HomeMy WebLinkAboutItem 4.4 GP & Housing Element Rptor 19 82 /ii � 111 DATE: TO: FROM: STAFF REPORT CITY COUNCIL March 20, 2012 Honorable Mayor and City Councilmembers Joni Pattillo, City Manager""' CITY CLERK File #430 -20 SUBJECT: Annual Progress Report on the Status of the Dublin General Plan and Housing Element for Calendar Year 2011 Prepared by Mamie R. Delgado, Senior Planner EXECUTIVE SUMMARY: The City Council will review the Annual Progress Report on the Status of the Dublin General Plan and Housing Element for Calendar Year 2011 in accordance with Government Code Section 65400(a)(2). FINANCIAL IMPACT: No financial impact. RECOMMENDATION: Staff recommends that the City Council: 1) Accept the Annual Progress Report on the Status of the Dublin General Plan and Housing Element Compliance for Calendar Year 2011; and 2) Direct Staff to forward the Annual Progress Report to the California State Office of Planning and Research and the California Department of Housing and Community Development. Submitted By Reviewed By Director of Community Development Assistant City Manager DESCRIPTION: Local governments are required by Government Code Section 65400(a)(2) to provide an annual report to their legislative body, the California Office of Planning and Research (OPR) and the California Department of Housing and Community Development (HCD), that includes the status of the General Plan and the progress made in implementing the General Plan as well as meeting its share of regional housing needs. The Annual Progress Report on the status of the Dublin General Plan and Housing Element Compliance for Calendar Year 2011 has been prepared in accordance with the Government Page 1 of 2 ITEM NO. 4.4 Code and is included as Attachment 1 to the Staff Report. The Dublin General Plan contains the following nine Elements: • Land Use Element • Parks and Open Space Element • Schools, Public Lands, and Utilities Element • Circulation and Scenic Highways Element • Housing Element • Conservation Element • Seismic Safety and Safety Element • Noise Element • Community Design and Sustainability Element The Annual Progress Report is divided into Sections according to the Elements of the General Plan. For each Element, a description of actions taken to further the policies of that Element is included. Throughout 2011, the City of Dublin continued to implement the goals and policies of the General Plan as well as work towards meeting the City's share of the regional housing need. One amendment to the Dublin General Plan was adopted during Calendar Year 2011 that created a new Downtown Dublin Specific Plan Area category within the Primary Planning Area; three new land uses were adopted for the Downtown Dublin Specific Plan Area: the Village Parkway District, the Transit - Oriented District and the Retail District. NEXT STEPS: Following City Council's acceptance of the Report, Staff will send the Report to the California Office of Planning and Research (OPR) and HCD. The Report will also be posted on the City of Dublin website. ENVIRONMENTAL REVIEW: In accordance with the California Environmental Quality Act (CEQA), compliance reports are exempt from environmental review. NOTICING REQUIREMENTS /PUBLIC OUTREACH: The Annual Progress Report on the Dublin General Plan and Housing Element is a progress report to the State on the status of implementing the General Plan and Housing Element. The Progress Report is not subject to a public hearing; therefore, a public notice is not required. Public outreach is also not required as the progress report does not change any of the guiding policies or programs in the General Plan. Following the City Council's acceptance of the Annual Progress Report, Staff will post the Report to the City's website. ATTACHMENT: 1. Annual Progress Report, Dublin General Plan and Housing Element, Calendar Year 2011. Page 2 of 2 CITY OF DUBLIN Annual Progress Report on the Dublin General Plan and Housing Element Reporting Period: Calendar Year 2011 INTRODUCTION Government Code Section 65400(a)(2) requires planning agencies to provide an annual report to their legislative body, the Office of Planning and Research (OPR) and the Department of Housing and Community Development (HCD) on the status of their General Plan and their progress in its implementation. The report must detail the progress in meeting the jurisdiction's share of regional housing needs and address efforts by the local agency towards removing governmental constraints to the maintenance, improvement, and development of housing. The City of Dublin's Annual Report was presented to the City Council on March 20, 2012. The purpose for the Annual Progress Report is to: assess how the General Plan is being implemented in accordance with adopted goals, policies and implementation measures; identify any necessary adjustments or modifications to the General Plan as a means to improve local implementation; provide a clear correlation between land use decisions that have been made during the 12 -month reporting period and the goals, policies and implementation measures contained in the General Plan; and, provide information regarding local agency progress in meeting its share of regional housing needs. The Dublin General Plan was adopted on February 11, 1985, three years following the City's incorporation in 1982. The General Plan contains the seven State - required elements which are Land Use, Circulation, Housing, Conservation, Open Space, Noise and Safety. The State allows the combining of elements or the addition of new elements as long as the required seven elements are present in some fashion. The Dublin General Plan contains the following nine (9) Elements: Land Use Element Parks and Open Space Element Schools, Public Lands, and Utilities Element Circulation and Scenic Highways Element Housing Element Conservation Element Seismic Safety and Safety Element Noise Element