Loading...
HomeMy WebLinkAboutItem 4.07 Dublin Blvd Resurfacing STAFF REPORT CITY CLERK File #600-35 CITY COUNCIL DATE:August 20, 2013 TO: Honorable Mayor and City Councilmembers FROM: Joni Pattillo, City Manager SUBJECT: Acceptance of Work – Contract No. 12-15, Dublin Boulevard Resurfacing Prepared by Steven Yee, Public Works Manager EXECUTIVE SUMMARY: The Annual Street Overlay Program (CIP No. 969104) resurfaced Dublin Boulevard between Dougherty Road and Scarlett Drive by placing 1½” asphalt concrete overlay on top of existing pavement. FINANCIAL IMPACT: The adopted Fiscal Year 2012-2013 total appropriations in CIP No. 969104 are $921,600, including design and inspection. Of this amount, $74,600 has been allocated for design and inspection and $847,000 for improvements. The improvements budget includes $297,000 in federal earmark funds for the pavement rehabilitation of Dublin Boulevard between Dougherty Road and Scarlett Drive. Contract No. 12-15 is for the resurfacing of Dublin Boulevard only and the actual cost of the completed resurfacing work is $254,868. The remaining improvements budget of $550,000 is included in Contract No. 13-07, 2013 Annual Street Overlay Program, currently underway. Improvement Actual Fund Budget* Cost Federal Earmark Funds #2202 $297,000 $254,868 * Improvement budget of $297,000 is for Dublin Boulevard resurfacing only. RECOMMENDATION: Staff recommends that the City Council accept improvements under Contract No. 12-15, Dublin Boulevard Resurfacing, and release retention after 35 days if there are no subcontractor claims. Submitted By Reviewed By Director of Public Works Assistant City Manager ITEM NO. 4.7 Page 1 of 2 DESCRIPTION: The Dublin Boulevard Resurfacing project consisted of removing and replacing failed asphalt concrete (AC) pavement to a minimum depth of 6 inches, resurfacing the street with a minimum 1-1/2-inch overlay of AC, and re-striping pavement markings. Major cracks were sealed prior to resurfacing in order to prevent the cracks from reflecting through the new AC overlay. This Contract resurfaced Dublin Boulevard between Dougherty Road and Scarlett Drive (Attachment 1). Staff has reviewed the work as part of Contract No. 12-15 and determined the work is complete. NOTICING REQUIREMENTS/PUBLIC OUTREACH: None. ATTACHMENTS: 1. Location Map Page 2 of 2 Dublin Boulevard Resurfacing Contract No. 12-15 DUBLIN BOULEVARD 0500 Feet