HomeMy WebLinkAboutItem 4.04 Street Overlay COG~~~ OF Dp~~~
~
i9`~.~~~~%~ STAFF REPORT C I T Y C L E R K
``c~~l,~ ~ DUBLIN CITY COUNCIL File # ^~00-~0
DATE: June 1, 2010
TO: Honorable Mayor and City Councilmembers
FROM: Joni Pattillo, City Manager
SUBJECT: Approve Budget Change and Contract Change Order No. 1 for Contract No. 10-
04, 2009-2010 Annual Street Overlay Program (CIP No. 969101)
Prepared By: Steven Yee, Public Works Manager
EXECUTIVE SUMMARY:
On May 4, 2010, the City Council awarded Contract No. 10-04, 2009-2010 Annual Street
Overlay Program to G. Bortolotto & Co., Inc. As a cost savings measure, Staff recommends that
the City Council approve a Budget Change and Contract Change order No. 1 to Contract No.
10-04. The total costs of the additional work including a 10% contingency is $62,645, which will
be used to repair a storm drain pipe on Wineberry Way (Wineberry Way is one of the streets
receiving an overlay) and to complete paving allowing for the use of Central Parkway between
Lockhart Street and Fallon Road.
FINANCIAL IMPACT:
The total additional appropriation is $62,645 and the proposed Budget Change will
1) Authorize a new appropriation from Gas Tax Unappropriated Reserves in the amount of
$9,174 to the Annual Street Overlay Program (CIP No. 969101); and
2) Authorize a new appropriation from Eastern Dublin Traffic Impact Fees (Section I)
Unappropriated Reserves in the amount of $53,471 to Capital Improvement Project #960004
Eastern Dublin Arterial Street Improvements.
RECOMMENDATION:
Staff recommends that the City Council approve a Budget Change and Contract Change Order
No. 1 to Contract NoA 1~0'-04 awarded to G. Bortolotto & Co., Inc.
~ ,.-- ,
, ;_
-~ ~~, A~,/`y~~ ~
.~ ~ ~
~~~~~
a~,~.r~ it ed By Reviewed By Revi w By
ty Engineer Admin. Services Director Assistant City Manag~r
Page 1 of 2 ITEM NO. `7'' ~
~ ~
DESCRIPTION:
On May 4, 2010, the City Council awarded Contract No. 10-04, 2009-2010 Annual Street
Overlay Program to G. Bortolotto & Co., Inc. The Annual Street Overlay project consists of
removing and replacing failed asphalt concrete (AC) pavement and resurfacing the street with a
minimum 1-1/2-inch overlay of AC, and re-striping pavement markings.
Wineberry Way is one of the streets included in the Annual Overlay Program. It has been
identified that approximately 60 LF of 12-inch reinforced concrete storm drain pipe on
Wineberry Way requires repair (Attachment 1). Staff recommends completing this repair prior to
resurFacing the street. The total cost to repair the storm drain is $9,174, including a 10%
contingency. The work can be completed under this contract and it is proposed to be funded
from Gas Tax Reserves.
A second modification to the contract is being recommended to address allowing traffic flow
along Central Parkway later this summer. This work will involve additional pavement on Central
Parkway befinreen Lockhart Street and Fallon Road (Attachment 2). The total cost of the
additional pavement work is $53,471, including a 10% contingency.
Central Parkway was constructed by the Lin Family as part of the Dublin Ranch backbone
infrastructure. The existing Central Parkway improvements include the two center travel lanes
and the median island as well as the outside travel lane and frontage improvements (curb and
gutter) on the north side of Central Parkway adjacent to the Fallon Sports Park.
The final completion of the outside travel lane and frontage improvements on the south side of
the street were partially deferred, which is a common practice when the roadway will not be
immediately open to general traffic. The work that was deferred was the placement of the top
layer of asphalt concrete and curb and gutter. The original plan anticipated that the work would
be constructed at a later date by the developer of the adjoining property in conjunction with the
frontage improvements. As development has slowed there is currently no development with
final approvals for construction on the property on the south side of the street.
The City proposes to open Central Parkway to traffic this summer and Staff recommends that
the top layer of pavement be installed at this time in order to provide the full pavement structural
section in advance of traffic being placed on the street. The cost of constructing the inside travel
lanes is part of the Eastern Dublin Traffic Impact Fee program and the additional pavement
work should be paid by the fee. Adequate funds currently exist in the Eastern Dublin Traffic
Impact Fee Section 1 reserves to complete this work.
A Budget Change Form (Attachment 3) and Contract Change Order (Attachment 4) are
presented for City Council approval.
NOTICING REQUIREMENTS/PUBLIC OUTREACH:
Public Noticing is not required. Copy of the staff report was provided to G. Bortolotto & Co., Inc.
ATTACHMENTS: 1) Location Map, Wineberry Way
2) Location Map, Central Parkway
3) Budget Change Order Form
4) Contract Change Order No. 1
6_1_ChangeOrder_overlay\Staff Report CCO1(2).doc
Page 2 of 2
~ ~~j ~
V
~, ~ ~~l-/r~
ATTACHMENT /
.... . . . . ., . - - - -
~ ~~ ~
ATTACHMENT ~
ci J~~j ~
TY OF DUBLIN
BUDGET CHANGE FORM FY 2009 / 2010
CHANGE FORM #
New Appropriations (City Council Approval Required): Budget Transfers:
X_ From Unappropriated Reserves (~) __ From Budgeted Contingent Reserve (1001.1901.81101'~
*Gas Tax Fund & TIF 1 Fund Within Same Department Activity
_ From New Revenues __ Between Departments (City Council Approvai Required)
Other
; ~EGREASE BUIICET ACCQUF~fT-~ _.