Community Design & Sustainability Element Local governments are required to keep their General Plans current and internally consistent. There is no specific requirement that a local government update its General Plan on a particular timeline, with the exception of the Housing Element, which is required to be updated every five years. The Dublin Housing Element was last updated and certified by the State Housing and Community Development Department on May 12, 2010 for the planning period of 2009 -2014. The City of Dublin continues to actively implement the policies of the General Plan including the goals, policies and programs of the Housing Element. The following represents the progress the City has made towards implementing the General Plan and Housing Element during the Calendar Year 2011 reporting period. The information to follow is organized to correspond with the elements of the Dublin General Plan. 2of15 LAND USE ELEMENT AMENDMENTS The Land Use Element can be amended a maximum of four times per calendar year. The Land Use Element of the Dublin General Plan was amended once during Calendar Year 2011 and created a new Downtown Dublin Specific Plan Area category within the Primary Planning Area; three new land uses were adopted for the Downtown Dublin Specific Plan Area: the Village Parkway District, the Transit - Oriented District and the Retail District. PROGRESS TOWARDS MEETING THE GOALS AND GUIDING POLICIES OF THE LAND USE ELEMENT Residential Land Use During the Calendar Year 2011, the following residential projects were under review, approved and /or under construction in furtherance of the guiding policies of the Land Use Element for residential land use: • Fallon Village: The Fallon Village project includes the future development of up to 3,108 residential units at various densities; up to 2.5 million square feet of commercial, office, light industrial and mixed use development; two elementary school sites; parks; utility extensions; and, open space. The project area includes 1,134 acres of land within the Eastern Dublin Specific Plan Area and consists of various parcels with 11 different ownership interests. o Positano: A Vesting Tentative Map (Braddock & Logan) was approved in 2005 to subdivide 488 acres into 1,043 low density single family residential units within a portion of Fallon Village. A Site Development Review for the first 247 lots in Positano (Salerno and Cantara) was approved in 2007 and the homes are nearing completion. Six new neighborhoods have been approved in Positano: Livorno, Cortona, Biella, Calarosa, Calabria and Cortona II. Cortona. D.R. Horton received approval of the Site Development Review on August 4, 2010. The approved project consists of 68 single family detached homes. Construction is currently underway. Livorno: Livorno is a subdivision of 69 single family detached homes being developed by K. Hovnanian. The Planning Commission approved the Site Development Review on September 14, 2010. Construction is currently underway. Biella. Braddock and Logan received Site Development Review approval for 101 single family detached homes from the Planning Commission on October 12, 2010. Building permits were issued in January 2011 and construction is currently underway. Calabria. K. Hovnanian Homes received approval by the Planning Commission on October 11, 2011 to develop 88 single family homes on lots of approximately 5,000 square feet. 3of15 Cortona 11: D.R. Horton received approval by the Planning Commission on October 11, 2011 to develop 70 single family homes on 6,000 square foot lots. Caiarosa. Braddock and Logan received approval by the Planning Commission on November 8, 2011 to develop 71 single family detached homes on lots of approximately 4,000 square feet. o Jordan Ranch: Also a portion of Fallon Village, Jordan Ranch was approved by the City Council on June 22, 2010. The project is currently proposed to provide 781 residential units and up to 12,500 square feet of potential retail commercial uses. Of the 781 units, 253 are single family detached; 111 are cluster homes; 94 are small lot alley homes; 218 are townhomes; and, 105 are mixed use units which include residential living space and retail commercial uses. Winwood. Brookfield Homes received approval by the Planning Commission on December 11, 2011 to develop 85 single family homes on approximately 5,200 square foot lots. Mariposa: Brookfield Homes received approval by the Planning Commission on December 11, 2011 to develop 81 single family homes approximately 4,000 square foot lots. • Dublin Ranch Area F West and East (`Sorrento'): The Dublin Ranch Area F West and East projects have been approved for 1,112 medium density residential units and will provide a variety of housing types within ten distinct neighborhoods. The Dublin Ranch Area F West project is currently under construction by Toll Brothers, Inc and is mostly occupied. There are a total of 5 neighborhoods comprised of 418 single family attached units and 75 detached units. The project also includes a neighborhood square and private recreation complex both of which are constructed and available for use. An amendment to the Dublin Ranch Area F East project was approved by the City Council on April 23, 2010. The original approval was for 694 residential units in 5 neighborhoods. On March 9, 2011 Regent Properties received approval for six neighborhoods comprised of 581 single family detached units with small yards. The project also includes a 5 acre neighborhood park, private recreation complex and 10 acre elementary school site. Four of the neighborhoods are currently under construction. • Schaefer Ranch: In June 2006, the Planning Commission adopted a Resolution approving a Site Development Review for the Schaefer Ranch (Discovery Homes) project. The project includes 302 single - family detached residential units in four distinct neighborhoods. The project