Loading...
HomeMy WebLinkAboutItem 7.4 SrCtr DsgnPresentation CITY CLERK File # 0600-30 AGENDA STATEMENT CITY COUNCIL MEETING DATE: May 6, 2003 SUBJECT: Dublin Senior Center Design Development Presentation Report prepared by: Herma Lichtenstein, Parks & Facilities Development Manager ATTACHMENTS: Design Development Package will be presented at the meeting RECOMMENDATION: 1. Receive presentation by Staff and the Dahlin Group 2. Receive public comment 3. Approve preferred Design Development Package FINANCIAL STATEMENT: None DESCRIPTION: On February 18, 2003, on the recommendation of the Senior Center Advisory Committee and Parks and Community Services Commission, the City Council approved the schematic design for the new Dublin Senior Center. The schematic design was created based on the results of extensive input from facility users and Staff. Based on the approved schematic design the Architect prepare, d the Design Development Package, which includes the building finishes together with interior and exterior wall and floor treatments and color schemes. The Design Development Package was presented to the Senior Advisory Committee on April 10, 2003. After reviewing the two alternatives prepared by the Architect, the Advisory Committee asked for a third alternative and requested that a joint meeting be conducted with the Parks and Community Services Commission in order to come to a decision on the preferred alternative. A third alternative was prepared and prior to the joint meeting all three alternatives were displayed at the Senior Center for input. A joint meeting of the Parks and Community Services Commission and Senior Center Advisory Committee was held on April 21, 2003 to review the three alternative Design Development Packages. As there was not a quorum of the Senior Advisory Committee a formal vote of the Committee was not taken. However the Committee members in attendance provided their input and the input from the Senior Center constituents to the Parks and Community Services Commission. Based on this input and after reviewing the three altematives, the Parks and Community Services Commission recommends approval by the City Council of Alternative C (to be presented to the City Council at the meeting). In order to begin preparation of the construction documents, the Architect needs final approval of the Design Development Package for the project. The Architect has prepared renderings of the exterior and interior elevations of the building. The architect will present the renderings at the meeting and, in addition to reviewing the proposed elevations, the architect will also present materials options for the interior and exterior finishes and colors. These finishes will include proposed flooring, wall coverings, building cladding, woodwork, etc. COPIES TO: Dahlin GroupITEM NO. 5-6 sr cntr dd.doc The finish packages, including samples, will be available for preview in the Economic Development conference room from Friday, May 2nd until the Council Meeting on the evening of May 6th. RECOMMENDATION It is the recommendation of Staff that the City Council take the following action: 1. Receive presentation by Staff and the Dahlin Group 2. Receive public comment 3. Approve preferred Design Development Package