Loading...
HomeMy WebLinkAboutItem 4.04 Award Bid Library Repairs CITY CLERK File # D[6][Q][Q]-[5][) AGENDA STATEMENT CITY COUNCIL MEETING DATE: October 17,2006 SUBJECT: Award of Bid - Contract 06-08, Library Repairs Report Prepared by Melissa Morton, Public Works DiredJrfL ATTACHMENTS: 1) 2) Budget Change Form Resolution RECOMMENDATION: -'I 'L~1) ~II". 2) ~ Approve budget change in the amount of $5,200, and Adopt the resolution awarding Contract 06-08 to RoSa Construction, Inc. FINANCIAL STATEMENT: The construction budget for this project is $25,300. One bid in the amount of $26,508 was received from RoSa Construction, Inc., which exceeds funds budgeted for construction. It is recommended that a 15% contingency be included for extra work identified subsequent to the bid process. Therefore, a budget change in the amount of$5,200 is needed to award this contract. The cost of the repair work is expected to be reimbursed through insurance claims. DESCRIPTION: The rear wall of the library building was damaged in a vehicle accident in March of 2006. This project would repair the damage, which consists primarily of metal framing, drywall and exterior plaster (stucco) work and replacement of two tubular bicycle racks. The specifications for the repair are consistent with the specifications for the original construction of the building. As noted in the Financial Statement above, one bid was received from RoSa Construction, Inc., in the amount of $26,508. Staff had contacted other potential bidders prior to the mandatory pre-bid meeting and was advised that scheduling the project in the near future would be a problem and these bidders were ------------------------------------------------------------------------------------------------------------- COpy TO: RoSa Construction, Inc. Page 1 of2 ITEM NO. 4-l\. '1' · G:\miscproj\library repair\agenda statement award therefore declining to bid. It is the City's goal that this work be completed expeditiously due to the possibility of exposure to weather, as well as a desire to conclude the insurance claim process as soon as possible. The bid received from RoSa Construction, Inc., is $1,208 higher than the funds budgeted for construction. On the basis of subsequent inspections of the damage and the fact that additional drywall needs to be removed before the extent of the damage can be fully confirmed, Staff recommends that a 15% contingency be applied to the bid amount and proposes a budget change in the amount of $5,200. It is anticipated that the City will be reimbursed for the cost of the work through insurance claims. Staff has reviewed the bid submitted by RoSa Construction and is familiar with the work performed by this contractor. Staff therefore recommends that the City Council 1) approve the budget change in the amount of $5,200, and 2) adopt the resolution awarding Contract 06-08 to RoSa Construction, Inc. Page 2 of2 CITY OF DUBLIN BUDGET CHANGE FORM ltib CHANGE FORM #: New Appropriations (City Council Approval Required): From Unappropriated Reserves Fund # x From New Revenues Budget Transfers: From Budgeted Contingent Reserve (1080-799.000) Within Same Department Activity Between Departments (City Council Approval Required) Other Name: Name: Library Repair Account: Account: 001-93451-750-050 Name: Name: Revenue - Reimbursement - General Account: Account: 001-570-005 Name: Name: Account: Account: Name: Name: Account: Account: Name: Name: Account: Account: Name: Name: Account: Account: Name: Name: Account: Account: Total Total $ 5,200.00 $ 5,200.00 10,400 Reason for Budget Change: Bid received is $1,208 higher than funds budgeted for construction. Due to possibility of more extensive repairs being needed, recommend adding 15% contingency to bid amount. $26,508 x 1.15 = $30,484, say $30,500. Budget is $25,300, difference of $5,200. It is anticipated that this additional amount will be reimbursed by an outside insurance company. ~ Fin Mgrl ASD:.?J-~ ~ Signature ~ \ Date: \ () . "3 'b City Manager: ~GtL (., . .L- 11~ 1_ Signature 4 Date: Id/,o/o~ Mayor: Date: Signature Posted By: Date: Signature C:\Documents and Seltings\fredm\Local Settings\Tempormy Internet Files\OLKncbpy of budget change form.xls ~. y rO/17/()b ATTAClDlENT ,. ~. RESOLUTION NO. - 06 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF DUBLIN ********************** AWARDING CONTRACT 06-08 LIBRARY REPAIRS TO ROSA CONSTRUCTION, INC. WHEREAS, the City of Dublin did, on October 3,2006, publicly open, examine, and declare all sealed bids for doing the work described in the approved Plans, Specifications, and Modifications for Contract 06-08, Library Repairs, authorized by the City Council on September 5, 2006, which Plans, Specifications, and Modifications are hereby expressly referred to for a description of said work and for all particulars relative to the proceedings under the request for bids; and WHEREAS, said bids were submitted to Public Works Director, who has recommended that the bid hereinafter mentioned is the lowest and best bid for doing said work; NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Dublin does hereby award City of Dublin Contract 06-08, Library Repairs, to the lowest responsible bidder therefor, to wit, RoSa Construction, Inc., with a bid of Twenty-Six Thousand Five Hundred Eight Dollars ($26,508), the particulars of which bid are on file in the Office of the Public Works Director. BE IT FURTHER RESOLVED that the Mayor is authorized to execute the agreement. PASSED, APPROVED AND ADOPTED this 17th day of October, 2006. AYES: NOES: ABSENT: ABSTAINING: Mayor . ATTEST: City Clerk g: Imiscprojlfs 16 repairslresoawrd ATTAUDMENT Z.