Loading...
HomeMy WebLinkAboutItem 4.3 - 1974 Award Dublin at Donlon Ped Improvements Pro Page 1 of 2 STAFF REPORT CITY COUNCIL DATE: May 1, 2018 TO: Honorable Mayor and City Councilmembers FROM: Christopher L. Foss, City Manager SUBJECT: Award of Contract to Columbia Electric Inc. and Approval of Plans and Specification for Dublin Boulevard and Donlon Way Intersection Pedestrian Improvements (CIP No. ST0517) Prepared by: Obaid Khan, Transportation and Operations Manager EXECUTIVE SUMMARY: The City Council will consider awarding a construction contract to Columbia Electric, Inc. and approving the plans and specifications for the Dublin Boulevard and Donlon Way Intersection Pedestrian Improvements. The project will construct pedestrian safety improvements, including flashing pedestrian warning lights, extension of the existing concrete median, and upgrade of roadway signs and markings. The project is part of the Citywide Bicycle & Pedestrian Improvements, Capital Improvement Program project ST0517, which funds various pedestrian and bicycle improvements throughout the City. STAFF RECOMMENDATION: Adopt the Resolution Approving the Plans and Specifications and Awarding a Contract to Columbia Electric, Inc., for the Dublin Boulevard and Donlon Way Intersection Pedestrian Improvements (CIP ST0517). FINANCIAL IMPACT: The lowest responsive bid for construction was $107,380.04. A construction contingency of $20,000 is requested for unforeseen construction issues, bringing the total potential construction cost to $127,380.04. Sufficient funding is available in the project budget to award the construction contract. This project is funded by Measure B and Measure BB Bicycle and Pedestrian Funds. There is no impact to the General Fund. DESCRIPTION: The 2016-2021 Capital Improvement Program (CIP) includes the Citywide Bicycle and Pedestrian Improvements project, CIP No. ST0517 (Attachment 1). The CIP project provides for the design and construction of various pedestrian and bicycle improvements throughout the City, including sidewalk repairs, Americans with Page 2 of 2 Disabilities Act Transition Plan improvements, and updates to the Bicycle and Pedestrian Master Plan. The plans and specifications for the Dublin Boulevard and Donlon Way Intersection Pedestrian Improvements project were completed and the project was advertised for bids in March 2018. The work includes the installation of a pedestrian warning light system which will activate automatically when a pedestrian is detected. As a redundancy, the warning lights can also be activated by pressing a push button on either side of the street. A new street light will also be installed for added illumination of the crosswalk at night. Other improvements include extending the existing concrete median to the crosswalk line to slow down turning vehicles, and installing new roadway signing and striping. A total of three sealed bids were received on April 3, 2018, ranging from $107,380.04 to $185,230.00. A summary of the bids is provided as Attachment 2. The low bid of $107,380.04 was submitted by Columbia Electric, Inc. Staff has reviewed the bid results and bidder qualification statements, checked references and necessary licenses, and recommends that the City Council adopt the Resolution (Attachment 3), awarding the project construction contract to Columbia Electric, Inc., as the lowest responsive bidder. Staff expects the project to begin in late May 2018 and anticipates it to be completed by the end of July 2018. NOTICING REQUIREMENTS/PUBLIC OUTREACH: A copy of this staff report was sent to Columbia Electric, Inc. and to the Alameda County Transportation Commission, Independent Watchdog Committee. ATTACHMENTS: 1. CIP ST0517 2. Bid Results 3. Resolution Approving