Loading...
HomeMy WebLinkAboutItem 8.1 VPkwyLewisIntersection CITY CLERK File #820-20 AGENDA STATEMENT CITY COUNCIL MEETING DATE: July 2, 2002 SUBJECT: Conceptual Altematives for Intersection Improvements at Village Parkway and Lewis Avenue (Downtown Streetscape Improvement Implementation Plan) Report Prepared by: Janet Harbin, Senior Planner ~ ATTACHMENTS: 1. Conceptual AlternatiVe A with attached Cost Estimate 2. Conceptual Alternative B with attached Cost Estimate 3. Conceptual Alternative C (Preferred Alternative) with attached Cost Estimate RECOMMENDATION: 1. Receive Staff report ~ ._r~. Direct Staff on selected Conceptual Alternative (Preferred Conceptual Alternative C in Attachment 3) 3. Authorize preparation of construction/bid documents for improvement plans FINANCIAL STATEMENT:. The funding for the improvement project and the related consultant services is included in existing funds allocated in Capital Improvement Program Project #94060 for FY 2002-2003 (for detailed information on funding, see section of report addressing this issue below). DESCRIPTION: In November 1999, the City Council directed staff to prepare three Specific Plans for various portions of the downtown area of Dublin to guide the development and revitalization of the West Dublin BART, Downtown Core and Village Parkway areas. The Specific Plans were adopted by the City Council on December 19, 2000. As a part of the implementation of the three downtown Specific Plans adopted by the City Council on December 19, 2000, streetscape improvements are necessary in the West Dublin BART, Downtown Core and Village Parkway Specific Plan areas to provide continuity and unifying elements to establish a positive image in the downtown area. Prior to construction of these improvements, the basic designs for the streetscapes, plazas, monuments, gateways, and street furnishings associated with the downtown planning area were to be determined, cost estimates obtained, and a phasing plan with priorities developed based on direction from the City Council. COPIES TO: In-House Distribution Singer Fukushima Evans ITEM NO. ~ G:\Downtown Streetscape Imp\CC-sr ConcptVP&LewisIntersection .doc The City's consultant for this project, Dave Evans of Singer Fukushima Evans, Inc. presented this information to the City Council at its meeting on May 1,2001. The City Council determined that the initial priorities for improvement of the streetscape in the downtown area should be focused on establishing a gateway monument at the northwest comer of Village Parkway and Dublin Boulevard which is an entryway to the downtown, a gateway arch at St. Patrick Way and Amador Plaza Road, and intersection improvements at Village Parkway and Lewis Avenue. This report addresses the conceptual design alternatives for the intersection improvements at Village Parkway and Lewis Avenue. Staff is requesting direction from the City Council onthe preferred Conceptual Alternative for the improvement project to begin preparation of construction and bid documents. Implementation of Village Parkway Specific Plan: The Village Parkway Specific Plan includes goals and objectives for the Village Parkway planning area to provide direction for private and public development to implement the overall vision for this portion of the downtown. The intent of the streetscape improvement project for the intersection at Village Parkway and Lewis Avenue is to implement the following goals and objectives of the Specific Plan by constructing physical improvements such as bulb-outs or bump-outs, a raised crosswalk, and a plaza that create a more accessible and pedestrian-friendly commercial environment: Goal 4: Create Public spaces within the Specific Plan area for people to enjoy while using area shops and services. Objective 4. !: A village square and/or plaza should be developed within the Specific Plan area. Goal 6: Traffic volumes and vehicular speed on Village Parkway shall be controlled to allow for improved access to individual businesses and to encourage a friendlier envirOnment. Objective 6. 