HomeMy WebLinkAboutItem 4.06 Sidewalk & Curb Safety~~ ,
-~-~
i
\~:'/
CITY CLERK
File # ^Q d^0"00
AGENDA STATEMENT
CITY COUNCIL MEETING DATE: May 19, 2009
SUBJECT: Award of Bid -Contract No. 09-06, 2008-2009 Annual Sidewalk
Safety Repair Program and Curb Ramp Installation
Report Prepared by: Melissa Morton, Public Works Director
ATTACHMENTS: I) Bid Results
2) Resolution of Award
RECOMMENDATION: 1) Adopt the Resolution awarding Contract No. 09-06, 2008-
2009 Annual Sidewalk Safety Repair Program and Curb
Ramp Installation, to Maxistone, Inc., dba Maxicrete, Inc.;
n w ~ and
~~ ~`~ 2) Authorize the City Manager to approve a potential Change
_~
Order in an amount not to exceed $32,300 for the installation
of additional curb ramps and sidewalk replacement.
FINANCIAL STATEMENT: The total amount of the base bid to be awarded is $76,290.50.
Prect
~ Finding St~uree Binge#' 16ax Low, ~1 With
~ ~..
x
Im rovemee#s
Conlin eac
Sidewalk Safety Repair (94250) General Fund $ 65,000
$33,890.50
Contingency 10% 3,389.05
Sub-Total $37,279.55
ADA Transition Plan /Curb Ramps General Fund $ 30,000
(93917) $23,100.00
Contingency 10% 2,310.00
Sub-Total $25,410.00
Bike Lane Amador Valley Blvd Traffic Impact Fees $ 10,512 $ 10,512.00
(96778) Electrical work for the #300 (after signal)
project under a separate contract 42,243 8,788.00
Measure B Bike/Ped $19,300.00
Contingency 10% (Measure B) #227 1,930.00
Sub-Total $52,755 $21,230.00
GRAND TOTAL 3 PROJECTS: $147,755 $83,919.55
-------------------------------------------------------------------------------------------------------------
COPY TO: Maxicrete, Inc.
Page 1 of 2 !~
ITEM NO. t
G:\CIP\SIDEWALK\2008-2009\Agenda Statement Awazd of Bid rev..doc n '
V
DESCRIPTION: On April 7, 2009, the City Council authorized Staff to solicit bids
for Contract No. 09-06, 2008-2009 Annual Sidewalk Safety Repair Program and Curb Ramp Installation.
The Annual Sidewalk Safety Repair Program (Remove and Replace) repairs sidewalk offsets of 3/4-inch
or more that may pose a tripping hazard. The remove and replace process is used in locations where the
offset is more significant or where tree roots are causing the offset. This procedure requires the removal
of the existing sidewalk and, in the case of root problems, removal of the tree roots, and then replacement
of the concrete sidewalk.
When a resident or field personnel report a sidewalk offset of 3/4-inch or more, maintenance staff take
pictures of the offset, construct a temporary ramp at the offset, and take another picture. While
maintenance of sidewalks and other frontage improvements is legally the responsibility of the private
property owner, the City Council has adopted aCity-paid sidewalk repair program on a year-by-year basis
since 1983. At the budget hearing for Fiscal Year 2008-2009, the City Council extended the City-paid
repair program for an additional year. Once the temporary repair is made, Staff inform the resident that
the responsibility for the repair is theirs, but also inform them that Staff will document the site for
potential inclusion in the Sidewalk Safety Repair Program. There is an ongoing list of needed sidewalk
safety repairs and each year that funding is available, Staff prioritizes the list based on the severity of the
offset. If bids received are less than the engineer's estimate, Staff recommends to the City Council that
additional improvements be constructed within the adopted budget to reduce the amount of sidewalk
repairs and curb ramps still needed in the City.
This year's Sidewalk Safety Repair Program will also include the construction of approximately 11
pedestrian curb ramps. The ramps are funded through the General Fund as identified in the ADA
Transition Plan (CIP No. 93917). A total of $10,000 for this project was provided by a Safety Grant from
the City's insurance provider (ABAG PLAN).
Retrofitting 30 existing ramps along Amador Valley Boulevard is part of the Bike Lane - Amador Valley
Boulevard Corridor Capital Improvement Program (CIP No. 96778) as it is necessary to bring the ramps
into conformance with current ADA requirements. This retrofit work is being included with the Annual
Sidewalk Safety Repair Program (CIP No. 94250) as the work is similar, and combining the project
elements will be acost-savings measure.
A total of 7 bids were received for this project (Attachment 1). The low bid of $76,290.50 was submitted
by Maxistone, Inc., dba Maxicrete, Inc.
