Loading...
HomeMy WebLinkAboutItem 4.03 Sports Ground CO #1G~~~ OF ~U~~ti ~ ~9~~~~~~ STAFF REPORT C I T Y C L E R K ~`c~~,,~ ~ DUBLIN CITY COUNCIL File # ^~~~-30~ DATE: June 22, 2010 TO: Honorable Mayor and City Councilmembers FROM: Joni Pattillo, City Manager SUBJE Dublin Sports Grounds Phase IV - Change Order #1 Prepared By: Rosemary Alex, Parks and Facilities Development Coordinator EXECUTIVE SUMMARY: Staff is seeking City Council authorization to approve Change Order #1 for Dublin Sports Grounds - Phase IV. The Change Order will expand the turf renovation area by approximately one acre immediately west of the base bid scope of work. FINANCIAL IMPACT: This project is funded by East Bay Regional Parks District (EBRPD) Measure WW Bond Program. Funding to accommodate the proposed Change Order is already appropriated as part of the Fiscal Year 2010-2011 Budget. EBRPD Grant (Fund #2402) Budget for construction and improvements. Contract Awarded By City Council for Base Bid June 1, 2010 (Inctuding 10% contingency) Proposed - Contract Change Order No. 1 Proposed - Construction Contingency (10%) Sub-Total Change Order Total Amended Contract Cost (Including Contingencies) $ 99,150 9,915 $109,065 $ 909,784 $ 654,500 109 065 $ 763,565 RECOMMENDATION: Staff recommends that the City Council approve Change Order #1 for Dublin Sports Grounds Phase IV. ; 1~~1 ~.~r~ti Submitted By Parks and Community Services Director ,r Reviewed By Administrative Services Dir. `" Revi we By Assistant ity Manager Page 1 of 2 ITEM NO. ~T: DESCRIPTION: As approved in the 2008-2013 Capital Improvement Program, design of Dublin Sports Grounds Phase IV began in Fiscal Year 2009-2010 and construction will conclude in Fiscal Year 2010- 2011. On June 1, 2010 the City Council awarded contract to Suarez and Munoz to comptete the turf grass and irrigation .improvements of Dublin Sports Grounds Phase IV. Construction is scheduled to begin at the end of June. Since the bids were lower than expected, Staff recommends expanding the scope of work to include the area immediately west of the base bid area (Attachment 1). The area is approximately one acre in size and serves as the outfield of Baseball Diamond #5 and is used for youth soccer fields. Subsequent to the June 1, 2010 City Council Meeting, East Bay Regional Parks Grant Administrative Staff approved the expanded scope of work and Suarez and Munoz has provided a cost proposal for the area. Staff is recommending that the City Councit approve the change order in the amount of $99,150 for the expanded scope of work (Attachment 2). NOTICING REQUIREMENTS/PUBLIC OUTREACH: A copy of the Staff Report has been provided to East Bay Regional Park District and Suarez and Munoz Construction, Incorporated. ATTACHMENTS: 1. Site Plan of Proposed Renovation Area 2. Change Order #1 Page 2 of 2 ~ ,. i '~^ i ,. ~ !*~II tyni ~ .,;~~~ ~;~; ,;' ~;Isr; , ~~,i~,~~~ ~, ~,, ~~;,' ~ z'~~~ :iai , ~;,~ ,'.~Q i ~',~~''C ' '` ~{i~C , ~',IL ~,~if :~~ ,. ,, ;.~~ ~ .. _ _ ____T ..,~\ .., ` ..- a~ "_C~k-_^^'-1_n-~' r . - -' ~ ~-i ~~~~~- __ N'TW]bN -- R1GBdl]990 N'lIW 35b5 ~~ f ~~ ~~~ i G\,~~~,. ~;,1`.~, ; ~'' . Lk. /: S ~ i~ / ~ -' ~ ~ ~ `~ ~/ :'~~F~ r~,:' ~~ + u pl ~ ~ '~. 8/3tt~' CR LVWN WIf7 ~J~, ~ S~-5~ ~~ l) ~ 1` X l" STAX£ SPACE 3=!' CC lYA hU7f' I F]BEA R01L INSIAfU7XAY REP%IA6 1N£ PULYa!