CITY COUNCIL MEETING DATE: November 6, 2001
SUBJECT:
Removal of Existing Street Closure on Central Parkway at the
Tassajara Creek Bridge
Report Prepared by: Lee $. Thompson, Public Works Director
ATTACHMENTS:
1) Notice to Residents
2) Area Map
RECOMMENDATION:
Approve the removal the existing street closure on Central Parkway
at the Tassajara Creek Bridge, opening Central Parkway to traffic
between Hibernia Drive and Glynnis Rose Drive, and leaving the
segment of Central Parkway closed between Glynnis Rose Drive and
Tassajara Road.
FINANCIAL STATEMENT:
Toll Brothers, Inc., the developer 'of residential subdivisions in this
area, will be responsible for removing all street closure devices on
Central Parkway at the Tassajara Creek bridge, and opening this
street to traffic to Glynnis Rose Drive.
DESCRIPTION: The developer of the Toll Brothers, Inc., residential project is
currently completing construction of the Dublin Greene subdivision (Tract 7148) in the area south of
Central Parkway and east of Tassaj ara Creek. As a condition of the development, Toll Brothers was
required to install median island landscaping on Central Parkway between the Tassajara Creek bridge and
Glynnis Rose Drive. Toll Brothers has kept Central Parkway closed to through traffic at the Tassajara
Creek bridge under direction from City Staff to allow this construction work on Central Parkway to take
place safely and with minimal interruption by vehicular traffic.
The median island work in this area is now complete. Staff is recommending removal of the street closure
at the Tassajara Creek bridge and opening Central Parkway to traffic between Hibernia Drive and Glynnis
Rose Drive. This action would facilitate access to and from residential neighborhoods along Central
Parkway on either side of Tassajara Creek, especially for parents driving their children to Dougherty
Elementary School from the Toll Development.
G:\TRAFF!C~Agst_Central Pkwy opening.doc
COPIES TO:
Dougherty Elementary School
Dublin Unified School District Superintendent
Toll Brothers, Inc.
Shea (Site 3)
ITEM NO.
Once open, traffic on Central Parkway originating from side streets east of Hibernia Drive and bound for
Tassajara Road would be able to travel eastbound on Central Parkway for a more direct access to Dublin
Boulevard and Tassajara Road via Glynnis Rose Drive. Traffic volumes are expected to increase only
~minimally at the intersection of Central Parkway/Hibernia Drive (where most school children cross the
street during school hours) as a result of opening this bridge. The City will study the before and after
traffic conditions at this intersection to see what, if any, impact this change will make.
For safety reasons, the segment of Central Parkway between Glynnis Rose Drive and Tassajara Road
will remain closed to through-traffic until the median island work in this area is complete and the traffic
signals at the Central Parkway/Hibernia Drive and Tassajara Road/Central Parkway intersections are
installed.
Staff has mailed Public Notices to the residents of the three adjacent subdivisions, the two neighboring
apartment complexes, and to Dougherty Elementary School.
Staff recommends that the City Council approve the removal of the existing street closure on Central
Parkway at the Tassajara Creek bridge, opening Central Parkway to traffic between Hibernia Drive and
Glynnis Rose Drive, and leaving the segment of Central Parkway closed between Glynnis Rose Drive and
Tassajara Road.
PUBLIC NOTIC
The Dublin City Council will consider a proposal on November 6, 2001, to
remove the existing street closure on Central Parkway at the Tassajara Creek
bridge and open this street to traffic between Hibernia and Glynnis Rose Drive
(see attached area map). Central Parkway has been closed to through traffic at
the Tassajara Creek bridge to allow for the median island construction work
between this bridge and Glynnis Rose Drive to be completed safely and with
minimal interruption by vehicular traffic.
The median island work in this area is now complete. City Staff is recommending
removing the street closure at the Tassajara Creek Bridge and opening Central
Parkway to traffic to Glynnis Rose Drive.- This action would facilitate traffic
circulation and access to and from the residential neighborhoods on either side of
Tassajara Creek. Traffic volumes are expected to increase only slightly at the
Central Parkway/Hibernia Drive intersection where school children cross the
street during school hours. The City will study the before and after traffic
conditions at this intersection to see what, if any, impact this change will make.
The segment of Central Parkway between Glynnis Rose Drive and Tassajara
Road is currently closed to traffic and proposed to remain closed for safety
reasons until the median island work on this segment is completed and the traffic
signals at the Hibernia Drive/Central Parkway and Tassajara Road/Central
Parkway intersections are installed.
You are invited to attend this meeting to provide input or voice any concern you
might have regarding the proposed opening of Central Parkway to traffic across
the Tassajara Creek Bridge.
The meeting will be held on Tuesday, November 6, 2001, at 7:00 p.m. in the
Dublin Civic Center Council Chambers, located at 100 Civic Plaza, Dublin. Any
intereSted person may be heard on this matter.
G:~ TRAFFIC~Notice_Central Pkwy opening, doc
Z
UJ
~ w
0
AREA MAP
N0~141S~[3cl
iO (300AAJ.S:~I/~A
.L3~LS N3dSV
(..5 LU
~ :~ 0
0 UJ "r
XV~Y~VH
£anoo
X¥~ HON~
3AlldQ VINtY38IH