HomeMy WebLinkAboutItem 6.1 Schaefer Ranch GP Amend
STAFF REPORT CITY CLERK
File
#400-20/410-30/420-30/450-30
CITY COUNCIL
DATE:December 15, 2015
TO:
Honorable Mayor and City Councilmembers
FROM:
Christopher L. Foss, City Manager
SUBJECT:
Schaefer Ranch General Plan Amendment, Planned Development Rezone with
related Stage 1 and Stage 2 Development Plan, Site Development Review,
Vesting Tentative Map 8136 to Create 19 Single-Family Lots, and a CEQA
Addendum (PLPA 2012-00013)
Prepared by Mike Porto, Consulting Planner
EXECUTIVE SUMMARY:
The City Council will consider an application by Schaefer Ranch Holdings LLC (Discovery
Builders) for a General Plan Amendment and Planned Development Zoning with a Stage 1
and Stage 2 Development Plan to change the land use designation and zoning of 17.30 acres
designated as Estate Residential and originally approved for six residential estate lots and
common areas, to 7.04 acres designated as Single-Family Residential for 19 single-family
detached homes and 10.26 acres designated as Open Space. This proposal results in a
net increase of 13 homes to a total of 419 homes, which is below the 474 homes originally
anticipated within the Schaefer Ranch project. The application also includes a Site
Development Review Permit and Vesting Tentative Map for the proposed homes on the 19
lots. A CEQA Addendum was prepared for this project described above and for a 1.14 acre
area at the end of Ridgeline Place contemplated for a future General Plan Amendment.
FINANCIAL IMPACT:
All costs associated with this project will be borne by the Applicant. The developer will
donate $250,000 towards the operation and maintenance of the Dublin Heritage Park and
Museums upon the City Council’s approval of this project as previously agreed to when the
Schaefer Ranch Park Improvement agreement was amended.
RECOMMENDATION:
Staff recommends that the City Council conduct the public hearing, deliberate, and adopt the
Resolution
Adopting a CEQA Addendum and a Statement of Overriding Considerations for
Resolution
the Schaefer Ranch Unit 3 and a portion of Unit 1 Project; adopt the Approving a
General Plan Amendment for the Schaefer Ranch Unit 3 Project; waive the reading and
INTRODUCE
an Ordinance Rezoning the Schaefer Ranch Unit 3 Project site to PD-Planned
Development and approving a related Stage 1 and Stage 2 Development Plan; and adopt
Resolution
the Approving a Site Development Review Permit and Vesting Tentative
Subdivision Tract Map 8136 for the Schaefer Ranch Unit 3 Project.
ITEM NO. 6.1
Page 1 of 5
Submitted By Reviewed By
Community Development Director Assistant City Manager
DESCRIPTION:
The Project Site is located within Schaefer Ranch which is an area of approximately 500
acres located generally at the westerly city limits north of the Interstate 580 freeway (1-580)
and south of an unincorporated area of Alameda County, near the intersection of Schaefer
Ranch Road and the westerly extension of Dublin Boulevard.
The Schaefer Ranch project area was annexed to the City and approved for development
in 1996. The original approvals anticipated 474 single-family homes in four neighborhoods.
The Schaefer Ranch project currently includes 406 lots. Significant portions of the Schaefer
Ranch development have since been constructed and much of the surrounding hillside open
space areas have been dedicated to the East Bay Regional Parks District or placed in
permanent conservation easements. The remaining undeveloped areas of Schaefer Ranch
include Unit 2, the 140 lot subdivision located south of Dublin Boulevard, of which 91 are
completed and 49 are yet to be completed, and the six existing undeveloped large estate
lots that comprise Unit 3 that are located at the western terminus of Dublin Boulevard. This
Staff Report addresses a development proposal for Unit 3 along with the environmental
analysis to add one additional lot in Unit 1 at the end of Ridgeline Court. However, no
development entitlements are proposed for the additional lot on Ridgeline Court at this time.
VICINITY MAP
The applicant is currently requesting approval of the following entitlements. Please refer
to Attachment 1 for a complete discussion of the proposed project and refer to
Attachment 2 for the Applicant's submittal package.
Page 2 of 5
• General Plan Amendment- To change 17.30 acres from Estate Residential
(0.01-0.8 units per acre) to 7.04 acres of Single-Family Residential (0.9 to 6 units
per acre) and10.26 acres of Open Space.
• Planned Development Rezone- Planned Development Rezone with related Stage 1
and Stage 2 Development Plan.
• Site Development Review- To construct a 19 single-family detached residential
homes.
• Vesting Tentative Map - To allow the subdivision of 19 residential lots with the
remainder as private access and Open Space.
• CEQA Addendum- To evaluate the environmental effects of the proposed Land
Use change from Estate Residential to Single Family Residential and Open Space
for 17.30 acres on Schaefer Way and for a 1.14 acre area at the end of Ridgeline
Place contemplated for a future General Plan Amendment.
Discovery Builders has provided a number of community benefits associated with the Schaefer
Ranch project. Discovery Builders built the School of Imagination ($1,550,000), the East Bay
Regional Park Staging Area and trail system ($400,000), Schaefer Ranch Community Park
($3,100,000), and contributed funds toward the construction of the Dublin Heritage Park and
Museums ($1,500,000).
Discovery Builders entered into a Park Improvement Agreement which obligated them to
construct Schaefer Ranch Park within a specified schedule. In 2011, the Developer requested
an amendment to the agreement giving them additional time to complete the improvements. In
exchange for this time extension, the Developer agreed to make a $750,000 donation, in two
payments, to partially fund the operation and maintenance of the Heritage Park and Museums.
A $500,000 donation was received by the City in September 2012. The remaining $250,000
donation will be made subsequent to approval by the City Council of the requested entitlements
for the 19 lot subdivision in Unit 3 of Schaefer Ranch (Attachment 3).
Discovery Builders has satisfied their inclusionary housing requirements for their existing
entitled project, including the six existing estate residential lots in Unit 3, by way of in-lieu fee
payments and the construction of affordable units. The proposed re-subdivision of the six
lots will result in 13 additional lots. Section 8.68.030 of the City of Dublin Zoning Ordinance
requires all new residential development projects of 20 units or more to construct affordable
units. Therefore, the proposed project is exempt from the Inclusionary Zoning
Requirements.
Tonight, the City Council will consider the proposed General Plan Amendment, Planned
Development Zoning, Site Development Review Permit, and Vesting Tentative Map for the
proposed 19 unit project located within Unit 3, and environmental clearance for one
additional lot within Unit 1 of Schaefer Ranch. The Resolutions and Ordinance related to
the proposed project entitlements are included as Attachments 4-7 of this Staff Report.
Page 3 of 5
PLANNING COMMISSION ACTION:
The Planning Commission considered the proposed project at its meeting on October 27,
2015. Written public comments received after the Planning Commission Agenda was
published are included as Attachment 8. The Planning Commission recommended, by a 3-0-
2 vote (2 Planning Commissioners were absent), that the City Council not approve the project.
The Planning Commission Resolution and draft meeting minutes are included (Attachments 9
and 10).
ENVIRONMENTAL REVIEW:
An Initial Study has been prepared in accordance with the provisions of the California
Environmental Quality Act (CEQA), CEQA Guidelines, and City of Dublin Environmental
Guidelines. The Initial Study assesses the potential environmental impacts of implementing
the proposed project beyond the impacts identified in the 1996 Schaefer Ranch EIR.
The proposed project is a modification of a project already approved by the City for the
Schaefer Ranch project. The impacts of the Schaefer Ranch project were analyzed in an
Environmental Impact Report that was certified by the City in 1996 (Schaefer Ranch
Project/General Plan Amendment Environmental Impact Report, State Clearinghouse No.
95033070 (the "Schaefer Ranch EIR" or "1996 EIR"). The EIR assumed 474 dwelling units,
including the six-lot Estate Residential development area. The Initial Study identified no
additional impacts from the proposed project, primarily because the project is within the
previous assumed density and also within the assumed development area. On the basis of
the Initial Study, the City prepared a CEQA addendum in accordance with CEQA Guidelines
section 15162/3 and 15164.
In 2008, the City approved an Addendum to the 1996 EIR for properties in Unit 2 of the
Schaefer Ranch project that included a General Plan Amendment, Planned Development
Rezone with related Stage 1 and 2 Development Plan, a Vesting Tentative Subdivision Map,
and a Development Agreement to eliminate a 5.69-acre retail commercial site on the
southwest corner of Dublin Boulevard and Schaefer Ranch Road, 12 estate lots, and 24
single-family lots on the south side of Dublin Boulevard and generally west of the retail
commercial site. These uses were replaced with up to 140 single-family detached lots. The
2008 Addendum was approved by Dublin City Council Resolution No. 203-08 on November 4,
2008. The 2008 Addendum did not affect land uses on the current project site.
A Resolution recommending that the City Council adopt a CEQA Addendum is included as
Attachment 7 with the Initial Study and Addendum attached as included as Exhibits A and B,
respectively.
NOTICING REQUIREMENTS/PUBLIC OUTREACH:
In accordance with State law, a public notice was mailed to all property owners and
occupants within 300 feet of the proposed project as well as the entirety of Schaefer Ranch
and California Highlands to advertise the project and the upcoming public hearing. A public
notice also was published in the Tri-Valley Times and posted at several locations
throughout the City. A copy of this Staff Report has been provided to the Applicant.
Page 4 of 5
ATTACHMENTS: .
1Planning Commission Staff Report (without attachments)
October 13, 2015
2. Applicant's submittal package dated September 25, 2015
3. Letter from Discovery Builders dated December 2, 2015
4. Resolution approving a General Plan Amendment for the
Schaefer Ranch Unit 3 Project
5. Ordinance rezoning the Schaefer Ranch Unit 3 Project site to PD
Planned Development and approving a related Stage 1 and
Stage 2 Development Plan
6. Resolution approving a Site Development Review Permit and
Vesting Tentative Map 8136 for the Schaefer Ranch Unit 3 Project
7. Resolution adopting a CEQA Addendum and a Related Statement
of Overriding Considerations for the Schaefer Ranch Unit 3 and a
portion of Unit 1 Project with the Initial Study and Addendum
attached as included as Exhibits A and B, respectively
8. Written comments to the Planning Commission
9. Planning Commission Resolution 15-13
10. Draft Planning Commission meeting min
utes dated October 27,
2015
Page 5 of 5
OF
O�LIF'OR���
STAFF REPORT
PLANNING COMMISSION
DATE: October 13, 2015
TO: Planning Commission
SUBJECT: PLPA 2012 -00013 — Schaefer Ranch General Plan Amendment, Planned
Development Rezone with related Stage 1 and Stage 2 Development Plan,
Site Development Review, Vesting Tentative Map 8136 to create 19 single -
family lots, and a CEQA Addendum
Report prepared by Mike Porto, Consulting Planner
EXECUTIVE SUMMARY: Application by Schaefer Ranch Holdings LLC (Discovery Builders)
for a General Plan Amendment and Planned Development Zoning with a Stage 1 and Stage 2
Development Plan to change the land use designation and zoning of 17.30 acres designated as
Estate Residential and originally approved for 6 residential estate lots and common areas, to
7.04 acres designated as Single - Family Residential for 19 single - family detached homes and
10.26 acres designated as Open Space. This proposal results in a total of 419 homes (a net
increase of 13 homes) which is below the 474 homes originally anticipated within the Schaefer
Ranch project. The application also includes a Site Development Review Permit and Vesting
Tentative Map for the proposed homes on the 19 lots. A CEQA Addendum was prepared for this
project described above and for a 1.14 acre area at the end of Ridgeline Place contemplated for
a future General Plan Amendment.
RECOMMENDATION: Staff recommends that the Planning Commission: 1) Receive Staff
presentation; 2) Open the Public Hearing; 3) Take testimony from the Applicant and the public;
4) Close the public hearing and deliberate; and 5) Adopt a Resolution recommending that the
City Council adopt a CEQA Addendum and a Statement of Overriding Considerations for the
Schaefer Ranch Unit 3 and a portion of Unit 1 Project; 6) Adopt a Resolution recommending
City Council adopt a Resolution approving a General Plan Amendment for the Schaefer Ranch
Unit 3 Project; 7) Adopt a Resolution recommending that the City Council adopt an Ordinance
rezoning the Schaefer Ranch Unit 3 Project site to PD- Planned Development and approving a
related Stage 1 and Stage 2 Development Plan; 8) Adopt a Resolution recommending City
Council adopt a Resolution approving a Site Development Review Permit and Vesting Tentative
Subdivision Tract Map 8136 for the Schaefer Ranch Unit 3 Project.
Submitted By
Consulting Planner
COPIES TO: Applicant
File
R vie By
Assistant Community Development Director
Page 1 of 12
Item 8.2
PROJECT DESCRIPTION:
Background
The Project Site is located within Schaefer Ranch which is an area of approximately 500 acres
located generally at the westerly city limits north of the Interstate 580 freeway (1 -580) and south
of unincorporated area of Alameda County, near the intersection of Schaefer Ranch Road and
the westerly extension of Dublin Boulevard.
The Schaefer Ranch project area was annexed to the City and approved for development in
1996. The original approvals anticipated 474 single - family homes in four neighborhoods. The
Schaefer Ranch project currently includes 406 lots. Significant portions of the Schaefer Ranch
development have since been constructed. The remaining undeveloped areas of Schaefer
Ranch include Unit 2, the 140 lot subdivision located south of Dublin Boulevard, which is
currently under construction. There also are 6 existing undeveloped large estate lots that
comprise Unit 3 that are located at the western terminus of Dublin Boulevard. Much of the
hillside open space area has been dedicated to the East Bay Regional Parks District or placed
in permanent conservation easements. Unit 3 is the subject of this Staff Report, and is
comprised of the six large lots with an Estate Residential land use, along with environmental
analysis to add one additional lot in Unit 1 at the end of Ridgeline Court. However, no
development entitlements are proposed for the additional lot on Ridgeline Court at this time).
The project site currently is vacant and is characterized by gentle canyon terrain which has been
graded
The 17.30 -acre Schaefer Ranch Unit 3 project site is shown on the vicinity map below:
Unit 3
Unit 1
BLVD
—VICINITY MAP
2of12
Adiacent and Surroundina Land Uses:
LOCATION
ZONING
GENERAL PLAN LAND USE
CURRENT USE OF PROPERTY
North
PD
Open Space and
Hillside Open Space
0
7.04
Public /Semi - Public
and DSRSD Water Tank
10.26
Total
17.30
Original Ranch Home and Operating
South
PD
Estate Residential
Facilities
Public /Semi - Public and
DSRSD Tank Site
Parks /Public Recreation
public park
East
PD
Estate Residential
Original Ranch Home and Operating
Facilities
West
PD
Open Space
Vacant
Current Request
The current request for the proposed Schaefer Ranch project includes:
• General Plan Amendment — To change 17.30 acres from Estate Residential (0.01 -0.8
units per acre) to 7.04 acres of Single - Family Residential (0.9 to 6 units per acre) and
10.26 acres of Open Space.
• Planned Development Rezone — Planned Development Rezone with related Stage 1
and Stage 2 Development Plan.
• Site Development Review— To construct a 19 single - family detached residential homes.
• Vesting Tentative Map - To allow the subdivision of 19 residential lots with the
remainder as private access and Open Space.
• CEQA Addendum — To evaluate the environmental effects of the proposed Land Use
change from Estate Residential to Single Family Residential and Open Space for 17.30
acres on Schaefer Way and for a 1.14 acre area at the end of Ridgeline Place
contemplated for a future General Plan Amendment.
ANALYSIS:
General Plan Amendment
The Applicant proposes to amend the General Plan and Specific Plan land uses as follows:
TABLE 1: General Plan /SDecific Plan Land Uses
Existing Proposed
Land Use
acres
acres
Estate Residential
17.30
0
Single Family Residential
0
7.04
Opens Space
0
10.26
Total
17.30
17.30
Density
2.70 units per acre
3 of 12
twaysm
ma I p, bel�ow- MANI
EXISTING LAND USE
EASTMIG GENERAL PLAN
4,x ,
SIM
1.*-? - =.# -
ANN"
PROP OS IA AND AND USE
PROPOSED GENE RAL PLAN' AMENDMIEN'T
ANN
The requested action is a Planned Development (PD) rezone with a related Stage 1 and Stage
2 Development Plan. The PD Rezone addresses the plan currently proposed for 19 single-
family detached units and open space areas.
3-0= HEMS=
I
1 A list of permitted, conditional and accessory us
2. Siite plan
3. Development densities, by land uise
The proposed project follows, the same descidptiion of residential uses, single-fairrilly detached
I
res,idential densities and residential development standards adopted for the adjacent
neighborhood which is located south of Dublin Boulevard and currently under construction by
Toll Brother's., The! Site P'lani, Architectural Design, Landscape Plan, Phasing, and Grading are
discussed under the Site Development Review,
r, n
50M
A Resolution recommending that the City Council adopt an Ordinance approving the Planned
Development Rezone with related Stage 1 and Stage 2 Development Plan for Schaefer Ranch
Unit 3 is included as Attachment 2 with the draft City Council Ordinance included as an Exhibit A
and the related Stage 1 and Stage 2 Development Plan as Exhibit B.
Site Development Review/Vesting Tentative Map
The Applicant's submittal package (including Site Plans, Floor Plans, Landscape Plans,
Architecture and the Vesting Tentative Tract Map) are provided in Attachment 3. A Resolution
recommending that the City Council approve the Site Development Review and Vesting
Tentative Tract Map are included as Attachment 4 with the draft City Council Resolution
attached as Exhibit A.
Site Layout/Plotting
The Vesting Tentative Map would create 19 single - family lots from the 6 existing lots and open
space. Ten lots would be located along the north side of Schaefer Way. Nine lots would be
located along the south side. The 7.04 acres of Single Family Residential (SFR) use would be
comprised of these 19 lots. Open Space and utilities would be located at the end of Schaefer
Way and redesignated as Open Space (Lots R and Q). The hillside areas behind the proposed
lots also would become part of the 10.26 acres of Open Space.
Lot size ranges from 7,007 square feet (Lot 410) to 28,664 square feet (Lot 302) with a
maximum coverage of 45% for all of the two -story structures, including optional loggias. Per the
Development Regulations each lot has at a minimum, usable private yard area of 500 square
feet of contiguous flat area with a minimum dimension of 10 feet on any one side and a clear
diameter of 15 feet.
Any of the four approved floor plans may be constructed on any of the 19 lots, with some
exceptions, as shown on Sheet C -5 and identified in the floor plan "fit list" for each lot (Sheet C-
7). However, Plan 3 fits only on Lots 301 and 414. The purpose of allowing this flexibility is to
enhance sales and marketing while maintaining sufficient diversity along the street scene. The
parameters for this plotting provision would be applied as follows:
- Any single floor plan may not exceed 45% of the subdivision.
- Individual floor plans may be placed next to each other. However, only two of the same
individual floor plans may be plotted next to each other without being interrupted by a
different floor plan.
- If two of the same individual floor plans are plotted next to each other, the same individual
floor plan may not be plotted across the street from the two.
- In no case will the same architectural elevation or color scheme be allowed next to or across
the street from each other, unless they are a different individual floor plan.
- Insufficient rear yard minimums may be increased by providing a retaining wall to create
additional flat usable area.
As individual plot plans are submitted for each phase of development, the Applicant shall
provide a master plotting plan for the previous phases to ensure compliance with these
standards. The smaller lot sizes for the proposed project than approved initially results in
additional open space.
5of12
Access & Circulation
All lots are accessible via Schaefer Way, a private street, to be located at the westerly terminus
of Dublin Boulevard. With the terrain as a factor, eight lots share driveway access through
easements across other lots.
Development Regulations
The Development Regulations generally are listed as follows:
TABLE 2: Development Regulations
Standard
Minimum (unless otherwise noted)
Lot Size
4,500 sf
Lot Width
Typical Street
45 ft
Cul -de -Sac (measure at right -of -way)
35 ft
Lot Depth
100 ft
Lot Coverage
One Story
50% maximum
Two Story
45% maximum
Building Height (Two Story Maximum)
35 ft
Setbacks
Front Yard
To Living Area or Porch
loft
To Front Entry Garage
18 ft
To side entry Garage
15 ft
Side Yard
Typical (Interior Lot)
5 ft
Corner Lot
5 ft
Rear Yard
loft
Usable Yard
Size
500 sf of contiguous flat
Dimension
10 ft minimum for any one side and 15 ft
minimum diameter clear within the usable
yard area.
Parking
Two enclosed spaces per unit plus one
uncovered guest space per unit which
may be curbside, on private driveway or in
dedicated parking areas.
Architecture
Styles /Elevations — The three architectural styles proposed are included from the five styles
approved previously for Neighborhood A of Schaefer Ranch. Three architectural styles
proposed are: (A) Early California, (B) Monterey, and (C) English Country and further described
in the Stage 1 and 2 Development Plan (Attachment 2, Exhibit B). The three styles are
proposed for each of the four floor plans.
6of12
Each style is identified and described with standards for architectural elements such as: 1)
roofs, 2) exterior finishes, 3) windows and doors, 4) trim, and 5) accent elements. The
Development Standards ensure that the garage plane will be situated further back from the
entry on the front elevation of each floor plan.
Color and materials are shown on Sheets A0.7 and A0.8. Among the three styles, the color and
materials sheet offer ten color schemes, including six (6) color /styles of brick veneer, seventeen
(17) styles of cultured stone veneer, ten (10) color /styles of concrete "S" roof tiles, five (5)
color /styles of concrete shake, and four (4) color styles of concrete slate tile. Roll -up garage
doors with natural light panels would be installed and coordinated with each color scheme.
Floor Plans
Each home is two stories with floor plans offered as a four or five - bedroom unit with some loft
and /or den options. Each home has a covered front porch, direct interior access to an attached
two -car garage, and optional rear ground floor loggia with optional upper level deck for
increasing the living area. The ground floor of all plans has access to at least one bathroom or
powder room. For Plans 1, 2, and 4, the formal living room and dining areas are near the entry
with Family Room integral to the kitchen. Plan 3, which fits only fits on Lots 301 and 414, is
arranged with a horizontal layout generally to accommodate the terrain. Each unit has a
dedicated laundry room with wash basin, and each kitchen has an island, pantry, and a
nook/informal dining area. All Family Rooms would have a gas- burning fireplace with optional
fireplaces in each Master bedroom and as a feature to each optional loggia.
On the second floor, each unit has at least 4 bedrooms and 2 bathrooms, including a master
suite. Each Master bathroom has dual basins, separate water closet, and separate tub and
shower. A walk -in closet is accessible through the Master Bathroom. Each secondary
bathroom has dual basins and separate compartments for bathing and water closets. With
exception of Plan 1, all laundry rooms are on the second floor.
Floor plan details are shown in Table 3, below.
TABLE 3- Floor Plans
Plan
Square Feet
Bedrooms and Options
Bathrooms
Parking
Elevations
Stories
1
2,933 sf
4 + loft + loggia
2%
2
A, B, & C
2
+ upper deck
2
3,210 sf
5 + loft + loggia
3
2
A, B, & C
2
3
3,370 sf
4 + 1 (or den) + loft
3
2
A, B, & C
2
+ loggia
4
3,469 sf
5 + loft + loggia
2 + 3/ +'/2
2
A, B, & C
2
Total
Elevation styles: All three Elevation styles are available for reach of the four floor plans.
(A) Early California, (B) Monterey, and (C) English Country.
In addition to the common features described above, the floor plans are uniquely described as
follows:
Plan 1 — Plan 1 is the smallest at 2,933 square feet. All four bedrooms and optional loft are
located on the second floor. In addition to the 2 full bathrooms on the second floor, the
ground floor has a powder room, or half bathroom, and laundry room as a transition area
7 of 12
from the garage to the living area. The optional ground floor loggia would be located outside
of the kitchen /nook area, and the optional second level deck accessible from the Master
bedroom.
Plan 2 — Plan 2 is 3,210 square feet with 5 bedrooms, including one downstairs bedroom
with an adjacent full bathroom. Second floor area also may be built out with optional loft
space. As with Plans 3 and 4, a dedicated laundry room would be located on the second
floor. The optional loggia may be situated adjacent to the kitchen area or the family room;
the family room location would accommodate an optional upper level deck adjacent to the
Master bedroom.
Plan 3 — This 3,370 square foot Floor Plan is limited to Lots 301 and 314. Plan 3 is a four -
bedroom unit plus a ground level (fifth) bedroom (or optional den) with adjacent full
bathroom. The entry features double front doors. The horizontal layout results in a linear
configuration of the family and dining rooms along the rear of the home, and the four upstairs
bedrooms along the front of the home. Optional loft space also may be built out on the
second floor. Plan 3 offers two smaller optional loggias, one off of the living room behind the
garage and a separate one adjacent to the Family Room with fireplace options for both. An
upper level deck would be an available option above the smaller loggia adjacent to the loft
area.
Plan 4 — Plan 4 is the largest at 3,469 square feet. The ground floor is provided with a
"Junior Master Bedroom" with a shower - equipped en suite bathroom (3/ bathroom) and walk -
in closet. A separate powder room also would be located on the ground floor. The second
floor would be accessed from a circular stairway in the center of the house to reach the four
bedrooms (including the Master suite), laundry room, optional and loft. Of the four available
floor plans, Plan 4 offers the largest optional loggia. The location of the loggia can be
accommodated either adjacent to the ground floor bedroom, where it could provide an
optional Master Bedroom deck, or adjacent to the Family Room with no upper deck option.
Parkin - The parking requirement is two enclosed parking spaces per unit (38 spaces) with one
guest space per unit (19 spaces) that may be provided curbside, on the driveway, or in
dedicated parking areas. Based on this standard, the residential parking required for Schaefer
Ranch Unit 3 would be 57 spaces. The parking is provided with the attached two -car garages
provided with each unit for a total of 38 enclosed parking spaces. Guest space parking is
satisfied in driveways (2 per unit resulting in 38 spaces) and curbside along the south side of
Schaefer Way (29 spaces) for a total of 67 guest spaces, resulting in an excess of 48 guest
spaces. The proposed parking is shown on Attachment 3, Sheet C -8.
Landscape / Streetscape Plan
The landscaping and streetscape is subject to the characteristics and constraints of a hillside
area. Although Schaefer Way is a private street, the landscaping theme and character is
intended to reflect the improvements elsewhere in Schaefer Ranch. Sections along the
streetscape would include landscaped slopes within front setback areas and along individual
and shared driveways. The landscape plans have been prepared to reflect the building footprint
of each floor plan in addition to the overall landscape plan for the neighborhood. The
landscaping has been designed to be compatible and complement the architecture as to theme
and character of the residential structures. Landscape materials include a variety of native and
other drought tolerant species.
8of12
Pedestrian circulation is accommodated by sidewalks on both sides of Schaefer Way, and the
clustering of driveway access points creates additional segments along the street for
landscaping.
The Landscape Plans also indicate the type, style, and placement of walls and fences that will
be used within the project. The topography is placed in a visual context by the type of fencing
materials utilized. This project proposes five different types of fencing. The fence types include:
ranch rail fence, tubular metal view fence, wire mesh view fencing primarily for rear yard
hillsides, split -view fence of solid wood and lattice, and solid good neighbor fences between
private property side yards.
The Landscape Plans are provided in Attachment 3, Sheets L -1 through L -6 and include:
landscape concept, planting plan, fence types and locations, and grading along with the
proposed palette of trees and shrubs. The landscaping for the individual lots will be required to
conform to the City Water Efficient Landscape Ordinance.
Vesting Tentative Tract Map 8136
The 17.30 area is currently comprised of 6 legal lots and a lot for an existing water quality basin.
The applicant is proposing to re- subdivide the area to provide 19 single family residential lots
(net gain of 13 lots) and two lots to be designated for open space (one of which will contain the
existing water quality basin).
A Resolution recommending that the City Council adopt a Resolution approving the Site
Development Review and Vesting Tentative Tract Map 8136 is included as Attachment 4.
Affordable Housing /Inclusionary Zoning — In accordance with Section 8.68.030 A. of the City
of Dublin Zoning Ordinance, projects with 20 or more lots are subject to the Inclusionary
Housing requirements. This project will comprise a total of 19 lots if approved and, therefore is
not subject to this requirement.
Public Art Compliance — In accordance with Section 8.58.030 B. of the City of Dublin Zoning
Ordinance, projects with 20 or more lots are subject to the Public Art provision requirements.
This project will comprise a total of 19 lots if approved and, therefore is not subject to this
requirement.
CONSISTENCY WITH GENERAL PLAN & ZONING ORDINANCE
The proposed amendment to the General Plan and Planned Development Rezoning reflect land
uses that are compatible with open space preservation and neighborhood character within the
area. The proposed project will contribute to housing opportunities and diversity of product type
as a complement to the surrounding neighborhoods, including the neighborhood south of Dublin
Boulevard that is currently under construction by Toll Brother's. The proposed Stage 1 Planned
Development rezoning is consistent with the requested land use amendments.
The proposed project has been reviewed for conformance with the Community Design and
Sustainability Element of the General Plan. The project has been designed to be compatible
with adjacent and surrounding development via architectural elevations, site planning, and
design details and integration with the Schaefer Ranch community over all as lots sizes,
densities and development standards mirror the neighborhood under construction south of
Dublin Boulevard in Schaefer Ranch. The Applicant intends to exceed the City of Dublin Green
Building Ordinance and will exceed the 50 point threshold in the City's program. In general, the
9 of 12
proposed project furthers the goals of the Community Design and Sustainability Element of the
General Plan by providing a high quality of life and preserving resources and opportunities for
future generations.
REVIEW BY APPLICABLE DEPARTMENT AND AGENCIES:
The Building Division, Fire Prevention Bureau, Public Works Department, Dublin Police Services
and Dublin San Ramon Services District reviewed the project to ensure that the Project is
established in compliance with all local Ordinances and Regulations. Conditions of Approval
from these departments and agencies are included in the Resolution approving Site
Development Review and Tentative Map Subdivisions (Attachment 4).
ENVIRONMENTAL REVIEW:
An Initial Study has been prepared in accordance with the provisions of the California
Environmental Quality Act (CEQA), CEQA Guidelines, and City of Dublin Environmental
Guidelines. The Initial Study assesses the potential environmental impacts of implementing the
proposed project beyond the impacts identified in the 1996 Schaefer Ranch EIR.
The proposed project is a modification of a project already approved by the City for the Schaefer
Ranch project. The impacts of the Schaefer Ranch project were analyzed in an environmental
impact report that was certified by the City in 1996 (Schaefer Ranch Project/General Plan
Amendment Environmental Impact Report, State Clearinghouse No. 95033070 (the "Schaefer
Ranch EIR" or "1996 EIR "). The EIR assumed 474 dwelling units, including the 6 -lot Estate
Residential development area. The Initial Study identified no additional impacts from the
proposed project, primarily because the project is within the previous assumed density and also
within the assumed development area. On the basis of the Initial Study, the City prepared a
CEQA addendum in accordance with CEQA Guidelines section 15162/3 and 15164.
In 2008, the City approved an Addendum to the 1996 EIR for properties in Unit 2 of the
Schaefer Ranch project that included a General Plan Amendment, Planned Development
Rezone with related Stage 1 and 2 Development Plan, a Vesting Tentative Subdivision Map,
and a Development Agreement to eliminate a 5.69 -acre retail commercial site on the southwest
corner of Dublin Boulevard and Schaefer Ranch Road, 12 estate lots, and 24 single - family lots
on the south side of Dublin Boulevard and generally west of the retail commercial site. These
uses were replaced with up to 140 single - family detached lots. The 2008 Addendum was
approved by Dublin City Council Resolution No. 203 -08 on November 4, 2008. The 2008
Addendum did not affect land uses on the current project site.
A Resolution recommending that the City Council adopt a CEQA Addendum is included as
Attachment 5 with the Initial Study and Addendum attached as included as Exhibits A and B,
respectively.
PUBLIC NOTICING:
In accordance with State law, a public notice was mailed to all property owners and occupants
within 300 feet of the proposed project as well as the entirety of Schaefer Ranch and California
Highlands to advertise the project and the upcoming public hearing. A public notice also was
published in the Valley Times and posted at several locations throughout the City. A copy of
this Staff Report has been provided to the Applicant.
10 of 12
ATTACHMENTS: 1.
Resolution recommending City Council adopt a Resolution
approving a General Plan Amendment for the Schaefer Ranch
Unit 3 Project, with draft City Council Resolution attached as
Exhibit A.
2.
Resolution recommending that the City Council adopt an
Ordinance rezoning the Schaefer Ranch Unit 3 Project site to
PD- Planned Development and approving a related Stage 1
and Stage 2 Development Plan, with the draft City Council
Ordinance attached as Exhibit A.
3.
Applicant's submittal package dated September 24, 2015.
4.
Resolution recommending that the City Council adopt a
Resolution approving a Site Development Review Permit and
Vesting Tentative Map 8136 for the Schaefer Ranch Unit 3
Project, with the draft City Council Resolution included as
Exhibit A.
5.
Resolution recommending that the City Council adopt a CEQA
Addendum and a Related Statement of Overriding
Considerations for the Schaefer Ranch Unit 3 and a portion of
Unit 1 Project, with the draft City Council Resolution included
as Exhibit A.
11 of 12
GENERAL INFORMATION:
PROPERTY OWNER/APPLICANT: Schaefer Ranch Holdings LLC, (Discovery Builders),
4061 Port Chicago Highway, Suite H
Concord, CA 94520
Attn: Doug Chen
LOCATION:
North of 1 -580 at the westerly terminus of Dublin
Boulevard, west of Schaefer Ranch Road
GENERAL PLAN: Existin — Estate Residential
Proposed — Single Family Residential and Open Space
ZONING: Existing — PD
Proposed — PD
SURROUNDING USES:
LOCATION
ZONING
GENERAL PLAN LAND USE
CURRENT USE OF PROPERTY
Open Space and
Hillside Open Space
North
PD
Public /Semi - Public
and DSRSD Water Tank
Original Ranch Home and
South
PD
Estate Residential
Operating Facilities
Public /Semi - Public and
DSRSD Tank Site
Parks /Public Recreation
public park
East
PD
Estate Residential
Original Ranch Home and
Operating Facilities
West
PD
Open Space
Vacant
12 of 12
A
W
r7
z_
F~
z
U
W
CL
F~
U
W
F�
Z
W
A
W
w
x
EI
w
H
H
w
a
°z ^ aQ m z° �a
avQ du 22a d
U�a d QQ
w. �Gw. ,1d co
du<CuC07O
zz +I A I I I .1..I
z I z
za.daz� Qa-I!.4.a¢¢z^QZaZ dd'I'I
r aa0^ �a c,a 0--
�axF�. . . 00�,7 c7aex�;a- gal -v�;
CU ) CU ) O Oz O g W aa A A abaU
C) C) W0 zz a 0C0 >zzz AA
0ww 0Oa ..Ia o.- i0zOOOw a-j
Z u0
w A w �A� w H _ _ _
zzE -dQQQ 0Z 0z Z Z +. z zH P 1� 0 Z z
000- .O-Oz» F"OOZ» »F 0 000
u C/)LI)L�wwww000000wccnW.uo www w w 0 0 0 0
I I I I
¢ 1 1 1 1 1 1 1 1 1 1 1 1 1 V f 1 11 11 11 11 11
M M M M M M M M M M M M M M 4 1 1,
dzQQQz zzzzzQdz QdzQdZzQzdz
.aa a �.a.a aaaa�a a.L a. a, a, a.. . .a.aaP, a. aa.a.L.aa
n. a a. P. a. a. a
^ N M 7 n lb r" 00 O� O^ ^ •-• •-• --^ ^ N M V. 11 lD t` 00 C� O^ ^
d¢¢¢¢¢¢¢¢¢¢¢Q¢¢¢¢¢¢¢¢¢¢¢¢¢¢
F
x
u�
U
F.
F
w
w a�
a O X
¢6¢d�
a a w a
F
wWt¢-z�f wwA
wwzd� >z >xz
04 F- C7 C.7EW.aQ��W C7
a 0 CA CA
H °zgWC)pza
a F A
Xawd wQ.r,A
wa >c7�'Av�a ¢
^ N I? 'T 11 b r 00 91
U U U U U U U U U
L)
x
W
H
v3 z
z 0
�x 3
00
U a`
y� u u
¢wC4C4U
U0a0Ut¢
U
(1 x.000
¢Q�uu
^ N M �
•--1 •-� ¢ Q � Q
�� aaaa
aaaa
u.w 1 I I I
W W Ft�»HHF-
�� wcocawm
x�xwx
xx�XX
n m W W W W W
F F W W W W W
cn cn UuUUU
Q Q Q Q Q
��HZzzzz
�vsaaaaa
X00000
°°wzzzzz
Q Q cn cn D5 D� cn cn
a a O w w w w w
H H x A A A A A
a¢¢¢¢¢
aawaaaaa
W W'�W wwww
ww0it
wcaQca D����
a
Z^ N N M K h 10
nx°Om °m °ma°�m°ce
A
J
S
as
¢¢ as
as zz�
F H N
00 0 W
ID 0
dadzzA
uudzz�
Z z F• Q d
W w w .-1 J w
wwAa.a.A
as as
Q¢ Qd
zzzzzz
�aaa�aaa�
w
^
CV M h D
A
z
Q
a
U U
� -d
0o z am
Oucoa
�mIm m �vrQ I I QU ¢ z�Z
xxyC 40aOC7 d ¢ VI I ¢ada O� dd'I I
N a Y Y >^ a p Q 0 d W U O O w w 0 0 0 p Q W U 0 0 w w
A A ¢A Q-j � A U u U u p Z w z z z z OO w W z z z z A
zzzz66 OOOO OO 000 Q
Q QUUUU uaA WHHHHzzzzu,AwA FF[ F -
-zzzz
r,.<ti�AAF-•Oz > >? >OOOO O�OZ» »0000
CL CL �¢ u0w-ta.wliaaaaaa[Ucl� W aWtawiwaan a
U u d d d d° 0 w W. w w w w 0 0 0 0 w n w n w w w W w 0000
rn 'n 3 3 3 3 W, 1 I I I I I I I I I I i I I I I I I I I I
W W O O a a ^ ^ ^ ^- ^-- ^ ^^ N N N- N N N N N. N N N
A A O O z zz zz z z zz z z z zz zz zz zz z z z zz zz z z z z
P r� zzzz 0 a Q¢ d Q¢¢ Q�¢¢ Q Q d¢ d Q Q 6 d Q d d
��r�i13333 °OUa'�.aaaa"J. aaaa .a'�.a�aaaaaaa'�.aa'a�ao'�.a
ZD
x
U
Q
z
z
o
Z
C
L)
w
w,
o_
z
x
w
cn
J
w
u
co
¢¢ as
as zz�
F H N
00 0 W
ID 0
dadzzA
uudzz�
Z z F• Q d
W w w .-1 J w
wwAa.a.A
as as
Q¢ Qd
zzzzzz
�aaa�aaa�
w
^
CV M h D
A
z
Q
a
U U
� -d
0o z am
Oucoa
�mIm m �vrQ I I QU ¢ z�Z
xxyC 40aOC7 d ¢ VI I ¢ada O� dd'I I
N a Y Y >^ a p Q 0 d W U O O w w 0 0 0 p Q W U 0 0 w w
A A ¢A Q-j � A U u U u p Z w z z z z OO w W z z z z A
zzzz66 OOOO OO 000 Q
Q QUUUU uaA WHHHHzzzzu,AwA FF[ F -
-zzzz
r,.<ti�AAF-•Oz > >? >OOOO O�OZ» »0000
CL CL �¢ u0w-ta.wliaaaaaa[Ucl� W aWtawiwaan a
U u d d d d° 0 w W. w w w w 0 0 0 0 w n w n w w w W w 0000
rn 'n 3 3 3 3 W, 1 I I I I I I I I I I i I I I I I I I I I
W W O O a a ^ ^ ^ ^- ^-- ^ ^^ N N N- N N N N N. N N N
A A O O z zz zz z z zz z z z zz zz zz zz z z z zz zz z z z z
P r� zzzz 0 a Q¢ d Q¢¢ Q�¢¢ Q Q d¢ d Q Q 6 d Q d d
��r�i13333 °OUa'�.aaaa"J. aaaa .a'�.a�aaaaaaa'�.aa'a�ao'�.a
ZD
x
U
Q
w
> z a.
CAu
w a
AAA
z
0.3
L bb
C7�o
b
b4 T ON
U v,
Ca U
y p ti 000
0
O a' O i.
h p N
A U
M
U
r�
U
rU�
V 1
ct
V
. rl
tn
N
O
� M
•� o
o rr
r�
r-1
V �
� O
� M
ca
- O A
O �
V1 A p!
M
H
z
w
H
F�
d
z
a
L)
w
U
x
w
u
M Z
w
pLTJ
oc
3
z� w
'
w>..
�� 3
0
kri
Z0°
x0 >k
W
v�a�¢
= �4F�Ga w
U�OUZ
d
w�nOw
pu z
¢�mwu
zQV°�
'
�3 ¢ U
w00
Z
E- >00
�0 u
00 Q
Cap' ZZ�
z = -°
�, --
uo (n 00
¢pS 0
U
u_N3
<2S u
3u
--
>
w
> z a.
CAu
w a
AAA
z
0.3
L bb
C7�o
b
b4 T ON
U v,
Ca U
y p ti 000
0
O a' O i.
h p N
A U
M
U
r�
U
rU�
V 1
ct
V
. rl
tn
N
O
� M
•� o
o rr
r�
r-1
V �
� O
� M
ca
- O A
O �
V1 A p!
M
H
z
w
H
F�
d
MAID
STOZ -OC-60 - £ lINn NJNVd 11333V143S - NV ld 1"3N39 9NI1SIX3 - OZTTOZ
a
0 ^ o
0
Z Z V O CL
z ¢ O+h 5
ZY > Oco Co, N
03 3 u;0:, S.
JS y�Z Iw-wp mu o
°OO mOO G °¢¢� c
4 O Z�� �s ^ O >U Y1 ON
U Vl Ym V
Q Q J � QZQ x 4 Q m =u Q° W m Z a c
W R V b > tp uKO+ O O
Z Z �Q WL CCON �p'ON zzFI a a 3w
CCY
r g o W m W~ LLaO� 5. p0
z K p W,zw ¢HV"� °V •aVin
W U �' LL f O x �D Z N 40 b Z N Q N Q N y�j W f� t� • V• L U
ZN v m W O}Z z invu.°.' °au.°f. HN3� D <a .... N C °o �..
w < p � cw n x3
U Z - m O. Qf p V �e N
'> W zw a z x j z
1' p u~i m a o !Z5 ° ?
w O a a m m
U U) _ ��
W 5
` J m J p O
m
O
�pz
wLL'
Z W uao>�
X Q (� WmiNS u o
W J a w u
O w �,G \NEER
Z Z ZY JQl7 V4' QN �%
z > V u aim zz
w
O O uzi
_ _ .., •aaav saoism3a I Siva
.�..� m
Z
U) �>
1
z�
0 Lt 1 [L \ a
U
I ga'0)
t 1
�Vx 1 1
� 1 1
0 1 1
11
1 1
ck� 11 t
Ld 1
co
am Z w i 1 tt1
W _� o
M 0- I to
�U) N
W 0 1
L L� U); a cs�
U vy u i `r LL
U � � I �-, tL1 Cr-' 1:0
M u (D rm � Q C9I i L J 0 r` w
�I w �_
AM 0-)
v ° N =I �
� o I
� n m i i tLl
»
,I aNCO 1
1
tL .... CO
co
, 4o
UJ 1 N U 1 1
U- U Q 1
"L OCR — w D ca) ko
zOW U 440 '1 `1
U 1~ < 1 \
g�
� i 0
g \v 0
g
STOZ-OE-60 - E 1INn HDN" d3d3VH7S -1N3W4N3wwv N1fld 1"3N39 O3SOdOWd - OZTTOZ
<
z
z o
0
N
j W
V F N
Q
0
J d
i Z 4
1- ° V = = V ° Z pia o
W I " _<
J Z} T 0. W C~
4 a 0 z W� _ �� �
Wm� Z �
o bas
Q 6 00 Z�Of 01 jS01T N�WM Z V Nth
LZZ_l ` }i Z N f m W }Z 4�V�< mV�� a�WM 4 Q O
W (7 z i i v ai E�or EacA "-. z
i Z U7 w in .`. Oa �/ uW.iOe > z. o "nog
�- W W W a w m �Z a..V ogO.. v,} a
Q N O a a ma �emA 2,z zA v< Zy7 < ULa G.
WW W w �0000� ��
') u)U)
EL c
w g s z
CL a _ a) o <.
,W
W ° = o 'w^ v w w vai /�G�KEER
d �
W ..... �f938 4L a
-- - 'tlddtl SNOISIA3N 31tl0
o E� s o
CO
Z
O a �6. W •�' I
W .. LO LO ^ Z
co
F4 U
p 0-
< N
x
Z1 ui m
z `� a +
< N O i 'I
ui
J m
m
z :2 + co
ui
_ +
i r
m
UJ
d
41. v
I I
0
aw _ d
L L� r a w i i G7
U uy U � i i tt-
W <
CD
iz _j
Q
Mal V)W
�-
N"al u
^ U + + tL1
W < ++
0 W1 cc
t1 �
NCO
� � t
W ^
Q
'L.� OCf ^C QN�
ZL 0W�IJ a „O
p ,
1 0QNm % +
O o o�R
WIMP
\,O OU
8
4
I W
O 6
z
w
A,
EL
Q
'✓] V7
v Pw O
J
z �
o�FNa
O a
c � <
L✓
H
u
�z 00
w W o
W Q
a,
xo °3
�✓.
>xaw°
Ofl00
�^�
E3
�H
4
<UU ° w
q
4
I W
w w w m w 1, w xw
w
o
N
W
> � L1 �
zLLJ
41
LL-
Z
-,.�
W I Lv O �
,h,� O r
(D C)
j J
Q
z F V)
L'L^� 0 i
C�
tall O r�
Wt
11 A
"L1
STOZ -OE-60 £ lINn HDN" 113:19VHDS - dVW 3ALLVIN31 9N11S3A - OZTTOZ
z
0
ti
r z s
o Q
N z ^^
o >
Q Z �L u
ffW w z v o W j ¢❑ ,�. p C�
51J
V/ =c°,b U�G QOrn O O Q U R Q D a z m N M i d O J� F- S x
w UUwm ��Vr7 pZa Q¢ W N U " r v, W O O O Fw w K W v
F— npwp a°�
¢2� I ° 1�f a s ° w F ,n w z —Oici v
U TT
Z �D�p FAO ¢O Z Q �C
ZN N pa
J Q zcVi»oU0 v � Z m~ p F-
W w z V N w W�� V i0 w N Z J o
O w y lil p Z z a O w u– O NwZ }gyp T O D
3vpi� K pm 3 ? O
ICJ] iZZ� o N o
KO o~ o r a O V! z r W o n o
\ w W N F NO Z NO Wp O¢ KJ m J �2 �<� Zm u m o
F
¢
d o N°
o a
cal .3 < ui ,o r� m of o ci ri v .0 1 C6 6 6 �Tti �c�ON �✓b� ac
PsbAx 'p w
4
11 U ❑
� aaav ova
i
z p a
C)
LL1
V)
Q
0
w � o
z om w m
z
0
s
N
1
�l
rr ,�
�V
1
oil
m
Oa ` R
u
1
Q
t
1 ! r
I
w
f � �
7 I ,
7
imp
z
w
A,
W
X
J
LLJ
F � ❑v
� z
w w w m w 1, w xw
w
o
N
W
> � L1 �
zLLJ
41
LL-
Z
-,.�
W I Lv O �
,h,� O r
(D C)
j J
Q
z F V)
L'L^� 0 i
C�
tall O r�
Wt
11 A
"L1
STOZ -OE-60 £ lINn HDN" 113:19VHDS - dVW 3ALLVIN31 9N11S3A - OZTTOZ
z
0
ti
r z s
o Q
N z ^^
o >
Q Z �L u
ffW w z v o W j ¢❑ ,�. p C�
51J
V/ =c°,b U�G QOrn O O Q U R Q D a z m N M i d O J� F- S x
w UUwm ��Vr7 pZa Q¢ W N U " r v, W O O O Fw w K W v
F— npwp a°�
¢2� I ° 1�f a s ° w F ,n w z —Oici v
U TT
Z �D�p FAO ¢O Z Q �C
ZN N pa
J Q zcVi»oU0 v � Z m~ p F-
W w z V N w W�� V i0 w N Z J o
O w y lil p Z z a O w u– O NwZ }gyp T O D
3vpi� K pm 3 ? O
ICJ] iZZ� o N o
KO o~ o r a O V! z r W o n o
\ w W N F NO Z NO Wp O¢ KJ m J �2 �<� Zm u m o
F
¢
d o N°
o a
cal .3 < ui ,o r� m of o ci ri v .0 1 C6 6 6 �Tti �c�ON �✓b� ac
PsbAx 'p w
4
11 U ❑
� aaav ova
i
z p a
C)
LL1
V)
Q
0
w � o
z om w m
z
0
s
N
1
�l
rr ,�
�V
1
oil
m
Oa ` R
u
1
Q
t
1 ! r
I
w
f � �
7 I ,
7
imp
\` \
kL111
I y
y 1
X `I
ol
i l }ti
i,i't�l�l,ly�
t 1,
Fr�
''l I
N f!I !/ //i /� y! �', �' 1'1\ -1+, 4,i tit NRllil' ii ll yp Il
I�il�li�rif lY\ l
1!j
� �
t
`/
i/
A,
\` \
kL111
I y
y 1
X `I
ol
i l }ti
i,i't�l�l,ly�
t 1,
Fr�
''l I
N f!I !/ //i /� y! �', �' 1'1\ -1+, 4,i tit NRllil' ii ll yp Il
I�il�li�rif lY\ l
1!j
� �
t
`/
i/
0
J
O
0
J
r 0
O °¢
z
Q
J
Q.
w
CD
a
z
a
0
Z
D
Q
C�
Q
Z
J
W
ry
Q U
Z
OR
Z
U
U)
STOZ-ZZ-60 £ IINn HEN" N3c13VH:)S - NVId 39VNI"Cl 19 9NIOV2l9 ANVNIWI1321d - OZTTOZ
W
V
A
'1
O
0
O
N
Aw
J 00
r—� m I
L� �W
9t AO �
ZUIo n
Zn
W U cn
PAN
O
ma
rQ.-- o
L�
Z L�
L
o w
W `
is
z
Ln
X
w �U
rS r
sbb�
W
J
0
w
U)
0
Q-
0
Y
W Z
U
z u a
j
0
O Uf
W�
cd X I.pIFFCR
w
o
4
C1 �
bs Bt
� t �
I
4
l �d ' ❑ 1 � Gs
� � I
CL
:GS 99.0 I Vi
Ii
.2S1
ast�i,E _ ve
r `
anse, i
to-} - ----------- -- W
cr-
0
w o _
I -r t9 I
V�� ¢ _,� m' 1Y\ �F. • v ` .561 rl
Ld
Y. .SFN o I � I k.
w 77 CD
. a , ss so
I � jai � cF. dg amvs.
°-
955. of �,
5 U1
1
W
WL
I' I
a� Y
+n, t5tt I
'1 S \,'
,L
-`,LT
N
ux�Fi WS ,w I
a
I E
IP I I
O �
U
. W
I
oil ,
I �
1
1 I I
I I
104
a
c�
W
i
i
o `
O
=
J
IL
Q
U
r
(n
Z
K
W
V
A
'1
O
0
O
N
Aw
J 00
r—� m I
L� �W
9t AO �
ZUIo n
Zn
W U cn
PAN
O
ma
rQ.-- o
L�
Z L�
L
o w
W `
is
z
Ln
X
w �U
rS r
sbb�
W
J
0
w
U)
0
Q-
0
Y
W Z
U
z u a
j
0
O Uf
W�
cd X I.pIFFCR
w
o
4
C1 �
bs Bt
� t �
I
4
l �d ' ❑ 1 � Gs
� � I
CL
:GS 99.0 I Vi
Ii
.2S1
ast�i,E _ ve
r `
anse, i
to-} - ----------- -- W
cr-
0
w o _
I -r t9 I
V�� ¢ _,� m' 1Y\ �F. • v ` .561 rl
Ld
Y. .SFN o I � I k.
w 77 CD
. a , ss so
I � jai � cF. dg amvs.
°-
955. of �,
5 U1
1
W
WL
I' I
a� Y
+n, t5tt I
'1 S \,'
,L
-`,LT
N
ux�Fi WS ,w I
a
I E
IP I I
O �
U
. W
I
oil ,
I �
1
1 I I
I I
104
x
w
0
Ln
11
J
Q
U
h
r
N
1L
K I
1.
g \
� I I
I
LL
.'I J
I
068— _L�\ _.,%\
.09
rqg ll '
I i •
a I •�•
11-1-1!
-1
o
c
MEMO
E
u
Pi
id
Y
F
�z
mz
�zl
zz
�I
cir,
wrT��
o
7
O
NQ7
�
Qj
wMd
pow
z AAL7
>
„2:4
VFW
p
�,Q
o
c
MEMO
E
u
Pi
id
Y
F
�z
mz
�zl
zz
ll N
0
0
7
O
NQ7
LL
LL
�,
Opp
X1-
70F
7
VFW
p
�,Q
W
< W
W�
N Q�z
i
ZmZ
Z K H F
QzLL
N f
w
�
pYQ
x
>1
�
Q
�Q
l~L H LL
LL
UIUI NO N
m0 O0) Od t
am-� cv`t mN �O
cvT m� mcv mcv
�z
mz
�zl
zz
O
0
0
O
LL
LL
LL
�,
z �z
U
('dAl) 3NIl Ail fld02dd �V
c
M
LL
U
I
z
u�
5
('dAl) 3N7 A1213d02id
w
`L ±• •�
u
.I
1
o
0 4�
f z — — - -- -- ? _
us �
Q
Q CD U W LL U O �I
I I I I I I I I I I I I I I �"� • �I
LL LL >LLL L L�"_ �u Q VY •�
0
z
LA
n Q Q n
(P j Q
Q F T
0
z� I
LL Q
z
LA z l O C
i "n I>
ICI
LLA
zte
Q
°
z I � �
I
1 I
Q
{
I
z LA
ll1!I Z
ILI �Q � I' W ly
-_ IL vi u W w w
�y r� Z Q 1 L (y Z 1 Ul F- N S
!u �' o �'�'iz0� of �� II" Q''�I� o, o
ILI 0 D
u Q Ll UiI S Q �I p <It �, �ji
z a
� �z
LA
X
w
F—
Q M
wZ
0
aC)
z
W LY
Ow
U w
Q
OC)
J
U)
a
@
i
CD
m
N
06
CD
m
m
N N
C >
O O
cu w
m
O J
O
OF
C 'p
ma
Qa
O C
> cn
CD y
0 C
d
N E
O
O G O
ao m
O >
a o
m
a
2 @ @
nO C E
L
T F C) C
L —
Comi2 a
N @ O N L
U 1] > L
C O` "� m
L 7
T C
@ @
m
E
to C a)
@ E N 'C
E ,O w O
n
C @ Z N @
E E n
� � O
@ O On O a
N
@ > C C
C >i N - N
E
V
U
C `J m O
> >
.co
2
C)
E LL O O
E c5HL~i
LL cn
O 6 O
c
v v o ~
N
O
(Q
a :E w
m a n >
o 0
,2
U) J J J J
"O
(6
T
N
@
N
7
L
3
@
N
U
E
.co
H
LL
LLJ
@ "O
LL C
to @
7 N
O
� N
O) @
� C
O O
U T
C
@
� E
E 7
LL
U
0 LL
0 0
'O N
M O
m �
c
y N E
D �o 0
N
L @
@ @ O N N
T O C Y C
� � O
T O y
C @ SC O NO O
n�
o ` C U o
Q7 @ N
O E O @
O m n O `- •L..
Q
N @ C O
E 0 C ti N
o O 3
n Y O z O
a� 3 O 10 @ m
N L
r °
N @ 3 U @
O @ O q O
C a
E O O
O N @ U C
O C 'n O
O O C O C
w Y > C d
m O
a o E m_
O
U L n @
n @ w p (6 @
N E N O 7 T
L N U @
E
O nw
'-
m c c m 7
n— @' E
@ n @ (D a
O 7 E w w
O O @ N
c j O (n O p
O-
a
(D a
E N N E T
O @ L @ O @
. a o v E
H
Z_
a'
IL
F-
0
0
LL
W
In
D
0
S .
� LL
z `n
a�
J p
a N
z
2
CL
F
O
O
LL
W
0
x
M LL
Z N
g�
N
CL N
Z_
w
a
F
0
0
LL
W
N
n
0
S
N LL
Z N
.0
g
a °O
F
Z
Ix
a
f'
0
O
LL
W
cn
D
0
cn
x
LL
Z
a O
J �
IL r
O O
� O
\
M
\
N
\
t0
\
r
\
r
\
00
\
M
\
N
\
O
\
O
\
N
\
\
M
\ \
m �
^O Z
N O a (�
N
O
U'
V
�=-
M
V'.
[r
ti')
LL
CO
o
m
cD
m
a °3 °o
N�
O
Z
o
Z
m
0
Z
°'
M
O
°°
'0
N°
r
> a
F F= y
O
w
O
oo
O
co
^o
co
O
O
co
O
co
O
co
O
co
O
O
O
d
O
O
O
O
O
O OJ V
N
N
N
N
N
N
coil
CYI
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
CCCYYYIII
N
N
N
N
N
N
N
N
N
N
r
LL'
iy
N
c0
CO
(D
0
M
m
r
O
M
r
M
M
O
Q u o
>a,°n
Z
N
Z
N
v
0
V
0
V
0
V
0
V
0
V'
0
V
0
v
0
V
0
V
0
V
0
V
0
'T
V
V
V
v
I~i
N
N
N
N
N
N
N
N
N
N
"
N
0
N
0
N
0
N
0
N
0
N
Z
a
--L-
v
v
v
�����0000N0000aoo�
�000�o
N O a
LL.
LL
LL
LL
L.L
LL
LL
LL
�t�
tzt
F-
c7
°a °oo
LL
LL
LL
L�
LL
LL
LL
LL
LL
3
0000
o
0
0
0
0
0
0
0
0
0
0
0
0
y a o
Z
Z
Z
Z
_
Z
Z
Z
Z
Z
Z
Z
Z
Z
Z
Z
Z
Z
O
N
N
�oZ
O
LL
LL
F-
,.
�����L�
LL
LO
LL
LL
LL
LL
LL LL
LL
LL
LL
LL
LL
LL
�'o
O
O
O
m N
0
0
0
0
0 0
0°
O
O
O
O
O
i s �°n
:...:.•`aTe�"
,z
Z
Z
Z
Z
Z
:.
�����
fW
cll
N
�`fl
FYI
CYI
�t
r
Z
a
rD
cA
cA
M
M
-
oU
ab
H!-
rp rp
M1
M
cp
cA
cW
cD
cD
\
RfD
Rl�
R-I�
XINNE�RNML;—:Im
C7
N
O
m
M
M
'
LO
p C
0 O
Q
ra
co
N
O
N
c0
N
O
V
r (D
O
d a rn
O
M
O
N
M
M
O
N
co
M
O
N
M
M
O
N
co
M
O
N
co
M
O
N
M
M
O
N
M
M
O
N
M
co
O
N
M
M
O
N
M
M
O
N
M
M
O
N
(((+++���
M
M
O
N
M
M
O
N
M
M
O
N
M
M
O
N
M
M
O
N
� O Z
to WO
LL
r
m
m
N
O
M
N
N
N
CO
N
m
N
M
V'
N
W
M
M
M
�O
co
M
r
M
m
O
w
to
o
O
N
N
N
m
N
N
c0
M
N
Q u
} d o
LL � v
N
r
TTTFFFF
N
N
N
N
N
N
�ee''hhh
N
a
e0
W
a2
c0
N
a0
N
O2
W
of
12
W
W
N
Oo
c0
N
d
'J
N
N
N
(VL
N
N
N
N
N
N
N
N
CVI
N
N
N
N
N
noo?