£M AND ffCURE STbYM'G Of 7XC ROLf lN A 7RFiW.'N, J•~J• cee'v. aw' av ca+rou2 ev~rr uusr kor sc,u~awm ro aux uvxe cw,wau,v~ xnu ~ 7 CUM1/MEifCY E/KYRCLf CB d4 0.WN INLE! W171/ f)BfR RO((, /ICMlYABIN/! ENJS 3. TEI/iC14 RY f7PER ROLLS MUS! 6E PUL'fD KONC SLP°f CON70URS ~ f. F£1PoK f7BER RO([ t S7Ak6 CG.Yf(EIF A/ ALLEPlANCf LY M<M7FNML'E PE1Pq7~ REP,UR CP~OC AND STFD O~SRMBED AFU S FlBfR ROIl RFIN/lR(p (py yiAq,Y p~/(ry/~` p~7pg[R fy71/ 7N,qU MRIL ISIK ~ FIBER ROLL EROSION GONTROL - ~ ~ 0 50 ~00 ~5~ I'= 50' z "^ car,cucncnxsd~n~s,p~ °` ~"`°;~; ~ ^~~~ F CoNSrnocnoN necroau DESIGNED HY DRANM 6Y CHECI(ED BY °° , , '%~ w""^ ~ ~ 1IEF PCD ~[F REVIEW BY: CITY OF DUHLIN DRAWQ7CNo CaMRACfOR ~ ~~ , xEe ~ c~^ ~ . "°1°6°" °"""~p1 ~ -l:i~, ' ~~ ~ P~9 p~P ~ ON~ER SIIPERVISION OP I// ~ ./ 11~ PUBLIC WORKS DEPARTMENT ~1.D "."~`•~"' m n INSPBCTOR ~~ I (/ , ~ -~ CIT y ,,,,,e~,~„m,,,, „ o D TC •- - + ~ ~ ~~~~RED L 9 ~\ J Y OF DUBLIN ~~ PUBLIC WORKS DIRECTDR/CITY ENGINEER ER0510N CONTROL PLAN ~~' ~ n~ runm~n i ~ C~~tETCU: . r " ANDSCAPE ARCHITECT \ / \\ ~ ~ l ~ ?E M1 o ' °~ ~b E' FEE C ~ v A~N~°<i. ~~ ~ Plu~, ~bllq hWomL G45EE s g~~}g p~ SCALE: no. oxts uro. uv~an -ATE Os/t</o2 RI.A N0.2537 , 'LfFOR~ ~+..eup.,mmi-se,,,,m~,fwclny,~ . . DATE DUBLJN SPORTS GROUNDS PHASE 2 ~~~ ~~E~ JO&'No,nugoo-o~ al BID SET ' ATTA( ro 11' carertEre rK aIF,u1 Phase IV- ~COna nf W~r~ n.~.. Ifl GB FRA1C ]73{ I]' 11(A EA ER0510N GONTROL LE6END E•, „~~~ •.. ~,awn,~ n~i« ~nuroia~ ~ Ro~.s osvum Pwoa ro sr~er o~ (AHSIN:1'DII ALTY7f@5, f01F01FLi JOSNG NEI~ ~-- o~artna~eFAwtluowNbE - . _~eyra~~a .~~ - s - _,: ..LiBRARY '~ SITfr . ~~ ,.,~~,:. s~,~~ ;.~ 1)4~~ Ai1H5PoNt 9:1, fJ C8 iG R~0 YC1 @I4RE Phase IV - Change Order #1 Area I ~ ~ ~~~ l~ ~?~-14 ~ :HMENT #1 a~~ CITY OF DUBLIN CONTRACT CHANGE ORDER NO. 1 PROJECT: Dublin Sports Grounds - Phase N Contract No. 10-03 TO: Suarez and Munoz Construction, Incorporated PAGE 1 OF 1 AGREEMENT DATED June 1, 2010 between Suarez and Munoz Construction Incorporated and the City of Dublin You are hereby directed to make the herein described changes from the scope of services or do the following described work not included in the scope of services on this contract. NOTE: This change order is not effective until apqroved bv the Citv Manager Description of work to be done, estimate of quantities, and prices to be paid. Segregate between additional work at contract price, agreed price and force account. Unless otherwise stated, rates for rental of equipment cover only such time as equipment is actually used and no allowance will be made for idle time. ChanQe requested bv: Citv of Dublin Turf and irrigation improvements in the Alternate Area as shown in the plans in specification and as further described in the proposal submitted by Suarez and Munoz Construction Incorporated (attached hereto). Additional Time: 0 days SUBMITTED BY: COST INCREASE: $99,150 APPROVAL RECOMMENDED BY APPROVED BY Chris Foss Date Joni Pattillo Date Acting Public Works Director City Manager Tim Sbranti Date Mayor We, the undersigned contractor, have given careful consideration to the change proposed and hereby agree, if this proposal is approved, to all terms of this change order, and to provide all equipment and furnish all materials except as may otherwise be noted above, and to perform all services necessary for the work above specified, and to accept as full payment the prices and time extensions shown above for any and all cost and time impacts resulting from this change order. Accepted, Date By Contractor: Suarez