HomeMy WebLinkAboutItem 8.2 General Plan & House Elment%~~
<~~;`~
~~
CITY CLERK
File # ^^~{ ~l^~-~
C~2 ~-20
AGENDA STATEMENT
CITY COUNCIL MEETING DATE: March 3, 2009
SUBJECT: Annual Progress Report on the Status of the Dublin General
Plan and Housing Element Compliance for Calendar Year 2008
Report prepared by Martha Aja, Assistant Planner
ATTACHMENT: 1) Annual Progress Report on the Status of the Dublin General
Plan and Housing Element Compliance for the Calendar
Year 2008.
RECOMMENDATION: 1) Accept -the Annual Progress Report on the Status of the
Dublin General Plan and Housing Element Compliance for
Calendar Year 2008; and
2) Direct Staff to forward the Annual Progress Report to the
California State Office of Planning and Research and the
California Department of Housing and Community
Development.
FINANCIAL STATEMENT: None.
DESCRIPTION:
Local governments are required by Government Code Section 65400(b) to provide an annual report to
their legislative body, the California Office of Planning and Research (OPR) and the California
Department of Housing and Community Development (HCD) that includes the status of the General Plan
and the progress made in implementing the General Plan as well as meeting its share of regional housing
needs.
The Annual Progress Report on the status of the Dublin General Plan and Housing Element Compliance
for Calendar Year 2008 has been prepared in accordance with the Government Code and is included as
Attachment 1 to the Staff Report. The Dublin General Plan contains the following nine Elements:
• Land Use Element
• Parks and Open Space Element
• Schools, Public Lands, and Utilities Element
• Circulation and Scenic Highways Element
-------------------------------------------------------------------------------------------------------------
COPY TO: n ~
Page 1 of 3 • ^ V
ITEM NO. ~ !~
G:\General Plan\GP Compliance\2009\City Council Staff Report.doc
• Housing Element
• Conservation Element
• Seismic Safety and Safety Element
• Noise Element
• Community Design and Sustainability Element
The Annual Progress Report is divided into Sections according to the Elements of the General Plan. For
each Element, a description of actions taken to further the policies of that Element is included.
During 2008, the City of Dublin made significant progress in implementing the goals and policies of the
General Plan as well as meeting the City's share of the regional housing needs. The Land Use Element
was amended three times during the last calendar year for the following projects: Schaefer Ranch South;
Anderson property; and the Croak and Jordan Medium Density. None of the remaining General Plan
Elements were amended during Calendar Year 2008.
The City Council adopted a Community Design and Sustainability Element in September 2008 as a new
Element to the General Plan. The Community Design and Sustainability Element established design
principles, policies and implementation measures to enhance the livability of Dublin and encourage a high
level of quality design while encouraging well designed sustainability measures. The purpose of the
Element is to enhance the physical form of the community by establishing policies to guide future
development.
Efforts are currently underway to update the Housing Element for State certification in summer 2009. The
section of the Annual Progress Report on the status of the Housing Element discusses in detail the
progress the City has made over the past calendar year in meeting the goals, policies, programs and
implementation measures contained within the Housing Element.
During the Calendar Year 2008, the City of Dublin issued a total of 143 permits for residential
development, all of which were for single-family homes. Of the 143 building permits that were issued
during Calendar Year 2008, 5 permits were for low income units, 1 permit was for moderate income unit
and 137 permits were for above moderate income units. For each of the last two fiscal years (2007-2008
and 2008-2009) $500,000 was allocated from the Affordable Housing Fund towards the First Time
Homebuyer Loan Program (FTHLP). During Calendar Year 2008, the City was successful in lending
$213,998 to 7 households through the FTHLP.
A certified Housing Element enables the City, as well as private organizations such as Eden, to apply for
and receive grant money. The City has received a total of $1,117,063 through the Workforce Housing
Grants Project. The Workforce Housing Reward Program Grant objective is to increase affordable new
residential construction, reward compliance with the State Housing Element Law and fund local capital
asset projects that benefits the entire community. The City received $1,500 for each bedroom that was
permitted for avert'-low income unit and $1,000 for each bedroom that was permitted for a low income
unit. The monies received from the Workforce Housing Reward Program were used to help rebuild the
Shannon Community Center.
Additionally, the City was awarded $3,376,000 in federal monies for the East and West Dublin BART
Corridor enhancements. In 2005, the City applied for multiple grants through the Housing Incentives
Program (HIP) through the Metropolitan Transportation Commission (MTC) in conjunction with the high
density housing component of the Dublin Transit Center project. The grant money received from MTC
will be used to improve a variety of transportation modes by improving pedestrian, transit and bicycle
2 of 3
facilities leading to the East Dublin BART station and will also be used for improvements in the corridor
of the West Dublin BART station.
The information contained in the Annual Progress Report (Attachment 1) must be submitted to the
Department of Housing and Community Development (HCD) following the City Council's review and
acceptance in order to be considered for housing grants and funding based on performance during the last
year.
ENVIRONMENTAL REVIEW:
In accordance with the California Environmental Quality Act (CEQA), compliance reports are exempt
from environmental review.
RECOMMENDATION:
Staff recommends that the City Council: 1) Accept the Annual Progress Report on the Status of the
Dublin, General Plan and Housing Element Compliance for Calendar Year 2008; and 2) Direct Staff to
forward the Annual Progress Report to the California State Office of Planning and Research and the
California Department of Housing and Community Development.
3 of 3
i~ a~
Annual Progress Report on the Status of the Dublin
General Plan and Housing Element Compliance
For the Calendar Year 2008
Z--{~rYi ~, ~ 3 - 3 - o ~
ATTACHMENT 1
<~ rJ""~ '~ '~
INTRODUCTION
Government Code Section 65400(b) requires planning agencies to provide an annual report to their
legislative body, the Office of Planning and Research (OPR) and the Department of Housing and
Community Development (HCD) on the status of their General Plan and their progress in its
implementation. The report must detail the progress in meeting the jurisdiction's share of regional
housing needs and address efforts by the local agency towards removing governmental constraints to the
maintenance, improvement, and development of housing. The City of Dublin's Annual Report was
presented to the City Council on March 3, 2009.
The purpose for the Annual Progress Report is to: assess how the General Plan is being implemented in
accordance with adopted goals, policies and implementation measures; identify any necessary adjustments
or modifications to the General Plan as a means to improve local implementation; provide a clear
correlation between land use decisions that have been made during the 12-month reporting period and the
goals, policies and implementation measures contained in the General Plan; and, provide information
regarding local agency progress in meeting its share of regional housing needs.
The Dublin General Plan was adopted on February 11, 1985, three years following the City's
incorporation in 1982. The General Plan contains the seven State-required elements which are Land Use,
Circulation, Housing, Conservation, Open Space, Noise and Safety. The State allows the combining of
elements or the addition of new elements as long as the required seven elements are present in some
fashion. The Dublin General Plan contains the following nine (9) Elements:
• Land Use Element
• Parks and Open Space Element
• Schools, Public Lands, and Utilities Element
• Circulation and Scenic Highways Element
• Housing Element
• Conservation Element
• Seismic Safety and Safety Element
• Noise Element
• Community Design &Sustainability Element
The City of Dublin adopted a Community Design and Sustainability Element in 2008. The Community
Design and Sustainability Element establishes design principles, policies and implementation measures
that are designed to enhance the livability of Dublin and encourage a high level of quality design while
encouraging well designed sustainability measures. The purpose of the element is to enhance the physical
form of the community by establishing policies that will guide future development. The Community
Design and Sustainability Element applies to developments throughout the City.
