Loading...
HomeMy WebLinkAboutItem 3.1 Final 08-09 G&O CITY CLERK File # D[[][Q][Q]-[I][Q] AGENDA STATEMENT CITY COUNCIL MEETING DATE: June 26,2008 SUBJECT: Adoption of Final 2008-2009 Goals & Objectives Report Prepared by: Richard C. Ambrose, City Manager ATTACHMENTS: 1. Report on the proposed Carry-Over 2007-2008 Goals & Objectives. 2. Preliminarily Adopted Fiscal Year 2008-2009 Goals & Objectives 3. Preliminarily Adopted 1 0- Year Strategic Plan RECOMMENDATION: 4# \ j Approve those Goals and Objectives that are proposed to be carried over from Fiscal Year 2007-2008 to Fiscal Year 2008-2009; and adopt the Fiscal Year 2008-2009 Goals & Objectives and 10- Y ear Strategic Plan, as amended. FINANCIAL STATEMENT: None DESCRIPTION: On March 31, 2008, the City Council preliminarily adopted the Fiscal Year 2008-2009 Goals & Objectives and the 1 0- Year Strategic Plan. The Goals & Objectives and 1 0- Year Strategic Plan have been included in the Preliminary Fiscal Year 2008-2009 Budget for final adoption by the City Council. Those objectives listed as high priority are recommended for funding in the Fiscal Year 2008-2009 Budget. Also included in the Budget is the final report as of May 31, 2008 for the Fiscal Year 2007-2008 Goals & Objectives. As of that date, a total of 54 of 110 objectives (49.1 %) have been completed. With respect to high priority objectives, a total of 48 out of91 (52.8%) have been completed. There have been 8 major additional assignments since July 1,2006, of which 4 (50.0%) have been completed or are nearly complete. COPY TO: Page 1 of2 ITEM NO. 3../ I:\G&0\2008-2009 G&O - Strategic Plan\Working Folder for 6-26-08 Budget Hearing\as-final adopt G&O.doc The 2008-2009 Goals & Objectives include those Fiscal Year 2007-2008 objectives that Staff anticipates will not be completed by June 30, 2008. Those objectives that were expected to be completed by the end of Fiscal Year 2007-2008 were not included in the 2008-2009 Goals & Objectives program. Attachment 1 identifies those objectives that Staff originally estimated would be completed by the end of Fiscal Year 2007-2008, but are now expected to be completed after June 30, 2008. Funding for these objectives has been included in the Fiscal Year 2008-2009 Preliminary Budget and Financial Plan. In order to properly track the progress ofthese objectives, it is appropriate for the City Council to consider adding these objectives to the 2008-2009 Goals & Objectives program. The 2007-2008 Council priorities for these objectives will be carried over to the 2008-2009 Goals and Objectives program unless directed otherwise by the City Council. These carry-over objectives will also be added to the pertinent section(s) of the Strategic Plan. For those items that have not been previously ranked by Councilor identified as a Strategic Goal, Staff recommends that Council assign a priority and affiliation with a Strategic Goal if appropriate. Those goals that need to be ra~ed are as follows: . Work with the Intemational Council for Local Environmental Initiatives (ICLEI) to perform a Greenhouse Gas Inventory for the City of Dublin. . Create new Medium Density Designations for specific properties in the EDSP. In addition, Staff recommends that the following goal be added to the Strategic Plan under section 5B. . Create new Medium Density Designations for specific properties in the EDSP. RECOMMENDATION: Staff recommends that the City Council approve those Goals & Objectives that are to be carried over from Fiscal Year 2007-2008 to the Fiscal Year 2008-2009 Goals & Objectives and 10-Year Strategic Plan, and Adopt the Fiscal Year 2008-2009 Goals & Objectives and 10- Year Strategic Plan, as amended. Page 2 of2 Report on the Proposed Carry-Over 2008-2009 Goals & Objectives I ~ 1.15 The following list represents those objectives that Staff originally anticipated would be completed by the end of Fiscal Year 2007-2008, and consequently were not included in the 2008-2009 Goals & Objectives Program. These objectives are now expected to be completed after June 30, 2008. STRATEGIC COUNCIL YEAR PROPOSED OBJECTIVE ESTIMATED START/ STATUS GOAL PRIORITY FOR ACCOMPLISHING COMPLETION GOALS Dept. Goal High 2007 Work with the Dublin Sep 2007 UNDERWAY; School district Unified School District TBD selecting appropriate staff to and Dublin Partners in work with the City. Education to develop a Local Government Career Day. Dept. Goal 2007 Work with the Dec 2007 UNDERWAY; Staff engaged in International Council Sep 2008 data collection process. for Local Environmental Initiatives (ICLEI) to perform a Greenhouse Gas Inventory for the City of Dublin. STRATEGIC COUNCIL YEAR PROPOSED OBJECTIVE ESTIMATED START/ STATUS GOAL PRIORITY FOR ACCOMPLISHING COMPLETION GOALS Dept. Goal High 2007 Replace financial Oct 2007 UNDERWAY; Eleven (11) accounting system. TBD Firms responded to RFP; Three (3) Vendors will provide Staff with demonstrations in May/Jun 2008; Reference checking and contract negotiation will follow with a recommendation to City Council in Se 2008. 