C7 LL
m
co
r
M
co
m
m
r
o
r
o
O
v
m
m
r
r
CO
�
N
r
oo
(o
r
O, c7 VJ
Q c � OJ O. -=
c0
N
o�
M
V'
N
r
M
V
O
N
m
N
cD
c0
N
y'.:
W
N
W
m
co
M
W
c0
c0
W
.
W
W
a0
N
a0
W
d C7 m
(D
c0
(O
(O
co
co
co
co
<o
co
co
co
cD
co
c0
co
(O
O Z
cn
LL
oa
m
M
N
M
lf7
N
m
N
c0
N
r
N
cD
zo
O
N
O
O
N
(O
O
O
C
m
m
lf7
O
M
c0
N
N
O
V
cl
M
O
m
M
O
O
m
N
r
N
CO
N
V
a K
J �
�
\
\°
\°
c
tthhh
w F
a
O
O
O
O
O
O
O
O
O
O
o
O
O
O
O
o
O
O LL
g -
a
•+
-
r
H a m
W LL
O
O
co
�
V
M
Od
N
cD
N
V
(O
m
V
r
M
�,.�
O
r
N
r
O
�
M
V
CD
O
O
m
co
O
O
O
V
G (n
co
m
O
r
W
N
V'
W
M
�
O
co
O
r
o
r
u7
'o
r
r
co
m
r
r
N
cD
F
O
J
mmmQ
N
m
N
m
N
O
M
M
N
M
r
-e
eo
le
m
't
O
't
r
V
N
V
M
V
a
-q
N
-e
c0
-e
r
a
W
--t
m
a
U
'r
W
0
z
AAL�
I �I
..
a�
o�
�xo
a\
ti U O\ �
Q V Q b
NO d
O O
U C N0
C) t U °
M
U
ct
Q�
U^
V 1
U
ct
U
�n
I�
V)
tu
"0
U 00
m
N
O
M Q
� O �
� Q �
■
00
i
Z
oai�
1 ^ �
� ; I,� '�, +•, • ;i ;' I 1 t;l, ,��`:, ,` 1i, 1i'!i, t!,'``',` ' i� � U � w a �''"I b
tai
;
;
;
ll
N i I�, 4f t'■
� t�i i`;;'• �� < ; III !:. . ��
kjj. ,
W ___ t d R {1S; ,fit• t 1, }llis ll {` '� I
� � '` ,;mo�dd,,° % • I t `� `ill�il `i1, 1�` ttllt,t i .
( it t� �(� � � •M � ! �t I � ,li `i}'ti,
_ � t
N_
l,;,
ill'' 'tti
ilti
r /
,
i°n n / �aJ. i m 6 uri
I
a ose I
fA y .09 I
'. . /..
� w
u
ILI u ..
m
W
D- LU
UA z x
W
—A
Q o
� Q �o
w
Q
Q
Hmniommomv
At"
ivil! "7-
WAM,
oil
ex
owl
Mil
c
0
U
s
ao
C
W
N
L
6�
C
O
�Q
M
L
C
O
'et
Al
C
O
O
U
s
o,o
W
U
N
O
u �
w \
y �
W to M o
0
[•� U � w � � ,� A
—1 Ay�5
�►�aAA4
.16 Fj
0
�1
r�
V 1
A
�8
z
Ng
zg
Q-�
XN�
Y �
F
or
it8
Z LL
LL z
_1
A F v
W- g
cv g
zL
Q�n
8
LL
Z Z Zg
p �LL
—o
z°
Z�
Q�
(18
z�
<o
Z�
d�
xj M
� O
w � a
� c
r � M
pow
�i ►--I z A A C7 ; � a
U t+ .
v� ►`� A A A a
•may
V
V
O
3
o
fn 4
a
k
z
w�
tL N
i
i
' z
k Q
�v
;o
o
m 07� m8
z�
A
�o
a.�
N
mo
z�
d�
A
d�
�s
cv o
LL
d�n
QC
AJ
Z p
d
n�
N�
z�
n
V °
Q~
OLE
(Y c
w�
MCI Z Q A u> v
-As
LN
m�
Z
d�
zLL
zJ
dg
C.�
Lin
4�
V
m
C�
z°
0
no_
m�
zLL
Lin
m
�
3
0
Q
Q
Z
Q �
OL
p-
J
(IN
o�
o
o
z
Og
�
N
m8
z�
(Y
O
mo
A
N
m 0 m
z�
�
zmLL
do
N
m�
zLL
d�
�s
m�
4�
zLL
�LL
C�
�Oo
zLL
D g
CIS
z�
d�n
m OL t�
mo
J
z�
��
`AJ
zp
d
n�
CA
zLL
�s
mV
zLL
m�
N
w �
U �
rl
w o0
O
rrT Y
�w M o �D
x�zAAL7���
rrTT�
h�
v
C
v
d�
3
0
am
I
s �
N
f
m
Q
Q
3
N
z��o -iLL o
a
a� }o oso
z
O —
i
I
N�
LL
1/-
rl,
LL
0-� i-L F:-::—��q
z LL
DL�
V O
zLL
J
0.
►� g
m
IL
O
M Z
Q9
rrTT U O
WQ M po+-�
�I Sot�gMC�
U
I� c' A A fx
Z9 Zi
CL OL
N�
z�
E
N�
K
°o
m �
zS
z lu
Q�U- °
IL
m�
0
z�
d1�
nJ
ll-
W
LL
d�n
m�
zLL
N�
d�n
� arc
LL 8� ZID
IL N
•POO
V
V
0
3
i
i
Df
Z
�Q
3�
� J
� Q
M
n
u
W
�TW
I�
w U �
�a>
� o
b ~
y o
r M
�Md a
Ad � Aa
d
Y o
d r ?n
cm
m t m
U �
8.2 S
C d U
o� W O
o
ti oo O v°
Q T 2 o
pj d O
W m Y m w
C
� Y
5 a oo m
m = m
o
U p
F� =
a
_ h
> y
T d
E y
dN
E s
a p
© y
H �
0
0
0
LJ
M
V
U
W
V �4
� A A
V
U �
H
MGM �
►�I � A A C7 � „ '°
��A �AAG4
�d
m
L � �
i L m
U V
o d U
i U rn 6,
` W O
� o �
T ` Q
Y ro W
C O7 Y
C V
a o �
a: c m
co
0
O
O
O
V
I—r
I
I Rm
I
I �
I
I
I
I E
I
I�
O
C �
O �
U ~
� a
rn �
bA
�a
v
r4
N
N.
N
N
u
Q
N
N
n
Q
N
N
U- LL
u �
s~ �
w
� o
y o
M
Lu
�
W �
O �+
v��A
Aaa
�
N
z
O
0
O
Q
O
Q
Q
Q
u�
U
O O
a
O
z
IL Q-1
V
w
Q
F p Q
V
V
O�
O
d
CL
q-
ILN�
V
o
IO
o
C �
O �
U ~
� a
rn �
bA
�a
v
r4
�a ^y
CC Q
�N
w �
r�
V
u �
s~ �
w
� o
y o
M
r
F•Yy
�
W �
O �+
v��A
Aaa
�a ^y
CC Q
�N
w �
N
N N N N N N N
r r° N Z N x
N `t r N W N
n n
/�\ Q �
M
M 11R,L D-
00
M
WM-e o
0 ? z U w a
JU
LL z
Lu (L a u.tn� a o o V11�A AAfx
O
Ir -- -- - - - - -_
IIJ `Q
11 �s
II �• �
II aL Q n
11 Ill N rt -n ^y
11 0 X II' \N ii
11 W X O
i I
II I I
11 I I
O II
m---- - - - - --
�- ----- - - - - --
O
�X m_
an 1N r7:1 I
lil u N Q X
a 0
I
Er
ma im,
4161'
Al
OR
LIB
7
AL
ililill
b111El
e
�IIIIII1111111111 t1IIl
llt� l_D,t �1,i,9.1.1,1.9,t.1,1
IINIItIE
III ! =
�-
IIIIE =_
IIII°
• „I
v
a•�•
nom•
Im
% Al i_
It
In
OC
W
.m1l -- Im■Il
It
ism
IN
IN
IN;
IN
IIIIIIIIIII ; r
IIIIIIIIIII ,�
111111
IN
r
01
_U
C
� wMQ W •�o�.
A U
V
0
e�
a�
W
aA
c�
Al
Q
�
o
V
0
e�
a�
W
aA
c�
Al
In
r
C
w
V
O
w w o
e� x ►-� z A A U
a ��a AAa
V
0
>
a�
W
-10
U
O
A
�
a�
W CO
�
�
N
V
0
>
a�
W
-10
�
N
N
N
N
n
Q
N�
�
�
�
N
N N N
0
O
�
Q
z_
N p�
v�
O�
�
O
E-
v �
R!
O
N
V
Z
0
o
..�
QQzz > z ~M�
wMd m LU
zoo �' �i A9z
QUA
ANN a �I AAa
ooly
'J w Il g -1 os
Ilo -,ZI � Q O I19 I V
r�1 I
---------- ------------ - - - - -- I
I t I t
I
I t
I
z_ o �� � --
I m
in }
in * I
Q i I tu I •� _�
I I
I
---------- - - - - -- i O
II �
II I
Q_ I t kb t II � � •�
N II '
J Q t I I
X Q N
fu
Ir, it t
Itt JI
Ir - -- I I
$ ). I `---------- - - - - -- -- '
ICY )I
JI
II 9 -I ii Y II
z - -- z
w I w OI o yy
o
----------- - - - - -- ----------- - - - - -- •�
t II t II w
I
I ii l
li l
it t it
L----- - ------------- -------- -
II II
II II
tt tt
II II
II II
II II
I
N
N
U
i.
~ rl
� M
d o �
,�' o ,, 'c ,,
x�� AAC7
F*IkrIAA�
„o -, zs
C�
O
O
O
V
M
V
O
OL
d Q z M
�pO N WMQ o?�caM�
E"�
OO xh�a
P�
lu
ANN p.� D-
D.- p ��A Aaa
ooh
w
p
Y
--
I
I I O
O
I I j •�
- zm
� I z � I •�
I I w O I
O - --
•0
I I
I O j N X
17<X
W
I i II � •�
' II
I r�` - I 1-------------- - - -; -- � I
IIY �I
Ili JI � .I
119 -IC V
z - -- z
I
w I ��,,, w O i O
U
r----------- - - - - -- c�
II
I II U
I
I ii j ii
l
1 II I
I ii j ii
------------- - --- I �- ------------- -
II II
{I �� II
N
N
N
N
n
N
N
N
-
IL IL IL
N N N
mm
Q
�
O
z
�
o
�
o
�
Q
o�>
°
~
a
�
Q
w
z
�
O
�
N
V
Z
m O
n n iiiIIII1M u n n n i i i I I I I 1 L
I I I I I i I
O �d �� N �u1r i 1
N
N LL LL- o N -
I � N N x
N
_ N
IL 1L IL Q Q
lu N N N ip �5
LL
TO Q kb mm /MNI\ z
o
O tV }
� N x
� ry
I ^ I
�w�w r Fi" j I ;i ' I I I
h►��- --- -A�c =`�,-u A t I i I I I
w A C�hT\O A /AI v -Ao ^o O /O � � � - � 1
1 i
A
� o
LL
Q o Q a M' Z o fj IL
LL D
lu D-
� LL
---------------------------
0 Poo
ki
� m 04
FT
m
Ir
1 11
wl
° LU
w x
ix Cj w u x
I
w
z
�
o
N
V
Z
m O
n n iiiIIII1M u n n n i i i I I I I 1 L
I I I I I i I
O �d �� N �u1r i 1
N
N LL LL- o N -
I � N N x
N
_ N
IL 1L IL Q Q
lu N N N ip �5
LL
TO Q kb mm /MNI\ z
o
O tV }
� N x
� ry
I ^ I
�w�w r Fi" j I ;i ' I I I
h►��- --- -A�c =`�,-u A t I i I I I
w A C�hT\O A /AI v -Ao ^o O /O � � � - � 1
1 i
A
� o
LL
Q o Q a M' Z o fj IL
LL D
lu D-
� LL
---------------------------
0 Poo
ki
� m 04
FT
m
Ir
1 11
wl
° LU
w x
ix Cj w u x
I
IN
a , C,
k
wri 7i
------------ P"ll
if 19,1111
ri
1"MM
M
ty
1,4H
oil
mr
�JI�
SA
..
10
i i i
6l0
iaia)
.+el.'.Q.+e�.11iI.+ell.'.
9ao�l�9�SaY,0�9�lao,l�9
fli h!
i�� 119
7 es:a
�� i�NOlf IIi9Ai
.,I
—II
':
,ice I 1 :::�
11
ml I U " "!
II
11
'\LIFEE
v i�t� PI ❑II
i __
i
�� i
r--I
N
V U
o �
ea
a�
� x h•�I z A A LJ � � �
V
0
W
aA
1.9
O
�
N
Q
�
O
V
0
W
aA
1.9
i
M
C
0
W
W
c�
I-E
Al
0
a�
W
e�
a�
U
0
e�
a�
W
aA
� To
M
N
� O
v ...,
A �
� W �
O � �
N
� cv
O � O
U
U �
� O
U1�c
AACx
� O
v ...,
A �
� W �
O � �
N
� cv
O � O
M
M
—i,7 II
N
_
�
N
N
u
Q
L
N
LL
N
u
—
Q
LL
N
N
u
N
Q
N
-
I
I l9 rIr—
LL
F 1
I � ICI
X
I I
N N
s J
k=
N
I a
o
IIY �I
m
z
IL JI
1
Q
Ln0�
-gym
z�
d
o
0
O
0
O
d
-�
Q
vn
0
Q
Nn
rO
-
N
;
t-
0
Q
Q
Q
d
Q
p
Q
z
O
Q
O
d
p
Ou>
LU
z
-1
z
LL
V- 6
U
3
O
O
O
IL
a°
o
°
o
°
o
—i,7 II
I 1
• Bill � �O
rA I -- •
�� -- ,: :::. J
i� � ■1►�f1
■ ■NOME■ 6 , ■ ■ ■ ■ ■ ■ ■ ■ ■1
NEEMMMUMMEMMEM
■E■!! !NOON ■ ■EE ■ONNI
■F"' "IEEE ■I ling■EI
• e- ■I II 11 ■■■ ■I IEI■ ■1
■�_ ■ ■ ■ ■I IC�3 ■■1 !-
' ■
MEMO 'MENE ■L_- Jill■ ■1
■N ■{.JAIME ■ ■ ■MEM ■M■ ■I
whi N ■ ■ ■ME31 ■ ■ ■ ■ ■r���■■■�
E/I inns \I. EMEMENNEEME �OO
riLvJI
L - - - J
Q Q O
z iu
oo�
QN�
O
O�w
O?�
0 QO
110-19S
M
V
cv r+
W � o
� o
� r M
� WMQ
o v��A Aaa
Miq
0
U
W
i
U
Cl
9L�
v
v
0
d
I
I l9 rIr—
o
F 1
I � ICI
X
I I
s J
k=
I a
o
IIY �I
IL JI
ii ��
z�
d
o
y-
-�
Q
vn
Nn
I 1
• Bill � �O
rA I -- •
�� -- ,: :::. J
i� � ■1►�f1
■ ■NOME■ 6 , ■ ■ ■ ■ ■ ■ ■ ■ ■1
NEEMMMUMMEMMEM
■E■!! !NOON ■ ■EE ■ONNI
■F"' "IEEE ■I ling■EI
• e- ■I II 11 ■■■ ■I IEI■ ■1
■�_ ■ ■ ■ ■I IC�3 ■■1 !-
' ■
MEMO 'MENE ■L_- Jill■ ■1
■N ■{.JAIME ■ ■ ■MEM ■M■ ■I
whi N ■ ■ ■ME31 ■ ■ ■ ■ ■r���■■■�
E/I inns \I. EMEMENNEEME �OO
riLvJI
L - - - J
Q Q O
z iu
oo�
QN�
O
O�w
O?�
0 QO
110-19S
M
V
cv r+
W � o
� o
� r M
� WMQ
o v��A Aaa
Miq
0
U
W
i
U
Cl
9L�
v
v
0
N
• Cv ley
s~
M
M o
p-I � \V1/�A�AAfx
r----------------------------------------------------
1
I I
,
i
, I
i
_J
I
m
1
ry
4.1 ,
m�
N
- I
i ----- i r =-1 i
I L - ;1 11
I ILJI
F -i
I r-
1
11 , I 1
i ❑❑ r� I I I
I I 11 O
1 C` - - - - -- I fl I�
IJ Ll rJ
I I j JI
I �
X
�p I
E'l I I Q �
1
1
- I
1
I
I_
I
I jfll
.` I r-JJ I I
VI I� - -JI
- 1 - - - -J
_ II
MAP*"
II
LLI
x
�O
1
O
Ul
N
i�(1
�
N
u
d
�
t�fl
QN
N
u
-
d
U
t�fl
N
u
N
d
N
Nl�(1N
N
d
O
O
�m
m
F
o
o
�
�
IK
Q
d
oo° � y
O�
O�
O
N
• Cv ley
s~
M
M o
p-I � \V1/�A�AAfx
r----------------------------------------------------
1
I I
,
i
, I
i
_J
I
m
1
ry
4.1 ,
m�
N
- I
i ----- i r =-1 i
I L - ;1 11
I ILJI
F -i
I r-
1
11 , I 1
i ❑❑ r� I I I
I I 11 O
1 C` - - - - -- I fl I�
IJ Ll rJ
I I j JI
I �
X
�p I
E'l I I Q �
1
1
- I
1
I
I_
I
I jfll
.` I r-JJ I I
VI I� - -JI
- 1 - - - -J
_ II
MAP*"
II
LLI
x
�O
1
O
M
M w
� o
M
M � w
WMQ >
M
� Lu
,4 cv '>
U
a 79z=9
- --------- - - - - -- - ----------------------------------------------- - - - - -,
1
i
I V I
I 111 I
I Q x 1
j s j
1 O 1 I
I I I
,
I
I { �
1L
I W `{ I
t
Q X -
m
I
O
I ,
I
I I
I i
lu
FL
I ❑ ❑ I i i j�A��
1�
, 1
I
I
Ind", i.lii O
I i J r�
I O
i i I I
O I
Y) I I
I j I
1
I
Q
o I �
L -----------
I I I I
I II
I II
Q�
I �
I �
X
O
N
N��
N
u
Q
N
N
N
u
—
Q
N
N
N
u
N
Q
N
N N N
N
O O
m
z
O
O
O
O
N
Q
0
�
O
u-
Q
�
N
Q
�
Q
Q
u�..��
Q
O
Q
Q
a
°o
�
°o
�
�
o
�
o
M
M w
� o
M
M � w
WMQ >
M
� Lu
,4 cv '>
U
a 79z=9
- --------- - - - - -- - ----------------------------------------------- - - - - -,
1
i
I V I
I 111 I
I Q x 1
j s j
1 O 1 I
I I I
,
I
I { �
1L
I W `{ I
t
Q X -
m
I
O
I ,
I
I I
I i
lu
FL
I ❑ ❑ I i i j�A��
1�
, 1
I
I
Ind", i.lii O
I i J r�
I O
i i I I
O I
Y) I I
I j I
1
I
Q
o I �
L -----------
I I I I
I II
I II
Q�
I �
I �
X
O
I
E N e`vcY,j9 f< r
C
r
r ll,
r
r
r
\ II.
i \
r
%
\
1■ �.,(• .
\
\�.
\ � I
\
f i
LLH 4,
[1- H ill
MIN
pat:
�.�.�.
a
f \ 3T tIaaaa� ahi1
lz-
taaaf ,�
uaa u
;i iaaa I , /JI l ti�
iii�ua IJI i'
aau j
a _
H �_ rat•:
a jl 6
�a. *• 1 x la��isras,a �,
at ars �
aa♦ <4aa
ar a.
ALL. ,
aai a
aaa.ra i
airs 'i a -�
A ra t Irn ra
a it t d
niu at —
aaaaeax
tai ei as �
+-ass •x —I— ,�
}\ aaaart
\t as
i
t P
\
� • 1
sss,.
ss Xk
s=
:aYex= A
S =�? !��_�� __ I I
=11G p
iYl ,.ls! �I' t xsgF
`! 3 !Y' is ■ d'" ��
i�isss =
E lrIp��
Y ! s s 1
!tea
Ex, -Zczl
ZZV
it=i
*;
;s
Ax A
=sY!!!
! 1
Xsa: _
am
.ice=i
l =sl ;3, a i�y1e
RiYlY01 6 t � p
Y!iliSY w ytlpii�i
n
-a
.. aaaa�.■ " I S i S S a ear'
/��il :=sss=ss =s� -
m1milki 11
I'm ass s=s
zoo a an a 11-113
=
=e = :=
lima
:s a,
s=rs : =a
S S S ,
agca
sg gg
uga
saga
i� -- etas
eggs
iiii
:;tea ff
A$ I
m OWRMMMTFWM
O
W
�I
e�
A
C
0
W
a�
rold
A
0
0
e�
W
e�
x
U
z
O �
� M �
O
� N
IT
U ^�
ICI rl
�
rT
z
A
�►�c
—=
O �
� M �
O
� N
M,
W
�I
14
c
0
e�
a�
W
a�
U M
N �
O �
� W
O
N
L �
U
�T
x�zAAC7;�,�
�/�
N �
O �
� W
O
N
a= ,
JAW
A
C
O
• rr
W
A
c
0
e�
a�
W
a�
ralld
x
z
a�
U ti
Li
Ct
C�
V
4�
0
0
4�
W
M
L
<t
N
0
qu
� rl
W
� M
rrTT�
�MQ
°
w c5 0 o
�
Ct
C�
V
4�
0
0
4�
W
M
L
<t
N
0
qu
D, J)
>do
<<a
ono
_w
~Q�
0NN
OO�Qr
I ff
I
I
u_
Ir'~�I
IY I
!LvJ!
M
CCU
UJ
N
N
N
N
Q
W
N
N
4
�
tIt-fl
N N N
!n It ly
DL
o
LL
�
Q
o
o
Q
;
LL
p
�
w
ILL Q J
Q
UJ
Q
a
t- p
N
U e-
R
0.
IIYY
t`
O
O
E-
O
iLNO�
IO
i, 9 -, 9S
� Z
ao
� o
V��A
9z 09
110-1,t7,
DI
Pmm ,
w
N
ZLU
w �
w o
r�
W M d W
o�� ~ °�
Z �wa,'OA
LL xj M��ji Q Q C7 >
mono c
Lij ;L+ o un A A a
IZ /1 GnbV II� /I 9 -17
---------------------------- - - - - -- -------- - - - - -- - - --
I
� - I
I
;
I
;
I
I
m
- fix❑
• ei I !L-jl
lF X I I
I I
W O
JIF- II m
II Z�
t—I I I
II I
I
❑ TG��
ND
Q�I I I X
W xl I N ❑ I Q
---- lu 't.
I I
I
1 ; ;
Il l 195 IIO I
N
u�i
—
�
m�
N
N�
0
�
Q
N
N
ry
cv
�
N
N
NNN
�
�
o
�
Q
�
O
o
Q
i
�
�
pr o
p
J
Q
w
�
Q
—� p J
W
0
�
z0
r-�
I S
I �
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
ILIL
L -11
�zz
>Qo
X <z
oho
_w
~Q�
0N�
uwT
aQo
lY
IL�JI
L - - - J
M
\%%Wool
d'
9 9S
M
�1
U
U ^�
C �
~ ri
rl
r4
cA
a
„O -,t7
O
.po
A
O
^V,
/I
A
�.1
�I
1"x'1
• r.l
N
1l1
del
m
N
`
N
N
Q
N
N
N
N
d
N
N
N NN
LU
iU
Qp�
`d
0
O
sm
z_
LL
O
Q
uI
o
Q
�
;
� �
U
�
�
N
�
p
w
0 0
m
IJ
IL
w
I
an
�oQ
o
o
UF—
Ltun
T
O
E
Do-
12
ci
9 9S
M
�1
U
U ^�
C �
~ ri
rl
r4
cA
a
„O -,t7
O
.po
A
O
^V,
/I
A
�.1
�I
1"x'1
• r.l
d' In
S Z tb
W
� o
M� o
��
U `.�. 00 9z
o un aaa
---------------------------- ----- -
�O
,
, 0
�L,
� m
o X
L v
m `'-- - - - - --
10 � [
i
7T m
A
ILH I W- I
j
' 0
ii aL
�T�
II Q-x I I I m
II It! I I I X
,
II O 111x1 I
lu
II 111x1 I I IQ
II i l l I Q X I
,
,
L I
-L- ---------------------------
N N N N N N N
O �t
u�i m •t ry N ry N
Q 4
tWf1NN �
W ��pp
Q lIl '34
Q
O
J
O
_ �m
�
z_
�
�
0
Q
uu.��
O
O
Q
�
('S
Q
U
W
�
�
V
�n
D
Q
O W J
Q
W
Q
Z
d
IAN°
d' In
S Z tb
W
� o
M� o
��
U `.�. 00 9z
o un aaa
---------------------------- ----- -
�O
,
, 0
�L,
� m
o X
L v
m `'-- - - - - --
10 � [
i
7T m
A
ILH I W- I
j
' 0
ii aL
�T�
II Q-x I I I m
II It! I I I X
,
II O 111x1 I
lu
II 111x1 I I IQ
II i l l I Q X I
,
,
L I
-L- ---------------------------
N N N N N N N
O �t
u�i m •t ry N ry N
Q 4
tWf1NN �
W ��pp
Q lIl '34
m
P
A J
.X
..1. r_--_ I �-� .1
♦
♦
ism
Alm
t. If. &'—r' ZX Z.
2 =1
ME,
s ME
x
x z
CZZZlZ
■ZZ Z' I v,'
as z
ir
m 2 z JA!,
■z
Islazz z xzxxax.
xxx
x mu, .
In
to I 'A z
K.XRZzii
7011 x 7
411.0g,
ARM :17,
iI
A J
.X
..1. r_--_ I �-� .1
♦
♦
ism
Alm
t. If. &'—r' ZX Z.
2 =1
ME,
s ME
x
x z
CZZZlZ
■ZZ Z' I v,'
as z
ir
m 2 z JA!,
■z
Islazz z xzxxax.
xxx
x mu, .
In
to I 'A z
K.XRZzii
7011 x 7
411.0g,
ARM :17,
I
19difloll I med
;Iilzl I
!u
INER w 1,
in
IN
u
D
IN �Ilffl rrlT
I
A
C
O
W
CC
III
4
c
0
�s
a�
W
a�
rmlrd
U
0
0
a�
W
an
U
U r-1
w
v��A AAaI
T
cm
=
�
•tf
•o
tf
-+..o
o
c�
PMMO
W
O
�
o
-I��I
_.
��_- ���
A
C
0
a�
W
r•a
a�
P,
c
0
a�
W
e�
roldr
V
0
W
s
aA
I-M
M
rw-
V
� o
v • r.,
a�
A �
O � �
0 � �
� o
W
� o
o
WMd
o 0 �D
V
��>
� o
v • r.,
a�
A �
O � �
0 � �
� o
ONIUlIns
U
u �
� o
r M
po++
�M o 0 aAo
d
V1M�A AAG�
a�4y
E §
E
�• q �N ♦NN
V
t0 °
t0 U Q
W -
0
411aaH/Otl 3 ii
W
cn a°
w N /.6—
- � Z
< p
° C
f4junmuM
73 6 U
EO
�N
E� m u k
c_P m o u = r= m P ~
•a c"-',4 9a .Q�� • E mg'g Si �3�E Mn p9,e q c
a? o f — °- — °;
� � 3 � Y ■ o' 3 � � � o Y Y � �
• '" agy
�'m8�° am�AA x3L��AU� g �m °��"sa3a`3LLam �g��$ E3�g E E
m �; �� ; � W Q�??��ps��a���� gE2otlNm �a��m�mg 9��EAtE "- a�r`ga�`�•wrm�� €m'�k� =$3�
C o o
uyna - °. c°e`�0 c'�`�ioaM : urcF pi z z °aq`! 02 3 q = g €€.Ns e8 rc a9"ia E z� ?g6
14 b'
El
o �
a °io,°ddom tn�¢3u� f� u�xorca _r ,�.re °000" 000000-`."❑
a S$ > u < 7 i 8 a a m m m• w o v e v o 0 o u u o u o U o o u u v o m °m o
G3 $aLL8
C2= �r�m., v i $$$,,$$ •$ _$$ tB i i z °z °> <z...z°Iz°
GaE €w
G �
O o gm Z5
E
S E Eg
P
M'
Ya oc SO, ;o x
1'2 MO 2-E
as
IF OE
E E A,
m z c I E 9 E
F t 1. �- 2 1 m
E . . � g a E L E E
I z
B E
E 2 ii 0
L
E'
'o
E
'.1zz1z1',1-1 'z I a k 0
Z 1z .1 1z 1z 1000 0 00
2 2 21z- z- 1
0
ZIL
111
Hill 11H
E
E
I
t
1.
S
"i
2
2E
E
E -6
$
-E M*
E
is
z
� 2- 10
E
E
.6
I . I
E
. .
E
;-
,
E-
E" , E
cog
E
t
E
S
7,
5 E
2
IE
a 0
2
E
'
'T z m
Hs
E 'T
I
tad
02 . d F,
A A w >6
vE .5
,
M'm M
mm T . 6
i
'r. OZ Z
w w
coo -
coo
�i � 4 �i
. . . . . .
a
w
at
vTOZ -9T-OT - £ imn HEN" 213:13VH:)S - NVId 39VNIvHa v 9NIaVHD AIIVNIWI13Nd - OZTTOZ
C�
N
2 �
Ik0 6 W M I I N Iw/1 a
O
O O J
U
'1
W �Ty
� � O
N
W o
U� o
W "
U) n �p Q
LLI
V, �MNzm
o O0
O
LL-
OO m O
�1
o
Oro
W z�
cn
~� w
U
06 w
w,
0 Lit
o
7.
CK
Q
cn
L.I..I
U
Z
Q
J
c_
G
O
U
waZ I O ¢ Q a x3 0g O F p J y�j O OJ
zsr91°nw ri N m 3 ON my J N m F- m 3 Ll
OJ_�U X X x X X X¢ Xa X X O ¢ W
Ll
xZ� JC W W W W W W W W W W
W W m W Z z
00.
a W 1
I
�r opoi y
kw,
I
• 1i � -
• �1 � ; � � JJ iii
i
.II
• 9 / _- r �ji Jj 1
• � � �` r-� - � /1/ �J'� /j I � ,ItRiil� 11111 � 11� _ -� �,�
¢
Z
r`
0
0
w
J
63 C
65
0
tf
0
W
y O <
V
COO
Z��
\
SzcS
yOmm�¢o�m
iwa �LL �w O� °vwi
N
Oc°jW
Z
m¢V
Uw
U�m(/IW41 {JIWm OW
2—U-0
<�1/IN w Vmwiw�cw¢i vmwi¢m � Z°p°I,�mO
ar 0
O p
O
_C
U
j
aUN
l m4O 2
��ia °�<uinoain°
2
O W U K U K a F W
0�2¢��¢U(/lOdNl°-
L y
C 7
Q
oawg
O
Wof
mo az
ow¢zww°
°
°Nw
¢
z
(1/ °-�m a
Ld
'^
a�N ^�
W W
K.
Oy�p�i�
JFzll
x
�FOWK�ZO
1�I
m
LLy1
U
YJR'UOI�VI
�JKUpri Vf
V/
oa
1•>m
aN
Oh
rn
Y
",
r0
dlrioom
a`aaaw
NNOi 0oo1�
W
w
OWU>
¢orco
�n
N
zw
i^
a
O
rc
O��a
o¢mp
i
z
J
a
z¢°°umi
ZF ZO
X
W
U
oci
m
11
a¢¢ab�
pSOln
w w
o
V
MQ�5 a
�m�mz
t~ilO
OK�N
�OW°�
1m�
OZ
z
}
z �m z
< a Z r�O
Z m
z W w
>
~
(A
'a
Drzmn 0
SE �iD
amx
0<1,4!
20�
Q rc
p 1 7 F.dip
m
W O Z
z
z a f-
O
OJ¢': .
x~
K U w X. Kz
0 N
W z F- F
U
'1
W �Ty
� � O
N
W o
U� o
W "
U) n �p Q
LLI
V, �MNzm
o O0
O
LL-
OO m O
�1
o
Oro
W z�
cn
~� w
U
06 w
w,
0 Lit
o
7.
CK
Q
cn
L.I..I
U
Z
Q
J
c_
G
O
U
waZ I O ¢ Q a x3 0g O F p J y�j O OJ
zsr91°nw ri N m 3 ON my J N m F- m 3 Ll
OJ_�U X X x X X X¢ Xa X X O ¢ W
Ll
xZ� JC W W W W W W W W W W
W W m W Z z
00.
a W 1
I
�r opoi y
kw,
I
• 1i � -
• �1 � ; � � JJ iii
i
.II
• 9 / _- r �ji Jj 1
• � � �` r-� - � /1/ �J'� /j I � ,ItRiil� 11111 � 11� _ -� �,�
1
1_
............
1
1 1
� L
-� %4
a0
r - - - --
;
0
m
1\
1
s"; 1
¢
Z
0
0
w
J
3W
w U oQ °ww
m<
w U oa ww
W
y
COO
Z��
\
SzcS
yOmm�¢o�m
iwa �LL �w O� °vwi
N
Oc°jW
Z
m¢V
Uw
U�m(/IW41 {JIWm OW
2—U-0
<�1/IN w Vmwiw�cw¢i vmwi¢m � Z°p°I,�mO
ar 0
O p
O
_C
U
j
aUN
l m4O 2
��ia °�<uinoain°
2
O W U K U K a F W
0�2¢��¢U(/lOdNl°-
L y
C 7
zow
oawg
of
wF
Wof
mo az
ow¢zww°
In >wz
°Nw
¢
z
(1/ °-�m a
�macn l�JZa�
°p
a�N ^�
W W
K.
uaS °0�1 -KxI
�FCOWKwZO
JFzll
x
�FOWK�ZO
OwwF<
a00�00
U•L N
U
YJR'UOI�VI
�JKUpri Vf
ZFI -(A�1�
oa
1•>m
aN
Oh
rn
Y
",
r0
dlrioom
a`aaaw
NNOi 0oo1�
; w
3Wn
zw
i^
w�
m
Os�¢
0,0
O��a
o¢mp
�rcsa
°vmi
a
z¢°°umi
z�
zS°w
U
H
N
amaaJ
o5:
a¢¢ab�
pSOln
<inan
ZO1p
�w
°
MQ�5 a
�m�mz
pFN=
1m�
OZ
U, x
OOHF,f
co.>,aaw
00K9a
Uw¢w
°O X�
<w
'a
Drzmn 0
SE �iD
7i�sim
0<1,4!
20�
mZ�
1
1_
............
1
1 1
� L
-� %4
a0
r - - - --
;
0
m
1\
1
s"; 1
i i t � lyt 11' 1 ,, V "i
r-- - - - - -- ttli
,tt,'it
11 _
r '
_1 __ , I 1tt
.. \ ? tilS li` t', ,yl 1,' t t`; ,l',1 1
/ ,
�lc•
i,
ii
W t5E 1 ;
016
1
O
°
m ZEN
wok
Z.
W W U J 1
1
�NWO I•� I
i
WWZ� J1
O F K
>z4W
In
mWp > 068
°z 109 I .• /�•
°amm
Mz
1
0wr-o r ��
ww.W-
F W > U
i t
¢
Z
0
0
w
J
0
a
U
W
y
-
N
LLI
LLJ
}
Z
_C
U
j
OZ
O
O
L y
C 7
S
Wof
w
ca ip
M
J
LL-
U•L N
U
m ti
C $
O
¢
c:
C -°
>
m
00 �
Z
Z
J
o
3
Z
O
N_
}
°m
>
m
m
w
O
i i t � lyt 11' 1 ,, V "i
r-- - - - - -- ttli
,tt,'it
11 _
r '
_1 __ , I 1tt
.. \ ? tilS li` t', ,yl 1,' t t`; ,l',1 1
/ ,
�lc•
i,
ii
W t5E 1 ;
016
1
O
°
m ZEN
wok
Z.
W W U J 1
1
�NWO I•� I
i
WWZ� J1
O F K
>z4W
In
mWp > 068
°z 109 I .• /�•
°amm
Mz
1
0wr-o r ��
ww.W-
F W > U
i t
0)
iu
�— Q
OZ
O 8 Q °,-
LLI
LF
� � Q
z�Q
o
Z o?��
W Q F�m
u
z d o �yo�
J
oQ�=
_�,�
ILI Z v LLJ
N
N�
Z
x
m°
Qg�
NWZK
�w
z�
OZ O
N
y�NOQ1
F
�NJ�O
a
aQUO
LL! 0
LL-
1)
�Qo
�
l
0
JNFJW�
LUN <u�
W°WQ
,L-210
OR
I in
ala
MOO
�R,0��
i
L
-- - --
i
1
1 /
I �
1 � i
1
i
1
1
1 \
1
I o
1 \
1
I
DI
I r
r --
�1L
-- -- -- -- -- -- --
I
I it
I
N
V
z
IL
M
WMQ > z oo�
z
v��A AAz
N
z
1L
Rl
z
IL
z
0
v
OL
w
0
A
73
ts)
v
v
X
�
Q
N �
z
0 m
W
Q c0
Q
I
I
L
/
I
i
L
I
�
I
Rl
z
IL
z
0
v
OL
w
0
A
Q
Ll
k)
tu
* Q IL �H Ri W WH
l� � �H Np0 � F F HILL oLLv o F-QU~ J
N NJ
V <Q wO�o �� ��'z �00 �0O
x W� W -N �Oy -N O QF w
ONV 0 Oz�i J� K ~O JQQNz Fez W z OtilW? kb
FKm 11)(3 oZW ��p Q1-i O1i OQ� 0 -01 7-To Q�z� o" o Q Qo3 ,cos "�Q =�Q °
LL z?Q �z�10 QW ���� QO° Viz° 0 ui N�wN O
opp0 W °z� �u.Io� a� mo��` w� ZuI� ZuuVQN
Q ~y W� �ypJ�p OW mN a~ F0.Fz J >jv
Q J Z - ° _
Q 0 IILY
0 sN QQ �i 2p� s s a Wv
x W� v WO Nz [UQ
Q >LZ� u�� O�2Q
p ~° i -v WQw0 --1 �� J-wU JET J� ZJx 0 Wzl- W W
Ox NW
Nz pzF ND�z O~ °F �� i � OPFOW Osz O W H )'t N -O N 0WH
z O zON zON _ wO U QJ �w Q z �xN Nz O Q
a s
U �T W o
v
zw >- a �z QW zN NOY 00 00 NQ wOQ0No
°O uwz �d0 F °u�uQ �~`'Q �FVQ _O►llJ OJW°Q'O N
0Q Qz WNT zu�v� ~)OH �z OFV�(J IZ Ozpz� v >� N NQO�uu.��IK ui
QO v Q WF�vO QpWD pD� QpR�F� pQ�F Fzz Q <N v
U zNN 00 ssOS J rQ' zY0 z �_ z N z N O Q
Q z -N F W O -Q :3 WO J -OWp
NJ s §0 K,z O� ~Q z0 Qw0 Q Rx Q �s Q 0.s OsN Q Wa N O
p� -ov (VNQ tti�F�v OQ[OQ iW� ��v�v ~ d QFW�
° W Q ° p W Z Z 2 z W
�WZ w °O z ��O�z Ow
�vQ' � HF-H —W WJ
CIE
v
N
2
lJ� H J
lu
Z N
go O Q�
LL Q
ILI < I A Y I
W - -- }
W
-
N
I
ip
ii-- -T - - -- i W W Il� W CS
J - JU
- - - - - y_ ,n �L W Z
� 1 O f IL VZ O �Q Z Q to
_ LI.J
00 - - -- r
o n- L = 0
- - - -- „i _
i Qp
L _ ---J >ZN1>U�
-� -- Q LL
N y
Z-1L
i -
- - - - - -- - - - - -- -- - - - - -- - - - -- LL
� I
Z
W I
mko
L -- -- �- -- -- �K pIL U
I
ILL ®I
I l Y I
IL,iJi
IL`.J I
O
� I
da�w 1L I
►r-� M
v �
� o0
� M
wM o 0
o
�I U U w a t'- A
�►�A
F*
LN
C�
Q
wo %"
M,
�I
A
�
O
i. G1
w r
� U
A
Q
V
LN
C�
Q
wo %"
M,
h
tu
0
lu
z
O
H
U
z
O
u
III
} $
~ �O 00 w~ AIL OIL�p p puF I� h+l
00
N *z FAUN 7,z zdN ZLL (3 IL d F d�JH
� Q �i w0N0 0� f w mz Nz0 0,) p uo d
2 � w -N O N -
w z OED
w� ��u �zw z w t-p wm=p C\,
�m NCS NuzV �O �m� dpi OFi OQ� ��► r.i
ONpad wWZ�� Qw ��d� dzWO NzWO 0 < w NxwN
UN= wz V w� d N =0. Za: zym U QOQN
pppw pz_ri Up- Q- [A �n ~uw U z w z �R�NN 1L w �O+•
QN wd yQwQ �w �Q�V �� 0.F z w� W M d O 004 � A�
ww >- zT z >u U eo
Tat N �wFd� ap oz�u LL 6P I O � yQ U w 4
IYt p wN d z� dim z� z� z m O 0 -V Z a> ^C
* u QwO �� J wp �- -A = z w I� AA`/ > a> w
ozQd� �'� �� -'�� � QT a
QOw �m zd�,_u Qd) H-wi 0 ~az per° w ��NO >
NS N N't N_p N N
NTT f.0= O�pw�� -� zp ZOdF - zON w0Q u <mw- OR' �!r Q AA R;
T d x w d pz O �z O *z O *z p~ Q wSIUIQ Q
dw zN �?
Ul
0
J-u
z
0
v
O
v
0
WA
J
H
z
w
Q w � '
T w w g�� O
LL z ~� HCD z D SQ= >
ZqH T ��OO ?z zQN 0O� O0LL
A � � �� � Wiz mz� Jz� O uIL
�O Nvz O O �w z�w r�_ m�=O
F J w �� pO wmp Q� O� O N o �w �--
° �Qw } H Q
z�o Q zW °o� o°�'� qo Yo Nq D_ o o0
�� z� �z�� qq �P QOp zpp wzQ uIFWQ W 4 o
Oz °�� VUz ww Q Q �n? z
Ow z� vp q ID CS D_ �T- w* Q tw zn,NUt wR' �
J wvw vw zw Q w N
�? �w yz ED vzx vzF �> w w D > z O M Cj =N d D_ J5000 �q00 Qw$ ~w= �C�z a >y Q M d O c7 �o ee Lu
� � W M,): Iwz�v D OQ�� LL uZF Ou�JN x p �<
p w wOJ �� J — —� z O z w MTj z a> 'C
z d -1 J�wV Jam o_F JJF v w -�$ w
O FOV p —< p �n ��n J 2 Q O
O ���yyy Q __ �v Q= Q w w Q z z D] �n Q _ �J �7 ..,
qzF 0) m pJRR�F J J1�Y Jl�p° if IK N q�O w �JNO Q� U/] C� ks) H__ °z po v J zq z_OwF z_�� z_O— wOq v Q wz A J AA�r
Qv� z0� Q z fu �Q Oz O�OW 0=z 0=z OFu Q N uQ o
F0. � o �o�<Q o? �0° �-� OQ )-F0 -d � z 0.OQO�
v z D — �O y�T a! pw D q= V q= O °Jw�Q N
I uw— z_O�v� v� �z OFO }� �?z� pzzv v ( Ut NQO° Q v
qaN v�Q zo Qw Q <u� QoCQ Qa <P z6) q p J�EF v
z01 ) pv_ wF � �� �D_ d mot- �Fw �zz cv? O
o$Q z� <w°o < LLI °D$ p =p- Q w °oQ
Ov wind 6fl pd Xmq 1 D_� 1 K I '0 ~ Q QFw N O
�� w�D zz zA ~w
Z
z O O O O ���N °LU
�F
�o
ov
�F
Q�
z�
LU
mz
tu
�QQ
I
�V
M
A
A
� o
a
c.
�
U
W
t
AQr
.r yr
O � �
V
�I
0
�I
O
Ll
10
■u
'z
Oz
H�
u�
�O
NU
z
o �
u d
wWN
z0?
�w
?_ U-
0
00
Z9 zz FN�°N
d if O
PSNV
� o LU
V �
zTLL Q t- Vw
OO OFd OL
Ow °zy u()
zw� �v D-U
z� N Q z 5 -1
CFO iNI dwz
l�2 ��v ZNN
qzf-- Nzw O�oC�
Qyx z F d °* w
_>z �q� �z ~dw
-1 z v0.z Q'd� <��ud
zo z zuz
zN� pUd w?�u�
dyz0 QKz �MDF
T- _
z
LL
z zdN
O w LU
�oLL 13
L
d
m O�Q
pw �NOs
Ou
�LL - ^w
F
F-
J z Q z O D F
QQz O �z
zN ~� t llu
pZ }-N NJ
Q' 2 0 LL
v� Q�
I'M o z�o Q z���
pQ <mQ tu
u�
zY O O
9�
�Z
LU
rc �o
W�
� ZZ
�W v
pYq
Q F��
w
w
�Du
Z ALL
N 0
z
LUNz
aKLU
X
z0
dz0
Nz�
uzi
� CL
1L H
z�
�N�
O=z
X00
}-Fud
� q=
F- z
�D-
z�NQ
z
oILu
J'VO
OF�
0 X LZI
u�
z05
°Q
Z
wz
u
=
Fa�
�z~
�D-
N
zUfu
O *z
�rVO
�FuQ
20q-
Oz_zd�
d2
QO�i
Q J
J
(� WJ
O nFF77 S
H =
�O
Z
Q <O
J
Qw z
d o � C)
O —d lu
IL wmw°
�dw �D- Vw
cv�q �zu� O
vQ N wN
Q � u }OQ �
z w z WN N w
LLI �N a Lu 0
O !Y
d
� -4 Id = w
-A j: z dt- Q
F
Di U- � -A Z °
IL-
ts) Q w v>
uJ� O �Ow�O
Ndo
uo N
~gip Q Qry?00 Q
� ~ d �Lu w
wE� z~ w0
LLY'u wQ ~ U z>
~ r-I
w� o
LI
A
� N
� O
CCt
MCI
w
o
Ao
�
U
w
� ~v
A
� N
� O
HdVDSQNV7
_ 8
V ~ yam Z
cr (V) Q 00= L� z
CO
L c ¢
w �
o " ^� pae OpH ��w �JQ Z, a
a�LLJ =� ¢¢ v° WLid p Z >g
O �O
Z- .2 `3 391, SSP n Wa O v z N QE
o T
7 �-77T I�/7/77 T -7— T
0118 11 Al
M
/ol
Iii lTI I 11 / #,l
�III /// / /// - iI
� / /
II / / / / o
J / /
/0_/ rn o 'fit`
II� a 0 n6
4) 096
o —
ff
I w m m Z E —
III wW I( /II /I / 111// oo E �� "
ga
I I!Il/ oo J $
I I w li� I �`I I I I 1 I I l 0� O 00
� �,e I ;v_;
Il I d
�> 1111 I AI 1 1 1 1 1 1 a v
co
BUJ I I III I IIIII J /$1
--- a T
I IIII n�T 3K 7-
II �I IIII I IIIII I°
-
_ I IIII I
Z-'1133HS 33S 3NI'1HO1HW
�� -iJi' IIII 1111 111111
°� � II � 111 II II11
W
'O
0
_ /<.� I I �I II I X11 I I I I I ~ W W
ss �v '1 I I II ' w?? W w
I I Iw W Z=u' W
"' II II I\�II m llll 1111II I ILU �J�"o
> 5= W
w I11� 1 1liM p N� >'uW�
ow \11 J Z �gw - >zW
oZ 11111 w tmNJoW
IIII II I I sfi�.\ c)
C) LL � \ 111 \ \ \ J F < (n 0 0
I
¢
I!� 11 II
i i �q II II IQI I II II \` s ss6 s 1 1 11111\ I1 w p1
I o $ 11
ID 'a I I II '�tli 1\ `\ 1111 II
I'a LL
E J
I
W 1 II 1 1 +- — 1 1
I —_ _ IT>
Low
Z 1 1 1 1 I i r6ZL a 11 11 1 11 1
a- LL I I I 1 11 1 X 1 1 II I
CO
I C J 1 1 1 1 1 11 11111
'6Z6 jt
I �1 1\ 11\ 11 II 11 11 I' GSS�S M 11 1 1 111111
� I 1
X641
II
S T- lartrt-
- --- — -- -
I�I I II IIII IIIII � I I�III� �'I' �
1 �� I IIII IIII � FN j�lll _T —,
"
J _ 0.4
asp x fif szu
�-
1
w
/ 1 —
/�� /il,� I- >w C\1 I I�
/Cz ALL a g COE6 I I I I it
o� / ¢ I I I I I INI I
,►-fie _ a_ 4 -Jll I
0y6 I! / - - - - - -� — — _ E6 Ftllf -Sf��
E ia. >t
w Ww4?—
ui
m2
(DE - E )�j
a
w
�A v.a'
/
=r= III" 1 L II
.8 I I I —
r
\III i Il/ I lI
a Q
aril CU
_. >
U)9
Ili
\\�\ \\�= �\� \ \� nas
Z 1�
M\ \ Yes a \ —_ \ \I \I \I \I \I 111 W \\ 7 1111 I`; 1
\_/ 11 j 1111 awl W
13 >,
• `��\ BLS 1jj11 111 111
\ \A \111 111
\\ \',k\ \ , *• �# 11 III 11 1 �
111 111.
X506 III III I I II II II II II II '
\ \1 \ \\ IIII IIIII I
\ \I \ \ \ \ \ \\ IIIIIIII II °co
\11�\ N X11111111111
N\ \ \ \\ O IIIIIIIIIIIII
Cf) III I I I I I I I I
o\ \ \ \ 11 1111111
\\ LL: \\ / / /Z l I 1 I I
\FU
w Jaw \ \\ \\ \ \\ 'w�I N
J \ u'a /23 I I I I 1 H
I w
M\ \\ \ \ \ \�rl I I I I IIII
�\ �J \ \\ \\ \T IIII i t LL JI I I I I o
LL
ov =
Z oU � Qwe� � cy)
Q o= om QON
OC K S ?ai cg' ao lQ�C7U mp: zQ o
6w 4 O Cu`o..� Taj crag „� >rnLLZ ��No� �WJ e N
�6� z E o3s r� -0 m0 z WUd o n z
o0 3 r= " v9i M'yJl'I S� n � Q w a O m � Z to � a a w w Q E E
D Z E� - 2 =S LW o oyy ¢? zN
os ul� Na o� o �� << LL
J
0
Lu ti
w Uw
Z /
U? LL Z
I /
2
LL LL � W °wE 2 i I i / •
= �aNkm
w o I I I
N¢} w w
z ��w >Zw I /
w LLj
L4 3� «g� I.
w 0 a
L) II w
Z
w II ' w
LL u o LL
IIIIII� �
III I
I I IIII � I
I '
� / / / / /'Er E
:5 L) a.
co
LL Ln ,dS
•Fa
as
'►rNjx
a
ss
/ /// s e / / y
ot8
it -�
co LLj Y
l w w a /7 /�'
Z a
/ �� oO oO A"•pt .9'£ %9 w LL
0 3 � � 'ice- // �z
I l of l / w
¢M ;jl
/s I IIIlk w� / �\ j -,r I
a I I I I /` / l �I s a" / I
I I zee I I I I I l I `, j <° i/I �= I l
/ 1 1 1 1 1 1 1
IIII
I 1
\, 11111 III II 11 III 111 �'S/ II 11 II
I I 11\
\\ II I 11 11 11 ��, II 1 1 it II II 1 S � II 11
s \ \\ \\ LU \� \V A� \Z"\ \ \\ \\ \V \N��
a LLJ 4)
\ \ mzE \ \��
\ `\ LL �'\ S \ .� 3
\ \
\ \ \ O
>u' \` xv \\ \ \\ \ \ \\ \ \\
w \ \ z LL \ \ \ \ \ \ \
\2 \ rnwV Aoo V A \ \V�`�
0
EoJ \ \ \00 \\\ \ \� \ \\ \ \ \ \ \\ \ \\ < C-3 \ \ \ ` \ \ ` \ N
vvv` y v
Lu \ \I\
0
CO
rrl I j`.zer 4 g5 \ \'n z \ °\ \
yxd \ \ w w\
W \\ \ y \\
1 111 a
qP
�1/� 1111 11 1 1111 1
95e°
Ill l l l �. 1111 11 {�I
1 II II I I II II II t \\ ` s5'
IIIIIIIII \�; � �� im I I I I I�I
�I I I I I I I I I � �t�ia i g IIIII I
II III II III 5 w!° ais iM ° IIIII�I
I l l l l l l l l l a �ie IIII I
Illllllllla � � IIIIIIII
Il lllllll I
GS 989.5 111111
IIIII III II l Ia l
lIIIII l 1 GS 999.5 IIII I
1 1 i � �' I 11
Illilil lull cfl pl l 1111
I�Illlllll � (IIIIIIIII
I�llllilll IIIIIIII
Iilllillll IIIIIIII
IIIlillll� lIIIII ,
Illllllll \ lIIIII I
I I I �I\ IIII I�
096 _ — ,00t _ IIIII Il it II II II II II Il 111\ \ II
:_------- ��� ///
_ -� - == 777 r
_ — / -- - -
/ I /II �i w — — — ] \� / / / l \ -= asxa�_ _ = �'1 =t 1_ =1_ � ------ - - - --- -- - - -- =_ ="
E' S„r - - - -- 1 / /w j — T - -- — -- WrODC
�aW
_
,xul' / / /// / /cwir o J 096 -- — �IC�i'i— N'y'� I —,- f \ \` \\ \\ \ \� \ \��'•� \ \<< �� 11 /�''�/ // / / I
09s \JIB / wZ / /mz E - - - -- aW w
I Ila ,WLL' / / / / . /rLLi�/ - - - - -- \ \�\\ \�\ .� \\ \
,''mo,/ / I \ \\ \ \ \ \ \\ \ I I
>i F • � i� �
I I --- -- \ \ \'6\ \ �� \ \ \ \\ \� \ \' \ \\ \ 1 I( l I I I I
/ ;r
N
^`Z- -
AM I
096 J I \N \ \ \ \ \ \ \ \11 1 I I I
��� / /II° �' —Z I S5 — \�L \� \�L�i` �! II! l
:.
L-1 133HS 33S - 3NIIHOibW
OE
Q U
2 �w M U J¢
�TECI' b c0 z z (x7 z cc J
Z O= a tl Cl) Q
w��V 2!� Q m s i PN P am L y } � x Q CJ /)
Om
tziv ZW b U cc m
N E
0 rQ ~
° Y ❑
v a
C j O x O w > M IL Z 7 ¢r.NpN _I W N "� O
Q m a E
u. o 3 LL .= � �asN�Jf'f �P� � � Q � o m° oz W p `°n z >
a w w E
E Er
V = G fe O F= O �'. „ N N j Z
a CJ �N� Ay mQ A �O >� x IM m_ � �
Ui �¢ of o u� or .- N ao LLa m2 J
w
N Z
o W
LL
Z 0 z o
>
.o-,9
O
U m
w a y Ywz
U ¢ w OFop
Z
¢Nz
o
a
O
6
La-11L
1
w
x >
l
am
❑NN ZQFU
\\
du zza sy�❑
❑o
U
mo pop ¢Nd
W
u
_ _
Dz
z
jmgq
ILL
U1 =IB °IIII
z a
aka xop
W x
CC
O
IIIIVgIIIp_
�a
�?� wo'-w <m
m
r-w:r
II11=
FmN a�¢No
zw zmw¢�
LLJ
Z°
g
III
I1=
woo ooa��m
xoiEa6Yc<b
0
U
b
IF
�OJw�oY3z ° °�
O II
W
c7Famm¢ °¢a3
-
3
W�
>
II-
ZWN �awNN
(�
I
NIII_
❑oz w..oza
CID
v °n.
x x
111.
kN'g'13N?�aaar
2. m <Nm�
Q
°
111 111 -.
LL
Bl�lllq� IIN
11 =91=1111=
❑ z
NUr
� O
¢ N
Fy <
N!
II1=111 -IIII=
¢az a
wz
¢
z
o
°1111 =11111 = „I5
=NU=
-26ym
NY ❑❑
woz
w
N
`zmm
x3g /�
111�I1i'
m
oo
W
U
L
NI14 Nw
a
Do
iNmww
Z
te_ LL.¢
NI- o
yaJOm
W
LL
ci
p
m III:
HP13
.D
Il
�say�
W
U
z
3 zm¢wm
x
f II�
III-
oF
Q m r)F
z °❑ Azz
J II
w,
III pI=
II =1h.
-
oogoLL�
zw3 ?z°
a
co
mzz
z pa-
A,z
IAN =11u-
I!19N�IIIII111
z¢ °a
8rSaw
w -rpN
c7Umzw
LL w
=,
dni.o-,z
3w�w�F
w�
p
z apN¢m<
M
J
N¢�w�
Rw
°p x3
_
wWOa� m
a� �z
W
zx<<,i-
x
N!'
zimJaiv
? n
Z
F
a
o
° Iµu�
�Giz
mo c���m
�mFaigw
° �
mo wo
az oy
LWL
X
a a
°k
oa
m xZF
FQ-wtn Nmk
�mwa'm
W W(wj
�❑ is
W
Y
a
Z< Q�
uN ¢a
w¢
J
Q
ww
N
L
a
°¢
aw
m
N7 2
c
G
a� <WF
03 U lj
Qy - g
pa_ 'w
¢omF
zo
i p
a0
F-
WO Z
4 �s
m ca7�
�z
x -g k x
5
x�xxxz
xk° X�
Nw U
zs w
w�
Wt
aw
pz❑w �3
J
a�❑
N3 ° ��
a�3� N4
�� W
-
:;L �F
W.
m n
r �a
? =c❑i
m J
g 'NE N=8
.ol
Z
F
o z n.
Oaf
O
¢
jaQ
w
V)
m a
i aim
w JUN
�
'� � 3i
e�
x 4WO F
°NZQ
iS a¢ �❑ ��
<.,..<r.
n ¢ammo
.n
r O
ul
m-
¢ ❑FNmz
0¢
Y ¢
F w OmziW
F-
I-
Xz
J
Ir ¢
N m mo�ZWa
Q
J
O
m Q
¢
I =_
w
a wmw
Q
IL
¢
III
a NJ °W
U
O
x
as
NEED
z
CC
o
IIII. -IIII-
P s
z
w
FF
II =IIII =III
m ��aOW
a 5 N
a�FU
2
=
J
WN
I
d pNQ y�yNOp
Q
o
UWF¢a wwO
w
3
N
III
zww ¢ U'
a0
¢
II
FO Ram
0
W
o
z
w
N
d
III
1=
Z
F �N UWE O
= �s= wN❑ >?
vimzo m¢�wo g
wJ
m
zpa a
>
o
III
_O
r
¢
aN`S'OZ wo °azx 3
aN w=
R.
Q
I-
Q
3tw� �
c
I °
W
wU(7VU ���j� ¢Z
ZZLL
Z
a
J
o
owl-
'i=K °o
III
J
w
zi¢wll 8o;A5
goy= =z�
¢wNa� 3¢�F� uoz
W
ar
3o
U>
q
m
��w5n"w
zw¢¢m
W
III
a ju °o OWgx z>
omx❑Q rsawN �g�
U
Z
w�
w❑
Ea
a
Z
pma-
p
w°l-mw
Z
__
a w z¢aom Fa
¢ <EUrz O °�m� =' »❑
W
O
z �>
_
0 0
�¢P�a
LL o,
IIII
u�wm❑cwi g?w<T aFa
>W
U
}
w
pwff=
IIII= IIII
c�o�wouixzLLFWmn boo
=w=
>
W
Q”
=uII=
s N¢g�WwQ��
>
,❑❑❑�
w888�
-
owzoza M
m
IL
M
J
W �333i
*;,eel'
. _. IIII
.� •.�
u°wiZdr'n-
=o�wwzN�FO =pm�x
W
lk
r0 �aaaa
z �NNd�
W J
.� `
IIII
—
mww aQ"_Wowioop
o
w
—IIII
IIII —iu'_
II
=IIII=
w =mx=m�wo<F¢� <a
❑oa °_ ¢ a¢y�W�o
W
�,l
IIII=
==Nmm�z=omw��¢¢
LL�W- �- �2¢aUfm3WW=
N
m
-
N °❑om dmwf�w�n�R❑p<
w2wwNN <z2.w oN.
ww
Q3a
U
3
w
9
03LL3aa n?