and Munoz Title ATTACHMENT #2 CITY •F ~UBLIN EXHIBIT "A" CHANGE ORDER FORM DATE: 6/22/2010 PROJECT NAME: Dublin Sports Grounds - Phase IV CIP #: 95830 CONTRACT NO. 10-03 CHANGE ORDER NO. 1 PERCENT COMPLETE: 0% CONTRACTOR: Suarez and Munoz Construction, Inc. CONTRACT AMOUNT: $595,000 10°/a CONTINGENCY AMOUNT $59,500 CONSTRUCTION BUDGET $909,784 CHANGE ORDERS AS % OF CONTRACT: 17°/a CONTRACT CHANGE ORDERS: AMOUNT CHANGE ORDER #01 Add Alternate Turf Area for-Renovation 99,150.00 TOTAL OF ALL CURRENT AND PRIOR CHANGE ORDERS: ADJUSTED CONTRACT AMOUNT: REMAINING CONTINGENCY PROGRESS PAYMENTS MADE: PAYMENT #01 PAYMENT #02 PAYMENT #03 PAYMENT #04 PAYMENT #05 PAYM ENT #06 PAYMENT #07 $99,150.00 $694,150.00 ~ ~' 1 TOTAL ACTUAL PAYMENTS: $ - ADJUSTED TOTAL CONTRACT: $694,150.00 REMAINING BALANCE ON CONTRACT: $694,150.00 RECOMMENDATION: APPROVED DENIED SIGNATURE: Supervising Dept. Head APPROVED APPROVED DENIED DENIED ATTACHMENT #2 ~ Suarez & Munoz Construction, Inc. ~' General Engineering and Landscape Contractors 20975 Cabot Blvd., Hayward, CA 94545-1155 <.K.~~/ Lic. No. 873996, Class A, B, C8, C27 ~+ ~ ~ (510) 782-6065 r~ (510) 782-6078 FAX PCO #1 Date: June 2, 2010 Project: Dublin Sports Grounds - Phase IV Change Proposal for Alternate Area Description.: To: City of Dublin Attn: Rosemary Alex Fax: via email Item No Descri tion Quantit Units Unit Price Extension 1 Alternate Area Per Plans & Specs (See attached breakdown) 1 LS $99,150.00 $ 99,150.00 Total $ 99,150.00 Includes Sand Drainage System per Colony Landscape Quote dated 6/1/10. If you have any questions or need any further information please give me a call at (510) 782-6065. Thank you, (4;~Cdl('li.';, ~~4~, ~II ~~Iiry1~?~~ l.J!9~1/y(/UA,C.~A,O~'L~ c}7LG. I John Suarez ALTERNATE ~ ~ ~ Reference Description Quantity Units Unit Price Extension 1 Mobilization 19°!0' LS $ 60,000.00 $ 11,400.00 2 Construction Fence 200 LF $ 2.74 $ 548.00 3 Clear& Grubb ' 41234 SF $ 0.04 $ 1,649.36 4 $ - 5 Erosion Control (SWPPP) 19% LS $ 500.00 $ 95.00 6 Cap & Adjust Existing Irrigation 41234 SF $ 0.01 $ 412.34 7 Rough Grading 41234 SF $ 0.20 $ 8,246.80 8 Fine Grading 41234 SF $ 0.05 $ 2,061.70 9 $ - 10 $ - 11 staking & layout 19°/Q: LS $ 3,500.00 $ 665.00 12 sand drainage 1 LS $ 36,225.€~0 $ 36,225.00 13 soil preparation for turF areas 41234 SF $ 0.30 $ 12,370.20 14 turt grass seeding 41234 SF $ 0.08 $ 3,298.72 15 $ - 16 4" collector drain line 66 LF $ 13.00 $ 858.00 17 6" collector drain line 347 LF $ 11.50 $ 3,990.50 18 $ _ 19 $ - 20 $ _ 21 buried junction box Christ V24 drain box 4 EA $ 415.00 $ 1,660.00 22 $ - 23 remote controi valve 7 EA $ 460.00 $ 3,220.00 24 quick coupler valve 1 EA $ 275.00 $ 275.00 25 $ _ 26 pull box -1 EA $ 70.00 $ (70.00) 27 $ - 28 I-40 Rotor 35 EA $ 85.00 $ 2,975.00 29 $ - 30 $ _ 31 $ _ 32 $ _ 33 $ _ 34 $ _ 35 $ _ 36 4" irrigation main line 35 LF $ 5.00 $ 175.00 37 ~ _ 38 $ _ 39 $ _ 40 1.5" irrigation lateral line 675 LF $ 2.90 $ 1,957.50 41 2" irrigation lateral line 700 LF $ 3.00 $ 2,100.00 42 2.5" irrigation lateral line 240 LF $ 3.50 $ 840.00 43 3" irrigation lateral line 190 LF $ 3.90 $ 741.00 44 conduit under pathway 0 LS $ 6,500.00 $ - 45 Compost Tea Application (During Maintenance Period) 19°!n LS $ 3,000.00 $ 570.00 46 120 days of maintenance 41234 SF $ 0.07 $ 2,886.38 47 All Scope of Work Shown in Addendum #1 item 1.2 0 LS $ 6,000.00 $ - $ 99,150.50 Page 1 ~ ! , ~.