5E High 2007 Complete 2008-2013 Oct 2007 UNDERWAY; Consultant financial forecast. Oct 2008 nearing completion of computer model with historical data; Staff developing format for collection of Department estimates. STRA TEGIC COUNCIL YEAR PROPOSED OBJECTIVE ESTIMA TED ST ART/ STATUS GOAL PRIORITY FOR ACCOMPLISHING COMPLETION GOALS Dept. Goal High 2007 Keep School District Sep 2007 UNDERWAY; Contact has Administrators and TBD been made with the Dublin Principals informed of Unified Superintendent's Office City news (i.e., Annual on the distribution and Newsletter, Housing preferred method of delivery of Newsletter, etc.). the information. r-fen')~ 3'/ ~/;u! 08 1 Attachment 1 STRATEGIC COUNCIL GOAL PRIORITY YEAR Propose placement in 5B 2007 PROPOSED OBJECTIVE FOR ACCOMPLISHING GOALS Create new Medium Density Designations for specific properties in the EDSP. ESTIMATED START/ COMPLETION STATUS Apr 2007 Oct 2008 UNDERWAY; Joint Study Session scheduled for August 2008. STRATEGIC COUNCIL GOAL PRIORITY YEAR 2A High 2007 PROPOSED OBJECTIVE FOR ACCOMPLISHING GOALS Facilitate the selection of public art for three (3) Private Development projects. ESTIMATED START/ COMPLETION STATUS F eb 2007 Sep 2008 UNDERWAY; San Ramon Village Plaza complete; Tralee proposal to HCAC in Jun 2008 and Council in Jul 2008; Preliminary meeting with Grafton Station. STRATEGIC COUNCIL GOAL PRIORITY YEAR Dept. Goal High 2007 Dept. Goal High 2007 PROPOSED OBJECTIVE FOR ACCOMPLISHING GOALS Implement program targeting underage drinking and ille gal/pharmaceutical dru use. Implement a Citywide child/adult bicycle safety program. ESTIMATED START/ COMPLETION STATUS Sep 2007 Nov 2008 UNDERWAY; Planning town hall forum for fall 2008. Sep 2007 Jun 2008 COMPLETE; This goal was added to the Preliminarily Adopted 2008-2009 G&O Program; As Staff will be able to complete this goal before Jun 30, 2008, this item is proposed to be removed. 2 STRATEGIC COUNCIL YEAR PROPOSED OBJECTIVE ESTIMATED START/ STATUS GOAL PRIORITY FOR ACCOMPLISHING COMPLETION GOALS Dept. Goal High 2006 Complete Building Jul 2006 NEARLY COMPLETE; Management Study. Jul 2008 Scheduled for City Council Jul 2008. Dept. Goal High 2007 Conduct assessment of Sep 2007 UNDERWAY the storm drain system Jun 2012 and develop an appropriate replacement schedule. 3A High 2007 Using the Tri-Valley Aug 2007 UNDERWAY Triangle Study, work Jul 2008 with the Tri-Valley Cities to develop a strategy to pursue project funding in the region. 3C High 2007 Work with the region's Jul 2007 UNDERWAY; Review of transportation partners to Aug 2008 Congestion Management develop projects for the Agency's Project Study Report 1-580 Corridor that will (PSR) will be complete by Jun minimize impacts to the 2008. Civic Center Complex and businesses. 3C High 2007 Develop a phased plan to Dec 2007 UNDERWAY expand the Traffic Aug 2008 Management System to include all arterials. 3A High 2002 Work with Pleasanton Sep 2005 UNDERWAY; Agreement and Livermore to TBD complete. develop a cost sharing agreement for the ultimate improvement of the I-580/Fallon Road Interchange. 3 Jf~/5 2008-2009 PRELIMINARY ADOPTED GOALS & OBJECTIVES On March 31, 2008, the City Council preliminarily adopted the following Goals and Objectives for Fiscal Year 2008-2009. Those goals listed as a high priority are included in the Fiscal Year 2008-2009 budget. COUNCIL PRIORITY High Hi h High High High Medium Medium # 1. 2. 3. YEAR 2006 2006 2007 PROPOSED OBJECTIVE Conduct comprehensive update to City's Municipal Code. Develop comprehensive communi -wide diversity Ian. Implement recommendations from the Civic Center Workspace Programming Study. Modify the City's Smoking Ordinance. Improve visibility of visual presentations in City Council Chambers for the City Council and members of the ublic. Conduct study of Labor Guidelines on both City projects and private development (i.e., re- ualification, project labor, a rentice rograms, etc.). Investigate opportunities and implement solutions for paperless Council Meetings. COUNCIL PRIORITY High 4. 5. 2007 2008 # YEAR PROPOSED OBJECTIVE 1. 2008 1m lement new financial accounting system. 