Loading...
HomeMy WebLinkAboutItem 4.08 Overlay AISUBJECT: CI'TY CLERK # 0600-35 AGENDA STATEMENT CITY COUNCIL MEETING DATE: August 1, 2000 Acceptance of Work - Contract 00-04, 1999-00 Annual Overlay Report Prepared By: Lee S. Thompson, Public Works Director ATTACHMENTS: Budget Change Forms RECOMMENDATION: 1) 2) Accept imProvements under Contract No. 00-04 and authorize the release-of retention in the amount' 'of $56,961.40 after 35 days if there are no subcontractor claims. Approve Budget Change FINANCIAL STATEMENT: FY 99-00 FY 99-00 Fund Budget Actual Difference Engineeritig/Inspections/Misc2 (CIP) Materials Testing 217 $ 8,600 $ '13,017.07 $ 3,218.00 Subtotal= $ 8,600 $ 16,235.07 -$7,635.07 1999-00 Annual Overlay Project: Overlay Improvements (CIP) Overlay- AC Repair (Operating Budget) Striping (Operating Budget) Slurry Seal- AC Repair (Operating Budget) 219 $298,000 $274,513.86 219 $120,000 $145,352.54 217 r $ -;42,275 $ 34,639.93 206 $ 41,238.82 001 $ 11,487.60' 219 $ 17,000 $ 15,133.60 206 $ 45,591 $ 47,247:64 Subtotal = ' $522,866 $569,613.99 -$46,747.99 TOTAL = $531,466 $585,849.06 -$54,383.06 * DSRSD has reimbursed $1 !,487.60 to repair and overlay .Caroline Court. The project costs are budgeted in the Capital Improvement Program (CIP) Budget and in the Street Maintenance Operating Budget. Funding comes from the State Transportation Improvements prOgram (219), GaS'Tax (206), and Measure B (217). COPIES TO: Et Camino Paving, Inc. ITEM NO. 4~ g:\overIay\99-00 AS acceptance An additional appropriation of $54,384 is necessary to fund the project. This will be comprised of $11,488 in new revenue from DSRSD and $42,896 from Gas Tax reserves. DESCRIPTION: On May 2,' 2000, the City Council awarded Contract No..00-04, 1999-00 Annual Overlay Project, to E1 Camino Paving, Inc. The contract consists of the Capital Improvement Program's Annual Overlay Project, as well as the A.C. pavement repair for the overlay and slurry seal streets (part of the Annual Slurry Seal Program). The 1999-00 Annual Overlay Project consisted of removing and replacing failed asphalt concrete to a depth of 4-inches and resurfacing the street with a 1-1/2-inch overlay of asphalt concrete. Reinforcing fabric was used prior to the overlay in order to prevent cracks from reflecting through the new overlay and . causing further deterioration to the base. The following streets were repaired and overlaid as part of the 1999-00 Annual Overlay Project: West Vomac Road Sierra Court San Sabana Court Utica COurt Pitt Court Erie Court Pine Court Fir Court Oak Court Tory Court Doreen Street Cranford Lane Tyne Court Ironwood Court Conter Court Pike Court Lancaster Court Corinth Court Elk Court Cedar Court Ash Court Elm Court Duke Court Doreen Court Southwick Drive Elba Court Elba Way Caroline Court This project is over budget due to the following reasons: 1) 2) 3) Several overlay streets required greater material quantities once construction had begun. Caroline Court was included for repair and overlay. DSRSD has reimbursed the City $11,487.60 to repair and overlay most of Caroline Court as part of its recent sewer project. Repalred Village Parkway in areas where the traffic signal loops are to be installed with the upcoming traffic Signal project. Staff recommends that the City Council accept improvements under Contract No. 00-04, approve Budget Change Forms and authorize the release of retention in the amount of $56,961.40 after 35 days if there are no subcontractor claims. Page 2 '-- CITY OP' DUBLIN BUDGET CHANGE FORM New Appropriations (City Council'Approval Required): Budget Transfers: CHANGE FORM # )< From Unappropriated Reserves From Budgeted Contingent Reserve (1080-799.000) (If Other than General Fund, Fund No - 206) Within Same Deparlment Activity ~ From New Revenues Between Departments (City Council Approval Required) Other '..DECREASE BUDGET ACCOUNT AMOUNT ':" .... .'".kNCRE.&SE'BUDGET ACCOUNT' AMOUNT Name: (I) Name: Street Maintenance- Street Repair (Overlay & Slurry) $42,896 Account #: Account #: 206-30200-740-020 Name: (1)Name: Street Maintenance- Street Repair (Overlay) $ I 1,488 Account #: Account #:. 001-30200-740-020 . Name: (2) Name: General Fund Reimbursement (Revenue) $1 t,488 Account #: . ] Account #: 001-570-005 Name: Name: Account #: Account #: Name: Name: Account #: Account #: City Manager: Date: Signature ASDFFin Mgr ~,-x..t~.k 'Q'---~z'"~/x'-~' Date: Signature REASON FOR BUDGET CHANGE ENTRY: (1) The actual cost for street repair on overlay streets was higher than budgeted. Cost increase xvas due to additional repairs required as well as adding Village Parkway and Caroline Court to the project, (2) Include DSRSD revenue in Street Maintenance- Street Repair budget for Caroline Court. Mayor: Date: Signature Posted By: Date: H.'l('f'-I"OR,~'l.5'U.'ORAbbml. k, ct chat~gc, dt~: Signature BUDGET CHANGE FORM New Appropriations (City Council Approval Required): From Unappropriated Reserves (If Other than General Fund, Fund No - From New Revenues Budget Transfers: CHANGEFORM# X From Budgeted Contingent Reserve (1080-799.000) Within Same Department Activity Between Departments (City Council Approval' Required) Other I)ECREASE BUDGET ACC() UNT A~IOUNT INCREASE BUDG ET ACCOUNT AMOUNT Name: Street Maintenance- i ' Name: A".:..~a! O~e:'iav Projec:-ii Street Repair (Overlay) Salaries [ $7,635 $1,617 Account #: 217-30200-740-020 Account #: 217-96580-701-001 Name: Name: Annual Overlay Project- Contract Services $1,160 Account #: Account # 217r96580-740-000 Name: Name: Annual Overlay Project- General Engineering · $1,640 Account #: Account #: 217-96580-740-0.70 Name: Name: Annual Overlay Project- Testing $3,218 Account #: Account #: 217-96580-740-077 Name: Name: Account #: Account #: City Manager: Date: Signature ASD/Fin Mgr- I/~6~,~-~4'~ Date: Signature REASON FOR BUDGET CHANGE ENTRY: Budget transfer necessary to sufficiently fund staff time, inspection, and testing for the overlay project. Mayor: ..... Date: Signature Posted By: Date: Signature