Local governments are required to keep their General Plans current and internally consistent. There is no
specific requirement that a local government update its General Plan on a particular timeline, with the
exception of the Housing Element, which is required to be updated every five years. The Dublin Housing
Element was last updated and certified by the State Housing and Community Development Department
on July 11, 2003 for the planning period of 1999-2006. Housing Elements were required to be updated
again in 2007; however, the Association of Bay Area Governments (ABAG) was granted a 2 year
extension by the State. Efforts are currently underway to update the Housing Element for the planning
period of July 1, 2009 through June 30, 2014.
1 of 26
J ti ;t-~~
Since the last time the Housing Element was updated and certified, the City of Dublin has been actively
implementing the various programs in the adopted Housing Element and the General Plan. The following
represents the progress the City has made towards implementing the goals and guiding policies of the
General Plan during the reporting period. The list is organized to correspond with the elements of the
Dublin General Plan.
LAND USE ELEMENT
Amendments
The Land Use Element can be amended a maximum of four times per calendar year. The Land Use
Element of the Dublin General Plan was amended three times during the reporting period of Calendar
Year 2008 for the following projects:
March 2008 -
1. Anderson: A General Plan Amendment to re-designate the land use of the parcel designated as
Medium Density Residential to Medium/High Density Residential to allow 108 units was
approved by the City Council in March 2008.
December 2008 -
2. Schaefer Ranch: A General Plan Amendment to replace a portion of the existing Estate
Residential and General Commercial land use designations to Single-Family Residential was
approved by the City Council in December 2008.
3. Croak and Jordan Medium Density. A General Plan Amendment to require 50% of the units
within the Medium Density land use designations on the Croak and Jordan properties provide
private yards was approved by the City Council in December 2008.
Progress towards meeting goals and guiding policies of the Land Use Element
Residential Land Use
During the Calendar Year 2008, the following residential projects were under review, approved and/or
under construction in furtherance of the guiding policies of the Land Use Element for residential land use:
• The Fallon Village project includes the future development of up to 3,108 residential units at
various densities; up to 2.5 million square feet of commercial, office, light industrial and mixed
use development; two elementary school sites; and parks, utility extensions and open space on
1,134 acres of land within eastern Dublin consisting of various parcels with 11 different ownership
interests. A Vesting Tentative Map for Positano (Braddock & Logan) was approved in 2005 to
subdivide 488 acres into 1,043 low density single family housing units within Fallon Village
project area. A Site Development Review for the first 247 lots in Positano (Salerno and Cantara)
was approved in 2007 and the homes are currently under construction.
• The Dublin Ranch Area F West and East (`Sorrento') project includes 1,111 medium density
residential units and will provide a variety of housing types within ten distinct neighborhoods.
The project will also provide a transition between the medium-high and high density residential
2 of 26
'~
d;
projects to the south and the medium and low density residential projects to the north. Toll
Brothers is currently constructing the five neighborhoods on the west side of the project site,
which contains a total of 434 units between Dublin Blvd. and Gleason Drive and are under
construction and partially occupied. Revised plans are currently being processed for development
of the easterly five neighborhoods by Regent Development Group.
• In June 2006, the Planning Commission adopted a Resolution approving a Site Development
Review for the Schaefer Ranch (Discovery Homes) project; this project includes 302 single-
family detached residential units in four distinct neighborhoods. The extension of Dublin
Boulevard to the project is complete. The project is under construction and the homes are being
occupied as completed. The project includes the construction of trails that the East Bay Regional
Park District will provide for potential future connections to the Calaveras Ridge Regional Trail,
the Pleasanton Ridge Regional Park and Don Castro Regional Park.
• The City Council approved a General Plan Amendment for Schaefer Ranch South in December
2008 to replace 12 estate lots and the 5.69-acre commercial site in the original Schaefer Ranch
project with up to 104 additional single-family detached homes. The Applicant is currently
processing a Site Development Review application with the City for the architecture of the homes.
• The City Council approved a General Plan Amendment for the Anderson property in March 2008
to change the land use designation of the site from Medium Density Residential to Medium/High
Density Residential. Braddock and Logan received approval to construct a residential development
consisting of 108 apartments on the Anderson property. The Anderson project is located at the
southeast corner of Croak Road and the future extension of Central Parkway in Fallon Village.
The project will include 19 market rate units, 88 affordable units, 1 manager's unit, and related
amenities including a club house and swimming pool.
• The proposed Dublin Ranch North project (commonly referred to as Redgewick) would cluster
development of 4 residential units on 30 gross acres in the northwestern portion of the 157 acre
site. The remainder of the site is proposed to be placed in a permanent conservation easement for
the protection of wildlife. The Applicant has requested approval of a General Plan Amendment
and Specific Plan Amendment to change the designation of the site from Single-family Residential
and Rural Residential/Agriculture to Estate Residential and Open Space. The proposed project is
currently under review and includes an Annexation, General Plan Amendment, Eastern Dublin
Specific Plan Amendment, Planned Development Rezone with a Stage I Development Plan, Pre
Annexation Agreement and a Planned Development Rezone with a Stage 2 Development Plan,
and other entitlements, as needed.
• The proposed Arroyo Vista project includes the demolition of the existing 150 affordable
dwelling units and the construction of a new development with up to 378 dwelling units (attached
and detached) including market rate, affordable senior housing and affordable family housing, a
child care center and community building. The project is currently under review and includes a
General Plan Amendment, Planned Development Rezone with a Stage 1 and Stage 2 Development
Plan, Tentative Map, Site Development Review and associated environmental review.
• The proposed Nielsen project consists of 35 residential units on 10 acres. The current General
Plan designation is Rural Residential/Agricultural. The Applicant has proposed a General Plan
Amendment and Specific Plan Amendment to change the designation of the site from Rural
Residential Agricultural to Single-family Residential. The project is currently under review and
3 of 26
5
includes a General Plan and Eastern Dublin Specific Plan Amendment, Planned Development
Rezone with a Stage 1 and Stage 2 Development Plan, Tentative Map and associated
Environmental Review.
• In June 2006, the City Council adopted an Ordinance to pre-zone the Mission Peak/Fallon
Crossing (Standard Pacific Homes) project; this project, encompassing 67 acres of land, was
annexed to the City in September 2006 and includes 106 single family residential units (8 duets
and 98 single-family homes). The project was approved by the City Council in December 2007
and included a Planned Development Rezone with a Stage 2 Development Plan, Vesting Tentative
Map, and a Site Development Review.
• The City Council adopted Planned Development Rezone with a Stage 1 Development Plan for
Moller Ranch/Casamira Valley in July 2007 for 298 attached and detached units on 226 acres of
land. The property was annexed into the City on July 2008.
• The Dublin Transit Center project includes up to 1,800 high-density residential units adjacent to
the existing Dublin/Pleasanton BART Station. Camellia Place (EAH, Inc.), consisting of 112
apartment units, was completed in January 2006 and is fully occupied. Construction of Avalon @
Dublin Station (Avalon Bay Communities) and Elan @ Dublin Station (D.R. Horton) has been
completed with 305 apartment units and 257 condominium units, respectively, and are mostly
occupied. Apre-application has been submitted by D. R. Horton for Site E-1 (former
Metropolitan site) for the potential development of approximately 112 townhomes. City Staff is
currently processing a development application for Avalon II @ Dublin Station (Avalon Bay
Communities) for 405 residential units on a 5.8-acre site. The project is currently in planning
review by City Staff.
• The Dublin Ranch West (commonly referred to as Wallis) project includes the development of a
variety of housing types and residential densities including low, medium and medium-high on 189
acres of land. The project has been approved and will provide 935 housing units. Development
will occur on approximately 80 acres of the site, with the remaining site area devoted to permanent
open space. There are 6 individual residential neighborhoods; 3 for single-family detached living
and 3 for condominium living. Additionally there will be a 7.9-acre City park and a private
community green where the historic Antone School is proposed to be relocated and enhanced.