is under construction and the homes are being occupied upon completion. As part of the project, Dublin Boulevard was extended, new trails were constructed and a new East Bay Regional Park District staging area including a parking lot, trailer parking area, restroom, maintenance building and associated landscaping was constructed. • Schaefer Ranch South: In December 2008, the City Council approved a General Plan Amendment for Schaefer Ranch South to replace 12 estate lots and a 5.69 -acre 4of15 commercial site in the original Schaefer Ranch project with up to 104 single - family detached homes. The next step in the development process is for the Applicant to submit a Site Development Review application for the architecture of the homes. • Arroyo Vista: The Dublin City Council approved a General Plan Amendment, Planned Development Rezone with a Stage 1 and Stage 2 Development Plan, Tentative Map, Site Development Review and associated environmental review for the Arroyo Vista project in September 2009. The project includes the demolition of 150 existing affordable housing units (which took place in 2011) and the construction of 378 new housing units (both attached and detached) including market rate for sale and affordable for sale, affordable senior rental housing, affordable family rental housing, a child care center and community building. Eden Housing obtained sitework and building permits in May 2011 for the construction of 130 affordable family apartments, a community center, childcare center, and 50 affordable senior apartments. The project is currently under construction. KB Homes obtained building permits in October 2011 to begin construction on 128 for sale townhomes and 70 single family homes. • Nielsen: In May 2010 the Dublin City Council approved a General Plan Amendment, Specific Plan Amendment, Planned Development Zoning, Tentative Map and associated environmental review to change the land use designation of the site from Rural Residential /Agricultural to Single Family Residential for the development of 36 residential units on 10 acres. The next step in the development process is for the Applicant to submit a Site Development Review application for the architecture of the homes. • Fallon Crossing: In June 2006, the City Council adopted an Ordinance to pre -zone the Mission Peak /Fallon Crossing (Standard Pacific Homes) project. The project was annexed to the City in September 2006 and includes 106 single family residential units (8 duets and 98 single - family homes) on 67 acres of land. The project was approved by the City Council in December 2007. On November 8, 2011 the Planning Commission approved a revised Site Development Review for the 98 single family homes. The project is currently under construction. • Moller Ranch /Casamira Valley: The City Council adopted a Planned Development Rezone and Stage 1 Development Plan for the Moller Ranch /Casamira Valley project in July 2007. The project consists of 298 attached and detached residential units on 226 acres of land. The property was annexed into the City in July 2008. A Stage 2 Development Plan and Site Development Review are required prior to development of the property. In 2011, a pre - application was submitted for a General Plan Amendment, Specific Plan Amendment, Stage 2 Planned Development Zoning and Vesting Tentative Tract Map to change the land use designation from Medium Density Residential to Low Density Residential and to construct 357 homes. The request is currently in Planning review. 5of15 • Dublin Transit Center: The Dublin Transit Center project includes up to 1,800 high - density residential units adjacent to the Dublin /Pleasanton BART Station. The following projects have been constructed and are currently occupied: Camellia Place (EAH, Inc.): 112 affordable apartment units Avalon @ Dublin Station (Avalon Bay Communities): 305 apartment units with 10% moderate income units Elan @ Dublin Station (D. R. Horton): 257 condominium units with 10% moderate income units The following projects have been approved but are not yet under construction: Metropolitan @ Dublin Station (D.R. Horton): 300 townhome /condominium units Esprit @ Dublin Station (D.R. Horton): 105 townhome units Both of these projects have been approved for Site E -1 at the Dublin Transit Center. Only one project may be built. It is unknown at this time which project the developer will elect to construct. The following project at the Dublin Transit Center was approved in March 2011 and is in building plan check review: Avalon II @ Dublin Station (Avalon Bay Communities): 505 apartment units with 10% moderate income units • Dublin Ranch West: The Dublin Ranch West (commonly referred to as Wallis) project includes the development of a variety of housing types and residential densities including low, medium and medium -high on 189 acres of land. The project has been approved and will provide 935 housing units. Development will occur on approximately 80 acres of the site, with the remaining site area devoted to permanent open space. There are 6 individual residential neighborhoods; 3 for single - family detached living and 3 for condominium living. Additionally there will be a 7.9 -acre City park and a private community green where the historic Antone School is proposed to be relocated and enhanced. Phase 1 construction of the vehicular and pedestrian bridges that cross Tassajara Creek has been completed. In 2011, portions of the backbone infrastructure were constructed. • Tralee Village: The Tralee Village project is a mixed -use project containing medium - high density residential and retail /commercial uses. The project is under construction and includes 35,000 square feet of ground floor commercial (partially occupied), 130 apartment units and 103 for sale townhomes. In October 2011, a new Site Development Review application was submitted to modify the design of 53 