Since adopting the ADA Transition Plan (2006), the City has installed 26 curb ramps and is making every
effort to bring the City into compliance as quickly as possible. There are 1,452 ramps remaining for either
full construction, or modification. Since the amount budgeted for this project is $125,000, it is proposed
to take advantage of the low bid prices by increasing the number of curb ramp installations and adding
more locations for sidewalk replacement. Staff will identify the sites and locations for the curb ramps and
sidewalk repairs, and will then confirm the cost with the contractor based on the low bid prices. With the
City Council's authorization, the City Manager can approve a Change Order in an amount not to exceed
$32,300 to cover this additional work.
RECOMMENDATION: Staff has reviewed the bid results, checked references, and
recommends that the City Council 1) adopt the Resolution awarding Contract No. 09-06, Fiscal Year
2008-2009 Annual Sidewalk Safety Repair Program and Curb Ramp Installation to Maxistone, Inc., dba
Maxicrete, Inc.; and 2) Authorize the City Manager to approve a potential Change Order in an amount not
to exceed $32,300 for the installation of additional curb ramps and sidewalk replacement.
Page 2 of 2
SUMMARY OF BID RESULTS -April 28, 2009 ~- I, __- G _ _
- _ - - -_
CONTRACT 09-06, 2008-2009 SIDEWALK SAFETY REPAIR PROGRAM AND CURB RAMP INSTALLATION ' '~
--- - --- ~- - -- ~ _ _ I _R_OTHERS
ENGINEER' M~ ETE, INC. AJW CON TOTAL PR CE UN T PRICE TOTAL
ITEM ITEM DESCRIPTION I~ MEASURE QTY UNIT PRICE TOTAL PRICE PRICE
_ I SF _ 3,367 $ _12.00 $ 40,404.00 UNIT PRICE ~ TOTAL _PRICE II UNIT PRICE ~- I~
-- _ _ - `_- _- _~-- --~ - _.$ -_8.50 $ _-28,619.50 $ 10.00 I $ 33,670.00 -
-- - - -
2 ;Saw Cut Concrete & Re lace ~ LF 1,128 I _$ 12.90 I $ 37,037.00
$ 3.75 $ 4,230 00 $ 450.00 $ 50.00 $ 3,384.00 '~ $ 3,271.20
( ( P _p) ) ~ - $ 2,256.00 $ 3.00 $ 500.00 ' $ 50.00 $ __5.00._00
$ 45.00 _
4 ACrPavunefRemove & ee lac) _ LF 10 $ - $ $ 300.00 $ 10.00 $ 100.00. $ 20.00 $ 200.00
R lace LF r 10 $ 30.00 $ 300.00 ~ $ 30.00
- 9~ -- P( P ) -_ i- -- - - ~ - - - - -~_- -
6 4'x3 Truncated dome ads retrofit - EA _ 27 $ _900.00. $ 24,300.00 $ __500.00 $ 13,500.00 $ 1,700.00 $ 18,700.00 I $ 1,950.00 ~ $ 21,450.00
5 Pedestrian Curb Ram CD-105 EA 11 $ 2,500.00 $ 500.00_ $ 500.00 $ 456.00 $ 456.00
7 5'x3' Truncated dome- ads retrofit EA 1 $ 1,000.00 $ 21,000.00 $ 2'600.00. $ 23 600 0 $ 500.00 $ 13,500.00 $ 350.00 ~ $ 9,450.00
8 10'x3' Truncated dome ads retrofit EA ~ 4 '' $ 1,400.000 ' $ 5,600.00 $ 700.00 $ 2,800.00 1 $ 850.00 $ 3,400.00. $ 900.00 ' $ 3,600.00
P ( )
_ - - --_ (- p) _ ~--- - - _ $ 1,200.00 ! $ 50.000 200.00 ' $ 300.000 $ 1,200.00
P ~ P_) _- _-_- __+ $ 200.00 $ 800.00 I $ 300.0_0 - - _ - _ _ $ 480.0.0
O Srdewalk Remove & Rem ace rams SF 151 '. $ 220.00 $ 3,020.00 ~ $ 300.00 $ 2 265.00 $ 105.00 $ 2,265.00 ', $ 115.00 ' $ 2,265.00
- $ 15.00
( -- P-
Exposed Aggregate __ _ _ _~ - _ ,I
- ~ _ -
- - - - ~ $.- 76,290.50- - _ I $ 76,619.00
- - - TOTAL: $ 108,404.00 '' _- -$ 79,909.20
-- -
-,
_ - - ----
~- - fi-- _ -
- -
_ - -- - -
-- -- - - i-- 1 TI - -
ENGINEERING JJR CONSTRUCTION FBD VA
-- OMPANY SPOSETO -_ _ __- TOTAL
-- -- -- it _ S.R.P. C -- -__ -- -- NGUARD
BID UNIT OF