6. 2007 COUNCIL PRIORITY High High Hi h 7. 2008 PROPOSED OBJECTIVE Participate in the Tri-Valley Vision Pro.ect. Evaluate benefits of Tri-Valley Transportation Council participation. Provide oversight ofTV30 0 erations for the Tri-Valley. COUNCIL PRIORITY High Hi h High # 1. 2. 3. YEAR 2003 2007 2008 PROPOSED OBJECTIVE Produce a Citywide Newsletter. Consider an annual video newsletter on TV30 for community. Produce an online Citywide Calendar. COUNCIL PRIORITY High High High # 1. 2. 3. YEAR 2008 2008 2008 # 1. 2. 3. YEAR 2008 2008 2008 PROPOSED OBJECTIVE Buildin and Safety Contract Evaluation. Crossing Guards Contract Evaluation. Animal Services Contract Evaluation 1 ATTACHMENT 2 5 15 COUNCIL PRIORITY # YEAR PROPOSED OBJECTIVE High 1. 2004 Implement residential planned development and investigate opportunities to create a new village in Eastern Dublin Transit Center. High 2. 2001 Complete Parks Reserve Forces Training Area (Camp Parks) General Plan and S ecific Plan Amendments. High 3. 2006 Prepare Community Design Element of General Plan. High 4. 2006 Update Downtown, West Dublin BART and San Ramon Specific Plans into one comprehensive Plan that addresses the entire Downtown Area. Hi h 5. 2002 Com lete Scarlett Court S ecific Plan. High 6. 2008 Create Multi-Modal General Plan Circulation Map. High 7. 2008 Partici ate in 2010 Census. High 8. 2008 Complete General Plan Amendment on Nielsen property. Hi h 9. 2007 Complete Grafton Plaza General Plan Amendment and S ecific Plan Amendment. High 10. 2008 Briefings to the Planning Commission regarding proposed significant redevelopment, which would include site and/or land uses, within the Downtown Planning Area. Low 11. 1996 U date Ci ' s General Plan. Low 12. 2007 Develop policy requiring play areas in walking distance of new homes in new subdivisions. COUNCIL PRIORITY High # YEAR PROPOSED OBJECTIVE 1. 2004 Complete evaluation of the potential renovation/redevelopment of the Arroyo Vista Housing site. 2. 2006 Work with ABAG to ensure that the Regional Housing Needs Allocation process addresses City of Dublin housin needs in an e uitable manner. 3. 2008 Process 15 First Time Homebuyer Loans. 4. 2007 U date Housing Element of the General Plan. 5. 2008 Review effectiveness of the City's current Inclusionary Zoning Ordinance. High High Hi h High COUNCIL PRIORITY # YEAR Hi h l. 2006 High 2. 2008 Medium 3. 2008 PROPOSED OBJECTIVE 1m lement real-time electronic field inspection s stem. Enhance residential green building requirements to create a mandatory self- certification ro am as part of the ermittin rocess. Examine need for homeowner after hours inspection program. 2 COUNCIL PRIORITY High # 1. YEAR 2008 High 2. 2007 PROPOSED OBJECTIVE Develop and Implement an action plan and budget for the new Municipal Stormwater Permit (NPDES). Prepare an alignment for Central Parkway from Fallon Rd to Croak RdlDublin Blvd. COUNCIL PRIORITY # YEAR High l. 2008 Hi h 2. 2008 High 3. 2003 High 4. 2007 Hi h 5. 2008 High 6. 2008 Hi h 7. 2008 High 8. 2008 Medium 9. 2008 PROPOSED OBJECTIVE Work with the owners of National Food Lab on new development opportunities. Work with the owners of the Chevron ro erty on new develo ment 0 ortunities. Work with Dublin Place Shopping Center to facilitate new improvements to the Center. Work with property owners in West Dublin BART Specific Plan area to identify development 0 ortunities. Work with ro erty owners in Santa Rita area to identify new office uses/users. Enhance presence of automobile dealers in the Scarlett Court Specific Plan area. Work with ro erty owners to tenant vacant buildings on Villa e Pkwy. Work with property owners at the Promenade to identify development o ortunities. Examine appropriate locations to permit automotive repair businesses within the City. COUNCIL PRIORITY High # YEAR PROPOSED OBJECTIVE 1. 2006 Conduct in-depth community needs assessment and opinion survey of Department programs and services, and develop a Strategic Plan for Department programs and servIces. High 2. 2007 High 3. 2008 Hi h High High 4. 5. 6. 2008 2008 2008 High 7. 2008 High 8. 2008 Hi h High 9. 10. 2008 2008 Undertake development of design and construction documents for Fallon Sports Park, Phase I. Prepare for the opening of the Shannon Community Center and develop Facility Use Policy for community use of the building. Conduct grand 0 enin event for the new Shannon Community Center. Conduct park dedication event for Piazza Sorrento and Devany Square. Undertake development of design and construction documents for Emerald Glen Recreation and Aquatic Complex. Evaluate options for continuing the operation of the Emerald Glen Activity Center following the opening of the new Shannon Community Center. Plan for new Summer Nature Day Camp program at the new Shannon Community Center Interpretive area (beginning summer 2009). Investigate options for ex anding Senior Center food service ro ams and hours. Expand use of the City website to promote Senior Center events, programs, and servIces. 