Impact. Similar to fire protection, there would be no new impact with regard to police protection, based on mitigation measures included in the Eastern Dublin EIR. These Mitigation Measures include incorporating Police Department safety and security requirements into the proposed project, including but not limited to adequate locking devices, security lighting and ensuring adequate surveillance for structures and parking areas (EDSP EIR Mitigation Measures 3.4 j 3.0-5.0), Based on discussions with Dublin Police Services Department staff, there would be no new or substantially more severe impacts with respect to police service associated with the proposed project beyond that analyzed in previous CEQA documents (source: Captain Tom McCarthy, Dublin Police Services, 10 / 28/ 13). c) Scliools? No New Impact. No new impacts to school service are anticipated should the proposed project be approved since no residents that would generate school aged children would be built.. There would be no new or substantially more severe significant impacts with respect to this impact than has been previously analyzed in previous CEQA documents. City of Dublin Page 54 Initial Study/Fallon Sports Park/Phase 11 February 2014 d) Other governmental service, including maintenance of public facilities? No New Impact. Maintenance of public facilities would continue to be provided by the City of Dublin with no new impacts in regard to this topic. New public facilities will be required to be designed to meet City of Dublin standards. There would therefore be no new or substantially more severe significant impacts with respect to this impact than has been previously analyzed in previous CEQA documents. 15. Recreation Previous CEQA documents Eastern Dublin EIR. Applicable mitigation measures contained in Eastern Dublin EIR addressing fire and police protection include: ■ Mitigation Measure 3.4 / 29.0: Ensure, as apart of the approval process, that each new development provide its fair share of planned open space, parklands and trail corridors. • Mitigation Measure 3.4131.0: Calculate and assess in -lieu park fees based on the City's parkland dedication ordinance. Credit towards parkland dedication requirements will only be given for level or gently sloping areas suitable for active recreation use. ■ Mitigation Measure 3.4/36.0: Require developer to dedicate public access easements along ridgetops and stream corridors to accommodate the development of trails and staging areas. No mitigation measures were included in the 2005 MND. Project Impacts a) Would the project increase the use of existing neighborhood or regional parks? No New Impact. Approval and construction of the proposed project would increase the use of City or regional recreational facilities, since the underlying project includes construction of new park and recreation facilities as part of the Fallon Sports Park. The intent of the project is to expand park and recreation opportunities in the Eastern Dublin planning area as directed by the Eastern Dublin Specific Plan. There would therefore be no new or more severe impacts with respect to recreation than were previously analyzed. b) .hoes the project include recreational facilities or require the construction of recreational facilities? See item "a," above. City of Dublin Page 51 Initial Study/Fallon Sports Park/Phase 11 February 2014 16. Transportation/Traffic Previous CEQA documents Eastern Dublin EIR. The Eastern Dublin EIR contains a number of mitigation measures to reduce anticipated traffic impacts from the General Plan and EDSP project. These measures generally include construction of new roadways, widening of existing roadways and improvements to local freeway facilities to accommodate anticipated increases in the number of vehicles associated with the build out of the Eastern Dublin area. With the exceptions noted below, the EIR found that all traffic and transportation impacts could be reduced to less -than -significant levels with adherence to mitigation measures identified in the EIR. A number of impacts could not be reduced to a level of insignificance even with mitigations. These include: impacts to the I-580 freeway between 1-680 and Hacienda Drive (IM 3.3/B), impacts to the I-580 Freeway between Tassajara Road and Airway Boulevard (IM 3.3IC), cumulative freeway impacts (IM 3.3/E) impacts to Santa Rita Road and T-580 Eastbound ramps (IM 3.3/1), and cumulative impacts to Tassajara Road (IM 3.3/N). 