STAFF REPORT
CITY COUNCIL
December 4, 2012
Honorable Mayor and City Councilmembers
Joni Pattillo City Manager""'
CITY CLERK
File #600 -35
SUBJECT: Acceptance of Work - Contract No. 12 -07, 2012 Storm Drain Cleaning and CCTV
Project, CIP No. 960017
Prepared by Mark Lander, City Engineer
EXECUTIVE SUMMARY:
On June 19, 2012 the City Council awarded Contract No. 12 -07, 2012 Storm Drain Cleaning
and CCTV Project (CIP No. 960017), to Sanact , Inc (DBA — Roto Rooter). The project included
storm drain cleaning and closed- circuit television inspection for thirteen pipe segments identified
in the Citywide Storm Drain Assessment Phase 2 Report. During the work, an additional location
was identified which needed to be addressed to avoid future back -ups and remove debris. All of
the work, including the added location, is complete and ready for acceptance.
FINANCIAL IMPACT:
Capital Improvement Project #960017 is a multi -year phased project to assess storm drain
conditions, and address prioritized repairs as identified. The project is funded by the General
Fund. In Fiscal Year 2012/2013 additional appropriations were made. The work completed
under the contract with Sanact, Inc. occurred in Fiscal Year 2012/2013. The total Project
Budget is $222,066 and includes $36,543 appropriated for condition assessment, design,
inspection, administration and related costs, with the remaining $185,523 is appropriated for
improvements (repairs). The amount of the base contract awarded on June 19, 2012, including
contingencies, was $37,084. The final costs for the project ($48,124.70) exceeded this amount
due to additional effort needed to clean the Las Palmas Way pipe and additional cleaning work
required on Houston Place which was not part of the original contract scope of work. Although a
Change Order is required for this agreement, the final cost is below the amount available for
contract repairs and improvements over the two years of appropriations. Staff will take into
account the remaining balance available in recommending additional work to be undertaken in a
future contract in the current year.
Page 1 of 2 ITEM NO. 4.5
Amount of Award W Sanact,
Funding Source
Inc,. (Jurte 19, 2012)
Actual
General Fund( #1001)
TOTAL: Improvements
$24,723.00
$48,124.70
Page 1 of 2 ITEM NO. 4.5
RECOMMENDATION:
Staff recommends that the City Council accept the improvements under Contract No. 12 -07,
2012 Storm Drain Cleaning and CCTV Project, authorize execution of a change order in the
amount of $23,401.70 to Sanact, Inc., authorize staff to file a Notice of Completion, and
authorize the release of retention after 35 days if there are no subcontractor claims.
x
Submit ed By
Public Works Director
DESCRIPTION:
Submitted By
Administrative Services
Director
-YY G//
Reviewed y
Assistant City Manager
The 2012 - -2017 Capital Improvement Program allocated General Fund appropriations to the
Citywide Storm Drain Assessment. This project involves a phased program to inspect the City's
storm drain system, identify the need for cleaning or repairs, and implement repairs and
cleaning as needed.
On June 19, 2012, the City Council awarded Contract No. 12 -07, 2012 Storm Drain Cleaning
and CCTV Project (CIP No. 960017) to Sanact, Inc. (doing business as — Roto Rooter). The
project included storm drain cleaning and closed- circuit television inspection for thirteen pipe
segments on Las Palmas Way, Las Palmas Court, Bloomington Way, Brittany Drive,
Champagne Court, Fenwick Way, Rolling Hills Drive, Solana Drive, and Tamarack Drive,
identified in the Citywide Storm Drain Assessment Phase 2 report as needing cleaning due to
build -up of debris, roots, calcium carbonate, and other material. The amount of the base
contract awarded on June 19, 2012 was $24,723.00, with an additional amount for
contingencies in the amount of 50% or $12,361, for a total of $37,084.
The final costs for the project exceeded this amount due to additional effort needed to clean the
Las Palmas Way pipe of heavy calcium carbonate deposits. In addition, Staff requested that the
contractor inspect and clean a section of pipe on Houston Place outside the original contract
scope of work. The work was performed in response to a complaint by an adjoining resident of a
strong odor in the pipe. Inspection of the Houston Place pipe showed high levels of sediment,
construction debris, and decomposing vegetation, which was subsequently removed.
The work is complete and ready for acceptance. The total final cost of work was $48,124.70,
including $9,256.56 for the work on Houston Place. The Fiscal Year 2012/2013 Capital Project
Budget included a total of $185,523 for contract improvements and repairs. This budget is to
address the completion of this work as well as address a future project later in the year. The
final cost is below the budgeted amount. The City Council approval is needed to approve a
change order covering the cost of work above the original amount authorized at the time of
contract award and to accept the project as complete.
NOTICING REQUIREMENTS /PUBLIC OUTREACH: None.
