HomeMy WebLinkAboutItem 4.13 Overlay #02-03 AI CI'TY CLERK FILE # 600-35 AGENDA STATEMENT CITY COUNCIL MEETING DATE: September 3, 2002 SUBJECT: Acceptance of Work- 2001-2002 Annual Street Overlay Project, Contract No. 02-03 Report Prepared by: Lee S. Thompson, Public Works Director ATTACHMENTS: None RECOMMENDATION: ~ Accept improvements under Contract No. 02-03, 2001-2002 Annual Street Overlay Project, and release retention in the amount of $41,288.48 after 35 days if there are no subcontractor claims FINANCIAL STATEMENT: FY 2001-2002 Project Budget: Fall 2001 Remaining Estimated Overlay Budget for Actual for Total Budget Actual 2001-2002 OL 2001-2002 OL Salaries/Inspections/Misc. $ 63,200 $ 31,600 $ 31,600 $ 14,469 Improvements -Overlay $1,678,089 $1,075,743 $ 602,346 $410,785 Pavement Repairs - Slurw Seal* $ 25,000 $ 0 $ 25,000 $ 2,100 TOTAL: $1,766,289 $1,107,343 $ 658,946 $427,354 * Improvements for the slurry seal streets are for pavement repairs only and are funded through the Gas Tax ($25,000) in the Annual Slurry Seal Program. The FY 2001-2002 Overlay project includes budget funding for constrUction of the Fall 2001 Overlay (Contract No. 01-09, 2000-2001 Annual Street Overlay Project). The Fall 2001 overlay project was carded over to FY 2001-2002 due to delays in the processing of outside funding. The FY 2001-2002 Annual Overlay budget includes funding from the General Fund ($39,000), Measure B Funds ($391,260), Gas Tax ($577,559), TEA-21 Federal funds ($439,000) and Traffic Co.p, gestion Relief Program (Federal) funds ($294,470). DESCRIPTION: On May 7, 2002, the City Council awarded-Contract No. 02-03, 2001-2002 Annual Street Overlay Project, to DeSilva Gates Construction. COPIES TO: DeSilva Gates ConstrUction ITEM g:\overlayX2002\projectXAS award The Annual Street Overlay project consisted of removing and replacing failed asphalt concrete pavement to a minimum depth of 4 inches, resurfacing the street with a 1-1/2-inch overlay of asphalt concrete, and re-applying striping and pavemen~ markings. Major cracks were sealed prior to resurfacing in order to prevent the cracks from reflecting through the new overlay. Pavement fabric was placed on major arterial and collector streets such as Village Parkway to control cracks and further pavement base failure. Pavement repair for slurry seal streets was also included in this Overlay contract as this type of work is not normally performed by contractors specializing in slurry seal. A reduced cost to the City was achieved by incorporating the repairs with the Overlay project. The 2001-2002 Annual Street Overlay Project repaired and overlaid the following streets: Cresta Lane Manzanita Lane Tina Place Amarillo Court Circle Way Mancini Court Reilly Court Alegre Drive Ladera Court Marquita Court Castillian Court Village Parkway- from Kimball to Davona Drive Luna Court Shannon Court Estrella Court San Sabana Road Murietta Court Calle Verde Road Mape Way This contract also repaired the pavement for the following streets for the 2001-2002 Annual Slurry Seal Program: Shady Creek Road York Drive Crossridge Road Penn Drive Wildwood Road Dublin Boulevard - from Scarlett Drive to Lancaster Road Dougherty Road (westbound lanes only) Staff has reviewed the work and recommends that the City Council accept the improvements under Contract No. 02-03, 2001-2002 Annual Street Overlay Project, and release retention in the amount of $41,288.48 after 35 days if there are no subcontractor claims. Page2 ~-~