2005 MND. One Mitigation Measure dealing with traffic and transportation was included in the 2005 MND. Mitigation Measure 3 required that a future study be completed at the entrance of proposed Phase II of the Park from Central Parkway prior to the development of this area, with consideration given to the potential for multi- family housing on the south side of Central Parkway from Fallon Sports Park. The proposed project will be required to comply with all of the above transportation and circulation mitigation measures. Project Impacts a,b) Conflict with applicable plans related to the effectiveness of the circulation system, including all modes of travel, including intersections, streets, highways and other components or conflict with an applicable congestion management program, including level of service standards, travel demand measures and other applicable standards? No New Impact. The Eastern Dublin EIR considered the development of Fallon Sports Park and, following approval of the Specific Plan and EIR, approved development impact fees for Eastern Dublin that provided funding for local and community parks and transportation improvements in Eastern Dublin. Many of the proposed goad and pedestrian improvements have been installed by either the City or by local developers. Future traffic that would be generated by construction of the Lower Terrace of the Fallon Sports Park have been analyzed in previous CEQA documents for Eastern Dublin and for the original Park Master Plan. Proposed uses within the park expansion are generally consistent with those included in the 2005 Park Master Plan. The proposed relocation of the day care facility to the Phase I of the Park was not considered in previous documents; however, based on the information about City of Dublin Page 52 Initial Study/Fallon Sports Park/Phase H February 2014 hours of operation included in the Project Description section of this Initial Study, the proposed day care would operate between the hours of late morning and early afternoon on weekdays. Traffic generated by the proposed day care operation would therefore be outside of a.m. and p.m peak hours, so this traffic would not contribute vehicles to nearby major intersections or to nearby freeways. Also, it is assumed that many of the trips to and from the relocated preschool facility are currently in operation, although the routes of the new trips would be somewhat different from current traffic patterns. A driveway has been constructed from Central Parkway into the Lower Terrace portion of the park. Since the improvement plans that depicted the location of he driveway have been approved by the Dublin Public Works Department, Mitigation Measure 3 contained in the 2005 MND has been satisfied. Therefore, no new or more severe impacts would result with respect to intersections, streets highways, routes of regional significance or other components of the local and regional circulation system than have been previously analyzed. c) Change in air traffic patterns? No New Impact. The proposed project includes park and recreational uses and would have no impact on air traffic patterns. No new or more severe impacts would result with respect to this topic than was previously analyzed in other CEQA documents. d) Substantially increase hazards due to a design feature or incompatible use? No New Impact. The primary on -site circulation feature on the Phase U park site would be a parking lot for approximately 145 vehicles. Adherence to Mitigation Measure 2 contained in the 2005 MND requires a study for the location of the drive entrance to the park site. This analysis will also determine if adequate driver site lines would be provided and that other safety standards Auld be met. No new or more severe impacts with respect to design hazards would be created than previously analyzed. e) Result in inadequate emergency access? No New Impact. A single drive access to Central Parkway would be provided to serve the Lower Terrace portion of the park that would meet City of Dublin and Alameda County Fire Department design standards to ensure that adequate emergency access would be provided. No new or more severe impacts would result with respect to this topic. f) Conflict with adopted policies, plans or programs regarding public transit, pedestrian facilities or otherwise decrease the performance or safety of such facilities? No New Impact. No conflicts to plans, policies or programs that promote public transit, pedestrian use or similar features were identified in the 2005 MND as part of previous CEQA review of the overall park development. No new or more impacts have been identified in this Initial Study that has been previously analyzed in other CEQA documents. City of Dublin Page 53 Initial Study/Fallon Sports Park/Phase 11 February 2014 lb. Utilities and Service Systems Environmental Setting The project area is served by the following service providers: • Water supply and distribution: Dublin San Ramon Services District (DSRSD). • Sewage collection and treatment, recycled water: DSRSD. ■ Storm drainage: City of Dublin and Zone 7. ■ Solid waste service: Amador Valley Industries ■ Electrical and natural gas power: Pacific Gas and Electric