~~ ,~~~~~;~~~ ~ ~~~~..,~,~:F°~sr~r~, ~i~ri~~~, ~~r~t~ ~(~~~ ~'°~~. Suarez & Munoz Construction, Inc. 20975 Cabot Blvd. Hayward, CA 94545 Attn: John RE: DUBLIN SPORTS COMPLEX RENOVATION - AD/ALT. FIELD #5 6.1.10 Thank you for the opportunity to provide a bid to install the QwikDrain Drainage System for the playing fields described in the Dublin Sports Grounds Renovation architectural drawings dated 4/8/10, including page L4.1 and details 1, 3, 4 and 5 on page L7.1, as well as spec sections 2620/2630 and Addendum #1. Colony Landscape & Maintenance, Inc. is a certified installer of the "QwikDrain System." The scope of the work outlined in this bid includes all labor, equipment and materials required to instali the QwikDrain Drainage System for the fields as detailed in the plans. The area will be presumed to be at finish grade and to specified compaction prior to the commencement of our work. Field 5 - AD/ALT: Included in our bid are: QwikDrains: 25,200 LF of topdrains, 3,500 LF of 2" QwikDrain subdrains @ 12' O.C., 30 collector tie-ins and 50 subdrain cleanouts. This process will produce approximately 235 tons of spoils. Soil off-haul by others. GRADES TO BE CERTIFIED BEFORE COLONY COMMENCES WORK. Total Base Bid = $31,500 """The general contractor will need to provide stub-ups with a tee and 2" pipe 2 ft. above grade at each 2" tie-in. Notes: • Scope for above work includes the playing field drainage only. • Any and all dust control by others. Fields will need to soaked and kept damp prior to Colony's commencement of work in order to aid in dust control. • After Colony installs its sand drains and drags the entire field, it will be the General Contractor's responsibility to keep the field damp in case high winds disperse the newly graded sand. • All Junction Boxes/DI's supplied and installed by others. The work related to Junction Boxes/DI's specified above reflects tie-ins only. Lic. No. C27 A 566808 . 49ll Spreckles Avenue . P.O.Box 940 . Alviso, CA 95002-0940 (408) 941-1090 Tel. . (408) 941-1094 Fax 0 ~~ ~ General Notes: • The General Contractor will need to provide and install the specified Junction Boxes. • The irrigation system must be in place and sprinkler heads/rotors set as if ready to lay sod. • Bonding for this portion of the project can be provided for a cost of 3%. Exciusions: • Soil off-haul or import. • Collector or French Drains; or any detector wire or drain pipe above the CD/FD lines. • Any and all dust control by others. Fields will need to soaked and kept damp prior to Colony's commencement of work in order to aid in dust control. • Overtime, excess liability insurance, grading, dust control, bonds, job-site security, and permits are excluded. • Colony Landscape & Maintenance, Inc. is a non-union company. Colony is willing to accepUsign a one-time labor union agreement; Any Union costs above standard prevailing wages are NOT included. Conditions: • The bid price is based on a standard 40-hour work week. • Accelerating the schedule by increasing the work week beyond 40 hours will require additional compensation including overtime pay. Thank you for the opportunity to provide your company with a bid for this project. Please do not hesitate to contact me if any questions or concerns should arise. Sincerely, Adam Bishop Project Manager Colony Landscape & Maintenance, Inc. Lic. No. C27 A 566808 . 4911 Spreckles Avenue . P.O.Box 940 . Alviso, CA 95002-0940 (408) 941-1090 TeI. . (408) 941-1094 Fax