3 High 11. 2008 Medium 12. 2004 Medium 13. 2004 Medium 14. 2004 Medium 15. 2004 Medium 16. 2006 Medium 17. 2008 1 15 Implement a volunteer carpool program to provide transportation to and from the Senior Center. Assess otential for joint ro.ect/facility im rovements at Dublin Hi h School. Work With EBRPD to complete negotiations for land acquisition in the western hills for an Open S ace Area. Identify and secure sources of funding for land acquisition in the western hills for an 0 en S ace Area. Upon completion of land acquisition in the western hills, complete an Open Space Master Plan and a ro riate CEQA documents. In cooperation with the DUSD, update the existing agreement regarding use of facilities between the City and DUSD. Continue to look for locations in City public facilities that will allow teens to gather in a welcoming environment. COUNCIL PRIORITY # YEAR PROPOSED OBJECTIVE High 1. 2008 Facilitate the selection of public art as a condition of approval for two (2) Private Develo ment projects. High 2. 2006 Facilitate inclusion of artworks in the Shannon Community Center Reconstruction roject. High 3. 2007 Upon acquisition of the Dublin Square Shopping Center, undertake development of desi and construction documents for Phase I of the Dublin Historic Park. High 4. 2007 Implement a self study and peer review for the Phase II Museum Assessment Program - Public Dimension Assessment for the Dublin Herita e Center. High 5. 2008 Create a dedicated "website" for the Dublin Heritage Center. High 6. 2004 Implement Phase II of the Downtown Public Art/Bus Shelter Project including; design, fabrication and installation of student art murals. High 7. 2004 Work with the developer to locate significant works of art in two key places of the Dublin Transit Center, the Village Green and the "Iron Horse" Plaza. Hi h 8. 2008 Plan and coordinate a Holiday Tea at the Heritage Center in December 2008. High 9. 2008 Create a "Virtual Tour" of Dublin' s public art and the Heritage Center museum that can be viewed on the City website. High 10. 2008 Offer a "Vintage Film Series" event 4 times per year at the Dublin Heritage Center. Medium ll. 2004 Work with BART to incorporate high quality artwork as part of the West Dublin BART Station Project provided funding is available. Medium 12. 2008 Provide ublic space for the community to celebrate socio-cultural events. COUNCIL PRIORITY # YEAR High l. 2007 High 2. 2008 High 3. 2008 PROPOSED OBJECTIVE Implement a Citywide child/adult bicycle safety program. Work with property managers to develop crime prevention programs for multifamily properties. Conduct bi-monthly crime prevention community forums with topics e.g. ill Theft, Teen Driving Safety, Gang Awareness, etc. 4 Hi h High 4. 5. 2008 2008 High 6. 2008 Hi h 7. 2008 J5 Provide "Critical Incident Response Training" for Officers and DUSD ersonnel. Conduct two Child Safety Seat Events and participate in Click it or Ticket Enforcement Program. Develop "Parent Project" program in order to enhance parenting skills to decrease involvement of youth with the juvenile justice system; lower juvenile crime and recidivism; and improve police community relations. 1m lement a Social Host Ordinance. COUNCIL PRIORITY # YEAR PROPOSED OBJECTIVE NO NEW OBJECTIVES PROPOSED FOR FISCAL YEAR 2006-2007 COUNCIL PRIORITY # YEAR High 1. 2008 High 2. 2008 High 3. 2008 PROPOSED OBJECTIVE Conduct four (4) open houses at Dublin's fire stations with emphasis on fire safety. Work with Livermore-Pleasanton Fire Department to enhance training opportunities. Develop an Automated External Defibrillators (AEDs) program that encourages the business community to install AEDs throughout the community in locations where lar e numbers of eo Ie gather. COUNCIL PRIORITY # YEAR Hi h 1. 2008 High 2. 2008 High 3. 2008 High 4. 2007 High 5. 