Z�N�aN m
J
k
w
o
F-
na
m
x
N
z
LL
�3
Z mmmm QQ�v /Q� o= pm QLzJz Q
OC K N ?` a as U 00 fn �L co U =0= J� z _ r- J
W zxSo'? z C/i Q v
0 C,°® ?rnLLZ � °�o� JQWJ e o
li °�0�`B.P W�p ¢¢ Um WJQW z >g`'
z– yLL.S E SA,, yR is O .wo z
°O ''J! I fn Q ¢ io o W fn �'' �. �' ,� m w j Z' E
_ `o Q Z
v0� s W °tn m� A �0 1 �W m i
U a U) U v�i< O V a LL
Nj=O Q. 0
m N
de
-11 s
4A
111 l IIII r lll`�l /// 11 I
l l I Al l' l l O � �' •'
/ /Il jlili 1 II'li /l �l N �' z
//�
��"lOtl
1 4
91dow"
aio ,
�co
O
0
y�
Oi o
Ito,/
9 i
O
i o
J e .ir
ti�rl
44
moo
> 0 0►,a
Q
t/ 0
C� V
'a
,IIII��
' 1 f 1LIIW�
��IIIIIIK
,f t
I II I ,(
'h-
�III�'lllllll
I V }}III III
I nC1 I l l i l l
I Q
4r I
C
6�
1 �a
1 o
� o
0o p
il
Q7Zo'o,o 0
Oeo � o c
'81"
S-1 133HS 33S - 3NI1HDIVW
5 \
1j11 11 111
IIII
� III ICI
lii�
IIII
II111
lllrrl
11 I I�
L/ L
r
I II fill) I 1
Illllll
11! I I
DD ��lilli
9 r I lilt I I
S.S I I I II I I I
I I�IjI I I
i h
ii -(D0 IIIIIIII
o�jlyjlll
•�I�Ijlll
III
a IIII
III III►
IIIIIIIIII
i t I$Ip I I I I
Ilitill
///
p O � p
\ -
! I I I
c
Cb
Nj=O Q. 0
m N
de
-11 s
4A
111 l IIII r lll`�l /// 11 I
l l I Al l' l l O � �' •'
/ /Il jlili 1 II'li /l �l N �' z
//�
��"lOtl
1 4
91dow"
aio ,
�co
O
0
y�
Oi o
Ito,/
9 i
O
i o
J e .ir
ti�rl
44
moo
> 0 0►,a
Q
t/ 0
C� V
'a
,IIII��
' 1 f 1LIIW�
��IIIIIIK
,f t
I II I ,(
'h-
�III�'lllllll
I V }}III III
I nC1 I l l i l l
I Q
4r I
C
6�
1 �a
1 o
� o
0o p
il
Q7Zo'o,o 0
Oeo � o c
'81"
S-1 133HS 33S - 3NI1HDIVW
5 \
1j11 11 111
IIII
� III ICI
lii�
IIII
II111
lllrrl
11 I I�
L/ L
r
I II fill) I 1
Illllll
11! I I
DD ��lilli
9 r I lilt I I
S.S I I I II I I I
I I�IjI I I
i h
ii -(D0 IIIIIIII
o�jlyjlll
•�I�Ijlll
III
a IIII
III III►
IIIIIIIIII
i t I$Ip I I I I
Ilitill
///
p O � p
\ -
! I I I
_ '9V
`�'�'"�e•'�!s°�'1� �;'r. ; �� -- I � I I I I I I I I I I I I I
\ ` _� �•a, -' — \` ' � —a to . � III I i I I I I I I I I I'
\ M" • "'�,, -.�y� � � o '.� II IIIIIIII I
NI i d° 4 i I III IIIIIIII I
�sxo '/ I-
'�'1 h-TTF T I I I I
A, I
III I i I
AV
III I I tIIIlillll
GS 920-5 IIIIIIIIII I
IIII / l d4/ co
Z
4L \ \\ II Il 1 II II II III / / // / / // / /// / / / �•
w
0
c
0
A
AA�A2
21
A
A
A �A
A
A A
�
923N
o
EooEoEQEQEoEo°
m
$A
Eoo
EEEEEEEE
EEE
z
i
N S
Fn
Fn
o
i i
o
o 222222
w
— w
w w
LL
o2QO
o
w IL
U
O
c
o
r
G
9
mmeio
9 0
0 0
0 0
0 0
;'I
0 o
'v 'n
_
N o
miom<o
0 0
o
0 0
vin
0 0,
in ina<oe
0
0
o
io b
m
N
N
e
O
m
C
_co _coo
TIT
00000000000000e0000000ao
l0
W l0
N W
--
I
N N
c
N N
c c
N N
c
N N
c
N N
YI �ONNh
N N
N N
N N
N
S.
- R
E E
E
>
E E E
3 °3
333mJgg
33933
°°f
o
°'
3
JJOO
L
'm
www
w
w
www
3
j
w w
x
W
X33
mm
m
33333333333333
N
m3 m 3
41 d1
tq y
w w
w w
w3z3333
Z
Z
ow
33
nowo
3
m
m
E
m
c
E
E c
a m
W ��
m
2
t7
a
>
m
cg
10 `m
n`cm5o
^�'
o
t0¢cmo�mE.
2
12
1
21
2 2w
E
A
c
`�t010
U
oLLO
0
3oo._Bi
❑oLLds�
>$wm°mrm000
no
n333
-33
m
a
$
w N
a
oY
.3
?w?UL
E E@
`o
° m
mrn
a¢c
;:P
m �.c
-in-
.m='
?m
Y
a
p 2
> >m
Na
mxo
00
»y
7
2
A
E 3
v
cw�i4'•
o
m
m u
m m
>>
m
-
Em
h
'
9
- rn
do
inmv
?'o
ot1Oi
.E
>`mop
ma:
coto
.o
.E
Lm
Vo
my
mono
cat.
°dvi
° -
m
comma
rn..mmm
i4m
E
mac
cW
°Er
w
> o
O
o
�7
N
m
0
0
¢
o
w
¢ a¢¢¢
a
2
V E
o
C
W
m
m
7
�
N O
E W
.- N
N
Q �N(�ONmnm
O
'
m
NNNN
o '
'
•i
NHHHH
N m
N
1 1
7Nm(A
w7
m
m
QO
U'
(7
_ '9V
`�'�'"�e•'�!s°�'1� �;'r. ; �� -- I � I I I I I I I I I I I I I
\ ` _� �•a, -' — \` ' � —a to . � III I i I I I I I I I I I'
\ M" • "'�,, -.�y� � � o '.� II IIIIIIII I
NI i d° 4 i I III IIIIIIII I
�sxo '/ I-
'�'1 h-TTF T I I I I
A, I
III I i I
AV
III I I tIIIlillll
GS 920-5 IIIIIIIIII I
IIII / l d4/ co
Z
4L \ \\ II Il 1 II II II III / / // / / // / /// / / / �•
w
0
Q oV E
Z
LLJJ
= V m o Q^
CL V k E
O o,, .. o P ��
LL Z_ um- E .95. SAP n
z ^ E $ 5
V
N
z
Q
�?
4oLL�J
\ \\ I l l • ®°j� ^/ I ,fir/ �V �d
ao l l l l I / � •I I l l l l l I r
' l l 1 1 / 1 1 /. � N. � *•1 \ I \F. 1 1 1 1 1 1 1
Z 1111111 / '�;��,�'I i�f \ 1�111tllill
o i �l l' l l l l /. - l/ II I l l i i i�•\
l l, l l, I l l° ��" � ,;' � :� I:�'� a II 1 1 1 1 1 1 i•�`I / I I I
o LL
�2 -- ©�\ 1 1 11 I I I I II II II
/ ' '- ,� — — — —_� �� � � —' � %r i! i L �.` -•. �;r r' � Gs�°� \�Q \ \\ \ \\ 11 1 1 11 Ij � j jl jl
Cb I IrI err ?I �" °e d'
/ % ✓ / j / �i i � a\ � ° ° � � O O ,';'�� �, � ;' � O .' �, I ,I ; \ \�� \\ \ \I\ 1� `1111 11'1 11 i I
/ I
/i/ / / /// /4. r- -' i �`o,l''1�r O ,ass 0) 111 1 1 1 1 1 1 1 �1 1
I1 1 1111
114X
/ / /// / /� / / / / /� //' //' r , /'°° / _ \ � —T!, •O�I I\1I��,1r �II` O 11 1 I 1 1 1 1 11 I i I I
I
�.�/ /' // // /'/ /' � � ' .\mss 'd ',r d' D�/;- I -` -. � I � I • .C� � Il ��, o, Gg989.5
4 4 IIIIIIIII I I
II
'LP II ® �fi III I I III
CV —tI'– /SJ /' / O p�i I \ r I • ° I I ° o°° $� ��' l 11 l / l l / l I 1
4 / c °
�i`� //� •rS< � ���� /Q/ °�
888.5 G38d95
°f 'oo ° O�''/ / / °� I III• Ill l I l �� llll l 111
fq. :;�; s;d; o I III lilll, l,, lllllll
O
ll� / / / / /' /' — -- � \ � — �- �ar-da�:'/ '•,_ ;.,�� °>�'
\�`�— ---------
T' �) ,oz -7' - T_7^ ,LLll� l '/
o
f t! /gi
v o �1? o
oz / / I W osQ
4-1 193HS 33S 3NIIHOlb'W
N
p
{h
J
O O
O
O
Q O
T
O
t7 °nD-
1�
N
V
c; N
O n
N
Z
CD Z
O1
a
0 0
o n
o
yno
m
I m
Z
CO
co(n��<
s
ZZZN
N
m
LU
Mn O W r S
G
J
C�LDZ
G Z co Q j
^ N
Z
?0) LLZ�
�Q =�
m
Q
c
J
JQwJ rn
CL
W
N
�
n n
r A
N -�i
A O
n
m
Z
r
e
J
o 0
0
o o
m n
4 m
N Q
N
a o
Z
LD
V
J
O O
N
g N
0 n
O 0
O�
m
16
0 0
N V
m
l7
°
N O
m
m
Oi d
O
c!
p O
O N
N
0 0
m O
y
n N
n
O
J
C6
m 6,6
m
Q
p
J
° oo•n
°°
^
<
J
^
N
O
0 0
o
0
o
0 0<
N
a
N m
r
Z B
O
J
N
�
pppp
m°°
m
Q
m m
N Q
<'
Z '-
N
2
J
N
�
n I
Q
5p
N N
t� Q
Z d
J
�
L
m g
o
o°
po Off
N c:;
72
N
G .B
N
O
•�
N
�
l7
n b
N
Oml
t7
!�
8
to
J
<
Y
O
ZN
J O
LL 3
V�
d Q<
LL
Q 3�
W p
�i�
V
N
z
Q
�?
4oLL�J
\ \\ I l l • ®°j� ^/ I ,fir/ �V �d
ao l l l l I / � •I I l l l l l I r
' l l 1 1 / 1 1 /. � N. � *•1 \ I \F. 1 1 1 1 1 1 1
Z 1111111 / '�;��,�'I i�f \ 1�111tllill
o i �l l' l l l l /. - l/ II I l l i i i�•\
l l, l l, I l l° ��" � ,;' � :� I:�'� a II 1 1 1 1 1 1 i•�`I / I I I
o LL
�2 -- ©�\ 1 1 11 I I I I II II II
/ ' '- ,� — — — —_� �� � � —' � %r i! i L �.` -•. �;r r' � Gs�°� \�Q \ \\ \ \\ 11 1 1 11 Ij � j jl jl
Cb I IrI err ?I �" °e d'
/ % ✓ / j / �i i � a\ � ° ° � � O O ,';'�� �, � ;' � O .' �, I ,I ; \ \�� \\ \ \I\ 1� `1111 11'1 11 i I
/ I
/i/ / / /// /4. r- -' i �`o,l''1�r O ,ass 0) 111 1 1 1 1 1 1 1 �1 1
I1 1 1111
114X
/ / /// / /� / / / / /� //' //' r , /'°° / _ \ � —T!, •O�I I\1I��,1r �II` O 11 1 I 1 1 1 1 11 I i I I
I
�.�/ /' // // /'/ /' � � ' .\mss 'd ',r d' D�/;- I -` -. � I � I • .C� � Il ��, o, Gg989.5
4 4 IIIIIIIII I I
II
'LP II ® �fi III I I III
CV —tI'– /SJ /' / O p�i I \ r I • ° I I ° o°° $� ��' l 11 l / l l / l I 1
4 / c °
�i`� //� •rS< � ���� /Q/ °�
888.5 G38d95
°f 'oo ° O�''/ / / °� I III• Ill l I l �� llll l 111
fq. :;�; s;d; o I III lilll, l,, lllllll
O
ll� / / / / /' /' — -- � \ � — �- �ar-da�:'/ '•,_ ;.,�� °>�'
\�`�— ---------
T' �) ,oz -7' - T_7^ ,LLll� l '/
o
f t! /gi
v o �1? o
oz / / I W osQ
4-1 193HS 33S 3NIIHOlb'W
CD Z
°_
Cr o
CO
co(n��<
oo -°�'
<S
ZZZN
m
LU
Mn O W r S
=<w
Z2t=
C�LDZ
G Z co Q j
Q a
?0) LLZ�
�Q =�
M� 01
JQwJ rn
CL
W
e
w O
v �� to
z
�''
3
° w
„w
'" _
H CL
o to
Bi
�''
m m
V
N
z
Q
�?
4oLL�J
\ \\ I l l • ®°j� ^/ I ,fir/ �V �d
ao l l l l I / � •I I l l l l l I r
' l l 1 1 / 1 1 /. � N. � *•1 \ I \F. 1 1 1 1 1 1 1
Z 1111111 / '�;��,�'I i�f \ 1�111tllill
o i �l l' l l l l /. - l/ II I l l i i i�•\
l l, l l, I l l° ��" � ,;' � :� I:�'� a II 1 1 1 1 1 1 i•�`I / I I I
o LL
�2 -- ©�\ 1 1 11 I I I I II II II
/ ' '- ,� — — — —_� �� � � —' � %r i! i L �.` -•. �;r r' � Gs�°� \�Q \ \\ \ \\ 11 1 1 11 Ij � j jl jl
Cb I IrI err ?I �" °e d'
/ % ✓ / j / �i i � a\ � ° ° � � O O ,';'�� �, � ;' � O .' �, I ,I ; \ \�� \\ \ \I\ 1� `1111 11'1 11 i I
/ I
/i/ / / /// /4. r- -' i �`o,l''1�r O ,ass 0) 111 1 1 1 1 1 1 1 �1 1
I1 1 1111
114X
/ / /// / /� / / / / /� //' //' r , /'°° / _ \ � —T!, •O�I I\1I��,1r �II` O 11 1 I 1 1 1 1 11 I i I I
I
�.�/ /' // // /'/ /' � � ' .\mss 'd ',r d' D�/;- I -` -. � I � I • .C� � Il ��, o, Gg989.5
4 4 IIIIIIIII I I
II
'LP II ® �fi III I I III
CV —tI'– /SJ /' / O p�i I \ r I • ° I I ° o°° $� ��' l 11 l / l l / l I 1
4 / c °
�i`� //� •rS< � ���� /Q/ °�
888.5 G38d95
°f 'oo ° O�''/ / / °� I III• Ill l I l �� llll l 111
fq. :;�; s;d; o I III lilll, l,, lllllll
O
ll� / / / / /' /' — -- � \ � — �- �ar-da�:'/ '•,_ ;.,�� °>�'
\�`�— ---------
T' �) ,oz -7' - T_7^ ,LLll� l '/
o
f t! /gi
v o �1? o
oz / / I W osQ
4-1 193HS 33S 3NIIHOlb'W
E _ �Q
Z v � om <zU) a
z z sPMZ mcn�Cr�� o�
LLI W�� Z�J
= Q o k .0Q�F- M)Pl °gym' �UiQ a
y m u" 0 E ° > W Z `n <0' C., L1J ~ m o b
O �° a =L a 0 U — LU ¢¢ ow J LIJ m N a
LL Z - iLL._ E .�y. P .� { W z ^ Y$
o� 0 3 F _ N Nq�rt SS Q w o o W O Q c°n 3 w w a= E
_ u _ _° F v o> N cr Z Cfl o �°Z J o 6 vNg my A �� >rc um m
°S �¢ of o u2 N QoLLa
w
Wa
,z w
won°w �O
ppZ x4W �N
a Zo2 �Z
Zak' iL9
Ga
N�3
J
w $dN
'NIW.9
o ¢ o�
m o Noo
>
�T
W
Z
o 'S 9 °a
O
gW
a
s� ❑I
Nx
z¢❑ x
d d
_
° °
J
Z2 m
o�
J
a
UN
z
>
U)
LL o o w
YNZNaO$
¢ a
W
U mL
w¢ zh
0Z -
O
3z o o N
w
aQ y
J
x 3r.
�
g
❑ � o O
w
Z
Yw
hi �g >g� w 8 mgr
O
ao ¢� m�5�p
oN�p zm 8w ❑� wr ¢z Pza
3x ds wF dw o� dz-a
Or
z aFw0a
3NwNOwOz
pNO
8w¢ ¢ °z wwo¢ S® is w zG y
z0 ULL dyd �zx Fa-¢ d DN °O
mam
a ❑❑ ZQZ -UO
WNFZ?�waaaa�
8�pw a,nmi wmf m j w JO w zw¢
ado ¢m ,�d ¢ �C7 uJ-. w0 N¢ NZ pWz
FaN
Li❑wzm wmw °¢w❑a
w5 n=iw a
m ��m
drdw�g�x x
❑ w az xyxU xz txi O �oti U� Ow
ww
Z.N ao g,8 ww"m cai� w cY.�ww �w a °iw
wz
z`-
�ni ma m m n
> > dad a ❑ adw Op ¢?
a°O z�z -5zM¢ 30 u�z w mN¢ OF MS.
z
a
a
¢¢t
w y ¢ ❑
'NIW 133A 9 ma 'NIW 133j E
m J O�x
uMM.¢ �
J
o NFP
z1
Fa-
8 3z z ga
W
z� z" < ?o'a
Z
m
og ww=
°N
8
°x3
IRE dO o ¢¢N
wm ¢ a0z
J
J
yQ aw .oF
Q
a
zo wz a J:LL
ry
z
fn
iz �o ❑ NjZt
m
m-'
Z
zS z¢ w Nzy
d�
N� xm„ wm❑
a 3' �za
a❑ �C
Buz a
m �zw
w °w
W
W
^g z¢ o ZZN
a3
Y
z N,m 8 Wgz
d aN oz<
ME2
z
�H ¢w w�OdO
Jz
mga '<,8 zo ❑°w w�' ¢z
�aaimzgaiJa
JJ 3NwNow z
O ¢N❑ 8Wg ON mwO 80 �a r_ xw z U
Q W�N ?m ULL dYd Ef?x a�'d �� �N N °O
U
as wpp UdiO
r~nyz�'O��zat o!-
O °_ mdfq FW ¢N. Z F6 tlN W N¢
o ¢wa xu�5 8� iwi3 xmf °�¢ y� y�" qdU w�
wmFzi dddFo
UWZ- mw❑w °a
ai w Rw¢w¢wzw
�a�aw�g¢sw
'u gcxi� ?00 ¢w gdR¢ ooiz wo. ¢ rz ❑izw
6a ❑d ai L� SZY FNw ¢
1 x �ry Ww xNxU ¢U -< awo _O �¢p ¢m wwo0
N zw_
cosy
z�ii wa m m n
wF w
ra
Zc7a zm ��9g oF-. cail� --cW7 og mw aP3w
JOOJ z, - mzE¢ Q 0 ❑ am dw O ¢QOW
NF3 w 3o u'S�a m¢ 8� c7eo m
¢
w"wm O
U °z
MM w >
�w
a
24}2U LLW� Zf z ¢
¢a q
m u�i y
H
W
5N S Edw 5 c�
MO W LL
fz�°¢ mr°n
O
¢w
8N m
J
h4
W
'NIW NQ S t
Q
a
OJ
a° ° a
W
Z�w�
Z
O
o ww, `m' w
Z
wJ
o
0
x az m ¢i
Z
z
J� Y
d<
Om
g
Z
Qp t
a
a
vi¢ z wa
r << LL
m
= Fm
a=C
N
¢i
('�
¢ ¢x U Z6
3x m� ❑O c� >a p gW
(nz
a@ ¢
�- z
=
°¢" zm OcW7 of z coin k s3
Oz ¢F ¢❑ wo� ❑io O ¢O
z 8
F �¢ O
Cl)
tw Q8?wo _� o °°e
`'� im �cwiZ UFZF 0¢ < c¢7'
a LL a
xo❑zw xao cog N aw
c?W Zzod W❑Vd o °aa
¢ �O �O
N N
w Ow
m a¢
H m °zzzz
ZmdO z �¢
mm_ a a n
O
m
m 9x
L
J
w xR
~
W
W3 LLm w
arH ¢m
� �mw
W
3w 8z
a:
z0 dOQ
a
m
w
�
0,
0
wz ¢
waa O
.0-.Z
N
z
A
W
r7
z_
F~
z
U
W
CL
F~
U
W
F�
Z
W
A
W
w
x
EI
w
H
H
w
a
°z ^ aQ m z° �a
avQ du 22a d
U�a d QQ
w. �Gw. ,1d co
du<CuC07O
zz +I A I I I .1..I
z I z
za.daz� Qa-I!.4.a¢¢z^QZaZ dd'I'I
r aa0^ �a c,a 0--
�axF�. . . 00�,7 c7aex�;a- gal -v�;
CU ) CU ) O Oz O g W aa A A abaU
C) C) W0 zz a 0C0 >zzz AA
0ww 0Oa ..Ia o.- i0zOOOw a-j
Z u0
w A w �A� w H _ _ _
zzE -dQQQ 0Z 0z Z Z +. z zH P 1� 0 Z z
000- .O-Oz» F"OOZ» »F 0 000
u C/)LI)L�wwww000000wccnW.uo www w w 0 0 0 0
I I I I
¢ 1 1 1 1 1 1 1 1 1 1 1 1 1 V f 1 11 11 11 11 11
M M M M M M M M M M M M M M 4 1 1,
dzQQQz zzzzzQdz QdzQdZzQzdz
.aa a �.a.a aaaa�a a.L a. a, a, a.. . .a.aaP, a. aa.a.L.aa
n. a a. P. a. a. a
^ N M 7 n lb r" 00 O� O^ ^ •-• •-• --^ ^ N M V. 11 lD t` 00 C� O^ ^
d¢¢¢¢¢¢¢¢¢¢¢Q¢¢¢¢¢¢¢¢¢¢¢¢¢¢
F
x
u�
U
F.
F
w
w a�
a O X
¢6¢d�
a a w a
F
wWt¢-z�f wwA
wwzd� >z >xz
04 F- C7 C.7EW.aQ��W C7
a 0 CA CA
H °zgWC)pza
a F A
Xawd wQ.r,A
wa >c7�'Av�a ¢
^ N I? 'T 11 b r 00 91
U U U U U U U U U
L)
x
W
H
v3 z
z 0
�x 3
00
U a`
y� u u
¢wC4C4U
U0a0Ut¢
U
(1 x.000
¢Q�uu
^ N M �
•--1 •-� ¢ Q � Q
�� aaaa
aaaa
u.w 1 I I I
W W Ft�»HHF-
�� wcocawm
x�xwx
xx�XX
n m W W W W W
F F W W W W W
cn cn UuUUU
Q Q Q Q Q
��HZzzzz
�vsaaaaa
X00000
°°wzzzzz
Q Q cn cn D5 D� cn cn
a a O w w w w w
H H x A A A A A
a¢¢¢¢¢
aawaaaaa
W W'�W wwww
ww0it
wcaQca D����
a
Z^ N N M K h 10
nx°Om °m °ma°�m°ce
A
J
S
as
¢¢ as
as zz�
F H N
00 0 W
ID 0
dadzzA
uudzz�
Z z F• Q d
W w w .-1 J w
wwAa.a.A
as as
Q¢ Qd
zzzzzz
�aaa�aaa�
w
^
CV M h D
A
z
Q
a
U U
� -d
0o z am
Oucoa
�mIm m �vrQ I I QU ¢ z�Z
xxyC 40aOC7 d ¢ VI I ¢ada O� dd'I I
N a Y Y >^ a p Q 0 d W U O O w w 0 0 0 p Q W U 0 0 w w
A A ¢A Q-j � A U u U u p Z w z z z z OO w W z z z z A
zzzz66 OOOO OO 000 Q
Q QUUUU uaA WHHHHzzzzu,AwA FF[ F -
-zzzz
r,.<ti�AAF-•Oz > >? >OOOO O�OZ» »0000
CL CL �¢ u0w-ta.wliaaaaaa[Ucl� W aWtawiwaan a
U u d d d d° 0 w W. w w w w 0 0 0 0 w n w n w w w W w 0000
rn 'n 3 3 3 3 W, 1 I I I I I I I I I I i I I I I I I I I I
W W O O a a ^ ^ ^ ^- ^-- ^ ^^ N N N- N N N N N. N N N
A A O O z zz zz z z zz z z z zz zz zz zz z z z zz zz z z z z
P r� zzzz 0 a Q¢ d Q¢¢ Q�¢¢ Q Q d¢ d Q Q 6 d Q d d
��r�i13333 °OUa'�.aaaa"J. aaaa .a'�.a�aaaaaaa'�.aa'a�ao'�.a
ZD
x
U
Q
z
z
o
Z
C
L)
w
w,
o_
z
x
w
cn
J
w
u
co
¢¢ as
as zz�
F H N
00 0 W
ID 0
dadzzA
uudzz�
Z z F• Q d
W w w .-1 J w
wwAa.a.A
as as
Q¢ Qd
zzzzzz
�aaa�aaa�
w
^
CV M h D
A
z
Q
a
U U
� -d
0o z am
Oucoa
�mIm m �vrQ I I QU ¢ z�Z
xxyC 40aOC7 d ¢ VI I ¢ada O� dd'I I
N a Y Y >^ a p Q 0 d W U O O w w 0 0 0 p Q W U 0 0 w w
A A ¢A Q-j � A U u U u p Z w z z z z OO w W z z z z A
zzzz66 OOOO OO 000 Q
Q QUUUU uaA WHHHHzzzzu,AwA FF[ F -
-zzzz
r,.<ti�AAF-•Oz > >? >OOOO O�OZ» »0000
CL CL �¢ u0w-ta.wliaaaaaa[Ucl� W aWtawiwaan a
U u d d d d° 0 w W. w w w w 0 0 0 0 w n w n w w w W w 0000
rn 'n 3 3 3 3 W, 1 I I I I I I I I I I i I I I I I I I I I
W W O O a a ^ ^ ^ ^- ^-- ^ ^^ N N N- N N N N N. N N N
A A O O z zz zz z z zz z z z zz zz zz zz z z z zz zz z z z z
P r� zzzz 0 a Q¢ d Q¢¢ Q�¢¢ Q Q d¢ d Q Q 6 d Q d d
��r�i13333 °OUa'�.aaaa"J. aaaa .a'�.a�aaaaaaa'�.aa'a�ao'�.a
ZD
x
U
Q
w
> z a.
CAu
w a
AAA
z
0.3
L bb
C7�o
b
b4 T ON
U v,
Ca U
y p ti 000
0
O a' O i.
h p N
A U
M
U
r�
U
rU�
V 1
ct
V
. rl
tn
N
O
� M
•� o
o rr
r�
r-1
V �
� O
� M
ca
- O A
O �
V1 A p!
M
H
z
w
H
F�
d
z
a
L)
w
U
x
w
u
M Z
w
pLTJ
oc
3
z� w
'
w>..
�� 3
0
kri
Z0°
x0 >k
W
v�a�¢
= �4F�Ga w
U�OUZ
d
w�nOw
pu z
¢�mwu
zQV°�
'
�3 ¢ U
w00
Z
E- >00
�0 u
00 Q
Cap' ZZ�
z = -°
�, --
uo (n 00
¢pS 0
U
u_N3
<2S u
3u
--
>
w
> z a.
CAu
w a
AAA
z
0.3
L bb
C7�o
b
b4 T ON
U v,
Ca U
y p ti 000
0
O a' O i.
h p N
A U
M
U
r�
U
rU�
V 1
ct
V
. rl
tn
N
O
� M
•� o
o rr
r�
r-1
V �
� O
� M
ca
- O A
O �
V1 A p!
M
H
z
w
H
F�
d
MAID
STOZ -OC-60 - £ lINn NJNVd 11333V143S - NV ld 1"3N39 9NI1SIX3 - OZTTOZ
a
0 ^ o
0
Z Z V O CL
z ¢ O+h 5
ZY > Oco Co, N
03 3 u;0:, S.
JS y�Z Iw-wp mu o
°OO mOO G °¢¢� c
4 O Z�� �s ^ O >U Y1 ON
U Vl Ym V
Q Q J � QZQ x 4 Q m =u Q° W m Z a c
W R V b > tp uKO+ O O
Z Z �Q WL CCON �p'ON zzFI a a 3w
CCY
r g o W m W~ LLaO� 5. p0
z K p W,zw ¢HV"� °V •aVin
W U �' LL f O x �D Z N 40 b Z N Q N Q N y�j W f� t� • V• L U
ZN v m W O}Z z invu.°.' °au.°f. HN3� D <a .... N C °o �..
w < p � cw n x3
U Z - m O. Qf p V �e N
'> W zw a z x j z
1' p u~i m a o !Z5 ° ?
w O a a m m
U U) _ ��
W 5
` J m J p O
m
O
�pz
wLL'
Z W uao>�
X Q (� WmiNS u o
W J a w u
O w �,G \NEER
Z Z ZY JQl7 V4' QN �%
z > V u aim zz
w
O O uzi
_ _ .., •aaav saoism3a I Siva
.�..� m
Z
U) �>
1
z�
0 Lt 1 [L \ a
U
I ga'0)
t 1
�Vx 1 1
� 1 1
0 1 1
11
1 1
ck� 11 t
Ld 1
co
am Z w i 1 tt1
W _� o
M 0- I to
�U) N
W 0 1
L L� U); a cs�
U vy u i `r LL
U � � I �-, tL1 Cr-' 1:0
M u (D rm � Q C9I i L J 0 r` w
�I w �_
AM 0-)
v ° N =I �
� o I
� n m i i tLl
»
,I aNCO 1
1
tL .... CO
co
, 4o
UJ 1 N U 1 1
U- U Q 1
"L OCR — w D ca) ko
zOW U 440 '1 `1
U 1~ < 1 \
g�
� i 0
g \v 0
g
STOZ-OE-60 - E 1INn HDN" d3d3VH7S -1N3W4N3wwv N1fld 1"3N39 O3SOdOWd - OZTTOZ
<
z
z o
0
N
j W
V F N
Q
0
J d
i Z 4
1- ° V = = V ° Z pia o
W I " _<
J Z} T 0. W C~
4 a 0 z W� _ �� �
Wm� Z �
o bas
Q 6 00 Z�Of 01 jS01T N�WM Z V Nth
LZZ_l ` }i Z N f m W }Z 4�V�< mV�� a�WM 4 Q O
W (7 z i i v ai E�or EacA "-. z
i Z U7 w in .`. Oa �/ uW.iOe > z. o "nog
�- W W W a w m �Z a..V ogO.. v,} a
Q N O a a ma �emA 2,z zA v< Zy7 < ULa G.
WW W w �0000� ��
') u)U)
EL c
w g s z
CL a _ a) o <.
,W
W ° = o 'w^ v w w vai /�G�KEER
d �
W ..... �f938 4L a
-- - 'tlddtl SNOISIA3N 31tl0
o E� s o
CO
Z
O a �6. W •�' I
W .. LO LO ^ Z
co
F4 U
p 0-
< N
x
Z1 ui m
z `� a +
< N O i 'I
ui
J m
m
z :2 + co
ui
_ +
i r
m
UJ
d
41. v
I I
0
aw _ d
L L� r a w i i G7
U uy U � i i tt-
W <
CD
iz _j
Q
Mal V)W
�-
N"al u
^ U + + tL1
W < ++
0 W1 cc
t1 �
NCO
� � t
W ^
Q
'L.� OCf ^C QN�
ZL 0W�IJ a „O
p ,
1 0QNm % +
O o o�R
WIMP
\,O OU
8
4
I W
O 6
z
w
A,
EL
Q
'✓] V7
v Pw O
J
z �
o�FNa
O a
c � <
L✓
H
u
�z 00
w W o
W Q
a,
xo °3
�✓.
>xaw°
Ofl00
�^�
E3
�H
4
<UU ° w
q
4
I W
w w w m w 1, w xw
w
o
N
W
> � L1 �
zLLJ
41
LL-
Z
-,.�
W I Lv O �
,h,� O r
(D C)
j J
Q
z F V)
L'L^� 0 i
C�
tall O r�
Wt
11 A
"L1
STOZ -OE-60 £ lINn HDN" 113:19VHDS - dVW 3ALLVIN31 9N11S3A - OZTTOZ
z
0
ti
r z s
o Q
N z ^^
o >
Q Z �L u
ffW w z v o W j ¢❑ ,�. p C�
51J
V/ =c°,b U�G QOrn O O Q U R Q D a z m N M i d O J� F- S x
w UUwm ��Vr7 pZa Q¢ W N U " r v, W O O O Fw w K W v
F— npwp a°�
¢2� I ° 1�f a s ° w F ,n w z —Oici v
U TT
Z �D�p FAO ¢O Z Q �C
ZN N pa
J Q zcVi»oU0 v � Z m~ p F-
W w z V N w W�� V i0 w N Z J o
O w y lil p Z z a O w u– O NwZ }gyp T O D
3vpi� K pm 3 ? O
ICJ] iZZ� o N o
KO o~ o r a O V! z r W o n o
\ w W N F NO Z NO Wp O¢ KJ m J �2 �<� Zm u m o
F
¢
d o N°
o a
cal .3 < ui ,o r� m of o ci ri v .0 1 C6 6 6 �Tti �c�ON �✓b� ac
PsbAx 'p w
4
11 U ❑
� aaav ova
i
z p a
C)
LL1
V)
Q
0
w � o
z om w m
z
0
s
N
1
�l
rr ,�
�V
1
oil
m
Oa ` R
u
1
Q
t
1 ! r
I
w
f � �
7 I ,
7
imp
z
w
A,
W
X
J
LLJ
F � ❑v
� z
w w w m w 1, w xw
w
o
N
W
> � L1 �
zLLJ
41
LL-
Z
-,.�
W I Lv O �
,h,� O r
(D C)
j J
Q
z F V)
L'L^� 0 i
C�
tall O r�
Wt
11 A
"L1
STOZ -OE-60 £ lINn HDN" 113:19VHDS - dVW 3ALLVIN31 9N11S3A - OZTTOZ
z
0
ti
r z s
o Q
N z ^^
o >
Q Z �L u
ffW w z v o W j ¢❑ ,�. p C�
51J
V/ =c°,b U�G QOrn O O Q U R Q D a z m N M i d O J� F- S x
w UUwm ��Vr7 pZa Q¢ W N U " r v, W O O O Fw w K W v
F— npwp a°�
¢2� I ° 1�f a s ° w F ,n w z —Oici v
U TT
Z �D�p FAO ¢O Z Q �C
ZN N pa
J Q zcVi»oU0 v � Z m~ p F-
W w z V N w W�� V i0 w N Z J o
O w y lil p Z z a O w u– O NwZ }gyp T O D
3vpi� K pm 3 ? O
ICJ] iZZ� o N o
KO o~ o r a O V! z r W o n o
\ w W N F NO Z NO Wp O¢ KJ m J �2 �<� Zm u m o
F
¢
d o N°
o a
cal .3 < ui ,o r� m of o ci ri v .0 1 C6 6 6 �Tti �c�ON �✓b� ac
PsbAx 'p w
4
11 U ❑
� aaav ova
i
z p a
C)
LL1
V)
Q
0
w � o
z om w m
z
0
s
N
1
�l
rr ,�
�V
1
oil
m
Oa ` R
u
1
Q
t
1 ! r
I
w
f � �
7 I ,
7
imp
\` \
kL111
I y
y 1
X `I
ol
i l }ti
i,i't�l�l,ly�
t 1,
Fr�
''l I
N f!I !/ //i /� y! �', �' 1'1\ -1+, 4,i tit NRllil' ii ll yp Il
I�il�li�rif lY\ l
1!j
� �
t
`/
i/
A,
\` \
kL111
I y
y 1
X `I
ol
i l }ti
i,i't�l�l,ly�
t 1,
Fr�
''l I
N f!I !/ //i /� y! �', �' 1'1\ -1+, 4,i tit NRllil' ii ll yp Il
I�il�li�rif lY\ l
1!j
� �
t
`/
i/
0
J
O
0
J
r 0
O °¢
z
Q
J
Q.
w
CD
a
z
a
0
Z
D
Q
C�
Q
Z
J
W
ry
Q U
Z
OR
Z
U
U)
STOZ-ZZ-60 £ IINn HEN" N3c13VH:)S - NVId 39VNI"Cl 19 9NIOV2l9 ANVNIWI1321d - OZTTOZ
W
V
A
'1
O
0
O
N
Aw
J 00
r—� m I
L� �W
9t AO �
ZUIo n
Zn
W U cn
PAN
O
ma
rQ.-- o
L�
Z L�
L
o w
W `
is
z
Ln
X
w �U
rS r
sbb�
W
J
0
w
U)
0
Q-
0
Y
W Z
U
z u a
j
0
O Uf
W�
cd X I.pIFFCR
w
o
4
C1 �
bs Bt
� t �
I
4
l �d ' ❑ 1 � Gs
� � I
CL
:GS 99.0 I Vi
Ii
.2S1
ast�i,E _ ve
r `
anse, i
to-} - ----------- -- W
cr-
0
w o _
I -r t9 I
V�� ¢ _,� m' 1Y\ �F. • v ` .561 rl
Ld
Y. .SFN o I � I k.
w 77 CD
. a , ss so
I � jai � cF. dg amvs.
°-
955. of �,
5 U1
1
W
WL
I' I
a� Y
+n, t5tt I
'1 S \,'
,L
-`,LT
N
ux�Fi WS ,w I
a
I E
IP I I
O �
U
. W
I
oil ,
I �
1
1 I I
I I
104
a
c�
W
i
i
o `
O
=
J
IL
Q
U
r
(n
Z
K
W
V
A
'1
O
0
O
N
Aw
J 00
r—� m I
L� �W
9t AO �
ZUIo n
Zn
W U cn
PAN
O
ma
rQ.-- o
L�
Z L�
L
o w
W `
is
z
Ln
X
w �U
rS r
sbb�
W
J
0
w
U)
0
Q-
0
Y
W Z
U
z u a
j
0
O Uf
W�
cd X I.pIFFCR
w
o
4
C1 �
bs Bt
� t �
I
4
l �d ' ❑ 1 � Gs
� � I
CL
:GS 99.0 I Vi
Ii
.2S1
ast�i,E _ ve
r `
anse, i
to-} - ----------- -- W
cr-
0
w o _
I -r t9 I
V�� ¢ _,� m' 1Y\ �F. • v ` .561 rl
Ld
Y. .SFN o I � I k.
w 77 CD
. a , ss so
I � jai � cF. dg amvs.
°-
955. of �,
5 U1
1
W
WL
I' I
a� Y
+n, t5tt I
'1 S \,'
,L
-`,LT
N
ux�Fi WS ,w I
a
I E
IP I I
O �
U
. W
I
oil ,
I �
1
1 I I
I I
104
x
w
0
Ln
11
J
Q
U
h
r
N
1L
K I
1.
g \
� I I
I
LL
.'I J
I
068— _L�\ _.,%\
.09
rqg ll '
I i •
a I •�•
11-1-1!
-1
o
c
MEMO
E
u
Pi
id
Y
F
�z
mz
�zl
zz
�I
cir,
wrT��
o
7
O
NQ7
�
Qj
wMd
pow
z AAL7
>
„2:4
VFW
p
�,Q
o
c
MEMO
E
u
Pi
id
Y
F
�z
mz
�zl
zz
ll N
0
0
7
O
NQ7
LL
LL
�,
Opp
X1-
70F
7
VFW
p
�,Q
W
< W
W�
N Q�z
i
ZmZ
Z K H F
QzLL
N f
w
�
pYQ
x
>1
�
Q
�Q
l~L H LL
LL
UIUI NO N
m0 O0) Od t
am-� cv`t mN �O
cvT m� mcv mcv
�z
mz
�zl
zz
O
0
0
O
LL
LL
LL
�,
z �z
U
('dAl) 3NIl Ail fld02dd �V
c
M
LL
U
I
z
u�
5
('dAl) 3N7 A1213d02id
w
`L ±• •�
u
.I
1
o
0 4�
f z — — - -- -- ? _
us �
Q
Q CD U W LL U O �I
I I I I I I I I I I I I I I �"� • �I
LL LL >LLL L L�"_ �u Q VY •�
0
z
LA
n Q Q n
(P j Q
Q F T
0
z� I
LL Q
z
LA z l O C
i "n I>
ICI
LLA
zte
Q
°
z I � �
I
1 I
Q
{
I
z LA
ll1!I Z
ILI �Q � I' W ly
-_ IL vi u W w w
�y r� Z Q 1 L (y Z 1 Ul F- N S
!u �' o �'�'iz0� of �� II" Q''�I� o, o
ILI 0 D
u Q Ll UiI S Q �I p <It �, �ji
z a
� �z
LA
X
w
F—
Q M
wZ
0
aC)
z
W LY
Ow
U w
Q
OC)
J
U)
a
@
i
CD
m
N
06
CD
m
m
N N
C >
O O
cu w
m
O J
O
OF
C 'p
ma
Qa
O C
> cn
CD y
0 C
d
N E
O
O G O
ao m
O >
a o
m
a
2 @ @
nO C E
L
T F C) C
L —
Comi2 a
N @ O N L
U 1] > L
C O` "� m
L 7
T C
@ @
m
E
to C a)
@ E N 'C
E ,O w O
n
C @ Z N @
E E n
� � O
@ O On O a
N
@ > C C
C >i N - N
E
V
U
C `J m O
> >
.co
2
C)
E LL O O
E c5HL~i
LL cn
O 6 O
c
v v o ~
N
O
(Q
a :E w
m a n >
o 0
,2
U) J J J J
"O
(6
T
N
@
N
7
L
3
@
N
U
E
.co
H
LL
LLJ
@ "O
LL C
to @
7 N
O
� N
O) @
� C
O O
U T
C
@
� E
E 7
LL
U
0 LL
0 0
'O N
M O
m �
c
y N E
D �o 0
N
L @
@ @ O N N
T O C Y C
� � O
T O y
C @ SC O NO O
n�
o ` C U o
Q7 @ N
O E O @
O m n O `- •L..
Q
N @ C O
E 0 C ti N
o O 3
n Y O z O
a� 3 O 10 @ m
N L
r °
N @ 3 U @
O @ O q O
C a
E O O
O N @ U C
O C 'n O
O O C O C
w Y > C d
m O
a o E m_
O
U L n @
n @ w p (6 @
N E N O 7 T
L N U @
E
O nw
'-
m c c m 7
n— @' E
@ n @ (D a
O 7 E w w
O O @ N
c j O (n O p
O-
a
(D a
E N N E T
O @ L @ O @
. a o v E
H
Z_
a'
IL
F-
0
0
LL
W
In
D
0
S .
� LL
z `n
a�
J p
a N
z
2
CL
F
O
O
LL
W
0
x
M LL
Z N
g�
N
CL N
Z_
w
a
F
0
0
LL
W
N
n
0
S
N LL
Z N
.0
g
a °O
F
Z
Ix
a
f'
0
O
LL
W
cn
D
0
cn
x
LL
Z
a O
J �
IL r
O O
� O
\
M
\
N
\
t0
\
r
\
r
\
00
\
M
\
N
\
O
\
O
\
N
\
\
M
\ \
m �
^O Z
N O a (�
N
O
U'
V
�=-
M
V'.
[r
ti')
LL
CO
o
m
cD
m
a °3 °o
N�
O
Z
o
Z
m
0
Z
°'
M
O
°°
'0
N°
r
> a
F F= y
O
w
O
oo
O
co
^o
co
O
O
co
O
co
O
co
O
co
O
O
O
d
O
O
O
O
O
O OJ V
N
N
N
N
N
N
coil
CYI
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
CCCYYYIII
N
N
N
N
N
N
N
N
N
N
r
LL'
iy
N
c0
CO
(D
0
M
m
r
O
M
r
M
M
O
Q u o
>a,°n
Z
N
Z
N
v
0
V
0
V
0
V
0
V
0
V'
0
V
0
v
0
V
0
V
0
V
0
V
0
'T
V
V
V
v
I~i
N
N
N
N
N
N
N
N
N
N
"
N
0
N
0
N
0
N
0
N
0
N
Z
a
--L-
v
v
v
�����0000N0000aoo�
�000�o
N O a
LL.
LL
LL
LL
L.L
LL
LL
LL
�t�
tzt
F-
c7
°a °oo
LL
LL
LL
L�
LL
LL
LL
LL
LL
3
0000
o
0
0
0
0
0
0
0
0
0
0
0
0
y a o
Z
Z
Z
Z
_
Z
Z
Z
Z
Z
Z
Z
Z
Z
Z
Z
Z
Z
O
N
N
�oZ
O
LL
LL
F-
,.
�����L�
LL
LO
LL
LL
LL
LL
LL LL
LL
LL
LL
LL
LL
LL
�'o
O
O
O
m N
0
0
0
0
0 0
0°
O
O
O
O
O
i s �°n
:...:.•`aTe�"
,z
Z
Z
Z
Z
Z
:.
�����
fW
cll
N
�`fl
FYI
CYI
�t
r
Z
a
rD
cA
cA
M
M
-
oU
ab
H!-
rp rp
M1
M
cp
cA
cW
cD
cD
\
RfD
Rl�
R-I�
XINNE�RNML;—:Im
C7
N
O
m
M
M
'
LO
p C
0 O
Q
ra
co
N
O
N
c0
N
O
V
r (D
O
d a rn
O
M
O
N
M
M
O
N
co
M
O
N
M
M
O
N
co
M
O
N
co
M
O
N
M
M
O
N
M
M
O
N
M
co
O
N
M
M
O
N
M
M
O
N
M
M
O
N
(((+++���
M
M
O
N
M
M
O
N
M
M
O
N
M
M
O
N
M
M
O
N
� O Z
to WO
LL
r
m
m
N
O
M
N
N
N
CO
N
m
N
M
V'
N
W
M
M
M
�O
co
M
r
M
m
O
w
to
o
O
N
N
N
m
N
N
c0
M
N
Q u
} d o
LL � v
N
r
TTTFFFF
N
N
N
N
N
N
�ee''hhh
N
a
e0
W
a2
c0
N
a0
N
O2
W
of
12
W
W
N
Oo
c0
N
d
'J
N
N
N
(VL
N
N
N
N
N
N
N
N
CVI
N
N
N
N
N
noo?
C7 LL
m
co
r
M
co
m
m
r
o
r
o
O
v
m
m
r
r
CO
�
N
r
oo
(o
r
O, c7 VJ
Q c � OJ O. -=
c0
N
o�
M
V'
N
r
M
V
O
N
m
N
cD
c0
N
y'.:
W
N
W
m
co
M
W
c0
c0
W
.
W
W
a0
N
a0
W
d C7 m
(D
c0
(O
(O
co
co
co
co
<o
co
co
co
cD
co
c0
co
(O
O Z
cn
LL
oa
m
M
N
M
lf7
N
m
N
c0
N
r
N
cD
zo
O
N
O
O
N
(O
O
O
C
m
m
lf7
O
M
c0
N
N
O
V
cl
M
O
m
M
O
O
m
N
r
N
CO
N
V
a K
J �
�
\
\°
\°
c
tthhh
w F
a
O
O
O
O
O
O
O
O
O
O
o
O
O
O
O
o
O
O LL
g -
a
•+
-
r
H a m
W LL
O
O
co
�
V
M
Od
N
cD
N
V
(O
m
V
r
M
�,.�
O
r
N
r
O
�
M
V
CD
O
O
m
co
O
O
O
V
G (n
co
m
O
r
W
N
V'
W
M
�
O
co
O
r
o
r
u7
'o
r
r
co
m
r
r
N
cD
F
O
J
mmmQ
N
m
N
m
N
O
M
M
N
M
r
-e
eo
le
m
't
O
't
r
V
N
V
M
V
a
-q
N
-e
c0
-e
r
a
W
--t
m
a
U
'r
W
0
z
AAL�
I �I
..
a�
o�
�xo
a\
ti U O\ �
Q V Q b
NO d
O O
U C N0
C) t U °
M
U
ct
Q�
U^
V 1
U
ct
U
�n
I�
V)
tu
"0
U 00
m
N
O
M Q
� O �
� Q �
■
00
i
Z
oai�
1 ^ �
� ; I,� '�, +•, • ;i ;' I 1 t;l, ,��`:, ,` 1i, 1i'!i, t!,'``',` ' i� � U � w a �''"I b
tai
;
;
;
ll
N i I�, 4f t'■
� t�i i`;;'• �� < ; III !:. . ��
kjj. ,
W ___ t d R {1S; ,fit• t 1, }llis ll {` '� I
� � '` ,;mo�dd,,° % • I t `� `ill�il `i1, 1�` ttllt,t i .
( it t� �(� � � •M � ! �t I � ,li `i}'ti,
_ � t
N_
l,;,
ill'' 'tti
ilti
r /
,
i°n n / �aJ. i m 6 uri
I
a ose I
fA y .09 I
'. . /..
� w
u
ILI u ..
m
W
D- LU
UA z x
W
—A
Q o
� Q �o
w
Q
Q
Hmniommomv
At"
ivil! "7-
WAM,
oil
ex
owl
Mil
c
0
U
s
ao
C
W
N
L
6�
C
O
�Q
M
L
C
O
'et
Al
C
O
O
U
s
o,o
W
U
N
O
u �
w \
y �
W to M o
0
[•� U � w � � ,� A
—1 Ay�5
�►�aAA4
.16 Fj
0
�1
r�
V 1
A
�8
z
Ng
zg
Q-�
XN�
Y �
F
or
it8
Z LL
LL z
_1
A F v
W- g
cv g
zL
Q�n
8
LL
Z Z Zg
p �LL
—o
z°
Z�
Q�
(18
z�
<o
Z�
d�
xj M
� O
w � a
� c
r � M
pow
�i ►--I z A A C7 ; � a
U t+ .
v� ►`� A A A a
•may
V
V
O
3
o
fn 4
a
k
z
w�
tL N
i
i
' z
k Q
�v
;o
o
m 07� m8
z�
A
�o
a.�
N
mo
z�
d�
A
d�
�s
cv o
LL
d�n
QC
AJ
Z p
d
n�
N�
z�
n
V °
Q~
OLE
(Y c
w�
MCI Z Q A u> v
-As
LN
m�
Z
d�
zLL
zJ
dg
C.�
Lin
4�
V
m
C�
z°
0
no_
m�
zLL
Lin
m
�
3
0
Q
Q
Z
Q �
OL
p-
J
(IN
o�
o
o
z
Og
�
N
m8
z�
(Y
O
mo
A
N
m 0 m
z�
�
zmLL
do
N
m�
zLL
d�
�s
m�
4�
zLL
�LL
C�
�Oo
zLL
D g
CIS
z�
d�n
m OL t�
mo
J
z�
��
`AJ
zp
d
n�
CA
zLL
�s
mV
zLL
m�
N
w �
U �
rl
w o0
O
rrT Y
�w M o �D
x�zAAL7���
rrTT�
h�
v
C
v
d�
3
0
am
I
s �
N
f
m
Q
Q
3
N
z��o -iLL o
a
a� }o oso
z
O —
i
I
N�
LL
1/-
rl,
LL
0-� i-L F:-::—��q
z LL
DL�
V O
zLL
J
0.
►� g
m
IL
O
M Z
Q9
rrTT U O
WQ M po+-�
�I Sot�gMC�
U
I� c' A A fx
Z9 Zi
CL OL
N�
z�
E
N�
K
°o
m �
zS
z lu
Q�U- °
IL
m�
0
z�
d1�
nJ
ll-
W
LL
d�n
m�
zLL
N�
d�n
� arc
LL 8� ZID
IL N
•POO
V
V
0
3
i
i
Df
Z
�Q
3�
� J
� Q
M
n
u
W
�TW
I�
w U �
�a>
� o
b ~
y o
r M
�Md a
Ad � Aa
d
Y o
d r ?n
cm
m t m
U �
8.2 S
C d U
o� W O
o
ti oo O v°
Q T 2 o
pj d O
W m Y m w
C
� Y
5 a oo m
m = m
o
U p
F� =
a
_ h
> y
T d
E y
dN
E s
a p
© y
H �
0
0
0
LJ
M
V
U
W
V �4
� A A
V
U �
H
MGM �
►�I � A A C7 � „ '°
��A �AAG4
�d
m
L � �
i L m
U V
o d U
i U rn 6,
` W O
� o �
T ` Q
Y ro W
C O7 Y
C V
a o �
a: c m
co
0
O
O
O
V
I—r
I
I Rm
I
I �
I
I
I
I E
I
I�
O
C �
O �
U ~
� a
rn �
bA
�a
v
r4
N
N.
N
N
u
Q
N
N
n
Q
N
N
U- LL
u �
s~ �
w
� o
y o
M
Lu
�
W �
O �+
v��A
Aaa
�
N
z
O
0
O
Q
O
Q
Q
Q
u�
U
O O
a
O
z
IL Q-1
V
w
Q
F p Q
V
V
O�
O
d
CL
q-
ILN�
V
o
IO
o
C �
O �
U ~
� a
rn �
bA
�a
v
r4
�a ^y
CC Q
�N
w �
r�
V
u �
s~ �
w
� o
y o
M
r
F•Yy
�
W �
O �+
v��A
Aaa
�a ^y
CC Q
�N
w �
N
N N N N N N N
r r° N Z N x
N `t r N W N
n n
/�\ Q �
M
M 11R,L D-
00
M
WM-e o
0 ? z U w a
JU
LL z
Lu (L a u.tn� a o o V11�A AAfx
O
Ir -- -- - - - - -_
IIJ `Q
11 �s
II �• �
II aL Q n
11 Ill N rt -n ^y
11 0 X II' \N ii
11 W X O
i I
II I I
11 I I
O II
m---- - - - - --
�- ----- - - - - --
O
�X m_
an 1N r7:1 I
lil u N Q X
a 0
I
Er
ma im,
4161'
Al
OR
LIB
7
AL
ililill
b111El
e
�IIIIII1111111111 t1IIl
llt� l_D,t �1,i,9.1.1,1.9,t.1,1
IINIItIE
III ! =
�-
IIIIE =_
IIII°
• „I
v
a•�•
nom•
Im
% Al i_
It
In
OC
W
.m1l -- Im■Il
It
ism
IN
IN
IN;
IN
IIIIIIIIIII ; r
IIIIIIIIIII ,�
111111
IN
r
01
_U
C
� wMQ W •�o�.
A U
V
0
e�
a�
W
aA
c�
Al
Q
�
o
V
0
e�
a�
W
aA
c�
Al
In
r
C
w
V
O
w w o
e� x ►-� z A A U
a ��a AAa
V
0
>
a�
W
-10
U
O
A
�
a�
W CO
�
�
N
V
0
>
a�
W
-10
�
N
N
N
N
n
Q
N�
�
�
�
N
N N N
0
O
�
Q
z_
N p�
v�
O�
�
O
E-
v �
R!
O
N
V
Z
0
o
..�
QQzz > z ~M�
wMd m LU
zoo �' �i A9z
QUA
ANN a �I AAa
ooly
'J w Il g -1 os
Ilo -,ZI � Q O I19 I V
r�1 I
---------- ------------ - - - - -- I
I t I t
I
I t
I
z_ o �� � --
I m
in }
in * I
Q i I tu I •� _�
I I
I
---------- - - - - -- i O
II �
II I
Q_ I t kb t II � � •�
N II '
J Q t I I
X Q N
fu
Ir, it t
Itt JI
Ir - -- I I
$ ). I `---------- - - - - -- -- '
ICY )I
JI
II 9 -I ii Y II
z - -- z
w I w OI o yy
o
----------- - - - - -- ----------- - - - - -- •�
t II t II w
I
I ii l
li l
it t it
L----- - ------------- -------- -
II II
II II
tt tt
II II
II II
II II
I
N
N
U
i.
~ rl
� M
d o �
,�' o ,, 'c ,,
x�� AAC7
F*IkrIAA�
„o -, zs
C�
O
O
O
V
M
V
O
OL
d Q z M
�pO N WMQ o?�caM�
E"�
OO xh�a
P�
lu
ANN p.� D-
D.- p ��A Aaa
ooh
w
p
Y
--
I
I I O
O
I I j •�
- zm
� I z � I •�
I I w O I
O - --
•0
I I
I O j N X
17<X
W
I i II � •�
' II
I r�` - I 1-------------- - - -; -- � I
IIY �I
Ili JI � .I
119 -IC V
z - -- z
I
w I ��,,, w O i O
U
r----------- - - - - -- c�
II
I II U
I
I ii j ii
l
1 II I
I ii j ii
------------- - --- I �- ------------- -
II II
{I �� II
N
N
N
N
n
N
N
N
-
IL IL IL
N N N
mm
Q
�
O
z
�
o
�
o
�
Q
o�>
°
~
a
�
Q
w
z
�
O
�
N
V
Z
m O
n n iiiIIII1M u n n n i i i I I I I 1 L
I I I I I i I
O �d �� N �u1r i 1
N
N LL LL- o N -
I � N N x
N
_ N
IL 1L IL Q Q
lu N N N ip �5
LL
TO Q kb mm /MNI\ z
o
O tV }
� N x
� ry
I ^ I
�w�w r Fi" j I ;i ' I I I
h►��- --- -A�c =`�,-u A t I i I I I
w A C�hT\O A /AI v -Ao ^o O /O � � � - � 1
1 i
A
� o
LL
Q o Q a M' Z o fj IL
LL D
lu D-
� LL
---------------------------
0 Poo
ki
� m 04
FT
m
Ir
1 11
wl
° LU
w x
ix Cj w u x
I
w
z
�
o
N
V
Z
m O
n n iiiIIII1M u n n n i i i I I I I 1 L
I I I I I i I
O �d �� N �u1r i 1
N
N LL LL- o N -
I � N N x
N
_ N
IL 1L IL Q Q
lu N N N ip �5
LL
TO Q kb mm /MNI\ z
o
O tV }
� N x
� ry
I ^ I
�w�w r Fi" j I ;i ' I I I
h►��- --- -A�c =`�,-u A t I i I I I
w A C�hT\O A /AI v -Ao ^o O /O � � � - � 1
1 i
A
� o
LL
Q o Q a M' Z o fj IL
LL D
lu D-
� LL
---------------------------
0 Poo
ki
� m 04
FT
m
Ir
1 11
wl
° LU
w x
ix Cj w u x
I
IN
a , C,
k
wri 7i
------------ P"ll
if 19,1111
ri
1"MM
M
ty
1,4H
oil
mr
�JI�
SA
..
10
i i i
6l0
iaia)
.+el.'.Q.+e�.11iI.+ell.'.
9ao�l�9�SaY,0�9�lao,l�9
fli h!
i�� 119
7 es:a
�� i�NOlf IIi9Ai
.,I
—II
':
,ice I 1 :::�
11
ml I U " "!