townhomes to comply with the City's Universal Design Ordinance. The project is currently in Planning Review. • Dublin Ranch Area F North: The Dublin Ranch Area F North project, which includes Neighborhood F -1 `Sonata' (Lennar Homes, previously owned by Standard Pacific 6of15 Homes) and Neighborhood F -2 `Verona' (Pulte Homes) will contribute 119 medium density single - family homes and 121 low density single family homes, respectively. The Sonata project is currently under construction. The Verona project has completed construction and all units are occupied. In August 2011 an application was submitted for a General Plan Amendment, Specific Plan Amendment, Planned Development Zoning, Site Development Review, Vesting Tentative Tract Map and a Development Agreement to change the land use designation of a 3 acre site from Public /Semi - Public to Medium Density Residential for the development of 19 single family detached homes. • Silvera Ranch: The Silvera Ranch project (formerly by Pinn Brothers Fine Homes) is under construction and includes 254 residential units on 105 acres of land. The four phase development contains a mix of housing types, including single - family estate -size units, smaller lot single - family cluster homes and multi - family condominiums. Phases 1 and 2 consisting of 108 single family cluster homes have been completed and are occupied. Phase 3 consisting of 102 multi - family condominiums is partially built and occupied; portions of Phase 3 remain unconstructed. Phase 4 consisting of 44 single family detached homes was approved by the Planning Commission on February 7, 2011 and is currently under construction. • Dublin Ranch Villages: The Dublin Ranch Villages (Toll Brothers) project includes 1,396 condominiums and townhomes within four neighborhoods. Three of the neighborhoods are completely occupied; the fourth neighborhood is still under construction. • Essex: The Essex project (formerly known as the Windstar project), which includes 309 residential units on approximately 3.66 acres in the Downtown Dublin Specific Plan area, was approved by the City Council in November 2007. Building permits were issued on the project in August 2011. A 150 -room hotel and 7,500 square foot restaurant were also conceptually approved in 2007 in conjunction with the project. Construction timelines for the hotel and restaurant are unknown at this time. • AMB: In 2004 a Planned Development Zoning District and Stage 1 Development Plan was adopted for the future development of a 150 room hotel, 7,500 square feet of restaurant /retail and 210 apartments adjacent to the West Dublin BART Station. A Stage 2 Development Plan and Site Development Review are required prior to construction. • Camp Parks Real Property Exchange: As part of a General Plan Amendment study that was initiated in 2003, the City has been working closely with the Army regarding future development of 187 acres on the southern portion of the Camp Parks Reserve Forces Training Area. A Community Visioning Process was completed in 2004, which identified potential uses for the site. The Camp Parks Master Plan identifies the redevelopment of 187 acres for private commercial, residential and open space uses. In 2007, the City worked extensively with the Army on Industry Day, the first step in the 7of15 Army's selection of a Master Developer. Industry Day was held in January 2008 and involved nearly 150 investors, contractors, developers and other interested parties. In October 2008, the Army announced the selection of SunCal Companies as the Master Developer. SunCal and the Army continue negotiations on the exchange agreement. SunCal has a pre - application on file with the City and pre - development discussions regarding the future development project are underway. It is expected that a Specific Plan and associated Environmental Impact Report will be underway in 2012. Commercial and Industrial Land Use During the Calendar Year 2011 reporting period, the following commercial and industrial projects were under review, approved and /or under construction in furtherance of the guiding policies of the Land Use Element for Commercial and Industrial land use: • Recreational Equipment, Inc. (REI) (formerly Custom Fireplace, Patio & BBQ): In late 2010, this 1.94 acre property was acquired by a developer for the purposes of demolishing the partially -built building that had occupied the site for two years and constructing a new retail building in its place. In January 2011, Site Development Review approval was granted for the construction of a 24,355 square foot building with associated site improvements. Construction commenced shortly thereafter and tenant REI Incorporated moved into the building in October 2011. • Grafton Station Shopping Center: In August 2006, the City Council approved a Planned Development Rezone for the 318,000 square foot Grafton Station Shopping Center located within the Eastern Dublin Specific Plan area. Grafton Station encompasses approximately 29 acres at the southwest corner of Dublin Boulevard and Grafton Street. In 2006, the Planning Commission also approved a Site Development Review for an approximately 140,000 square foot Lowe's home improvement warehouse with an approximately 30,000 square foot garden center within the shopping center. Lowe's opened to the public in December 2007. In March 2007, the Planning Commission approved a Site Development Review for four retail buildings totaling approximately 48,000 square feet; construction of these buildings are complete. In June 2008, the Planning Commission approved a Site Development Review for a 107,000 square foot retail building and a 16,600 square foot retail /restaurant building, which are not yet under construction. • West Dublin BART Station: Construction of a 720 space, multi -level parking garage in Dublin and construction of the associated West Dublin BART Station was