2: Develop and implement measures to decrease vehicular speed using Village Parkway. Appropriate traffic calming measures to be incorporated into the design of Village Parkway include bump-outs and raised crossings. Goal 7: Create a more pedestrian-friendly environment for Village Parkway to attract shoppers. Objective 7. 4: Improved pedestrian connections should be considered between uses on Village Parkway, including new pedestrian crosswalks along Village Parkway between Dublin Boulevard and Amador Valley Boulevard, improved signs warning motorists of pedestrian activity and improved sidewalks. Budget/Capital Improvement Program Funding: The funding for the improvements and plaza at the intersection of Village Parkway and Lewis Avenue is allocated in the fiscal year 2002-2003 Capital Improvement Program (CIP) budget for the Downtown Streetscape Improvement Implementation Plan, CIP Project #94060. The CIP contains $170,500 for the bulb-outs and pedestrian crossing improvements, and $114,875 for the plaza improvements, including the necessary land acquisition at the northeast comer of Village Parkway and Lewis Avenue. The total funding allocated in the CIP for this portion of the Downtown project is $285,375. This amount also includes monies for completion of the design and construction documents. Concept Alternatives for Intersection Improvement Design: Over the past several months, Dave Evans of Singer Fukushima Evans, Inc. has been working with the Community Development and Public Works Staff to develop three alternative designs for the intersection improvements at Lewis Avenue at Village Parkway. Each alternative consists of bulb-outs for a modified pedestrian crossing, new sidewalk, curbs and gutters, a new easier to identify pedestrian crosswalk, a plaza on the northeasterly comer of the intersection with paving and seating, and other related minor improvements. The concept alternatives that have been developed vary in the extent of the proposed improvements to be constructed and other amenities such as the amount of landscaping and lighting. Additionally, with the varying degree of improvements, the estimated cost of each concept changes. The consultant will make a short presentation of the design alternatives for the intersection improvements at the City Council meeting. Summarized below are the differences between the three alternatives, Concept Alternatives A, B and C. Concept Alternative A has the highest estimated cost of approximately $310,000 and would provide the most physical amenities and features of all the alternatives, whereas Concept Alternative B is the lowest in estimated cost at approximately $132,000 but provides the least amount of amenities and features (such as no landscaping, irrigation and a smaller seatwall). The estimated cost of Concept Alternative C is $204,000 which is at the midpoint of the cost range for all the design alternatives. COMPARISON OF ALTERNATIVES FOR INTERSECTION IMPROVEMENTS VILLAGE PARKWAY & LEWIS AVENUE Alternative Amenities Land Acquisition Estimated Cost (Approx0 CONCEPTUAL · New concrete paving & sidewalk Requires acquisition $310,000 ALTERNATIVE A (4011 sq.ft) of 425 sq.ft, of · New catch basins - 4 private property · New bench · New plaza w/concrete seatwall (45 linear ft.) · New arbor w/vines & shrubs · New irrigation system · Relocation of traffic signals & business signage CONCEPTUAL · New concrete paving & sidewalk No acquisition $132,000 ALTERNATIVE B (1975 sq.fL) required · New catch basins - 2 · New plaza w/concrete seatwall (20 linear ft.) CONCEPTUAL · New concrete paving & sidewalk Requires acquisition $204,000 ALTERNATIVE C (1975 sq.ft.) of 425 sq.ft. Of · New catch basins - 2 private property · New plaza w/concrete seatwall (60 linear ft.) · New shade tree, groundcover, flowers · New irrigation system · Relocation of traffic signals & business signage Preferred Concept Alternative C: Of the three Concept Alternatives developed by the consultant, the preferred plan for the intersection improvements at Lewis Avenue and Village Parkway is Concept Alternative C. The plan for this alternative is the most comprehensive in design and the most cost effective alternative, providing both pedestrian crossing improvements and plaza design elements with landscaping and irrigation. The conceptual design of this alternative will meet the goals of the Village Parkway Specific Plan relative to creation of a more pedestrian-friendly environment and a public space/plaZa at the intersection. As the CIP budget for FY 2002-2003 contains a total allocation of $285,375 for both aspects of this particular project, Concept Alternative C is within the budget allocated for the land acquisition and the planned improvements at approximately $204,000. CONCLUSION: Based on the comprehensiveness of the design of the proposed improvements and the cost allocated for the project in the CIP budget for the Downtown Streetscape Improvement Implementation Plan, Staff recommends that the City Council select the Preferred Alternative, Concept Alternative C, for the basic design for the Village Parkway/Lewis Avenue intersection improvements. Following Council direction on the project, the consultant could then be directed to go forward with completion of the construction and bid documents at this time. These documents would be brought back to the City Council in September for authorization to commence the bid process. RECOMMENDATION: Staff recommends that the City Council receive Staff report, select the Preferred Concept Alternative C, and direct Staff to authorize the consultant to prepare construction and bid documents. · Catch Basin Arbor w/Seating --~ ~ ~ IExist,, Catch Basin Relocate Exist. Traffic Signal w/Mast A~ ' ~ ~ ~. Village Parkway . . . , ~ ,~ ~p~ed Catch Basin * ~. a ~ ~ Village Par~ay ~ Lewis Avenue -'..~: ~ ' Concept A . . On ~llage Parkway ~uth ApHI 29, 2002 otchltect~re 1 · Mobilization 1 Allow $3,093.00 $3,093.00 2 Land Acquisition ' 425 SF $35.00 $14,875.00 3 RemoVe Existing Concrete Curb & Gutter 169 LF $10.00 $I,690.00 4 Remove Existing Asphalt'Pavement 23~35 SF $4.00 $9,340.00 5 RemoVe Existing Concrete Sidewalk 825 SF $8.00 $6,600.00 6 Re-Grade Street & Sidewalk. 4011 SF $2.50 $10,027.50 7 Adjust Existing Utility Box to Grade 11 EA $225.00 $2,475.00 . 8 Relocate Existing Business Sign 1 EA $4,500.00 $4,500.00 9. Temporary Construction Area Signs 1 Allow $500.00 $500.00 10 Temporary Traffic Mitigation & Control 1 . Allow ' $3,165.00. $3,165.00 11 Relocate Existing Traffic Signals 3 EA $4,000.00 $12,000.00 12 iRelocate Existing Mast-Arm Traffic Signals 1 EA $10,000.00 $10,000.00 13 New Catch Basins.& Pipe 4 EA $5,000.00 $20,000.00 14 INew Concrete Curb & Gutter 260 - LF $18.00 . $4,680.00 15 NewAsphalt Pavementw/AB ~. 500 SF $3.00 $1,500.00 16 New Concrete Pvmt. w/AB 40il. SF $9.00 $36,099.00 17 New Concrete Seatwatl .45 LF $200:00..' ..... $9~00~):0~) ..... 18 New Arbor. 