2008 PROPOSED OBJECTIVE Conduct Ci ide disaster exercise. Conduct six (6) Personal Emergency Preparedness (PEP) training sessions for Dublin residents. Update the City's Comprehensive Emergency Management Plan, including a pet evacuation protocol. Identify and provide all Dublin HOAs and Neighborhood Watch groups with disaster preparedness informational bulletins, and provide at least two (2) opportunities for Dublin residents to attend Community Emergency Response Team (CERT) training. Develop a template for preparation of emergency plans for facilities with vulnerable populations. COUNCIL PRIORITY High # 1. YEAR 2008 High 2. 2008 High 3. 2007 PROPOSED OBJECTIVE Adopt and implement a waste management/recycling plan for the City's large public venues and events, which consists of events that serve more than 2,000 individuals er day. Engage and analyze Dublin's jurisdictional partners' (DUSD, Camp Parks, Santa Rita Jail, etc.) diversion efforts and recommend im rovements. Increase commercial organics recycling participation by 10 businesses. 5 COUNCIL PRIORITY High Hi h # 1. 2. YEAR 2008 2007 PROPOSED OBJECTIVE Implement five (5) new community volunteer projects. Identify site for Maintenance Facility/Emer ency erations Center (EOC). COUNCIL PRIORITY # YEAR PROPOSED OBJECTIVE High 1. 2008 Examine signal timings throughout the City to improve intersection efficiency by coordinating signalized intersections along major arterials and optimizing pedestrian safety. High 2. 2008 Work with the Congestion Management Agency on the Development of the Regional Transportation Plan (RTP) to insure the City of Dublin's recommendations for needed regional infrastructure are addressed in the RTP. High 3. 2004 As part of the GP A for Parks RFT A, evaluate alternatives for a Central Parkway extension through Dougherty Road and interface options to the planned Scarlett Drive Extension. High 4. 2005 Update Tri-Valley Transportation Development Fee Nexus Study together with the other six (6) agencies in the TVTC. High 5. 2008 Study need for signalizing Brighton and Amador Valley Blvd. 6 CITY OF DUBLIN TEN YEAR STRATEGIC PLAN J 00;( /6 Preliminary Adopted 2008-2009 Update STRATEGIES STRATEGY #1: Establish villages within the City of Dublin. # 1. G&O Ref # 2004-2005 PROPOSED OBJECTNE FOR ACCOMPLISHING STRATEGIC GOAL Develop policy defining village conce t. (COMPLETE) # G&O Ref # 1. 2004-2005 2. 2004-2005 3. 2005-2006 4. 2005-2006 5. II-A-l 6. II-A-2 7. II-A-4 8. II-B-l # 1. G&O Ref # II-A-3 PROPOSED OBJECTNE FOR ACCOMPLISHING STRATEGIC GOAL Complete Pak 'n Save General Plan Amendment and Planned Development Rezoning. (COMPLETE) Complete review of Dublin Ranch West Annexation (Wallis) General Plan & Specific Plan Amendments. (COMPLETE) Complete General Plan and Specific Plan Amendments for Eastern Dublin Property Owners Annexation Area. (COMPLETE) Investigate creatin new village around West Dublin BART Station. (COMPLETE) Implement residential planned development and investigate opportunities to create a new village in Eastern Dublin Transit Center. Complete Parks Reserve Forces Training Area (Camp Parks) General Plan and Specific Plan Amendments. Update Downtown West Dublin BART and San Ramon Specific Plan into one com rehensive Plan that addresses the entire Downtown Area. Complete evaluation ofthe potential renovation/redevelopment ofthe Arroyo Vista Housing site. PROPOSED OBJECTNE FOR ACCOMPLISHING STRATEGIC GOAL Prepare Community Design Element for General Plan. STRA TEGY #2: Facilitate and encourage continued investment in Downtown Dublin. ~JlIT.J;.Li""~,",.. : iffll1.T:llfjci\'f I&th~ii i.i # G&O Ref# PROPOSED OBJECTNE FOR ACCOMPLISHING STRATEGIC GOAL 1. 2005-2006 Complete Senior Housing Project. (COMPLETE) 2. 2005-2006 Complete construction of new Senior Center and prepare for operation of new facility. (COMPLETE) Work with Dolan Lumber owners to facilitate development opportunities. (COMPLETE) Negotiate Lease Agreement and resolve funding for the West Dublin BART project. (COMPLETE) Install lighting at approaches to the 1-680 Freeway Underpass Art Projects. (COMPLETE) Develop and implement program to keep trucks out of shopping centers and overnight parking. (COMPLETE) Develop Historic District Master Plan for Dublin Blvd/Donlon property and implement Specific Plan, if required. (COMPLETE) 3. 4. 2005-2006 2005-2006 5. 2005-2006 6. 2005-2006 7. 2006-2007 . Attachm~nt '::t !? 11 ~/ 8. 2006-2007 Work with property owner of Ralph's Grocery store to identify replacement alternativesl (COMPLETE) 9. 2007-2008 Work with Dublin Honda on development options for Amador Plaza site. (COMPLETE) 10. 2008-2009 Facilitate the selection of public art for three (3) Private Development projects. (UNDERWAY; Sep 2008) 11. II-A-3 Prepare Community Design Element for General Plan. 12. II-A-4 Update Downtown West Dublin BART and San Ramon Specific Plans into one comprehensive Plan that addresses the entire Downtown Area. 13. II-E-3 Work with Dublin Place Shopping Center to facilitate new improvements to the center. 