~AMOUNT ~a:~~
(NG~EASE~B[~L~G~~G„t'.~~~N. .._.
~
AMQUNT, ~ ~,. ~~
:~.
Name: EXPENSE - GAS TAX FUNDS
- 2010 Overlay Project -
Improvements $ 9,174
Project Account #
969101.9400.9401.2201
GL Account #: 3600.9601.73103
Name: EXPENSE: - EASTERN
DUBLIN TRAFFIC IMPACT FEE (TIF
1) Funds - Eastern Dublin Arterial
Street & Freeway Improvements $ 53,471
Project - Improvements
Project Account #
960004.9400.9401.4301
GL Account #: 3600.9601.73103
R~H~v~v rvrc rsuu~c i ~hHiv~t cN i Kr: i ne t;ity c;ouncil considered a contract change order to the
2010 Annual Street Overlay Project at the meeting on June 1, 2010.
The total costs of the additional work including a 10% contingency is $62,645 which will be used to repair of ;a
storm drain pipe on Wineberry Way (Wineberry Way is one of the streets receiving an overlay) and t~~
complete paving allowing for the use of Central Parkway between Lockhart Street and Fallon Road. The
funding will be $9,174 from Gas Tax Reserves and $53,471 from TIF 1 Reserves.
Fin Mgr/ASD: ~~ ~--, Date: S 19 20-{~~
Sinnafi ira ~
City Man
Sig
~ ~-~L~r! t~k=~C~
ature
Date: ~~ ~~
i ~
As Approved at the City Council Meeting on: Date: 6/1/2010
Mayor:
Posted By:
Signature
Signature
Date:
Date:
~~r,dger ~h~»ges~z_zoa9_,o~z,_6_,_,0_~~o_ove.,~A~~ oo~ ATTA C H M E N T~
~
D ~
~
CITY OF DUBLIN
100 Civic Plaza
Dublin, CA 94568
ORDER NO. 1
DATE Ma 13, 2010
CONTRACT CHANGE ORDER STATE
California
CONTRACT FOR: 2009-2010 Annual Street Overlay Program COUNTY
CONTRACT NO: 10-04 Alameda
OWNER: City of Dublin
CONTRACTOR: G. Bortolotto & Co., Inc.
CURRENT CONTRACT PRICE: $ 486,465.37
CURRENT CONTRACT TIME OF COMPLETION: 40 Working days
CURRENT NO. WORKING DAYS 3 Days
TO: G. Bortolotto & Co., Inc.
(Contractor)
You are hereby requested to complv with the followina chanaes from to the contract olans. s~ecifications or other r.~ntrart rinr.~~mPr,t~•
Description of Changes
Su lemental Plans and S ecifications Attached DECREASE
in Contract Price INCREASE
In Contract Price
(1) Place 39,000 SF of 2" AC pavement on Central Parkway between Lockhart Street and
Fallon Road as directed by the Engineer. The agreed unit price to fully complete this work
is $0.99 per SF The agreed unit price to complete pavement striping and marking shall be
the contract unit price and the total cost for striping and marking shall not exceed
$10,000.
48,610.00
2) Repair 60 LF of 12" RCP pipe on Wineberry Way as directed by the Engineer. The
a reed unit rice to full com lete the storm drain re air is $139 er LF.
$ 8,340.00
TOTALS $ 0.00 $ 56,950.00
NET CHANGE IN CONTRACT PRICE $ 56,950.00
~u~ ~~rwr~ ~~vrv: ~ n~s cnange oraer is oemg reques[ea oy tne C;rcy to add tne placement of 2" AC
pavement on Central Parkway and repair of storm drain pipe on Wineberry Way
The amount of the Contract will be Increased By The Sum Of:
$ 56,950.00
The Contract Total Including this and previous Change Orders Will Be:
G:\CIP\Overlay~2009-2010\CCO OOl.doc
$ 543,415.37
ATTACHMENT ~
~ ~~j 4} ~
L~
The Contract Period Provided for Completion Will Be Increased: 5 Workina Days
Upon execution by representatives authorized to bind the parties, this Change Order will become a part of the contract. The consideration specified
in this Change Order (whether an adjustment of the contract price, an adjustment of time, andlor other consideration) is the full and sole
compensation owed to the contractor as a result of the changes and issues described in this Change Order. Such consideration includes, but is not
limited to, any and all direct and indirect costs incurred by the contractor as a result of the changes and issues described in this Change Order for any
labor, equipment, materials, overhead (additional, extended, field and home office), profit, or time adjustments. By signing this Change Order the
contractor waives and releases the owner from any and all claims for additional compensation concerning any of the changes and issues specified in
this Change Order.
The undersigned, being the (Title) of the Contractor, by signing this Changer Order declares under penalty
of perjury under the laws of the State of California, and does personally certify and attest that: the undersigned has thoroughly reviewed the attached
request for change order and knows its contents, and said request for change order is made in good faith; that it is supported by truthful and accurate
data; that the amount requested and the additional time requested accurately reflect the allowable expenses that would be incurred, and the time
necessary, to perForm the change order; and further, that the undersigned is familiar with California Penal Code Section 72 and California
Government Code Section 12650 et seq., pertaining to false claims, and further knows and understands that the submission or certification of a false
claim may lead to fines, imprisonment, or other severe legal consequences.
Requested
(City)
Recommended
Public Works Director
Accepted
(Contractor)
Approved by Agency
(Name and Title)
925984
(Date)
(Date)
(Date)
(Date)
G:\CIP\Overlay~2009-2010\CCO OOl.doc