Construction is currently underway on one of the two vehicular and pedestrian bridges that cross
Tassajara Creek. A construction start date is currently unknown at the time.
• The Tralee Village (Pinn Brothers Fine Homes) project is a mixed-use project containing
medium-high density residential and retail/commercial uses. The project is under construction and
includes 35,000 square feet of ground floor commercial (partially occupied) in addition to 130
apartment units for rent and 103 townhouse units for sale. A portion of the townhome units are
currently for sale and are partially sold and the remaining townhome units and apartments units
are currently under construction.
• The Willows at San Ramon Village Plaza (Braddock & Logan) project is another mixed-use
project containing medium-density residential and retail/commercial uses. The project has been
constructed and is fully occupied. The project has contributed 56 townhouse units to the City's
multi-family residential housing stock.
4 of 26
l~ ,~ ~.~
~,~Y
A~
Homes) will contribute 119 medium density single-family homes and 121 low density single
family homes, respectively. Most of the units in the Verona project are occupied and the project is
nearing completion. The Sonata project is currently under construction and the units are being
occupied as completed.
• The Silvera Ranch (Pine Brothers Fine Homes) project is under construction with 254 residential
units on 105 acres of land. The four phase development contains a mix of housing types,
including single-family estate-size units, smaller lot single-family cluster homes and multi-family
condominiums. The project is currently under construction. The units and cluster homes that are a
part of Phase I, II and III have been completed and are occupied.
• The Dublin Ranch Villages (Toll Brothers) project includes 1,396 condominiums and townhomes
and is nearing completion of construction. The majority of the units are occupied, with the
exception of the Terraces, which is still under construction and partially occupied.
• The Windstar project, which includes 309 units on approximately 3.66 acres in the West Dublin
BART Specific Plan area, was approved by the City Council in November 2007. This project is
currently in Building Permit Plan Check review. A 150-room hotel and 7,500 square foot
restaurant has also been conceptually approved. Construction timelines of the hotel and restaurant
are unknown at this time.
• As part of a General Plan Amendment study, the City has been working closely with the Army
regarding future development of the Camp Parks military facility. The Camp Parks Master Plan
identifies the redevelopment of 187 acres of government property for private commercial,
residential and open space uses. A Community Visioning Process was completed in 2004, which
identified potential uses for the site. The City worked extensively with the Army in 2007 in
preparation for Industry Day. Industry Day was the first step in the Army's selection of a Master
Developer. Industry Day was held in January 2008 and it involved nearly 150 investors,
contractors, developers and other interested parties. The Army prepared a Notice of Availability to
solicit a Master Developer for the project. Interested parties had until April 2008 to submit
proposals to the Army for consideration. In October 2008, the Army announced the selection of
SunCal Companies as the Master Developer.
Commercial and Industrial Land Use
During the Calendar Year 2008 reporting period, the following commercial and industrial projects were
under review, approved and/or under construction in furtherance of the guiding policies of the Land Use
Element for Commercial and Industrial land use:
• The Elephant Bar project is an 8,300 square foot restaurant located in the Dublin Place Shopping
Center within the Downtown Core Specific Plan area; the project contributes to the intensification
of the downtown by revitalizing an existing vacant building. Construction of the project was
completed in 2008 and is now open.
• In June 2006, the City Council approved a Planned Development rezone and Site Development
Review fora 17,500 square foot commercial building within the Dublin Place Shopping Center
in the Downtown Core Specific Plan area. The project contributes to the intensification of the
downtown through the development of a new commercial building within an existing shopping
5 of 26
~ U~ ~ ~
center in the central downtown area. The project was constructed in 2007. The project is complete
and is fully occupied.
• In October 2007, the City Council approved a Downtown Core Specific Plan Amendment for the
expansion and re-use of an existing vacant auto dealership building on a 1.94-acre parcel for a
retail use called Custom Fireplace, Patio & BBQ. The project included a Specific Plan
Amendment, Planned Development Rezone with a Stage 2 Development Plan, Conditional Use
Permit and Site Development Review. The project is currently under construction.
• The Dublin Gateway Medical Center is a 178,000 square foot medical office complex.
Construction of approximately 120,000 square feet of medical offices was completed in 2007.
The project is located within the Eastern Dublin Specific Plan Area and is within walking distance
of Waterford Place, a mixed use project and neighborhood shopping center. A hospital facility was
also approved in 2007 by the Planning Commission and City Council. The construction of a
hospital on this site will require review and approval by the Office of Statewide Health Planning
and Development.
• The Shamrock Village shopping center is a neighborhood shopping center for which a facade
enhancement and the construction of a new 25,846 square foot retail building were completed in
November 2006. In December 2007 the Planning Commission approved a Site Development
Review for Big Lots, which is located within the Shamrock Village shopping center. The Site
Development Review for Big Lots included a 4,185 square foot addition to the existing 21,470
square foot building and associated site improvements including exterior building renovation,
landscaping and parking lot upgrades. The expansion and facade renovation for Big Lots is
currently in Building Permit Plan Check review. Shamrock Village shopping center is located
within the Dublin Downtown Specific Plan area and contributes to the strengthening of an existing
neighborhood shopping center through the renovation of existing buildings and the construction of
additional retail square footage; together these improvements have reduced the vacancy rates
within the center.
• In 2007, Staff approved a Site Development Review for Kentucky Fried Chicken, located within
the Village Parkway Specific Plan area. The Site Development Review included a facade remodel,
site improvements and new signage. The remodel project updated the existing restaurant and site,
which was approved by Alameda County in 1977. Construction was completed in 2008.
• In June 2007, the City Council approved a Rezone, Conditional Use Permit and Site Development
Review for an existing Shell Gas Station at 8999 San Ramon Road. The project includes
demolition of an existing service station which includes a car wash, cashier kiosk, fuel dispensers
and canopy cover, and the construction of a new 2,162 square foot convenience store, a 1,264
square foot automated car wash and six new fuel dispensers with a new canopy cover.
Construction of the project was completed in late 2008.
• In August 2006, the City Council approved a Planned Development Rezone for the 318,000
square foot Grafton Station Shopping Center located within the Eastern Dublin Specific Plan
area. Grafton Station encompasses approximately 29 acres at the southwest corner of Dublin
Boulevard and Grafton Street. In 2007, the Planning Commission also approved a Site
Development Review for an approximately 140,000 square foot home improvement warehouse
with an approximately 30,000 square foot garden center, Lowe's, within the Grafton Station
shopping center. Lowe's opened to the public in December 2007. In March 2007, the Planning
6 of 26
~~.~
Commission approved a Site Development Review for four retail buildings totaling approximately
48,000 square feet, which are currently under construction. In June 2008, the Planning
Commission approved a Site Development Review for one 107,000 square foot retail building and
one 16,600 square foot retail/restaurant building, which are not yet under construction.
• In October 2006, the Planning Commission approved a Site Development Review for the Venture
Commerce Center project. The project included demolition of an existing one-story, 38,825
square foot building and construction of four two-story buildings on the site. The new buildings
range in size from 14,774 square feet to 18,602 square feet for a total floor area of 67,029 square
feet. The four buildings have approximately 31 units designed for sale as "office condominiums."
Construction of the project is completed and the majority of the "office condominiums" have been
sold and are partially occupied.
• The City worked closely with Blake -Hunt Ventures on The Green at Park Place Retail Lifestyle
Center project located at the intersection of Hacienda Drive and Dublin Boulevard in the Eastern
Dublin Specific Plan Area. In 2008, the City approved a 305,000 square-foot outdoor retail
shopping center on the 27.5 acre site. The center will be anchored by a Whole Foods grocery store
and will include apedestrian-oriented area called "The Green," which will be lined by shops and
restaurants. The project is anticipated to be under construction in 2009 and open to the public by
late 2010/early 2011.