completed in February 2011. • Sports Authority: Retail tenant "Sports Authority" received approval in January 2011 for a Site Development Review permit to occupy approximately 45,500 square feet of the 85,000 square foot building in Downtown Dublin that was formerly occupied by Mervyn's. The building remodel and site improvements were completed in December 2011. Another retail tenant is expected to occupy the remainder of the building in the near future. • Grafton Plaza: In May 2010, the City Council adopted a Mitigated Negative Declaration and amendments to the General Plan and Eastern Dublin Specific Plan for the Grafton 8of15 Plaza project site. Subsequently, in June 2010, the City Council approved a PD Planned Development Rezone and a related Stage 1 Development Plan for Grafton Plaza. The approved General Plan and Eastern Dublin Specific Plan amendments modified the existing land use designations from Campus Office to a new Mixed Use 2 /Campus Office flexible land use designation. Approval of a Planned Development Rezone with a related Stage 1 Development Plan expanded the allowable uses on the site and allowed for two options of development. Option 1 allows a mixed use development and permits up to 50% of the development area be comprised of residential uses and Option 2 allows a campus office development. The next step in the development process is for the Applicant to submit a Site Development Review application for the architecture of the project. • School of Imagination: In March 2010, the Planning Commission approved a Site Development Review for a 12,065 square foot pre - school building with a playground and related improvements for the operation of the School of Imagination. Subsequently, in April 2010, the City Council adopted an Ordinance approving the Planned Development Rezone with a related Stage 2 Development Plan for the project. The project site is located in the Schaefer Ranch development. Construction of the project was completed in October 2011. • Kaiser Permanente Hospital and Medical Offices: The City is currently reviewing a Pre - Application for Kaiser Permanente. Kaiser owns approximately 56 -acres within the Eastern Dublin Specific Plan Area and is proposing to construct a hospital and medical office buildings. The timeline for this project is approximately 10 to 20 years. • Nissan: In 2010, the City approved a Conditional Use Permit and Site Development Review application for the construction of a new 27,500 square foot Nissan automobile dealership on Scarlett Court. Construction was completed in 2011. The former Nissan building on Scarlett Drive is now occupied by Dublin Mazda. • Fallon Gateway: Fallon Gateway is a 34 acre commercial shopping center located at the southwest corner of Fallon Road and Dublin Boulevard within the Eastern Dublin Specific Plan Area. The project was approved in June 2009 and includes 379,000 square feet of retail commercial development. Subsequently in May 2010, the Community Development Director approved minor revisions to the Site Development Review permit. There are 5 major tenant stores and 13 smaller commercial buildings which are planned to be constructed in four phases. The first three phases of development include approximately 311,000 square feet, 4 major tenants and 6 smaller shop buildings. On -site amenities include outdoor seating areas, pedestrian paseos and unique paving, landscaping and lighting elements. o Phase 1 of the project has been completed. The center's anchor tenant, Target, opened in October 2011. o On September 27, 2011 the Planning Commission approved BJs Brewhouse, a 8,736 square foot restaurant and brew house. Construction is currently underway. • Dublin Kia: In October 2011, the Planning Commission approved a Conditional Use Permit and Site Development Review for a new 13,720 square foot automobile 9of15 dealership and service building with related site improvements such as parking and landscaping. The project is currently in building plan check review. PARKS AND OPEN SPACE ELEMENT AMENDMENTS The Parks and Open Space Element was not amended during the reporting period for Calendar Year 2011. PROGRESS TOWARDS MEETING THE GOALS AND GUIDING POLICIES OF THE PARKS AND OPEN SPACE ELEMENT • Dublin Sports Grounds Phase 4 Renovation: A Consulting Services Agreement for the Dublin Sports Grounds Renovation, Phase 4, was approved by the City Council in October 2009. The project includes turf and irrigation renovations to approximately 4 acres of the 22 acre park. The contract for construction of improvements was awarded in June 2010, and the improvements were accepted by the City Council on June 7, 2011. • Dublin Transit Center — Public Art: The Dublin Transit Center Public Art Project moved forward in August 2009 with the approval of a contract with artist Cliff Garten to prepare conceptual designs for two artwork sites at the Dublin Transit Center. The proposed artwork is located at two key places within the Dublin Transit Center: Campbell Green and Iron Horse Plaza. The conceptual design for the artwork was approved by the City Council in September 2010 and installed in 2011. • Emerald Glen Park Recreation and Aquatic Complex: The City entered into a Consultant Services Agreement for the design of the Emerald Glen Park Recreation and Aquatic Complex, a 35,895 square foot facility including two swimming pools, a gymnasium, fitness center, game room /teen center, group exercise /dance studio, special events room, juice bar, locker rooms, and administrative offices. One of the swimming pools will be a leisure and instructional pool (6,675 square feet) and the other a 25 -meter by 25 -yard (6,150 square feet) deep water competition pool. The design of the project was placed on hold in 2009 due to insufficient funding. The 2010 -2015 Capital Improvement Program includes funding to restart the design of the facility. • Western Extended