Co. • Communications: AT &T Previous CEOA documents Eastern Dublin EIR. In terms of water resources, the Eastern Dublin EIR identified overdraft of groundwater resources (Impact 3.5 / P) as a potentially significant impact Adherence to Mitigation Measures 3.5/24.0 and 25.0 would reduce this impact to a level of insignificant. These measures require the City of Dublin to coordinate with DSRSD to develop recycled water resources and otherwise carefully use water resources and that all new development in the Eastern Dublin project area to connect to the DSRSD water system. Impact 3.5 / Q identified an increase in water demand as a potentially significant impact, but this impact could be mitigated to an insignificant level based on implementation of Mitigation Measures 3.5/26.0-31.0. These mitigation measures require implementation of water conservation measures in individual development projects and construction of new system -wide water improvements which are funded by development impact fees. Another related impact identified in the Eastern Dublin EIR is the need for additional water treatment plant capacity (Impact 3.5/R). This impact was identified as being reduced to a level of insignificance through the implementation of Mitigation Measures 3.5 / 32.0-31 .0, which requires improvement to the Zone 7 water system, to be funded by individual development impact fees. Impact 3.5/S (lack of a water distribution system) was identified as a potentially significant impact in the Eastern Dublin EIR, but this impact has been reduced to an insignificant level through adherence to Mitigation Measures3.5 / 4.34.0-38.0. These mitigations require upgrades to the project area water system and provision of a "will serve" letter prior to issuance of a grading permit. Impact 3.5/T identified a potentially significant impact related to inducement of substantial growth and concentration of population in the project area_ The Eastern Dublin found that this was a significant and unavoidable impact. Regarding sewer service, the Eastern Dublin EIR identified Impact 3.5 / B (lack of a wastewater collection system) as a potentially significant impact that could be mitigated City of Dublin Page 54 Initial Study/Fallon Sports Park/Phase 11 February 2014 through adherence to Mitigation Measures 3.5/1.0-5.0. These measures require DSRSD to prepare an area -wide wastewater collection system master plan, requires all new development to be connected to DSRSD's public sewer system, discourages on -site wastewater treatment, requires a "will -serve" letter from DSRSD and requires that all sewer facilities be constructed to DSRSD engineering standards. Impact 3.5 noted an impact with regard to extension of a sewer trunk line with capacity to serve new development, but could be reduced to an insignificant level since the proposed Eastern Dublin Specific Plan sewer system has been sized to accommodate increased sewer demand from the proposed Specific Plan project. Impact 3.5/G found that lack of wastewater disposal capacity as a significant impact. An upgraded wastewater disposal facility is presently being constructed by the Livermore Amador Valley Water Management Agency. Impact 3.5/ E identified lack of wastewater treatment plant capacity as a potentially significant impact, which could be reduced to an insigzvficant level through adherence to Mitigation Measure. No significant impacts or mitigation measures pertaining to utilities or service systems were identified in the 2005 MND. Project Impacts a) Exceed wastewater treatment requirements of the RWQCB? No New Impact. The current project would contain the same type of development as analyzed in the Eastern Dublin EIR and he 2005 MND. based on recent discussions with DSRSD staff (noted below) regarding this project, the proposed project would not exceed wastewater requirements of the Regional Water Quality Control Board (RWQCB). No new or more significant impacts with respect to wastewater treatment requirements have been identified in this Initial Study than have been analyzed in previous CEQA documents. b) Require new water or wastewater treatment facilities or expansion of existing facilities? No New Impact. Water, recycled water and wastewater extensions to existing mains in Central Parkway and other local roads would need to be extended to provide recycled water for field irrigation and potable water for restrooms, drinking fountains and similar uses. Sewer laterals would also need to be extended to the site to serve proposed restrooms and concession uses. According to a representative of DSRSD, District wastewater collection, treatment and disposal facilities and proposed recycled and domestic water for the proposed project would not result in a new or more significant impact than was analyzed in previous CEQA documents (source: Stan Kolo;zdie, DSRSD 11 / 11 / 13) c) Require new storm drainage facilities? No New Impact. The proposed expansion of Fallon Sports Park would require new and or upgraded drainage facilities to support proposed new uses. Consistent with Eastern Dublin EIR Mitigation Measures, the project developer (City of Dublin) will be required to install new or upgraded on and off -site (if required) storm drain systems that comply with City of Dublin and Zone 7 standards. No storm drainage impacts were identified in other previous CEQA documents. No new or more significant impacts are anticipated with respect to storm drain facilities that have been analyzed in previous CEQA documents. City of Dublin Page 55 Initial Study/Fallon Sports Park/Phase 11 February 2014 dj Are sufficient water supplies available? No New Impact. Based on the information provided by DSRSD staff, the District has planned for future urban uses on this site and included such development in the District's Urban Water Management Plan (source: Stan Kolozdie, DSRSD,11111113). No new or more significant are anticipated with respect to water supplies than have been previously analyzed. e) Adequate wastewater capacity to serve the proposed project? See response to "a," above. e, f) Solid waste disposal? No New Impact. The project site is within the franchise area of Amador Valley Industries that provides residential and commercial solid waste pick-up and recycling services. Fallon Sports Park is currently receiving solid waste services from Amador Valley Industries. The topic of solid waste disposal was not identified as a potentially significant impact in previous CEQA documents and no new or more significant impacts have been identified in this Initial Study than have been previously analyzed. g) Corrzply with federal, state and local statutes and regulations related to solid waste? No New Impact. The existing service provider will ensure adherence to federal, state and local solid waste regulations. No new or more severe impacts are anticipated impacts than have been previously analyzed. 17. Mandatory Findings of Significance a) Does the project have the potential to degrade the gr.rrrlity of the environment, substantially reduce the habitat of a fish or wildlife species, cause a fish or wildlife population to drop below self-sustaining levels, threaten to eliminate a plant or animal community, reduce the number of or restrict the range of a rare or endangered plant or animal or eliminate important examples of the major periods of California history or prehistory? No. Potential impacts related to biological resources, including a reduction in habitat area of fish or wildlife species, elimination of a plant or animal community, or elimination of an important example of major periods of California history or prehistory was analyzed in the Eastern Dublin EIR and the 2005 MN. The proposed project would represent a similar development type that was previously analyzed and no new or more significant impacts are anticipated than previously analyzed. b) Does the project have impacts that are individually limited, but cumulatively considerable? ("Cumulatively considerable" means that the incremental effects of a project are considerable when viewed in connection with the effects of past projects, the effects of other current projects and the effects of probable future projects). No. Cumulative impacts of the proposed Fallon Sports Park project have been analyzed in the Eastern Dublin EIR. c) Does the project have environmental effects which will cause substantial adverse effects on human beings, either directly or indirectly? No. No such impacts have been discovered in the course of preparing this Initial Study. City of Dubiin Page 56 initial Study/Fallon Sports Park/Phase 11 February 2014 Initial Study Preparers Jerry Haag, Urban Planner, project manager Agencies and Organizations Consulted The following agencies and organizations were contacted in the course of this Initial Study: City of Dublin Paul McCreary, Director of Parks and Community Services Rosemary Alex, Parks and Facilities Development Coordinator Bonnie Terra, Alameda County Fire Department Chief Tom McCarthy, Dublin Police Services Kathleen Faubion, AICP, Assistant City Attorney California Department of Toxic Substances Control {DTSQ Website DSRSD Stan Kolozdie References Dublin General Plan, City of Dublin, Updated through 7J2111 Eastern Dublin General Plan Wallace Roberts & Todd, 1993 Eastern Dublin Specific Plan and General PlanEnvironmental Impact Report, Wallace Roberts & Todd, 1994 Fallon Sports Park Master Plan, Carducci & Associates,, 2006 Livermore Municipal Airport, Airport Land Use Compatibility Plan, ESA Associates, August 2012 Parks and Recreation Master Plan City of Dublin, 2006 update City of Dublin Page 57 Initial Study/Fallon Sports Park/Phase 11 February 2014 ���� �f f � CEQA ADDENDUM FOR THE FALLON SPORTS PARK PHASE II PROJECT February 7, 2014 On May 10, 1993, the Dublin City Council adopted Resolution No. 51-93, certifying an Environmental Impact Report for the Eastern Dublin General Plan Amendment and Specific Plan ("Eastern Dublin EIR, SCH #91103064). The certified EIR consisted of a Draft EIR and Responses to Comments bound volumes, as well as an Addendum to the Eastern Dublin EIR dated May 4, 1993, assessing a reduced development project alternative. The City Council adopted Resolution No. 53-93 approving a General Plan Amendment and Specific Plan for the reduced area alternative on May 10, 1993. On August 22, 1994, the City Council adopted a second Addendum updating wastewater disposal plans for Eastern Dublin. The Eastern Dublin EIR evaluated the potential environmental effects of urbanizing Eastern Dublin over a 20 to 30 year period. Since certification of the EIR, many implementing projects have been proposed, relying to various degrees on the certified EIR. In 2005, the Dublin City Council adopted Resolution No. 89-05 that approved a Mitigated Negative Declaration for the Fallon Sports Park Master Plan. The 2005 MN❑ analyzed the environmental impacts of approving a Master Plan for the development of the Fallon Sports Park, located on the northwest corder of Fallon Road and Central Parkway and constructing recreational improvements envisioned in the Master Plan. This Addendum has been prepared pursuant to CEQA Guidelines Section 15164 for the Project, as described below. Project Description The current application includes approving and developing the Lower Terrace of the Park, also identified as Phase It. Overall improvements envisioned for this phase include but are not limited to: • Constructing an on -site entry road at the existing curb cut along the north side of Central Parkway; ■ Building an approximately 145-space vehicle parking lot. • Constructing a combination restroom and concession building. ■ Extending existing on -site pedestrian pathways from the existing park. • Constructing a 90' lighted baseball field. • Construction of a 2,000 square foot building for public use, including but not limited to community meetings, rentals, etc.) • Constructing two synthetic turf lighted soccer fields plus a warm up area. • Extending utility lines. • Temporarily relocating a City pre-school facility for a five-year period. ■ Related improvements, such as site grading and water quality features, to facilitate the above improvements. Prior CEQA Analyses and Determinations As summarized above and discussed in more detail in the attached Initial Study, the site has been planned for a community park since the Eastern Dublin approvals in 1993 and has been the subject of a Mitigated Negative Declaration in 2005. The Eastern Dublin FIR identified numerous environmental impacts, and numerous mitigations were adopted upon approval of the Easter Dublin General Plan Amendment and Specific Plan. For identified impacts that could not be mitigated to insignificance, the City Council adopted a Statement of Overriding Considerations. Similarly, the 2005 MND identified environmental impacts and mitigation measures. All previously adopted mitigation measures for development of Eastern Dublin identified in the Eastern Dublin FIR and the 2005 MND that are applicable to the Project and Project site continue to apply to the currently proposed Project as further discussed in the attached Initial Study. Current CEQA Analysis and Determination that an Addendum is Appropriate for this Project. Updated Initial Study. The City of Dublin has determined that an Addendum is the appropriate CEQA review for the Project, which proposes minor changes to the approved Fallon Sports Park Master Plan. If approved, the proposed project would allow lighted soccer fields and a temporarily relocated City pre-school facility within the park. The City prepared an updated Initial Study dated February 7, 2014, incorporated herein by reference, to assess whether any further environmental review is required for this Project Through this Initial Study, the City has determined that no subsequent FIR, or Negative Declaration is required for the plan and zoning amendments or the refined development details. No Subsequent Review is Required per CEQA Guidelines Section 15162. CEQA Guidelines Section 15162 identifies the conditions requiring subsequent environmental review, After a review of these conditions, the City has determined that no subsequent EIR or negative declaration is required for this Project. This is based on the following analysis: a) Are there substantial changes to the Project involving new or more severe significant impacts? There are no substantial changes to the Project analyzed in the Eastern Dublin FIR and the 2005 MND. The Project is similar to