HomeMy WebLinkAboutItem 4.21 SidewalkRepair01-17AI CTTY CLERK File# 600-35 AGEN DA STATEMENT CTTY COUNCI'L MEETTNG DATE: 3une 18, 2002 SUBJECT: Acceptance of Work - Contract No. 01-17, 2001-2002 Annual Sidewalk Safety Repair Program and Curb Ramp Installations Report Prepared by: Lee SD Thompson, Public Works Director ATTACHMENTS: Budget Change Form RECOMMENDATION:/~..;~/ 1) Approve budget change 2) Accept improvements under Contract No. 01-17 and authorize the release of retention after 35 days if there are no subcontractor claims FINANCIAL STATEMENT: CIP ii- 94250 Budget Estimated Actual Sidewalk Safety Repair: Design/Inspection/Misc. $11,250 $ 8,865 Improvements (Remove & Replace) $56,500 $44,772 Curb Ramps (CDBG) $11,467 * $11~467 Total: $79,217 $65,104 CIPg-94255 Sidewalk Reconstruction Underneath 1-680 on Dublin Boulevard & Amador Valley Boulevard $88,510 $ 9,407 Grand Total for Contract No. 01-07 $74,511 * Budget for curb ramps is increased by $1,944. O0 as additional CDBGfunds became available from unused FY 2000-2001 funds. COPIES TO: AJW Construction p!/(5/ ITEM NO. ~ g:\mntcproj\sidewalkLa~S acceptance The Sidewalk Safety Repair is funded through the General Fund (001). Curb ramps are funded through a Community Development Block Grant (209). In addition, as a cost savings measure, the contractor also completed additional sidewalk improvements on Amador Valley Boulevard underneath 1-680 freeway. Total cost of these improvements is $9,407 and is being funded through CIP #94255, "Sidewalk Reconstruction Underneath the 1-680 on Dublin Boulevard and Amador Valley Boulevard" with General Fund monies. These new sidewalks underneath 1-680 will later be stained to match the underpass artwork as it is being installed. DESCRIPTION: On February 19, 2002, the City Council awarded the 2000-2001 Annual Sidewalk Safety Repair Program and Curb Ramp Installations, Contract No. 01-17, to AJW Construction. The Annual Sidewalk Safety Repair Program repaired sidewalk locations that are offset 3/4" or more and may pose a tripping hazard. This contract specified the removal and replacement of existing sidewalk, curb and gutter. This year's project included the construction of 11 curb ramps at various street comers. A portion of the Capital Project to replace sidewalk under 1-680 as part of the artwork project in these same locations was added to the Annual Sidewalk Safety Repair project. Initially, it was proposed to remove all of the sidewalk under 1-680 on Dublin Boulevard and Amador Valley Boulevard and replace it with decorative paving. However, Caltrans repaired most of the sidewalk with the 1-580/1-680 Flyover project, and it was decided to fill in the remainder of the open areas along the existing sidewalks with standard sidewalk, and then stain the concrete at a later date to match the simulated sidewalk included in the artwork murals. Staffhas reviewed the work on the project and has determined that the work is complete. Staff recommends that the City Council approve the budget change, accept the improvements under Contract No. 01-17 and authorize the release of retention after 35 days if there are no subcontractor claims. Page 2 CITY OF DUBLIN BUDGET CHANGE FORM CHANGE FO~ # New Appropriations (City Council Approval Required): Budget TranSfers: From Unappropriated Reserves From Budgeted Contingent Reserve (10800.799.000) (If Other than General Fund, Fund No - Within Same Department Activity x From New Revenues Between Departments (City Council Approval Required) Name: CDBG Fund - Sidewalk Safety Repair- $1,944 Name: Improvements Account #: Account #: 209.94250.750.050 REVENUES $1,94~ Name: Name: CDBG Fund - Intergovernmental Revenue Account #: Account #: 209.559.002 blame: Name: Ac~_.o,_mt #: Account #: Name: Name: AccoUnt #: Account #: Name: Name: Account #: Account #: 'Signature REASON FOR BUDGET CHANGE ENTRY: To adjust budget for leftover UDBG funds.realloCated from Fiscal Year 2000-01 Date: City Manager: Signature As approved at the City Council Meeting on: Date: Date: Mayor: ' Signature Date: Posted By: Signature H:~CC-FORMShr'ORM'budget change, doc