HomeMy WebLinkAboutItem 8.8 DubSportGround Jensen CITY CLERK File # ~--~[~~~-~~ AGENDA STATEMENT CITY COUNCIL MEETING DATE: August 6, 2002 SUBJECT: Award of Contract for Dublin Sports Grounds Renovation Phase II Report Prepared by: Rosemary Alex, Parks and Facilities Development Coordinator ATTACHMENTS: 1) Bid Results 2) Letter of Protest from Sand Channel Greens 3) Resolution of Award 4) Budget Change Form RECOMMENDATION: /Q/~ Adopt resolution awarding bid to Jensen Corporation  Approve Budget Change ~ ~ FINANCIAL STATEMENT: Three bids were received with the low bid from Jensen Corporation with a base bid of $794,777 and altemates that decrease the bid to a low of $732,277 or increase the bid to a high of $852,805. The source of funds for the project includes State Park Bond Act - $389,628, Measure D - $23,796 and Park Dedication In-Lieu Fund - $342,139 for a total of $755,563. In order to award the Base Bid with Alternate #4, Scoreboards for Softball Fields #1 and #2, (Staff recommendation) plus a 10% contingency, an additional appropriation from the Unappropriated General Fund Reserve for $158,291 is required. DESCRIPTION: At the meeting of June 24, 2002 the City Council authorized Staff to advertise for bids for the Dublin Sports Grounds Renovation, Phase II. As part of the bid package Staff originally included three altemates primarily to achieve some flexibility in meeting the project intent and budget. During the bid period Staff sought the opportunity to include a fourth altemate item in response to the City Council's High Priority Goal to purchase and install scoreboards at the Dublin Sports Grounds softball fields. On July 24, 2002 the City received bids from Jensen Corporation, Valley Crest Landscape Inc. and Bauman Landscape. Upon careful evaluation of the bid results and consideration of the overall project, Staff recommends the award of contract to Jensen Corporation of the Base Bid along with the inclusion of Altemate #4 - the installation of two scoreboards for Softball Diamonds #1 and #2. Alternates #1-3 are not recommended for inclusion in the project scope. Alternates #1 and #2 would result in cost savings whereas Alternate #3 would increase costs. Altemate #1 is the deletion of a secondary 8" diameter storm drainpipe along the COPIES TO: Bidders, Carducci & Associates ITEM NO. _~ H:XRosemaryXDublin Sports Grounds Phase II award.doc swale that parallels Interstate 580. Upon further dls~assion with Public Works Staff, the secondary pipe provides additional capacity for drainage that could benefit future sports field renovation. Alternate #2 changes the sod turf at the soccer and baseball field to seeded turf and increases the maintenance period from 60 to 90 calendar days. The Base Bid provides for sod turf in the high traffic athletic areas and seeded turf along the swale and play areas. Considering the time of year for grass seed germination, Staff recommends retaining the combination of sod and seed installation to ensure that the intensely used turf areas are well established before the onset of winter. Alternate #3 provides for sod installation throughout the entire site. As described previously, Staff recommends the combination of seed and sod. A complete cost breakdown for all three bids is included in Attachment #1. If the Base Bid including Alternate #4 is approved, the cost would increase to $830,077. Staff recommends adding a 10% contingency thus bringing the amount of funds needed to $913,854. An additional appropriation in the amount of $158,291 is needed to award contract. A protest has been lodged by Sand Channel Greens (Attachment 2). Sand Channel Greens has protested the substitution of Kwik Drain system by Jensen Corporation for the soccer field drainage system. In regards to the protest, the two primary concerns included the overall performance of the substituted drainage system and the process by which the City accepted the substitute. The project's Landscape Architect has reviewed the technical calculations on drainage capacity, as well as all of the descriptive information on the drain system and has found that the Quik Drain system will meet the performance criteria outlined in the technical specifications. In response to the City's process of accepting the substitute, all pertinent information has been reviewed by the City Attorney. The City Attorney has found the protest to be invalid and is recommending acceptance of the subcontractor as identified by Jensen Corporation. RECOMMENDATION: It is the recommendation of Staff that the City Council adopt the resolution in Attachment 3 awarding the contract to Jensen Corporation for the Base Bid along with the inclusion of Alternate ~ - the installation of two scoreboards for Softball Diamonds #1 and #2. Further, it is recommended that the City Council approve the Budget Change Form in Attachment 4 that will provide for an additional appropriation from the Unappropriated General Fund Reserve for $158,291. Dublin Sports Grounds Bid Results Alt #1 I DeleteS" Storm Drain Pipe LF 1,200 $ 25.00 ($30,000.00) (1,200) $ 20.00 ($.24,000.00) (1,800 $ 20.00 $ (36,000.00 (1,260) $ 30.00 '$ (37,800.001 Alt #2 1 Additional Cost of Sod SF 60,600; $' 0.23 $13,938.00 62,400 $ 0.36 $ 22,464.00 59,300 $ 0,33 $ 19,569.00 65,000 $. 0.36 $ 23,400.00 2 Reduce Cost of Maintenance SF .. 60,600 $ 0.05 .