II
11
'\LIFEE
v i�t� PI ❑II
i __
i
�� i
r--I
N
V U
o �
ea
a�
� x h•�I z A A LJ � � �
V
0
W
aA
1.9
O
�
N
Q
�
O
V
0
W
aA
1.9
i
M
C
0
W
W
c�
I-E
Al
0
a�
W
e�
a�
U
0
e�
a�
W
aA
� To
M
N
� O
v ...,
A �
� W �
O � �
N
� cv
O � O
U
U �
� O
U1�c
AACx
� O
v ...,
A �
� W �
O � �
N
� cv
O � O
M
M
—i,7 II
N
_
�
N
N
u
Q
L
N
LL
N
u
—
Q
LL
N
N
u
N
Q
N
-
I
I l9 rIr—
LL
F 1
I � ICI
X
I I
N N
s J
k=
N
I a
o
IIY �I
m
z
IL JI
1
Q
Ln0�
-gym
z�
d
o
0
O
0
O
d
-�
Q
vn
0
Q
Nn
rO
-
N
;
t-
0
Q
Q
Q
d
Q
p
Q
z
O
Q
O
d
p
Ou>
LU
z
-1
z
LL
V- 6
U
3
O
O
O
IL
a°
o
°
o
°
o
—i,7 II
I 1
• Bill � �O
rA I -- •
�� -- ,: :::. J
i� � ■1►�f1
■ ■NOME■ 6 , ■ ■ ■ ■ ■ ■ ■ ■ ■1
NEEMMMUMMEMMEM
■E■!! !NOON ■ ■EE ■ONNI
■F"' "IEEE ■I ling■EI
• e- ■I II 11 ■■■ ■I IEI■ ■1
■�_ ■ ■ ■ ■I IC�3 ■■1 !-
' ■
MEMO 'MENE ■L_- Jill■ ■1
■N ■{.JAIME ■ ■ ■MEM ■M■ ■I
whi N ■ ■ ■ME31 ■ ■ ■ ■ ■r���■■■�
E/I inns \I. EMEMENNEEME �OO
riLvJI
L - - - J
Q Q O
z iu
oo�
QN�
O
O�w
O?�
0 QO
110-19S
M
V
cv r+
W � o
� o
� r M
� WMQ
o v��A Aaa
Miq
0
U
W
i
U
Cl
9L�
v
v
0
d
I
I l9 rIr—
o
F 1
I � ICI
X
I I
s J
k=
I a
o
IIY �I
IL JI
ii ��
z�
d
o
y-
-�
Q
vn
Nn
I 1
• Bill � �O
rA I -- •
�� -- ,: :::. J
i� � ■1►�f1
■ ■NOME■ 6 , ■ ■ ■ ■ ■ ■ ■ ■ ■1
NEEMMMUMMEMMEM
■E■!! !NOON ■ ■EE ■ONNI
■F"' "IEEE ■I ling■EI
• e- ■I II 11 ■■■ ■I IEI■ ■1
■�_ ■ ■ ■ ■I IC�3 ■■1 !-
' ■
MEMO 'MENE ■L_- Jill■ ■1
■N ■{.JAIME ■ ■ ■MEM ■M■ ■I
whi N ■ ■ ■ME31 ■ ■ ■ ■ ■r���■■■�
E/I inns \I. EMEMENNEEME �OO
riLvJI
L - - - J
Q Q O
z iu
oo�
QN�
O
O�w
O?�
0 QO
110-19S
M
V
cv r+
W � o
� o
� r M
� WMQ
o v��A Aaa
Miq
0
U
W
i
U
Cl
9L�
v
v
0
N
• Cv ley
s~
M
M o
p-I � \V1/�A�AAfx
r----------------------------------------------------
1
I I
,
i
, I
i
_J
I
m
1
ry
4.1 ,
m�
N
- I
i ----- i r =-1 i
I L - ;1 11
I ILJI
F -i
I r-
1
11 , I 1
i ❑❑ r� I I I
I I 11 O
1 C` - - - - -- I fl I�
IJ Ll rJ
I I j JI
I �
X
�p I
E'l I I Q �
1
1
- I
1
I
I_
I
I jfll
.` I r-JJ I I
VI I� - -JI
- 1 - - - -J
_ II
MAP*"
II
LLI
x
�O
1
O
Ul
N
i�(1
�
N
u
d
�
t�fl
QN
N
u
-
d
U
t�fl
N
u
N
d
N
Nl�(1N
N
d
O
O
�m
m
F
o
o
�
�
IK
Q
d
oo° � y
O�
O�
O
N
• Cv ley
s~
M
M o
p-I � \V1/�A�AAfx
r----------------------------------------------------
1
I I
,
i
, I
i
_J
I
m
1
ry
4.1 ,
m�
N
- I
i ----- i r =-1 i
I L - ;1 11
I ILJI
F -i
I r-
1
11 , I 1
i ❑❑ r� I I I
I I 11 O
1 C` - - - - -- I fl I�
IJ Ll rJ
I I j JI
I �
X
�p I
E'l I I Q �
1
1
- I
1
I
I_
I
I jfll
.` I r-JJ I I
VI I� - -JI
- 1 - - - -J
_ II
MAP*"
II
LLI
x
�O
1
O
M
M w
� o
M
M � w
WMQ >
M
� Lu
,4 cv '>
U
a 79z=9
- --------- - - - - -- - ----------------------------------------------- - - - - -,
1
i
I V I
I 111 I
I Q x 1
j s j
1 O 1 I
I I I
,
I
I { �
1L
I W `{ I
t
Q X -
m
I
O
I ,
I
I I
I i
lu
FL
I ❑ ❑ I i i j�A��
1�
, 1
I
I
Ind", i.lii O
I i J r�
I O
i i I I
O I
Y) I I
I j I
1
I
Q
o I �
L -----------
I I I I
I II
I II
Q�
I �
I �
X
O
N
N��
N
u
Q
N
N
N
u
—
Q
N
N
N
u
N
Q
N
N N N
N
O O
m
z
O
O
O
O
N
Q
0
�
O
u-
Q
�
N
Q
�
Q
Q
u�..��
Q
O
Q
Q
a
°o
�
°o
�
�
o
�
o
M
M w
� o
M
M � w
WMQ >
M
� Lu
,4 cv '>
U
a 79z=9
- --------- - - - - -- - ----------------------------------------------- - - - - -,
1
i
I V I
I 111 I
I Q x 1
j s j
1 O 1 I
I I I
,
I
I { �
1L
I W `{ I
t
Q X -
m
I
O
I ,
I
I I
I i
lu
FL
I ❑ ❑ I i i j�A��
1�
, 1
I
I
Ind", i.lii O
I i J r�
I O
i i I I
O I
Y) I I
I j I
1
I
Q
o I �
L -----------
I I I I
I II
I II
Q�
I �
I �
X
O
I
E N e`vcY,j9 f< r
C
r
r ll,
r
r
r
\ II.
i \
r
%
\
1■ �.,(• .
\
\�.
\ � I
\
f i
LLH 4,
[1- H ill
MIN
pat:
�.�.�.
a
f \ 3T tIaaaa� ahi1
lz-
taaaf ,�
uaa u
;i iaaa I , /JI l ti�
iii�ua IJI i'
aau j
a _
H �_ rat•:
a jl 6
�a. *• 1 x la��isras,a �,
at ars �
aa♦ <4aa
ar a.
ALL. ,
aai a
aaa.ra i
airs 'i a -�
A ra t Irn ra
a it t d
niu at —
aaaaeax
tai ei as �
+-ass •x —I— ,�
}\ aaaart
\t as
i
t P
\
� • 1
sss,.
ss Xk
s=
:aYex= A
S =�? !��_�� __ I I
=11G p
iYl ,.ls! �I' t xsgF
`! 3 !Y' is ■ d'" ��
i�isss =
E lrIp��
Y ! s s 1
!tea
Ex, -Zczl
ZZV
it=i
*;
;s
Ax A
=sY!!!
! 1
Xsa: _
am
.ice=i
l =sl ;3, a i�y1e
RiYlY01 6 t � p
Y!iliSY w ytlpii�i
n
-a
.. aaaa�.■ " I S i S S a ear'
/��il :=sss=ss =s� -
m1milki 11
I'm ass s=s
zoo a an a 11-113
=
=e = :=
lima
:s a,
s=rs : =a
S S S ,
agca
sg gg
uga
saga
i� -- etas
eggs
iiii
:;tea ff
A$ I
m OWRMMMTFWM
O
W
�I
e�
A
C
0
W
a�
rold
A
0
0
e�
W
e�
x
U
z
O �
� M �
O
� N
IT
U ^�
ICI rl
�
rT
z
A
�►�c
—=
O �
� M �
O
� N
M,
W
�I
14
c
0
e�
a�
W
a�
U M
N �
O �
� W
O
N
L �
U
�T
x�zAAC7;�,�
�/�
N �
O �
� W
O
N
a= ,
JAW
A
C
O
• rr
W
A
c
0
e�
a�
W
a�
ralld
x
z
a�
U ti
Li
Ct
C�
V
4�
0
0
4�
W
M
L
<t
N
0
qu
� rl
W
� M
rrTT�
�MQ
°
w c5 0 o
�
Ct
C�
V
4�
0
0
4�
W
M
L
<t
N
0
qu
D, J)
>do
<<a
ono
_w
~Q�
0NN
OO�Qr
I ff
I
I
u_
Ir'~�I
IY I
!LvJ!
M
CCU
UJ
N
N
N
N
Q
W
N
N
4
�
tIt-fl
N N N
!n It ly
DL
o
LL
�
Q
o
o
Q
;
LL
p
�
w
ILL Q J
Q
UJ
Q
a
t- p
N
U e-
R
0.
IIYY
t`
O
O
E-
O
iLNO�
IO
i, 9 -, 9S
� Z
ao
� o
V��A
9z 09
110-1,t7,
DI
Pmm ,
w
N
ZLU
w �
w o
r�
W M d W
o�� ~ °�
Z �wa,'OA
LL xj M��ji Q Q C7 >
mono c
Lij ;L+ o un A A a
IZ /1 GnbV II� /I 9 -17
---------------------------- - - - - -- -------- - - - - -- - - --
I
� - I
I
;
I
;
I
I
m
- fix❑
• ei I !L-jl
lF X I I
I I
W O
JIF- II m
II Z�
t—I I I
II I
I
❑ TG��
ND
Q�I I I X
W xl I N ❑ I Q
---- lu 't.
I I
I
1 ; ;
Il l 195 IIO I
N
u�i
—
�
m�
N
N�
0
�
Q
N
N
ry
cv
�
N
N
NNN
�
�
o
�
Q
�
O
o
Q
i
�
�
pr o
p
J
Q
w
�
Q
—� p J
W
0
�
z0
r-�
I S
I �
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
ILIL
L -11
�zz
>Qo
X <z
oho
_w
~Q�
0N�
uwT
aQo
lY
IL�JI
L - - - J
M
\%%Wool
d'
9 9S
M
�1
U
U ^�
C �
~ ri
rl
r4
cA
a
„O -,t7
O
.po
A
O
^V,
/I
A
�.1
�I
1"x'1
• r.l
N
1l1
del
m
N
`
N
N
Q
N
N
N
N
d
N
N
N NN
LU
iU
Qp�
`d
0
O
sm
z_
LL
O
Q
uI
o
Q
�
;
� �
U
�
�
N
�
p
w
0 0
m
IJ
IL
w
I
an
�oQ
o
o
UF—
Ltun
T
O
E
Do-
12
ci
9 9S
M
�1
U
U ^�
C �
~ ri
rl
r4
cA
a
„O -,t7
O
.po
A
O
^V,
/I
A
�.1
�I
1"x'1
• r.l
d' In
S Z tb
W
� o
M� o
��
U `.�. 00 9z
o un aaa
---------------------------- ----- -
�O
,
, 0
�L,
� m
o X
L v
m `'-- - - - - --
10 � [
i
7T m
A
ILH I W- I
j
' 0
ii aL
�T�
II Q-x I I I m
II It! I I I X
,
II O 111x1 I
lu
II 111x1 I I IQ
II i l l I Q X I
,
,
L I
-L- ---------------------------
N N N N N N N
O �t
u�i m •t ry N ry N
Q 4
tWf1NN �
W ��pp
Q lIl '34
Q
O
J
O
_ �m
�
z_
�
�
0
Q
uu.��
O
O
Q
�
('S
Q
U
W
�
�
V
�n
D
Q
O W J
Q
W
Q
Z
d
IAN°
d' In
S Z tb
W
� o
M� o
��
U `.�. 00 9z
o un aaa
---------------------------- ----- -
�O
,
, 0
�L,
� m
o X
L v
m `'-- - - - - --
10 � [
i
7T m
A
ILH I W- I
j
' 0
ii aL
�T�
II Q-x I I I m
II It! I I I X
,
II O 111x1 I
lu
II 111x1 I I IQ
II i l l I Q X I
,
,
L I
-L- ---------------------------
N N N N N N N
O �t
u�i m •t ry N ry N
Q 4
tWf1NN �
W ��pp
Q lIl '34
m
P
A J
.X
..1. r_--_ I �-� .1
♦
♦
ism
Alm
t. If. &'—r' ZX Z.
2 =1
ME,
s ME
x
x z
CZZZlZ
■ZZ Z' I v,'
as z
ir
m 2 z JA!,
■z
Islazz z xzxxax.
xxx
x mu, .
In
to I 'A z
K.XRZzii
7011 x 7
411.0g,
ARM :17,
iI
A J
.X
..1. r_--_ I �-� .1
♦
♦
ism
Alm
t. If. &'—r' ZX Z.
2 =1
ME,
s ME
x
x z
CZZZlZ
■ZZ Z' I v,'
as z
ir
m 2 z JA!,
■z
Islazz z xzxxax.
xxx
x mu, .
In
to I 'A z
K.XRZzii
7011 x 7
411.0g,
ARM :17,
I
19difloll I med
;Iilzl I
!u
INER w 1,
in
IN
u
D
IN �Ilffl rrlT
I
A
C
O
W
CC
III
4
c
0
�s
a�
W
a�
rmlrd
U
0
0
a�
W
an
U
U r-1
w
v��A AAaI
T
cm
=
�
•tf
•o
tf
-+..o
o
c�
PMMO
W
O
�
o
-I��I
_.
��_- ���
A
C
0
a�
W
r•a
a�
P,
c
0
a�
W
e�
roldr
V
0
W
s
aA
I-M
M
rw-
V
� o
v • r.,
a�
A �
O � �
0 � �
� o
W
� o
o
WMd
o 0 �D
V
��>
� o
v • r.,
a�
A �
O � �
0 � �
� o
ONIUlIns
U
u �
� o
r M
po++
�M o 0 aAo
d
V1M�A AAG�
a�4y
E §
E
�• q �N ♦NN
V
t0 °
t0 U Q
W -
0
411aaH/Otl 3 ii
W
cn a°
w N /.6—
- � Z
< p
° C
f4junmuM
73 6 U
EO
�N
E� m u k
c_P m o u = r= m P ~
•a c"-',4 9a .Q�� • E mg'g Si �3�E Mn p9,e q c
a? o f — °- — °;
� � 3 � Y ■ o' 3 � � � o Y Y � �
• '" agy
�'m8�° am�AA x3L��AU� g �m °��"sa3a`3LLam �g��$ E3�g E E
m �; �� ; � W Q�??��ps��a���� gE2otlNm �a��m�mg 9��EAtE "- a�r`ga�`�•wrm�� €m'�k� =$3�
C o o
uyna - °. c°e`�0 c'�`�ioaM : urcF pi z z °aq`! 02 3 q = g €€.Ns e8 rc a9"ia E z� ?g6
14 b'
El
o �
a °io,°ddom tn�¢3u� f� u�xorca _r ,�.re °000" 000000-`."❑
a S$ > u < 7 i 8 a a m m m• w o v e v o 0 o u u o u o U o o u u v o m °m o
G3 $aLL8
C2= �r�m., v i $$$,,$$ •$ _$$ tB i i z °z °> <z...z°Iz°
GaE €w
G �
O o gm Z5
E
S E Eg
P
M'
Ya oc SO, ;o x
1'2 MO 2-E
as
IF OE
E E A,
m z c I E 9 E
F t 1. �- 2 1 m
E . . � g a E L E E
I z
B E
E 2 ii 0
L
E'
'o
E
'.1zz1z1',1-1 'z I a k 0
Z 1z .1 1z 1z 1000 0 00
2 2 21z- z- 1
0
ZIL
111
Hill 11H
E
E
I
t
1.
S
"i
2
2E
E
E -6
$
-E M*
E
is
z
� 2- 10
E
E
.6
I . I
E
. .
E
;-
,
E-
E" , E
cog
E
t
E
S
7,
5 E
2
IE
a 0
2
E
'
'T z m
Hs
E 'T
I
tad
02 . d F,
A A w >6
vE .5
,
M'm M
mm T . 6
i
'r. OZ Z
w w
coo -
coo
�i � 4 �i
. . . . . .
a
w
at
vTOZ -9T-OT - £ imn HEN" 213:13VH:)S - NVId 39VNIvHa v 9NIaVHD AIIVNIWI13Nd - OZTTOZ
C�
N
2 �
Ik0 6 W M I I N Iw/1 a
O
O O J
U
'1
W �Ty
� � O
N
W o
U� o
W "
U) n �p Q
LLI
V, �MNzm
o O0
O
LL-
OO m O
�1
o
Oro
W z�
cn
~� w
U
06 w
w,
0 Lit
o
7.
CK
Q
cn
L.I..I
U
Z
Q
J
c_
G
O
U
waZ I O ¢ Q a x3 0g O F p J y�j O OJ
zsr91°nw ri N m 3 ON my J N m F- m 3 Ll
OJ_�U X X x X X X¢ Xa X X O ¢ W
Ll
xZ� JC W W W W W W W W W W
W W m W Z z
00.
a W 1
I
�r opoi y
kw,
I
• 1i � -
• �1 � ; � � JJ iii
i
.II
• 9 / _- r �ji Jj 1
• � � �` r-� - � /1/ �J'� /j I � ,ItRiil� 11111 � 11� _ -� �,�
¢
Z
r`
0
0
w
J
63 C
65
0
tf
0
W
y O <
V
COO
Z��
\
SzcS
yOmm�¢o�m
iwa �LL �w O� °vwi
N
Oc°jW
Z
m¢V
Uw
U�m(/IW41 {JIWm OW
2—U-0
<�1/IN w Vmwiw�cw¢i vmwi¢m � Z°p°I,�mO
ar 0
O p
O
_C
U
j
aUN
l m4O 2
��ia °�<uinoain°
2
O W U K U K a F W
0�2¢��¢U(/lOdNl°-
L y
C 7
Q
oawg
O
Wof
mo az
ow¢zww°
°
°Nw
¢
z
(1/ °-�m a
Ld
'^
a�N ^�
W W
K.
Oy�p�i�
JFzll
x
�FOWK�ZO
1�I
m
LLy1
U
YJR'UOI�VI
�JKUpri Vf
V/
oa
1•>m
aN
Oh
rn
Y
",
r0
dlrioom
a`aaaw
NNOi 0oo1�
W
w
OWU>
¢orco
�n
N
zw
i^
a
O
rc
O��a
o¢mp
i
z
J
a
z¢°°umi
ZF ZO
X
W
U
oci
m
11
a¢¢ab�
pSOln
w w
o
V
MQ�5 a
�m�mz
t~ilO
OK�N
�OW°�
1m�
OZ
z
}
z �m z
< a Z r�O
Z m
z W w
>
~
(A
'a
Drzmn 0
SE �iD
amx
0<1,4!
20�
Q rc
p 1 7 F.dip
m
W O Z
z
z a f-
O
OJ¢': .
x~
K U w X. Kz
0 N
W z F- F
U
'1
W �Ty
� � O
N
W o
U� o
W "
U) n �p Q
LLI
V, �MNzm
o O0
O
LL-
OO m O
�1
o
Oro
W z�
cn
~� w
U
06 w
w,
0 Lit
o
7.
CK
Q
cn
L.I..I
U
Z
Q
J
c_
G
O
U
waZ I O ¢ Q a x3 0g O F p J y�j O OJ
zsr91°nw ri N m 3 ON my J N m F- m 3 Ll
OJ_�U X X x X X X¢ Xa X X O ¢ W
Ll
xZ� JC W W W W W W W W W W
W W m W Z z
00.
a W 1
I
�r opoi y
kw,
I
• 1i � -
• �1 � ; � � JJ iii
i
.II
• 9 / _- r �ji Jj 1
• � � �` r-� - � /1/ �J'� /j I � ,ItRiil� 11111 � 11� _ -� �,�
1
1_
............
1
1 1
� L
-� %4
a0
r - - - --
;
0
m
1\
1
s"; 1
¢
Z
0
0
w
J
3W
w U oQ °ww
m<
w U oa ww
W
y
COO
Z��
\
SzcS
yOmm�¢o�m
iwa �LL �w O� °vwi
N
Oc°jW
Z
m¢V
Uw
U�m(/IW41 {JIWm OW
2—U-0
<�1/IN w Vmwiw�cw¢i vmwi¢m � Z°p°I,�mO
ar 0
O p
O
_C
U
j
aUN
l m4O 2
��ia °�<uinoain°
2
O W U K U K a F W
0�2¢��¢U(/lOdNl°-
L y
C 7
zow
oawg
of
wF
Wof
mo az
ow¢zww°
In >wz
°Nw
¢
z
(1/ °-�m a
�macn l�JZa�
°p
a�N ^�
W W
K.
uaS °0�1 -KxI
�FCOWKwZO
JFzll
x
�FOWK�ZO
OwwF<
a00�00
U•L N
U
YJR'UOI�VI
�JKUpri Vf
ZFI -(A�1�
oa
1•>m
aN
Oh
rn
Y
",
r0
dlrioom
a`aaaw
NNOi 0oo1�
; w
3Wn
zw
i^
w�
m
Os�¢
0,0
O��a
o¢mp
�rcsa
°vmi
a
z¢°°umi
z�
zS°w
U
H
N
amaaJ
o5:
a¢¢ab�
pSOln
<inan
ZO1p
�w
°
MQ�5 a
�m�mz
pFN=
1m�
OZ
U, x
OOHF,f
co.>,aaw
00K9a
Uw¢w
°O X�
<w
'a
Drzmn 0
SE �iD
7i�sim
0<1,4!
20�
mZ�
1
1_
............
1
1 1
� L
-� %4
a0
r - - - --
;
0
m
1\
1
s"; 1
i i t � lyt 11' 1 ,, V "i
r-- - - - - -- ttli
,tt,'it
11 _
r '
_1 __ , I 1tt
.. \ ? tilS li` t', ,yl 1,' t t`; ,l',1 1
/ ,
�lc•
i,
ii
W t5E 1 ;
016
1
O
°
m ZEN
wok
Z.
W W U J 1
1
�NWO I•� I
i
WWZ� J1
O F K
>z4W
In
mWp > 068
°z 109 I .• /�•
°amm
Mz
1
0wr-o r ��
ww.W-
F W > U
i t
¢
Z
0
0
w
J
0
a
U
W
y
-
N
LLI
LLJ
}
Z
_C
U
j
OZ
O
O
L y
C 7
S
Wof
w
ca ip
M
J
LL-
U•L N
U
m ti
C $
O
¢
c:
C -°
>
m
00 �
Z
Z
J
o
3
Z
O
N_
}
°m
>
m
m
w
O
i i t � lyt 11' 1 ,, V "i
r-- - - - - -- ttli
,tt,'it
11 _
r '
_1 __ , I 1tt
.. \ ? tilS li` t', ,yl 1,' t t`; ,l',1 1
/ ,
�lc•
i,
ii
W t5E 1 ;
016
1
O
°
m ZEN
wok
Z.
W W U J 1
1
�NWO I•� I
i
WWZ� J1
O F K
>z4W
In
mWp > 068
°z 109 I .• /�•
°amm
Mz
1
0wr-o r ��
ww.W-
F W > U
i t
0)
iu
�— Q
OZ
O 8 Q °,-
LLI
LF
� � Q
z�Q
o
Z o?��
W Q F�m
u
z d o �yo�
J
oQ�=
_�,�
ILI Z v LLJ
N
N�
Z
x
m°
Qg�
NWZK
�w
z�
OZ O
N
y�NOQ1
F
�NJ�O
a
aQUO
LL! 0
LL-
1)
�Qo
�
l
0
JNFJW�
LUN <u�
W°WQ
,L-210
OR
I in
ala
MOO
�R,0��
i
L
-- - --
i
1
1 /
I �
1 � i
1
i
1
1
1 \
1
I o
1 \
1
I
DI
I r
r --
�1L
-- -- -- -- -- -- --
I
I it
I
N
V
z
IL
M
WMQ > z oo�
z
v��A AAz
N
z
1L
Rl
z
IL
z
0
v
OL
w
0
A
73
ts)
v
v
X
�
Q
N �
z
0 m
W
Q c0
Q
I
I
L
/
I
i
L
I
�
I
Rl
z
IL
z
0
v
OL
w
0
A
Q
Ll
k)
tu
* Q IL �H Ri W WH
l� � �H Np0 � F F HILL oLLv o F-QU~ J
N NJ
V <Q wO�o �� ��'z �00 �0O
x W� W -N �Oy -N O QF w
ONV 0 Oz�i J� K ~O JQQNz Fez W z OtilW? kb
FKm 11)(3 oZW ��p Q1-i O1i OQ� 0 -01 7-To Q�z� o" o Q Qo3 ,cos "�Q =�Q °
LL z?Q �z�10 QW ���� QO° Viz° 0 ui N�wN O
opp0 W °z� �u.Io� a� mo��` w� ZuI� ZuuVQN
Q ~y W� �ypJ�p OW mN a~ F0.Fz J >jv
Q J Z - ° _
Q 0 IILY
0 sN QQ �i 2p� s s a Wv
x W� v WO Nz [UQ
Q >LZ� u�� O�2Q
p ~° i -v WQw0 --1 �� J-wU JET J� ZJx 0 Wzl- W W
Ox NW
Nz pzF ND�z O~ °F �� i � OPFOW Osz O W H )'t N -O N 0WH
z O zON zON _ wO U QJ �w Q z �xN Nz O Q
a s
U �T W o
v
zw >- a �z QW zN NOY 00 00 NQ wOQ0No
°O uwz �d0 F °u�uQ �~`'Q �FVQ _O►llJ OJW°Q'O N
0Q Qz WNT zu�v� ~)OH �z OFV�(J IZ Ozpz� v >� N NQO�uu.��IK ui
QO v Q WF�vO QpWD pD� QpR�F� pQ�F Fzz Q <N v
U zNN 00 ssOS J rQ' zY0 z �_ z N z N O Q
Q z -N F W O -Q :3 WO J -OWp
NJ s §0 K,z O� ~Q z0 Qw0 Q Rx Q �s Q 0.s OsN Q Wa N O
p� -ov (VNQ tti�F�v OQ[OQ iW� ��v�v ~ d QFW�
° W Q ° p W Z Z 2 z W
�WZ w °O z ��O�z Ow
�vQ' � HF-H —W WJ
CIE
v
N
2
lJ� H J
lu
Z N
go O Q�
LL Q
ILI < I A Y I
W - -- }
W
-
N
I
ip
ii-- -T - - -- i W W Il� W CS
J - JU
- - - - - y_ ,n �L W Z
� 1 O f IL VZ O �Q Z Q to
_ LI.J
00 - - -- r
o n- L = 0
- - - -- „i _
i Qp
L _ ---J >ZN1>U�
-� -- Q LL
N y
Z-1L
i -
- - - - - -- - - - - -- -- - - - - -- - - - -- LL
� I
Z
W I
mko
L -- -- �- -- -- �K pIL U
I
ILL ®I
I l Y I
IL,iJi
IL`.J I
O
� I
da�w 1L I
►r-� M
v �
� o0
� M
wM o 0
o
�I U U w a t'- A
�►�A
F*
LN
C�
Q
wo %"
M,
�I
A
�
O
i. G1
w r
� U
A
Q
V
LN
C�
Q
wo %"
M,
h
tu
0
lu
z
O
H
U
z
O
u
III
} $
~ �O 00 w~ AIL OIL�p p puF I� h+l
00
N *z FAUN 7,z zdN ZLL (3 IL d F d�JH
� Q �i w0N0 0� f w mz Nz0 0,) p uo d
2 � w -N O N -
w z OED
w� ��u �zw z w t-p wm=p C\,
�m NCS NuzV �O �m� dpi OFi OQ� ��► r.i
ONpad wWZ�� Qw ��d� dzWO NzWO 0 < w NxwN
UN= wz V w� d N =0. Za: zym U QOQN
pppw pz_ri Up- Q- [A �n ~uw U z w z �R�NN 1L w �O+•
QN wd yQwQ �w �Q�V �� 0.F z w� W M d O 004 � A�
ww >- zT z >u U eo
Tat N �wFd� ap oz�u LL 6P I O � yQ U w 4
IYt p wN d z� dim z� z� z m O 0 -V Z a> ^C
* u QwO �� J wp �- -A = z w I� AA`/ > a> w
ozQd� �'� �� -'�� � QT a
QOw �m zd�,_u Qd) H-wi 0 ~az per° w ��NO >
NS N N't N_p N N
NTT f.0= O�pw�� -� zp ZOdF - zON w0Q u <mw- OR' �!r Q AA R;
T d x w d pz O �z O *z O *z p~ Q wSIUIQ Q
dw zN �?
Ul
0
J-u
z
0
v
O
v
0
WA
J
H
z
w
Q w � '
T w w g�� O
LL z ~� HCD z D SQ= >
ZqH T ��OO ?z zQN 0O� O0LL
A � � �� � Wiz mz� Jz� O uIL
�O Nvz O O �w z�w r�_ m�=O
F J w �� pO wmp Q� O� O N o �w �--
° �Qw } H Q
z�o Q zW °o� o°�'� qo Yo Nq D_ o o0
�� z� �z�� qq �P QOp zpp wzQ uIFWQ W 4 o
Oz °�� VUz ww Q Q �n? z
Ow z� vp q ID CS D_ �T- w* Q tw zn,NUt wR' �
J wvw vw zw Q w N
�? �w yz ED vzx vzF �> w w D > z O M Cj =N d D_ J5000 �q00 Qw$ ~w= �C�z a >y Q M d O c7 �o ee Lu
� � W M,): Iwz�v D OQ�� LL uZF Ou�JN x p �<
p w wOJ �� J — —� z O z w MTj z a> 'C
z d -1 J�wV Jam o_F JJF v w -�$ w
O FOV p —< p �n ��n J 2 Q O
O ���yyy Q __ �v Q= Q w w Q z z D] �n Q _ �J �7 ..,
qzF 0) m pJRR�F J J1�Y Jl�p° if IK N q�O w �JNO Q� U/] C� ks) H__ °z po v J zq z_OwF z_�� z_O— wOq v Q wz A J AA�r
Qv� z0� Q z fu �Q Oz O�OW 0=z 0=z OFu Q N uQ o
F0. � o �o�<Q o? �0° �-� OQ )-F0 -d � z 0.OQO�
v z D — �O y�T a! pw D q= V q= O °Jw�Q N
I uw— z_O�v� v� �z OFO }� �?z� pzzv v ( Ut NQO° Q v
qaN v�Q zo Qw Q <u� QoCQ Qa <P z6) q p J�EF v
z01 ) pv_ wF � �� �D_ d mot- �Fw �zz cv? O
o$Q z� <w°o < LLI °D$ p =p- Q w °oQ
Ov wind 6fl pd Xmq 1 D_� 1 K I '0 ~ Q QFw N O
�� w�D zz zA ~w
Z
z O O O O ���N °LU
�F
�o
ov
�F
Q�
z�
LU
mz
tu
�QQ
I
�V
M
A
A
� o
a
c.
�
U
W
t
AQr
.r yr
O � �
V
�I
0
�I
O
Ll
10
■u
'z
Oz
H�
u�
�O
NU
z
o �
u d
wWN
z0?
�w
?_ U-
0
00
Z9 zz FN�°N
d if O
PSNV
� o LU
V �
zTLL Q t- Vw
OO OFd OL
Ow °zy u()
zw� �v D-U
z� N Q z 5 -1
CFO iNI dwz
l�2 ��v ZNN
qzf-- Nzw O�oC�
Qyx z F d °* w
_>z �q� �z ~dw
-1 z v0.z Q'd� <��ud
zo z zuz
zN� pUd w?�u�
dyz0 QKz �MDF
T- _
z
LL
z zdN
O w LU
�oLL 13
L
d
m O�Q
pw �NOs
Ou
�LL - ^w
F
F-
J z Q z O D F
QQz O �z
zN ~� t llu
pZ }-N NJ
Q' 2 0 LL
v� Q�
I'M o z�o Q z���
pQ <mQ tu
u�
zY O O
9�
�Z
LU
rc �o
W�
� ZZ
�W v
pYq
Q F��
w
w
�Du
Z ALL
N 0
z
LUNz
aKLU
X
z0
dz0
Nz�
uzi
� CL
1L H
z�
�N�
O=z
X00
}-Fud
� q=
F- z
�D-
z�NQ
z
oILu
J'VO
OF�
0 X LZI
u�
z05
°Q
Z
wz
u
=
Fa�
�z~
�D-
N
zUfu
O *z
�rVO
�FuQ
20q-
Oz_zd�
d2
QO�i
Q J
J
(� WJ
O nFF77 S
H =
�O
Z
Q <O
J
Qw z
d o � C)
O —d lu
IL wmw°
�dw �D- Vw
cv�q �zu� O
vQ N wN
Q � u }OQ �
z w z WN N w
LLI �N a Lu 0
O !Y
d
� -4 Id = w
-A j: z dt- Q
F
Di U- � -A Z °
IL-
ts) Q w v>
uJ� O �Ow�O
Ndo
uo N
~gip Q Qry?00 Q
� ~ d �Lu w
wE� z~ w0
LLY'u wQ ~ U z>
~ r-I
w� o
LI
A
� N
� O
CCt
MCI
w
o
Ao
�
U
w
� ~v
A
� N
� O
HdVDSQNV7
_ 8
V ~ yam Z
cr (V) Q 00= L� z
CO
L c ¢
w �
o " ^� pae OpH ��w �JQ Z, a
a�LLJ =� ¢¢ v° WLid p Z >g
O �O
Z- .2 `3 391, SSP n Wa O v z N QE
o T
7 �-77T I�/7/77 T -7— T
0118 11 Al
M
/ol
Iii lTI I 11 / #,l
�III /// / /// - iI
� / /
II / / / / o
J / /
/0_/ rn o 'fit`
II� a 0 n6
4) 096
o —
ff
I w m m Z E —
III wW I( /II /I / 111// oo E �� "
ga
I I!Il/ oo J $
I I w li� I �`I I I I 1 I I l 0� O 00
� �,e I ;v_;
Il I d
�> 1111 I AI 1 1 1 1 1 1 a v
co
BUJ I I III I IIIII J /$1
--- a T
I IIII n�T 3K 7-
II �I IIII I IIIII I°
-
_ I IIII I
Z-'1133HS 33S 3NI'1HO1HW
�� -iJi' IIII 1111 111111
°� � II � 111 II II11
W
'O
0
_ /<.� I I �I II I X11 I I I I I ~ W W
ss �v '1 I I II ' w?? W w
I I Iw W Z=u' W
"' II II I\�II m llll 1111II I ILU �J�"o
> 5= W
w I11� 1 1liM p N� >'uW�
ow \11 J Z �gw - >zW
oZ 11111 w tmNJoW
IIII II I I sfi�.\ c)
C) LL � \ 111 \ \ \ J F < (n 0 0
I
¢
I!� 11 II
i i �q II II IQI I II II \` s ss6 s 1 1 11111\ I1 w p1
I o $ 11
ID 'a I I II '�tli 1\ `\ 1111 II
I'a LL
E J
I
W 1 II 1 1 +- — 1 1
I —_ _ IT>
Low
Z 1 1 1 1 I i r6ZL a 11 11 1 11 1
a- LL I I I 1 11 1 X 1 1 II I
CO
I C J 1 1 1 1 1 11 11111
'6Z6 jt
I �1 1\ 11\ 11 II 11 11 I' GSS�S M 11 1 1 111111
� I 1
X641
II
S T- lartrt-
- --- — -- -
I�I I II IIII IIIII � I I�III� �'I' �
1 �� I IIII IIII � FN j�lll _T —,
"
J _ 0.4
asp x fif szu
�-
1
w
/ 1 —
/�� /il,� I- >w C\1 I I�
/Cz ALL a g COE6 I I I I it
o� / ¢ I I I I I INI I
,►-fie _ a_ 4 -Jll I
0y6 I! / - - - - - -� — — _ E6 Ftllf -Sf��
E ia. >t
w Ww4?—
ui
m2
(DE - E )�j
a
w
�A v.a'
/
=r= III" 1 L II
.8 I I I —
r
\III i Il/ I lI
a Q
aril CU
_. >
U)9
Ili
\\�\ \\�= �\� \ \� nas
Z 1�
M\ \ Yes a \ —_ \ \I \I \I \I \I 111 W \\ 7 1111 I`; 1
\_/ 11 j 1111 awl W
13 >,
• `��\ BLS 1jj11 111 111
\ \A \111 111
\\ \',k\ \ , *• �# 11 III 11 1 �
111 111.
X506 III III I I II II II II II II '
\ \1 \ \\ IIII IIIII I
\ \I \ \ \ \ \ \\ IIIIIIII II °co
\11�\ N X11111111111
N\ \ \ \\ O IIIIIIIIIIIII
Cf) III I I I I I I I I
o\ \ \ \ 11 1111111
\\ LL: \\ / / /Z l I 1 I I
\FU
w Jaw \ \\ \\ \ \\ 'w�I N
J \ u'a /23 I I I I 1 H
I w
M\ \\ \ \ \ \�rl I I I I IIII
�\ �J \ \\ \\ \T IIII i t LL JI I I I I o
LL
ov =
Z oU � Qwe� � cy)
Q o= om QON
OC K S ?ai cg' ao lQ�C7U mp: zQ o
6w 4 O Cu`o..� Taj crag „� >rnLLZ ��No� �WJ e N
�6� z E o3s r� -0 m0 z WUd o n z
o0 3 r= " v9i M'yJl'I S� n � Q w a O m � Z to � a a w w Q E E
D Z E� - 2 =S LW o oyy ¢? zN
os ul� Na o� o �� << LL
J
0
Lu ti
w Uw
Z /
U? LL Z
I /
2
LL LL � W °wE 2 i I i / •
= �aNkm
w o I I I
N¢} w w
z ��w >Zw I /
w LLj
L4 3� «g� I.
w 0 a
L) II w
Z
w II ' w
LL u o LL
IIIIII� �
III I
I I IIII � I
I '
� / / / / /'Er E
:5 L) a.
co
LL Ln ,dS
•Fa
as
'►rNjx
a
ss
/ /// s e / / y
ot8
it -�
co LLj Y
l w w a /7 /�'
Z a
/ �� oO oO A"•pt .9'£ %9 w LL
0 3 � � 'ice- // �z
I l of l / w
¢M ;jl
/s I IIIlk w� / �\ j -,r I
a I I I I /` / l �I s a" / I
I I zee I I I I I l I `, j <° i/I �= I l
/ 1 1 1 1 1 1 1
IIII
I 1
\, 11111 III II 11 III 111 �'S/ II 11 II
I I 11\
\\ II I 11 11 11 ��, II 1 1 it II II 1 S � II 11
s \ \\ \\ LU \� \V A� \Z"\ \ \\ \\ \V \N��
a LLJ 4)
\ \ mzE \ \��
\ `\ LL �'\ S \ .� 3
\ \
\ \ \ O
>u' \` xv \\ \ \\ \ \ \\ \ \\
w \ \ z LL \ \ \ \ \ \ \
\2 \ rnwV Aoo V A \ \V�`�
0
EoJ \ \ \00 \\\ \ \� \ \\ \ \ \ \ \\ \ \\ < C-3 \ \ \ ` \ \ ` \ N
vvv` y v
Lu \ \I\
0
CO
rrl I j`.zer 4 g5 \ \'n z \ °\ \
yxd \ \ w w\
W \\ \ y \\
1 111 a
qP
�1/� 1111 11 1 1111 1
95e°
Ill l l l �. 1111 11 {�I
1 II II I I II II II t \\ ` s5'
IIIIIIIII \�; � �� im I I I I I�I
�I I I I I I I I I � �t�ia i g IIIII I
II III II III 5 w!° ais iM ° IIIII�I
I l l l l l l l l l a �ie IIII I
Illllllllla � � IIIIIIII
Il lllllll I
GS 989.5 111111
IIIII III II l Ia l
lIIIII l 1 GS 999.5 IIII I
1 1 i � �' I 11
Illilil lull cfl pl l 1111
I�Illlllll � (IIIIIIIII
I�llllilll IIIIIIII
Iilllillll IIIIIIII
IIIlillll� lIIIII ,
Illllllll \ lIIIII I
I I I �I\ IIII I�
096 _ — ,00t _ IIIII Il it II II II II II Il 111\ \ II
:_------- ��� ///
_ -� - == 777 r
_ — / -- - -
/ I /II �i w — — — ] \� / / / l \ -= asxa�_ _ = �'1 =t 1_ =1_ � ------ - - - --- -- - - -- =_ ="
E' S„r - - - -- 1 / /w j — T - -- — -- WrODC
�aW
_
,xul' / / /// / /cwir o J 096 -- — �IC�i'i— N'y'� I —,- f \ \` \\ \\ \ \� \ \��'•� \ \<< �� 11 /�''�/ // / / I
09s \JIB / wZ / /mz E - - - -- aW w
I Ila ,WLL' / / / / . /rLLi�/ - - - - -- \ \�\\ \�\ .� \\ \
,''mo,/ / I \ \\ \ \ \ \ \\ \ I I
>i F • � i� �
I I --- -- \ \ \'6\ \ �� \ \ \ \\ \� \ \' \ \\ \ 1 I( l I I I I
/ ;r
N
^`Z- -
AM I
096 J I \N \ \ \ \ \ \ \ \11 1 I I I
��� / /II° �' —Z I S5 — \�L \� \�L�i` �! II! l
:.
L-1 133HS 33S - 3NIIHOibW
OE
Q U
2 �w M U J¢
�TECI' b c0 z z (x7 z cc J
Z O= a tl Cl) Q
w��V 2!� Q m s i PN P am L y } � x Q CJ /)
Om
tziv ZW b U cc m
N E
0 rQ ~
° Y ❑
v a
C j O x O w > M IL Z 7 ¢r.NpN _I W N "� O
Q m a E
u. o 3 LL .= � �asN�Jf'f �P� � � Q � o m° oz W p `°n z >
a w w E
E Er
V = G fe O F= O �'. „ N N j Z
a CJ �N� Ay mQ A �O >� x IM m_ � �
Ui �¢ of o u� or .- N ao LLa m2 J
w
N Z
o W
LL
Z 0 z o
>
.o-,9
O
U m
w a y Ywz
U ¢ w OFop
Z
¢Nz
o
a
O
6
La-11L
1
w
x >
l
am
❑NN ZQFU
\\
du zza sy�❑
❑o
U
mo pop ¢Nd
W
u
_ _
Dz
z
jmgq
ILL
U1 =IB °IIII
z a
aka xop
W x
CC
O
IIIIVgIIIp_
�a
�?� wo'-w <m
m
r-w:r
II11=
FmN a�¢No
zw zmw¢�
LLJ
Z°
g
III
I1=
woo ooa��m
xoiEa6Yc<b
0
U
b
IF
�OJw�oY3z ° °�
O II
W
c7Famm¢ °¢a3
-
3
W�
>
II-
ZWN �awNN
(�
I
NIII_
❑oz w..oza
CID
v °n.
x x
111.
kN'g'13N?�aaar
2. m <Nm�
Q
°
111 111 -.
LL
Bl�lllq� IIN
11 =91=1111=
❑ z
NUr
� O
¢ N
Fy <
N!
II1=111 -IIII=
¢az a
wz
¢
z
o
°1111 =11111 = „I5
=NU=
-26ym
NY ❑❑
woz
w
N
`zmm
x3g /�
111�I1i'
m
oo
W
U
L
NI14 Nw
a
Do
iNmww
Z
te_ LL.¢
NI- o
yaJOm
W
LL
ci
p
m III:
HP13
.D
Il
�say�
W
U
z
3 zm¢wm
x
f II�
III-
oF
Q m r)F
z °❑ Azz
J II
w,
III pI=
II =1h.
-
oogoLL�
zw3 ?z°
a
co
mzz
z pa-
A,z
IAN =11u-
I!19N�IIIII111
z¢ °a
8rSaw
w -rpN
c7Umzw
LL w
=,
dni.o-,z
3w�w�F
w�
p
z apN¢m<
M
J
N¢�w�
Rw
°p x3
_
wWOa� m
a� �z
W
zx<<,i-
x
N!'
zimJaiv
? n
Z
F
a
o
° Iµu�
�Giz
mo c���m
�mFaigw
° �
mo wo
az oy
LWL
X
a a
°k
oa
m xZF
FQ-wtn Nmk
�mwa'm
W W(wj
�❑ is
W
Y
a
Z< Q�
uN ¢a
w¢
J
Q
ww
N
L
a
°¢
aw
m
N7 2
c
G
a� <WF
03 U lj
Qy - g
pa_ 'w
¢omF
zo
i p
a0
F-
WO Z
4 �s
m ca7�
�z
x -g k x
5
x�xxxz
xk° X�
Nw U
zs w
w�
Wt
aw
pz❑w �3
J
a�❑
N3 ° ��
a�3� N4
�� W
-
:;L �F
W.
m n
r �a
? =c❑i
m J
g 'NE N=8
.ol
Z
F
o z n.
Oaf
O
¢
jaQ
w
V)
m a
i aim
w JUN
�
'� � 3i
e�
x 4WO F
°NZQ
iS a¢ �❑ ��
<.,..<r.
n ¢ammo
.n
r O
ul
m-
¢ ❑FNmz
0¢
Y ¢
F w OmziW
F-
I-
Xz
J
Ir ¢
N m mo�ZWa
Q
J
O
m Q
¢
I =_
w
a wmw
Q
IL
¢
III
a NJ °W
U
O
x
as
NEED
z
CC
o
IIII. -IIII-
P s
z
w
FF
II =IIII =III
m ��aOW
a 5 N
a�FU
2
=
J
WN
I
d pNQ y�yNOp
Q
o
UWF¢a wwO
w
3
N
III
zww ¢ U'
a0
¢
II
FO Ram
0
W
o
z
w
N
d
III
1=
Z
F �N UWE O
= �s= wN❑ >?
vimzo m¢�wo g
wJ
m
zpa a
>
o
III
_O
r
¢
aN`S'OZ wo °azx 3
aN w=
R.
Q
I-
Q
3tw� �
c
I °
W
wU(7VU ���j� ¢Z
ZZLL
Z
a
J
o
owl-
'i=K °o
III
J
w
zi¢wll 8o;A5
goy= =z�
¢wNa� 3¢�F� uoz
W
ar
3o
U>
q
m
��w5n"w
zw¢¢m
W
III
a ju °o OWgx z>
omx❑Q rsawN �g�
U
Z
w�
w❑
Ea
a
Z
pma-
p
w°l-mw
Z
__
a w z¢aom Fa
¢ <EUrz O °�m� =' »❑
W
O
z �>
_
0 0
�¢P�a
LL o,
IIII
u�wm❑cwi g?w<T aFa
>W
U
}
w
pwff=
IIII= IIII
c�o�wouixzLLFWmn boo
=w=
>
W
Q”
=uII=
s N¢g�WwQ��
>
,❑❑❑�
w888�
-
owzoza M
m
IL
M
J
W �333i
*;,eel'
. _. IIII
.� •.�
u°wiZdr'n-
=o�wwzN�FO =pm�x
W
lk
r0 �aaaa
z �NNd�
W J
.� `
IIII
—
mww aQ"_Wowioop
o
w
—IIII
IIII —iu'_
II
=IIII=
w =mx=m�wo<F¢� <a
❑oa °_ ¢ a¢y�W�o
W
�,l
IIII=
==Nmm�z=omw��¢¢
LL�W- �- �2¢aUfm3WW=
N
m
-
N °❑om dmwf�w�n�R❑p<
w2wwNN <z2.w oN.
ww
Q3a
U
3
w
9
03LL3aa n?
Z�N�aN m
J
k
w
o
F-
na
m
x
N
z
LL
�3
Z mmmm QQ�v /Q� o= pm QLzJz Q
OC K N ?` a as U 00 fn �L co U =0= J� z _ r- J
W zxSo'? z C/i Q v
0 C,°® ?rnLLZ � °�o� JQWJ e o
li °�0�`B.P W�p ¢¢ Um WJQW z >g`'
z– yLL.S E SA,, yR is O .wo z
°O ''J! I fn Q ¢ io o W fn �'' �. �' ,� m w j Z' E
_ `o Q Z
v0� s W °tn m� A �0 1 �W m i
U a U) U v�i< O V a LL
Nj=O Q. 0
m N
de
-11 s
4A
111 l IIII r lll`�l /// 11 I
l l I Al l' l l O � �' •'
/ /Il jlili 1 II'li /l �l N �' z
//�
��"lOtl
1 4
91dow"
aio ,
�co
O
0
y�
Oi o
Ito,/
9 i
O
i o
J e .ir
ti�rl
44
moo
> 0 0►,a
Q
t/ 0
C� V
'a
,IIII��
' 1 f 1LIIW�
��IIIIIIK
,f t
I II I ,(
'h-
�III�'lllllll
I V }}III III
I nC1 I l l i l l
I Q
4r I
C
6�
1 �a
1 o
� o
0o p
il
Q7Zo'o,o 0
Oeo � o c
'81"
S-1 133HS 33S - 3NI1HDIVW
5 \
1j11 11 111
IIII
� III ICI
lii�
IIII
II111
lllrrl
11 I I�
L/ L
r
I II fill) I 1
Illllll
11! I I
DD ��lilli
9 r I lilt I I
S.S I I I II I I I
I I�IjI I I
i h
ii -(D0 IIIIIIII
o�jlyjlll
•�I�Ijlll
III
a IIII
III III►
IIIIIIIIII
i t I$Ip I I I I
Ilitill
///
p O � p
\ -
! I I I
c
Cb
Nj=O Q. 0
m N
de
-11 s
4A
111 l IIII r lll`�l /// 11 I
l l I Al l' l l O � �' •'
/ /Il jlili 1 II'li /l �l N �' z
//�
��"lOtl
1 4
91dow"
aio ,
�co
O
0
y�
Oi o
Ito,/
9 i
O
i o
J e .ir
ti�rl
44
moo
> 0 0►,a
Q
t/ 0
C� V
'a
,IIII��
' 1 f 1LIIW�
��IIIIIIK
,f t
I II I ,(
'h-
�III�'lllllll
I V }}III III
I nC1 I l l i l l
I Q
4r I
C
6�
1 �a
1 o
� o
0o p
il
Q7Zo'o,o 0
Oeo � o c
'81"
S-1 133HS 33S - 3NI1HDIVW
5 \
1j11 11 111
IIII
� III ICI
lii�
IIII
II111
lllrrl
11 I I�
L/ L
r
I II fill) I 1
Illllll
11! I I
DD ��lilli
9 r I lilt I I
S.S I I I II I I I
I I�IjI I I
i h
ii -(D0 IIIIIIII
o�jlyjlll
•�I�Ijlll
III
a IIII
III III►
IIIIIIIIII
i t I$Ip I I I I
Ilitill
///
p O � p
\ -
! I I I
_ '9V
`�'�'"�e•'�!s°�'1� �;'r. ; �� -- I � I I I I I I I I I I I I I
\ ` _� �•a, -' — \` ' � —a to . � III I i I I I I I I I I I'
\ M" • "'�,, -.�y� � � o '.� II IIIIIIII I
NI i d° 4 i I III IIIIIIII I
�sxo '/ I-
'�'1 h-TTF T I I I I
A, I
III I i I
AV
III I I tIIIlillll
GS 920-5 IIIIIIIIII I
IIII / l d4/ co
Z
4L \ \\ II Il 1 II II II III / / // / / // / /// / / / �•
w
0
c
0
A
AA�A2
21
A
A
A �A
A
A A
�
923N
o
EooEoEQEQEoEo°
m
$A
Eoo
EEEEEEEE
EEE
z
i
N S
Fn
Fn
o
i i
o
o 222222
w
— w
w w
LL
o2QO
o
w IL
U
O
c
o
r
G
9
mmeio
9 0
0 0
0 0
0 0
;'I
0 o
'v 'n
_
N o
miom<o
0 0
o
0 0
vin
0 0,
in ina<oe
0
0
o
io b
m
N
N
e
O
m
C
_co _coo
TIT
00000000000000e0000000ao
l0
W l0
N W
--
I
N N
c
N N
c c
N N
c
N N
c
N N
YI �ONNh
N N
N N
N N
N
S.
- R
E E
E
>
E E E
3 °3
333mJgg
33933
°°f
o
°'
3
JJOO
L
'm
www
w
w
www
3
j
w w
x
W
X33
mm
m
33333333333333
N
m3 m 3
41 d1
tq y
w w
w w
w3z3333
Z
Z
ow
33
nowo
3
m
m
E
m
c
E
E c
a m
W ��
m
2
t7
a
>
m
cg
10 `m
n`cm5o
^�'
o
t0¢cmo�mE.
2
12
1
21
2 2w
E
A
c
`�t010
U
oLLO
0
3oo._Bi
❑oLLds�
>$wm°mrm000
no
n333
-33
m
a
$
w N
a
oY
.3
?w?UL
E E@
`o
° m
mrn
a¢c
;:P
m �.c
-in-
.m='
?m
Y
a
p 2
> >m
Na
mxo
00
»y
7
2
A
E 3
v
cw�i4'•
o
m
m u
m m
>>
m
-
Em
h
'
9
- rn
do
inmv
?'o
ot1Oi
.E
>`mop
ma:
coto
.o
.E
Lm
Vo
my
mono
cat.
°dvi
° -
m
comma
rn..mmm
i4m
E
mac
cW
°Er
w
> o
O
o
�7
N
m
0
0
¢
o
w
¢ a¢¢¢
a
2
V E
o
C
W
m
m
7
�
N O
E W
.- N
N
Q �N(�ONmnm
O
'
m
NNNN
o '
'
•i
NHHHH
N m
N
1 1
7Nm(A
w7
m
m
QO
U'
(7
_ '9V
`�'�'"�e•'�!s°�'1� �;'r. ; �� -- I � I I I I I I I I I I I I I
\ ` _� �•a, -' — \` ' � —a to . � III I i I I I I I I I I I'
\ M" • "'�,, -.�y� � � o '.� II IIIIIIII I
NI i d° 4 i I III IIIIIIII I
�sxo '/ I-
'�'1 h-TTF T I I I I
A, I
III I i I
AV
III I I tIIIlillll
GS 920-5 IIIIIIIIII I
IIII / l d4/ co
Z
4L \ \\ II Il 1 II II II III / / // / / // / /// / / / �•
w
0
Q oV E
Z
LLJJ
= V m o Q^
CL V k E
O o,, .. o P ��
LL Z_ um- E .95. SAP n
z ^ E $ 5
V
N
z
Q
�?
4oLL�J
\ \\ I l l • ®°j� ^/ I ,fir/ �V �d
ao l l l l I / � •I I l l l l l I r
' l l 1 1 / 1 1 /. � N. � *•1 \ I \F. 1 1 1 1 1 1 1
Z 1111111 / '�;��,�'I i�f \ 1�111tllill
o i �l l' l l l l /. - l/ II I l l i i i�•\
l l, l l, I l l° ��" � ,;' � :� I:�'� a II 1 1 1 1 1 1 i•�`I / I I I
o LL
�2 -- ©�\ 1 1 11 I I I I II II II
/ ' '- ,� — — — —_� �� � � —' � %r i! i L �.` -•. �;r r' � Gs�°� \�Q \ \\ \ \\ 11 1 1 11 Ij � j jl jl
Cb I IrI err ?I �" °e d'
/ % ✓ / j / �i i � a\ � ° ° � � O O ,';'�� �, � ;' � O .' �, I ,I ; \ \�� \\ \ \I\ 1� `1111 11'1 11 i I
/ I
/i/ / / /// /4. r- -' i �`o,l''1�r O ,ass 0) 111 1 1 1 1 1 1 1 �1 1
I1 1 1111
114X
/ / /// / /� / / / / /� //' //' r , /'°° / _ \ � —T!, •O�I I\1I��,1r �II` O 11 1 I 1 1 1 1 11 I i I I
I
�.�/ /' // // /'/ /' � � ' .\mss 'd ',r d' D�/;- I -` -. � I � I • .C� � Il ��, o, Gg989.5
4 4 IIIIIIIII I I
II
'LP II ® �fi III I I III
CV —tI'– /SJ /' / O p�i I \ r I • ° I I ° o°° $� ��' l 11 l / l l / l I 1
4 / c °
�i`� //� •rS< � ���� /Q/ °�
888.5 G38d95
°f 'oo ° O�''/ / / °� I III• Ill l I l �� llll l 111
fq. :;�; s;d; o I III lilll, l,, lllllll
O
ll� / / / / /' /' — -- � \ � — �- �ar-da�:'/ '•,_ ;.,�� °>�'
\�`�— ---------
T' �) ,oz -7' - T_7^ ,LLll� l '/
o
f t! /gi
v o �1? o
oz / / I W osQ
4-1 193HS 33S 3NIIHOlb'W
N
p
{h
J
O O
O
O
Q O
T
O
t7 °nD-
1�
N
V
c; N
O n
N
Z
CD Z
O1
a
0 0
o n
o
yno
m
I m
Z
CO
co(n��<
s
ZZZN
N
m
LU
Mn O W r S
G
J
C�LDZ
G Z co Q j
^ N
Z
?0) LLZ�
�Q =�
m
Q
c
J
JQwJ rn
CL
W
N
�
n n
r A
N -�i
A O
n
m
Z
r
e
J
o 0
0
o o
m n
4 m
N Q
N
a o
Z
LD
V
J
O O
N
g N
0 n
O 0
O�
m
16
0 0
N V
m
l7
°
N O
m
m
Oi d
O
c!
p O
O N
N
0 0
m O
y
n N
n
O
J
C6
m 6,6
m
Q
p
J
° oo•n
°°
^
<
J
^
N
O
0 0
o
0
o
0 0<
N
a
N m
r
Z B
O
J
N
�
pppp
m°°
m
Q
m m
N Q
<'
Z '-
N
2
J
N
�
n I
Q
5p
N N
t� Q
Z d
J
�
L
m g
o
o°
po Off
N c:;
72
N
G .B
N
O
•�
N
�
l7
n b
N
Oml
t7
!�
8
to
J
<
Y
O
ZN
J O
LL 3
V�
d Q<
LL
Q 3�
W p
�i�
V
N
z
Q
�?
4oLL�J
\ \\ I l l • ®°j� ^/ I ,fir/ �V �d
ao l l l l I / � •I I l l l l l I r
' l l 1 1 / 1 1 /. � N. � *•1 \ I \F. 1 1 1 1 1 1 1
Z 1111111 / '�;��,�'I i�f \ 1�111tllill
o i �l l' l l l l /. - l/ II I l l i i i�•\
l l, l l, I l l° ��" � ,;' � :� I:�'� a II 1 1 1 1 1 1 i•�`I / I I I
o LL
�2 -- ©�\ 1 1 11 I I I I II II II
/ ' '- ,� — — — —_� �� � � —' � %r i! i L �.` -•. �;r r' � Gs�°� \�Q \ \\ \ \\ 11 1 1 11 Ij � j jl jl
Cb I IrI err ?I �" °e d'
/ % ✓ / j / �i i � a\ � ° ° � � O O ,';'�� �, � ;' � O .' �, I ,I ; \ \�� \\ \ \I\ 1� `1111 11'1 11 i I
/ I
/i/ / / /// /4. r- -' i �`o,l''1�r O ,ass 0) 111 1 1 1 1 1 1 1 �1 1
I1 1 1111
114X
/ / /// / /� / / / / /� //' //' r , /'°° / _ \ � —T!, •O�I I\1I��,1r �II` O 11 1 I 1 1 1 1 11 I i I I
I
�.�/ /' // // /'/ /' � � ' .\mss 'd ',r d' D�/;- I -` -. � I � I • .C� � Il ��, o, Gg989.5
4 4 IIIIIIIII I I
II
'LP II ® �fi III I I III
CV —tI'– /SJ /' / O p�i I \ r I • ° I I ° o°° $� ��' l 11 l / l l / l I 1
4 / c °
�i`� //� •rS< � ���� /Q/ °�
888.5 G38d95
°f 'oo ° O�''/ / / °� I III• Ill l I l �� llll l 111
fq. :;�; s;d; o I III lilll, l,, lllllll
O
ll� / / / / /' /' — -- � \ � — �- �ar-da�:'/ '•,_ ;.,�� °>�'
\�`�— ---------
T' �) ,oz -7' - T_7^ ,LLll� l '/
o
f t! /gi
v o �1? o
oz / / I W osQ
4-1 193HS 33S 3NIIHOlb'W
CD Z
°_
Cr o
CO
co(n��<
oo -°�'
<S
ZZZN
m
LU
Mn O W r S
=<w
Z2t=
C�LDZ
G Z co Q j
Q a
?0) LLZ�
�Q =�
M� 01
JQwJ rn
CL
W
e
w O
v �� to
z
�''
3
° w
„w
'" _
H CL
o to
Bi
�''
m m
V
N
z
Q
�?