ITEM DESCRIPTION MEASURE QTY UNIT_ PRICE TOTAL PRICE I TOTAL PRICE
ITEM '' -- -- - 12.70 42 760.90 ~ 15.80 UNIT PRICE TOTAL PRICE UNIT PRICE ' _PRICE
1 Sidewalk (Remove & Replace) SF 3,367 $ $ ~_ NIT PRIC $ 53,194.40 1_.052 r$ 38,888.85 $ 14.85 $ 49,999.95
2 Saw Cut Concrete LF 1,128 -- $ 2.30 $ 2,59 ~ 69.45 I $ 7'918.56 } $ 900.00
- - _ j - -_ _ - - - $-_ ~ -.- - -
- .-- --- - -- -t- - $ 90.00 $ 7,783.20
3_ Curb/Gutter (Remove & Replace) _ LF ~ 10 $ 56.50 $ 5 565.00 ~ $ 85.00 ~ $ 850.00 $ _ 34.75 $ 694.50 $ 6.90
4 rAC Paving (Remove & Replace) LF 10 ' $ 43.50 ' $ _ 435.00 $ 26.00 $ 260.00 ; $ 347.50 $ _ 40.00 ' $ 400.00
_ 5 Pedestrian Curb Ram CD-105 EA _ - - 11 $ 1,810.00 I-$ 19,910.00_$_ 1,840.00 $ 20,240.00'' $ 2,3.40.00 $ 25,740.00
6 4x_3_' Truncated dome pads (retrofit) t-- -EA !I 27 I $ 9,180.00 $ 419.00 $ 11,313.00 $ 2 550.00__ $ 14,850.00 _ ~ $ 8,100.00
P( ( ) ) $ 340.00- _ - - - - - - $ 300.00
_ $ 470.00 $ 519.00 $ 519.00 $ 1375.00+$ 5,500.00 _
- _~
8 j 10'x3TTruncated dome aadsreetro'fit EA 4 $ 720 000 ~~ { - $ 685.00 $ 325.00 '~ $ 325.0_0
p ( ) t $ 2,880.00 ~ $ 1,056.00 $ 4,224.00 $ 685.00 $ 195.000 2,740.00
- -- _- _ _ I _-- - - _ -- ~ _ $ 685.00 f $ 780.00
9 ~ ill Concrete Grooves at curb rams EA 4 $ 180.00 $ 720.00 I $ 390.00 $ 1,560.00 $ 200.000 $ 800.00 $ 18.95 $ 2,861.45
~ i
10 _ Grind AC Lip (at curb ramps) P) - _ EA 4 $ _ 250.00 $ 1,000.00 $ 242.00 ~ $ 968.00 $ _ 200.00 $ 800.00 ~ $ 471.00 ~ $ 1,884.00_
_ _ Sidewalk Remove & Re lace SF ~ 151 $ 22.00. $ 3,322.00 ' $ 9.10 $ 1,374.10 $ 13.00. $ 1,963.00
l _ -- -
Exposed Aggregate __ ___ _ '~
TOTAL:' '~ ' $ 86,713.70 $ 97,101.10 ~ $ 97,747.41 $101,513.60
S
~ ~
r'
RESOLUTION NO. - 09
A RESOLUTION OF THE CITY COUNCIL
OF THE CITY OF DUBLIN
AWARDING CONTRACT N0.09-06,
2008-2009 ANNUAL SIDEWALK SAFETY REPAIR PROGRAM
AND CURB RAMP INSTALLATION TO
MAXISTONE, INC., DBA MAXICRETE, INC.
WHEREAS, the City of Dublin did on April 28, 2009, publicly open, examine, and declare all
sealed bids for doing the work described in the approved Plans, Specifications, and Modifications for
Contract No. 09-06, 2008-2009 Annual Sidewalk Safety Repair Program and Curb Ramp Installation,
authorized by the City Council on April 7, 2009, which Plans, Specifications, and Modifications are
hereby expressly referred to for a description of said work and for all particulars relative to the
proceedings under the request for bids; and
WHEREAS, said bids were submitted to the Public Works Director, who has reviewed the bids to
determine the lowest bid which was responsive to the requirements of the bid documents;
NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Dublin does
hereby award Contract No. 09-06, 2008-2009 Annual Sidewalk Safety Repair Program and Curb Ramp
Installation, to the lowest responsible bidder therefor, to wit, Maxistone, Inc., dba Maxicrete, Inc., at a bid
of Seventy-Six Thousand, Two Hundred, Ninety Dollars, and Fifty Cents ($76,290.50), the particulars of
which bid are on file in the office of the Public Works Director.
BE IT FURTHER RESOLVED that the Mayor is authorized to execute the Agreement.
PASSED, APPROVED AND ADOPTED this 19th day of May, 2009, by the following vote:
AYES:
NOES:
ABSENT:
ABSTAIN:
ATTEST:
City Clerk
G:\CIP\SIDEWALK\2008-2009\Resolution of Awazd.DOC
Mayor
~rr~r z.