14. II-E-4 Work with property owners in West Dublin BART Specific Plan area to identify development opportunities. 15. III-B-6 Implement Phase II of the Downtown Public Art/Bus Shelter Project including; design, fabrication and installation of student art murals. 16. III-B-ll Work with BART to incorporate high quality artwork as part of the West Dublin BART Station Project provided funding is available. # G&O Ref # 1. 2004-2005 2. 2004-2005 3. 2005-2006 4. 2005-2006 5. 2006-2007 6. 2007-2008 7. II-A-3 8. II-A-4 9. II-E-3 10. II-E-4 1l. II-E-7 (New) PROPOSED OBJECTIVE FOR ACCOMPLISHING STRATEGIC GOAL Investigate Options for Shamrock Village. (COMPLETE) Work with Shamrock Villa e to facilitate im rovement to the Center. (COMPLETE Work with Dolan Lumber owners to facilitate development opportunities. (COMPLETE) Negotiate Lease Agreement and resolve funding for the West Dublin BART project. (COMPLETE) Work with property owner of Ralph's Grocery store to identify replacement alternatives. (COMPLETE) Work with Dublin Honda on development options for Amador Plaza site. (COMPLETE) Pre are Community Desi Element for General Plan. Update Downtown West Dublin BART and San Ramon Specific Plans into one com rehensive Plan that addresses the entire Downtown Area. Work with Dublin Place Shopping Center to facilitate new improvements to the Center. Work with property owners in West Dublin BART Specific Plan area to identify development opportunities. Work with ro erty owners to tenant vacant buildin s on Village Pkwy. STRATEGY #3: Develop a transportation system that facilitates ease of movement throughout the City # 1. G&O Ref # 2004-2005 2. 2004-2005 3. 2006-2007 4. 2006-2007 5. 2008-2009 6. 2008-2009 PROPOSED OBJECTIVE FOR ACCOMPLISHING STRATEGIC GOAL Work with Contra Costa Transportation Authority to develop a regional traffic model and seek concurrence from the TVTC for the adoption of the model for use in regional traffic planning. (COMPLETE) Examine the feasibility of coordinating central communications for traffic signals in downtown Dublin. (COMPLETE) Participate in Tri-Valley Triangle Analysis to prioritize 1-580,1-680 and route 84 transportation improvements. (COMPLETE) Utilize new CCT A traffic model to work with Livermore, Pleasanton, Alameda County and the Tri- Valley Transportation Council to examine configurations of streets parallel to 1-580 (i.e. Dublin Blvd./North Canyons Parkway, Stoneridge Drive/Jack London Blvd.) and make recommendations/advocacy. (COMPLETE) Work with Pleasanton and Livermore to develop a cost sharing agreement for the ultimate im rovement of the 1-5801Fallon Road Interchan e. (UNDERWAY; TBD) Using the Tri-Valley Triangle Study, work with the Tri-Valley Cities to develop a strategy to ursue roject funding in the re ion. (UNDERWAY; Jul 2008) 2 10<' ~ /5 7. V-B-2 (New) Work with the Congestion Management Agency on the Development of the Regional Transportation Plan (RTP) to insure the City of Dublin's recommendations for needed regional infrastructure are addressed in the RTP. # 1. G&ORef# 2005-2006 2. 2006-2007 3. 2006-2007 4. 2006-2007 5. 6. 2006-2007 2007-2008 PROPOSED OBJECTWE FOR ACCOMPLISHING STRATEGIC GOAL Negotiate Lease Agreement and resolve funding for the West Dublin BART project. (COMPLETE) Work with EBRPD and the City of Pleasanton to conduct a preliminary engineering study and identify funding sources to facilitate the connection of Alamo Canal Trail under 1-580 to Pleasanton trails. (COMPLETE) Work with ACTIA for the implementation of the Measure B transportation project along the Scarlett Drive corridor between Dublin Blvd. and Dougherty Road. (COMPLETE) Work with LA VTA and BART to improve connectivity between the City Park-and-Ride Lot and the BART Station. (COMPLETE) Pre are lobal transportation Ian for City (multi-modal). (COMPLETE) Develop a City-wide Bicycle Master Plan including bicycle access to parks and open space areas. (COMPLETE) # G&O Ref # 1. 2004-2005 2. 2005-2006 3. 2006-2007 4. 2008-2009 5. 