• The West Dublin BART Station and the 720-parking space, multi-level parking garage is
currently under construction; anticipated opening is the Summer/Fall of 2009.
• The Promenade is comprised of 6 individual blocks that are proposed to be developed with a
combination of retail and office uses patterned on a Main Street developed over time. Buildings
will front the sidewalk with storefront openings and display windows with exterior seating areas.
Total square footage of development is anticipated to be 230,000 square feet. Potential uses
include restaurants, florists, gift stores, banks, dry cleaners, business and professional office, travel
agencies and other similar uses. The first block of development was recently approved by the City
Council and includes a Club Sport, a 40,000 square foot athletic club, a 50,000 square foot retail,
office facility and parking garage on the northeast corner of Dublin Blvd. and Grafton Street, at
the southerly end of The Promenade. The 2-story Club Sport will include a pool, spa and various
workout facilities as well as an eating facility. The retail office building will have retail uses on the
first floor with two floors of office above.
• The City is currently reviewing a request for a General Plan Amendment and Eastern Dublin
Specific Plan Amendment for the Grafton Plaza project to change the land use designation of the
site from Campus Office (CO) to Mixed-Use (MU) and a Planned Development Rezone with a
Stage 1 Development Plan to allow a mixture of uses including but not limited to residential,
retail, restaurant and office. The proposed Grafton Plaza project is located in Area H of Dublin
Ranch. The site is bounded on the north by Dublin Blvd., on the west by Grafton Street, on the
east by a new street aligning with Clairbourne Drive and on the south by I-580. The project is
currently in Planning Review.
• The City is currently reviewing a request for a Planned Development Rezone with a Stage 2
Development Plan, Conditional Use Permit and Site Development Review for the Springfield
Montessori School and related site improvements. The proposed project is located at the corner of
Kohnen Way and Brannigan Street and includes a 16,002 square foot daycare/school building,
7 of 26
~~ ~ ~
playground and related improvements. The public hearings for the project have been scheduled for
February 24, 2009 before the Planning Commission and March 17, 2009 before the City Council.
The City is currently reviewing a Pre-Application for Kaiser Permanete. Kaiser owns
approximately 56-acres in Eastern Dublin. Kaiser has indicated that they will be developing this
site with medical office buildings and a hospital. The timeline for this project is approximately 10
to 20 years.
8 of 26
/~~~~~
PARKS AND OPEN SPACE ELEMENT
Amendments
The Parks and Open Space Element was not amended during the reporting period for Calendar Year 2008.
Progress towards meeting goals and guiding policies of the Parks and Open Space Element
The bid was awarded for the procurement and installation of new play equipment and resilient
surfacing at Stagecoach Park. This project meets the City's goal to replace aging play equipment
in City Parks. The play equipment has been installed and was accepted by the City Council on
January 6, 2009.
• The City Council approved Consultant Service Agreements with three artists who were selected to
design and install public art at the new Shannon Community Center.
A Feasibility Study for relocating the proposed competitive swimming pool from Emerald Glen
Park to the Dublin Swim Center was completed. The Study concluded that the proposed pool
could be relocated but the public facility fees collected from Eastern Dublin development to
construct the pool at Emerald Glen Park could not be used at the Dublin Swim Center.
Consequently it was determined that the competitive pool would remain at Emerald Glen Park.
• The City entered into a Consultant Services Agreement with a professional art coordinator for the
Bus Shelter Capital Improvement Project (CIP). The Bus Shelter CIP identifies eight bus
shelters to be replaced and enhanced with student art murals.
The preferred plan for the Fallon Sports Park, Phase I was approved by the City Council. Phase
I encompasses approximately 27 acres and includes the following primary elements: two 60 foot
little league fields; two lighted softball fields; four lighted basketball courts; four lighted tennis
courts; two lighted soccer fields; parking area; three restrooms; concession spaces; and rough
grading for BMX facility.
• Piazza Sorrento, atwo-acre neighborhood square in the Sorrento project (Dublin Ranch Area F
South), was accepted as complete in March 2008. Devany Square, atwo-acre neighborhood
square in Dublin Ranch Area G, was accepted as complete in September 2008. A dedication
ceremony and grand opening for the two parks was held in October 2008.
• As part of a multi-year project to replace aging wood park furniture in City parks with furniture
made of recycled materials, the City Council awarded the bid for replacement of park furniture at
Shannon and Kolb Parks. The park furniture has been replaced and was accepted by the City
Council on January 6, 2009.
• The repainting of the Old St. Raymond's Church at the Dublin Heritage Center was completed.
• Dublin Little League completed construction of batting cages at the Dublin Sports Grounds and
the ownership of the batting cages was transferred to the City of Dublin.
• An artwork design submitted by Sunnyvale artist, Rachel Davis, was approved by the City
Council for installation at the Tralee project at the northwest corner of Dublin Boulevard and
Dougherty Road.
9 of 26
~ ~ /~
r~ ~~
• Work on the Dublin Transit Center public art project was initiated by contracting with a
professional art consultant to lead the project and with the appointment of an artist selection
committee to assist with the selection of the artworks for the project. The project provides for the
installation of significant works of art in two key places of the Dublin Transit Center, the
Campbell Green and the Iron Horse Plaza.
• The City entered into a Consultant Services Agreement for the Emerald Glen Park Recreation
and Aquatic Complex. The 35,895 square foot facility includes a gymnasium, fitness center,
game room/teen center, group exercise/dance studio, special events room, juice bar, locker rooms,
administrative offices and the space needed to support two swimming pools. The facility will
have two swimming pools including a leisure and instructional pool (6,675 s.f.) and a 25-meter by
25-yard (6,150 sf) deep water competition pool.
• The results of the Parks and Community Services Needs Assessment were presented to the City
Council in August 2008. A Parks and Community Services Strategic Plan was adopted by the
City Council in November 2008.
• The City continued to work with the East Bay Regional Park District (EBRPD) to negotiate for
land acquisition in the Western Extended Planning Area for an Open Space Area.
• Plans and specifications for the 10.6 acre Schaefer Ranch Park, prepared by the developer of the
Schaefer Ranch housing development, were received and reviewed by City Staff.
• An addendum to the Dublin Historic Park Master Plan was approved by the City Council in
2008. The addendum provides for the relocation of five structures from the historic Kolb Ranch to
the Dublin Historic Park including: Old House; Main House; Sunday School Barn; Hay Barn; and
Pumphouse. Additionally, environmental documentation relating to the move, rehabilitation and
reuse of the Kolb Ranch structures at the Dublin Historic Park was approved and an Amendment
to the Dublin Historic Park Master Plan to incorporate the structures from the Kolb Ranch was
approved. In June 2008, the City Council awarded a bit to demolish the existing Dublin Square
Shopping Center to make way for improvements related to the Dublin Historic Park. The shopping
center was demolished in August 2008 and the bid for construction of the Phase 1 improvements
was subsequently awarded in December 2008.
10 of 26
~ ~- ~ ~ '~
SCHOOLS, PUBLIC LANDS AND UTILITIES ELEMENT
Amendments
The Schools, Public Lands, and Utilities Element was not amended during the reporting period for
Calendar Year 2008.
Progress towards meeting goals and guiding policies of the Schools, Public Lands, and Utilities
Element
Schools
• In 2008, City Staff continued to work with developers and property owners to ensure that adequate
sites are reserved to meet the Dublin Unified School District's projected demand for future
school uses. School fees are collected at the building permit issuance stage of project development
in accordance with State law.
• The Quarry Lane School, a privately owned school located within the Eastern Extended Planning
Area, was expanded from an elementary school to include a new middle school and high school
with playing fields and associated improvements. Construction of the project was completed in
early 2008 and the new middle school and high school is open.
