Loading...
HomeMy WebLinkAboutItem 4.17 Dublin Blvd Imprv AICTTY CLERK FILE # 0600-35 AGENDA STATEMENT CITY COUNCIL MEETING DATE: June 20, 2000 SUBJECT: Acceptance of Work - Contract No. 99-06, Dublin Boulevard Improvements in the Vicinity of Hansen Drive Report Prepared by: Lee S. Thompson, Public Works Director ATTACHMENTS: None RECOMMENDATION: Accept improvements under Contract No. 99-06 and authorize the release of retention after 35 days if there are no subcontractor claims. FINANCIAL STATEMENT: FY 99-00 Budget Engineering/Design/Inspection Surveying/Testing Construction Miscellaneous Estimated Actual $ 60,200.00 $ 43,500.00 $ 34,200.00 $ 13,921.00 $ 513,280.00 $ 505,336.00 $ 800.00 $ 669.00 TOTAL: $ 608,480.00 $ 563,426.00 This project is funded through Traffic Impact Fees (Fund 300). DESCRIPTION: At the meeting of July 20, 1999, the Dublin City Council awarded Contract No. 99-06, Dublin Boulevard Improvements in the vicinity of Hansen Drive, to Bay Cities Paving & Grading, Inc. This project is Phase 1 of the widening of Dublin Boulevard from two to four lanes between Silvergate Drive and Hansen Drive, and the realigning of Dublin/Silvergate to a more conventional "T" intersection. The Phase 1 project included the installation of a traffic signal at the intersection of Dublin Boulevard and Hansen Drive, widening approximately 520 feet of Dublin Boulevard west of Hansen Drive, and modifying a driveway south of this intersection to align with Hansen Drive. The City Engineer has reviewed the work on the project and has determined that the work is complete. Staff recommends that the City Council accept the improvements and authorize the release of retention after 35 days if there are no subcontractor claims. g Amiscproj\dublin-hansenXAS Acceptance COPIES TO: Bay Cities Paving & Grading ITEM NO.