2008-2009 6. II-A-2 7. II-A-5 8. II-D-2 9. V-B-l (New) 10. V-B-3 PROPOSED OBJECTWE FOR ACCOMPLISHING STRATEGIC GOAL Ado t a s ecific alignment of Fallon Road from 1-580 to Bent Tree Drive. (COMPLETE) Complete General Plan and Specific Plan Amendments for Eastern Dublin Property Owners Annexation Area. (COMPLETE) Work with ACTIA for the implementation ofthe Measure B transportation project along the Scarlett Drive corridor between Dublin Blvd. and Dou herty Road. (COMPLETE Work with the region's transportation partners to develop projects for the 1-580 Corridor that will minimize impacts to the Civic Center Complex and businesses. (UNDERWAY; Au 2008 Develop a phased plan to expand the Traffic Management System to include all arterials. (UNDERWAY; Aug 2008) Complete Parks Reserve Forces Training Area (Camp Parks) General Plan and Specific Plan Amendments. Complete Scarlett Court Specific Plan. Prepare an alignment for Central Parkway from Fallon Rd to Croak RdlDublin Blvd. Examine signal timings throughout the City to improve intersection efficiency by coordinating signalized intersections along major arterials and optimizing pedestrian safety . As part of the GPA for Parks RFTA, evaluate alternatives for a Central Parkway extension to Dougherty Road and interface options to the planned Scarlett Drive Extension. STRATEGY #4: Create an open space network that ensures environmental protection and provides public access where appropriate. # 1. G&O Ref # III-A-13 2. III-A-14 3. III-A-15 PROPOSED OBJECTWE FOR ACCOMPLISHING STRATEGIC GOAL Work with EBRPD to complete negotiations for land acquisition in the western hills for an Open Space Area. Identify and secure sources of funding for land acquisition in the western hills for an Open Space Area. Upon completion of land acquisition in the western hills, prepare an Open Space Master Plan and appropriate CEQA documents. 3 13 of;/5 # G&O Ref# 1. 2005-2006 2. 2005-2006 3. 2006-2007 4. 2006-2007 5. 2007-2008 6. II-A-2 PROPOSED OBJECTIVE FOR ACCOMPLISHING STRATEGIC GOAL Complete General Plan and Specific Plan Amendments for Eastern Dublin Property Owners Annexation Area. (COMPLETE) Complete Review of Mission Peak Annexation and General Plan & Specific Plan Amendments. (COMPLETE) Work with EBRPD and the City of Pleasanton to conduct a preliminary engineering study and identify funding sources to facilitate the connection of Alamo Canal Trail under 1-580 to Pleasanton trails. (COMPLETE) Complete review of Moller annexation and General Plan and Specific Plan Amendments. (COMPLETE). Com lete GP A Study on the Trans ortation Corridor Ri ht-of-wa . (COMPLETE) Complete Parks Reserve Forces Training Area (Camp Parks) General Plan and Specific Plan Amendments. # 1. G&O Ref # 2005-2006 2. 2005-2006 3. 2006-2007 PROPOSED OBJECTIVE FOR ACCOMPLISHING STRATEGIC GOAL Complete General Plan and Specific Plan Amendments for Eastern Dublin Property Owners Annexation Area. (COMPLETE) Complete Review of Mission Peak Annexation and General Plan & Specific Plan Amendments. (COMPLETE) Complete review of Moller annexation and General Plan and Specific Plan Amendments. (COMPLETE STRATEGY #5: Continue to develop a community that provides a balance of jobs, housing, and services in a fiscally sound manner. # 1. G&O Ref # II-A-2 2. II-A-3 PROPOSED OBJECTIVE FOR ACCOMPLISHING STRATEGIC GOAL Complete Parks Reserve Forces Training Area (Camp Parks) General Plan and Specific Plan Amendments. Prepare Community Design Element of General Plan. # G&O Ref # 1. 2004-2005 2. 2005-2006 3. 2005-2006 4. 2006-2007 5. II-A-l 6. II-A-8 (New) 7. II-A-9 8. II-E-5 (New) 9. Proposed Placement PROPOSED OBJECTIVE FOR ACCOMPLISHING STRATEGIC GOAL Develop a master plan & phasing plan for Sports Park on Gleason Drive & Fallon Road includin evaluation ofBMX Track. (COMPLETE) Complete General Plan and Specific Plan Amendments for Eastern Dublin Property Owners Annexation Area. (COMPLETE) Complete Review of Mission Peak Annexation and General Plan & Specific Plan Amendments. (COMPLETE) Complete review of Moller annexation and General Plan and Specific Plan Amendments. (COMPLETE) Implement residential planned development and investigate opportunities to create a new village in Eastern Dublin Transit Center. Complete General Plan Amendment on Nielsen property. Com lete Grafton Plaza General Plan Amendment and S ecific Plan Amendment. Work with property owners in Santa Rita area to identify new office uses/users. Create new Medium Density Designations for specific properties in the EDSP. 4 15 # G&O Ref# 1. 2004-2005 2. 2005-2006 3. 2006-2007 4. 2006-2007 5. 2006-2007 6. 2006-2007 7. 2007 -2008 8. 2007-2008 9. 2007 -2008 10. 