land uses for the project site analyzed in previous CEQA documents. As demonstrated in the Initial Study, the proposed changes within park would not be a substantial change to either the 1993 Eastern Dublin EIR analysis or the 2005 MND and will not result in additional significant impacts, and no additional or different mitigation measures are required. b) Are there substantial changes in the conditions which the Project is undertaken involving new or more severe significant impacts? There are no substantial changes in the conditions assumed in the Eastern Dublin EIR or the 2005 MND. This is documented in the attached Initial Study prepared for this Project dated February 7, 2014. Page 2 c) Is there new information of substantial importance, which was not known and could not have been known at the time of the previous EIR that shows the Project will have a significant effect not addressed in the previous EIR; or previous effects are more severe; or, previously infeasible mitigation measures are now feasible but the applicant declined to adopt them; or mitigation measures considerably different from those in the previous EIR would substantially reduce significant effects but the applicant declines to adopt them? As documented in the attached Initial Study, there is no new information showing a new or more severe significant effect beyond those identified in the prior CEQA documents. Similarly, the Initial Study documents that no new or different mitigation measures are required for the Project. All previously adopted mitigations continue to apply to the Project. The previously approved CEQA documents adequately describe the impacts and mitigations associated with the proposed development on portions of the Fallon Sports Park site. d) If no subsequent EIR-level review is required, should a subsequent negative declaration be prepared? No subsequent negative declaration or mitigated negative declaration is required because there are no impacts, significant or otherwise, of the Project beyond those identified in the Eastern Dublin EIR and previous CEQA documents for the site, as documented in the attached initial Study. Conclusion. This Addendum is adopted pursuant to CEQA Guidelines Section 15164 based on the attached Initial Study dated February 7, 2414. The Addendum and Initial Study review the proposed changes to the Fallon Sports Park Master Plan as discussed above. Through the adoption of this Addendum and related Initial Study, the City determines that the above minor changes in land uses do not require a subsequent EIR or negative declaration under CEQA Section 21166 or CEQA Guidelines Sections 15162 and 15163. The City further determines that the Eastern Dublin EIR and the 2005 MND adequately address the potential environmental impacts of the Master Plan change as documented in the attached Initial Study. As provided in Section 15164 of the Guidelines, the Addendum need not be circulated for public review, but shall be considered with the prior environmental documents before making a decision on this project. The Initial Study, Eastern Dublin EIR, the 2005 MND, and all resolutions cited above are incorporated herein by reference and are available for public review during normal business hours in the Community Development Department, Dublin City Hall, 100 Civic Plaza, Dublin CA during normal business hours. Page 3 Parks City of Dublin Capital Improvement Program 2020-2025 Page 46 Number – PK0119 FALLON SPORTS PARK - PHASE 3 Program – PARKS PROJECT DESCRIPTION Fallon Sports Park is a 60-acre community park bordered by Fallon Road, Central Parkway, Lockhart Street and Gleason Drive. Phases 1 and 2 of the park have been completed and Phase 3 represents the final phase of park development. The Phase 3 project provides for the design and construction of the remaining 14 acres of Fallon Sports Park, referred to as the Upper Terrace. On December 17, 2019, City Council approved the concept design that includes a cricket field, sand volleyball courts and multi-sport batting cages. Construction is anticipated to start in 2021. ANNUAL OPERATING IMPACT: $260,000 MANAGING DEPARTMENT: Public Works 2020-2025 CAPITAL IMPROVEMENT PROGRAM ESTIMATED COSTS PRIOR YEARS 2019-2020 BUDGET 2020-2021 2021-2022 2022-2023 2023-2024 2024-2025 FUTURE YEARS TOTALS 9100 - Salaries & Benefits $19,909 $44,519 $105,590 $170,018 9200 - Contract Services $55,696 $1,938,416 $1,994,112 9400 - Improvements $980,924 $7,252,846 $8,233,770 9500 - Miscellaneous $26 $200,074 $200,100 TOTAL $75,631 $3,163,933 $7,358,436 $10,598,000 FUNDING SOURCE PRIOR YEARS 2019-2020 BUDGET 2020-2021 2021-2022 2022-2023 2023-2024 2024-2025 FUTURE YEARS TOTALS 4100 - Public Facility Fees $75,631 $3,163,933 $7,358,436 $10,598,000 TOTAL $75,631 $3,163,933 $7,358,436 $10,598,000 ANNUAL OPERATING IMPACT $260,000 $260,000 $260,000