Loading...
HomeMy WebLinkAboutItem 4.06 Sidewalk Safety Repair CITY CLERK File # D[b][Q][Q]-[2]f5:] AGENDA STATEMENT CITY COUNCIL MEETING DATE: October 2, 2007 SUBJECT: Acceptance of Work - Contract No. 07-05,2006-2007 Annual Sidewalk Safety Repair Program and Curb Ramp Installation Report Prepared by: Melissa A. Morton, Public Works Director ~ Budget Change Form ATTACHMENTS: RECOMMENDATION: 1) 2) Approve a budget change in the amount of $17,234 Accept the improvements under Contract No. 07-05, 2006- 2007 Annual Sidewalk Safety Repair Program and Curb Ramp Installation, and authorize the release of retention after 35 days ifthere are no subcontractor claims. l FINANCIAL STATEMENT: The following table outlines the Appropriated Project Budget for Fiscal Year 2006-20007 compared with the combined expenditures to complete the project with expenses incurred in both Fiscal Year 2006-2007 and Fiscal Year 2007-2008. The combined expenditures include the proposed budget change for work performed in Fiscal Year 2007-2008. TOTAL PROJECT 2006-2007 APPROPRIATED FUNDS COMPARED TO ACTUAL 2006-2007 COSTS PLUS PROJECTED 2007-2008 CONTRACT EXPENSES Desi n & Ins ection General Fund - Staff $ 7,561 $ 7,561 General Fund - Misc. 312 312 Contract 1m rovements General Fund 49,622 $17,234 66,856 CDBG Fund - Ram s 17,581 17,581 TOTAL $ 75,076 $ 17,234 $ 92,310 ------------------------------------------------------------------------------------------------------------- COpy TO: R. Dawson Construction, Inc. Alma Balanza, Alameda County RCD ITEM NO. 1-:b Page 1 of2 G:\CIP\SIDEW ALK\2006-2007\AS acceptance. DOC 6 DESCRIPTION: On May 01, 2007, the City Council awarded Contract No. 07-05, 2006-2007 Annual Sidewalk Safety Repair Program and Curb Ramp Installation, to R. Dawson Construction, Inc. The Annual Sidewalk Safety Repair Program (Remove and Replace) repairs sidewalk offsets of 3/4-inch or more that may pose a tripping hazard. The Remove and Replace process is used in locations where the offset is more significant or where tree roots are causing the offset. This procedure requires removal of the existing sidewalk, and in the case of root problems, removal of the tree roots, and then replacement of the concrete sidewalk. While maintenance of sidewalks and other frontage improvements is legally the responsibility of the private property owner, the City Council has adopted a City-paid sidewalk repair program on a year-by- year basis since 1983. At the budget hearing for Fiscal Year 2006-2007, the City Council extended the funding of the repair program for an additional year. This year, the sidewalk safety repair program included construction of approximately nine (9) pedestrian curb ramps that are funded through a Community Development Block Grant. This project was originally programmed to be complete in Fiscal year 2006-2007. However, a budget change in the amount of $17,243 is necessary due to project expenditures that carried over into Fiscal Year 2007-2008. Staffhas reviewed the work performed under this contract and has determined that the work is complete. Staff recommends that the City Council 1) approve the budget change in the amount 0[$17,234; and 2) accept the improvements under Contract No. 07-05, 2006-2007 Annual Sidewalk Safety Repair Program and Curb Ramp Installation, and authorize the release of retention after 35 days if there are no subcontractor claims. Page 2 of2 CITY OF DUBLIN BUDGET CHANGE FORM 2007/2008 100 \ CHANGE FORM # New Appropriations (City Council Approval Required): Budget Transfers: -L From Unappropriated Reserves (Fund) (General Fund - ProjectCarryover I Close-Out) From New Revenues From Budgeted Contingent Reserve (1 080-799.000) Within Same Department Activity Between Departments (City Council Approval Required) Other Name: Public Facility Fee Fund Reserve Name: General Fund / Sidewalk Repair Project / Improvements Account $ 17,243 Name: Account #: 001-94250-750-050 Name: Account #: Account :#: Name: Name: Account #: Name: Account #: Name: Account #: Account #: Fil1 Mgr/ ASD: 3~~~Q Signature Date: 'f.'!ldJ1- REASON FOR BUDGET CHANGE ENTRY: This project was originally programmed to be complete in Fiscal Year 2006/07. Based on field inspections additional locations were repaired beyond the original number at the time of the Bid Award. The total cost including the additional locations did not exceed the original 2006/07 Project Budget. This Budget adjustment will appropriate funds necessary to accommodate the 2006/07 Project contract expenditures which carried over to Fiscal Year 2007/2008. The Project is presented for Final Acceptance at the City Council meeting on October 3, 2007. City Manager: Date: Signature City Council Meeting on: 10lZ!2007 Mayor: Date: Signature Posted By: Date: formslbudgchng Signature ATTACHMENT # 1 10 -2 - 07 '-/-. /.p