2007-2008 11. II-B-l 12. II-B-2 13. II-B-3 (New) 14. II-B-4 15. II-B-5 (New) PROPOSED OBJECTIVE FOR ACCOMPLISHING STRATEGIC GOAL Undertake Housing Needs Assessment. (COMPLETE) Complete Senior Housin project. (COMPLETE) Work with cities in the Tri-Valley Area to develop and maintain affordable housing o ortunities, and ublicize and coordinate the re ion's housing needs. (COMPLETE) Implement First Time Homeowner Program. (COMPLETE) Process five (5) First Time Homebuyer Loans and make progress report to City Council. (COMPLETE) Revise Density Bonus Ordinance. (COMPLETE) Process five (5) first time homebuyer loans. (COMPLETE) Hold two (2) community meetings to educate the community on the City's affordable housing program. (COMPLETE) Educate the City's large employers on the City's affordable housing program to assist with employee attraction and retention. (COMPLETE) Prepare Universal Design Ordinances for adoption as an amendment to Building Code requirements. (COMPLETE) Complete evaluation of the potential renovation/redevelopment of the Arroyo Vista Housing site. Work with ABAG to ensure that the Regional Housing Needs Allocation process addresses City of Dublin housing needs in an equitable manner. Process 15 first time homebuyer loans. Update Housing Element of the General Plan. Review effectiveness of the City's current Inclusionary Zoning Ordinance. # G&O Ref # 1. II-A-3 2. II-A-5 3. II-B-l 4. II-E-I (New) 5. II-E-2 (New) 6. II-E-6 (New) # 1. 2. 3. G&O Ref # 2008-2009 I-A-3 III-l\-7 (Nevv) PROPOSED OBJECTIVE FOR ACCOMPLISHING STRATEGIC GOAL Prepare Community Design Element of General Plan. Complete Scarlett Court Specific Plan. Complete evaluation of the potential renovation/redevelopment of the Arroyo Vista Housing site. Work with the owners of National Food Lab on new development opportunities. Work with the owners of the Chevron property on new development opportunities. Enhance presence of automobile dealers in the Scarlett Court Specific Plan area. PROPOSED OBJECTIVE FOR ACCOMPLISHING STRATEGIC GOAL Com lete 2008-2013 Multi-year Financial Forecast. (UNDERWAY; Oct 2008) Implement recommendations from the Civic Center Workspace Programming Study. Evaluate options for continuing the operation of the Emerald Glen Activity Center following the opening of the new Shannon Community Center. STRA TEGY #6: Develop dynamic community facilities that provide unique recreational and cultural experiences in the region. # 1. 2. 2006-2007 3. 2006-2007 PROPOSED OBJECTIVE FOR ACCOMPLISHING STRATEGIC GOAL Refurbish exhibit space within the Murray Schoolhouse to provide a fresh setting that will optimally highlight Dublin's history. (COMPLETE) Develop Historic District Master Plan for Dublin Blvd./Donlon property and implement S ecific Plan, if required. (COMPLETE) Prepare an update to the Parks & Recreation Master Plan. (COMPLETE) 5 150;{ /5 4. 2006-2007 Undertake a site master plan, programming and financial feasibility study for the Dublin Historic Park including DHPA land/cemetery feasibility study. (COMPLETE) 5. 2006-2007 Research and submit new application for Murray Schoolhouse to be placed on the National Register of Historic Places. (COMPLETE) 6. 2006-2007 Submit application for California Cultural Historic Endowment grant for Dublin Historic Park project. (COMPLETE) 7. 2007 -2008 Establish a Visitor Center at St. Raymond's Church. (COMPLETE) 8. 2007-2008 Assess the condition of the Kolb Family properties (house, barn, and workshop) and develop a plan for relocation of the properties as appropriate. (COMPLETE) 9. III-B-3 Upon acquisition of the Dublin Square Shopping Center, undertake development of design and construction documents for Phase I of the Dublin Historic Park. 10. III-B-4 Implement a self study and peer review for the Phase II Museum Assessment Program - Public Dimension Assessment for the Dublin Heritage Center. 2. III-l\-6 (Nevv) PROPOSED OBJECTIVE FOR ACCOMPLISHING STRATEGIC GOAL Re-evaluate the Facilities Feasibility Study and update the conceptual Master Plan for the Emerald Glen Recreation/Aquatic Center. (COMPLETE) Undertake development of design and construction documents for Emerald Glen Recreation and Aquatic Complex. # 1. G&O Ref # 2007 -2008 # G&O Ref # 1. 2005-2006 2. 2005-2006 3. 2006-2007 4. 2007-2008 5. II-A-2 PROPOSED OBJECTIVE FOR l\CCOMPLlSHING STRATEGIC GOAL Complete General Plan and Specific Plan Amendments for Eastern Dublin Property Owners Annexation Area. (COMPLETE) Conduct research on various unique passive park/recreation facilities and identify preferred com onents and site requirements. (COMPLETE) Closely monitor development projects Citywide to identify potential sites for a unique assive ark/recreation facility. (COMPLETE) Complete GP A Study on the Transportation Corridor Right-of-way. (COMPLETE) Complete Parks Reserve Forces Training Area (Camp Parks) General Plan and Specific Plan Amendments. 6