Planning Area Open Space: The City continues to work with the East Bay Regional Park District (EBRPD) to negotiate land acquisitions in the Western Extended Planning Area for designated Open Space Areas. • Schaefer Ranch Park: The City is currently reviewing plans and specifications submitted by Discovery Builders for a 10.6 acre park within the Schaefer Ranch housing development. It is anticipated that construction of the park will begin in early summer 2012 and be complete in June 2013. • Dublin Historic Park and Museums: The demolition of the Dublin Square Shopping Center was completed in January 2009. The Shopping Center was acquired by the City in order to expand the existing Dublin Heritage Center through the construction of a historic park. Five structures from the historic Kolb Ranch were relocated to the park site 10 of 15 in 2009 and include: the Old House; the Main House; the Sunday School Barn; the Hay Barn; and the Pump House. Construction of the park was completed in July 2011. • Fallon Sports Park, Phase II Master Plan Update: A Consulting Services Agreement to update the Fallon Sports Park Lower Terrace Master Plan and prepare for the next phase of construction was approved by the City Council in August 2011 • Dublin Swim Center Modernization Study: In 2011, the City Council awarded a Consulting Services Agreement to Dahlin Group Architecture to conduct a study and develop alternatives for modernizing the Dublin Swim Center. • Dublin Library Building Program Update: In November 2011, the City Council entered into a Consulting Services Agreement to update the building program for the ultimate build -out of the expansion spaces in the Dublin Public Library. • Positano Hills Neighborhood Park: The design of this 4.6 -acre neighborhood park was completed in December 2011. It is anticipated the project will be completed by early 2013. • Park Lighting Replacement Project: In 2011, the City received an Energy Efficient and Conservation Block Grant for light replacement at Dolan, Kolb and Shannon Parks. The existing park lights will be replaced with energy efficient LED lights. SCHOOLS, PUBLIC LANDS AND UTILITIES ELEMENT AMENDMENTS The Schools, Public Lands, and Utilities Element was not amended during the reporting period for Calendar Year 2011. PROGRESS TOWARDS MEETING THE GOALS AND GUIDING POLICIES OF THE SCHOOLS, PUBLIC LANDS AND UTILITIES ELEMENT Schools • In 2011, the City continued to work with developers and property owners to ensure that adequate sites are reserved to meet the Dublin Unified School District's projected demand for future school uses. As part of the Fallon Village project (as described in the Land Use section above) two elementary school sites have been reserved for future development by the Dublin Unified School District. • In 2011, the City continued to collect school fees upon issuance of building permits for development projects in accordance with State law. Public Lands • Alameda County Courthouse: In November 2004, Alameda County received City approval to construct a 210,000 square -foot East County Hall of Justice (County Courthouse) complex on a 22 -acre portion of the Santa Rita Property near the 11 of 15 intersection of Gleason Drive and Hacienda Drive. In December 2009, Alameda County was granted an amendment to the original approval for a slightly smaller building (196,000 square feet). The East County Hall of Justice will house 13 courtrooms and associated governmental facilities. Construction dates are unknown at this time. • Camp Parks Reserve Forces Training Area: The City continues to work with the Army and their selected master developer, SunCal Companies, on the development of approximately 187 acres of land at the southern end of Camp Parks. As part of the development of the property, improvements along Dougherty Road would be constructed. Utilities • In 2011, the City continued to work closely with project applicants and service utilities to ensure that there is adequate capacity to serve all new and existing areas of Dublin. CIRCULATION AND SCENIC HIGHWAYS ELEMENT AMENDMENTS The Circulation and Scenic Highways Element was not amended during the reporting period for Calendar Year 2011 for the following project: PROGRESS TOWARDS MEETING THE GOALS AND GUIDING POLICIES OF THE CIRCULATION AND SCENIC HIGHWAYS ELEMENT • Alamo Canal Trail: The City worked jointly with East Bay Regional Park District, the City of Pleasanton, Caltrans and Zone 7 to complete the design of the Alamo Canal Trail underneath 1 -580. The design is complete and funds have been acquired to construct the project. Final design was completed in 2011. • Right -of -Way Maintenance: In 2011, the City continued to provide for the replacement of damaged curbs, gutters and sidewalks at various locations throughout the City as well as completing annual street overlay and slurry seals projects. The City replaced the eastern sidewalk on Village Parkway in front of Dublin High School under a cooperative project with the Dublin Unified School District. • Fallon Road Extension: The extension of Fallon Road and connection with Tassajara Road was completed in November 2011 and the road is open to traffic. • Tassajara Road Widening: The engineering design phase for the widening of Tassajara Road between 1 -580 and the Alameda- Contra Costa County limit line in the Eastern Dublin Specific Plan Area began in 2003 and continues with the review of future projects. • Traffic Impact Fees: In 2011, the City continued to collect traffic impact fees for new development projects to ensure that new facilities are built to accommodate the additional vehicle, bicycle, and pedestrian trips that result from the projects. 