Utilities
• In 2008, the City continued to work closely with project applicants and the service utilities to
ensure that there is adequate capacity to serve all new and existing areas of Dublin.
11 of 26
~ 2' ~~ '~
CIRCULATION AND SCENIC HIGHWAYS ELEMENT
Amendments
The Circulation and Scenic Highways Element was not amended during the reporting period for Calendar
Year 2008.
Progress towards meeting goals and guiding policies of the Circulation and Scenic Highways
Element
• The City, in cooperation with Caltrans and the Cities of Pleasanton and Livermore, is constructing
improvements to the I-580/Fallon Road and EI Charro Road interchange to increase the
interchange capacity while maintaining safe and efficient traffic operations. Construction is
scheduled for completion in summer 2009.
The Dougherty Road improvements were completed in 2008 and accepted by the City Council in
early 2009. Construction to widen the existing roadway between Houston Place and I-580 and on
Dublin Boulevard between Dublin Court and approximately 700 feet east of Dougherty Road has
been completed. The improvements accommodate additional traffic generated from planned
growth in the area.
• The City worked jointly with East Bay Regional Park District, the City of Pleasanton, Caltrans and
Zone 7 to complete the design of the Alamo Canal Trail underneath I-580. The design is nearing
completion and funds are being acquired to construct the project.
• The development of a Citywide Bikeways Master Plan was approved by the City Council in July
2007. The plan evaluated existing bicycle conditions and created an integrated plan including
access to parks and open space areas. Development projects are reviewed on a case-by-case basis
for compliance with the Bikeways Master Plan.
• In 2008, the City continued to provide for the replacement of damaged curbs, gutters and
sidewalks at various locations throughout the City as well as completing annual street overlay and
slurry seals projects.
• The northern extension of Fallon Road and the intersection of Fallon Road and Tassajara Road
have been constructed and connected with the Silvera Ranch development project.
• The extension of Fallon Road through Silvera Ranch to Dublin Ranch is under construction and
project is scheduled for completion in late 2009.
• The engineering design phase for the widening of Tassajara Road between I-580 and the
Alameda-Contra Costa County limit line in the Eastern Dublin Specific Plan Area began in 2003
and continues with the review of future projects.
• In 2008, the City continued to collect traffic impact fees for new development projects to ensure
that new facilities are built to accommodate the additional vehicle, bicycle, and pedestrian trips
that result from the projects.
12 of 26
~Y6~ 2~
modal improvements and streetscape enhancements in accordance with the Streetscape Master
Plan along Dublin Boulevard, from Hansen Drive to Tassajara Road. Currently, the design of
improvements and streetscape enhancements are underway and is scheduled for construction in
2009.
In 2008, the City Council identified the creation of a Multi-Modal Map as a high priority goal.
The City is currently working on the creation of a Multi-Modal Map, which will provide a central
location where residents and visitors of the City can view transportation opportunities within the
City. The map will display streets as well as pedestrian paths and bicycle lanes to help residents
and visitors determine which areas are accessible by alternative methods of transportation (i.e., by
walking or by bicycle). Additionally, the map will encourage the use of alternative methods of
transportation and use of recreation areas by showing each opportunity for recreation in the City
(trails, parks, etc.) and will encourage people to walk or bike to these opportunities by showing
pedestrian paths and bicycle lanes. The map is in draft form and will be considered for approval in
2009.
13 of 26
~ ~` r
HOUSING ELEMENT
Amendments
The Dublin General Plan Housing Element was certified by the Department of Housing and Community
Development on July 11, 2003. The Element was not amended during the Calendar Year 2008.
Progress Towards Meeting Goals and Policies of the Housing Element
Number of New Housing Permits Issued
During Calendar Year 2008, the City of Dublin issued a total of 143 permits for residential development.
All 143 permits were issued for single-family homes. There were no permits issued for multi-family units
in Calendar Year 2008.
Progress toward Mitigating Governmental Constraints in the Maintenance, Improvement and
Development of Housing
The City of Dublin Housing Element identifies governmental and non-governmental constraints relative
to providing housing sufficient to meet the number of units identified in the Regional Housing Needs
Allocation (RHNA) developed by the Association of Bay Area Governments (ABAG). The non-
governmental constraints include: market conditions such as land costs; construction and labor costs; and,
the cost and availability of financing. Efforts to mitigate non-governmental constraints included the
creation of a First Time Homebuyer Loan Program.
For each of the last two fiscal years (2007-2008 and 2008-2009) $500,000 was allocated by the City
Council towards the First Time Homebuyer Loan Program (FTHLP). During Calendar Year 2008 the
City was successful in lending $213,998 to 7 households through the FTHLP. The FTHLP assists
households with financing in the form of down payment assistance towards the purchase of a home.
The primary governmental constraint identified in the Housing Element is the permit and processing fees.
The City of Dublin charges a number of planning, building and engineering fees to cover the cost of
processing development requests, providing public facilities and services to new development, and
mitigating the environmental impacts of new development. These fees are necessary to meet City service
and environmental standards. Impact fees for water, sewer and school services are charged by other
agencies.
Comparison of Units Added To Regional Housing Need Allocation by Income for the Current Housing
Element Period.
The City of Dublin's fair share of the regional housing need for the current Housing Element cycle is
5,436 units. For Calendar Year 2008, Dublin issued building permits for 143 new residential units. For
the period of July 1, 2001 to December 31, 2006 (RHNA cycle), the total number of permits issued for
residential units is 3,832.
14 of 26
~ ~~ ~_ --~
The table below discusses how the City is achieving the Regional Housing Needs Allocation (7-year
cycle).
Table 1: Building Permits Issued Towards Meeting the Regional Housing Need
Income Level New Construction Total Units Remaining RHNA
Need For 1999- Permitted through Need
2006 CY 2006 (A - B))
(A) (B)
Very Low Income 796 263 533
~50% AMI*)
Low Income 531 243 288
(>50% <80%AMI*)
Moderate Income 1,441 378 1,063
(>80%<120%
AMI*)
Above Moderate 2,668 2,948 (280)
Income
(>120% AMI*)
Total 5,436 3,832 1,604***
~`AMl =Area Median Income a farmly of 4 for 2008 - $86,100
**Permitted is defined as the issuance of Building Permits for the construction of a residential unit.
*** This number represents the remaining RHNA need to be accommodated in order to meet the overall RHNA numbers.
Affordability of New Units Including the Number of Deed Restricted Affordable Housing Units
• The median sales price for a single family home in Dublin at the end of Calendar Year 2008 was
$620,000.' These units are financially available to above-moderate income households. Above-
moderate income households are those households that have an annual income that exceeds 120%
of the Area Median Income (AMI). The AMI for 2008 was $86,100. Very low income households
are defined as households with annual income less than or equal to 50% of the AMI; low income
households are households with an annual income that falls within 50% to 80% of the AMI; and,
moderate income households are households with an annual income that falls between 80% to
120% of the AMI.
• The affordable for-sale units constructed and/or sold during this reporting period include:
0 2 new units were sold at The Terraces @ Dublin Ranch to moderate-income households
with 30-year deed restrictions.
0 3 units were re-sold at The Terraces @ Dublin Ranch to moderate-income households with
30-year deed restrictions.
0 8 units were sold at Elan @ Dublin Station to moderate-income households with 55-year
deed restrictions.
o No affordable units were sold at Silvera Ranch in Calendar Year 2008.
0 2 units were sold at the Willows; both units sold to moderate-income households with 55-
year deed restrictions.
0 1 unit sold at Tralee to a moderate income household includes a 55-year deed restriction.
• The affordable rental units constructed and/or rented during this reporting period include:
0 30 units restricted to moderate-income households at Avalon @ Dublin Station.