450 SF $30.00 $13,500.00 19 New Concrete Disabled Ramp 6 EA $2,500.00 $15,000.00 20 New Trash Receptacle 1 EA $1,200.00 $1,200.00 21 NewMetal Bollard 20 EA $950.00 $19,000.00 22 New Bench 3' EA $2,000.00 $6,000.00 23 New Thermoplastic Crosswalks 155 LF $30.00 $4,650.00 24 New Vines & Shrubs 30 5 Gal. $45.00 $1,350.00 25~.'New lrri ,.ga. ti(~n System 1 Allow $t2 500.00 $12,500.00 Subtotal $222,744.50 Contractor General Conditions (15%) $33,411.68. Subtotal $256,156.t8 Contractor OVerhead & Profit (10%) I* $25,615,62 Subtotal . [ $28t,771.79 L Construction Contingency (10%) . $28,177.18 Total Construction CoSt $309,948.97 m Proposed Catch Basin ~ ;IExist. Catch Basin  /~ '~ Planter  ' Exist. Sign Exist. ~atch ~ ~ Proposed Catch .asin (T~-~' ~ _. ~oliard Village Parkway . ~i~est~an Grate . ' j ~ Pedest~an G~te ~ ~ Village Par~ay ~ Lewis Avenue Concept B I Mobilization I Allow $1,422.00 $1,422.00 2 Remove Existing Concrete Curb & Gutter 73 LF $10.00 $730.00 3 Remove Existing Asphalt Pavement 1665 SF $4.00 $6,660.00 4 RemOVe Existing Concrete Sidewalk 490 SF $8.00 $3,920.00 5 Re-Grade Street & Sidewalk 1975 SF $2.50 $4,813.00 6 Adjust Existing Utility Box to Grade 8 EA $225.00 $1,800.00 7 Temporary Construction Area Signs I Allow $500.00 $500.00 8 ;Temporary Traffic Mitigation & Control ' 1 Allow $3,165.00 $3,165.00 9 New Catch Basins & Pipe 2 EA $5,000.00 $10,000.00 10 iNew Concrete Curb & Gutter 145 LF $18.00 $2,610.00 11 iNew Asphalt Pavement W/AB 500 SF $3.00 $1,500.00 12 New Concrete Pvmt. w/AB 1975' SF $9.00 $17,775.00 13 New Pedestrian Grate ~- 35 LF $45.00 $1,575.00 14 New concrete seatwall 20 LF $200.00 $4,000.00 '15 New Concrete Disabled Ramp 6 'EA $2,500.00 $15,000.00 16 New Metal Bollard 14 EA $950.00 $13,300.00 17 ~lew Trash ReCeptacle I EA · $1,200,00 $1,200.00 18 New Thermoplastic Crosswalks 155 LF $30.00 $4,650100 Subtotal $94,620.00 Contractor General Conditions (15%) '$14,193.00 Subtotal ' $t08,813.00 I Contractor Overhead & Profit (10%) $10,881.30 Subtotal $t 1.9,694.30 I Construction Contingency (10%) $11,969.43 Total ConStruction Cost $131,663.73 Existing Catch Basin ~ ~ ~ P~st Concrete Ma~er (~p.) ~ ~ ' Flush ".di.o. ~ Edge. Bulb.ut ~ ~ ~ Village Pa~ay asin ~ ~ P~an Grate : ~ingCatchB ~ P~dan O~te ~ ~st ~nc~te Ma~er ~.) ~ ~ . Village Pa~ay ~ Lewis Avenue .~ ~_ ~-~ ConcePt C . ~ on ~l~ge Pa~ay ~ urban design of L~s Av~ Ap~l 29, 2002 I Mobilization I Allow $2,742.00 $2,742~00 2 Land Acquisition 425 SF $35.00 $14,875.00 3 Remove Existing Concrete Curb & Gutter 73 LF $10.00 $730.00 4 Remove Existing Asphalt Pavement 1665 SF $4.00 $6,660.00 5 Remove Existing Concrete Sidewalk 490 SF $8.00 $3,920.00 6 Re-Grade Street & Sidewalk lg75 SF $2.50 $4,813.00 7 Adjust Existing Utility Box to Grade 8 EA $225.00 $1,800.00 8 Relocate Existing BuSiness Sign 1 EA $4,500.00 $4,500.00 9 Relocate Existing Traffic Signal 1 EA $4,000.00 $4,000.00 10 Temporary Construction Area Signs 1 Allow $500.00 $500.00 11 Temporary Traffic Mitigation & Control 1 Allow $3,165.00 $3,165.00 12 New Catch Basins & Pipe 2 EA $4,000.00 $8,000.00 13 New Concrete Gutter Band 145 LF $15.00 $2,175.00 14 New Asphalt Pavement w/AB . 500 SF $3.00 $1,500.00 15 New Concrete Pvmt. w/AB 2425 SF $9.00 $21,825.00 16 New Pedestrian Grate 35 LF $45.00 $1,575.00 17 New Concrete Seatwalt .I 35 LF $200.00 $7,000.00 18 New Metal Bollard 10 EA $950.00 $9,500.00 19 New Precast Concrete Markers 8 EA $2,500.00 $20,000.00 20 New 8' Bench.. .. ,... .. 2 . EA $1,500.00 $3,000.00 21 New Thermoplastic Crosswalks 155 LF $20.00 $3,100.00 22 New Shade Tree (36" BOX) 4 EA $1,200.00 $4,800.00 23 New Groundcover 264 SF $2.50 $660.00 24 New Perennial Flowers 95 SF $2.50 $240.00 25 New Irrigation System I Allow $15,000.00 $15,000.00 Subtotal $146,080.00 Contractor General Conditions (15%) $21,912.00 Subtotal $167,992.00 Contractor Overhead & Profit (t0%) $16,799.20 Subtotal $t84,791.20 Construction Contingency (10%) $18,479.12 Total Construction Cost $203,270.32