Loading...
HomeMy WebLinkAbout4.16 - 1269 Award of Contract for Emerald Glen Aquatic Page 1 of 2 STAFF REPORT CITY COUNCIL DATE: December 20, 2016 TO: Honorable Mayor and City Councilmembers FROM: Christopher L. Foss, City Manager SUBJECT: Award of Construction Contract - Emerald Glen Aquatic Complex – Audio System Prepared by: Douglas Rooney, Parks & Facilities Development Coordinator EXECUTIVE SUMMARY: The City Council will consider awarding a construction contract to 54 Electric Inc. for the installation of an audio system at the Emerald Glen Recreation and Aquatic Complex in the building and on the exterior pool decks. STAFF RECOMMENDATION: Adopt the Resolution Awarding a Contract for the Emerald Glen Aquatic Complex - Audio System as part of the Emerald Glen Recreation and Aquatic Complex Project – Phase I (CIP NO. PK0105) to 54 Electric Inc. FINANCIAL IMPACT: The 2016-2021 Capital Improvement Program includes the Emerald Glen Recreation and Aquatic Complex Project - Phase 1. The total available funding for the improvements in the CIP is $36,256,627. When awarded in Febru ary 2015, the base contract for construction of the project was $33,090,000 with a 10% contingency for unforeseen construction issues. The lowest bid received for the audio system was $179,900. With a proposed 10% contingency of $17,990, the total improvement costs for the audio system are estimated at $197,890. Adequate funds remain in the improvements contingency to c over these costs. The Resolution will authorize Staff to use the contingency funds to install the system. DESCRIPTION: On February 3, 2015, the City Council awarded the construction contract for the Emerald Glen Recreation and Aquatic Complex - Phase I (Project # PK0105) to C. Overaa and Company. In addition to the base contract, the bids included two additive alternates. One of those alternates was for an audio system. At the time of award, Staff Page 2 of 2 recommended that the City Council only approve the base contract amount as all bids had exceeded the budget and award of the base contract would require a budget adjustment. The City Council awarded the contract per Staff recommendation, but also requested that Staff find the means to include the alternates in the project. During construction, Staff directed the architect to issue an Owners Proposed Revision (OPR) to C. Overaa and Company. This OPR requested that the contractor and their electrical subcontractor provide a price to install an audio system as a change order to the project. The contractor provided a proposed change order in the amount of $547,426. The change order was reviewed by Staff and the architect and was rejected because it was not a good value for the City. Staff determined that bidding the audio system as an individual project would likely provide better value to the City. In addition, Staff worked with the architect to reduce the price of the audio system by reducing the number of zones involved and simplifying some components. The architect then prepared an audio system bid package. The bidding period began on October 28, 2016, and was advertised on the City website, on various building exchanges, and twice in the East Bay Times. An optional pre-bid walk-through was held on November 9, 2016. Two contractors submitted bids before the bid opening at 10:00 a.m. on Friday, December 2, 2016. The apparent low bidder was 54 Electric Inc. Following is a summary of the bid results: 1. 54 Electric Inc. ................................................................ $179,900 2. Cal-Pacific Construction Inc. ........................................... $217,000 An additional bid was received from PCD, however the bid was delivered several hours after the bid opening and was therefore deemed nonresponsive. No bid protests were received within the allotted time. Staff has reviewed the bid proposal from 54 Electric Inc., checked their license status, and has determined 54 Electric Inc. to be the lowest responsible and responsive bidder. NOTICING REQUIREMENTS/PUBLIC OUTREACH: A copy of this Staff Report was sent to 54 Electric Inc. ATTACHMENTS: 1. Resolution Awarding a Contract for the Emerald Glen Aquatic Center – Audio System to 54 Electric Inc. RESOLUTION NO. XX - 16 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF DUBLIN * * * * * * * * * * * AWARDING A CONTRACT FOR THE EMERALD GLEN AQUATIC COMPLEX – AUDIO SYSTEM AS PART OF THE EMERALD GLEN RECREATION AND AQUATIC COMPLEX PROJECT – PHASE I (CIP NO. PK0105) TO 54 ELECTRIC INC. WHEREAS, the City of Dublin did, on December 2, 2016, publicly open, examine and declare all sealed bids for doing the work described in the approved Plans and Speci fications for the Emerald Glen Aquatic Complex - Audio System, which Plans and Specifications are hereby expressly referred to for a description of said work and for all particulars relative to the proceedings under the request for bids; and WHEREAS, said bids were submitted to the Public Works Director, who has reviewed the bids to determine the lowest bid which was responsive to the requirements of the bid docume nts. NOW, THEREFORE BE IT RESOLVED that the City Council of the City of Dublin does hereby award the Contract for the Emerald Glen Aquatic Complex – Audio System (as part of Project # PK0105), to the lowest responsible bidder therefore, to wit, 54 Electric Inc., at a bid of one hundred and seventy-nine thousand nine hundred dollars even ($179,900) the particulars of which bid are on file in the office of the Public Works Director. NOW, THEREFORE BE IT FURTHER RESOLVED, the City Council of the City of Dublin does hereby authorize the City Manager or his designee to approve the contract change orders for this project, up to a cumulative total of ten-percent (10%) of the contract amount ($17,990). BE IT FURTHUR RESOLVED the City Manager is authorized to execute the Agreement. PASSED, APPROVED AND ADOPTED this 20th day of December, 2016, by the following vote: AYES: NOES: ABSENT: ABSTAIN: ______________________________ Mayor ATTEST: _________________________________ City Clerk