~ Bay East Association of Realtors, December 2008 Housing Statistics -Single Family Residence
15 of 26
~7
0 535 units that income restricted to various income levels at The Groves @ Dublin Ranch;
221 units to moderate-income households, 187 units to low-income households and 127
units to very-low income households.
It should be noted that the City does not track the number of rental units listed above that are vacated and
re-rented during the reporting period. The City does perform an annual monitoring of all rental affordable
housing developments.
Status of Programs in Adopted Housing Element (Calendar Year 2008)
GOAL A: TO PROVIDE ADEQUATE SITES TO MEET THE CITY HOUSING NEEDS
Po~.icv 1: Ensure that adequate sites exist to accommodate future housing needs.
Progess: The City has issued 3,832 building permits (through 2006) towards meeting the housing
need (refer to Table 1 above). Additional sites have been zoned to accommodate the
remaining need. The number of medium, medium high and high density sites that are
available within the City will meet the remaining need, which is 1,604.
Po~.icv 2: Increase units produced in Dublin; increase sites appropriate for affordable housing
and accessible to downtown.
Prowess: Two residential developments have been approved in the Downtown Intensification Area.
A mixed-use project (AMB, former Corovan Project) including 150,000 square feet of
office space and 308 multi-family apartment units within the West Dublin BART Specific
Plan Area has received full entitlements. The project will provide 39 affordable units of
which 23 units must be constructed on-site. The Development Agreement for this project
allows the developer to construct the project by June 2014. The project is anticipated to be
constructed within the next five years. The project will be built at 6541 Golden Gate
Drive, the former Corovan warehouse building.
A 309-unit high density condominium project known as Windstar received full
entitlements in 2007 and will be constructed adjacent to the City's future West
Dublin/Pleasanton BART Station. The project will be located on a 3.55 acre vacant piece
of property. The construction start-date for this project is unknown at this time.
GOAL B: TO INCREASE THE AVAILABILITY OF HOUSING AFFORDABLE TO LOW-
AND MODERATE-INCOME HOUSEHOLDS
POLICY 1: Promote development of affordable housing in Dublin.
Pry: The Groves @ Dublin Ranch, formerly known as Fairway Ranch, includes a 304 unit
multi-family apartment project known as Oak Groves. This project is 80% affordable.
Tenants started moving into the complex in September 2006. The City of Dublin provided
a loan for $2,250,000 to assist with the financing of the project. The project is 98%
occupied as of December 2008.
~1
16 of 26
The Groves @ Dublin Ranch, formerly known as Fairway Ranch, also includes a 322-
unit senior apartment project known as Pine Groves and Cedar Groves. This project is
90% affordable. Tenants started moving into the complex in September 2006. All units are
restricted to seniors 55 years of age and over. The City of Dublin provided a loan for
$2,250,000 to assist with the financing of the project. The project was 97% occupied as of
December 2008.
POLICY 2: Provide incentives for affordable units.
Progress: In March 2007, the City repealed the previous Density Bonus Ordinance and adopted a
new Ordinance (Chapter 8.52) in order to comply with current State Law.
The City provided low interest loans to assist with the development of a project which
include affordable units: The Groves @ Dublin Ranch (formerly known as Fairway
Ranch). The Groves is a high density residential project located in eastern Dublin that
includes 930 units. Of the 930 units, 587 are affordable rental units, 39 are market rate
rental units, 252 are for-sale market rate units and 52 are affordable for-sale market rate
units.
POLICY 3: Require the development of lower-income housing.
Progress: Avalon @ Dublin Station (Avalon Bay Communities), a 305 unit multi-family residential
apartment community near the existing Dublin/Pleasanton BART Station, provides 30
units for rent to moderate-income households. All affordable units have restrictions on
rental rates for 55 years. The project was complete in 2008.
Elan @ Dublin Station (D.R. Horton), a 257 unit multi-family residential condominium
project also near the existing Dublin/Pleasanton BART Station, provides 26 affordable
units for sale to moderate-income households. All affordable units have 55-year resale
restrictions. The project was complete in 2007.
The Groves @ Dublin Ranch, formally known as Fairway Ranch, includes amulti-family
residential apartment community and a senior apartment community totaling 626 units.
The multi-family project, The Oaks has 304 units of which 243 are affordable as follows:
90 moderate-income units, 90 low-income units and 63 very-low income units. The senior
project, Pine Groves and Cedar Groves has 322 units of which 292 are affordable as
follows: 131 moderate-income units, 97 low-income units and 64 very-low income units.
All affordable units have restrictions on rental rates for 55 years. The project is 98% and
97% respectively leased as of December 2008.
Silvera Ranch (Pinn Brothers Fine Homes), a 254 unit residential ownership subdivision,
has a total of 19 affordable single-family dwellings and town homes. Of these, 9 units are
for moderate-income households, 4 units are for low-income households and 6 units are for
very-low income households. All affordable units have 55-year resale restrictions.
Tralee (Pinn Brothers Fine Homes), a 233 unit multi-family residential mixed-use project,
has 29 affordable units for sale. Of these, 9 units are for very-low income households, 6
units are for low-income households and 14 units are for moderate-income households.
All affordable units have 55-year resale restrictions.
17 of 26
j ~ ~~ .~~ ;
The Villages @ Dublin Ranch (Toll Brothers), a 1,395 unit multi-family residential
condominium community consisting of 4 distinct neighborhoods, has a total of 105
affordable units. All of the affordable units are located within the neighborhood known as
The Terraces and are affordable to moderate-income households; all affordable units have
30-year resale restrictions.
The Willows (Braddock & Logan), a 56 unit multi-family residential town home
community, has a total of 6 affordable units. Of these, 1 unit is for very-low income
households, 1 unit is for low-income households and 4 units are for moderate-income
households. All affordable units have 55-year resale restrictions.
PoL[cv 4: Conduct Housing and Commercial Nexus Study to determine the feasibility of
establishing a commercial linkage fee to be deposited in the City's Inclusionary
Housing Fund.
Prog ess: A task force was formed to work with a consultant on the development of a commercial
linkage fee which was subsequently approved by the City Council in May 2005. The
commercial linkage fee, also known as the Non-Residential Development Affordable
Housing Impact Fee, is collected at issuance of building permits and deposited into a
Housing In-lieu fund for the funding of affordable housing programs. A total of $344,401
has been collected through December 2008.
POLICY 5: Improve housing affordability with higher densities near BART.
Prog ess: The City currently has a functioning BART station, the Dublin/Pleasanton BART Station,
and a new BART Station and parking structure under construction, the West
Dublin/Pleasanton BART Station within the Downtown Intensification Area. Adjacent to
the new BART station will be a 308-unit high density residential project (AMB) and a 309-
unit high density residential project (Windstar), along with other commercial, retail and
office uses.
The existing Dublin/Pleasanton BART Station is located in an area known as the Dublin
Transit Center (Dublin Station) which allows for up to 1,800 units of high density
residential housing. Currently, four high density residential projects have been approved
and are either under construction or have completed construction. Camellia Place (EAH,
Inc) has completed construction and provides 112 very-low and low-income apartment
units; Elan @ Dublin Station (D.R. Horton) has also completed construction and provides
257 for-sale condominium units with 26 units set aside for moderate-income households;
and Avalon @ Dublin Station (Avalon Bay Communities) was completed and provides
305 apartment units with 30 units set aside for moderate-income households.
Metropolitan @ Dublin Station is a 300-unit condominium community that was
previously approved. The plan check for Metropolitan has expired. The Applicant for the
Metropolitan project, D.R. Horton, has submitted a re-design for the potential development
of approximately 112 townhomes. The project is currently in planning review. The amount
and extent of affordable units at this site is unknown at this time. Avalon II @ Dublin
Station (Avalon Bay Communities), a 405 unit apartment project with 41 units set aside
for moderate-income households, is currently in planning review.