ATTACHMENTS: 1. Location Map
Page 2 of 2
CITY OF DUBLIN
ALAMEDA COUNTY, CALIFORNIA
YEAR 2012 STORM DRAIN CLEANING AND CCTV PROJECT
INDEX OF SHEETS
SHEET N
DRAWING k DRAWING NAME
1
T -1 TITLE SHEET AND VICINITY MAP
2
L -1 PLAN
sun
Ra610 bay Crockett
Helculez
Bemcie ea
Meranez ego Bay P -mm Pittsburg �texe
Beyrlew- Manakin Plnole
AntlOGI Oal
El SObrente
Pacnaa C.—W B4cA DiamoM
San Pablo
♦Minn Regonrl
Pl—M Hill C � Preserve grpe
Riahmbntl
5rsonw Clsylon
Regtnrrel Pen * Wen Br[
El Cesrila
Walnut Harney
Creek Mt olebla
Plbany
Ori- Infryetle ' 0 51ale Park Rared V 111
esleerl
Belkeley
♦ Rea,oml Par4
u
Alama ♦
Emeryville
Moraae pieElo
PlM mertl Danville Temrory ,. .;I ,;
San Oakland
RMSrgan
glerml Preserve r -,i
T
anciscc
San Ramon ®sere
Alameda D
re
_
gatl I, PNe a,mm PROJECT SITE)
�
®
L6aaa R gioral Pare
rtd
eSI 0
Vane. Du bn
'iOLlh$arl Fren. aCO Say San Lorenzo Fairviev Fs -u L,,,—
`rantlata
Hayward' pleesanlon
an BraRO
o
Mr Faaa moo R,
a,
Reginrwl PnM1
Burlingame
Ed-L oMina ttll- City pgm" sunsl. Dal V i6lteta
R
glaal eveation Aiee
emrrtaan San Mateo
ReseNe Cm
Fasterary
Fremom araneRaya�
Newafk WMemna
Belmvnl
♦ •
LOCATION MAP
is h�
4
i
g
O
W
Kolb Park
Opalan Park a
n
0.
Dn cer 0'`
u
g Dubli l
Y
k O �
oaban Blvd �G�— - 3T
Ilk W Arth ur H, 5Teed'
or es,
VICINITY MAP
O
= SITE NUMBER
,io g �y
Harris &Associates
CITY OF DUBLIN
100 CIVIC PLAZA
YEAR ZOO
CLEANING /
los/03
DUBLIµ CA 94588
TITLE SHE
or es,
DI ,0,, TO sDMH —13
$
G t FRDM
DI 6D9
K,y zo.
15.
EM SLNG 502 ROOT O
B OCN GE4 }'t
FROM SD 026
C; h
/JQQ.
BLOOMINGTON WY AT SOUTHWICK DR
NOT TO SCALE
h
^�
BLOCKAGE 4'3 FROM .,fig e° %6 28 01 568° 0I t1�zT
NI
CLEAN OI 560 TO GI 41
REMOVE EXISTING CCNCRETE
BLOCKAGE FROM FIRENGTH ,6 t
FRISTING CONCRETE BLOCK-
14'± FROM DI 547,F
CLEAN 36' LFm 12' SD
DI 4944 TO DI 4913 7, _...� SEINF�T�r1_�,:_-
A
� -1, A �`. •� . 8147.
EXISTN
802 ROCT
KI
FROM DI 43 ° ^� ^ N m
0-
A�
8131
�
41 ROLLING HILLS DR, CHAMPAGNE CT, BRITTANY DR
NOT TO SCALE
LEGEND
REMOVE HARDENED DEPOSITS FROM ENTIR
— — — — — — OF STORM DRAIN SEGMENT CLEAN —R. O A LINE
NOTABLE BLOCKAGE SEE CALLOUT
DESCR PT ON
ENISTING STORM DRAIN OKN E%I$TNG DRAINAGE INLETANHOLE
HAR
E % *ING OSITS 1
DEPOSITS J/
FR NOO PIPE
REEMOME E%ISTNG
861, H ARDENE D DEPOSITS
FR 53 1 T sDI 533. DEPTH
8632 3t, LENGTH 4Gt
MAR w1�,. 0623
�FENWICK WY
NOT TO SCALE
TAT
CLEAN 300 LFt 18'SD
ty DI 3 }q TO DI 1598
N
NG BOE
FROM 11 311
ExISiIN
AP
PIPE
G t FRDM
DI 6D9
°
h
^�
REMOVE EXISTING
HARDENED DEPOSITS FROM
rvNj V
3G 6
9G GI 09 TD DI 111,
^
I/�y 71 >•
^ ^ - DEPTH 6't, LENGTH 44'±
71•
/ 3 1 TAMARACK zDR
NOT TO SCALE
REMOVE EXISTING
HEPTHEN3 t DLEPNGTo D -
G
°1 `EXISTING 502 HARDENED
DEPOSITS AT DI 2722
ff SOLANA DR
NOT TO SCALE
ROLLING HILLS DR a 4190 _ of 1111T Ill HAR*N
NOT TO SCALE z',y, DEPOS TS FROM 15' SD D OJ TO O
SD GHO DEPOS TS T10' Q.
'.d T1R0 G O T PPE DEPT Q
zgiZ vzz Hof III.
FROM � lHR0UGH0UT PIPE UEP VARIE '
,A IVVVVVV 10' -18'. ENGT1 1)8'tSTH Op. �`
179' 7436 I EXISTING HARDENED'
D I DEPOSIT BLOCKAGE 802
t2^ .1St FROM MH _
PEAIOVE EXISTING N 18
HARDENED DEPOSITS FROM I MHN,830 TO SOMH SO 94
EIN
/ I
ETr DEPTH 2Gt, LENGTH 1 t J ' A , °,RTMwS aa7g oIF PIPE
D GEPOL SFROM
h
z,. 7402 7403 >�2 DEPTH VARIES
'.�H
FW46'
K Q� LENGTH 90't
LAS PALMAS
NOT TO SCALE nCfij
Poos03 ,,o iiii� CITY OF DUBLN YEAR 2012 STORM DRAIN L_7
Harris 8 Associates 100 CIVIC PLAZA CLEANING AND CCTV PROJECT
1 DUBLIN, CA 94568 PLAN SHEET 2 OF