12 of 15 • Bus Rapid Transit: The City cooperated with the Livermore - Amador Valley Transit Authority in development of the Bus Rapid Transit (RAPID) project to provide express bus service and coordinated signal timing along Dublin Boulevard providing connections to the Dublin /Pleasanton BART Station. The design was completed in 2009 and construction was completed in 2010. RAPID service commenced in early 2011. • Traffic Signal Improvements: The City installed a new traffic signal at the intersection of Amador Valley Boulevard and Brighton Avenue and upgraded the existing traffic signal at the intersection of San Ramon Road and Shannon Avenue. The engineering design of the project began in Summer 2010 and construction was completed in December 2011. • Dougherty Road Widening from Sierra Lane to Northern City Limit: The City plans to widen Dougherty Road from Sierra lane to the northern City Limit from four to six lanes and include bicycle lanes. Preliminary engineering began in Fall 2010 and continued through 2011. If full funding is identified, right of way will be acquired in 2012 and construction will begin in 2013. • Dublin Boulevard, Hansen Drive to Silvergate Drive: In 2011, Dublin Boulevard was widened to provide an additional westbound through lane, bike lanes and a sidewalk. A traffic signal was installed at the intersection of Dublin Boulevard and Silvergate Drive. HOUSING ELEMENT Pursuant to Government Code Section 65400, the City Council is required to prepare an annual report on the status and progress in implementing the City's Housing Element using forms and definitions adopted by the Department of Housing and Community Development. These forms and definitions were adopted on March 27, 2010 and are required to be used for the Annual Progress Report. The completed forms for Calendar Year 2011 are attached as Exhibit A to this report. CONSERVATION ELEMENT AMENDMENTS The Conservation Element was not amended during the reporting period of Calendar Year 2011. PROGRESS TOWARD MEETING THE GOALS AND GUIDING POLICIES OF THE CONSERVATION ELEMENT • Dublin Village Historic Area Specific Plan: The City continues to work on preserving Dublin's historic resources through the implementation of the Dublin Village Historic Area Specific Plan. • Dublin Historic Park Master Plan: In August 2006 the City Council adopted the Dublin Historic Park Master Plan. The Master Plan envisions the creation of a historic park that will complement the existing Dublin Heritage Center where several notable historic buildings have been assembled and preserved. The historic park would also meet the needs of the community for parkland and re- establish the City's historic heart. The historic park site was acquired by the City in 2007 and in 2008 the existing shopping 13 of 15 center was demolished to make way for the new historic park. In 2009, five historic structures from Kolb Ranch were relocated to the park site and include: the Old House; the Main House; the Sunday School Barn; the Hay Barn; and the Pump House. Construction of the park was completed and dedicated to the community in July 2011. • The City continues to review each new development project that is proposed near a natural resource such as a stream corridor with the intent of protecting the resource. Conditions of approval include measures to ensure adequate setbacks, minimal impacts to water quality, passive recreational opportunities, and the maintenance of natural systems to the extent possible. • The City continues to work with developers to ensure that open space corridors established in new neighborhoods are maintained and managed appropriately, and open space areas are contiguous with other such lands. SEISMIC SAFETY AND SAFETY ELEMENT AMENDMENTS The Seismic Safety and Safety Element was not amended during the reporting period for Calendar Year 2011. PROGRESS TOWARDS MEETING THE GOALS AND GUIDING POLICIES OF THE SEISMIC SAFETY AND SAFETY ELEMENT • All new construction and certain building renovations are reviewed for compliance with the Uniform Building Code for seismic safety. • All new development projects are required to submit a Geotechnical Analysis to assess site conditions. • The City continues to implement the Wildfire Management Plan for all properties identified within a fire buffer zone. • The City continues to participate in the Federal Emergency Management Agency's (FEMA) flood insurance program. • In May 2011, the City conducted a disaster exercise for the City's Emergency Operations Center personnel. NOISE ELEMENT AMENDMENTS The Noise Element was not amended during the reporting period for Calendar Year 2011. PROGRESS TOWARDS MEETING THE GOALS AND GUIDING POLICIES OF THE NOISE ELEMENT 14 of 15 • Due to the nature of the Guiding and Implementing Policies of the Noise Element, efforts to implement this Element of the General Plan are on -going in nature. Projects are reviewed on a case -by -case basis for adverse noise impacts to the environment and sensitive receptors. In addition, a Noise Mitigation fee is charged to developers in the Eastern Dublin Specific Plan Area to assist in funding the construction of improvements to mitigate noise impacts. COMMUNITY DESIGN & SUSTAINABILITY ELEMENT AMENDMENTS The Community Design & Sustainability Element was not amended during the reporting period for Calendar Year 2011. PROGRESS TOWARDS MEETING THE GOALS AND GUIDING POLICIES OF THE COMMUNITY DESIGN & SUSTAINABILITY ELEMENT • The Community Design & Sustainability Element was adopted in September 2008. The Community Design Element establishes principles, policies and implementation measures that are designed to enhance the livability of Dublin and encourage a high level of quality design while encouraging well designed sustainability measures. The purpose of the Element is to enhance the physical form of the community by establishing policies that will guide future development. The Community Design Element applies to developments throughout the City. The efforts to implement this Element of the General Plan are on -going in nature. Projects are reviewed on a case -by -case basis for conformance with this Element. 