18 of 26
Po~tcv 6: Simplify and coordinate the means of obtaining project approvals for senior projects
and those with below-market-rate units.
Progress: The City has a procedure in place to expedite projects for senior projects and those with
below-market-rate units. The Groves @ Dublin Ranch project is a senior and affordable
housing project, which was completed in 2007. This project was processed expeditiously.
Po[,~cv 7: Encourage reduction of housing expenses through shared-living arrangements.
Progesess: A Housing Needs Survey was completed in June 2005 and evaluated the feasibility of a
shared-housing program. Information collected in a random sample by Godbe Research
indicated that residents did not have any interest in a shared housing program nor would
use ashared-housing program at this time.
POLICY 8: Encourage development of affordable housing by private organizations primarily
engaged in housing construction or management.
Progress: Camellia Place and Wicklow Square are examples of housing projects that were
constructed and managed by non-profit organizations. Camellia Place (EAH) is a 112 unit
affordable apartment complex and Wicklow Square (Eden) is a 56 unit affordable
senior project.
The City is currently working with Eden Housing on the Arroyo Vista project. Eden
Housing and Citation Homes were selected by the Dublin Housing Authority and the City
of Dublin to redevelop the existing 150 unit Arroyo Vista project into a mixed income
development. The proposed project will include 378 housing units, in a combination of
affordable and market rate, rental and ownership units.
Po[.[c'v 9: Promote the use of available funds and funding mechanisms in private-sector housing
development.
Progress: The City of Dublin website provides information on those developers accepting
applications for restricted Inclusionary Below Market Rate (BMR) units for both
ownership and rental units. The web page is updated routinely to provide up-to-date
information on various housing opportunities in the region. Included on the website are the
Inclusionary Ordinance Regulations and the newly adopted Inclusionary Ordinance
Guidelines to assist developers with the requirements related to the development of
affordable housing units. For each of the last two fiscal years (2007-2008 and 2008-2009)
$500,000 was allocated by the City Council towards the First Time Homebuyer Loan
Program (FTHLP). During the Calendar year 2008, the City was successful in lending
$213,998 to 7 households through the FTHLP.
Po~.~cv 10: Promote energy efficiency in new projects.
Prog ess: The City requires all developments to submit a Waste Management Plan to meet the City's
Construction and Debris Ordinance to divert at least 50% of waste from landfills. In
addition, the City Council adopted Green Building Guidelines for use in Civic Buildings in
the future to promote energy efficiency. The City continues to implement the Guidelines
on a project specific basis. In addition, the City approved the installation of solar panel
roofs for the Sonata project, which includes 119 single-family detached homes.
19 of 26
~~ ~ a~
POLICY 11: Provide opportunities for first-time homebuyers to purchase homes in Dublin.
Progress: The City continues to support the Tri-Valley Housing Opportunity Center (TVHOC)
through the community grant process. TVHOC is designed to serve as a one-stop center for
affordable homeownership in the Tri-Valley.
For each of the last two fiscal years (2007-2008 and 2008-2009) $500,000 was allocated
by the City Council towards the First Time Homebuyer Loan Program (FTHLP).
During Calendar Year 2008 the City was successful in lending $213,998 to 7 households
through the FTHLP.
POLICY 12: Continue to make available fee deferrals to encourage the development of affordable
housing.
Progress: The City continues to offer fee deferrals to encourage the development of affordable
housing. Within the Calendar Year 2008, none was requested of the City of Dublin. The
Inclusionary Zoning Regulations within the Dublin Zoning Ordinance provides incentives
to encourage the on-site construction of affordable units in excess of the 12.5% of the total
number of units in the project. Incentives may include deferral of Development Processing
Fees. The terms and payment schedule of the deferred fees is subject to the approval of the
City Manager. Additionally, the City Council may authorize the deferred payment of
development impact fees applicable to the affordable units.
POLICY 13: Encourage a mix of housing types as a means of achieving a wider range of housing
types, sizes, and potential affordability to low and moderate income households,
including affordable by design units and large family units.
Pry: Fallon Village: This project will include a variety of residential densities including low,
medium, medium-high and mixed-use for a total of 3,108 units. All projects within Fallon
Village are subject to the City's Inclusionary Zoning Ordinance. The first project within
Fallon Village is known as Positano, which is 1,043 dwelling units (Braddock & Logan).
The first neighborhoods include 247 units in Cantara and Solerno. The developer will
construct 9four-bedroom single family homes for low and moderate income households
and 17 one-bedroom secondary dwelling units for low and very-low income households.
These units are affordable in perpetuity.
Dublin Ranch Area F West and East (Sorrento): This project includes a variety of
housing types within ten distinct neighborhoods for a total of 1,111 medium density
residential units. The Inclusionary Zoning requirements for this project have been satisfied
within the Groves @ Dublin Ranch (formerly known as Fairway Ranch) project. Each
neighborhood has between 4 and 9 varying floor plans and units range in size from 1,320
square feet up to 2,981 square feet. These units are under construction and are partially
occupied.
Schaefer Ranch: This project includes 302 units in four distinct neighborhoods. Housing
types and sizes include one-story and two-story single detached units with 20 differing
floor plans. Units range from 2,692 square feet up to 6,853 square feet. These units are
under construction and are partially occupied.
20 of 26
a~ j
Dublin Ranch West (Wallis): This project would also include a variety of housing types
and residential densities including low, medium and medium high. The project has been
approved for 935 housing units. Construction is currently underway on one of the two
vehicular and pedestrian bridges that cross Tassajara Creek. A construction date is
currently unknown at this time.
Fallon Crossings: The project proposal includes up to 106 single-family residential units
on lots ranging from small lots, zero lot line lots to large estate lots. This project was
approved by the City Council in December 2007 and included a Stage 2 Planned
Development, Vesting Tentative Map and a Site Development Review.
GOAL C: TO CONSERVE THE EXISTING STOCK OF AFFORDABLE RENTAL
HOUSING
POLICY 1: Preserve low income housing.
Progress: In 2005, a Condominium Conversion Ordinance was passed by the City Council to
preserve the existing rental housing stock.
In addition, for each for-sale affordable unit, the buyers must sign a Resale Restriction
Agreement that guarantees that the units will remain affordable for up to 55 years.
The City of Dublin website contains a list of rental properties that is updated when new
projects are complete. The Tri-Valley Area Affordable Rental Housing Directory, which is
updated periodically and published by the City of Pleasanton, was updated in 2008 and
lists existing and new projects in the Tri-Valley. This directory is available at the City of
Dublin's Information Counter. There were no subsidized rental properties in the City of
Dublin at risk of converting to market-rate housing during this reporting period.
GOAL D: TO PRESERVE AND INCREASE THE EFFICIENT USE OF THE CITY'S
EXISTING HOUSING STOCK
PoLicv 1: Encourage efficient use of existing housing stock; promote development of small units
at low cost.
Progress: Providing financial assistance to construct second units on sites with existing single-family
homes was evaluated through the Housing Needs Study (July 2005). The Study indicated
that residents did not find that providing financial assistance for second units was a highly
needed program for the City. However, in October 2005, the City Council approved a new
Second Unit Ordinance that makes it easier for families to provide alternative housing by
means of second units.
The Positano residential development project includes 34 second units, which are
affordable in perpetuity.
