HomeMy WebLinkAboutItem 8.3 AlamoCanalBike02-04AI CTTY CLERK AGEN DA STATEMENT CTTY COUNCTL MEETTNG DATE: December 3f 2002 SUBJECT: Acceptance of Work- Contract No. 02-04, Alamo Canal Bike Path from the Iron Horse Trail Junction to I-580 Report Prepared by: Lee $. Thompson, Public Works Director ATTACHMENTS: 1) Budget Change Form 2) Location Map RECOMMENDATION: Approve a budget change in the amount of $22,031, accept the /~ impr~ovements under Contract No. 02-04, and authorize the release  y//~]~~etention in the amount of $26,501.89 after 35 days if there are no subcontractor claims FINANCIAL STATEMENT: Total Project Prior Years FY 02-03 FY 02-03 Est. Required Budget Expenditures Budget Expenditures Budget Change Design: $ 64,631 $ 64,631 Salaries/Inspection/Misc: $ 17,882 $ 13,512 $ 4,370 $ 28,138 $ 23,768 Improvements: -; $ 266,756 $ 86,790 $179,966 $178,229 ($ 1,737) TOTAL: $ 349,269 $164,933 $184,336 $ 206,367 $ 22,031 This project is funded through Transportation Development Act ($102,770), Transportation for Clean Air grant ($154,080), Measure B Bicycle & Pedestrian Program ($15,920) and General Fund ($78,145). Due to higher inspection costs from extra work and additional materials testing required to mitigate unsuitable soil conditions, a budget change in the amount of $20,387 from Measure B Bicycle & Pedestrian Program is necessary to help fund the project. In addition, $1,844 from Unappropriated Measure B Reserves is required to fully fund this project. Also, a budget change in the amount of $1,644 from the Transportation for Clean Air grant is necessary to maximize the use of the grant funds. DESCRIPTION: On May 21, 2002, the City Council awarded Contract No. 02-04, Alamo Canal Bike Path from the Iron Horse Trail Junction to 1-580, to Top Grade Construction, Inc. This project paved the existing Zone 7 maintenance road along the east side of the Alamo Canal from the Iron Horse Trail Junction in the north to the Dublin Civic Center in the south, resulting in a path approximately 12 feet wide with a concrete curb and gutter to control drainage. This path connects to the Iron Horse Trail system and provides pedestrian and bicycle access to the Civic Center and Library. COPIES TO: Top Grade, Inc. ITEM NO. _~~ G:~VlISCPROJ',Alamo Bike IH-I580XProject'~S acceptance.doc As a safety precaution, the constructed path will remain closed to the public until the Dublin Boulevard bridge widening work is completed in Summer 2003. Staff recommends that the City Council approve a budget change in the amount of $22,031, accept the improvements under Contract No. 02-04, and authorize the release of retention in the amount of $26,501.89 after 35 days if there are no subcontractor claims. Page2 ~f CITY OF DUBLIN BUDGET CHANGE FORM CHANGE FORM # New Appropriations (City council Approval Required): Budget Transfers: X__ From Unappropriated Reserves - Measure B From Budgeted Contingent Reserve (1080-799.000) Within Same Department Activity X From New Revenues Between Departments (City Council Approval Required) Other Name: Alamo Canal Bike Path- Iron Horse Name: Alamo Canal Bike Path- Iron Horse Trail Junction to 1-580 - Improvements $ '1,737 Trail Junction to 1-580, Testing $ 8,136. Account #: 227-96772-750-050 Account #: 227-96772-740-077 Name: ' Name: Alamo Canal Bike Path - Iron Horse Trail Junction to 1-580 - Inspections · ~ $ 13,988 Account #: Account #: 227-96772-740-079 Name: Name: Alamo Canal Bike Path - Iron Horse Trail Junction to. 1-580 - Improvements $ 1,644. Account #: Account#: 221-96772-750-050 ? Name: Name: Revenue - TFCA Grant $1,644 Account #: Account #: 221-555-016 Name: Name: Account #: A~ ccount #: Fin Mgr/AS'D: '~--~~ ~ Date: \\ ~'2~ / ~'Z., Signature REASON FOR BUDGET CHANGE ENTRY: Budget increase required to fully fund the additional materials testing and inspections for the project. , City Manager: Date: Signature Mayor: Date: Signature g%~ /~/~/~'¢~ DUBUN HIGF :'CT LIMITS w-58o PROJEC' LIMITS ALAMO CANAL BIKE PATH PROJECT IRON HORSE TRAIL JUNCTION~TO 1-580 LOCATION MAP