4oLL�J
\ \\ I l l • ®°j� ^/ I ,fir/ �V �d
ao l l l l I / � •I I l l l l l I r
' l l 1 1 / 1 1 /. � N. � *•1 \ I \F. 1 1 1 1 1 1 1
Z 1111111 / '�;��,�'I i�f \ 1�111tllill
o i �l l' l l l l /. - l/ II I l l i i i�•\
l l, l l, I l l° ��" � ,;' � :� I:�'� a II 1 1 1 1 1 1 i•�`I / I I I
o LL
�2 -- ©�\ 1 1 11 I I I I II II II
/ ' '- ,� — — — —_� �� � � —' � %r i! i L �.` -•. �;r r' � Gs�°� \�Q \ \\ \ \\ 11 1 1 11 Ij � j jl jl
Cb I IrI err ?I �" °e d'
/ % ✓ / j / �i i � a\ � ° ° � � O O ,';'�� �, � ;' � O .' �, I ,I ; \ \�� \\ \ \I\ 1� `1111 11'1 11 i I
/ I
/i/ / / /// /4. r- -' i �`o,l''1�r O ,ass 0) 111 1 1 1 1 1 1 1 �1 1
I1 1 1111
114X
/ / /// / /� / / / / /� //' //' r , /'°° / _ \ � —T!, •O�I I\1I��,1r �II` O 11 1 I 1 1 1 1 11 I i I I
I
�.�/ /' // // /'/ /' � � ' .\mss 'd ',r d' D�/;- I -` -. � I � I • .C� � Il ��, o, Gg989.5
4 4 IIIIIIIII I I
II
'LP II ® �fi III I I III
CV —tI'– /SJ /' / O p�i I \ r I • ° I I ° o°° $� ��' l 11 l / l l / l I 1
4 / c °
�i`� //� •rS< � ���� /Q/ °�
888.5 G38d95
°f 'oo ° O�''/ / / °� I III• Ill l I l �� llll l 111
fq. :;�; s;d; o I III lilll, l,, lllllll
O
ll� / / / / /' /' — -- � \ � — �- �ar-da�:'/ '•,_ ;.,�� °>�'
\�`�— ---------
T' �) ,oz -7' - T_7^ ,LLll� l '/
o
f t! /gi
v o �1? o
oz / / I W osQ
4-1 193HS 33S 3NIIHOlb'W
E _ �Q
Z v � om <zU) a
z z sPMZ mcn�Cr�� o�
LLI W�� Z�J
= Q o k .0Q�F- M)Pl °gym' �UiQ a
y m u" 0 E ° > W Z `n <0' C., L1J ~ m o b
O �° a =L a 0 U — LU ¢¢ ow J LIJ m N a
LL Z - iLL._ E .�y. P .� { W z ^ Y$
o� 0 3 F _ N Nq�rt SS Q w o o W O Q c°n 3 w w a= E
_ u _ _° F v o> N cr Z Cfl o �°Z J o 6 vNg my A �� >rc um m
°S �¢ of o u2 N QoLLa
w
Wa
,z w
won°w �O
ppZ x4W �N
a Zo2 �Z
Zak' iL9
Ga
N�3
J
w $dN
'NIW.9
o ¢ o�
m o Noo
>
�T
W
Z
o 'S 9 °a
O
gW
a
s� ❑I
Nx
z¢❑ x
d d
_
° °
J
Z2 m
o�
J
a
UN
z
>
U)
LL o o w
YNZNaO$
¢ a
W
U mL
w¢ zh
0Z -
O
3z o o N
w
aQ y
J
x 3r.
�
g
❑ � o O
w
Z
Yw
hi �g >g� w 8 mgr
O
ao ¢� m�5�p
oN�p zm 8w ❑� wr ¢z Pza
3x ds wF dw o� dz-a
Or
z aFw0a
3NwNOwOz
pNO
8w¢ ¢ °z wwo¢ S® is w zG y
z0 ULL dyd �zx Fa-¢ d DN °O
mam
a ❑❑ ZQZ -UO
WNFZ?�waaaa�
8�pw a,nmi wmf m j w JO w zw¢
ado ¢m ,�d ¢ �C7 uJ-. w0 N¢ NZ pWz
FaN
Li❑wzm wmw °¢w❑a
w5 n=iw a
m ��m
drdw�g�x x
❑ w az xyxU xz txi O �oti U� Ow
ww
Z.N ao g,8 ww"m cai� w cY.�ww �w a °iw
wz
z`-
�ni ma m m n
> > dad a ❑ adw Op ¢?
a°O z�z -5zM¢ 30 u�z w mN¢ OF MS.
z
a
a
¢¢t
w y ¢ ❑
'NIW 133A 9 ma 'NIW 133j E
m J O�x
uMM.¢ �
J
o NFP
z1
Fa-
8 3z z ga
W
z� z" < ?o'a
Z
m
og ww=
°N
8
°x3
IRE dO o ¢¢N
wm ¢ a0z
J
J
yQ aw .oF
Q
a
zo wz a J:LL
ry
z
fn
iz �o ❑ NjZt
m
m-'
Z
zS z¢ w Nzy
d�
N� xm„ wm❑
a 3' �za
a❑ �C
Buz a
m �zw
w °w
W
W
^g z¢ o ZZN
a3
Y
z N,m 8 Wgz
d aN oz<
ME2
z
�H ¢w w�OdO
Jz
mga '<,8 zo ❑°w w�' ¢z
�aaimzgaiJa
JJ 3NwNow z
O ¢N❑ 8Wg ON mwO 80 �a r_ xw z U
Q W�N ?m ULL dYd Ef?x a�'d �� �N N °O
U
as wpp UdiO
r~nyz�'O��zat o!-
O °_ mdfq FW ¢N. Z F6 tlN W N¢
o ¢wa xu�5 8� iwi3 xmf °�¢ y� y�" qdU w�
wmFzi dddFo
UWZ- mw❑w °a
ai w Rw¢w¢wzw
�a�aw�g¢sw
'u gcxi� ?00 ¢w gdR¢ ooiz wo. ¢ rz ❑izw
6a ❑d ai L� SZY FNw ¢
1 x �ry Ww xNxU ¢U -< awo _O �¢p ¢m wwo0
N zw_
cosy
z�ii wa m m n
wF w
ra
Zc7a zm ��9g oF-. cail� --cW7 og mw aP3w
JOOJ z, - mzE¢ Q 0 ❑ am dw O ¢QOW
NF3 w 3o u'S�a m¢ 8� c7eo m
¢
w"wm O
U °z
MM w >
�w
a
24}2U LLW� Zf z ¢
¢a q
m u�i y
H
W
5N S Edw 5 c�
MO W LL
fz�°¢ mr°n
O
¢w
8N m
J
h4
W
'NIW NQ S t
Q
a
OJ
a° ° a
W
Z�w�
Z
O
o ww, `m' w
Z
wJ
o
0
x az m ¢i
Z
z
J� Y
d<
Om
g
Z
Qp t
a
a
vi¢ z wa
r << LL
m
= Fm
a=C
N
¢i
('�
¢ ¢x U Z6
3x m� ❑O c� >a p gW
(nz
a@ ¢
�- z
=
°¢" zm OcW7 of z coin k s3
Oz ¢F ¢❑ wo� ❑io O ¢O
z 8
F �¢ O
Cl)
tw Q8?wo _� o °°e
`'� im �cwiZ UFZF 0¢ < c¢7'
a LL a
xo❑zw xao cog N aw
c?W Zzod W❑Vd o °aa
¢ �O �O
N N
w Ow
m a¢
H m °zzzz
ZmdO z �¢
mm_ a a n
O
m
m 9x
L
J
w xR
~
W
W3 LLm w
arH ¢m
� �mw
W
3w 8z
a:
z0 dOQ
a
m
w
�
0,
0
wz ¢
waa O
.0-.Z
N
z
SCHAEFER RANCH HO�LDINGS9 LLC
4061 Port Chicago Hwy.
Concord, CA 94520
(925) 682-6419
December 2, 2.015
Via Email -chris.fO8Skdub1in.ca.goy)
Mr. Chris Foss
City Manager
City of Dublin
100 Civic Plaza
Dublin, CA 94568,
Re: Schaefer Ranch, Dublin, CA
Dear Chris:
This letter will confirm that Schaefer Ranch Holdings, LLC will contribute an additional
$250,000 endowment for the Dublin Heritage Park and Museum upon final, non-appealable
approval of the necessary entitlements for the following:
1, Re- mapping of Lots 29?, 298, 299,300,301 and 302 into 19 lots (Schaefer Ranch
Unit 3).
Should you desire any additional information,, please do not hesitate to contact the
undersigned.
Sincerely,
Louis Parsons,
Cc: Jeff Baker
Albert D�. Seeno III
Jeanne Pavao
RESOLUTION NO. XX - 15
A RESOLUTION OF THE CITY COUNCIL
OF THE CITY OF DUBLIN
* * * * * * * * *
APPROVING A GENERAL PLAN AMENDMENT FOR THE
SCHAEFER RANCH UNIT 3 PROJECT
PLPA-2012-00013
WHEREAS,
the Applicant, Schaefer Ranch Holdings LLC (Discovery Builders), proposes
a General Plan and Amendment to change the land use designation on the 17.30 acre site from
Estate Residential (0.01 to 0.8 units) to 7.04 acres of Single-Family Residential (0.9-6.0
units/acre) and 10.26 acres of Open Space; and
WHEREAS,
the application also includes consistent PD-Planned Development rezoning
with Stage 1 and Stage 2 Development Plan, Site Development Review, and Vesting Tentative
Map 8136 to allow development of 19 single-family detached homes. The proposed
development applications are collectively known as the “Project”; and
WHEREAS,
the Project site is located in the Western Extended Planning Area at the
westerly terminus of Dublin Boulevard, north of Interstate 580 and west of Schaefer Ranch
Road; and
WHEREAS
,consistent with California Government Code Section 65352.3, the City
obtained a contact list of local Native American tribes from the Native American Heritage
Commission and notified the tribes on the contact list of the opportunity to consult with the City
on the proposed General Plan and Specific Plan amendments. None of the contacted tribes
requested a consultation within the 90-day statutory consultation period and no further action is
required under section 65352.3; and
WHEREAS
, the California Environmental Quality Act (CEQA), together with the State
guidelines and City environmental regulations, require that certain projects be reviewed for
environmental impacts and that environmental documents be prepared. To comply with CEQA,
the City prepared an Addendum to the environmental impact report that was certified by the City
in 1996 (Schaefer Ranch Project/General Plan Amendment Environmental Impact Report, State
Clearinghouse No. 95033070 (the “Schaefer Ranch EIR” or “1996 EIR”); and
WHEREAS
, on October 27, 2015, the Planning Commission adopted Resolution 15-13
(incorporated herein by reference) recommending that the City Council not approve the General
Plan Amendment for the Project; and
WHEREAS
, on _________, 2015 the City Council held a properly noticed public hearing
on the Project, including the proposed General Plan amendment, at which time all interested
parties had the opportunity to be heard; and
WHEREAS
, a Staff Report dated _______, 2015 and incorporated herein by reference
described and analyzed the project and related CEQA Addendum for the City Council and
recommended approval of the General Plan amendment for the Project; and
` Page 1 of 4
WHEREAS
, following the public hearing, the City Council approved Resolution XX-15
approving the proposed CEQA Addendum, which resolution is incorporated herein by reference;
and
WHEREAS,
the City Council did hear and use their independent judgment and
considered the CEQA Addendum and prior CEQA documents, and all said reports,
recommendations, and testimony hereinabove set forth prior to taking any action on the project.
NOW, THEREFORE, BE IT RESOLVED
that the foregoing recitals are true and correct
and made a part of this resolution.
BE IT FURTHER RESOLVED
that the City Council hereby approves the following
amendment to the General Plan based on findings that the amendments are in the public
interest and that the General Plan as so amended will remain internally consistent, (strikeout
and bold text will not be shown in the General Plan).
A. Amend the Land Use Map (Figure 1-1) of the General Plan as shown below for Schaefer
Ranch:
B. Amend the second paragraph of Section 2.4 to read as follows:
Approximately 485 acres lie east of the Urban Limit Line of which 375 acres are Open
Space. The remainder of the Western Extended Planning Area is comprised of the
Schaefer Ranch residential development which has been approved for up to 419
residential units with an estimated population of 1,131 persons. Table 2.3 sets forth the
development potential of the Western Extended Planning Area.
` Page 2 of 4
C. Amend Table 2.3 as shown below.
Table 2.3 - Land Use Development Potential: Western Extended Planning Area
CLASSIFICATIONACRESINTENSITYUNITSFACTORYIELD
11
RESIDENTIALAcresDwelling UnitsPopulation
Dwelling
Persons/
Units/AcreDwelling Unit
2,647 .0 1 unit/100 acres 26 2 .7 70
Rural Residential/
Agriculture
Estate Residential 20.2 0 .01-0 .8 0-16 2 .7 0-43
Single-Family 73.64 0 .9-6 .0 66-442 2 .7 178-1,193
Residential
TOTAL:2,740.8492-458248-1,236
AcresNumber
PARKS AND
PUBLIC
RECREATION
Neighborhood Park 10 .4 1
Open Space 375.56
TOTAL:385.961 park
AcresJobs
Floor AreaSquare Feet Square Feet/
PUBLIC/SEMI-
PUBLICRatio (Gross)
Employee
(millions)
Public/Semi-Public 5 .4 .60 max .14 590 239
TOTAL:5.4.14
ACRESPOPULATIONJOBS
DWELLING SQUARE FEET
UNITS(MILLIONS)
GRAND TOTAL:3,132.292-458248-1,236.14239
1 For dwelling units, population and jobs, a decimal fraction of .5 or less is disregarded; a decimal fraction of greater
than .5 is rounded up to the nearest whole number .
BE IT FURTHER RESOLVED
that this Resolution shall take effect thirty days after the
date of adoption.
PASSED, APPROVED, AND ADOPTED
this _______ day of ______ 2015 by the
following votes:
AYES
:
NOES
:
ABSENT
:
ABSTAIN
:
` Page 3 of 4
________________________________________
Mayor
ATTEST
:
_______________________________________
City Clerk
` Page 4 of 4
ORDINANCE NO. XX – 15
AN ORDINANCE OF THE CITY COUNCIL
OF THE CITY OF DUBLIN
* * * * * * * * * * * * * *
REZONING THE SCHAEFER RANCH UNIT 3 PROJECT SITE TO A PLANNED
DEVELOPMENT ZONING DISTRICT AND APPROVING A RELATED STAGE 1 AND 2
DEVELOPMENT PLAN
PLPA 2012-00013
The Dublin City Council does ordain as follows:
SECTION 1. RECITALS
A. The Applicant, Schaefer Ranch Holdings LLC (Discovery Builders), proposes to develop 19
single-family detached homes within a 17.30-acre area. The applications include a General
Plan Amendment to change the land use designations from Estate Residential to a combination
of Single Family Residential (7.04 acres) and Open Space (10.26 acres). The applications also
include Planned Development rezone with a related Stage 1 and Stage 2 Development Plan,
Site Development Review, and Vesting Tentative Subdivision Map 8136. The proposed
development and applications are collectively known as the “Project”.
B. The Project Site is located in the Western Extended Planning Area at the westerly portion of
the Schaefer Ranch planned community at the westerly terminus of Dublin Boulevard, north of
Interstate 580 and west of Schaefer Ranch Road.
C. The City prepared an Addendum to the certified 1996 Schaefer Ranch EIR for the Project.
D. Following a duly noticed public hearing, on October 27, 2015, the Planning Commission
adopted Resolution 15-13 recommending that the City Council not approve the CEQA
addendum, the General Plan amendment, the Planned Development rezoning with related
Stage 1 and 2 Development Plans, and the requested Site Development Review and Vesting
Tentative Tract Map 8136. The above resolution are incorporated herein by reference and are
available for review at City Hall during normal business hours; and
E. A Staff Report for the City Council, dated ____, 2015 and incorporated herein by reference,
described and analyzed the Project, including the Planned Development rezoning and related
Stage 1 and 2 Development Plan.
F. On ____, 2015, the City Council held a properly noticed public hearing on the Project,
including the proposed Planned Development rezoning and related Stage 1 and 2 Development
Plan, at which time all interested parties had the opportunity to be heard.
G. On ____, 2015, the City Council adopted Resolution XX-15 approving the CEQA Addendum
for the Project and adopted Resolution XX-15 approving a General Plan amendment for the
Project, which resolutions are incorporated herein by reference and available for review at City
Hall during normal business hours.
Page 1 of 10
H. The City Council considered the CEQA Addendum and related prior CEQA documents and
all above-referenced reports, recommendations, and testimony prior to taking action on the
Project.
SECTION 2: FINDINGS
A. Pursuant to Section 8.32.070 of the Dublin Municipal Code, the City Council finds as follows.
1. The Schaefer Ranch Unit 3 Project Planned Development zoning meets the purpose
and intent of Chapter 8.32 in that it provides a comprehensive development plan that
creates a desirable use of land that is sensitive to surrounding land uses by virtue of the
layout and design of the site plan.
2. Development of the Project under the Planned Development zoning and the related
Stage 1 and 2 Development Plan will be harmonious and compatible with existing and
future development in the surrounding area in that the site will provide residential
development consistent with the surrounding development by providing unique floor plan
designs and the incorporation of open space components while also being sensitive to
the surrounding hillsides and conservation areas.
B. Pursuant to Sections 8.120.050.A and B of the Dublin Municipal Code, the City Council finds
as follows.
1. The Planned Development zoning for the Project and the related Stage 1 and 2
Development Plan will be harmonious and compatible with existing and potential
development in the surrounding area in that the proposed site plan has taken into
account sensitive adjacencies.
2. The project site is physically suitable for the type and intensity of the zoning district
being proposed in that the Project maintains the general character and density of
adjacent development. The project site conditions are documented in the adopted CEQA
Addendum; the environmental impacts that have been identified will be mitigated, and the
project will implement all adopted mitigation measures. There are no site conditions that
were identified in the Schaefer Ranch EIR and Project CEQA Addendum that will present
an impediment to development of the site for the intended purposes. There are no major
physical or topographic constraints and thus the site is physically suitable for the type and
intensity of the proposed residential uses approved through the Planned Development
zoning.
3. The Planned Development zoning will not adversely affect the health or safety of
persons residing or working in the vicinity, or be detrimental to the public health, safety
and welfare in that the project will comply with all applicable development regulations and
standards and will implement all adopted mitigation measures. The Project uses are
compatible with surrounding uses.
4. The Planned Development zoning is consistent with the Dublin General Plan, as
amended, in that the proposed residential uses and site plan are consistent with the
Single Family Residential and Open Space land use designations for the site.
Page 2 of 10
C. Pursuant to the California Environmental Quality Act, the City Council approved a CEQA
Addendum on _____, 2015, as set forth in Resolution XX-15, which resolution is incorporated
herein by reference and available for review at City Hall during normal business hours.
SECTION 3:ZONING MAP AMENDMENT
Pursuant to Chapter 8.32, Title 8 of the City of Dublin Municipal Code the City of Dublin Zoning
Map is amended to rezone the property described below to a Planned Development Zoning
District:
17.30 acres located in the Western Extended Planning Area at the westerly portion of the
Schaefer Ranch planned community at the westerly terminus of Dublin Boulevard, north
of Interstate 580 and west of Schaefer Ranch Road (“Project site”, or “Property”).
A map of the rezoning area is shown below:
Stage 1 Development Plan
SECTION 4. APPROVAL OF STAGE 1 AND 2 DEVELOPMENT PLAN
The regulations for the use, development, improvement, and maintenance of the Project site are
set forth in the following Stage 1 and 2 Development Plan for the Project area, which is hereby
approved. Any amendments to the Stage 1 and 2 Development Plan shall be in accordance
with section 8.32.080 of the Dublin Municipal Code or its successors.
Stage 1 and 2 Development Plan for the Schaefer Ranch Unit 3 Project
This is a Stage 1 and 2 Development Plan pursuant to Chapter 8.32 of the Dublin Zoning
Ordinance. This Development Plan meets all the requirements for both a Stage 1 and Stage 2
Development Plan set forth in Chapter 8.32 of the Zoning Ordinance and is adopted as part of
the Planned Development rezoning for the Schaefer Ranch Unit 3 project, PLPA-2012-00013.
Page 3 of 10
The Planned Development District and this Stage 1 and 2 Development Plan provides flexibility
to encourage innovative development while ensuring that the goals, policies, and action
programs of the General Plan and provisions of Chapter 8.32 of the Zoning Ordinance are
satisfied.
1. Statement of Permitted, Conditional and Accessory Uses.
PD – Single Family Residential
Permitted Uses
Single-family detached Dwelling Unit
Accessory structures and uses in accordance with Section 8.40.030 of the Dublin
Zoning Ordinance
Home occupation in accordance with Chapter 8.64 of the Dublin Zoning Ordinance
Small family day care homes
Other similar uses as determined by the Community Development Director
Conditional Uses
Accessory structures and uses located on the same site as a conditional use
Bed and Breakfast inns
Community clubhouse
Community facilities
Large family day care homes
Other similar uses as determined by the Community Development Director
PD Open Space
Permitted Uses, including, but not limited to:
Agriculture and grazing
Conservation and wildlife habitat preservation areas
Public or private utilities, services and facilities necessary to serve the project
Public or private recreation facility- active or passive consistent with Open Space
use
Trails and maintenance roads, including emergency vehicle access
Other similar uses as determined by the Community Development Director
Page 4 of 10
Aerial Photo
2. Stage 1 and 2 Site Plan.
Page 5 of 10
3. Site area, proposed densities.
Proposed
Land Use acres %
Single Family Residential – 19 units 7.04 41%
Opens Space 10.26 59%
Total 17.30 100%
4. Development Regulations.
SINGLE FAMILY SITE DEVELOPMENT STANDARDS
STANDARD
Minimum Unless Otherwise Noted
Lot Size 4500 sf
Lot Width
45 ft
Typical street
35 ft
Cul-de-sac (measure at right-of-way)
Lot Depth 100 ft
Lot Coverage
(1)
50 % maximum
one-story
45 % maximum
two-story
Building Height (two-story maximum) 35 ft
(2)
Setbacks
Front Yard
10 ft
to living or porch
18 ft
to front entry garage
15 ft
to side entry garage
Side Yard
5 ft
typical
8 ft
at corners
Rear Yard 10 ft
Usable Yard
500 sf contiguous flat
size
10 ft minimum any one side and 15 ft diameter clear
dimension
within usable yard.
Parking Spaces
2
Off-street covered (enclosed garage)
1
additional space (may be on-street)
Specific Notes:
Maximum lot coverage regulations are intended to establish the maximum lot area that may be covered with buildings and structures. Buildings
(1)
and structures include: All land covered by principal buildings, garages and carports, permitted accessory structures, covered decks and
gazebos, and other covered and enclosed areas. It does not include: Standard roof overhangs, cornices, eaves, uncovered decks, swimming
pools, and paved areas such as walkways, driveways, patios, uncovered parking areas, or roads. (Dublin Zoning Ordinance Section 8.36.100).
Residential Building Height: A 35-foot maximum two stories shall be measured from the finished grade at the midpoint of the building (as
(2)
shown on a façade or cross section view running parallel to the slope) to the top ridge of the structure’s roof. However, architectural features and
elements may exceed this provision by a 5-foot maximum, and a gable element may exceed this provision by a 5-foot maximum, subject to
approval by the Director of Community Development.
Page 6 of 10
5. Phasing Plan. The project be constructed under one phase.
6. Preliminary/Master Neighborhood Landscape Plan.
Plan 1
Page 7 of 10
Plan 2
7. Architectural Standards.
The following five (3) architectural styles are shown in the Stage 2 Development Plan. The
variety of architectural styles will provide visual interest and identity for each neighborhood
street. The architectural elements will be articulated and themed to represent a variety of
styles through color, texture, and massing details. The architectural styles, along with
design elements, are identified below:
Monterey: The Monterey style is characterized by low-pitched gable roof and cantilevered
second story balconies covered by the principal roof of flat or “S” concrete tile. Wall
materials typically are different for first and second floors generally consisting of extensive
use of brick on the lower levels with stucco, wood siding, or board and batten above.
Page 8 of 10
Architectural elements include simple wooden posts and railings, shutters, window frames,
and gable end accents. Colors are California mission blends with varied color accents.
Early Californian: Early Californian is distinguished by simple massing and the principal
roof material of concrete barrel tiles representing terracotta in color and form on a hip or
gable roof above shorter overhangs. Stucco finished exteriors are accented by arched
doorways, shutters, wrought iron detailing, and gable end accents. Colors are California
mission and brown blends with varied tone accents.
English Country: Formal characteristics of the English County style are identified by
steeper pitched roof elements with gable forms, stucco accent walls, use of brick accents,
and half-timbered details. Stone features, bricked archways, decorative corbels, and multi-
paned windows give this style its country image along with the hip and gable roof
elements. Colors and materials are lighter charcoal and brown blends with earthy green
tone accents.
8. Inclusionary Zoning Regulations. In accordance with Section 8.68.030 A. of the City of
Dublin Zoning Ordinance, projects with 20 or more lots are subject to the Inclusionary Housing
requirements. This project will comprise a total of 19 lots if approved and, therefore is not
subject to this requirement.
9. Applicable Requirements of Dublin Zoning Ordinance. Except as specifically provided in
this Stage 1 and 2 Development Plan, the use, development, improvement and maintenance of
the property shall be governed by the provisions of the closest comparable Zoning District as
determined by the Community Development Director and of the Dublin Zoning Ordinance
pursuant to Section 8.32.060.C except as provided in the Stage 1 and Stage 2 Development
Plan. No development shall occur on this property until a Site Development Review permit has
been approved for the property.
10. Compliance with adopted Mitigation Measures. The Applicant/Developer shall comply
with all adopted mitigation measures of the Schaefer Ranch EIR and subsequent environmental
documents, as applicable.
SECTION 5. PRIOR PD ZONING SUPERSEDED
Ordinance No. 37-08 (Schaefer Ranch
South) establishing the existing PD zoning is superseded as to the Project site.
SECTION 6. POSTING OF ORDINANCE
The City Clerk of the City of Dublin shall cause this Ordinance to be posted in at least three (3)
public places in the City of Dublin in accordance with Section 36933 of the Government Code of
the State of California.
Page 9 of 10
SECTION 7. EFFECTIVE DATE
This Ordinance shall take effect thirty (30) days following its adoption.
PASSED AND ADOPTED BY
the City Council of the City of Dublin, on this _________
day of _____________ 2015, by the following votes:
AYES:
NOES:
ABSENT:
ABSTAIN:
_____________________________
Mayor
ATTEST:
_____________________________
City Clerk
Page 10 of 10
RESOLUTION NO. XX-15
A RESOLUTION OF THE CITY COUNCIL
OF THE CITY OF DUBLIN
* * * * * * * * * * *
APPROVING A SITE DEVELOPMENT REVIEW PERMIT AND
VESTING TENTATIVE MAP 8136 FOR THE SCHAEFER RANCH UNIT 3 PROJECT
(PLPA-2012-00013)
WHEREAS,
the Applicant, Schaefer Ranch Holdings LLC (Discovery Builders), proposes a
development of 19 single-family detached homes and open space, on approximately 17.30 acres
known as Schaefer Ranch Unit 3, in the planned community known as Schaefer Ranch. The
proposed development and applications are collectively known as the “Project”; and
WHEREAS,
the application includes Site Development Review for 19 single family detached
residential units and open space, and Vesting Tentative Map 8136 which subdivides 7.04 acres of the
17.30-acre area for 19 residential lots; and
WHEREAS,
the application also includes a General Plan Amendment to change the land use
designation on the 17.30 acre site from Estate Residential to 7.04 acres of Single-Family Residential
and 10.26 acres of Open Space and consistent PD-Planned Development rezoning with Stage 1 and
Stage 2 Development Plan; and
WHEREAS,
the Project site is located in the Western Extended Planning Area at the westerly
portion of the Schaefer Ranch planned community at the westerly terminus of Dublin Boulevard, north
of Interstate 580 and west of Schaefer Ranch Road; and
WHEREAS,
the Project Site currently is subdivided as Lots 297 thru 302, Parcel R, and a
portion of Parcel “Q” of Tract 6765; and
WHEREAS
, the California Environmental Quality Act (CEQA), together with the State
guidelines and City environmental regulations, require that certain projects be reviewed for
environmental impacts and that environmental documents be prepared. The City prepared an Initial
Study and an Addendum to the environmental impact report that was certified by the City in 1996
(Schaefer Ranch Project/General Plan Amendment Environmental Impact Report, State
Clearinghouse No. 95033070 (the “Schaefer Ranch EIR” or “1996 EIR”); and
WHEREAS,
a Staff Report dated October 27, 2015 was submitted to the City of Dublin
Planning Commission recommending City Council approval of the Project, including the Site
Development Review request and Vesting Tentative Tract Map 8136; and
WHEREAS
, on October 27, 2015, the Planning Commission held a properly notice public
hearing and adopted Resolution 15-13 recommending that the City Council not approve the CEQA
addendum, the General Plan amendment, the Planned Development rezoning with related Stage 1
and 2 Development Plans, and the requested Site Development Review and Vesting Tentative Tract
Map 8136. The above resolution are incorporated herein by reference and are available for review at
City Hall during normal business hours; and
130
Page of
WHEREAS,
on _____, 2015, the City Council held a duly noticed public hearing on the Project
at which time all interested parties had the opportunity to be heard. Following the public hearing, the
City Council approved Resolution XX-15 approving the proposed CEQA addendum, Resolution XX-15
approving an amendment to the General Plan, and adopted Ordinance XX-15 approving a Planned
Development Rezone with a related Stage 1 and 2 Development Plan for the Schaefer Ranch Unit 3
Project. The above resolutions and ordinance are incorporated herein by reference and are available
for review at City Hall during normal business hours; and
WHEREAS
, the City Council did hear and use its independent judgment and considered the
addendum and prior EIR, all said reports, recommendations, and testimony hereinabove set forth
before approving the Project.
NOW, THEREFORE, BE IT RESOLVED
that the above recitals are true and correct and made
a part of this resolution.
BE IT FURTHER RESOLVED
that the City Council of the City of Dublin hereby makes the
following findings and determinations regarding the proposed Site Development Review for a
development of 19 single-family detached homes on 7.04 acres and 10.26 acres of Open Space
within a 17.30 acre site known as Schaefer Ranch Unit 3 located in in the Western Extended
Planning Area at westerly portion of the Schaefer Ranch planned community at the westerly terminus
of Dublin Boulevard, north of Interstate 580 and west of Schaefer Ranch Road:
Site Development Review
:
A. The proposal is consistent with the purposes of Chapter 8.104 of the Zoning Ordinance,
with the General Plan and any applicable Specific Plans and design guidelines because: 1)
the project will be consistent with the architectural character and scale of development in
the area; 2) the project will provide a needed and attractive housing opportunity; 3) the
project is consistent with the General Plan land use designations of Single Family
Residential and Open Space; and 4) the project complies with the development standards
established in the Planned Development ordinance for the Project.
B. The proposal is consistent with the provisions of Title 8, Zoning Ordinance because: 1) the
project contributes to orderly, attractive, and harmonious site and structural development
compatible with the intended use, proposed subdivision, and the surrounding properties;
and 2) the project complies with the development regulations set forth in the Zoning
Ordinance where applicable and as adopted for PD PLPA 2012-00013.
C. The design of the project is appropriate to the City, the vicinity, surrounding properties, and
the lot in which the project is proposed because: 1) the size and mass of the proposed
houses is consistent with other existing and approved residential development in the
surrounding area; 2) the project will contribute to housing opportunities as a complement to
the surrounding neighborhoods; 3) the project will serve the current buyer profile and
market segment anticipated for this area; and 4) the project contributes to the preservation
of Open Space.
D. The subject site is suitable for the type and intensity of the approved development because:
1) the Project development envelope is tailored to protect the hillsides which are
designated for open space and provide proper drainage; 2) the Project will implement all
230
Page of
applicable prior adopted mitigation measures; and 3) the project site is or will be fully
served by public services and existing roadways.
E. Impacts to existing slopes and topographic features are addressed because: 1) the Project
is required to comply with all previously adopted mitigation measures designed to ensure
slope stability; 2) grading on the site will ensure that the site drains away from any
structures and complies with the Regional Water Quality Control Board requirements; 3)
most of the steeper areas of the site are in designated open space; and 4) retaining walls
will be constructed as required to support grade differentials between building envelopes
and setback or right-of-way areas.
F. Architectural considerations including the character, scale and quality of the design, site
layout, the architectural relationship with the site and other buildings, screening of unsightly
uses, lighting, building materials and colors and similar elements result in a project that is
harmonious with its surroundings and compatible with other developments in the vicinity
because: 1) the Project provides a high degree of design and landscaping to complement
existing uses in the area; 2) the structures reflect the architectural styles and development
standards for residential buildings currently under construction by Toll Brothers in another
portion of Neighborhood A; 3) the materials proposed will be consistent with the City’s
expectations for a quality level of development; and 4) the color and materials proposed will
be coordinated among the structures on site.
G. Landscape considerations, including the location, type, size, color, texture and coverage of
plant materials, and similar elements have been incorporated into the project to ensure
visual relief, adequate screening and an attractive environment for the public because: 1)
topography has been taken into consideration for design of the landscape plan; 2)
generous and appropriate landscaping is proposed along the street; 3) landscaping in
common areas is coordinated with adjacent areas; and 4) the project will conform to the
requirements of the Stage 2 Development Plan and the Water Efficient Landscape
Ordinance.
H. The site has been adequately designed to ensure the proper circulation for bicyclist,
pedestrians, and automobiles because: 1) the project site provides opportunities for
pedestrian and bicycle circulation; 2) the project will connect to the regional trail system
through adjacent neighborhoods and access points.
BE IT FURTHER RESOLVED
that the City Council of the City of Dublin hereby makes the
following findings and determinations regarding Vesting Tentative Tract Map 8136:
Vesting Tentative Tract Map 8136
A. The proposed Vesting Tentative tract Map 8136 is consistent with the intent of applicable
subdivision regulations and related ordinances.
B. The proposed subdivision together with its design and improvements of the proposed Vesting
Tentative Tract Map 8136 are consistent with the General Plan, as amended, as they relate to
the subject property in that it is a subdivision for residential and open space uses consistent
with the approved land use designations and density.
330
Page of
C. The proposed Vesting Tentative Tract Map 8136 is consistent with the Planned Development
zoning approved for Project and therefore consistent with the City of Dublin Zoning Ordinance.
D. The properties created by the proposed Vesting Tentative Tract Map 8136 will have adequate
access to major constructed or planned improvements.
E. Project design, architecture, and concept have been integrated with topography of the project
site created by the Vesting Tentative Tract Map 8136 to incorporate water quality measures
and minimize overgrading and extensive use of retaining walls. Therefore, the proposed
subdivision is physically suitable for the type and intensity of development proposed.
F. The Mitigation Measures adopted with the Schaefer Ranch EIR would be applicable as
appropriate for addressing or mitigating any potential environmental impacts of the Project, as
documented in the adopted Addendum.
G. The proposed Vesting Tentative Map 8136 and the type of improvements will not result in
environmental damage or substantially injure fish or wildlife or their habitat or cause public
health concerns with compliance to applicable adopted Mitigation Measures and Conditions of
Approval.
H. The design of the subdivision will not conflict with easements, acquired by the public at large,
or access through or use of property within the proposed subdivision. The City Engineer has
reviewed the map and title report and has not found any conflicting easements of this nature.
BE IT FURTHER RESOLVED
that the Dublin City Council hereby approves the Site
Development Review Permit for a development of 19 single-family detached homes on 7.23 acres
and 10.05 acres of Open space within a 17.28 acre site known as Schaefer Ranch Unit 3 located in in
the Western Extended Planning Area at westerly portion of the Schaefer Ranch planned community
at the westerly terminus of Dublin Boulevard, north of Interstate 580 and west of Schaefer Ranch
Road, as shown on plans prepared by Discovery Design Group, MD Fotheringham & Associates, and
Isakson & Associates dated received September 25, 2015 and subject to the conditions included
below.
BE IT FURTHER RESOLVED
that the Dublin City Council hereby approves Vesting Tentative
Map 8136 prepared by Discovery Design Group, MD Fotheringham & Associates, and Isakson &
Associates dated received September 25, 2015 and subject to the conditions included below.
CONDITIONS OF APPROVAL
Unless stated otherwise, all Conditions of Approval shall be complied with prior to the issuance
of building permits or establishment of use, and shall be subject to Planning Department review
and approval. The following codes represent those departments/agencies responsible for
monitoring compliance of the conditions of approval. [PL.] Planning, [B] Building, [PO] Police,
[PW] Public Works [P&CS] Parks & Community Services, [ADM] Administration/City Attorney,
[FIN] Finance, [F] Alameda County Fire Department, [DSR] Dublin San Ramon Services District,
[CO] Alameda County Department of Environmental Health, [Z7] Zone 7.
CONDITIONS OF APPROVAL
430
Page of
NO. CONDITIONS OF APPROVAL Agency Prior to: Source
PLANNING GENERAL CONDITIONS
1. Approval. This Site Development Review approval PL Ongoing Planning
is for the Schaefer Ranch Unit 3 (PLPA 2012-00013).
This approval shall be as generally depicted and
indicated on the project plans prepared by Discovery
Design Group, MD Fotheringham & Associates, and
Isakson & Associates dated received September 25,
2015, on file in the Community Development
Department, and other plans, text, and diagrams
relating to this Site Development Review, and as
specified as the following Conditions of Approval for
this project. This approval is subject to adopting the
CEQA addendum, and companion General Plan and
Specific Plan Amendments and related Planned
Development Zoning.
2. Permit Expiration. Construction or use shall PL One Year DMC
commence within one (1) year of Site Development After Effective 8.96.020.
Review Permit approval or the Permit shall lapse and Date D
become null and void. If there is a dispute as to
whether the Permit has expired, the City may hold a
noticed public hearing to determine the matter. Such
a determination may be processed concurrently with
revocation proceedings in appropriate circumstances.
If a Permit expires, a new application must be made
and processed according to the requirements of this
Ordinance.
3. Time Extension. The original approving decision-PL Prior to DMC
maker may, upon the Applicant’s written request for Expiration 8.96.020.
an extension of approval prior to expiration, upon the Date E
determination that all Conditions of Approval remain
adequate and all applicable findings of approval will
continue to be met, grant an extension of the
approval for a period not to exceed six (6) months.
All time extension requests shall be noticed and a
public hearing shall be held before the original
hearing body.
4. Compliance. The Applicant/Property Owner shall PL Ongoing DMC
operate this use in compliance with the Conditions of 8.96.020.
Approval of this Site Development Review Permit, the F
approved plans and the regulations established in the
Zoning Ordinance. Any violation of the terms or
conditions specified may be subject to enforcement
action.
5. Revocation of Permit. The Site Development PL Ongoing DMC
Review approval shall be revocable for cause in 8.96.020.I
accordance with Section 8.96.020.I of the Dublin
Zoning Ordinance. Any violation of the terms or
530
Page of
conditions of this permit shall be subject to citation.
6. Requirements and Standard Conditions. The Various Building Standard
Applicant/Developer shall comply with applicable City Permit
of Dublin Fire Prevention Bureau, Dublin Public Issuance
Works Department, Dublin Building Department,
Dublin Police Services, Alameda County Flood
Control District Zone 7, Livermore Amador Valley
Transit Authority, Alameda County Public and
Environmental Health, Dublin San Ramon Services
District and the California Department of Health
Services requirements and standard conditions. Prior
to issuance of building permits or the installation of
any improvements related to this project, the
Applicant/Developer shall supply written statements
from each such agency or department to the
Planning Department, indicating that all applicable
conditions required have been or will be met.
7. Required Permits. Applicant/Developer shall obtain PW Building Standard
all permits required by other agencies including, but Permit
not limited to Alameda County Flood Control and Issuance
Water Conservation District Zone 7, California
Department of Fish and Game, Army Corps of
Engineers, Regional Water Quality Control Board,
Caltrans and provide copies of the permits to the
Public Works Department.
8. Fees. Applicant/Developer shall pay all applicable Various Building Various
fees in effect at the time of building permit issuance, Permit
including, but not limited to, Planning fees, Building Issuance
fees, Traffic Impact Fees, TVTC fees, Dublin San
Ramon Services District fees, Public Facilities fees,
Dublin Unified School District School Impact fees,
Fire Facilities Impact fees, Alameda County Flood
and Water Conservation District (Zone 7) Drainage
and Water Connection fees; or any other fee that
may be adopted and applicable.
9. Indemnification. Applicant/Developer shall defend, ADM Ongoing Administr
indemnify, and hold harmless the City of Dublin and ation/City
its agents, officers, and employees from any claim, Attorney
action, or proceeding against the City of Dublin or its
agents, officers, or employees to attack, set aside,
void, or annul an approval of the City of Dublin or its
advisory agency, appeal board, Planning
Commission, City Council, Community Development
Director, Zoning Administrator, or any other
department, committee, or agency of the City to the
extent such actions are brought within the time period
630
Page of
required by Government Code Section 66499.37 or
other applicable law; provided, however, that the
Applicant/Developer's duty to so defend, indemnify,
and hold harmless shall be subject to the City's
promptly notifying the Applicant/ Developer of any
said claim, action, or proceeding and the City's full
cooperation in the defense of such actions or
proceedings.
10. Clarification of Conditions. In the event that there PW Ongoing Public
needs to be clarification to the Conditions of Works
Approval, the Director of Community Development
and the City Engineer have the authority to clarify the
intent of these Conditions of Approval to the
Applicant/Developer without going to a public
hearing. The Director of Community Development
and the City Engineer also have the authority to
make minor modifications to these conditions without
going to a public hearing in order for the
Applicant/Developer to fulfill needed improvements or
mitigations resulting from impacts to this project.
11. Clean-up. The Applicant/Developer shall be PL Ongoing Planning
responsible for clean-up & disposal of project related
trash to maintain a safe, clean and litter-free site.
12. Modifications. Modifications or changes to this Site PL Ongoing DMC
Development Review approval may be considered by 8.104.100
the Community Development Director if the
modifications or changes proposed comply with
Section 8.104.100 of the Zoning Ordinance.
13. Lighting. Lighting is required over exterior PL, PW Building Municipal
entrances/doors. Exterior lighting used after daylight Permit Code
hours shall be adequate to provide for security Issuance
needs.
PLANNING – PROJECT SPECIFIC
14. Satellite Dishes. The Developer’s Architect shall PL Project
prepare a plan for review and approval by the Specific
Director of Community Development and the Building
Official that provides a consistent and unobtrusive
location for the placement of individual satellite
dishes. Individual conduit will be run on the interior
of the unit to the satellite location on the exterior of
the home to limit the amount of exposed cable
required to activate any satellite dish. It is preferred
that where chimneys exist, the mounting of the dish
be incorporated into the chimney. In instances where
chimneys do not exist, then the plan shall show a
common and consistent location for satellite dish
placement to eliminate the over proliferation,
haphazard and irregular placement.
730
Page of
15. PL In conjunction Project
Street Lights.
Street lights selected for this
with approval Specific
subdivision shall have the ability to accept cut-off
of
shielding to the satisfaction of the City Engineer.
improvement
plans
LANDSCAPING
16. PL Issuance of Standard
Final Landscape Construction Documents.
The
building
final planting and irrigation design shall:
permits
a. Utilize plant material that will be capable of
healthy growth within the given range of soil
and climate.
b. Provide landscape screening that is of a height
and density so that it provides a positive visual
impact within three years from the time of
planting.
c. Provide that 75% of the proposed trees on the
site are a minimum of 15 gallons in size, and at
least 50% of the proposed shrubs on the site
are a minimum of 5 gallons in size.
d. Provide concrete curbing at the edges of all
planters and paving surfaces where applicable.
Final landscape construction documents shall:
a. Provide specific landscape and irrigation plans
for non-typical and corner lots. This
requirement includes any lot that varies more
than five feet in width from the typical plan.
b. Specify that all cut and fill slopes graded and
not constructed by September 1, of any given
year, are hydroseeded with perennial or native
grasses and flowers, and that stockpiles of
loose soil existing on that date are
hydroseeded in a similarmanner.
c. Specify that the area under the drip lineof all
existing oaks, walnuts, etc., which are to be
saved are fenced during construction and
grading operations and no activity is permitted
under them that will cause soil compaction
or damage to the tree, if applicable.
d.
Include a warranty from the owners and/or
contractors to warrant all trees, shrubs and
ground cover and the irrigation system for one
year from the date of project acceptance by the
City.
17. PL Issuance of Standard
Maintenance Agreement.
A permanent
the building
maintenance agreement on all common area
permit
landscaping will be required from the owner insuring
regular irrigation, fertilization and weed abatement.
830
Page of
18. PL Issuance of Standard
Tree Preservation.
Tree preservation techniques,
the building
and guarantees, if applicable, shall be reviewed and
permit
approved by the Dublin Planning Division prior to the
issuance of the building permit.
19. PL Issuance of Standard
Street Trees and Accent Trees.
Street trees shall
the building
be spaced between 30 and 50 feet on center or
permit
approximately one per typical lot. Corner lots shall
provide a minimum of two trees and a maximum of
three street trees per lot. Generally, each lot will
provide one accent tree, space permitting.
20. PL Issuance of Standard
Water Efficient Landscaping Regulations.
The
the building
Applicant shall meet all requirements of the City of
permit
Dublin's Water-Efficient Landscaping Regulations,
Section 8.88 of the Dublin Municipal Code.
21. PL Issuance of Standard
Bio-Retention Areas.
The designed bio-retention
the building
areas shall be enhanced to create an open space
permit
landscape that is landscape attractive, conserves
water, and requires minimal maintenance.
22. PL Issuance of Standard
Plant Clearances.
All trees planted shall meet the
the building
following clearances:
permit
a. 6' from the face of building walls or roof eaves
b. 7’ from fire hydrants, storm drains, sanitary
sewers and/or gas lines
c. 5' from top of wing of driveways, mailboxes,
water, telephone and/or electrical mains
d. 15' from stop signs, street or curb sign returns
e. 20' from either side of a streetlight
23. PL Issuance of Standard
Irrigation System Warranty.
The Applicant shall
the building
warranty the irrigation system and planting for a
permit
period of one year from the date of installation. The
Applicant shall submit for the Dublin Community
Development Department approval, a landscape
maintenance plan for the Common Area landscape
including a reasonable estimate of expenses for the
first five years.
24. PL Issuance of Standard
Walls, Fences and Mailboxes
. Applicant shall work
the building
with staff to prepare a final wall, fencing and mailbox
permit
plan that is consistent with Dublin Municipal Code and
the design character of the architecture. The design
of the mailbox station shall be upgraded to provide an
enclosure or housing for the gang mailboxes so that
they are integrated into the structure. Mailbox
locations shall be integrated within the landscape and
shall comply with USPS requirements.
25. PL Issuance of Standard
Sustainable Landscape Practices.
The landscape
the building
design shall demonstrate compliance with sustainable
permit
landscape practices as detailed in the Bay-Friendly
930
Page of
Landscape Guidelines by earning a minimum of 60
points or more on the Bay-Friendly scorecard,
meeting 9 of the 9 required practices and specifying
that 75% of the non-turf planting only requires
occasional, little or no shearing or summer water once
established. Final selection and placement of trees,
shrubs and ground cover plants shall ensure
compliance with this requirement. Herbaceous plants
shall be used along walks to reduce maintenance and
the visibility of the sheared branches of woody ground
cover plants. Planters for medium sized trees shall be
a minimum of six feet wide. Small trees or shrubs
shall be selected for planting areas less than six feet
wide.
26. PL Construction Standard
Copies of Approved Plans
. The Applicant shall
provide the City with one full size copy, one reduced
(1/2 sized) copy and one electronic copy of the
approved landscape plans prior to construction.
CIVIL CONDITIONS
27. Plans Coordination. Civil Improvement Plans, PL Preparation of Standard
Joint Trench Plans, Street Lighting Plans and final grading,
Landscape Improvement Plans shall be submitted on planting and
the same size sheet and plotted at the same drawing utility plans
scale for consistency, improved legibility and
interdisciplinary coordination.
28. Utility Placement and Coordination: Utilities shall PL Preparation of Standard
be coordinated with proposed tree locations to eliminate final grading,
conflicts between trees and utilities. Submit typical utility planting and
plans for each house type to serve as a guide during the utility plans
preparation of final grading, planting and utility plans.
Utilities may have to be relocated in order to provide
the required separation between the trees and utilities.
The applicant shall submit a final tree/utility coordination
plan as part of the construction document review
process to demonstrate that this condition has been
satisfied.
32. Building Codes and Ordinances. All project B Through Standard
construction shall conform to all building codes and Completion
ordinances in effect at the time of building permit.
33. Retaining Walls. All retaining walls over 30 inches in B Through Standard
height and in a walkway shall be provided with Completion
guardrails. All retaining walls over 24 inches with a
surcharge or 36 inches without a surcharge shall obtain
permits and inspections from the Building & Safety
Division.
34. Phased Occupancy Plan. If occupancy is requested to B Occupancy of Standard
occur in phases, then all physical improvements within any affected
each phase shall be required to be completed prior to building
1030
Page of
occupancy of any buildings within that phase except for
items specifically excluded in an approved Phased
Occupancy Plan, or minor handwork items, approved by
the Department of Community Development. The
Phased Occupancy Plan shall be submitted to the
Directors of Community Development and Public Works
for review and approval a minimum of 45 days prior to
the request for occupancy of any building covered by
said Phased Occupancy Plan. Any phasing shall
provide for adequate vehicular access to all parcels in
each phase, and shall substantially conform to the intent
and purpose of the subdivision approval. No individual
building shall be occupied until the adjoining area is
finished, safe, accessible, and provided with all
reasonable expected services and amenities, and
separated from remaining additional construction activity.
Subject to approval of the Director of Community
Development, the completion of landscaping may be
deferred due to inclement weather with the posting of a
bond for the value of the deferred landscaping and
associated improvements.
35. Building Permits. To apply for building permits, B Issuance of Standard
Applicant/Developer shall submit five (5) sets of Building
construction plans to the Building & Safety Division for Permits
plan check. Each set of plans shall have attached an
annotated copy of these Conditions of Approval. The
notations shall clearly indicate how all Conditions of
Approval will or have been complied with. Construction
plans will not be accepted without the annotated
resolutions attached to each set of plans.
Applicant/Developer will be responsible for obtaining the
approvals of all participation non-City agencies prior to
the issuance of building permits.
36. Construction Drawings. Construction plans shall be B Issuance of Standard
fully dimensioned (including building elevations) building
accurately drawn (depicting all existing and proposed permits
conditions on site), and prepared and signed by a
California licensed Architect or Engineer. All structural
calculations shall be prepared and signed by a California
licensed Architect or Engineer. The site plan, landscape
plan and details shall be consistent with each other.
37. Air Conditioning Units. Air conditioning units and B, PL Occupancy of Standard
ventilation ducts shall be screened from public view with Unit
materials compatible to the main building and shall not
be roof mounted. Units shall be permanently installed
on concrete pads or other non-movable materials
approved by the Chief Building Official and Director of
Community Development. Air conditioning units shall be
located such that each dwelling unit has one side yard
1130
Page of
with an unobstructed width of not less than 36 inches.
Air conditioning units shall be located in accordance with
the PD text. Air conditioning units shall comply with
.
Section 8.36.060,C,3 of the Zoning Ordinance
38. Temporary Fencing. Temporary Construction fencing B Through Standard
shall be installed along the perimeter of all work under Completion
construction.
39. Addressing B Standard
a) Provide a site plan with the City of Dublin’s
address grid overlaid on the plans (1 to 30 scale). Prior to
Highlight all exterior door openings on plans release of
(front, rear, garage, etc.). The site plan shall addresses
include a single large format page showing the
entire project and individual sheets for each
neighborhood. 3 copies on full size sheets and 5
copies reduced sheets. Prior to
permitting
b) Provide plan for display of addresses. The
Building Official shall approve plan prior to
issuance of the first building permit. (Prior to
Prior to
permitting)
permitting
c) Addresses will be required on the front of the
dwellings. Addresses are also required near the
Occupancy of
garage door opening if the opening is not on the
any Unit
same side of the dwelling as the front door.
Occupancy of
d) Address signage shall be provided as per the
any Unit
Dublin Residential Security Code.
e) Exterior address numbers shall be backlight and
Prior to permit
be posted in such a way that they may be seen
issuance, and
from the street.
through
completion
f)
Driveways servicing more than one (1) individual
dwelling unit shall have a minimum of 4 inch high
identification numbers, noting the range of unit
numbers placed at the entrance to each driveway
at a height between 36 and 42 inches above
grade. The light source shall be provided with an
uninterruptible AC power source or controlled
only by photoelectric device.
40. Engineer Observation. The Engineer of record shall B Scheduling Standard
be retained to provide observation services for all the final
components of the lateral and vertical design of the frame
building, including nailing, hold-downs, straps, shear, inspection
roof diaphragm and structural frame of building. A
written report shall be submitted to the City Inspector
prior to scheduling the final frame inspection.
41. Foundation. Geotechnical Engineer for the soils BPermit Standard
report shall review and approve the foundation issuance
1230
Page of
design. A letter shall be submitted to the Building
Division on the approval.
42. B Standard
Green Building
Through
Green Building measures as detailed in the SDR Completion
package may be adjusted prior to master plan check
application submittal with prior approval from the
City’s Green Building Official provided that the design
of the project complies with the City of Dublin’s Green
Building Ordinance and State Law as applicable. In
addition, all changes shall be reflected in the Master
Plans. (Through Completion)
The Green Building checklist shall be included in the Prior to first
master plans. The checklist shall detail what Green permit
Points are being obtained and where the information
is found within the master plans. (Prior to first permit).
Prior to each unit final, the project shall submit a
completed checklist with appropriate verification that Through
all Green Points required by 7.94 of the Dublin Completion
Municipal Code have been incorporated. (Through
Completion)
Homeowner Manual – if Applicant takes advantage of
this point the Manual shall be submitted to the Green Project
Building Official for review or a third party reviewer
with the results submitted to the City. (Project)
Landscape plans shall be submitted to the Green
Building Official for review. (Prior to approval of the
landscape plans by the City of Dublin)
Prior to
Applicant/Developer may choose self-certification or approval of
certification by a third party as permitted by the Dublin the landscape
Municipal Code. Applicant shall inform the Green plans by the
Building Official of method of certification prior to City of Dublin
release of the first permit in each subdivision /
neighborhood.
43. Electronic File: The Applicant/Developer shall submit BIssuance of Standard
all building drawings and specifications for this project the final
in an electronic format to the satisfaction of the occupancy
Building Official prior to the issuance of building
permits. Additionally, all revisions made to the
building plans during the project shall be incorporated
into an “As Built” electronic file and submitted prior to
the issuance of the final occupancy.
44. Construction trailer: Due to size and nature of the BTUP required Standard
1330
Page of
development, the Applicant/Developer, shall provide a prior to
construction trailer with all hook ups for use by City placement of
Inspection personnel during the time of construction trailer
as determined necessary by the Building Official. A
Temporary Use Permit is required prior to placement
of the construction trailer. In the event that the City
has their own construction trailer, the
applicant/developer shall provide a site with
appropriate hook ups in close proximity to the project
site to accommodate this trailer. The
applicant/developer shall cause the trailer to be
moved from its current location at the time necessary
as determined by the Building Official at the
Applicant/Developer’s expense.
45. Copies of Approved Plans. Applicant shall provide B 30 days after Standard
City with 2 reduced (1/2 size) copies of the City of permit and
Dublin stamped approved plan.each revision
issuance
46. Solar Zone – CA Energy Code B In conjunction Standard
Show the location of the Solar Zone on the site plan. with Master
Detail the orientation of the Solar Zone. This Plan check,
information shall be shown in the master plan check prior to
on the overall site plan, the individual roof plans and issuance of
the plot plans. This condition of approval will be Building
waived if the project meets the exceptions provided in Permits
the CA Energy Code.
47. Wildfire Management. Provide in the master B Prior to Standard
drawing set, a sheet detailing which lots are adjacent issuance of
to open space and subject to the Wildfire Building
Management provisions of the code.Permits
48. Household Waste Materials. Removal of existing B Prior to Project
household waste materials on the site shall be issuance of Specific
monitored by a qualified professional and that normal Grading
and customary testing be performed for lead based Permits and
paint and asbestos building materials prior to issuance of
demolition of existing on-site buildings. Compliance demolition
with this condition shall be demonstrated to the permit
Building Official prior to obtaining a demolition permit.
FIRE
49. New Fire Residential Sprinkler System F Prior to CA
Requirements.
In accordance with The Dublin Fire
issuance of Building /
Code, fire sprinklers shall be installed in all buildings. Building Residenti
The system shall be in accordance with the NFPA Permits al Code
13D, the CA Fire Code and CA Building / Residential
Code.
50. Fire apparatus. Roadways shall have a minimum F In conjunction CA
unobstructed width of 20 feet and an unobstructed with Site Building /
vertical clearance of not less than 13 feet 6 inches. Improvement Residenti
Roadways under 36 feet wide shall be posted with Drawings al Code
1430
Page of
signs on one side; roadways under 28 feet wide shall
be posted with signs both sides of the street as
follows: “NO STOPPING FIRE LANE - CVC 22500.1”.
1. Fire apparatus roadways must extend to within
150 ft. of the most remote first floor exterior
wall of any building.
2. The maximum grade for a fire apparatus
roadway is 12%.
3. Fire apparatus roadways in excess of 150 feet
approved
in length must make provisions for
apparatus turnarounds.
51. Gate Approvals. Fencing and gates that cross F Prior to CA
pedestrian access and exit paths, as well as vehicle issuance of Building /
entrance and exit roads and Emergency Vehicle Building Residenti
Access ways, need to be approved for fire department Permits al Code
access and egress as well as exiting provisions where
such is applicable. Plans need to be submitted that
clearly show the fencing and gates and details of
such. This should be clearly incorporated as part of
the site plan with details provided as necessary.
52. Hydrants & Fire Flows. Show the location of any on-F Prior to CA
site fire hydrants and any fire hydrants that are along issuance of Building /
the property frontage as well as the closest hydrants Building Residenti
to each side of the property that are located along the Permits al Code
access roads that serves this property. Provide a
letter from the water company indicating what the
available fire flow is to this property.
DSRSD
53. Complete improvement plans shall be submitted to DSRSD Issuance of Standard
DSRSD that conform to the requirements of the any building
Dublin San Ramon Services District Code, the permit
DSRSD “Standard Procedures, Specifications and
Drawings for Design and Installation of Water and
Wastewater Facilities”, all applicable DSRSD Master
Plans and all DSRSD policies.
54. All mains shall be sized to provide sufficient capacity DSRSD Issuance of Standard
to accommodate future flow demands in addition to any building
each development project’s demand. Layout and permit
sizing of mains shall be in conformance with DSRSD
utility master planning.