The Dublin Housing Authority selected the development team of Eden Housing and
Citation Homes to redevelop the existing 150 unit Arroyo Vista project. The proposed
redevelopment project will include 378 housing units, in a combination of affordable and
market rate, rental and ownership units. The U.S. Department of Housing and Urban
Development (HUD) approved the Environmental Assessment (Finding of No Significant
21 of 26
~~~U~~~
Impact) on December 29, 2008 and the City is waiting for approval of the Disposition
Application from HUD. Project environmental work, pursuant to the California
Environmental Quality Act is currently underway, with the Draft Environmental Impact
Report recently circulated for public review. The existing affordable housing units will be
replaced with new affordable housing units, along with additional affordable and market
rate units.
POLICY: 2: Provide subsidies for housing rehabilitation.
Progress: The Alameda County Community Development Agency administers a Minor and Major
Home Improvement Program for the City of Dublin. The Community Development
Agency administered $14,216 of Community Development Block Grant funds for one
minor home repair and one accessibility grant in the City of Dublin during fiscal year
2008-2009.
GOAL E: TO PROMOTE EQUAL HOUSING OPPORTUNITIES FOR ALL DUBLIN
RESIDENTS
POLICY 1: Support services and programs that fight housing discrimination; direct persons
towards agencies that provide assistance to victims of discrimination.
Progress: The City of Dublin web page has a link for fair housing issues which directs interested
readers to Eden Council for Hope and Opportunity (ECHO) Housing and to the State of
California Consumer Affairs Office booklet "California Tenants: Guide to Residential
Tenants and Landlord's Rights and Responsibilities." In addition, the City contributes
Community Block Development Grant (CDBG) funding to ECHO housing.
Po[,~cv 2: Encourage greater access to housing for persons with disabilities.
Pro ess: In October 2007, the City adopted a Universal Design Ordinance which requires new
single-family home developers to install base Universal Design features in all single-
family developments of 20 or more homes. The guiding principle behind Universal
Design is that the features should be useful to people with diverse disabilities. An
examples of a Universal Design feature includes requiring a grab bar reinforcement
consistent with CBA 1 IA for the toilet and shower or bathtub.
In addition, with Community Development Block Grant funds, the City of Dublin supports
Community Resources for Independent Living (CRIL) Housing Services Center, serving
people with disabilities and seniors with limitations.
GOAL F: TO PROVIDE SHORT-TERM SHELTER FOR INDIVIDUALS AND FAMILIES
WITHOUT AFFORDABLE PERMANENT HOUSING
Po~.icv 1: Allow emergency shelters and transitional housing for homeless.
Pro ess: An Emergency Shelter Ordinance and Transitional Housing Ordinance were adopted by
the City Council in October 2004 as required by State law. Within this report period no
applications were received for either emergency shelters or transitional housing. In
addition, .the City provides a Community Development Block Grant to the Tri-Valley
Haven which supports a Domestic Violence Shelter and a Homeless Shelter.
22 of 26
CONSERVATION ELEMENT
Amendments
The Conservation Element was not amended during the reporting period of Calendar Year 2008.
Progress toward meeting goals and guiding policies of the Conservation Element
• The City continues to review each new development project that is proposed near a natural
resource such as a stream corridor with the intent of protecting the resource. Conditions of
approval include measures to ensure adequate setbacks, minimal impacts to water quality, passive
recreational opportunities, and the maintenance of natural systems to the extent possible.
• The City continues to work with developers to ensure that open space corridors established in new
neighborhoods are maintained and managed appropriately, and open space areas are contiguous
with other such lands.
• In 2008, Schaefer Ranch collaborated with the East Bay Regional Park District to dedicate land
and to construct trails and trailheads within the project area. The project is approximately 500
acres and is located at the western edge of the City.
• The City continues to work on preserving Dublin's historic resources. The Historic Area is
approximately 40 acres and is generally located northwest of San Ramon Road and Interstate 580.
After completing an archeological resource analysis and historic resource inventory study in 2005,
the City adopted a Historic Overlay Zoning District and Historic Area Design Guidelines for
projects within the historic area. In August 2006, the City Council adopted the Dublin Village
Historic Area Specific Plan which calls out land use designations and development guidelines
and future public/private development in the planning area. In 2007, two additional properties
were added to the Dublin Village Historic Area Specific Plan.
• The Dublin Village Historic Area Specific Plan anticipates development of a public park, known
as the Dublin Historic Park within the Specific Plan area. In August 2006, following the adoption
of the Dublin Village Historic Area Specific Plan, the City Council adopted the Dublin Historic
Park Master Plan. The Master Plan anticipates the creation of the Dublin Historic Park that will
compliment the existing Heritage Center, meet the needs of the community for parkland and will
re-establish the City's historic heart. The Historic Park site, which was acquired by the City in
2007, will add to the Dublin Heritage Center where several notable historic buildings have been
assembled and preserved. In 2007, the City entered into a Consultant Services Agreement to
contract Phase I improvements for the Dublin Historic Park. Additionally, the agreement provided
for a study of the implications of moving historic structures from the Kolb Ranch in Pleasanton to
the Dublin Historic Park, the potential uses of these structures, and the cost of rehabilitating the
structures. In 2008, the shopping center was demolished, the design details for Phase 1 were
completed, and the bid for construction of the Phase 1 improvements was subsequently awarded in
December 2008.
23 of 26
.~
~,~" ... l.~ ~ l
SEISMIC SAFETY AND SAFETY ELEMENT
Amendments
The Seismic Safety and Safety Element was not amended during the reporting period for Calendar Year
2008.
Progress toward meeting goals and guiding policies of the Seismic Safety and Safety Element
• In conjunction with the Dublin Unified School District, the City of Dublin conducted a school
disaster training exercise where the City instructed the school district on how to manage an event
and how to organize themselves in case of a disaster.
• In 2008, the City took part in a citywide functional disaster exercise. The exercise was an
earthquake scenario. The exercise focused on the day after the earthquake and analyzed the
challenges and obstacles that would be faced on the day after a disaster.
• In August 2006, the City Council adopted the National Incident Management System (NIMS),
which provides a consistent nationwide approach for federal, state, local and tribal governments to
work together more effectively and efficiently to prevent, prepare for, respond to, and recover
from disasters, regardless of cause, size, or complexity. The City of Dublin has integrated the
National Incident Management System, to the extent appropriate, into the existing emergency
management system, in its efforts toward disaster prevention and preparedness.
• The following disaster objectives were added to the City's Goals and Objectives for 2008: conduct
six Personal Emergency Preparedness (PEP) training sessions for Dublin residents; develop a
template for preparation of emergency plans for facilities with vulnerable populations; and provide
all Dublin Homeowners' Associations and Neighborhood Watch groups with disaster
preparedness informational bulletins, and provide at least two opportunities for Dublin residents to
attend Community Emergency Response Team (CERT) training.
24 of 26
~ ,n :.~ r: ~ ~.i
NOISE ELEMENT
Amendments
The Noise Element was not amended during the reporting period for Calendar Year 2008.
Progress toward meeting goals and guiding policies of the Noise Element
Due to the nature of the guiding and implementing policies of the Noise Element, the efforts to implement
this element of the General Plan are on-going in nature. Projects are reviewed on a case-by-case basis for
adverse noise impacts to the environment and sensitive receptors. Additionally, a Noise Mitigation fee is
charged to developers in the Eastern Dublin Specific Plan area to assist in funding the construction of
improvements to mitigate noise impacts.
25 of 26
~~
COMMUNITY DESIGN & SUSTAINABILITY ELEMENT
Amendments
The Community Design & Sustainability Element was adopted in September 2008. The Community
Design Element establishes principles, policies and implementation measures that are designed to enhance
the livability of Dublin and encourage a high level of quality design while encouraging well designed
sustainability measures. The purpose of the element is to enhance the physical form of the community by
establishing policies that will guide future development.
The Community Design Element applies to developments throughout the City. The efforts to implement
this element of the General Plan are on-going in nature. Projects are reviewed on a case-by-case basis for
conformance with this element.
26 of 26