the Plans and Specifications and Awarding a Contract to Columbia Electric, Inc., for the Dublin Boulevard and Donlon Way Intersection Pedestrian Improvements (CIP ST0517) Number ST0517 Program STREETS ESTIMATED COSTS PRIOR YEARS 2016-2017 BUDGET2017-2018 2018-2019 2019-2020 2020-2021 FUTURE YEARS ESTIMATE TOTALS 9100$21,600$36,980$36,980$19,180$19,180$133,920 9200$15,000$190,000$15,000$15,000$15,000$250,000 9400$568,000$350,000$368,000$368,000$368,000$2,022,000 9500$5,000$25,200$5,400$5,400$5,400$46,400 $609,600$602,180$425,380$407,580$407,580$2,452,320 FUNDING SOURCE PRIOR YEARS 2016-2017 BUDGET2017-2018 2018-2019 2019-2020 2020-2021 FUTURE YEARS ESTIMATE TOTALS 1001$108,000$108,000$108,000$108,000$108,000$540,000 2204$180,000$180,000$180,000$180,000$180,000$900,000 2205$80,000$176,400$19,600$276,000 2214$213,600$20,000$233,600 2215$28,000$117,780$17,780$19,580$19,580$202,720 4304$100,000$100,000$100,000$300,000 $609,600$602,180$425,380$407,580$407,580$2,452,320 CITYWIDE BICYCLE AND PEDESTRIAN IMPROVEMENTS TOTAL General Fund Measure B Sales Tax - Local Streets Fund (ACTC) Salaries & Benefits Contract Services Improvements TOTAL 2016-2021 CAPITAL IMPROVEMENT PROGRAM Measure B Sales Tax - Bike & Pedestrian Fund (ACTC) Measure BB Sales Tax - Local Streets Fund (ACTC) Measure BB Sales Tax - Bike & Pedestrian Fund (ACTC) Western Dublin Traffic Impact Fee Miscellaneous PROJECT DESCRIPTION This project includes improvements to variouspedestrian and bicycle facilities throughout the City. This project replaces former projects that provided funding for ADA Transition Plan improvements and Citywide Sidewalk Repair improvements. In addition to the scope of those previous projects, this project includes design and construction of improvements recommended in the City of Dublin Bicycle and Pedestrian Master Plan, the ADA Transition Plan, and the Class 1 Facilities Maintenance Plan. In Fiscal Year 2017-2018, work on the update to the ADA Transition Plan will commence. In Fiscal Year 2018-2019, work will begin on the update of the City of Dublin Bicycle and Pedestrian Master Plan. ANNUAL OPERATING IMPACT:None MANAGING DEPARTMENT: Public Works Dublin Blvd and Donlon Way Intersection Pedestrian Improvements Project ST0517 Bid Date: BASE BID ITEM Qty.UNIT Unit Cost Extension Unit Cost Extension Unit Cost Extension 1 1 LS $9,838.64 $9,838.64 $6,700.00 $6,700.00 $4,900.00 $4,900.00 2 1 LS $12,068.20 $12,068.20 $15,161.00 $15,161.00 $11,900.00 $11,900.00 3 1 EA $1,500.00 $1,500.00 $150.00 $150.00 $200.00 $200.00 4 8 EA $500.00 $4,000.00 $500.00 $4,000.00 $200.00 $1,600.00 5 4 EA $250.00 $1,000.00 $200.00 $800.00 $250.00 $1,000.00 6 4 EA $250.00 $1,000.00 $200.00 $800.00 $250.00 $1,000.00 7 2 EA $250.00 $500.00 $200.00 $400.00 $200.00 $400.00 8 2 EA $500.00 $1,000.00 $200.00 $400.00 $350.00 $700.00 9 2 EA $291.50 $583.00 $300.00 $600.00 $300.00 $600.00 10 1 LS $2,500.00 $2,500.00 $5,200.00 $5,200.00 $4,850.00 $4,850.00 11 2 EA $900.00 $1,800.00 $900.00 $1,800.00 $1,150.00 $2,300.00 12 3 EA $2,000.00 $6,000.00 $3,200.00 $9,600.00 $8,950.00 $26,850.00 13 1 EA $2,000.00 $2,000.00 $3,300.00 $3,300.00 $8,250.00 $8,250.00 14 1 EA $550.00 $550.00 $500.00 $500.00 $865.00 $865.00 15 65 LF $85.00 $5,525.00 $300.00 $19,500.00 $125.00 $8,125.00 16 100 LF $8.00 $800.00 $20.00 $2,000.00 $2.50 $250.00 17 6 EA $2,915.00 $17,490.00 $4,300.00 $25,800.00 $9,650.00 $57,900.00 18 4 EA $1,000.00 $4,000.00 $870.00 $3,480.00 $2,250.00 $9,000.00 19 66 SF $16.50 $1,089.00 $17.00 $1,122.00 $20.00 $1,320.00 20 10 LF $16.50 $165.00 $17.00 $170.00 $20.00 $200.00 21 1 LS $4,500.00 $4,500.00 $6,800.00 $6,800.00 $5,200.00 $5,200.00 22 116 LF $183.70 $21,309.20 $220.00 $25,520.00 $225.00 $26,100.00 23 212 SF $38.50 $8,162.00 $40.00 $8,480.00 $60.00 $12,720.00 TOTAL $107,380.04 $142,283.00 $186,230.00 15% Contingency Grand Total List of Sub-Contractors CITY OF DUBLIN PUBLIC WORKS DEPARTMENT ENGINEERING DIVISION BID SUMMARY Project Name: Project No. : April 3, 2018 COLUMBIA ELECTRIC W.BRADLEY ELECTRIC TENNYSON ELECTRIC DESCRIPTION Mobilization Traffic control Remove existing roadside sign and pole Furnish and install W11-2 (36x36) Furnish and install W16-7p (24x12) Furnish and install Modified W16-7p (24x12) Furnish and install R1-5 (36x36) Furnish and install R4-7 (24x30) Furnish and install 2" square telespar post Install City-furnished Caltrans Type 15D pole (12' MA) on new foundation Furnish and install LED luminaire (Leotek GC1-60F-MV-NW-3-GY-530- Furnish and install Caltrans Type 1-B (15') pole and foundation Furnish and install Caltrans Type 1-B (18') pole and foundation Furnish and install Caltrans No.3-1/2 pull box Furnish and install 2" conduit with trenching and backfill Furnish and install #8 conductors Install City-furnished Solar RRFB System Install City-furnished Pedestrian Sensor with Harness (Sedco XP-S) Install pavement markings (paint) (yield line) Install reflective yellow paint on median nose curb (top and face) Relocate existing street light pole on new foundation Miscellaneous Concrete Construction (Curb) Median Pavers APPARENT LOW BIDDER Description COLUMBIA ELECTRIC W.BRADLEY ELECTRIC TENNYSON ELECTRIC General Engineering Golden Bay Construction Inc Golden Bay Construction Inc Golden Bay Construction Striping/Signage Chrisp Co Chrisp Co Chrisp Co RESOLUTION NO. XX- 18 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF DUBLIN * * * * * * * * * APPROVING THE PLANS AND SPECIFICATIONS AND AWARDING A CONTRACT TO COLUMBIA ELECTRIC INC. FOR THE DUBLIN BOULEVARD AND DONLON WAY INTERSECTION PEDESTRIAN IMPROVEMENTS, CIP NO. ST0517 WHEREAS, Staff completed plans and specifications for the Dublin Boulevard and Donlon Way Intersection Pedestrian Improvements, CIP No. ST0517 (“Project”). The project includes the installation of pedestrian warning lights, a new street light, extension of concrete median, and improved roadway signage and markings; and WHEREAS, the City of Dublin did, on April 3, 2018, publicly open, examine, and declare all sealed bids for doing the work described in the approved Plans, Specifica tions, and Modifications for Project No. ST0517, Dublin Boulevard and Donlon Way Intersection Pedestrian Improvements, which Plans, Specifications, and Modifications are hereby expressly referred to for a description of said work and for all particulars re lative to the proceedings under the request for bids; and WHEREAS, said bids were submitted to the Public Works Director, who has recommended that the bid hereinafter is the lowest and best bid for doing said work; and NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Dublin hereby approves the plans and specifications for the Project. BE IT FURTHER RESOLVED that the City Council of the City of Dublin does h ereby award the Contract for Project No. ST0517 Citywide Bicycle and Pedestrian Improvements “Dublin Boulevard and Donlon Way Intersection Pedestrian Improvements ”, to the lowest responsible bidder therefore, to wit, Columbia Electric Inc., at a bid of One Hundred Seven Thousand Three Hundred Eighty Dollars and Four cents ($107,380.04), the particulars of which bid are on file in the Office of the Public Works Director. BE IT FURTHER RESOLVED that the City Manager or his designee is authorized to execute the Construction Agreement with Columbia Electric Inc. PASSED, APPROVED AND ADOPTED this 1st day of May, 2018, by the following vote: AYES: NOES: ABSENT: ABSTAIN: ________________________________________ Mayor ATTEST: _____________________________ City Clerk