55. Sewers shall be designed to operate by gravity DSRSD Issuance of Standard
flow to DSRSD’s existing sanitary sewer system. any building
Pumping of sewage is discouraged and may only be permit
allowed under extreme circumstances following a
case by case review with DSRSD staff. Any pumping
station will require specific review and approval by
DSRSD of preliminary design reports, design criteria,
and final plans and specifications. The DSRSD
1530
Page of
reserves the right to require payment of present worth
20 year maintenance costs as well as other conditions
within a separate agreement with the applicant for any
project that requires a pumping station.
56. Domestic and fire protection waterline systems for DSRSD Issuance of Standard
Tracts or Commercial Developments shall be any building
designed to be looped or interconnected to avoid permit
dead end sections in accordance with requirements of
the DSRSD Standard Specifications and sound
engineering practice.
57. DSRSD policy requires public water and sewer lines DSRSD Issuance of Standard
to be located in public streets rather than in off-any building
street locations to the fullest extent possible. If permit
unavoidable, then public sewer or water easements
must be established over the alignment of each public
sewer or water line in an off-street or private street
location to provide access for future maintenance
and/or replacement.
58. Prior to approval by the City of a grading permit or a DSRSD Issuance of Standard
site development permit, the locations and widths of any building
all proposed easement dedications for water and permit
sewer lines shall be submitted to and approved by
DSRSD.
59. All easement dedications for DSRSD facilities shall be DSRSD Issuance of Standard
by separate instrument irrevocably offered to DSRSD any building
or by offer of dedication on the Final Map. permit
60. Prior to approval by the City for Recordation, the Final DSRSD Issuance of Standard
Map shall be submitted to and approved by DSRSD any building
for easement locations, widths, and restrictions. permit
61. Prior to issuance by the City of any Building Permit or DSRSD Issuance of Standard
Construction Permit by the Dublin San Ramon any building
Services District, whichever comes first, all utility permit
connection fees including DSRSD and Zone 7, plan
checking fees, inspection fees, connection fees, and
fees associated with a wastewater discharge permit
shall be paid to DSRSD in accordance with the rates
and schedules established in the DSRSD Code.
62. Prior to issuance by the City of any Building Permit or DSRSD Issuance of Standard
Construction Permit by the Dublin San Ramon any building
Services District, whichever comes first, all permit
improvement plans for DSRSD facilities shall be
signed by the District Engineer. Each drawing of
improvement plans shall contain a signature block for
the District Engineer indicating approval of the
sanitary sewer or water facilities shown. Prior to
approval by the District Engineer, the applicant shall
pay all required DSRSD fees, and provide an
engineer's estimate of construction costs for the
sewer and water systems, a performance bond, a
1630
Page of
one-year maintenance bond, and a comprehensive
general liability insurance policy in the amounts and
forms that are acceptable to DSRSD. The applicant
shall allow at least 15 working days for final
improvement drawing review by DSRSD before
signature by the District Engineer.
63. No sewer line or waterline construction shall be DSRSD Issuance of Standard
permitted unless the proper utility construction permit any building
has been issued by DSRSD. A construction permit permit
will only be issued after all of the items in Condition
No. 9 have been satisfied.
64. The Applicant shall hold DSRSD, its Board of DSRSD Issuance of Standard
Directors, commissions, employees, and agents of any building
DSRSD harmless and indemnify and defend the same permit
from any litigation, claims, or fines resulting from the
construction and completion of the project.
65. Improvement plans shall include recycled water DSRSD Issuance of Standard
improvements as required by DSRSD. Services for any building
landscape irrigation shall connect to recycled water permit
mains. Applicant must obtain a copy of the DSRSD
Recycled Water Use Guidelines and conform to the
requirements therein.
66. DSRSD has no objections to this proposed alternate DSRSD Issuance of Project
site plan should such a site plan be permissible under any building Specific
Dublin Zoning regulations. permit
PUBLIC WORKS – PROJECT SPECIFIC CONDITIONS OF APPROVAL
67. Ownership and Maintenance of Improvements. PW Final Map Public
Prior to approval of the Final Map, the Developer Works
shall submit an “Ownership and Maintenance” exhibit
indicating ownership and maintenance responsibilities
for the project street, common area parcels and open
space improvements. The “Ownership and
Maintenance” exhibit shall be subject to review and
approval by the City Engineer.
68. Covenants, Conditions and Restrictions PW Final Map Public
(CC&Rs):
If the project subdivision is not included in
Works
the existing Schaefer Ranch Homeowners
Association, a new Homeowners Association shall
be formed by recordation of a declaration of
Covenants, Conditions, and Restrictions to govern
use and maintenance of Schaefer Way, all common
area improvements and all stormwater treatment
measures. The said declaration shall set forth the
Association name, bylaws, rules and regulations.
The CC&Rs shall also contain a provision that
prohibits the amendment of those provisions of the
CC&Rs requested by its members without the City’s
approval. The CC&R shall ensure that there is
1730
Page of
adequate provision for the maintenance, in good
repair and on a regular basis, of Schaefer Way:
landscaping and irrigation, fences, walls, drainage
and stormwater treatment features, lighting, signs,
and other related improvements. The CC&Rs shall
also contain all other items required by these
conditions. The Developer shall submit a copy of the
CC&R document to the City for review and approval.
69. Covenants, Conditions and Restrictions (CC&Rs): PW Final Map Public
If the project subdivision is included in the existing Works
Schaefer Ranch Homeowners Association, the
CC&Rs shall be amended as needed to govern use
and maintenance of Schaefer Way and all other
common area improvements specific to the
subdivision.
70. Covenants, Conditions and Restrictions (CC&Rs): PW Final Map Public
A disclosure shall be provided in the CC&Rs clearly Works
alerting residents that the driveway design may cause
the bottom of their cars to scrape or otherwise come
in contact with the surface of the driveway, which may
cause damage to their vehicle(s). The disclosure
shall further state that the Buyer should test the
driveway before entering into an agreement to
purchase the lot.
71. Private street and common area subdivision PW Final Map Public
improvements
. Common area improvements, private
Works
streets, private drives and all other subdivision
improvements owned or maintained by the HOA are
subject to review and approval by the City Engineer
prior to Final Map approval and shall be included in
the Tract Improvement Agreement. Such
improvements include, but are not limited to: curb &
gutter, pavement areas, sidewalks, access ramps &
driveways, enhanced street paving, parking spaces,
street lights (wired underground) and appurtenances,
drainage facilities, utilities, landscape and irrigation
facilities, open space landscaping, stormwater
treatment facilities, striping and signage, and fire
hydrants.
72. Schaefer Way: Schaefer Way shall be a Private PW Final Map Public
Street, owned and maintained by the Homeowners’ Works
Association. The Developer shall install complete
roadway and utility improvements along Schaefer
Way as shown on the Tentative Map. Required
roadway and utility improvements on Schaefer Way
shall include, but are not limited to the installation of
curb, gutter, sidewalk, curb ramps, driveways,
drainage structures, utilities, street lights, and fire
hydrants.
1830
Page of
a. Existing roadway pavement shall be
evaluated and overlaid with a minimum 2” AC
overlay (grind and overlay), or replaced as
necessary.
73. Schaefer Way: The sidewalk shown along the south PW Occupancy of Public
side of Schaefer Way shall extend to the driveway on Units or Works
Lot 302 Acceptance of
Improvements
74. Schaefer Way Driveway Design: Driveways shall be PW Approval of Public
constructed such that a minimum 4-foot wide Improvement Works
accessible path is provided across the driveways, Plans or Final
similar to the design used for Schaefer Ranch Units 1 Map
and 2.
75. Schaefer Way: Developer shall design and construct PW Occupancy of Public
a paved roadway from the end of Schaefer Way to Units or Works
the City limit line. Improvements shall also include an Acceptance of
appropriately designed gate and cattle guard at the Improvements
western terminus. The paved roadway shall consist of
minimum 20’ wide pavement and structural section
comparable to the existing street section for Schaefer
Way. Curb and gutter shall be installed on both sides
of the street, and the existing catch basins shall be
relocated to the new curb and gutter to intercept the
storm water run-off and prevent concentrated flows
from being released on the adjacent property. All
costs of design and construction of these
improvements shall be borne by the Developer.
76. Schaefer Way Parking and Restrictions: 29 parallel PW Final Map Public
parking stalls shall be provided along the south side Works
of Schaefer Way as shown on the Tentative Map.
The Developer shall install “No Parking” signs along
the north side of Schaefer Way. Final sign location
shall be coordinated with and approved by the City
Traffic Engineer.
77. Monuments: The Final Map shall include private PW Final Map Public
street monuments to be set along Schaefer Way as Works
determined by the City Engineer.
78. DSRSD Gate: The Developer shall remove the PW Acceptance of Public
existing cable across DSRSD’s reservoir access road Tract Works
off of the Dublin Boulevard cul-de-sac and install a Improvements
new access gate per DSRSD standard details. The
gate shall be subject to review and approval by
DSRSD and be set back from the back-of-sidewalk
such that a standard truck may completely pull off the
cul-de-sac while opening the gate.
79. Dublin Blvd.: Special care shall be taken to protect PW Final Map Public
existing sidewalks, driveways, roadways, Works
landscaping, or other improvements near the
entrance to Schaefer Way that may be damaged as a
1930
Page of
result of operation of construction equipment or
construction activities. The Developer shall be solely
responsible to repair or replace any damaged
improvements as directed by the City Engineer or his
representative.
80. Existing Davilla Easement: The Developer shall PW Prior to Public
st
coordinate and complete the recordation of a Issuance of 1 Works
Quitclaim Deed from Davilla Easement Holders. Building Permit
on Lot
a) Developer shall prepare legal descriptions, plats
Encumbered by
and Quitclaim Deed for execution by the Davilla
the Existing
Easement Holders.
Easement
b) The Developer shall offer an access easement to
the heirs and successors of the Davilla Easement
that aligns with the existing Schaefer Way from
the terminus at Dublin Blvd to the city limit.
81. Offsite Landscape Improvements: The Developer PW Final Map Public
shall plant clinging vine material at the base of the Works
entire section of soundwall installed with the Schaefer
Ranch Unit 1 Dublin Boulevard extension, along the
south side of Dublin Boulevard near Roys Hill Lane.
Vines shall be planted on both sides of the
soundwall. Developer shall also be responsible for
providing a water source and irrigation system to the
vines.
82. Public Service Easements: Public utility vaults, PW Final Map Public
boxes, appurtenances or similar items shall be Works
located within the Public Service Easement behind
the back-of-sidewalk. Private improvements such as
fences, gates or trellises shall not be located within
the public service easements.
83. Private Easements: Reciprocal Ingress/Egress PW Final Map Public
Easements shall be required on those lots where Works
driveways cross parcel lines. Easements shall be
shown/reserved on Final Map for dedication by
separate instrument. Copies of recorded easement(s)
shall be provided to City prior to issuance of Building
Permit for any residence whose driveway crosses the
adjacent lot(s)
84. GHAD Dedication: The Developer shall reserve for PW Final Map Public
dedication to the Schaefer Ranch Geologic Hazard Works
Abatement District (GHAD) by separate instrument
for private open space Parcel AA and Parcel BB and
any other dedications deemed reasonably necessary
by the GHAD Manager. GHAD acceptance of
Parcels AA and BB shall be contingent upon
completion of all tract and GHAD improvements and
formal acceptance of said improvements by the City.
85. GHAD Fence: The Developer shall install a fence PW Acceptance of Public
along all boundary lines between the private lots and Improvements Works
2030
Page of
GHAD parcels. Fence type shall be as approved by Associated with
Planning Director and GHAD Manager. Gates to be GHAD Parcels
installed at both GHAD maintenance access points or
as directed by GHAD Manager, and locks shall be
placed on all access gates. Driveway cuts shall be
provided at both access points.
86. Conformance to GHAD Plan of Control: The PW Approval of Public
Developer shall have the Geotechnical Engineering Improvement Works
firm that prepared the Plan of Control (POC) for the Plans
Schaefer Ranch Geologic Hazard Abatement District
(GHAD) review all final grading and improvement
plans and verify that the plans conform to the
Schaefer Ranch GHAD POC prior to City approval
and issuance of Grading or Sitework Permits.
87. Stormwater Management: The Developer shall PW Final Map and Public
submit a Stormwater Management Plan to ensure On-going Works
that the existing drainage system, including the
existing water quality basin(s), is adequate to treat
the additional runoff generated by this development.
The Final Stormwater Management Plan is subject to
City Engineer approval prior to approval of the Tract
Improvement Plans. Approval is subject to the
Developer providing the necessary plans, details, and
calculations that demonstrate that the plan complies
with the standards issued by the San Francisco Bay
Regional Water Quality Control Board.
88. Stormwater Source Control: “No Dumping Drains to PW Final Map and Public
Bay” storm drain medallions per City Standard Detail On-going Works
CD-704 shall be placed on all public and private
storm drain inlets.
89. Trash Capture: The project Stormwater PW Final Map and Public
Management Plan shall incorporate trash capture On-going Works
measures such as inlet filters or hydrodynamic
separator units to address the requirements of
Provision C.10 of the Regional Water Quality Control
Board (RWQCB), and the Municipal Regional Permit
(MRP) to the satisfaction of the City Engineer.
90. Landscape Plans: At the latest, the Developer shall PW Final Map and Public
submit design development Landscape Plans with the On-going Works
second plan check for the street improvement plans
and final map. The Landscape Plans shall show
details, sections and supplemental information as
necessary for design coordination of the various civil
design features and elements including utility location
to the satisfaction of the City Engineer. Complete
Landscape Plans shall be concurrently approved with
the Tract Improvement Agreement and Final Map.
91. Street Light and Joint Trench Plans. Street Light PW Final Map and Public
Plans and Joint Trench Plans shall be submitted with On-going Works
2130
Page of
the first plan check for the street improvement plans
and final map. At the latest, design development
Street Light Plans and Joint Trench Plans shall be
submitted with the second plan check for the street
improvement plans and final map. The final streetlight
plan and joint trench plan shall be completed prior to
Final Map approval for each respective subdivision.
92. Geotechnical/Soils Report: The Developer shall PW Issuance of Public
submit a design level geotechnical/soils investigation Grading Permit Works
report prepared by a qualified engineer, registered or Final Map
with the State of California. The report shall include
recommendations regarding pavement sections, soil
retention systems, etc. The report shall also include
specific recommendations for the proposed
permeable pavers or permeable pavement
driveways. Grading operations shall be in
accordance with recommendations contained in the
required soils report and grading shall be supervised
by an engineer registered in the State of California to
do such work.
93. Geotechnical Engineer Review and Approval: The PW Issuance of Public
Project Geotechnical Engineer shall be retained to Grading Permit Works
review all final grading plans and specifications. The or Final Map
Project Geotechnical Engineer shall approve all
grading plans prior to City approval and issuance of
grading permits.
94. Grading: The disposal site and haul truck route for PW Issuance of Public
any off-haul dirt materials shall be subject to the Grading Works
review and approval by the City Engineer prior to the Permit(s) or
approval of the improvement plans or issuance of a Final Map
Grading Permit.
95. Dust Control/Street Sweeping: The Developer shall PW Issuance of Public
provide adequate dust control measures at all times Grading Works
during the grading and hauling operations. All trucks Permit(s) or
hauling export and import of materials shall be Final Map
provided with tarp cover at all times. Spillage of haul
materials and mud-tracking on the haul routes shall
be prevented at all times. Developer shall be
responsible for sweeping of streets within,
surrounding and adjacent to the project. If it is
determined that the tracking or accumulation of
material on the streets is due to its condition
activities.
96. Underground Obstructions: Prior to excavation and PW Issuance of Public
grading on any portion of the project site, all Grading Works
underground obstructions (i.e. debris, septic tanks, Permit(s) or
fuel tanks, barrels, chemical waste, etc.) shall be Final Map
identified and remove pursuant to Federal, State and
local regulations and subject to the review and
2230
Page of
approval by the City. Excavations shall be properly
backfilled using structural fill, subject to the review
and approval of the City Engineer.
97. Resource Agency Permits: Prior to the start of any PW Issuance of Public
grading of the site as necessary, permits shall be Grading Works
obtained from US Army Corps of Engineers, the San Permit(s) or
Francisco Bay Regional Water Quality Board, the Final Map
State of California Department of Fish and Games,
and the US Fish and Wildlife Service for the grading
or alteration of wetland areas within the site, if
applicable. The project shall be modified as needed
to response to the conditions of the permits.
PUBLIC WORKS – STANDARD CONDITIONS OF APPROVAL
98. Developer shall comply with the City of Dublin Public PW Ongoing Standard
Works Standard Conditions of Approval contained Condition
below (“Standard Condition”) unless specifically
modified by Project Specific Conditions of Approval
above.
99. General. The Developer shall comply with the PW Ongoing Standard
Subdivision Map Act, the City of Dublin Subdivision, Condition
and Grading Ordinances, the City of Dublin Public
Works Standards and Policies, the most current
requirements of the State Code Title 24 and the
Americans with Disabilities Act with regard to
accessibility, and all building and fire codes and
ordinances in effect at the time of building permit. All
public improvements constructed by Developer and to
be dedicated to the City are hereby identified as
“public works” under Labor Code section 1771.
Accordingly, Developer, in constructing such
improvements, shall comply with the Prevailing Wage
Law (Labor Code. Sects. 1720 and following).
100. Hold Harmless/Indemnification. The Developer shall PW Ongoing Standard
defend, indemnify, and hold harmless the City of Condition
Dublin and its agents, officers, and employees from
any claim, action, or proceeding against the City of
Dublin or its agents, officers, or employees to attack,
set aside, void, or annul an approval of the City of
Dublin or its advisory agency, appeal board, Planning
Commission, City Council, Community Development
Director, Zoning Administrator, or any other
department, committee, or agency of the City
related to this project (Tract Map 8136) to the extent
such actions are brought within the time period
required by Government Code Section 66499.37 or
other applicable law; provided, however, that The
Developer's duty to so defend, indemnify, and hold
harmless shall be subject to the City's promptly
notifying The Developer of any said claim, action, or
2330
Page of
proceeding and the City's full cooperation in the
defense of such actions or proceedings.
101. Clarifications and Changes to the Conditions. In the PW Ongoing Standard
event that there needs to be clarification to these Condition
Conditions of Approval, the Director of Community
Development and the City Engineer have the
authority to clarify the intent of these Conditions of
Approval to the Developer without going to a public
hearing. The Director of Community Development
and the City Engineer also have the authority to make
minor modifications to these conditions without going
to a public hearing in order for the Developer to fulfill
needed improvements or mitigations resulting from
impacts of this project.
102. If there are conflicts between the Tentative Map PW Ongoing Standard
approval and the SDR approval pertaining to mapping Condition
or public improvements, the Tentative Map shall take
precedence.
AGREEMENTS AND BONDS
103. The Developer shall enter into a Tract Improvement PW First Final Standard
Agreement with the City for all public improvements Map and Condition
including any required offsite storm drainage or Successive
roadway improvements that are needed to serve the Maps
Tract that have not been bonded with another Tract
Improvement Agreement.
104. The Developer shall provide performance (100%), PW First Final Standard
and labor & material (100%) securities to guarantee Map and Condition
the tract improvements, approved by the City Successive
Engineer, prior to execution of the Tract Improvement Maps
Agreement and approval of the Final Map. (Note:
Upon acceptance of the improvements, the
performance security may be replaced with a
maintenance bond that is 25% of the value of the
performance security.)
FEES
105. The Developer shall pay all applicable fees in effect PW Ongoing Standard
at the time of building permit issuance including, but Condition
not limited to, Planning fees, Building fees, Dublin
San Ramon Services District fees, Public Facilities
fees, Dublin Unified School District School Impact
fees, Public Works Traffic Impact fees, Alameda
County Fire Services fees, Noise Mitigation fees,
Inclusionary Housing In-Lieu fees, Alameda County
Flood and Water Conservation District (Zone 7)
Drainage and Water Connection fees and any other
fees as noted in the Development Agreement.
PERMITS
106. Developer shall obtain an Encroachment Permit from PW Prior to Standard
the Public Works Department for all construction Start of Condition
2430
Page of
activity within the public right-of-way of any street Work
where the City has accepted the improvements. The
encroachment permit may require surety for slurry
seal and restriping. At the discretion of the City
Engineer an encroachment for work specifically
included in an Improvement Agreement may not be
required.
107. Developer shall obtain a Grading / Sitework Permit PW Prior to Standard
from the Public Works Department for all grading and Start of Work Condition
private site improvements that serves more than one
lot or residential condominium unit.
108. Developer shall obtain all permits required by other PW Prior to Standard
agencies including, but not limited to Alameda Start of Work Condition
County Flood Control and Water Conservation
District Zone 7, California Department of Fish and
Game, Army Corps of Engineers, Regional Water
Quality Control Board, Caltrans and provide copies
of the permits to the Public Works Department.
SUBMITTALS
109. All submittals of plans and Final Maps shall comply PW Prior to Standard
with the requirements of the “City of Dublin Public Approval of Condition
Works Department Improvement Plan Submittal Improvement
Requirements”, and the “City of Dublin Improvement Plans or Final
Plan Review Check List”. Map
110. The Developer will be responsible for submittals and PW Prior to Standard
reviews to obtain the approvals of all participating Approval of Condition
non-City agencies. The Alameda County Fire Improvement
Department and the Dublin San Ramon Services Plans or Final
District shall approve and sign the Improvement Map
Plans.
111. Conditions of Approval. A copy of the Conditions of PW Ongoing Standard
Approval which has been annotated how each Condition
condition is satisfied shall be included with the
submittals to the Public Works Department for the
review of the Final Map and improvements plans. The
notations shall clearly indicate how all Conditions of
Approval will be satisfied and where they are located
on the plans. Submittals will not be accepted without
the annotated conditions.
112. Geotechnical Report. Developer shall submit a PW Prior to Standard
Geotechnical Report, which includes street pavement Approval of Condition
sections and grading recommendations. Improvement
Plans,
Grading
Plans, or Final
Map
113. Electronic File. Developer shall provide the Public PW Prior to Standard
Works Department a digital vectorized file of the Acceptance of Condition
“master” files for the project when the Final Map has Improvements
2530
Page of
been approved. Digital raster copies are not and Release
acceptable. The digital vectorized files shall be in of Bonds
AutoCAD 14 or higher drawing format. Drawing units
shall be decimal with the precision of the Final Map.
All objects and entities in layers shall be colored by
layer and named in English. All submitted drawings
shall use the Global Coordinate System of USA,
California; NAD 83 California State Plane, Zone III,
and U.S. foot.
FINAL MAP
114. The Final Map shall be substantially in accordance PW Prior to Standard
with the Tentative Map approved with this application, Approval of Condition
unless otherwise modified by these conditions. Final Map
Multiple final maps may be filed in phases, provided
that each phase is consistent with the tentative map,
that phasing progresses in an orderly and logical
manner and adequate infrastructure is installed with
each phase to serve that phase as a stand-alone
project that is not dependent upon future phasing for
infrastructure.
115. All rights-of-way and easement dedications required PW Prior to Standard
by the Tentative Map shall be shown on the Final Approval of Condition
Map. Final Map
116. Any phasing of the final mapping or improvements of PW Prior to Standard
a Tentative Map is subject to the approval and Approval of Condition
conditions of the City Engineer. Final Map
117. Street names shall be assigned to each public/private PW Prior to Standard
street pursuant to Municipal Code Chapter 7.08. The Approval of Condition
approved street names shall be indicated on the Final Final Map
Map.
118. The Final Map shall include the street monuments to PW Monuments to Standard
be set in all public streets. be Shown on Condition
Final Map and
Installed Prior
to Acceptance
of
Improvements
EASEMENTS
119. The Developer shall obtain abandonment from all PW Prior to Standard
applicable public agencies and/or private owners of Approval of Condition
existing easements and right-of-ways within the Improvement
development that will no longer be used. Plans or
Appropriate
Final Map
120. The Developer shall acquire easements, and/or PW Prior to Standard
obtain rights-of-entry from the adjacent property Approval of Condition
owners for any improvements on their property. The Improvement
easements and/or rights-of-entry shall be in writing Plans or
and copies furnished to the City Engineer. Appropriate
2630
Page of
Final Map
GRADING
121. The Grading Plan shall be in conformance with the PW Prior to Standard
recommendations of the Geotechnical Report, the Approval of Condition
approved Tentative Map and/or Site Development Grading Plans
Review, and the City design standards & ordinances. or Issuance of
In case of conflict between the soil engineer’s Grading
recommendations and City ordinances, the City Permits, and
Engineer shall determine which shall apply. Ongoing
122. A detailed Erosion Control Plan shall be included with PW Prior to Standard
the Grading Plan approval. The plan shall include Approval of Condition
detailed design, location, and maintenance criteria of Grading Plans
all erosion and sedimentation control measures. or Issuance of
Grading
Permits, and
Ongoing
IMPROVEMENTS
123. The public improvements shall be constructed PW Prior to Standard
generally as shown on the Tentative Map and/or Site Approval of Condition
Development Review. However, the approval of the Improvement
Tentative Map and/or Site Development Review is not Plans or Start
an approval of the specific design of the drainage, of
sanitary sewer, water, and street improvements. Construction,
and Ongoing
124. All public improvements shall conform to the City of PW Prior to Standard
Dublin Standard Plans and design requirements and Approval of Condition
as approved by the City Engineer. Improvement
Plans or Start
of
Construction,
and Ongoing
125. Public streets shall be at a minimum 1% slope with PW Prior to Standard
minimum gutter flow of 0.7% around bump-outs. Approval of Condition
Private streets and alleys shall be at minimum 0.5% Improvement
slope. Plans or Start
of
Construction,
and Ongoing
126. Any decorative pavers/paving installed within City PW Prior to Standard
right-of-way shall be done to the satisfaction of the Approval of Condition
City Engineer. Where decorative paving is installed at Improvement
signalized intersections, pre-formed traffic signal Plans or Start
loops shall be put under the decorative pavement. of
Decorative pavements shall not interfere with the Construction,
placement of traffic control devices, including and Ongoing
pavement markings. All turn lane stripes, stop bars
and crosswalks shall be delineated with concrete
bands or color pavers to the satisfaction of the City
Engineer. Maintenance costs of decorative paving
2730
Page of
shall be the responsibility of the Homeowners
Association
127. The Developer shall install all traffic signs and PW Prior to Standard
pavement marking as required by the City Engineer. Occupancy of Condition
Units or
Acceptance of
Improvements
128. Street light standards and luminaries shall be PW Prior to Standard
designed and installed per approval of the City Occupancy of Condition
Engineer. The maximum voltage drop for streetlights Units or
is 5%. Acceptance of
Improvements
129. Developer shall construct all potable and recycled PW Prior to Standard
water and sanitary sewer facilities required to serve Occupancy of Condition
the project in accordance with DSRSD master plans, Units or
standards, specifications and requirements. Acceptance of
Improvements
130. Fire hydrant locations shall be approved by the PW Prior to Standard
Alameda County Fire Department. A raised reflector Occupancy of Condition
blue traffic marker shall be installed in the street Units or
opposite each hydrant. Acceptance of
Improvements
131. The Developer shall furnish and install street name PW Prior to Standard
signs for the project to the satisfaction of the City Occupancy of Condition
Engineer. Units or
Acceptance of
Improvements
132. Developer shall construct gas, electric, cable TV and PW Prior to Standard
communication improvements within the fronting Occupancy of Condition
streets and as necessary to serve the project and the Units or
future adjacent parcels as approved by the City Acceptance of
Engineer and the various Public Utility agencies. Improvements
133. All electrical, gas, telephone, and Cable TV utilities, PW Prior to Standard
shall be underground in accordance with the City Occupancy of Condition
policies and ordinances. All utilities shall be located Units or
and provided within public utility easements and sized Acceptance of
to meet utility company standards. Improvements
134. All utility vaults, boxes and structures, unless PW Prior to Standard
specifically approved otherwise by the City Engineer, Occupancy of Condition
shall be underground and placed in landscape areas Units or
and screened from public view. Prior to Joint Trench Acceptance of
Plan approval, landscape drawings shall be submitted Improvements
to the City showing the location of all utility vaults,
boxes and structures and adjacent landscape
features and plantings. The Joint Trench Plans shall
be signed by the City Engineer prior to construction of
the joint trench improvements.
CONSTRUCTION
135. The Erosion Control Plan shall be implemented PW Ongoing as Standard
2830
Page of
between October 15th and April 15th unless Needed Condition
otherwise allowed in writing by the City Engineer. The
Developer will be responsible for maintaining erosion
and sediment control measures for one year following
the City’s acceptance of the subdivision
improvements.
136. If archaeological materials are encountered during PW Ongoing as Standard
construction, construction within 100 feet of these Needed Condition
materials shall be halted until a professional
Archaeologist who is certified by the Society of
California Archaeology (SCA) or the Society of
Professional Archaeology (SOPA) has had an
opportunity to evaluate the significance of the find
and suggest appropriate mitigation measures.
137. Construction activities, including the maintenance and PW Ongoing as Standard
warming of equipment, shall be limited to Monday Needed Condition
through Friday, and non-City holidays, between the
hours of 7:30 a.m. and 5:30 p.m. except as otherwise
approved by the City Engineer. Extended hours or
Saturday work will be considered by the City
Engineer on a case-by-case basis.
138. Developer shall prepare a Construction Noise PW Prior to Start Standard
Management Plan that identifies measures to be of Condition
taken to minimize construction noise on surrounding Construction
developed properties. The plan shall include hours of Implementatio
construction operation, use of mufflers on n Ongoing as
construction equipment, speed limit for construction Needed
traffic, haul routes and identify a noise monitor.
Specific noise management measures shall be
provided prior to project construction.
139. Developer shall prepare a plan for construction traffic PW Prior to Start Standard
interface with public traffic on any existing public of Condition
street. Construction traffic and parking may be Construction;
subject to specific requirements by the City Engineer. Implementatio
n Ongoing as
Needed
140. The Developer shall be responsible for controlling any PW Ongoing Standard
rodent, mosquito, or other pest problem due to Condition
construction activities.
141. The Developer shall be responsible for watering or PW Prior to Start Standard
other dust-palliative measures to control dust as of Condition
conditions warrant or as directed by the City Construction;
Engineer. Ongoing as
Needed
142. The Developer shall provide the Public Works PW Prior to Standard
Department with a letter from a registered civil Issuance of Condition
engineer or surveyor stating that the building pads Building
have been graded to within 0.1 feet of the grades Permits or
shown on the approved Grading Plans, and that the Acceptance of
2930
Page of
top & toe of banks and retaining walls are at the Improvements
locations shown on the approved Grading Plans.
NPDES
143. Prior to any clearing or grading, the Developer shall PW Prior to Start Standard
provide the City evidence that a Notice of Intent (NOI) of Any Condition
has been sent to the California State Water Construction
Resources Control Board per the requirements of the Activities
NPDES. A copy of the Storm Water Pollution
Prevention Plan (SWPPP) shall be provided to the
Public Works Department and be kept at the
construction site.
144. The Storm Water Pollution Prevention Plan (SWPPP) PW SWPPP to be Standard
shall identify the Best Management Practices (BMPs) Prepared Prior Condition
appropriate to the project construction activities. The to Approval of
SWPPP shall include the erosion control measures in Improvement
accordance with the regulations outlined in the most Plans;
current version of the ABAG Erosion and Sediment Implementatio
Control Handbook or State Construction Best n Prior to Start
Management Practices Handbook. The Developer is of
responsible for ensuring that all contractors Construction
implement all storm water pollution prevention and Ongoing
measures in the SWPPP. as Needed
PASSED, APPROVED, AND ADOPTED this ____day of _____, 2015 by the following vote:
AYES:
NOES:
ABSENT:
ABSTAIN:
______________________________
Mayor
ATTEST:
______________________________
City Clerk
3030
Page of
RESOLUTION NO. XX - 15
A RESOLUTION OF THE CITY COUNCIL
OF THE CITY OF DUBLIN
ADOPTING A CEQA ADDENDUM AND A RELATED STATEMENT OF OVERRIDING
CONSIDERATIONS FOR THE SCHAEFER RANCH UNIT 3 AND A PORTION OF UNIT 1
PROJECT
PLPA-2012-00013
WHEREAS,
the Applicant, Schaefer Ranch Holdings LLC (Discovery Builders), proposes
to develop 19 develop single family homes and open space on approximately 17.30 acres
known as Schaefer Ranch Unit 3 in the planned community known as Schaefer Ranch. The
proposed development and applications are collectively known as the “Project”; and
WHEREAS,
the application includes a General Plan and Amendment to change the land
use designation on the 17.30 acre site from Estate Residential to 7.04 acres of Single Family
Residential (SFR) and 10.26 acres of Open Space (OS); and
WHEREAS,
the application also includes consistent PD-Planned Development rezoning
with Stage 1 and Stage 2 Development Plan, Site Development Review, and Vesting Tentative
Map 8136; and
WHEREAS,
the Project site is located in the Western Extended Planning Area at
westerly portion of the Schaefer Ranch planned community at the westerly terminus of Dublin
Boulevard, north of Interstate 580 and west of Schaefer Ranch Road; and
WHEREAS,
the Project Site currently is subdivided as Lots 297 thru 302, Parcel R, and
a portion of Parcel “Q” of Tract 6765; and
WHEREAS
, a portion of Unit 1 located at the end of Ridgeline Place was also included
in the Addendum and is currently designated as Open Space; and
WHEREAS,
the California Environmental Quality Act (CEQA), together with the State
guidelines and City environmental regulations, require that certain projects be reviewed for
environmental impacts and that environmental documents be prepared; and
WHEREAS
, development of the Project site was addressed in a 1996 EIR (Schaefer
Ranch Project/General Plan Amendment Environmental Impact Report, State Clearinghouse
No. 95033070, the “Schaefer Ranch EIR” or “1996 EIR”). The 1996 EIR identified significant
unavoidable impacts that could apply to the Project; therefore, any Project approval must
include a Statement of Overriding Considerations. The prior EIR is further described in the draft
City Council resolution attached as Exhibit A and incorporated herein by reference; and
WHEREAS,
based on the proposed Single Family Residential and Open Space land use
designations the proposed Project remains less than the number of units initially analyzed in
the Schaefer Ranch EIR: and
Page 1 of 3
WHEREAS,
the City prepared an Initial Study to determine if additional review of the
proposed Project was required pursuant to CEQA Guidelines section 15162. Based on the
Initial Study, the City prepared an Addendum dated October 2015 describing the project and
finding that the impacts of the proposed Project have been adequately addressed in the prior
EIR. The Addendum and its supporting Initial Study is attached as Exhibit A; and
WHEREAS
, on October 27, 2015, the Planning Commission adopted Resolution 15-13
(incorporated herein by reference) recommending that the City Council not adopt the CEQA
Addendum for the Project; and
WHEREAS
, a Staff Report, dated _______, 2015 and incorporated herein by reference,
described and analyzed the Project and related Addendum for the City Council and
recommended adoption of the CEQA Addendum and approval of the Project; and
WHEREAS
, on _________, 2015 the City Council held a properly noticed public hearing
on the Project, at which time all interested parties had the opportunity to be heard; and
WHEREAS,
the City Council considered the Addendum, as well as the prior EIR and all
above-referenced reports, recommendations, and testimony before taking any action on the
Project.
NOW, THEREFORE BE IT RESOLVED
that the foregoing recitals are true and correct
and made a part of this resolution.
BE IT FURTHER RESOLVED
that theCity Council makes the following findings to
support the determination that no further environmental review is required under CEQA for the
proposed project. These findings are based on information contained in the CEQA Addendum,
the prior EIR, the City Council staff report, and all other information contained in the record
before the City Council. These findings constitute a summary of the information contained in
the entire record. The detailed facts to support the findings are set forth in the CEQA
Addendum and related Initial Study, the prior EIR, and elsewhere in the record. Other facts
and information in the record that support each finding that are not included below are
incorporated herein by reference:
1. The proposed Project does not constitute substantial changes to the previous
projects affecting the Project site as addressed in the prior EIR, that will require major revisions
to the prior documents due to new significant environmental effects or a substantial increase in
severity of previously identified significant effects. Based on the Initial Study, all potentially
significant effects of the proposed Project are the same or less than the impacts for project
which were previously addressed. The proposed Project will not result in substantially more
severe significant impacts than those identified in the prior CEQA documents. All previously
adopted mitigation measures from the Schaefer Ranch EIR continue to apply to the proposed
Project and project site as applicable.
2. The Addendum and its related Initial Study did not identify any new significant
impacts of the proposed Project that were not analyzed in the prior EIR.
2 of 3
3. The City is not aware of any new information of substantial importance or substantial
changes in circumstances that would result in new or substantially more severe impacts or
meet any other standards in CEQA Section 21166 and related CEQA Guidelines Sections
15162/3.
BE IT FURTHER RESOLVED
that the City Council of the City of Dublin finds the
following:
1. No further environmental review under CEQA is required for the proposed Project
because there is no substantial evidence in the record as a whole that any of the standards
under Sections 21166 or 15162/3 are met.
2. The City has properly prepared an Addendum and related Initial Study under
CEQA Guidelines section 15164 to explain its decision not to prepare a subsequent or
Supplemental EIR or conduct further environmental review for the proposed Project.
3. The City Council considered the information in the Addendum and prior EIR
before approving the land use applications for the proposed Project.
BE IT FURTHER RESOLVED
that the City Council of the City of Dublin adopts the
CEQA Addendum and related Initial Study, attached as Exhibit A (and incorporated herein by
reference), pursuant to CEQA Guidelines Sections 15162 and 15164 for the Schaefer ranch
Unit 3 project.
BE IT FURTHER RESOLVED
that the City Council of the City of Dublin adopts the
Statement of Overriding Considerations attached as Exhibit B and incorporated herein by
reference.
PASSED, APPROVED AND ADOPTED
this _______ day of _____________, 2015 by the
following vote:
AYES:
NOES:
ABSENT:
ABSTAIN:
Mayor
ATTEST:
City Clerk
3 of 3
CEQA ADDENDUM FOR SCHAEFER RANCH UNIT 3
October 13, 2015
On July 9, 1996, the Dublin City Council adopted Resolution No. 203 -08, certifying an
Environmental Impact Report for the Schaefer Ranch Project/General Plan Amendment
( "Schaefer Ranch EIR, SCH #95033070). The certified EIR consisted of a Draft EIR and
separate Responses to Comments, both in bound volumes. The Schaefer Ranch EIR evaluated
the potential environmental effects of urbanizing the approximately 500 -acre Schaefer Ranch
with a mixture of residential, commercial, office, parks, public and semi - public and open
space land uses.
This Addendum has been prepared pursuant to CEQA Guidelines Section 15164 for the Unit
3 portion of Schaefer Ranch, as described below.
Project Description and Prior Approvals
The City of Dublin approved development of portions of the approximately 500 -acre Schaefer
Ranch in 1996. The approvals included a General Plan Amendment, prezoning, annexation to
the City, Zone 7 and DSRSD, detachment from the Hayward Area Recreation and Parks
District, vesting tentative subdivision maps and a development agreement.
The Schaefer Ranch is located in the western portion of the City of Dublin and adjacent to the
western City limit of Dublin. More specifically, the Schaefer Ranch is located on the north
side of the I -580 freeway, at the western terminus of Dublin Boulevard and south and east of
current City of Dublin City limits.
Portions of Unit 3 of Schaefer Ranch included in the application are located at the western
terminus of Dublin Boulevard (Subarea 1) and at the western terminus of Ridgeview Place
(Subarea 2). For the 17.28 -acre Subarea 1, the project proposes to resubdivide 11.3 acres
containing 6 estate - residential lots to 19 single - family residential lots within the same
development area.
The current application for Subarea 1 includes an amendment to the Dublin General Plan, a
Planned Development rezoning with related Stage 1 and 2 Development Plan, Site
Development Review and a tentative subdivision map . For Subarea 2, the project proposes to
build a single family dwelling on a 1.14 -acre site. Applications have not yet been submitted;
however, a General Plan amendment, Planned Development rezoning with related Stage 1 and
Stage 2 Development Plan, and Site Development Review would be required for the proposed
development.
Schaefer Ranch Unit 3 Page 2
Addendum EIR -City of Dublin
October 2015
Prior CEQA Analyses and Determinations
Schaefer Ranch EIR. The Schaefer Ranch EIR analyzed the potential effects of future urban
development planned for a then largely undeveloped area west the City of Dublin. Numerous
environmental impacts were identified and numerous mitigations adopted upon approval of
the Schaefer Ranch General Plan General Plan Amendment. For identified impacts that could
not be mitigated to insignificance, the City Council adopted a Statement of Overriding
Considerations. All previously adopted mitigation measures for development of the overall
Schaefer Ranch project that are applicable to the Project and Project site continue to apply to
the currently proposed Project. The Schaefer Ranch EIR is incorporated herein by reference.
Current CEQA Analysis and Determination that an Addendum is Appropriate for this
Project.
Updated Initial Study and Project. The City of Dublin has determined that an Addendum is
the appropriate CEQA review for the proposed Project. Prior to making this determination, the
City reviewed the Schaefer Ranch EIR to determine if any further environmental review is
required for the proposed General Plan Amendment, Planned Development rezoning with
related Stage 1 and Stage 2 Development Plan, Site Development Review and associated
applications for Unit 3 of the Schaefer Ranch.
The Project analyzed in the Initial Study includes re- subdivision of portions of Schaefer
Ranch Tract 6765 to create 13 additional residential lots on Subarea 1 of Unit 3, located
at the western terminus of Dublin Boulevard in the western portion of the Schaefer
Ranch. Dublin Boulevard transitions to Schaefer Ranch, a private street, within the
project area. One other residential lot would also be created at the western terminus of
Ridgeline Place. Land use entitlements include a General Plan Amendment, a Planned
Development rezoning, Site Development Review and Vesting Tentative Tract Maps and
Final Maps for the area located at the terminus of Dublin Boulevard. A future General
Plan Amendment, Planned Development rezoning, Site Development Review and Final
Map would be required for the property located at the western terminus of Ridgeline
Place.
The City prepared an updated Initial Study dated October 13, 2015, attached and incorporated
herein by reference. Through this Initial Study, the City has determined that no subsequent
EIR, or negative declaration is required for this Project.
No Subsequent Review is Required per CEQA Guidelines Section 15162. CEQA
Guidelines Section 15162 identifies the conditions requiring subsequent environmental
review. After a review of these conditions, the City has determined that no subsequent EIR or
negative declaration is required for this Project. This is based on the following analysis:
a) Are there substantial changes to the Project involving new or more severe significant
impacts? As documented in the attached Initial Study, there are no substantial changes to
the Project from that analyzed in the 1996 Schaefer Ranch EIR. A slight increase in the
Schaefer Ranch Unit 3
Addendum EIR -City of Dublin
October 2015
Page 3
number of dwellings are proposed as part of this project, but the total number of dwellings
would be less than the 466 units originally approved for Schaefer Ranch and less than the
474 units analyzed in the 1996 Schaefer Ranch EIR. The Project on the Unit 3 portion of
the Schaefer Ranch would not be a substantial change to the approved Schaefer Ranch
project and no additional or different mitigation measures are required.
This General Plan Amendment would replace the "Estate Residential" and "Open
Space " land use designation with "Single Family Residential" and "Open Space" on
14.7 acres of land at the western terminus of Dublin Boulevard and an "Open Space"
land use designation with "Single Family Residential" on an approximately 1.14 -acre
site at the western terminus of Ridgeline Place.
b) Are there substantial changes in the conditions which the Project is undertaken involving
new or more severe significant impacts? There are no substantial changes in the conditions
assumed in the Schaefer Ranch EIR. This is documented in the attached Initial Study
prepared for this Project dated October 13, 2015.
c) Is there new information of substantial importance, which was not known and could not
have been known at the time of the previous EIR that shows the Project will have a
significant effect not addressed in the previous EIR; or previous effects are more severe;
or, previously infeasible mitigation measures are now feasible but the applicant declined
to adopt them; or mitigation measures considerably different from those in the previous
EIR would substantially reduce significant effects but the applicant declines to adopt
them? There is no new information showing a new or more severe significant effect. As
documented in the attached Initial Study, no new or different mitigation measures are
required. All previously adopted mitigations continue to apply to the Project, except as
noted in the Initial Study.
d) If no subsequent EIR -level review is required, should a subsequent negative declaration
be prepared? No subsequent negative declaration or mitigated negative declaration is
required because there are no impacts, significant or otherwise, of the Project beyond
those identified in the Schaefer Ranch EIR.
Conclusion. This Addendum is adopted pursuant to CEQA Guidelines Section 15164 based
on the attached Initial Study dated October 3, 2015. The Addendum and Initial Study review
the proposed redesignation of land uses and development as discussed above. Through the
adoption of this Addendum and related Initial Study, the City determines that the above minor
changes in land uses do not require a subsequent EIR or negative declaration under CEQA
Guidelines Section 15162. The City further determines that the Schaefer Ranch EIR,
adequately addresses the potential environmental impacts of the proposed Project.
As provided in Section 15164 of the Guidelines, the Addendum need not be circulated for
public review, but shall be considered with the prior certified EIR before making a decision
on this project.
Schaefer Ranch Unit 3
Addendum EIR -City of Dublin
October 2015
Page 4
The Initial Study, Schaefer Ranch EIR and all resolutions cited above are incorporated herein
by reference and are available for public review during normal business hours in the
Community Development Department, Dublin City Hall, 100 Civic Plaza, Dublin CA
SCHAEFER RANCH
UNIT 3
INITIAL STUDY/
CEQA ADDENDUM
Lead Agency:
City of Dublin
Prepared By:
Jerry Haag, Urban Planner
October 2015
Table of Contents
Introduction..................................................................................... ..............................2
Applicant.......................................................................................... ..............................2
Project Location and Context ........................................................ ..............................2
ProjectDescription .......................................................................... ..............................3
Environmental Factors Potentially Affected ................................ .............................15
Evaluation of Environmental Impacts ..........................................
.............................17
EarlierAnalysis ................................................................................
.............................29
Attachment to Initial Study ............................................................
.............................31
1. Aesthetics ..................................................................
.............................31
2. Agricultural Resources ............................................ .............................33
3. Air Quality ................................................................
.............................34
4. Biological Resources ................................................ .............................37
5. Cultural Resources ...................................................
.............................39
6. Geology and Soils ....................................................
.............................40
7. Greenhouse Gas Emissions ..................................... .............................43
8. Hazards and Hazardous Materials ....................... .............................43
9. Hydrology and Water Quality ............................... .............................45
10. Land Use and Planning ........................................... .............................49
11. Mineral Resources .................................................... .............................49
12. Noise .......................................................................... .............................50
13. Population and Housing ......................................... .............................52
14. Public Services .......................................................... .............................53
15. Recreation .................................................................. .............................57
16. Transportation/ Traffic ............................................ .............................58
17. Utilities and Service Systems ..................................
.............................62
18. Mandatory Findings of Significance
..................... .............................64
InitialStudy Preparers .................................................................... .............................65
Agencies and Organizations Consulted ....................................... .............................65
References......................................................................................... .............................65
Introduction
This Initial Study has been prepared in accord with the provisions of the California
Environmental Quality Act (CEQA), CEQA Guidelines, and City of Dublin
Environmental Guidelines. The Initial Study assesses the potential environmental
impacts of implementing the proposed project described below.
The Initial Study consists of a completed environmental checklist and a brief
explanation of the environmental topics addressed in the checklist. The proposed
project is a modification of a project already approved by the City -the Schaefer Ranch
project. The impacts of the Schaefer Ranch project were analyzed in an environmental
impact report that was certified by the City in 1996 (Schaefer Ranch Project/ General
Plan Amendment Environmental Impact Report, State Clearinghouse No. 95033070 (the
"Schaefer Ranch EIR" or "1996 EIR ").
For the potentially significant impacts identified in the Schaefer Ranch EIR that apply to
the proposed project, the adopted mitigation measures also apply and are incorporated
into this Initial Study by reference.
Applicant
Schaefer Ranch Holdings, LLC
4061 Port Chicago Highway, Suite H
Concord CA 94520
Attn: Doug Chen, RCE, LS
(925)803-2617
Project Location and Context
The project analyzed in this document is a portion of the larger Schaefer Ranch
development project, identified as Unit 3 of Schaefer Ranch. The overall Schaefer Ranch
development contains approximately 500 acres of land located in the western portion of
the City of Dublin and adjacent to the western boundary of the City Dublin. More
specifically, Schaefer Ranch is located on the north side of the I -580 freeway, at the
western terminus of Dublin Boulevard.
Exhibit 1 depicts the regional setting of Dublin. Exhibit 2 shows the location of the
Schaefer Ranch in context with the City of Dublin and the nearby I -580 freeway.
This Initial Study analyzes proposed land use changes that would affect two small sites
comprising Schaefer Ranch Unit 3. One portion of the project (Subarea 1) is 17.30 acres
of land along Schaefer Way, located west of the current cul -de -sc terminus of Dublin
Boulevard. A second portion of the project (Subarea 2) involves a 1.14 -acre parcel of
land located at the western cul -de -sac terminus of Ridgeline Place. For the purposes of
this Initial Study, these two Subareas are identified as the "project" or the "project site."
The two component areas of the project site are shown on Exhibit 3. This exhibit
identifies Subareas 1 and 2, described more fully below.
City of Dublin Page 2
Initial Study /Schaefer Ranch Unit 3 October 2015
Existing land uses adjacent to the overall Schaefer Ranch include vacant lands to the
north and west (within the unincorporated portion of Alameda County), vacant lands
and residential uses to the east and the I -580 freeway to the south. Properties south of I-
580 include the Rowell Ranch rodeo and equestrian facility and vacant lands within the
unincorporated portion of Alameda County.
Project Description
Background. The Schaefer Ranch General Plan Amendment and prezoning was
approved by the City of Dublin in 1996. Subsequently, the Ranch was annexed into the
City of Dublin and Dublin San Ramon Services District. A vesting tentative subdivision
map for the entire Schaefer Ranch property and a development agreement were
approved by the City of Dublin in 1998.
1996 Project EIR. An Environmental Impact Report (EIR) was certified by the City of
Dublin in 1996 for the whole of the proposed Schaefer Ranch development. The project
analyzed in the 1996 Schaefer Ranch EIR included the following land uses and related
features:
• A total of 474 residences, including a mix of estate residences, singe family
detached dwellings and attached residential dwellings;
• Retail and office uses, including a 9.2 -acre neighborhood- serving retail and office
center on the corner of Dublin Boulevard and Schaefer Ranch Road and a second,
smaller 1.5 -acre retail and office parcel adjacent to I -580;
• Public and semi- public uses including a recycled water reservoir, a water
storage tank and street rights -of -way;
• Parks and recreation uses consisting of approximately 162 acres of land that
includes dedication to the East Bay Regional Park District trail, trail head
facilities and related improvements. A private homeowners' association
recreation facility was also approved; and
• Approximately 89 acres of the Schaefer Ranch devoted to other non - buildable
open spaces, including but not limited to wildlife habitat areas, drainage
retention areas and a reconstructed creek corridor.
Primary access is provided by the westerly extension of Dublin Boulevard and the
construction of Schaefer Ranch Road, a north south arterial roadway that crosses under
the I -580 freeway to connect to Dublin Canyon Road south of the freeway.
A Vesting Tentative Subdivision Map (Tract 6765) was subsequently approved by the
City of Dublin for 466 total lots on the Schaefer Ranch. The original approval also
included extensive grading and re- contouring of the site and extension of utilities and
services to support proposed uses.
Significant portions of the Schaefer Ranch development have since been constructed. To
date, the project developer has re- graded the Schaefer Ranch property, re- subdivided
portions of the overall property into 302 lots and, extended Dublin Boulevard,
constructed Schaefer Ranch Road, dedicated trails to the East Bay Regional Park
City of Dublin Page 3
Initial Study /Schaefer Ranch Unit 3 October 2015
District, constructed a water storage tank and stormwater retention basins and
completed major water and sewer lines.
2008 EIR Addendum. In 2008, the City approved an Addendum to the 1996 EIR for
properties in Unit 2 of the Schaefer Ranch that included a General Plan Amendment, a
vesting tentative subdivision map, a Planned Development rezoning with a Stage 2
Development Plan and a Development Agreement to delete the approved
approximately 5.69 -acre retail commercial site on the southwest corner of Dublin
Boulevard and Schaefer Ranch Road, 12 estate lots and 24 single - family lots on the
south side of Dublin Boulevard and generally west of the retail commercial site. These
uses were replaced with up to 140 single - family detached lots.
The 2008 Addendum was approved by Dublin City Council Resolution No. 203 -08,
approved on November 4, 2008. The 2008 Addendum did not affect current or proposed
land uses on the project site.
Current development application. The proposed project includes two separate
properties on the Schaefer Ranch property. These are identified as Subareas 1 and 2 on
Exhibit 3.
a) Subarea 1. The first portion of the project would include re- subdivision of
portions of six (6) existing Estate Residential lots on 7.04 acres of the 17.30 acres
of land located along the north and south sides of Schaefer Way at the western
terminus of Dublin Boulevard. The Vesting Tentative Subdivision Map is known
as VTM 8136. Approval of the proposed project would result in the creation of
nineteen (19) single - family residential lots (a net gain of 13 lots). Proposed lots
would range in size from approximately 7007 gross square feet to approximately
28,644 gross square feet. One primary dwelling unit would be allowed per
residential lot. Exhibit 4 shows the proposed Vesting Tentative Subdivision Map.
b) Subarea 2. A second part of the project would include creation of a new 1.14 -acre
residential lot at the terminus of Ridgeline Place and construction of a single -
family dwelling on the lot (see Exhibit 5). Approval of a dwelling on this site
would require approval of a General Plan Amendment, a Planned Development
rezoning, a Site Development Permit and recordation of a Final Subdivision Map
to create this lot.
The required actions to approve the proposed project would include amending the
Dublin General Plan and approval of a Planned Development rezoning with related
Stage 1 and Stage 2 Development Plan for Subarea 1. Additionally, new Tentative
Subdivision Maps would be needed for Subarea 1. Future approvals of a General Plan
Amendment, a Planned Development rezone, a Site Development Review Permit and
other actions would be required to allow construction of a dwelling on Subarea 2.
If approved, the build -out number of lots on the entire Schaefer Ranch would increase
by a total of 14 lots, which includes proposed development on Subareas 1 and 2. The
total unit count would increase to 420 dwellings which is less than originally approved
and fewer dwellings analyzed in the 1996 EIR, which was 474 residential lots and 10.7
City of Dublin Page 4
Initial Study /Schaefer Ranch Unit 3 October 2015
acres (gross) of commercial uses. The commercial use designation has been since
deleted.
Access and Circulation. No changes are proposed to the currently approved and
constructed roadway system. Both Schaefer Way (a private road) and Ridgeline Place (a
public road) are built and operational.
As part of this application, the applicant is requesting relief from the provisions of
Mitigation Measure 4.G.1 that require fair share payment towards a future traffic signal
(EIR pp. 4 -15, 4 -22). The traffic signal requirement was based on projected signal
warrants for near term and cumulative 2010 build -out traffic; however, circumstances
have changed since the prior EIR in that build -out traffic levels do not meet signal
warrants. By email dated October 16, 2014, the County Public Works Agency stated the
developer no longer needs to make the fair share payment so long as the developer
installed certain improvements, which the developer has agreed to do. Based on the
changed circumstances in which a traffic signal is no longer warranted for cumulative
traffic, deletion of the fair share payment obligation would not result in new or more
severe significant impacts at the intersection beyond those identified in the 1996 EIR.
Grading. All Subareas have been mass graded pursuant to a grading permit issued by
the City of Dublin. Additional minor grading may be needed in order to create future
house pads, access roads and easements. Trenching and excavation would also be
required for underground utilities.
Infrastructure. As identified in the Schaefer Ranch EIR, the project developer would
provide a range of underground utilities to serve the proposed dwellings, including
potable, wastewater, telecommunication, natural gas and electrical service. These
facilities have been provided.
Requested land use approvals. As described above, a number of land use entitlements
and approvals are required by the City of Dublin to construct land uses proposed as
part of this project. Applications for development of Subarea 1 have been submitted;
applications for development of Subarea 2 would be submitted in the future, but the
proposed development is assumed for purposes of this Initial Study. These
entitlements and approvals are described in more detail below.
General Plan Amendment: Existing General Plan land use designations on Subarea 1
have been requested to change from "Estate Residential" and "Open Space" to a
combination of "Single Family Residential" and "Open Space." The General Plan is
also proposed to be changed in the future from "Open Space" to "Single Family
Residential" for Subarea 2. Exhibit 6 shows existing and proposed General Plan land
use designations for these subareas.
Planned Development Rezoning with related Stage 1 and Stage 2 Development Plan. A
Stage 1 and 2 Rezoning and Development Plan is proposed for Subarea 1. A future
Planned Development rezoning would be required for Subarea 2
City of Dublin Page 5
Initial Study /Schaefer Ranch Unit 3 October 2015
Site Development Review. An application for a Site Development Review permit has
been filed for Subarea 1 to approve building architecture, materials, colors,
landscaping, fencing and other design issues. Site Development Review approval is
also required for the proposed future dwelling on Subarea 2.
Tentative subdivision maps. Subdivision maps must be approved by the City of Dublin
to create individual building lots on the two project areas.
City of Dublin Page 6
Initial Study /Schaefer Ranch Unit 3 October 2015
CITY OF DUBLIN
SCHAEFER RANCH PROJECT
CEQA ADDENDUM
Exhibit 1
REGIONAL LOCATION
0 2 4 6 8 10 miles
SAN PA B L 0
B A Y
4
Martinez
4
San
80
Concord
�0
Rafael
Richmond
Mill 101
580
Valley
Walnut
24
Creek
Berkeley
O
680
Oakland
San Francisco
580
�yd�eaa
S A N
San
Leandro
-10
DUBLIN
FRANCISCO
880
Daly
seo
City
Livermore
BAY
n
101
Pleasanton
Hayward
92
280
San Mateo
Fremont
f1
84
1
Newark
0
Redwood
City
Half
84
d
Moon
Bay
Palo
(�
Alto
880
if
J
85 101
680
280
Sunnyvale
Santa Clara
San
Jose
101
17
CITY OF DUBLIN
SCHAEFER RANCH PROJECT
CEQA ADDENDUM
Exhibit 1
REGIONAL LOCATION
0 2 4 6 8 10 miles
U
W
O
cc
IL
x
U
Z Z
J Q m
mxo
0w W
LL LL O
O Q °a
x
5) in
I
E
Fallon Rd.
Z
Z
a
w
J
N cc
E
a
a
C LWL
O
I
a
W W
W
a
Ii,4
o,
W
I
cn
assajara Rd.
0
O
a
°�
eg
i aaa
a
QQ�
Q
Hacienda Dr.
w
J
W
Arnold Rd.
U
U
"
O
U_
¢
~
.
W
W 2
owl
i LL¢2
c..�
y
U
y
LU
i
•
a
`
I
Dougherty
Rd.
yya
cY t4
O
�
Q
C
D7
Z
�
Q
rn
U-
0
SanFamonRd
}yw
U
`
f
1
/
GOY
G�P��EO
I
t O
�� o
U
W
O
cc
IL
x
U
Z Z
J Q m
mxo
0w W
LL LL O
O Q °a
x
5) in
E
Z
Z
a
w
J
N cc
E
a
C LWL
O
I
a
W W
W
W
I
cn
0
U
W
O
cc
IL
x
U
Z Z
J Q m
mxo
0w W
LL LL O
O Q °a
x
5) in
� r
✓ �;,
ILI
ca
a EE-v
LO
/ l e• i
c
5s •
cn
a
w
a
M m
t N
w U
w
D
IL
r
U
W
O
ir
a
s
z
J a �
m � O
O W w
LL LL D
O w a
a
s
Uu v
g
V) III
�§
w
Oo
ggg s
- N N • d d w d N tl � N .1 � A d ^ - � g
U
�
,
�
tyyG
4 F
- ...– .._ -...—
ii
_ x
U
o
?•oo U• 5
1554�a ,L
5
'k. Irby
0
csu i
\
J •:
g
V) III
�§
w
Oo
ggg s
- N N • d d w d N tl � N .1 � A d ^ - � g
an ,mob e i i
.r
I
b.
t ` �
J
R
N
Ci
C
Ci
O
h
Q
O
U
O
W
Q
T
Z
UJ
a�
Z N
.Q F
IL
w >
a F-
LU
U Q
CL F-
CL F-
cc
a
U
w
O
cc
a
CO Z
X =
0 W
W
LL W O
Oaa
U N v
U
�
,
�
tyyG
4 F
Z
F
N
O
'k. Irby
csu i
\
J •:
I4. k_,.
