Loading...
HomeMy WebLinkAboutItem 4.04 Automatic Doors Accpt Wrk CITY CLERK File # 600-35 AGENDA STATEMENT CITY COUNCIL MEETING DATE: July 17, 2001 SUBJECT: Acceptance of Work, Contract 01-01 Civic Center Automatic Doors and Outdoor Electrical Upgrade Report Prepared by: Lee S. Thompson, Public Works Director ATTACHMENTS: Budget Change Form RECOMMENDATION: 1) 2) Authorize appropriation in the amount of $1,397 to'the Internal Service Fund for the Outdoor Electrical Upgrade project. Accept improvements constructed under Contract 01-01 and authorize final Payment in the amount of $14,676, less retention, to Morgan Electric. Authorize payment of 10% retention in 35 days if there are no subcontractor claims. FINANCIAL STATEMENT: BUDGET ACTUAL CIP #93915 AUTOMATIC DOORS Printing & Legal $250 $225 Design & Construction Administration $2,500 $2,775 Construction $16,000 $14,676 Total, Automatic DoorS $18,750 $17,676 CIVIC CENTER OUTDOOR ELECTRIC (ISF) Printing & Legal $150 $60 Design & Construction Administration $2,500 $4,830 Construction $18,068 $17,225 Total, Outdoor Electrical $20,718 $22,115 The Automatic Doors CIP was completed within funds budgeted for construction. The Outdoor Electrical project exceeds funds budget.ed by $1,397. A additional appropriation is necessary in order to close out the project. gPtmiscproj~ada doors~agstaccept COPIES TO: Morgan Electric ITEM NO. DESCRIPTION: This contract combined two projects. The Automatic Door project converted two exiSting sets of entrance doors, one in the Administrative Wing and one in the Police Wing, for actuated operation. The doors operate either manually or by means of a pushbutton. The door opening devices meet the criteria of the Americans With Disabilities Act (ADA) and all other applicable codes. While automatic doors are not required by ADA, provision of the door opening devices improves accessibility to the Civic Center for disabled persons. The Automatic Doors portion of the project was completed within funds budgeted for construction. The outdoor electrical upgrade renovated the site lighting in the lawn area and provided additional circuits for electrical outlets in the area of the Civic Center plaza. The additional outlets would support the lighted holiday tree as well as events that are held in the plaza area such as the summer concert series. One change order was incurred during construction of the outdoor electrical improvements; the cost of the change order was $800.00. The final cost of the outdoor electrical upgrade exceeds funds budgeted by $1,397. The overage occurred in the area of design and project administration rather than in the construction portion of the project, as it was not originally planned to hire aix outside consultant to prepare the project plans. Improvements constructed under Contract 01-01 are satisfactory and have passed Building Code inspection. Staffrecommends that the City Council accept the improvements, authorize an appropriation in the amount of $1,397, authorize final payment to Morgan Electric in the amount of $14,676, less ' retention, and author'~ze release of retention in 35 days if no subcontractor claims are received. CITY OF DUBLIN BUDGET CHANGE FORM - FISCAL YEAR 2000-2001 CHANGE FORM # New Appropriations (City Council Approval Required): Budget Transfers: X __ From Unappropriated Reserves (If Other than General Fund, Fund No -832 · From New Revenues FrOm Budgeted Contingent Reserve (1080-799.000) Within Same Department Activity Between Departments (City Council Approval Required) Other Name: Name: Building Internal Service Fund $1,397.00 Account #: 832.10000.740.050 Account #: Name: Name: Account #: Account #: Name: Name: Account #: Account #: Name: Name: Account #: Account #: City Manager: Date: Signature ASD/Fin Mgr '(~, ~J~ ~ Date: Signature REASON FOR BUDGET CHANGE ENTRY: Cost of design and project administration services exceeded budget. $843 can be transferred from the construction line item to the general contract services line item. Mayor: Date: Signature 'Posted By: Date: Document4 Signature