15 of 15 w 0 a. W vI �W V F- 5W W J W J Z Q O w N O CN LO N r � U W Z 0 N m ('4 -i O Z N LLJ � CO � O } H V O 0 a a . V � y O CL LN 0 N w M F- r_ O V N o �a O U 1 z E O 7 V CO O^ ^ � CL M w 2 a� a� �0 J m J' a N D w E O U C 3 O J a N E v X W y 0 i a3 C 7 O ul a) U) Ul a) t ai O z O N w a co E E 0 E 9 o a a C C 0 O N U C O N mu N J L m ` Y N O C O N a ';T 0 �6 C Go Y � � C d � � Q C Y R O o w (6 (D N O N O C L L ) a Y E E O O � - -O X L U O O s E E C a O E C ' N E N m a E � o `o T N E 9 E m a a 0 4 L � ~ Y � C Q � N T O E Y m m � Q m E a) O a O m .0 m a E T O N M. In 9 9 C a � E O o °Q E o o (D E � a o � m � L E O LL C m E U) o E m w L E � o O C N `m a ° o U 0 N C OC N f0 � � a U) 0 o O EL O 0 Cf) O Y LU O 6 O E Y Z N N N V > (D m o OR ` C 0 N ow FLU v E Q Q Li N U C_ F L 9 U) 9 o L W J v c m m o O O O O O r O 3 N N 3 N N N a) -2 of a y .p o E� N o a5 a5 O O O O R �� N z z z z d o w N Q N (O N N N OO OO OO OO r 0 Of x 'o im im i im 3 m o a) N a) N a) N a) a) LL O �_ m m Q E 'V U. E L U) U) U) U) B 2 o p Z UC o 0 O U U U U U W Q O N N R � O C R p V C r d LL R t/1 O _ N E E U O U 3 D m w o O O ` C w d p N C 7 Q N U) 2 Ln C � � Lf1 C W Y C U � N O O O Q O o � O LO V LO LO LO U) ID N � 9 0 o -i V M O LO r r Q O C U C E E a o -`oo 0 C O O 2 c o z O T N E .+-T' o o N CO CO O) O c s m a J M 0 Q O CL 0 0 00 00 m CO N C H > E o s C `w x �_ �_ �_ �_ O O O O O 0 . T .E o' LL LL al 0 M N I U- a a d C O � m R al Q R H LLJ E w 0 N t o z° M m --° Q Ul 3 N C N �O >. Q 4 C 0 9 0 o O a> > :° o ° Q a E as N a) 2 C) m J O N E 2 E LLB LI N D w E O U C 3 O J a N E v X W y 0 i a3 C 7 O ul a) U) Ul a) t ai O z O N w a co E E 0 E 9 o a a C C 0 O N U C O N mu N J L m ` Y N O C O N a ';T 0 �6 C Go Y � � C d � � Q C Y R O o w (6 (D N O N O C L L ) a Y E E O O � - -O X L U O O s E E C a O E C ' N E N m a E � o `o T N E 9 E m a a 0 4 L � ~ Y � C Q � N T O E Y m m � Q m E a) O a O m .0 m a E T O N M. In 9 9 C a � E O o °Q E o o (D E � a o � m � L E O LL C m E U) o E m w L E � o O C N `m a ° o U 0 N C OC N f0 � � a U) 0 o O EL O 0 Cf) O Y LU O 6 O E Y Z N N N V > (D m o OR ` C 0 N ow FLU v E Q Q Li N U C_ F L 9 U) 9 o L W J L CL L a a N L a r Go NN� W) 11. w Q o V co L � v! r � U E O co r- 0 Q NNw I.f. a M� W a O C N O Z N Q ai L � N W O � C (D E C E ° a) U CD a) O U) C_ (J (7 O O .0 L a 'J C E '-0 O Q a) a5 ._ � U a .0 O U U N C Q m a) a5 a) L Y C O N U_ E a L � U C Q a) Z 0 O W O 9 C a3 O 9 � O ID Y m a O jp O 0 O a E (D O U U (D � T O T E Ul C a) O C a) N a L a) Q E O U M Y .0 C L(7 O U C a5 O O U o (n .. N o E� � C U N a E T E a) O (D O O O U O �. L C O O C O � Q � — L U O a) � L H J Q Oz O O O O H a) E O C a) O O L a) O O U J C S 9 3 o E E T O O 9 � C a `o > � Q T D a) a)oo J U X o C W U) H T U C E O U Q O C U Q O C O O CO 9 L 6 - E o N M LO i 1 N U) L ai O Z M a a N i N E O V T N � a N � O � N O > O 0'a a� L O O Q w a L E E co r- 0 Q a v a i i a a N O t 7 v O O N E L .0 7 E Y_ z E V! O O l0 Oi Ln Ol O m -1 I, r4 N R N -i -i -1 Ln Ln O H V! a E O 2 O v c O a V! O Ln N M N V! O -1 M m N E R =L O CO ci Ln ci N O Ln Ln a N ci .-i Ln N CO 0 i O W N _ D v a a z z c m �v m v v O z u W s a) v o Q O Y O Y a N 0 W C > > +�+ N L v m = 0 a) C C% �/ i f0 LJ % -6 U m > >0 a o 0 0 N u O O Q v cn N cn O cn 0 0 0 o E O Z Z (n (n w °> N a� t a O z m r N N N L L a 0 a Z i .N 7 2 0 N� N T R `o Q dj Z > S a) a5 O E O .0 E M o N Lo o M r' H C O C O) (9 (O E O T � 9 C O M D a) W O Lo Q > � LO _ Lo O a) a) O) r a) �O r `m r a) (D `m O a) LO N O o) M O v 6) o Oo V O N N O co O O O o M M `a5 M O) o N O O M O O O Lo M o M a) r N co O O O V O O I� M M V N r CO CO o o 0 0 0 o O 0 O ♦ O 9 > ♦ a) a Z O J M V OM U O o O Lo O.. O M Q O O w O Q C ♦ X y W a _ U) aai U D U aai U °— a o(D a ai aai a aai a ♦ Q a (D ) S C a) .o > d a) O Z O a) O Z O a) O Z a) E 0 O O y J (6 0 a) T C 9 O ♦ a) a o O -OO z o `w—' C CJ = J a) O �:::, c a a) m m E W y J 9 H W H Q 0 Ul C a LD Q a) E O C 0 O a) L_ C a) a C O L 0 L E O C 0 T N X O Y ■ I � § \ § \ § 2 2 E @ � a \\ k \� ) a G / 2 kq t 2% ® [ W) »% § \§ \\ § E k \ ] E E G 2#0 � E a) e ° o 3[\ E) ) §7 ) \} E&e / > (o/ \k \0� o $ 7 2 a ± u� ' a .F \ § ƒ o#§ G \/ /§\ 0t-r- 0 E E.2ƒ §uj >�� E \} /. 2 a 0 IL 0 —; k\/ �cn E \ W 2 J / D LU W � ° k\ E 5 - E E \ of ) ) 2 B ® ) z / } § 7¢ o ƒ m.- a= E E E q o § E_ 7 »/ g / \ \ / / / M E / \ - \ / 0 ) / \\ /ƒ & f } 7\ 7 / § / E § E g jj( ] § m .c \ C 5% t \ / / \ / \ j x k \ \ § j } \ j j j E o o a e a o § ® \ § § } $ \ eƒ k / / § § k § § § § § § § § § § § § E § / / (n / 2 k / / / / / / / / / / o / _ = 7 = = o = _ _ _ _ _ _ _ _ = o = §k § \E § {} - )) : ■ \\ \ \j \{ / d\ / \ E E - - -- oE m IS _ - E E - E °E E _ E E = a EE E BE EE 2E _ To - E om - EE s _ _ - - - E Eo - - E E° - - E E E = - °E E -- E E _ E of EE = - E E - of - o° N z E E E _ ET - E E o - E EEE E - E E QE = - E E = Eon E° E E m �s E �s °° E Ea E ESE o of EEE __ 33 DoE e aw E E 3 3 E E ELL O E E E E E o m o m U e e e Uo� E 3 o E` 3 �o c V E N U s E EE m IEEE E E ¢E zE 2 - E°c' uu Aw= i _ E r E _ o - -- o E Ea 0 E °oE o E E E E L �E GE E E Ea 5 E o3 _ - Ea 5 y Em_ E� mE `oE Ea _- E - E E E E E a E a`� Ea EZ, ° - - E E E E zm_ E E E S E _ - o E - aE _ova u E �E EE„ _ B E - - -oao �E� - �y� - as - - Ea �EE E am E E - oa° 2E _ E ao ox aE� aE Eo o o - E 22 F �E - x° U E' o E o 5 r a 3 u a a E a € 15 ° �o E E= E E E � E a E E E 3 3 E E - s E1 a °� a 03 E E °3 of a z Uj m E 3 o E o E Eo °' o f En° Aw E � ` �E m� E EE b3 - Eir oa EE _ 2 ° m _ E - V°U �E �U - m 8 Z Em E E EE EE E E E E - EE' E 3 E - _ = E - E o - o - U c � -- O -c5o � - - E E E E _ - _ - - E m_ - E - - - E - mU - - - - - - E - ¢ m E - ° SE E EV° - p6 - - - E F U Q E U U° U U Aw= = 21 E s E E a - _ - E m - E m m m EE E m E of E EE - Em m3 £ o a _- o o do do 0 mE o Gio m 5 a -- f ¢ m E E E - E - E E E m Z E= E> EE = = EE EO � 0 E`m° E`m o E E`o_ E`o_ E E E� \\ \ \ / \ � \\ \ \\ /\ ! \ \/ it i I}i t{;{ j 7 \;i \ j 15 o bm