• ��
I
1
I W w
r
.I
I JAI I, I�
o�� trty
�,t W I_• C
qb, I ,.
t
1
'-
��
f�
�
�U
\'.•'�
V it 4•'..
CT m� 2 �
X11
ji
a
`l
an ,mob e i i
.r
I
b.
t ` �
J
R
N
Ci
C
Ci
O
h
Q
O
U
O
W
Q
T
Z
UJ
a�
Z N
.Q F
IL
w >
a F-
LU
U Q
CL F-
CL F-
cc
a
U
w
O
cc
a
CO Z
X =
0 W
W
LL W O
Oaa
U N v
U
�
,
�
tyyG
4 F
'k. Irby
csu i
\
an ,mob e i i
.r
I
b.
t ` �
J
R
N
Ci
C
Ci
O
h
Q
O
U
O
W
Q
T
Z
UJ
a�
Z N
.Q F
IL
w >
a F-
LU
U Q
CL F-
CL F-
cc
a
U
w
O
cc
a
CO Z
X =
0 W
W
LL W O
Oaa
U N v
0),
098
w
'zi
cl
LEGEND:. LOT 70
NEW LOT 70
.71
NEW LOT 70—A
N F"f
SOURCE Isakson & Assoc. Inc., 8-1-2012.
CITY OF DUBLIN
SCHAEFER RANCH PROJECT
CEQA ADDENDUM
Exhibit 5
PROPOSED FINAL MAP
(Subarea 2)
d �
a
L�
a LT �J
O 0 Q�iA�di
I
w O
d
U 4
�Oe
F�
ZN
Q Z
a0
Z
w w C�
Z U
x Ox 0
W j3 W
w cn
Cf)�
CL z
OZ
m J
CL
H
U
w
0
a
z
CO x
0 w w
LL LL ❑
0 W a
U cn v
1. Project description: Resubdivision of portions of Schaefer Ranch Tract
6765 to create 13 additional residential lots on Subarea
1 of Unit 3. One other residential lot would also be
created (Subarea 2). Land use entitlements applicable
to Subarea 1 include a General Plan Amendment, a
Planned Development rezoning, Site Development
Review and Vesting Tentative Tract Maps and Final
Maps. A future General Plan Amendment, Planned
Development rezoning, Site Development Review
and Final Map would be required for Subarea 2.
2. Lead agency: City of Dublin
Community Development Department
100 Civic Plaza
Dublin CA 94568
3. Contact person:
Michael Porto
Consulting Planner
(925) 833 6610
4. Project locations: Subarea 1: Along Schaefer Way, west of the cul -de -sac
terminus of Dublin Boulevard; Subarea 2: terminus of
Ridgeline Place
5. Project sponsor: Schaefer Ranch Holdings, LLC, attn: Doug Chen
6. General Plan designations: Existing: Estate Residential (0.01 -0.8 du. / ac.) & Open
Space (Subarea 1 only)
Open Space (Subareas 2)
Proposed, Single Family Residential (0.9 -6.0 du./ac.) &
Open Space (Subarea 1)
Single Family Residential (0.9 -6.0 du. / ac.) (Subarea 2)
7. Zoning: Existing: PD- Planned Development- Estate Residential
& Open Space (Subarea 1); PD -Open Space (Subarea
2)
Proposed: PD- Planned Development
8. Public agency required approvals:
• Approval of Amendment to the General Plan (City of Dublin)
• Approval of PD- Planned Development rezoning with related Stage 1
& Stage 2 Development Plan (City of Dublin)
• Approval of Site Development Review (City of Dublin)
• Approval of Tentative and Final Subdivision Maps (City of Dublin)
• Approval of water and sewer connections (DSRSD)
• Approval of building permits (City of Dublin)
City of Dublin Page 13
Initial Study /Schaefer Ranch Unit 3 October 2015
Approval of a Grading Permit (City of Dublin)
City of Dublin Page 14
Initial Study /Schaefer Ranch Unit 3 October 2015
Environmental Factors Potentially Affected
The environmental factors checked below would be potentially affected by this Project,
involving at least one impact that is a "potentially significant impact" as indicated by the
checklist on the following pages.
-
Aesthetics
-
Agricultural
-
Air Quality/
Resources
Greenhouse Gas
Emissions
-
Biological
-
Cultural Resources
-
Geology /Soils
Resources
-
Hazards and
-
Hydrology/ Water
-
Land Use/
Hazardous
Quality
Planning
Materials
-
Mineral Resources
-
Noise
-
Population/
Housing
-
Public Services
-
Recreation
-
Transportation/
Circulation
-
Utilities / Service
-
Mandatory
Systems
Findings of
Significance
Determination (to be completed by Lead Agency):
On the basis of this initial evaluation:
I find that the proposed Project could not have a significant effect on the
environment and a Negative Declaration will be prepared.
_ I find that the proposed Project could not have a significant effect on the
environment and a Addendum will be prepared.
_ I find that although the proposed Project could have a significant effect on the
environment, there will not be a significant effect in this case because the mitigation
measures described on an attached sheet have been added to the Project. A Negative
Declaration will be prepared.
_I find that although the proposed Project may have a potentially significant effect, or
a potentially significant effect unless mitigated, on the environment, but at least one
effect: 1) has been adequately analyzed in an earlier document pursuant to applicable
legal standards; and 2) has been addressed by mitigation measures based on the earlier
analysis as described on the attached sheets. A focused Supplemental Environmental
Impact Report is required, but it must only analyze the effects that remain to be
addressed.
X I find that although the proposed Project could have a significant effect on the
environment, there will not be a significant effect in this case because all potentially
significant effects: a) have been analyzed adequately in an earlier EIR pursuant to
City of Dublin Page 15
Initial Study /Schaefer Ranch Unit 3 October 2015
applicable standards; and (b) have been avoided or mitigated pursuant to that earlier
EIR, including revisions or mitigation measures that are imposed on the proposed
Project. An Addendum to the 1996 Schaefer Ranch Environmental Impact Report will
be prepared.
Signature: ��'% Date:
Printed Name: Ldk a For:
y
City of Dublin Page 16
Initial Study /Schaefer Ranch Unit 3 October 2015
Evaluation of Environmental Impacts
1) A brief explanation is required for all answers except "no impact" answers that are
adequately supported by the information sources a lead agency cites in the
parenthesis following each question. A "no impact" answer is adequately
supported if the referenced information sources show that the impact simply does
not apply to projects like the one involved (e.g. the project falls outside a fault
rupture zone). A "no impact" answer should be explained where it is based on
project- specific factors as well as general factors (e.g. the project will not expose
sensitive receptors to pollutants, based on a project- specific screening analysis).
2) All answers must take account of the whole action involved, including off -site as
well as on -site, cumulative as well as project - level, indirect as well as direct, and
construction as well as operational impacts.
3) Once the lead agency has determined that a particular physical impact may occur,
then the checklist answers must indicate whether the impact is potentially
significant, less- than - significant with mitigation, or less- than - significant.
"Potentially Significant Impact" is appropriate if there is substantial evidence that
an effect may be significant. If there are one or more "Potentially Significant
Impact" entries when the determination is made, an EIR is required.
4) "Negative Declaration: Less - than - Significant With Mitigation Incorporated"
applies where the incorporation of mitigation measures has reduced an effect from
"Potentially Significant Impact" to a "Less- than - Significant Impact." The lead
agency must describe the mitigation measures and briefly explain how they reduce
the effect to a less- than - significant level (mitigation measures from Section 17,
"Earlier Analysis," as described in (5) below, may be cross - referenced).
5) Earlier analyses may be used where, pursuant to the tiering, program EIR, or other
CEQA process, an effect has been adequately analyzed in an earlier EIR or
negative declaration. Section 15063 (c) (3) (D). In this case, a brief discussion
should identify the following:
a) Earlier Analysis Used. Identity and state where they are available for
review.
b) Impacts Adequately Addressed: Identify which effects from the above
checklist were within the scope of and adequately analyzed in an earlier
document pursuant to applicable legal standards, and state whether such
effects were addressed by mitigation measures based on the earlier
analysis.
c) Mitigation Measures. For effects that are "No New Impact," describe the
mitigation measures which were incorporated or refined from the earlier
document and the extent to which they address site - specific conditions for
the project.
City of Dublin Page 17
Initial Study /Schaefer Ranch Unit 3 October 2015
6) Lead Agencies are encouraged to incorporate into the checklist references to
information sources for potential impacts (e.g. general plans, zoning ordinances,
etc.). Reference to a previously prepared or outside document should, where
appropriate, include a reference to the page or pages where the statement is
substantiated.
7) Supporting Information Sources: A source list should be attached and other
sources used or individuals contacted should be cited in the discussion.
8) This is a suggested form and lead agencies are free to use different formats;
however, lead agencies should normally address the questions from this checklist
that are relevant to a project's environmental effects in whatever format is selected.
9) The explanation of each agency should identify the significance criteria or
threshold, if any, used to evaluate each question and the mitigation measures
identified, if any, to reduce the impact to a less than significant level.
City of Dublin Page 18
Initial Study /Schaefer Ranch Unit 3 October 2015
Environmental Impacts (Note: Source of determination listed in parenthesis. See listing of
sources at end of checklist used to determine each potential impact).
Note: A full discussion of each item is found
following the checklist.
Aesthetics. Would the project:
a) Have a substantial adverse impact on a scenic
vista?
b) Substantially damage scenic resources,
including but not limited to trees, rock
outcroppings and historic buildings within a
state scenic highway? (Source: 1, 3)
c) Substantially degrade the existing visual
character or quality of the site and its
surroundings? (Source: 3)
d) Create a new source of substantial light or
glare, which would adversely affect day o
nighttime views in the area? (Source: 3)
2. Agricultural Resources. Would the project:
a) Convert Prime Farmland, Unique Farmland or
Farmland of Statewide Importance, as show
on the maps prepared pursuant to the
Farmland Mapping and Monitoring Program
of the California Resources Agency, to a
non - agricultural use? (Source: 1, 3)
b) Conflict with existing zoning for agriculture
use or a Williamson Act contract? (1)
c) Conflict with existing zoning for, or cause
rezoning of forestland (as defined by PRC
Sec. 12220(g), timberland (as defined in
PRC Sec. 4526), or timberland zoned
Timberland Production (as defined in PRC
Sec. 51104 (g)? (Source: 1, 3)
d) Result in the loss of forest land or conversion
of forest land to non - forest use? (1, 3)
e) Involve other changes in the existing
environment that, due to their location or
nature, could result in conversion of
farmland to a non - agricultural use or
conversion of forestland to a non - forest
use? (Source: 1, 3)
City of Dublin
Initial Study /Schaefer Ranch Unit 3
Potentially
Significant
Impact
Less Than
Significant
With
Mitigation
Less than
Significant
Impact
No Impact/
No New
Impact
X
X
X
X
X
X
X
X
X
Page 19
October 2015
3. Air Quality (Where available, the significance
criteria established by the applicable air
quality management district may be relied
on to make the following determinations).
Would the project:
a) Conflict with or obstruct implementation of
the applicable air quality plan? (Source: 1, 5)
b) Violate any air quality standard or contribute
substantially to an existing or projected air
quality violation? (Source: 1, 4)
c) Result in a cumulatively considerable net
increase of any criteria pollutant for which
the project region is non - attainment under an
applicable federal or state ambient air
quality standard (including releasing
emissions which exceed quantitative
thresholds for ozone precursors? (1, 4)
d) Expose sensitive receptors to substantial
pollutant concentrations? (3)
e) Create objectionable odors affecting a
substantial number of people? (3)
4. Biological Resources. Would the project
a) Have a substantial adverse effect, either
directly through habitat modifications, on
any species identified as a candidate,
sensitive or special status species in local or
regional plans, policies or regulations, or by
the California Department of Fish and Game
or the U.S. Fish and Wildlife Service? (1,3)
b) Have a substantial adverse effect on any
riparian habitat or other sensitive natural
community identified in local or regional
plans, policies or regulations or by the
California Department of Fish and Game or
the U.S. Fish and Wildlife Service? (1, 3)
c) Have a substantial adverse impact on
federally protected wetlands as defined by
Section 404 of the Clean Water Act
(including but not limited to marsh, vernal
pool, coastal, etc.) through direct removal,
filling, hydrological interruption or other
means? (1, 2, 3)
City of Dublin
Initial Study /Schaefer Ranch Unit 3
Potentially
Significant
Impact
Less Than
Significant
With
Mitigation
Less than
Significant
Impact
No Impact/
No New
Impact
X
X
X
X
X
X
X
X
Page 20
October 2015
d) Interfere substantially with the movement of
any native resident or migratory fish or
wildlife species or with established native
resident or migratory wildlife corridors or
impede the use of native wildlife nursery
sites? (3)
e) Conflict with any local policies or ordinances
protecting biological resources, such as a
tree preservation policy or ordinance? (4)
f) Conflict with the provision of an adopted
Habitat Conservation Plan, Natural
Community Conservation Plan or other
approved local, regional or state habitat
conservation plan? (Source: 4)
5. Cultural Resources. Would the project
a) Cause a substantial adverse impact in the
significance of a historical resource as
defined in Sec. 15064.5? (Source: 1)
b) Cause a substantial adverse change in the
significance of an archeological resource
pursuant to Sec. 15064.5? (Source: 1)
c) Directly or indirectly destroy a unique
paleontological resource or unique geologic
feature? (Source: 1)
d) Disturb any human remains, including those
interred outside of a formal cemetery? (1)
6. Geology and Soils. Would the project
a) Expose people or structures to potential
substantial adverse effects, including the risk
of loss, injury, or death involving:
i) Rupture of a known earthquake fault, as
delineated on the most recent Alquist - Priolo
Fault Zoning Map issued by the State
Geologist or based on other known evidence
of a known fault? (Source: 1, 4)
ii) Strong seismic ground shaking? (1, 4)
iii) Seismic - related ground failure, including
liquefaction? (Source: 1, 4)
iv) Landslides? (Source: 1, 4)
b) Result in substantial soil erosion or the loss of
topsoil? (Source: 1, 4)
City of Dublin
Initial Study /Schaefer Ranch Unit 3
Page 21
October 2015
Potentially
Significant
Impact
Less Than
Significant
With
Mitigation
Less than
Significant
Impact
No Impact/
No New
Impact
X
X
X
X
X
X
X
X
X
X
X
X
Page 21
October 2015
c) Be located on a geologic unit or soil that is
unstable, or that would become unstable as a
result of the project and potentially result in
on- and off -site landslide, lateral spreading,
subsidence, liquefaction or collapse? (4)
d) Be located on expansive soil, as defined in
Table 18 -1 -B of the Uniform Building Code
(1994), creating substantial risks to life or
property? (Source: 4)
e) Have soils capable of adequately supporting
the use of septic tanks or alternative
wastewater disposal systems where sewers
are not available for wastewater disposal?
(4)
7. Greenhouse Gas Emissions. Would the
project:
a) Generate greenhouse gas emissions, either
directly or indirectly, that may have a
significant impact on the environment? (4)
b) Conflict with an applicable plan, policy or
regulation adopted for the purpose of
reducing the emissions of greenhouse gases?
8. Hazards and Hazardous Materials. Would
the project:
a) Create a significant hazard to the public or the
environment through the routine transport,
use or disposal of hazardous materials? (1,
3)
b) Create a significant hazard to the public or the
environment through reasonably foreseeable
upset and accident conditions involving the
release of hazardous into the environment?
(3)
c) Emit hazardous emissions or handle
hazardous materials, substances, or waste
within one - quarter mile of an existing or
proposed school? (Source: 1, 3)
Potentially
Significant
Impact
Less Than
Significant
With
Mitigation
Less than
Significant
Impact
No Impact/
No New
Impact
X
X
X
X
X
X
X
X
City of Dublin Page 22
Initial Study /Schaefer Ranch Unit 3 October 2015
d) Be located on a site which is included on a
list of hazardous materials sites complied
pursuant to Government Code Sec. 65962.5
and, as a result, would it create a significant
hazard to the public or the environment? (4)
e) For a project located within an airport land
use plan or, where such plan has not been
adopted, within 2 miles of a public airport or
public use airport, would the project result in
a safety hazard for people residing or
working in the project area? (Source: 4)
f) For a project within the vicinity of private
airstrip, would the project result in a safety
hazard for people residing or working in the
project area? (Source: 4)
g) Impair implementation of or physically
interfere with the adopted emergency
response plan or emergency evacuation
plan? (Source: 1, 4)
h) Expose people or structures to a significant
risk of loss, injury or death involving
wildland fires, including where wildlands
are adjacent to urbanized areas or where
residences are intermixed with wildlands?
(2,3)
9. Hydrology and Water Quality. Would the
project:
a) Violate any water quality standards or waste
discharge requirements? (Source: 1, 2)
b) Substantially deplete groundwater supplies or
interfere substantially with groundwater
recharge such that there would be a net
deficit in aquifer volume or a lowering of the
local groundwater table level (e.g. the
production rate of existing nearby wells
would drop to a level which would not
support existing land uses or planned uses
for which permits have been granted)?
(Source: 1, 2)
City of Dublin
Initial Study /Schaefer Ranch Unit 3
Potentially
Significant
Impact
Less Than
Significant
With
Mitigation
Less than
Significant
Impact
No Impact/
No New
Impact
X
X
X
X
X
X
X
Page 23
October 2015
c) Substantially alter the existing drainage
pattern of the site or area, including through
the alteration of the course of a stream or
river, in a manner which would result in
substantial erosion or siltation on- or off -
site? (Source: 1, 2)
d) Substantially alter the existing drainage
pattern of the site or areas, including through
the alteration of a course or stream or river,
or substantially increase the rate or amount
of surface runoff in a manner which would
result in flooding on- or off -site? (Source: 1,
2)
e) Create or contribute runoff water which
would exceed the capacity of existing or
planned stormwater drainage systems or
provide substantial additional sources of
polluted runoff? (Source: 1, 2)
f) Otherwise substantially degrade water
quality? (Source: 1, 2)
g) Place housing within a 100 -year flood hazard
area as mapped on a Flood Hazard Boundary
or Flood Insurance Rate Map or other flood
delineation map? (Source: 1,4)
h) Place within a 100 -year flood hazard area
structures which impede or redirect flood
flows? (Source: 1, 4)
i) Expose people or structures to a significant
risk of loss, injury, and death involving
flooding, including flooding as a result of
the failure of a levee or dam? (Source: 1, 2)
j) Inundation by seiche, tsunami or mudflow?
10. Land Use and Planning. Would the project:
a) Physically divide an established community?
(Source: 1, 3)
Potentially
Significant
Impact
Less Than
Significant
With
Mitigation
Less than
Significant
Impact
No Impact/
No New
Impact
X
X
X
X
X
X
X
X
X
City of Dublin Page 24
Initial Study /Schaefer Ranch Unit 3 October 2015
b) Conflict with any applicable land use plan,
policy, or regulation of an agency with
jurisdiction over the project (including but
not limited to the general plan, specific plan,
or zoning ordinance) adopted for the purpose
of avoiding or mitigating an environmental
effect? (Source: 1, 2, 4)
c) Conflict with any applicable habitat
conservation plan or natural community
conservation plan? (Source: 1, 2,4)
11. Mineral Resources. Would the project
a) Result in the loss of availability of a known
mineral resource that would be of value to
the region and the residents of the state? (1)
b) Result in the loss of availability of a locally
important mineral resource recovery site
delineated on a local general plan, specific
plan or other land use plan? (Source: 1)
12. Noise. Would the proposal result in:
a) Exposure of persons to or generation of noise
levels in excess of standards established in
the general plan or noise ordinance, or
applicable standards of other agencies? (1,3)
b) Exposure of persons or to generation of
excessive groundborne vibration or
groundborne noise levels? (Source: 1,3)
c) A substantial permanent increase in ambient
noise levels in the project vicinity above
existing levels without the project? (1)
d) A substantial temporary or periodic increase
in ambient noise levels in the project vicinity
above levels without the project? (1)
e) For a project located within an airport land
use plan or, where such a plan has not been
adopted, within two miles of a public airport
or public use airport, would the project
expose people residing or working n the
project area to excessive noise levels? (4)
City of Dublin
Initial Study /Schaefer Ranch Unit 3
Potentially
Significant
Impact
Less Than
Significant
With
Mitigation
Less than
Significant
Impact
No Impact/
No New
Impact
X
X
X
X
X
X
X
X
X
Page 25
October 2015
f) For a project within the vicinity of a private
airstrip, would the project expose people
residing or working in the project area to
excessive noise levels? (4)
13. Population and Housing. Would the project
a) Induce substantial population growth in an
area, either directly or indirectly (for
example, through extension of roads or other
infrastructure)? (1, 3)
b) Displace substantial numbers of existing
housing, necessitating the construction of
replacement housing elsewhere? (1, 3)
c) Displace substantial numbers of people,
necessitating the replacement of housing
elsewhere? (Source: 1, 3)
14. Public Services. Would the proposal:
a) Would the project result in substantial adverse
physical impacts associated with the
provision of new or physically altered
governmental facilities, the construction of
which could cause significant environmental
impacts, in order to maintain acceptable
service ratios, response times or other
performance objectives for any of the public
services? (Source: 1, 2)
Fire protection?
Police protection?
Schools?
Parks?
Other public facilities
15. Recreation:
a) Would the project increase the use of existing
neighborhood or regional parks or other
recreational facilities such that substantial
physical deterioration of the facility would
occur or be accelerated? (Source: 1, 2)
b) Does the project include recreational facilities
or require the construction or expansion of
recreational facilities which might have an
adverse physical effect on the environment?
(Source: 1, 2)
City of Dublin
Initial Study /Schaefer Ranch Unit 3
Potentially
Significant
Impact
Less Than
Significant
With
Mitigation
Less than
Significant
Impact
No Impact/
No New
Impact
X
X
X
X
X
X
X
X
X
X
X
Page 26
October 2015
16. Transportation and Traffic. Would the
project:
a) Conflict with an applicable plan, ordinance
or policy establishing measures of
effectiveness for the performance of the
circulation system, taking into account all
modes of transportation, including mass
transit and all non - motorized travel and
relevant components of the circulation
system, including but not limited to
intersections, streets, highways and
freeways, pedestrian and bicycle paths and
mass transit? (Source: 1, 2)
b) Conflict with an applicable congestion
management program, including but not
limited to, level of service and travel
demand measures, or other standards
established by the county congestion
management agency for designated roads or
highways ? - (Source: 1, 2)
c) Result in a change in air traffic patterns,
including either an increase in traffic levels
or a change in location that results in
substantial safety risks? (Source: 1, 4)
d) Substantially increase hazards due to a design
feature (e.g. sharp curves or dangerous
intersections) or incompatible uses, such as
farm equipment? (Source: 2)
e) Result in inadequate emergency access? (2)
f) Conflict with adopted policies, plans or
programs regarding public transit, bicycle or
pedestrian facilities or otherwise decrease the
performance of safety of such facilities? (1)
17. Utilities and Service Systems. Would the
project
a) Exceed wastewater treatment requirements of
the applicable Regional Water Quality
Control Board? (Source: 2)
City of Dublin
Initial Study /Schaefer Ranch Unit 3
Potentially
Significant
Impact
Less Than
Significant
With
Mitigation
Less than
Significant
Impact
No Impact/
No New
Impact
X
X
X
X
X
X
X
Page 27
October 2015
b) Require or result in the construction of new
water or wastewater treatment facilities or
expansion of existing facilities, the
construction of which could cause
significant environmental effects? (2)
c) Require or result in the construction of new
storm water drainage facilities or expansion
of existing facilities, the construction of
which could cause significant environmental
effects? (2)
d) Have sufficient water supplies available to
serve the project from existing water
entitlements and resources, or are new or
expanded entitlements needed? (2)
e) Result in a determination by the wastewater
treatment provider which serves or may
serve the project that it has adequate
capacity to serve the project's projected
demand in addition to the providers existing
commitments? (Source: 2)
f) Be served by a landfill with sufficient
permitted capacity to accommodate the
project's solid waste disposal needs?
g) Comply with federal, state and local statutes
and regulations related to solid waste? (2)
18. Mandatory Findings of Significance.
a) Does the project have the potential to degrade
the quality of the environment, substantially
reduce the habitat of a fish or wildlife
species, cause a fish or wildlife population to
drop below self - sustaining levels, threaten to
eliminate a plant or animal community,
reduce the number of or restrict the range of
a rare or endangered plant or animal or
eliminate important examples of the major
periods of California history or prehistory?
City of Dublin
Initial Study /Schaefer Ranch Unit 3
Potentially
Significant
Impact
Less Than
Significant
With
Mitigation
Less than
Significant
Impact
No Impact/
No New
Impact
X
X
X
X
X
X
X
Page 28
October 2015
b) Does the project have impacts that are
individually limited, but cumulatively
considerable? ( "Cumulatively considerable"
means that the incremental effects of a
project are considerable when viewed in
connection with the effects of past projects,
the effects of other current projects and the
effects of probable future projects).
c) Does the project have environmental effects
which will cause substantial adverse effects
on human beings, either directly or
indirectly?
Potentially
Significant
Impact
Less Than
Significant
With
Mitigation
Less than
Significant
Impact
No Impact/
No New
Impact
X
X
Sources used to determine potential environmental impacts
1. Schaefer Ranch Final EIR
2. Discussion with City staff or service provider
3. Site Visit
4. Other Source
XVII. Earlier Analyses
a) Earlier analyses used. Identify earlier analyses and state where they are available for
review.
The following EIR was used in the preparation of this Initial Study: "Final
Environmental Impact Report for Schaefer Ranch Project/ General Plan Amendment"
WPM Planning Team, April 1996, SCH #95033070.
Portions of the environmental setting, project impacts and mitigation measures for this
Initial Study refer to environmental information contained in the certified Schaefer
Ranch EIR which was prepared for the Schaefer Ranch Project of which the proposed
project is a part. The Schaefer Ranch EIR contains mitigation measures which apply to
this project. Specific mitigation measures identified in the Schaefer Ranch EIR for
potential impacts are referenced in the text of this Initial Study.
The Schaefer Ranch EIR is hereby incorporated by reference into this Initial Study
pursuant to the standards in CEQA Guideline Section 15150. A copy of this EIR is
available to the public for review at the Dublin Planning Division, 100 Civic Plaza,
Dublin CA during normal business hours.
City of Dublin Page 29
Initial Study /Schaefer Ranch Unit 3 October 2015
Pursuant to CEQA Guidelines Section 15162 and 15163, this Initial Study is intended to
identify the potential for any new or substantially increased significant impacts of the
project which were not evaluated in the Schaefer Ranch EIR and which would require
additional environmental review.
City of Dublin Page 30
Initial Study /Schaefer Ranch Unit 3 October 2015
Attachment to Initial Study
Discussion of Checklist
1. Aesthetics
Environmental Setting
The overall Schaefer Ranch site contains a mix of rugged ridges and canyons,
woodland, open grasslands and rock outcroppings. Pursuant to previous approvals
granted by the City of Dublin, portions of the overall Schaefer Ranch property have
been graded and recontoured to accommodate residential development allowed
pursuant to the Dublin General Plan, zoning and other land use entitlements.
Although a substantial portion of the Schaefer Ranch property has been graded, other
portions have either been preserved as permanent open space or open space preserves
have been created on the site to replace special - status species habitat that has been
impacted.
No trees, rock outcroppings or other natural features exist on any of the subareas.
Subarea 2 provides views of undeveloped hillsides within the unincorporated portions
of Alameda County west of Schaefer Ranch from the terminus of Ridgeline Place.
Nearby scenic highways include the I -580 freeway immediately south of Schaefer
Ranch.
Several light sources exist within the project area due to the presence of streetlights and
building lights, although no light sources are located on any of the two Subareas.
Schaefer Ranch EIR
The Schaefer Ranch EIR identifies significant impacts and mitigation measures to
reduce anticipated visual resource impacts to a less- than - significant level. Applicable
impacts and mitigation measures include:
Impact 5A identified a significant impact with regard to alteration of the site
character. This impact noted extensive landform alteration on the Ranch,
including ridgeline removal, filling of canyons and creation of an urban
landscape. Mitigation Measure 5A.1 requires approval of a subsequent grading
plan for the property that relies on matching natural contours to the extent
feasible, limitations on the extent of grading and preservation of existing trees.
Mitigation measure 5.A.2 requires approval of a master landscape plan for each
phase of the project, with special provisions for visually sensitive areas, use of
appropriate plant materials adjacent to natural open space areas, use of plants to
screen buildings and development of a long -term landscape maintenance
program.
• Impact 5B noted a significant impact of proposed project construction on the
Rowell Ranch Rodeo Park and I -580 freeway south of the site. Development of
the project site would change the visual character from both of these viewpoints.
Mitigation Measure 5.B.1 requires planting of landscaping, placement of berms
City of Dublin Page 31
Initial Study /Schaefer Ranch Unit 3 October 2015
and use of setbacks to substantially reduce the impact of the project from the I-
580 freeway and the Rowell Ranch facility. Mitigation Measure 5.13.2 requires
that future site grading be accomplished to reduce visual impacts. Mitigation
Measure 5.13.3 requires the issuance of a conditional use permit by the City for
the commercial component of the project to ensure that future structures are
screened from view and signs are controlled.
These mitigation measures continue to apply to the proposed project.
Project Impacts
a) Have a substantial adverse impact on a scenic vista? No New Impact. Approval and
implementation of the proposed project would result in no new or more
significant impacts than identified in the 1996 EIR regarding scenic vistas. Both
subareas are in areas assumed for development in the 1996 EIR and thus are not
part of a scenic vista from offsite or onsite public vantage points. A proposed
General Plan Amendment and Planned Development rezoning would convert
Subarea 2 from an open space designation to a residential designation that would
allow construction of one single family dwelling. The lot is located between two
similarly sized residential lots at the end of a cul -de -sac. Redesignating Subarea 2
from open space to residential use would somewhat reduce public views to open
spaces to the west, but views would still be partially available even with
construction of a home under applicable single family development standards.
There are also other, more expansive public views to the west. Because of the
location of the lot in relation to neighboring lots and the limited views from the
cul -de -sac, the proposed project impact would not be substantial. A potential
condition of project approval will require that the future residence on this site be
constructed immediately behind the existing dwelling on Ridgeline Place to
allow for a scenic corridor of undeveloped lands west of the site. Overall, no new
or more severe significant impacts would occur with regard to scenic vistas than
were analyzed in the 1996 EIR.
b) Substantially damage scenic resources, including visual resources within state scenic
highway? No New Impact. The two subareas have been fine graded as part of the
mass grading of the overall Schaefer Ranch. None of the sites are located within
view of a state scenic highway (I -580) and none contain significant scenic
resources, including but not limited to major rock outcroppings, major stands of
trees or bodies of water. Overall, no new or more severe significant impacts
would occur with regard to scenic resources than were analyzed in the 1996 EIR.
C) Substantially degrade existing visual character or the quality of the site? No New
Impact. The proposed project would include replacing vacant estate residential
lots with single - family dwellings (Subarea 1) and a vacant open space lot with a
single - family dwelling (Subarea 2). The 1996 EIR analyzed the impact of altering
the entire Schaefer Ranch from a rural area to a more urbanized development.
The overall type and character of land uses included the proposed project would
have approximately the same impacts on Subarea 1 as the current General Plan
residential land use designations. Subarea 2 has already been graded for
residential development. No new or more severe significant impacts would
City of Dublin Page 32
Initial Study /Schaefer Ranch Unit 3 October 2015
occur with regard to degradation of the scenic character of the project area than
were analyzed in the 1996 EIR.
d) Create light or glare? No New Impact. Both Subareas are vacant and contain no
light sources. Construction of the proposed project would add additional light
sources in the form of streetlights as well as new housing and yard lights. The
1996 EIR analyzed light and glare impacts on residential uses across Schaefer
Ranch, and identified significant impacts where commercial or public facilities
would be located near residences. No commercial or lighted public facilities are
near the Subareas so there would be no impact. The added light sources in
Subarea 1 would be in an area assumed for residential development in the 1996
EIR so would cause no new impact. The added light sources for Subarea 2 would
be from a single home and would be integrated into an existing residential
neighborhood. The proposed single dwelling would not have the potential to
generate significant light or glare. Under these circumstances, there would be no
new or more severe significant impacts beyond those analyzed in the 1996 EIR.
2. Agricultural and Forestry Resources
Environmental Setting
The Schaefer Ranch, including the two Subareas, was historically used for agricultural
production and a Williamson Act Land Conservation Contract was in effect on the
Schaefer Ranch at the time the 1996 EIR was prepared and certified. Since then, the
Williamson Act Contract no longer exists on the Schaefer Ranch. The Ranch is no longer
in agricultural production and has been substantially converted to residential uses as
envisioned in the Dublin General Plan. No forests or forestry production exist on either
Subarea.
The Schaefer Ranch site is zoned Planned Development, which is not an agricultural
zoning district.
Schaefer Ranch EIR
The Schaefer Ranch EIR noted that the project site was identified as a farmland with
only grazing importance, not prime farmland, due to the relatively steep topography of
the Schaefer Ranch property.
The Schaefer Ranch EIR identified the following less - than - significant impacts associated
with agricultural resources: Impact 35A, discontinuance of on -site agricultural uses,
Impact 3.5B, loss of on -site farmland and Impact 3.5C, cancellation of a Williamson Act
contract on the property.
Impact 3.51) was identified as a potentially significant impact. This impact noted
impacts on adjoining agricultural lands adjacent to the Schaefer Ranch. These impacts
included predatory dogs from suburban dwellings harassing livestock and odor
impacts from grazing and livestock keeping onto proposed dwellings. Mitigation
Measure 3 -12 required disclosure of ongoing grazing for future project residents.
Mitigation Measure 3 -13 required enforcement of leash laws for dogs. Mitigation
City of Dublin Page 33
Initial Study /Schaefer Ranch Unit 3 October 2015
Measure 3 -14 required disclosure to future homeowners of the presence of flies and
odors from agricultural and livestock keeping. Mitigation Measure 3 -15 required
installation of fencing around grazing areas.
Project Impacts
a -c) Convert prime farmland to a non - agricultural use or involve other changes which could
result in conversion of farmland to a non - agricultural us, including conflicts with
agricultural zoning and Williamson Act contracts? No New Impact. The overall
Schaefer Ranch project site has been graded for urban uses pursuant to current
General Plan land use designations and current zoning. No agricultural uses or
zoning remain on the site and the Williamson Act Land Conservation Agreement
formerly on the site has been terminated. No new or more significant impacts
would therefore occur with regard to agricultural resources beyond those
analyzed in the 1996 EIR. The project applicant will be required to comply with
mitigation measures included in the 1996 EIR, including: providing notifications
to future homeowners regarding protection of livestock (Mitigation Measure 3-
12) and the presence of nearby agricultural operations (Mitigation Measure 3 -14).
Appropriate fencing to protect on -going livestock grazing is also required per
Mitigation Measure 3 -15.
No agricultural operations exist on any of the subareas. No new or more severe
significant impacts beyond those analyzed in the 1996 EIR are anticipated.
d) Result in the loss of forest land or conversion of forest land to a non forest use? No
forest land exists on the two Subareas and no impact would result with respect to
this topic.
e) Involve other changes which, due to their location or nature, could result of forest land to
a non forest use? See item "d," above.
3. Air Quality
Environmental Setting
The project is within the Amador Valley, a part of the Livermore sub - regional air basin
distinct from the larger San Francisco Bay Area Air Basin. The Livermore sub -air basin
is surrounded on all sides by high hills or mountains. Significant breaks in the hills
surrounding the air basin are Niles Canyon and the San Ramon Valley, which extends
northward into Contra Costa County.
Schaefer Ranch EIR
The Schaefer Ranch EIR contains a number of mitigation measures to reduce anticipated
air quality impacts from the development of the Schaefer Ranch. Applicable air quality
impacts and mitigation measures include:
• Impact 12A identified a significant impact with regard to temporary increases in
dust and particulate emissions during earthmoving operations. Mitigation
Measure 12.A1 required implementation of dust control measures during site
City of Dublin Page 34
Initial Study /Schaefer Ranch Unit 3 October 2015
grading earth moving and excavation operations to reduce this impact to a less -
than- significant level. Such measures included were not limited to frequent
watering of graded areas, limiting speeds of construction vehicles on the site and
sweeping of public streets.
• Impact 12B found that emissions from construction vehicles would be a
potentially significant impact. Adherence to Mitigation Measure 12.13.1, which
required limited idling of construction equipment and reduction of grading
activities during period of poor air quality, reduced this impact to a less -than-
significant level.
Impact 12 D identified a significant impact from regional pollutant emissions in
the form of increased vehicle trips to and from the project. Adherence to
Mitigation Measures 12.D.1, implement control measures that are specified in
attainment plans, and 12.D.2, provide physical facilities in the project design
reduced regional emissions but not to a less- than - significant level. This impact
was therefore found to be significant and unavoidable.
• Impact 12E noted a potentially significant impact with regard to emission of local
carbon monoxide. Based on the analysis in the EIR, emission of carbon monoxide
was found to be below threshold levels and was a less - than - significant impact.
• Impact 12F, on -site fuel combustion, was identified as a potentially significant
impact and adherence to Mitigation Measure 121.1 reduced this impact to a less -
than- significant impact. This mitigation restricted installation of on -site fireplaces
or stoves to either gas burning units or units that have been EPA - approved.
Conventional open hearth fireplaces were not allowed.
• Impact 12G included a significant impact from miscellaneous dust sources
leaving the site. Adherence to Mitigation Measure 12.G.1, that required
adherence to the Bay Area Air Quality Management fugitive dust rules, reduced
this impact to a less - than - significant level.
The proposed project is required to adhere to these existing mitigation measures and
current air quality regulations enforced by the Bay Area Air Quality Management
District (BAAQMD).
Project Impacts
a) Would the project conflict with or obstruct implementation of an air quality plan? No
New Impact. The BAAQMD's Clean Air Plan is based on population and growth
assumptions projected by the Association of Bay Area Governments (ABAG). For
the proposed project, the applicant is requesting a modification in the type of
residential units. As noted in the Project Description section of this Initial Study,
under the proposed project the overall number of dwellings on the overall
Schaefer Ranch site would be 420 units which would be less than the project
originally approved by the City of Dublin and analyzed in the 1996 EIR (474 units).
Vehicle trips associated with the proposed project would be slightly less than s
analyzed in the 1996 EIR (see analysis in the Traffic and Transportation section of
City of Dublin Page 35
Initial Study /Schaefer Ranch Unit 3 October 2015
this Initial Study). The proposed project would therefore be generally consistent
with the Clean Air Plan and this would not represent a substantial change to the
project analyzed in the previous EIR. No new or more severe significant impacts
beyond those analyzed in the 1996 EIR would result regarding this topic.
b) Would the project violate any air quality standards? No New Impact. The 1996 EIR
identified regional pollutant emissions as Significant and Unavoidable impacts.
The project proposes residential development within the Schaefer Ranch area in a
manner consistent with the previous approvals on the site and within the
parameters of the 1996 EIR. This impact would remain significant and
unavoidable. Table 2 within the Traffic and Transportation section of this Initial
Study demonstrates that the total daily vehicle trips would be approximately the
same as the project analyzed in the 1996 EIR. Also, the total number of additional
dwellings proposed as part of the project (14 units) is significantly fewer than the
number of dwellings identified by the Bay Area Air Quality Management District
as having potentially significant air emissions (320 units), as shown on Table 6 of
the BAAQMD CEQA Guidelines document. Therefore, regional pollutant
emissions from the proposed project would same or less and the impact would
remain significant and unavoidable as identified in 1996 EIR.
In terms of construction -level air quality impacts, as conditions of grading plan
approval by the City of Dublin, the applicant is required to have their grading
contractor undertake dust and wind -borne erosion control methods listed in
Mitigation Measure 12G.1 of the 1996 EIR, including covering of stockpiled
material, watering of graded sites and similar methods to meet BAAQMD
standards.
In terms of operational -level air quality impacts, the number of daily vehicle trips
are anticipated to be slightly less under the proposed project than the original 1996
project as demonstrated in Table 2 contained in the Traffic and Transportation
section of this Initial Study. Therefore, air quality emissions would be same or less
than documented in the 1996 project EIR.
As discussed above, no new or more severe significant impacts beyond those
analyzed in the 1996 EIR would result regarding this topic.
c) Would the project result in cumulatively considerable air pollutants? No New Impact.
The proposed project would result in an increase of 14 single - family dwellings
from the total number of dwellings allowed on the Schaefer Ranch under the
current General Plan and Planned Development zoning and as was analyzed in the
1996 EIR. However, within the context of the larger overall Schaefer Ranch
development, regional pollutant emissions, as identified in Impact 12 contained in
the 1996 EIR, would still remain as a significant and unavoidable impact.
d,e) Expose sensitive receptors to significant pollutant concentrations or create objectionable
odors? No New Impact. The proposed project would result in an increase of 14
single - family dwellings from the total number of dwellings allowed on the
Schaefer Ranch under the current General Plan and Planned Development zoning
City of Dublin Page 36
Initial Study /Schaefer Ranch Unit 3 October 2015
and as was analyzed in the 1996 EIR. The added dwellings would not substantially
increase the overall Schaefer Ranch contribution to cumulative air pollution. No
new or more severe significant impacts beyond those analyzed in the 1996 EIR
would result regarding cumulative air pollution. However, within the context of
the larger overall Schaefer Ranch development, regional pollutant emissions, as
identified in Impact 12 contained in the 1996 EIR, would still remain as a
significant and unavoidable impact.
4. Biological Resources
Environmental Setting
The overall Schaefer Ranch site contains a number of biologically important biological
communities, including annul grasslands, northern coastal scrub, coast live oak
woodland, riparian woodland, freshwater emergency wetland and stock ponds. The
Schaefer Ranch has been mass graded to allow for urban development pursuant to
existing land use approvals, although portions of the Ranch have been preserved
and/or reconstructed as riparian habitat, oak tree preserve areas and other open space
areas to protect biological resources. None of the preserved areas are located within this
project area.
Subareas 1 and 2 have been included in a completed mass grading operation, approved
pursuant to a grading permit by the City of Dublin and therefore contain no trees,
creeks or other significant natural features.
Schaefer Ranch EIR
The Schaefer Ranch EIR identified that the project site contained a number of significant
biological resources, including a stand of coast live oak trees, and cost live oak/ bay
riparian vegetation mixed with annual grasslands.
The 1996 EIR contains a number of impacts and mitigation measures regarding
biological resource impacts and mitigation measures. Applicable impacts and
mitigation measures include:
Impact 6C identified loss of approximately 245 acres of grasslands as a
potentially significant impact. Mitigation Measure 6.C.1 required reseeding of
disturbed grasslands with native grasses.
Impact 6D noted a loss of oak woodlands and other heritage trees as part of the
development proposal, which would be a significant impact. Mitigation Measure
6.D.1 required completion of a tree survey before grading and retention of
heritage class trees (18 -inch diameter at 20 inches above grade) to the extent
feasible. Mitigation Measure 6.D.2 required implementation of protection
measures for trees that are to be preserved. Mitigation Measure 6.D.3 required
planting of replacement trees on the site at a ratio of 3 replacement trees for each
1 tree lost.
City of Dublin Page 37
Initial Study /Schaefer Ranch Unit 3 October 2015
Impact 6E identifies secondary impacts to native plants and wildlife, including
"escape" of non -native plants into the environment and impacts to native
wildlife of domestic pets. Mitigation Measures 6.E.1 required project landscape
plans to emphasize use of native plant materials. Mitigation Measure 6.E.2
required enforcement of Dublin's leash law. Even with adherence to these
measures, Impact 6E would remain significant and unavoidable.
• Impact 6F found that runoff of herbicide sprays could enter natural plant
communities and would be a potentially significant impact. Adherence to
Mitigation Measure 6.F.1 required restrictions of application of herbicides will
reduce this impact to a less - than - significant level.
The proposed project will be required to adhere to these existing biological resource
mitigation measures.
Pro-ject Impacts
a) Have a substantial adverse impact on a candidate, sensitive, or special - status species? No
New Impact. The Schaefer Ranch EIR identified a number of special status plant
and wildlife species that could occur on the Schaefer Ranch property. Since
certification of the 1996 and approval of the original land use entitlements, the
entire project site has been graded to accommodate future buildings and roads.
As required by Mitigation Measures 6.D.1, 6.D.2, and 6.D.3 contained in the 1996
EIR, surveys for sensitive tree species were completed, tree protection measures
provided for trees to be preserved and replacement trees planted for as part of
approved project landscaping.
As a result of mass grading of a majority of the Schaefer Ranch property, no
plant or wildlife species or habitats exist on the site. As required by Mitigation
Measure 1996 EIR C.6.1, a preconstruction survey was completed for burrowing
owl by the firm of LSA prior to commencement of grading activities (source:
project applicant 8 / 31 / 12) Therefore, approval and construction of the project
would not have new or more severe significant impacts on candidate, sensitive
or special- status plants or wildlife or their respective habitats beyond those
analyzed in the 1996 EIR.
b, c) Have a substantial adverse impact on riparian habitat, other sensitive natural
communities or federally protected wetlands? No New Impact. No creeks, streams,
wetlands or waters of the United States or waters of the state were identified on
any portion of the two Subareas in the 1996 EIR. There would be no impacts with
respect to riparian habitats, sensitive natural communities or federally protected
wetlands. No new or more severe significant impacts would therefore result with
regard to riparian habitats, sensitive natural communities or federally protected
wetlands than were analyzed in the previous EIR.
d) Interfere substantially with movement of native fish or wildlife species? No New
Impact. No creeks or streams exist currently on the site so there would be no
interference with native fish migration. Proposed residences would be
constructed in areas planned and approved for residences and that have been
City of Dublin Page 38
Initial Study /Schaefer Ranch Unit 3 October 2015
previously graded to remove suitable habitat for wildlife migration. No new or
more severe significant impacts would therefore result with regard to
interference of fish or wildlife movement than was analyzed in the 1996 EIR.
e) Conflict with local policies or ordinances protecting biological resources? No New
Impact. There would be no conflicts and no impacts with any local policies
regarding biological resources should this project be approved and constructed.
Any trees formerly growing on the site were removed prior to or as part of the
mass grading of Schaefer Ranch. No new or more severe significant impacts
would therefore result with regard to potential conflicts with local ordinances
protecting biological resources than was analyzed in the 1996 EIR.
f) Conflict with any adopted Habitat Conservation Plans or Natural Community
Conservation Plans? The project site lies within the Eastern Alameda County
Conservation Strategy ( EACCS) planning area. The City of Dublin utilizes the
Conservation Strategy as guidance for environmental permitting for public
projects, and private development projects are encouraged to use the EACCS as a
resource as well. The Conservation Strategy embodies a regional approach to
permitting and mitigation for wildlife habitat impacts associated with land
development, infrastructure, and other activities. The Conservation Strategy is
neither a Habitat Conservation Plan nor a Natural Community Conservation
Plan, but is a document intended to provide guidance during the project
planning and permitting process to ensure that impacts are offset in a
biologically effective manner. There would therefore be no new or more severe
significant impacts associated with this topic.
5. Cultural Resources
Environmental Setting
A cultural resources survey of the Schaefer Ranch was undertaken as part of the 1996
EIR. Prehistoric findings were limited to one isolated chert flake and a possible bedrock
mortar which were not located on the project site. These finds were not conclusively
determined to be of prehistoric origins.
The two Subareas are vacant and contain no structures.
Schaefer Ranch EIR
The Schaefer Ranch EIR contains a number of mitigation measures regarding cultural resource
impacts and mitigation measures. Applicable impacts and mitigation measures include:
Impact 14A identifies a potential impact with regard to prehistoric resources that
may not have been identified in previous cultural resource surveys of the
Schaefer Ranch. This impact was reduced to a less- than - significant level by
adherence to Mitigation Measure 14.A.1 that required work to stop within a 100 -
foot radius of the discovery of any cultural resources and for the City to prepare
a work plan consistent with CEQA Guidelines to ensure that such resource is
City of Dublin Page 39
Initial Study /Schaefer Ranch Unit 3 October 2015
properly evaluated and treated. If necessary, monitoring of this site by a
qualified archeologist may be required.
This mitigation measure will continue to apply to the proposed project.
Project Impacts
a) Cause substantial adverse change to significant historic resource or human remains? No
New Impact. No structures exist on the two Subareas so there would be no
impact with regard to historic resources. This would not represent a new or more
severe significant impact than previously analyzed in the 1996 EIR.
b -d) Cause a substantial adverse impact or destruction to archeological, paleontological
resources or human remains? No New Impact. Subareas 1 and 2 have been mass
graded and no significant archeological, prehistoric, paleontological or Native
American remains were discovered. Minimal additional grading would be
required for building foundations and trenching for on -site utilities. Based on a
discussion with the project representative (pers. comm. D. Chen, 9/ 31 / 12) the
depth of such additional grading would be minor, approximately 10 feet into an
existing 100 -foot deep fill area, and would not exceed the depths of completed
grading activities. Therefore, with adherence to Mitigation Measure 14.A.1, there
would be no new or more severe significant impacts with regard to this topic
than was analyzed in the 1996 EIR.
6. Geology and Soils
Environmental Setting
The 1996 EIR noted the presence of several soil and geotechnical conditions on the
Schaefer Ranch Site.
Colluvial soils, which are composed of clay and silty clay are found in ravines and
swales leading to main stream channels. Alluvial deposits are generally located in a
drainage course in the northern portion of the Ranch. A large portion of the Ranch was
underlain by historic landsides.
As noted in the Project Description portion of this Initial Study, the Schaefer Ranch has
been substantially graded. Overall grading also remediated identified landslide areas
pursuant to oversight by registered geologists.
The Schaefer Ranch does not lie within an Earthquake Fault Zone (formerly Alquist-
Priolo Special Studies Zone), as documented in the 1996 EIR. Major active faults in the
region that influence earthquake susceptibility include the Pleasanton, San Andreas,
Hayward, Calaveras, and Greenville Faults.
Schaefer Ranch EIR
The Schaefer Ranch EIR identified a number of impacts and mitigation measures related
to soils and geology. The following are applicable impacts and mitigation measures that
will continue to apply to the current project:
City of Dublin Page 40
Initial Study /Schaefer Ranch Unit 3 October 2015
Impact 9A identified a significant impact related to mass grading of the Ranch,
which would have the effect of removing natural vegetation and wildlife habitat
as well as possibly causing landslides and slope failures. Mitigation Measure
9.A.1 required City approval of a grading plan consistent with City standards
and that also reduced visual impacts and satisfy geotechnical requirements.
Mitigation Measure 9.A.2 required that grading activities be balanced to
eliminate the need for off -haul of material.
Impact 9B identified a significant impact with regard to slope stability, since
much of the pre - project soil conditions exhibited the presence of historic
landslides. Mitigation Measures 9.B.1 through 8 reduced landslide and slope
stability impacts to a less -than significant level. These measures required
remediation of historic landslides, control of surface and subsurface drainage,
removal of soils that are susceptible to "soil creep," establishment of setbacks
from landslide hazard areas, use of appropriate engineering designs to ensure
slope stability and formation of a Geologic Hazard Abatement District to ensure
long -term maintenance of slope areas.
Impact 9C found a significant impact with regard to erosion impacts of grading
activities off of the Ranch. Adherence to Mitigation Measures 9.C.1 through 3
reduced this impact to a less- than - significant level by requiring adherence to a
site - specific erosion control plan, implementing erosion control measures during
construction and incorporating permanent erosion control measures into the
development, including creek bank revetments and slope seeding.
• Impact 9D identified an impact with regard to fill settlement. The 41.5 -acre site
has already been filled consistent with Mitigation Measures 9.D.1 through 9.D.5.
None of the three project subareas are affected by this Mitigation Measure.
Impact 9E identified an impact related to expansive and corrosive soils.
Expansive soils could damage building foundations and other improvements
due to shrinking and swelling of clay soils. Corrosive soils could impact
underground utilities, foundations and concrete in contact with soil. Mitigation
Measures 9.E.1 through 3 are included in the EIR to reduce this impact to a less -
than- significant level. These measures required geotechnical investigations for
shrink -swell potential, special foundation designs to deal with expansive soil and
control of moisture content to minimize soil shrinking and swelling.
Impact 9F identified an impact related to seismic hazards, including strong
ground shaking and possible surface rupture. Secondary seismic effects could
include landsliding, liquefaction and soil lurching. Adherence to Mitigation
Measures 91.1 through 3 reduced seismic hazards to a less - than - significant level.
These measures included completing detailed analyses of seismic hazards for
individual development projects to evaluate the effects of groundshaking and
rupture as well as secondary effects and a determination of specific construction
techniques to minimize these effects. The mitigations also required incorporation
of earthquake resistant design for all structures and mapping of inactive faults in
City of Dublin Page 41
Initial Study /Schaefer Ranch Unit 3 October 2015
the project area and incorporation of remedial measures for inactive faults on
project structures.
The current project will be required to comply with the above geologic mitigation
measures.
Project Impacts
a) Expose people or structures to potential substantial adverse impacts, including loss,
injury or death related to ground rupture, seismic ground shaking, ground failure, or
landslides? No New Impact. The potential for impacts related to ground -based
seismic hazards, specifically severe ground shaking, ground rupture or other
ground failure was addressed in the 1996 EIR (Impact 9F) and adherence to
Mitigation Measures 9.17.1 through 3 reduced these impacts to a less -than-
significant level. To comply with these mitigation measures, a soils and geology
reports were completed by Alan Kropp & Associates (1997) and ENGEO (2004).
The reports include specific construction measures to minimize groundshaking,
ground failure and landslides that have been followed for previous grading and
will be followed for future construction on the subareas. These reports are hereby
incorporated by reference into this Initial Study and are available for review at
Dublin Civic Center during normal business hours. These measures continue to
apply to this portion of the Schaefer Ranch development project. There would
therefore be no new or more severe significant impacts with regard to seismic
impacts than was analyzed in the 1996 EIR.
b) Is the site subject to substantial erosion andlor the loss of topsoil? No New Impact.
Refer to Hydrology section 8a for a discussion of this topic.
c,d) Is the site located on soil that is unstable or expansive or result in potential lateral
spreading, subsidence, liquefaction, landslide or collapse? No New Impact. The 1996
EIR noted Impact 9E, expansive and corrosive soils, within the Schaefer Ranch
property. The 1996 EIR determined that with adherence to Mitigation Measures
91.1 through 3, impacts related to unstable and expansive soils, including lateral
spreading, liquefaction and similar hazards, were less- than - significant. Similarly,
adherence to 1996 EIR Mitigation Measures 9.13.1 through 8 reduced impacts
related to landslide and slope stability to a less - than - significant level, as did
Mitigation Measures 9.D.1 through 5 related to fill settlement. The current project
would be residential and within the development areas included in the 1996 EIR.
With adherence to these and other soil and geology mitigations contained in the
1996 EIR, there would be no new or more severe significant impacts with regard
to this topic than was analyzed in the 1996 EIR.
e) Have soils incapable of supporting on -site septic tanks if sewers are not available? No
New Impact. Proposed residences on the site would be connected to sanitary
sewers provided by DSRSD, so there would be no impacts with regard to septic
systems, as identified in the 1996 Schaefer Ranch EIR.
City of Dublin Page 42
Initial Study /Schaefer Ranch Unit 3 October 2015
7. Greenhouse Gas Emissions
Environmental Setting
Since certification of the EIR in 1996, the issue of contribution of greenhouse gasses to
climate change has become a more prominent issue of concern as evidenced by passage
of AB 32 in 2006. Because the Schaefer Ranch EIR has been certified, the determination
of whether greenhouse gasses and climate change needs to be analyzed for this
proposed project is governed by the law on supplemental or subsequent EIRs (Public
Resources Code section 21166 and CEQA Guidelines Sections 15162 and 15163).
Greenhouse gas and climate change is not required to be analyzed under those
standards unless it constitutes "new information of substantial importance, which was
not known and could not have been known at the time the previous EIRs were certified
as complete (CEQA Guidelines Sec. 15162 (a) (3).) Greenhouse gas and climate change
impacts were not analyzed in the prior EIR; however, these impacts are not new
information that was not known or could not have been known at the time the Schaefer
Ranch EIR was certified. The issue of climate change and greenhouse gasses was widely
known prior to the certification of the EIR. The United Nations Framework Convention
on Climate Change was established in 1992. The regulation of greenhouse gas emissions
to reduce climate change impacts was extensively debated and analyzed throughout the
early 1990s. The studies and analyses of this issue resulted in the adoption of the Kyoto
Protocol in 1997. In the early and mid 2000s, GHGs and climate change were
extensively discussed and analyzed in California. In 2000, SB 1771 established the
California Climate Action Registry for the recordation of greenhouse gas emissions to
provide information about potential environmental impacts. In 2005, the Governor
issued Executive Order # S -03 -05 establishing greenhouse gas emission reduction
targets in California. AB 32 was adopted in 2006. Therefore, the impact of greenhouse
gases on climate change was known at the time of the certification of the Schaefer Ranch
EIR in 1996. Under CEQA standards, it is not new information that requires analysis in
a supplemental EIR or negative declaration. No supplemental environmental analysis of
the project's impacts on this issue is required under CEQA.
Project Impacts
a,b Generate greenhouse gas emissions, either directly or indirectly, that may have a significant
impact on the environment or conflict with an applicable plan, policy or regulation adopted for the
purpose of reducing the emissions of greenhouse gases? As discussed above, no additional
environmental analysis is required under CEQA Section 21166.
8. Hazards and Hazardous Materials
Environmental Setting
The 1996 EIR noted that several areas of the Schaefer Ranch property were found to
contain hazardous and potentially hazardous materials, including areas contaminated
with petrochemicals associated with vehicle storage and maintenance, insecticide
residue from agricultural operations, refuse disposal sites and several power poles and
transformers that could contain PCBs (polychlorinated biphenyls, a potentially hazard
substance).
City of Dublin Page 43
Initial Study /Schaefer Ranch Unit 3 October 2015
Schaefer Ranch EIR
The Schaefer Ranch EIR identified one impact related to hazards and hazardous
materials. Impact 15A found that the potential presence of hazardous materials on the
Ranch property in close proximity to planned residential and similar uses would be a
significant impact. Mitigation Measures 15.A.1 through 4 were included in the EIR that
reduced this impact to a less- than - significant level. These measures call for removal of
hazardous materials, including electrical transformers with potentially hazardous
materials, abandonment and destruction of on -site wells and additional hazardous
materials analysis if found on the Schaefer Ranch during construction. These measures
have been completed.
Project Impacts
a) Create a significant hazard to the public or the environment through the routine transport,
use or disposal of hazardous materials? No New Impact. There would be no impact
with regard to transport, use or disposal of hazardous materials, since the
proposed project involves construction of a residential development project.
Although a normal and customary amount of paint, solvents, lawn care chemicals
and similar substances would be used and stored within individual residences on
the project site, these would not be used, stored or transported in any significant
quantities. No new or more severe significant impacts would therefore result with
respect to this topic than was previously analyzed in the Schaefer Ranch EIR.
b) Create a significant hazard to the public or the environment through reasonably foreseeable
upset and accident conditions involving the release of hazardous materials into the
environment? No New Impact. Schaefer Ranch has been graded and filled with
approximately 100 feet of fill material in specific areas. Prior to the grading
operation, the applicant was required by Mitigation Measure 15.A.1 of the 1996
EIR to remove hazardous materials from the site, remove above - ground electrical
power transformer, close existing wells and septic system facilities and assess
other hazardous materials on the site. A site investigation was completed by
ENGEO, Inc. to fulfill this mitigation measure on June 19, 2008. This letter is
hereby incorporated by reference into this document and is available for review at
Dublin Civic Center during normal business hours. No new or more severe
significant impacts with regard to this topic is therefore anticipated than was
analyzed in the 1996 EIR.
c) Emit hazardous materials or handle hazardous materials or acutely hazardous materials,
substances, or waste within one - quarter mile of an existing or proposed school? No New
Impact. No public schools exist or are planned within one - quarter mile of the
project site, based on the document entitled "Demographic Study and Facilities
Plan," published by the Dublin Unified School District in October 2004 (Shilts
Consulting, Inc.). Adherence to mitigation measures to remove any hazardous
materials on the site, as required by Mitigation Measure 15.A.1 contained in the
1996 EIR ensures that there will be no impact with regard to this topic. There are
therefore no new or more severe significant impacts with regard to this topic than
was analyzed in the 1996 EIR.