$ (3,120.00) (62,4005 0.02 $ (936.00) (5{t,306')$ '0.05 $ (2,965.00) (65,000) $ 0.04 $ (2,600.00 Alt #3 1 Delete Cost of Sod 'SF -105,250 $ 0.23 $(23,000.00) (100,000) $ 0.40 '$ (40,000.00) (69,000) $ 0.16 $ (11,040.00 69,300 $ 0.36. $ 24,948.00 2 !n.c. rease CostofMaintenance SF 105~250 $ 0.05 $5,263.00 100,000 $ 0,02 $ 1,500.00 69,000 $ 0.06 $ 4:140.00 (69,300) $ 0.04 $ (2,772.00 Alt #4 1 Score Board LS 1 $ 30,000.00 $:~0,000.00 1 $ 36,000.00 $ 36,000.00 1 40,000.00 $ 40,000.00 60,.000.00 $ 60,000.00 SN"qD CHANNEL GREENS Sports Turf Drainage Systems CiTY July 29, 2002 Mr. Richard Ambrose, City Manager City of Dublin 100 Civic Plaza Dublin, CA 94568 Re: Dublin Sports Grounds Solicitation (Project #95830) Dear Mr. Ambrose: In accordance with the requirements of the referenced solicitation, Sand Channel Greens hereby protests the acceptance of the Kwik Drain system as an approved substitute for the Sand Channel Drainage System, which was specified for drainage of the soccer field area. Our protest is based on Kwik Drain's failure to comply with Section 02620, Paragraph 1.07 of the solicitation; specifically, their failure to provide calculations documenting the performance of their proposed design. We note that there was no date certain by which the calculations were due. Notwithstanding the lack of a date certain, we believe that the requ.ested documentation constituted a pre-qualification requirement, and thus was due no later than the time bids were due. Failure to provide required documentation in a timely manner should be grounds for disqualification. When we were asked to document the performance of our system, it was made clear to us that the information was required in advance of the bid closing date; that it constituted a pre-qualification requirement. We understood that the data would be used to determine whether or not a drainage system could be included in bidders' proposals. We complied. We submitted calculations describing the drainage capacity of our system, and even included formulas the City could use to independently evaluate competing designs. To the best of our knowledge, Kwik Drain received a similar request, and was unable or unwilling to provide the required documentation in a timely manner. This raises two issues that further reinforce the "pre-qualification" nature of thedata. First, if Kwik Drain could not document or demonstrate the capacity of their system prior to bid closing, how can there be any verifiable assurance they will be able to meet the City's needs after bid closing? Second, granting Kwik Drain a seemingly unconditional qualification unduly exposes the City to the risks of an after-the-fact disqualification, and the likely need to issue costly change orders to complete the project. ATTACHMENT #2 (800) DRY-TURF - (800-579-8873) P.O. Box 1504. Pebble Beach. CA 93953-1504 Fax (831) 722-2247 License No. 569065 We feel .it is unfair that Kwik Drain be given an open-ended opportunity to meet solicitation requirements. A promise of future compliance should not be acceptable. Information submitted subsequent to the bid closing date should not be considered. We believe the City of Dublin and its citizens will best be served by rejecting the untested and unsubstantiated promises of the Kwik Drain system, in favor of the proven and documented performance of the Sand Channel Drainage System. We request that Kwik Drain be disqualified, and that t.he existing bids for the project be adjusted to reflect a price for the Sand Channel Soccer Field Drainage System to be provided by Sand Channel Greens. Sincerely, Sand Channel Greens Parker Wood Marketing and Operations (831) 728-3520 cc: Bauman Landscape; Atto: Ted Carducci Associates; Atto: Paul Donnelly City of Dublin; Attn: Rosemary Alex Jensen Corporation; Attn: Mike Dalke Valley Crest; Atto: Noel RESOLUTION NO, - A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF DUBLIN AWARDING CONTRACT NO. 02-09 DUBLIN SPORTS GROUNDS RENOVATION TO JENSEN CORPORATION WHEREAS, the City of Dublin did, on July 24, 2002, publicly open, examine and declare all sealed bids for doing the work described in the approved Plans and Specifications for Contract No. 02-09, which Plans and Specifications are hereby expressly referred to for a description of said work and for all particulars relative to the proceedings under the request for bids; and WHEREAS, said bids were submitted to the City Engineer, who has reviewed the bids to determine the lowest bid which was responsive to the requirements of the bid documents; and NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Dublin does hereby award Contract No. 02-09 to the lowest responsible bidder therefOr, to wit, Jensen Corporation, at a base bid of seven-hundred and ninety-four thousand seven hundred and seventy-seven dollars ($794,777) and alternate #4 at thirty-six thousand dollars ($36,000) the particulars of which bid are on file in the office of the City Engineer. PASSED, APPROVED AND ADOPTED, this 6th day of August, 2002. AYES: NOES: ABSENT: ABSTAIN: Mayor ATTEST: CitY Clerk ATTACHMENT #3 -'CITY OF DUBLIN ~- ~ CHANGE FORM # New Appropriations (ciW Comcil Approv~ Req~d): Budget Transfers: X From Umpprophated Rescues From Budgeted Con, gent Reseme (1080-799.000) Wi~ S~e D~m-mient AcfiviW From New Revenues Be~een D~ments (CiW Council ApprovM Required) Nme: Nme: Improvemen~ Accomt S: :. Accost ~001.95830.750.050 $158,291 Nme: Nme: Acmunt g: Account ~: Nme: Nme: Accomt g: Account g: Nme: Nme: A~ount ~: Account ~} Nme: Nme: Account g: Account ~: · Silage REASON FOR BUDGET CHANGE ENTRY: Additional resources are necessary for the Dublin Sports Grounds renovation project. The funds will be used for two scoreboards, as well as provide for construction contingency. City Manager: Date: Signature As Approrved at the.,CiW Council Me,ting on: Da;'e;~ ~- .- _ Mayor: Date: Signature Posted By: Date: Signature fo,~,,~.~,*., ATTACH M E NT #4