City of Dublin Page 44
Initial Study /Schaefer Ranch Unit 3 October 2015
d) Is the site listed as a hazardous materials site? No New Impact. The project site is not
listed by the State of California Department of Toxic Substances Control as an
identified hazardous site as of November 13, 2014. There is therefore no new or
more severe significant impact with regard to this topic than was analyzed in the
previous EIR.
e,f) Is the site located within an airport land use plan of a public airport or private airstrip? No
New Impact. The project site is not located near any public airport or private
airstrip (source: Alameda County Airport Land Use Compatibility Plan, August
2012). No new or more severe significant impacts would therefore occur with
respect to this topic than have been previously analyzed.
g) Interference with an emergency response or evacuation plan? No New Impact. The
proposed project would include construction of a residential project on private
land. No emergency evacuation plan would be affected since no public or private
roadways would be blocked. No new or more severe significant impact would
therefore result with respect to this topic than were previously analyzed in the
1996 EIR.
h) Expose people and structures to a significant risk of loss, injury or death involving wildland
fires or where residences are intermixed with wildlands? No New Impact. The project
area is located in a substantially urbanizing area, although wildlands do exist
north and west of the site. Mitigation Measures 7.3.1 through 7.3.5 contained in the
1996 EIR reduced this impact to a less - than - significant level. These measures
required installation of a irrigated border of fire - resistant vegetation with a
minimum width of 30 feet, provision of disced fire breaks, use of fire resistant
construction materials, provision of adequate emergency access and, as a condition
of tentative subdivision map approval, require a fuel management plan to reduce
the fire fuel load. With adherence to these measures, which will be required as
conditions of the requested land use entitlements, no new or more severe
significant impacts with regard to wildland fire have been identified than were
analyzed in the 1996 EIR.
9. Hydrology and Water Quality
Environmental Setting
Local surface water
The Schaefer Ranch area drains into two major regional watersheds: Palomares Creek
and Dublin Creek. These two are divided by Skyline Ridge.
The western portion of Schaefer Ranch, including the project Subareas, are located
within the jurisdictions of Zone 2 of the Alameda County Flood Control and Water
Conservation District (Zone 2). Zone 2 provides maintenance of regional drainage
facilities within this portion of Alameda County. The eastern portion of Schaefer Ranch
(east of Schaefer Ranch Road) is located within Zone 7.
City of Dublin Page 45
Initial Study /Schaefer Ranch Unit 3 October 2015
Existing drainage facilities
As a condition of project approval from the Dublin Public Works Department, the
project will be conditioned to meet the requirements of the 2009 Municipal Regional
Permit that requires compliance with C.3 surface water quality standards (pers. comm.,
Jayson Imai, City of Dublin Senior Civil Engineer, 11/20/ 14). Pursuant to the approved
Master Drainage Plan, a number of drainage facilities have been constructed on
Schaefer Ranch, including but not limited to underground drainage lines, swales and
detention and water quality ponds.
Groundwater recharge
The project Subareas are not located near any major creek and has been filled with
approximately 100 feet of earth material that precludes groundwater recharge. The
Schaefer Ranch property is not designated for groundwater recharge purposes in the
Dublin General Plan.
Flooding
The most recent Flood Insurance Rate Map for the western portion of Dublin
Community Panel #060705 0001B) does not include the Schaefer Ranch property.
However, based on discussions with the City of Dublin Public Works Department
( Jayson Imai, City of Dublin, 11 / 20 / 14), the topographic elevation of the two subareas
are out of the 100 -year flood plain.
Schaefer Ranch EIR
The Schaefer Ranch EIR identified the following impacts and mitigation measures with
regard to flooding, drainage and water quality.
Impact 8.1A noted potentially significant impacts with regard to grading and
related impacts on drainage. With adherence to Mitigation Measure 8.1.1
through 8.1.7, this impact was reduced to a less - than - significant level. This
measure called for preparation of a master drainage plan for the whole of the
Schaefer Ranch property, provision of flood control improvements on and off the
site, coordination with other applicable agencies and ensuring design is
consistent with applicable drainage design standards.
Impact 8.2A noted that increased sedimentation would occur with development
of the Schaefer Ranch and would be a potentially significant impact. Adherence
to Mitigation Measures 8.2.1, 8.2.2 and 8.2.4 reduced sediment impacts to a less -
than- significant level. These measures require preparation and submittal of a
water quality report to the City of Dublin, DSRSD, the Regional Water Quality
Control Board and Zone 7 that includes specific construction techniques to
ensure that less -than- significant impacts would result to surface bodies of water.
The mitigation measures also requires the abandonment and sealing of existing
on -site wells and septic tanks and provisions for ensuring water quality for any
open reservoirs located on the Ranch.
These mitigation measures continue to apply to the project. The project is also subject to
the requirements under current Clean Water Act and associated implementing
regulations enforced by the City of Dublin.
City of Dublin Page 46
Initial Study /Schaefer Ranch Unit 3 October 2015
Project Impacts
a) Violate any water quality standards or waste discharge requirements? No New Impact.
Approval and construction of the proposed project would add impervious
surfaces to the two subareas that would increase the amount of stormwater runoff
and potentially degrade water quality. This impact was analyzed in the 1996 EIR
as Impact 8.2A and, with adherence to Mitigation Measure 8.2.1, this impact was
reduced to a less- than - significant level. The project applicant will be required to
comply with C.3 surface water quality standards and other water quality
regulations normally and customarily enforced by the City of Dublin and other
jurisdictions (including but not limited to Zone 7). The project applicant will also
be required to continue adherence to this Mitigation Measure for final grading
operations on the project subareas.
Therefore, no new or more severe significant impacts with regard to water quality
standards have been identified in this Initial Study than was analyzed in the 1996
EIR.
b) Substantially deplete groundwater recharge areas or lowering of water table? No New
Impact. No impacts are anticipated with regard to depletion of groundwater
resources, since the proposed water source for this project would rely on surface
water supplies from DSRSD and not on local groundwater supplies. No local wells
would be used to supply water to the proposed project. The Schaefer Ranch is not
designated as a groundwater recharge area as part of the Dublin General Plan.
There would be no new or more severe significant impacts with respect to this
topic than have been previously analyzed in the 1996 EIR.
c) Substantially alter drainage patterns, including streambed courses such that substantial
siltation or erosion would occur? No New Impact. Although new impervious surfaces
would be added to the project site to accommodate new dwellings, driveways and
similar surfaces, this impact was analyzed in the 1996 EIR (see Impact 8.1A,
Grading and Impacts on Drainage). With adherence to Mitigation Measure 8.1.1,
which requires preparation of a Master Drainage Plan and Mitigation Measure
8.1.6 that requires installation of erosion improvements for unlined drainage
channels, among others, this impact was reduced to a less- than - significant level.
Much of the project site has been mass graded with approvals of a grading plan
and in conformity with the City approved Master Drainage Plan. It is anticipated
that additional fine grading would be required to create individual building pads
and related improvements. Subsequent grading activities on the site will be
required to conform to the approved Master Drainage Plan, C.3 water quality
standards and all other mitigation measures contained in the 1996 EIR to ensure
that no new or more severe significant alterations to drainage patterns, stream
courses or that significant amounts of siltation or erosion would occur.
d) Substantially alter drainage patterns or substantially increase surface water runoff that
would result in flooding, either on or off the project site? No New Impact. Much of the
project site has already been graded based on a mass grading plan and Master
Drainage Plan approved by the City of Dublin and other agencies as required by
City of Dublin Page 47
Initial Study /Schaefer Ranch Unit 3 October 2015
Mitigation Measure 8.1.1. Additional fine grading that would occur will be
required to conform to Mitigation Measure 8.1.1 to ensure that no additional
impacts would occur to drainage patterns or stormwater runoff. The developer is
also required to adhere to Mitigation Measure 8.1.2 requiring the project developer
to install flood control facilities and Mitigation Measure 8.1.5, that requires the
developer to undertake additional off -site flooding improvements, as needed.
Therefore, no new or more severe significant impacts have been identified in this
Initial Study regarding drainage patterns and runoff than were analyzed in the
1996 EIR.
e) Create stormwater runoff that would exceed the capacity of drainage systems or add
substantial amounts of polluted runoff? No New Impact. The issue of exceeding
capacities of drainage systems or increasing the amount of polluted runoff was
addressed in the 1996 EIR by Impact 8.1A. Adherence to Mitigation Measure 8.1.2
required the project developer to plan and install necessary flood control and
drainage facilities to minimize downstream flooding, including installation of on-
site detention facilities. Appropriate storm drain and flood control facilities have
been incorporated into the Master Drainage Plan approved by the City of Dublin
and other regulatory agencies. The Master Drainage Plan includes local
improvements to the local drainage system to minimize flooding and substantial
amounts of polluted runoff.
The project is also required by the City of Dublin to incorporate Best Management
Practices (BMPs) to minimize runoff of polluted drainage (pers. comm., Jayson
Imai Public Works Department, 11 / 20 / 14). The applicant has proposed to use an
existing area -wide water quality pond west of the project site to ensure compliance
with all applicable City and regional water quality standards. Therefore, no new or
more severe significant impacts with regard to drainage systems or polluted runoff
than was analyzed in the 1996 EIR.
f) Substantially degrade water quality? No New Impact. This issue and has been
addressed above in item "a."
g) Place housing within a 100 -year flood hazard area as mapped by a Flood Insurance Rate
Map? No New Impact. Project Subareas lie outside of the 100 -year flood plain and
no impacts would occur with regard to placing additional housing units within a
100 -year flood plain (pers. comm., Jayson Imai, 11 / 20 / 14).
h, i) Place within a 100 -year flood hazard boundary structures that impeded or redirect flood
flow, including dam failures? No New Impact. Refer to item "g," above. No impacts
with regard to hazards from dam failure were identified in the 1996 EIR.
j) Result in inundation by seiche, tsunami or mudflows? No New Impact. Project
Subareas are located well inland from San Francisco Bay or other major bodies of
water and would not be impacted by a tsunami or seiche. Adherence to Mitigation
Measures 9.B.1 through 8 contained in the 1996 EIR addressed impacts related to
protection from landslide and mudflows. The ENGEO soils report addressed the
potential for landslide on the Schaefer Ranch and recommended steps to reduce
City of Dublin Page 48
Initial Study /Schaefer Ranch Unit 3 October 2015
this potential impact to a less- than - significant level. These steps were incorporated
into the mass grading plan for the overall Schaefer Ranch site as required by the
Mitigation Measure. No new or more severe significant impacts than were
analyzed in the previous EIR are anticipated with regard to landslides and
mudflows.
10. Land Use and Planning
Environmental Setting
Properties comprising the project site areas currently vacant and contain no structures.
Project Impacts
a) Physically divide an established community? No New Impact. The properties
comprising the two Subareas are vacant and are part of the larger Schaefer Ranch
residential planned community. A portion of the Schaefer Ranch master plan has
been constructed. There are no existing dwellings or residents on the two subareas
included in this application. No new or more severe significant impacts would
therefore occur with respect to division of an established community should the
project be approved. No new or more severe significant impacts would occur with
respect to this topic.
b) Conflict with any applicable land use plan, policy or regulation adopted for the purpose of
avoiding or mitigating an environmental effect? No New Impact. The applicant has
requested an amendment to the Dublin General Plan to redesignate land uses on
Subarea 1 as described in the Project Description section of this Initial Study. A
future General Plan amendment would be required with development
applications for development of Subarea 2.
If this application is approved by the City, the project would be consistent with the
Dublin General Plan, since it would be consistent with the land uses and the
density range specified in the General Plan. No other land use plan or policy
conflicts would exist and there would be no new or more severe significant
impacts to this topic than previously analyzed.
c) Conflict with a habitat conservation plan or natural community conservation plan? No
New Impact. The project area is not located within a habitat conservation plan area
or natural community conservation plan area. See section 4 "f" of this Initial Study.
There are no new or more severe significant impacts with respect to conflicts with
a Habitat Conservation Plan or natural community conservation plan for this
project than analyzed in the 1996 EIR.
11. Mineral Resources
Environmental Setting
City of Dublin Page 49
Initial Study /Schaefer Ranch Unit 3 October 2015
The 1996 EIR does not identify the presence of significant mineral deposits in the
Schaefer Ranch area.
Project Impacts
a, b) Result in the loss of availability of regionally or locally significant mineral resources? No
New Impact. The 1996 EIR does not indicate that significant deposits of minerals
exist in the project area, so no new or more severe significant impacts would occur
with respect to this topic.
12. Noise
Environmental Setting
The City defines "noise" as a sound or series of sounds that are intrusive, irritating,
objectionable and /or disruptive to daily life. Noise is primarily a concern with regard to
noise sensitive land uses such as residences, schools, churches and hospitals. Although
noise is controlled around commercial, industrial and recreation uses, community noise
levels rarely exceed maximum recommended levels for these uses.
Regulatory setting
The Noise Element of the General Plan identifies the following primary sources of noise
in Dublin: traffic noise from freeways and major roadways within the community and
noise generated by the BART line adjacent to the I -580 freeway.
The Noise Element identifies the following maximum noise exposure levels by land use
type. These standards were contained in the previous Noise Element of the Dublin
General Plan, which have since been updated (February 2013), but the noise exposure
criteria were in effect at the time this project was submitted and are used for this
analysis.
Table 1. City of Dublin Land Use /Noise Compatibility Standards (decibels)
Land Use
Normally
Acceptable
Conditionally
Acceptable
Normally
Unacceptable
Clearly
Unacceptable
Residential
60 or less
60 -70
70 -75
75+
Lodging Facilities
60 -70
70 -80
80+
--
Schools, churches,
nursing homes
60 -70
70 -80
80+
--
Neighborhood
arks
60 or less
60 -65
65 -70
70+
Office /Retail
70 or less
70 -75
75 -80
80+
Industrial
70 or less
70 -75
75+
--
Source: Dublin General Plan Noise Element, Table 9 -1
The City of Dublin also enforces an interior noise standard of 45 decibels for residential
dwellings.
City of Dublin Page 50
Initial Study /Schaefer Ranch Unit 3 October 2015
The major sources of noise near the Schaefer Ranch site is traffic noise from the I -580
freeway, immediately south of the site. The 1996 EIR estimated that the 60 dB Ldn noise
contour extended approximately 1000 feet north of the centerline of the freeway
Schaefer Ranch EIR
The following noise impacts and mitigation measures are contained in the 1996 EIR.
• Impact 11A identified construction noise generated by grading of the
Schaefer Ranch site as a significant impact. Mitigation Measure 11.A.1
required that existing residents near the Schaefer Ranch be moved off -site
during construction, or that grading activities be phased to limit duration of
grading.
Impact 11B noted that future residents on a portion of the Schaefer Ranch site
would be impacted by noise from I -580 and, to a lesser extent, by on -site
vehicle noise. To mitigate this impact to a less - than - significant level,
Mitigation Measure 11.13.1 required each project developer to prepare and
submit a precise noise control plan identifying how City noise exposure
levels will be met, including but not limited to building treatments,
construction of noise barriers and other techniques. Mitigation Measure
11.B.2 required a redesign of the project where anticipated noise levels would
exceed 70 dB Ldn. This impact does not apply to the current project
submittal.
These mitigation measures continue to apply to the current project.
Project Impacts
a) Would the project expose persons or generation of noise levels in excess of standards
established by the General Plan or other applicable standard? No New Impact. Figure
11 -12 contained in the 1996 EIR indicates that all Subareas lie outside of a future
significant noise area, defined as an exterior noise level of 60 decibels or greater
(Ldn). Therefore, approval and construction of the proposed project would not
expose additional residents or visitors to excessive noise levels. No new or more
significant noise impacts would result than have been previously analyzed in the
1996 EIR and no new or additional analysis is required.
b) Exposure of people to excessive groundborne vibration or groundborne noise levels? No
New Impact. The proposed project would include normal construction methods
and techniques typical of single - family dwellings. A majority of site grading has
already occurred as part of the overall Schaefer mass grading operation, so
remaining construction activities would include fine grading and house
construction. Typical construction methods for single- family dwellings do not
involve significant groundborne vibration levels, so no impacts are anticipated
with regard to vibration. Therefore, no new or more severe significant impacts
would result with regard to vibration than were analyzed in the 1996 EIR.
c) Substantial permanent increases in ambient noise levels? No New Impact. The 1996 EIR
noted that on -site traffic noise would be a minor component of noise on the site
City of Dublin Page 51
Initial Study /Schaefer Ranch Unit 3 October 2015
(Impact 11B.). Increases in off -site noise as a result of traffic generated on the
Schaefer Ranch was identified as a less - than - significant level (see Impact 11E). The
proposed project, if approved, would slightly increase the number of vehicle
trips(see Section 15 of this Initial Study, Transportation). The increase in associated
vehicle noise on the site would not be substantial. Therefore no new or more
severe significant impacts would result than were analyzed in the 1996 EIR.
d) Substantial temporary or periodic increase in ambient noise levels in the project vicinity
above levels without the project? No New Impact. Future grading and construction
activities on the project site are limited to weekdays between 7:30 am and 5 pm by
Mitigation Measure 11.A.1 contained in the 1996 EIR. No new or more severe
significant impacts have been identified in this Initial Study than were analyzed in
the 1996 EIR.
e, f) For a project located within an airport land use plan or private airstrip, would the project
expose people to excessive noise levels? No New Impact. As noted in the
Environmental Setting section, the Schaefer Ranch site is not located near any
public or private airports or airstrips and no impact would result with regard to
this topic.
13. Population and Housing
Environmental Setting
The Subareas included in this project are vacant and contain no dwellings.
Schaefer Ranch EIR
The Schaefer Ranch EIR identified less - than - significant or a beneficial impacts
with regard to population growth (Impact 2A), housing stock (Impact 2B),
affordable housing (Impact 2C), employment (Impact 21)), jobs /housing balance
(Impact 2E), sales tax revenues (Impact 2F), property tax revenues (Impact 2G)
and competitive impacts (Impact 2H). No mitigation measures regarding
population or housing impacts were included in the 1996 EIR.
Project Impacts
a) Induce substantial population growth in an area, either directly or indirectly? No New
Impact. Approval of the proposed project would increase the permanent
population on this portion of the overall Schaefer Ranch project. However, the
total number of dwellings within the overall Schaefer Ranch should the project be
approved (420 dwellings) would be fewer than analyzed in the 1996 EIR (474
dwellings) and entitled in the current subdivision map (466 dwellings). No impact
with regard to substantial population growth is therefore anticipated and no new
or more severe significant impacts regarding population growth have been
identified in this initial study than were identified in the 1996 EIR.
b,c) Would the project displace substantial numbers of existing housing units or people? No
New Impact. The project site is vacant and no housing units or people would be
displaced should the project be approved.
City of Dublin Page 52
Initial Study /Schaefer Ranch Unit 3 October 2015
14. Public Services
Environmental Setting
The following provide essential services to the community:
Fire Protection. Fire protection services are provided by the Alameda County
Fire Department. The Department provides fire suppression, emergency
medical response, fire prevention, education, building inspection services and
hazardous material control. The nearest station to the project site is Station
No. 16, located at 7494 Donohue Drive in western Dublin. The original
development plan for Schaefer Ranch depicted a site for a future fire station.
Subsequently, the Alameda County Fire Department determined that there
was no need for a station in this location and the City of Dublin allowed the
fire station site to be converted to another land use.
• Police Protection: Police and security protection is provided by the Dublin
Police Services Department, headquartered at the Dublin Civic Center.
• Schools. The Dublin Unified School District provides K -12 educational
services.
• Library Services: Alameda County Library service.
• Maintenance. Maintenance of streets, roads and other governmental facilities
is the responsibility of the City of Dublin.
The City and related service providers, including the Dublin Unified School District,
also charge impact fees on new development, which is generally collected at the time
building permits are issued and are used to help off -set project impacts to service
providers.
Schaefer Ranch EIR
The 1996 Schaefer Ranch EIR contains the following impacts regarding public services:
Impact 7.3C identified a significant impact with regard to Fire Department
emergency response times to the Schaefer Ranch. Adherence to Mitigation
Measures 7.3.1 through 6 will reduce this impact to a less - than - significant level.
These measures require reservation of a fire station site and staffing of a new fire
station in western Dublin, imposition of fire protection measures on future
subdivision maps in the Schaefer Ranch and planting of fire resistant vegetation
surrounding dwellings on the Schaefer Ranch.
• Impact 7.31) identified a significant impact related to meeting response times to
the Schaefer Ranch site by emergency vehicles. Individual developments in the
Schaefer Ranch will be required to adhere to Mitigation Measures 7.3.1 and 7.3.8
City of Dublin Page 53
Initial Study /Schaefer Ranch Unit 3 October 2015
to reduce this impact to a less- than - significant level. Mitigation Measure 7.3.1
required dedication of a fire station in West Dublin that would contain
emergency medical response equipment. Mitigation Measure 7.3.8 requires an
educational program to residents focusing on emergency medical response
times.
• Impact 7.3E notes a significant impact with regard to wildland - structural fires,
that would be reduced to a less - than - significant level by adherence to Mitigation
Measure 7.3.2 — 7.3.5. This measure requires planting of fire - resistant vegetation
between buildings and wildland areas, provide for emergency vehicle access and
discing of fire breaks.
• Impact 7.3F identified a significant impact with regard to lack of fire hydrants in
the Schaefer Ranch area. Adherence to Mitigation Measure 7.3.3, that requires
installation of DSRSD- approved fire hydrants within the Schaefer Ranch
development.
Impact 7.3G noted an impact with regard to an increase of combustible materials
on the site. Mitigation Measures 7.3.1 and 7.3.4 require measures such as the use
of appropriate materials as part of future construction, including Class A roof
material and non - combustible walls, such as stucco, installation of interior fire
sprinklers and similar techniques, to reduce this impact to a less -than- significant
level.
Impact 7.3H noted fire impacts with regard to burning of vegetation on the
Schaefer Ranch that would be significant. Adherence to Mitigation Measure 7.3.5
requires that landscape plans for the project exclude high combustion plant
species in favor of fire retardant plants. The measure also requires approval of a
fuel modification plan to reduce fuel load adjacent to future houses and that
perimeter landscaping be irrigated. With adherence to this measure, Impact 7.3H
is less -than- significant.
Impact 7.3I identified an impact with regard to street and road access into the
Schaefer Ranch site for emergency vehicles and to maneuver on the Ranch.
Adherence to Mitigation Measure 7.3.6 reduced this impact to a less -than-
significant level by requiring roads within the Schaefer Ranch meet fire
department design standards, including appropriate road surfaces, maximum
gradients, length of cul -de -sac roads and similar items.
Impact 7.3J noted potential impacts with regard to life safety impacts with
approval of the Schaefer Ranch project, including allowing sufficient time for
occupants to escape buildings in the event of an emergency. Adherence to
Mitigation Measure 7.3.1, 7.3.7 and 7.3.8 reduces this impact to a less -than-
significant level. Mitigation Measure 7.3.1 is described above. Mitigation
Measures 7.3.7 and .8 require implementation of an education and self- inspection
program for future residents to allow sprinklers to remain in place and
implementation of a Community Education Program focusing on medical
emergencies.
City of Dublin Page 54
Initial Study /Schaefer Ranch Unit 3 October 2015
Impact 7.4A identifies a significant impact with regard to an increase in the
number of calls for service based on development of the Schaefer Ranch and the
need for additional police staffing and equipment. Adherence to Mitigation
Measure 7.4.1 and 7.4.2 reduced these impacts to a less - than - significant level.
These measures require the Schaefer Ranch developer to prepare a budget
strategy to increase police staffing and equipment to serve the project and that
adequate security services can be provided to regional trails in the area by East
Bay Regional Park District.
Impact 7.4B notes a significant impact with regard to site security in terms of
visibility of dwellings and police response times. Adherence to Mitigation
Measure 7.4.3 requires police department review of individual development
projects to ensure that safety and security components are included in project
designs, including proper visibility, access and similar components and reduced
this impact to a less- than - significant level.
Impact 7.8A identified a significant impact with regard to other municipal
services, such as building and safety, engineering, planning, and general
governmental services provided by the City of Dublin. Other governmental
services are provided by Alameda County, including libraries, welfare and
similar functions. Adherence to Mitigation Measure 7.8.1 will reduce this impact
to a less -than- significant level. This measure requires that the City of Dublin
analyze other municipal service costs to ensure that satisfactory services can be
provided as part of a Development Agreement.
Impact 7.9A notes a potentially significant impact with regard to the amount of
solid waste generated by new land uses on the Schaefer Ranch site. The Schaefer
Ranch EIR includes Mitigation Measures 7.9.1 and 7.9.2 to reduce this impact to a
less- than - significant level. These measures requires the applicant to furnish the
City a "will serve" letter from the solid waste collector confirming that solid
waste collection and disposal services are available to serve the project and that
commercial portions of the Schaefer Ranch area provide on -site areas for
recycling.
Impact 7.10A identified an impact with regard to school district boundaries and
school facilities. When the 1996 EIR was prepared, neither the Castro Valley
Unified School District or the Dublin Unified School District had the capacity to
accommodate additional students generated by the Schaefer Ranch development.
Adherence to Mitigation Measure 7.10.1 reduced this impact to a less -than-
significant level. It requires that, prior to residential occupancy, the City verify
that attendance boundaries between the two school districts have been resolved,
that the Development Agreement for the project provide for payment of school
fees by project developers and that the applicable school district has been
consulted with regard to siting of any new schools required to serve the Schaefer
Ranch project. This action has been completed.
These mitigation measures continue to apply to the currently proposed project.
City of Dublin Page 55
Initial Study /Schaefer Ranch Unit 3 October 2015
Therefore, no new or more severe significant impacts at regard. to police service
than. analyzed in. th.e 1996 EIR have been. identified,
c) Schools? No New Impact, I 'here would be no impacts with. regard to school
impacts with. adherence tc) Mitigation Measures 7.10A. contained in the 1,996 EIR
Payment of statutorily inandated impact., fees at the time of issuance of btfild.ing
pernii.-ts will comply with this mitigation req-thremenit, The school district
boundary between th.e. Castro Valley Unifted School District and Dublin. Unified
School District liar been adjtisted to inchade the entire !3chaefer Ranch. site within
th.e Dublin Undfied School District. Therefore, no new orrr.iore severe significant
impacts would occur with regard to school. im.pacts than were analyzed in the 1996
EIR-
d.) Other Mnxrninental servi(.x, including maintenance qf'ptiblic filcili ties? No New
Impact. Mitigation. Measure 7.8.1. contained in. tile 1.996 EIR requires, a
Development Agre ern ent for Hae project to ensure that satisfactory
financial resources are devoted to other governmental se.n. -vices. A.
Dever opt-nent Agreement has been approved per the Mitigation Measure.
Overall, no new or more severe signif ic.ant impacts than analyzed in the
1,996 EIR would occur with regard. to other governmental services,
e) Solid waste generation? I. See i tern.16 "e"' and "'f," below.
�"-Ifty-o'-Fb)'-u b - - - — --------- - - -------- - - -,"---Pag-e'- 5-6
Birflfial Sturfy/ chant er Ream Uiliit 2 October 2 0,15
15. Recreation
Environmental Setting
Project Subareas currently vacant and contains no City or regional parks.
The City of Dublin Parks and Recreation Master Plan indicates that local parks are
planned to be constructed north of Subarea 1 and a regional trail is planned to extend
through the approximate center of the Schaefer Ranch project. The regional trail has
been completed and accepted by the East Bay Regional Park District. A staging area for
the regional trail has been constructed in the eastern portion of Schaefer Ranch and is
currently operational.
Schaefer Ranch EIR
The 1996 EIR contains the following impacts and mitigation measures with regard to
parks and recreation facilities.
• Impact 7.6A identified an impact to open space management issues within the
Schaefer Ranch, including balancing public use of open space areas and overuse
of environmentally fragile areas. Adherence to Mitigation Measures 7.6 -1
requires preparation of an Open Space Management Plan that would identify
open space areas, specific issues and funding sources for open space areas.
Impact 7.613 notes a potentially significant impact with regard to the need for
additional parks within the Schaefer Ranch project to serve the anticipated
increase of on -site residents. Mitigation Measures 7.6.2 through 7.6.4 requires the
provision of local parks, a regional trail and payment of in -lieu park fees to the
City of Dublin for neighborhood and community parks. Park sites offered to the
City shall be reviewed for developability as a park in terms of geotechnical
considerations, availability of services and other conditions. With adherence to
these measures, Impact 7.6B will be less - than - significant. These facilities have
been provided.
Impact 7.6C notes a potentially significant impact with regard to internal open
space, including on -going maintenance, fire suppression, weed abatement,
erosion control and slope stability. Mitigation Measure 7.6.5 requires the City of
Dublin to impose conditions of approval on specific development projects within
the Schaefer Ranch, including ownership of graded slopes with heights of 15 feet
or greater, maintenance of access points to open space areas, provision of a
permanent management entity for internal and perimeter open space areas.
• Impact 7.6E relates to an impact with regard to the proposed regional trail and
other on -site trail facilities being consistent with EBRPD standards. Adherence to
Mitigation Measures 7.6.8 and 7.6.9 reduces this impact to a less- than - significant
level. These measures require the City of Dublin to verify that regional trail
facilities and linkages are consistent with EBRPD standards.
These mitigation measures continue to apply to the proposed project.
City of Dublin Page 57
Initial Study /Schaefer Ranch Unit 3 October 2015
Project Impacts
a) Would the project increase the use of existing neighborhood or regional parks? No New
Impact. Approval and construction of the proposed project would not increase the
use of nearby City and/ or regional recreational facilities from that analyzed in the
1996 EIR, since the total number of dwellings within the overall Schaefer Ranch
should the project be approved (420 dwellings) would be fewer analyzed in the
1996 EIR (474 dwellings) and entitled in the current subdivision map (466
dwellings). No recreational facilities are proposed as part of the current project.
Therefore, no new or more severe significant impacts with regard to use of parks
would occur beyond those analyzed in the 1996 EIR.
b) Does the project include recreational facilities or require the construction of recreational
facilities? No New Impact. See item "a," above.
16. Transportation /Traffic
Environmental Setting
The project site is served by Dublin Boulevard, a major east -west arterial road that has
been extended into Schaefer Ranch. Dublin Boulevard links Schaefer Ranch with central
Dublin as well as providing regional access to the I -580 freeway. North -south access to
and from the project site is provided by Schaefer Ranch Road that intersects with
Dublin Canyon Road south of the I -580 freeway.
Public transit to West Dublin is provided by the Livermore Amador Valley Transit
Authority that operates WHEELS, a fixed and demand based bus service in Dublin,
Pleasanton and Livermore. The closest bus line to Schaefer Ranch is Route 3 that
extends as far west as the intersection of Dublin Boulevard and Silvergate Drive. Route
3 provides fixed weekday and Saturday service to Stoneridge Mall, Hacienda Business
Park, the Dublin/ Pleasanton BART station and other points within Dublin.
As noted in the Recreation section above, a regional multi-use trail has been constructed
within the Schaefer Ranch site and dedicated to the East Bay Regional Park District. A
trailhead has also been built.
Dublin Boulevard has been designed to accommodate bicyclists (2008 Addendum).
Schaefer Ranch EIR
The 1996 Schaefer Ranch EIR contains the following traffic and circulation significant
impacts and mitigation measures.
• Impact 4A identifies a significant impact with regard to additional traffic at the
Silvergate Drive/ Dublin Boulevard intersection causing this intersection to
operate at an unsatisfactory level of service. Adherence to Mitigation Measure
4.A.1 would reduce this impact to a less- than - significant level and requires
developments within the Schaefer Ranch to contribute a fair share contribution to
City of Dublin Page 58
Initial Study /Schaefer Ranch Unit 3 October 2015
a traffic signal at this intersection and associated widening of this intersection.
This measure has been completed.
Impact 4B noted a significant impact with regard to future traffic at the San
Ramon Road/ Dublin Boulevard intersection as a result of traffic from Schaefer
Ranch. Mitigation Measure 4.B.1 requires the Schaefer Ranch developer to
contribute a fair share contribution to widening and improving this intersection
to accommodate future project traffic. With such a payment, this impact will be
less -than- significant. This mitigation measure has been completed.
Impact 4F identified an impact with regard to significant impacts at the Hansen
Drive/ Dublin Boulevard intersection as a result of Schaefer Ranch traffic.
Adherence to Mitigation Measure 41.1 reduced this impact to a less -than-
significant level by requiring the Schaefer Ranch project developer to contribute
a fair share portion of the cost of installing a traffic signal at this intersection. This
measure has been completed.
• Impact 4G identified a significant impact at the Schaefer Ranch /Dublin Canyon
Road intersection due to future traffic from Schaefer Ranch. Adherence to
Mitigation Measure 4.G.1 reduces this impact to a less -than- significant level and
requires the developer to contribute a fair share amount of the cost to signalizing
this intersection and to making related improvements to Dublin Canyon Road.
• Impact 4H notes a significant impact with regard to future traffic at Schaefer
Ranch Road and Dublin Boulevard. Adherence to Mitigation Measure 4.H.1
reduces this impact to a less - than - significant impact by requiring the Schaefer
Ranch developer install a traffic signal at this intersection. This measure has been
completed.
Impact 4L identified a significant cumulative impact with regard to future traffic
conditions at Eden Canyon Road /Palomares Canyon Road and a I -580
interchange due to future traffic plus the Schaefer Ranch's contribution to future
traffic conditions. Mitigation Measure 4.L.1 reduced this impact to a less -than-
significant level by requiring the project applicants to contribute a fair -share
portion of future signal costs at the intersection of Eden Canyon Road /I -580 EB
ramps and the intersection of Palo Verde Road /I -580 EB ramps. The fair -share
contribution shall be determined by a future fee study based on trips using these
intersections.
Impact 40 identified a potentially significant impact with regard to transit access
to the Schaefer Ranch site, specifically that no pubic transit stops exist near the
Ranch. Mitigation Measure 4.0.1 requires the City of Dublin to consult with
public transit districts to make necessary transit arrangements for future transit
provisions. The City shall require a park- and -ride lot, if appropriate, as well as a
transit stop, bus turning radii and other facilities to support transit.
• Impact 4R identified a significant impact with the provision of pedestrian and
bicycle access within the Schaefer Ranch development and with providing
City of Dublin Page 59
Initial Study /Schaefer Ranch Unit 3 October 2015
regional linkages to existing bicycle and pedestrian systems. Mitigation Measure
4.R.1 through 4.R.3 reduced this impact to a less - than - significant level by
requiring Dublin Boulevard to accommodate bicycles, extending the
pedestrian/ equestrian trial under I -580 to connect with Dublin Canyon Road and
providing proper signs and markings for trail crossings.
These mitigation measures continue to apply to the proposed project.
Project Impacts
a) Conflict with applicable plans related to the effectiveness of the circulation system,
including all modes of travel, including intersections, streets, highways and other
components? No New Impact. The proposed project would slightly reduce peak
hour vehicle trips to local and regional roads than was analyzed in the 1996 EIR.
This would be 18 fewer AM peak hour trips and 18 fewer PM peak hour trips. This
is shown on Table 2, below.
Table 2. Residential Peak Hour Trip Generation Comparison
Land Use
Dwelling Units
A.M. Peak Hour
Trips
P.M. Peak Hour
Trips
Included in 1996 EIR
Single Family-
detached
400
296
401
Single Family-
Attached
74
33
41
Total Trips
--
329
442
Proposed Development
Single Family-
detached
420
311
424
Total Proposed Trips
--
344
424
Net Change
-18
-18
Note: Trip rates based on Table 4 -5 contained in the 1996 Schaefer Ranch EIR, updated by City of
Dublin staff (2015). Trip rates as documented in 1996 EIR.
There would be fewer peak trips than analyzed in the Schaefer Ranch EIR.
Therefore, the proposed project would result in less of an impact to roadways
than the project analyzed in the 1996 EIR.
As required by various mitigation measures contained in the 1996 EIR, the project
developer has installed a traffic signal system at the Dublin Boulevard/ Schaefer
Ranch Road intersection as well as paid fair share contributions to improvements
at the Silvergate Drive/ Dublin Boulevard intersection, the San Ramon
Road /Dublin Boulevard intersection, the Hansen Drive /Dublin Boulevard
intersection, the Schaefer Ranch Road/ Dublin Canyon Road intersection, the
Dublin Boulevard/ Schaefer Ranch Road intersection and the Eden Canyon Road -
Palomares Road/ I -580 interchange.
City of Dublin Page 60
Initial Study /Schaefer Ranch Unit 3 October 2015
Based on discussions with the Dublin Public Works Department, the above
improvements have constructed, have been bonded for, or fees have been paid to
the City as required by the various 1996 EIR Mitigation Measures.
Thus, no new or more severe significant impacts beyond those analyzed in the
1996 would result.
b) Conflict with an applicable congestion management program, including level of service
standards, travel demand measures and other applicable standards? No New Impact.
Although the applicant is requesting an amendment to the Dublin General Plan,
the project would not generate a minimum of 100 P.M. peak hour vehicle trips,
which is the threshold of significance for the local congestion management plan.
No new or more severe significant impacts beyond those analyzed in the 1996 EIR
would result.
c) Change in air traffic patterns? No New Impact. Since the proposed project includes
residential uses, it would have no impact on air traffic patterns. No new or more
severe impacts would result with respect to this topic than was previously
analyzed in the 1996 EIR.
d) Substantially increase hazards due to a design feature or incompatible use? No New
Impact. Future residential development that would be allowed by the project
approvals would be served by existing roadways and access easements that have
been designed to City engineering standards and criteria.
As identified in the Project Description, the applicant has requested a modification
of 1996 EIR Mitigation Measure 4.G.1. Among other requirements, this measure
required the project applicant to contribute a fair share portion of financing a
traffic signal at the Schaefer Road/ Dublin Canyon Road intersection. Alameda
County Public Works Department have submitted documentation that signal
warrants in this location have not been met. The project applicant has requested
that Mitigation Measure 4.G.1 be modified, but that the project applicant be
responsible for improvements at this intersection, including a contribution for a
future signal when and if warrants are met.
Therefore, no new or more severe significant impacts beyond those analyzed in the
1996 EIR would result with respect to design hazards.
e) Result in inadequate emergency access? No New Impact. Dwellings included in the proposed
project within Subareas 1 and 2 would be served by existing roads that would provide
adequate emergency access. No new or more severe significant impacts with regard to
emergency access would occur beyond those analyzed in the 1996 EIR.
f) Conflict with policies, plans or programs supporting alternative transportation plans or
result in hazards or barriers for pedestrians or bicyclists? No New Impact. The overall
Schaefer Ranch project includes features that promotes pedestrian and bicycle use
as required by Mitigation Measures 4.R.1— 4.R.3, including allowing bicycle traffic
along Dublin Boulevard and including sidewalks along major sidewalks No new
City of Dublin Page 61
Initial Study /Schaefer Ranch Unit 3 October 2Q15
or more severe significant impacts regarding alternative transportation modes
would occur beyond those analyzed in the 1996 EIR.
17. Utilities and Service Systems
Environmental Setting
The project site is currently served by the following service providers:
• Potable water supply: Dublin San Ramon Services District (DSRSD)
• Sewage collection and treatment: DSRSD
• Solid waste service: Amador Valley Industries.
• Electrical and natural gas power: Pacific Gas and Electric Co.
• Communications: AT & T (formerly Pacific Bell).
Schaefer Ranch EIR
The 1996 EIR contains the following significant impacts and mitigation measures with
regard to utilities and service systems.
Impacts 7.1A and 7.1B identified significant impacts with regard to lack of a
water system on the project site and constraints on water supply. These impacts
were reduced to less- than - significant levels by adherence to Mitigation Measures
7.1.1 through 7.1.8. These measures require incorporation of water conservation
features into the project, designing and constructing water systems to meet
DSRSD engineering standards, construction of a new water reservoir on the site,
issuance of a will -serve water service letter from DSRSD, appropriate phasing of
the water system and similar elements.
Impact 7.2A was identified as a significant impact related to the adequacy of
wastewater collection and treatment facilities. Adherence to Mitigation Measures
7.2.1 through 7.2.12 would reduce this impact to a less -than- significant level.
These measures require issuance of a "will- serve" letter from DSRSD indicating
that adequate wastewater disposal capacity is available, requiring the applicant
to update the local wastewater collection system master plan, requires the
project developer to obtain wastewater connections from DSRSD, requires use of
recycled water for open space areas, requires annexation of the Ranch to DSRSD,
requires that all wastewater facilities be constructed to DSRSD engineering
standards, requires that treated effluent from the project meet Regional Water
Quality Control Board standards and other related items.
• Impact 7.2C noted a significant impact with regard to disposal of treated
wastewater that will be reduced to a less - than - significant level by adherence to
Mitigation Measure 7.2.1, 7.2.2 and 7.2.4.
City of Dublin Page 62
Initial Study /Schaefer Ranch Unit 3 October 2015
• Impact 7.21D identified a significant impact with regard to wastewater
improvements. Mitigation Measure 7.2.6 reduced this impact to a less -than-
significant level.
• Impact 7.9A noted a significant impact with regard to solid waste capacity.
Mitigation Measure 7.9.1
The above mitigation measures continue to apply to the proposed project.
Project Impacts
a) Exceed wastewater treatment requirements of the RWQCB? No New Impact. Mitigation
Measure 7.2.8 contained in the Schaefer Ranch EIR requires the project to meet
treated effluent standards adopted by the Regional Water Quality Control Board.
Based on the will -serve letter issued by DSRSD for the overall Schaefer Ranch
project, adequate wastewater treatment and disposal capacity exists to serve
development planned in the Schaefer Ranch development so that no new or more
severe significant impacts would result. The currently proposed project would
generate less wastewater than the total number of dwellings and the commercial
development originally planned and approved for this portion of the overall
Schaefer Ranch development. The local service provider recently documented that
adequate wastewater treatment capacity exists to serve the proposed project and
would not exceed regional water quality bard discharge standards (source: Stan
Kolodzie, DSRSD engineer, 12/17/14). Therefore, no new or more severe
significant impacts are anticipated with respect to this topic than were analyzed in
the previous EIR prepared for the Schaefer Ranch project.
b) Require new water or wastewater treatment facilities or expansion of existing facilities?
No New Impact. Water and wastewater extensions from existing utility facilities
would need to be constructed to serve the amount of development proposed for
the two subareas. According to a representative of DSRSD, the need for increased
water, wastewater collection, treatment and disposal facilities from the
construction of the proposed project would not result in a new or more severe
significant impact than was analyzed in the 1996 EIR document and as contained
in current General Plan land use build -out assumptions (source: Stan Kolozdie,
DSRSD, 12/17/14).
The issue of wastewater treatment facilities is addressed in subsection "a," above.
Overall, no new or more severe significant impacts would occur with regard to
water and wastewater provision than was analyzed in the 1996 EIR.
c) Require new storm drainage facilities? No New Impact. Impacts related to drainage
impacts and mitigation measures from the 1996 EIR are contained in Section 8 of
this Initial Study. Based on the analysis contained in that section, no new or more
severe significant impacts related to storm drainage facilities beyond those set
forth in the 1996 EIR have been identified.
d) Are sufficient water supplies available? No New Impact. See item "b," above.
City of Dublin Page 63
Initial Study /Schaefer Ranch Unit 3 October 2015
e) Adequate wastewater capacity to serve the proposed project? No New Impact. See
response to "a," above.
f) Solid waste disposal? No New Impact. Adherence to Mitigation Measure 7.9.1
contained in the 1996 EIR reduced the impact to solid waste facilities as a result of
the proposed project to a less - than - significant level. This mitigation requires the
solid waste provider to issue a will -serve letter prior to issuance of a tentative
subdivision map. Based on information provided by Amador Valley Industries,
the franchised solid waste and recycle hauler for the City of Dublin, adequate
capacity exists in the Altamont Landfill to accommodate the quantity of solid
waste generated by this project (per. comm., Karen Brighi, Amador Valley
Industries, 7 / 21 / 08). With adherence to Mitigation Measure 7.9.1, no new or more
severe significant impacts beyond those analyzed in the 1996 EIR with regard to
solid waste would occur.
g) Comply with federal, state and local statutes and regulations related to solid waste? No
New Impact. The existing service provider will ensure adherence to federal, state
and local solid waste regulations should the proposed development applications
be approved. No impacts are anticipated in this regard.
18. Mandatory Findings of Significance
a) Does the project have the potential to degrade the quality of the environment, substantially reduce
the habitat of a fish or wildlife species, cause a fish or wildlife population to drop below self -
sustaining levels, threaten to eliminate a plant or animal community, reduce the number of or
restrict the range of a rare or endangered plant or animal or eliminate important examples of the
major periods of California history or prehistory? No. Potential impacts related to substantial
reduction of fish or wildlife species or their respective species, reduce the range or
number of endangered plant or animal species or eliminate examples of major period of
California history or prehistory on the Schaefer Ranch site area have been analyzed and
mitigated in the 1996 Schaefer Ranch EIR. The proposed project would cause no new or
substantially more severe significant impacts on biological or cultural resources beyond
those identified in the previous EIR.
b) Does the project have impacts that are individually limited, but cumulatively considerable?
( "Cumulatively considerable" means that the incremental effects of a project are
considerable when viewed in connection with the effects of past projects, the effects of
other current projects and the effects of probable future projects). No. Significant and
unavoidable impacts have been identified with regard to secondary impacts on native
plants, regional pollutant emissions, cumulative loss of open space and cumulative loss of
vegetation and wildlife. The proposed project would not result in additional or more
severe significant cumulative impacts than have been previously analyzed by the City in
the 1996 EIR.
c) Does the project have environmental effects, which will cause substantial adverse effects on human
beings, either directly or indirectly? No. No such impacts have been discovered in the course
of preparing this Initial Study.
City of Dublin Page 64
Initial Study /Schaefer Ranch Unit 3 October 2015
Initial Study Preparers
Jerry Haag, Urban Planner, project manager
Jane Maxwell, report graphics
Agencies and Organizations Consulted
The following agencies and organizations were contacted in the course of this Initial
Study:
City of Dublin
Luke Sims, AICP, Community Development Director (former)
Jeff Baker, AICP, Assistant Community Development Director
Michael Porto, Project Manager
Kathleen Faubion, Assistant City Attorney
Captain Tom McCarthy, Police Services Department
Bonnie Terra, Alameda County Fire Department
Dublin San Ramon Services District
Rhodora Biagton, senior engineer
California Department of Toxic Substances Control (DTSC)
Website
Applicant Representatives
Doug Chen, Discovery Builders
References
Bay Area Air Quality Management District, CEQA Guidelines, 2012
California Department of Toxic Substances Control, website, November 2014
CEQA Addendum to the Schaefer Ranch Final Environmental Impact Report,
2008.
Dublin General Plan, City of Dublin, Updated through 2/ 18/ 14
Final Environmental Impact Report for Schaefer Ranch Project/ General Plan
Amendment, WPM Planning Team, 1996
Parks and Recreation Master Plan, City of Dublin.
City of Dublin Page 65
Initial Study /Schaefer Ranch Unit 3 October 2015
EXHIBIT B
STATEMENT OF OVERRIDING CONSIDERATIONS
General.
1. Pursuant to CEQA Guidelines section 15093, the City Council of the City
of Dublin adopted a Statement of Overriding Considerations for those impacts identified
in the Schaefer Ranch EIR as significant and unavoidable (Resolution No. 76-96, July 9,
1996). The City Council carefully considered each impact in its decision to approve
urbanization of the Schaefer Ranch through approval of a General Plan Amendment
and the Schaefer Ranch Planned Development Zoning and Land Use and Development
Plan. The City Council is currently considering a General Plan Amendment, a PD
rezoning amendment and related development applications for Unit 3 of the Schaefer
Ranch.
More specifically, the project involves a resubdivision of a portion of Unit 3 at the
terminus of Dublin Boulevard, known as Schaefer Way. The resubdivision would create
19 residential lots in lieu of six existing lots on the site. The project also involves a
modification of Mitigation Measure 4.G.1 contained in the 1996 EIR that required the
project developer to pay a fair share of the cost to signalize the Dublin Canyon
Road/Schaefer Ranch Road intersection. The proposed action would delete this portion
of Mitigation Measure 4.G.1 since it has been documented by Alameda County Public
Works Department that signal warrants are not met.
The area described above is in Schaefer Ranch and was addressed in the certified
Schaefer Ranch EIR. Pursuant to CEQA Guidelines section 15162, the City prepared
an Addendum to the 1996 Schaefer Ranch EIR for the current project described above.
The Addendum is based on a completed Initial Study that identified no additional
significant unavoidable impacts for the current project; however, the Schaefer Ranch
EIR identified three significant unavoidable impacts, for which statements of overriding
considerations were adopted for the related 1996 project approvals. Pursuant to a 2002
court decision, the City Council must again adopt overriding considerations for the
1
previously identified unavoidable impacts that apply to the current Project.
The City Council believes that many of the unavoidable environmental effects identified
in the Schaefer Ranch EIR will be substantially lessened by mitigation measures
adopted with the previous approvals and by the environmental protection measures
included in the current project design or adopted through the project approvals, to be
implemented with the development of the project on the sites described above. Even
with mitigation, the City Council recognizes that the implementation of the current
project on the above described sites carries with it unavoidable adverse environmental
effects as identified in the Schaefer Ranch EIR. The City Council specifically finds that
to the extent that the identified adverse or potentially adverse impacts for the project
have not been mitigated to acceptable levels, there are specific economic, social,
1
“
public officials must still go on the record and explain specifically why they are approving the later project
despite its significant unavoidable impacts.” (emphasis original.) Communities for a Better Environment v.
th
California Resources Agency 103 Cal. App. 4 98. ____ (2002)
Page 1 of ________
2524514.1
environmental, land use, or other considerations that support approval of the current
project.
2. Unavoidable Significant Adverse Impacts from the Schaefer Ranch EIR.
The
following unavoidable significant environmental impacts identified in the Schaefer
Ranch EIR for future development of Schaefer Ranch apply to the current project.
Vegetation and Wildlife, Impact 6E. Secondary effects on native plants and wildlife.
Air Quality Impact 12D. Regional pollutant emissions.
Cumulative Impact 18.4D. Cumulative vegetation and wildlife impacts.
3. Overriding Considerations.
The City Council previously balanced the benefits of
the Schaefer Ranch project approvals against the significant and potentially significant
adverse impacts identified in the Schaefer Ranch EIR. The City Council now balances
those unavoidable impacts that apply to future development on the current project site
against its benefits, and hereby determines that such unavoidable impacts are
outweighed by the benefits of the current project as further set forth below. The City
declares that each one of the benefits included below, independent of any other
benefits, would be sufficient to justify approval of the current project and override the
current project’s significant and unavoidable impacts. The substantial evidence
demonstrating the benefits of the current project are found in these findings, and in the
record as a whole for the current project.
The current project will further the urbanization of the Schaefer Ranch area as planned
through the comprehensive framework established in the original Schaefer Ranch Land
Use and Development Plan. The current project provides for approximately 10.26 acres
of permanent open space on the west side of Schaefer Ranch that does not currently
exist. Future lots that will be allowed by the Project would be of a size and configuration
more consistent with other nearby residential lots in Schaefer Ranch. By adding new
dwelling units, the Project will assist the City in providing unique lotting opportunities
and housing options as set forth in the adopted Housing Element of the General Plan.
The project will create new revenue for the City, County, and State through the transfer
and reassessment of property due to the improvement of the property and the
corresponding increase in value. The project will contribute funds to construct schools,
parks, and other community facilities that are a benefit Citywide. Development of the
project site will provide construction employment opportunities for Dublin residents.
Page 2 of ________
2524514.1
Jeff Baker
I
Firm= Jim
ent T C)ie�,iirlbaiuiqf.� <dIMMVM*w@MMMwRftRVAw
S h u r id ay, C) obler 2 2, 2 01115 4 � 3 15 1:-1 NI
To: W BWC Am Dewbmgh
SkilbJect., 82 IRC&R, Schaefer IR anibl--iii iCI PA
leff,
I wm Mourn aWe to attichinid the.� Oict6ber 27th ir'nieladilig M'1111e.11re CINN'60R disiciussed,, blut III nu air tied to sharie rnyOiew
a,Ndthi Ch e bity cioluir-urJ1 ric..%airidimrg pwoposed change in zonbrig hum 6-astate Ihoini es to .1-19 5;lirglle faurnmlilll Ihlornes
in Sdmekr Rwdl- .
I io;)J; *se C1,1115 dhainu e for tli!ie ficfllloMing rieiisions��
L The My pmMudy convorbeid' a sert.Jloiirn of trw Schaefer IR armidl'-n dievelopment (the swbn cwrmdj Wgi
biuHt IL, y FI pi brothers) frorni estatie sizied Ilots to a higher denoty Or lats. Is change drove du tKe
potenUA avosge KlIng pMce hn the neighbori'mod divvalIiWirn the exdliusiv lty amd apIjpie,FO of dhe. ID vier4ll
devOapirnerc
2, 'rvmie adi&lfloinaI chairsjrge widl 'ilk ra: pin er deva1bl p'n I avieirajFne
prliciefoir ilk iro�jpierbi'ps irs the devietoprnieirnt �as
o Irma pin mW YAth the o0onal Me OW
3. Potentlai addlKnal oasts for Me I GRAD Ispechal taxation ditrIM) vAh Me adf%nd homes On the ama.
Given the current W e9aW rMet the developer should nut harc any Ip ir,&Lflen-rs these eslate holl'I'lic"S
and We h no need to Wease dengwy other Allan desire for Wart tiL4-irr-s ofit irnexinkatIon by the builder.
which WH deFade Pre appeal of C1 ilp arild
SIncerdly,
W rod Leshe Dearbau&
INAUn Ca 94568
leff loalleir
Thursday, Cklobm 2Z,2015 GAG Ritol
III Jeff Baker
510blelct: Propimmid plan For coRmSor at sdoehor rmb
11 aim 'a resWmUoU&eSdmeQr IRiarm hownmunkyreddNg at 1..iDl1.7ltA,ar-sha11 11 CanponCmwl Dubhirii
I M be umble trai ia rt nid thie. rneiebinF i OlCtii)tier 2 7th.
I hmvby apse wRh all We sitaternennits madle, lnIPII)105iin&, fll,iirs bl',DPDSC:ld cioirmtir%,�irfiion,
�P I E ase co nis I dea r, t hil is o I!) �pio si It 11c) ir� ollnini i ii-w-
Rego rds,
SoVkha SedUr'
Sent From my Rhioinie
Jeff Balksir
11
P`raw Jeff Raker
Saw: li!!'rlday, Dctlo�bieir 23, 2,1015 4AI l:::lN'A
Tm: 'sawom,
sluhj RE Prnpowd Qr� If011" COIrlstruiction at schialefer Ilr ainch,
MM&M,
Thank you for ,your, eirnaii rlpgpirdiira g thie pIrqp,o&eld pilirloject ist Schaefer Itancli %We mil proWde yid to Out PlannNg
CornirnII ssII oin for thehr Consideration at the noeeUng an 0dobwAMMe Pl'aIII "anIrn I iQ11 "11 II'na' '5m IU i'WII11111 IIT111,1I e 19.
re cia nru u mieiin datilo in to the My Cou &L The My Co undi � M H ! 'ulbl eiq ule ir t Q hold a pWAc hea H og to n-w ke a tha I ded& n
regardiRg tM prNeu. All people wliro :rip icim. ivipid noUce of toe Planniq ComwvhMoin nwieting, will'I Asia rleirieiivl,� a url otilcle 'of
Ge City Coundl meeVqg,
MMIMM
Assistant Coirnrnlunly DevelopmeM Moor CAV of DubHn
100 Oi viiic Plil[a T.a, IDli.0 lblHin, CA 194568
1(925�833-166'.LO I 1�1915)813-6628 FAX
itff !:2.kL.r' Stateirrveint; The My& Dublin siup�:,,�aii •tsa Ngll-,a
q=y Of B9, EWSIUMS iEl 511 andselcure envViommew, i fioste'll"S I'lli
'ljjj a ll Kess3,gIc'—,
1:;,r1oll'TV: SaAd o �j
Slerift-, TI-vairsday, I Dictudbleir 22, 21D115: 5 :1416 IPM
To: Jeff Bakeir
Siulbji.:u lry P"riD4M ie Ipl ian for cioinsLrlucdcira i olefer ur, inich
I mn a rimWem oUMe SMider Ranich ommnumity resildilIrlIg alL 10111.7 II' AmMaN Canyon Caun KUM
I wyHl be unable to a tte. inid d,,w, in,*letinr
, o in i ir 7th,
I hme III
y apee w1h at Ne MiMcmenu ma ii. C.Y jjG)IiYsillng .' priollpiuseld coirmitlIrlij
., U'liS . (.1. t' lillo jjl~v.
11.111i consideir 4: IIIm is lapplasitimia 0 m4ile,,
IRege rds,
Savil[ia Setluir
S MT my IP hane
Jeff Baker
JAMM. Rek'a's d"MMOMMININD
senv Siuniday,. Olictiolbeir,215, 2n,15i 2:58 PINI
Tm Juff Baheil,.
SAM. Oppoing the proposed pWn amNidment amd tall nnod devellanwint =019
As as Schaefer ranch resildieint. I alsio opplose this pbn .
Thanks
Renuka
P rio iect ; P LP A 210 1 24)(K.) 13 Sic hae fe r Ranc h
I oppose the Proplo"Sled Ptan Arnendmient ainid PL,,-inneid [X�, Ye I opin lent Zoning,
L 'City Shir')Wd havill: sizal!::nJe numbier !fir r- naw Estate Rcsmidianfiall (10.10] - 10.8, urnts.; pier acres) Units. This will
I-iialpi Dubhn Residents svith increased Name Hnd an up,sizalie hil within DubJim, R is necr-&s.'ary to havic
affordable hiausing, unit in any city. SimHaHy, 4: is dicsi.rablli,-, to have UPSIMMIC IMLICS in Wdh nxid
Whonables and bili.ionaires should, blu wlHini.,,, to mcwic iwio,,
2. The she is perfeedy suhad and [Anned far Ewe Reshhnaal houses, &Lfiliding SiingIile Farnifyliiomes
deft Lqoc. For Example, one su6h proped is tine cioin.plkabd drivieways that w-e being pmposed An
ne,,,'y plain,, i drivc%il cannouiqg duce houses Phiere are many suc,h feau.ires in thie new propo,sa,[ whilch
i!,O dlWliinst thle njnnrc of teir-rain,
3. Ruilidirq.,.� highi denshy houQp on a street MOi c1lowin gt-aidiient with hiHs on billoth sidies is dangicrous. In.
ecirsu Ofstirciet bliloc'kage wiil nil be ablie tic) too im, I lir;,Itclolpters will aJsc) not bic very
useful because of hightr elevation iron l>othsidies,
4 Sichinefeir R�,aniuh home ownem pay for thic Cil [A.D. B..y putifi,rq,; thricie tin'ties (16 to 119) the proplasile hiouses the
prob,abJy of ,Ln.y dx,,rtaLr.;e and L!,-iie assiolciamid All goes up drasliciflly,, Schaefer Ranch honic l up,
pay i n
this clairns,, So, 1 t 1 in he initerl of'Schi'tePer Ranch J flurne, owners, to ni i nm ni izic the risk
5. It, rnay not ble W OlEplaicle to, rneintion thatSichaiefeii- Randh has been MR on asite that has reportici&(y had
newly MlapNhdies, Sic-)tnie hrave. alleged AM iOue projecCis devchplar had to blast nlearJy L I M i yards of
hard radw ininvic 9AM Me yards Adki, and fill ut..i to 15,C) feet ofsir..)illl to build this nenv residential
CIMIIMI.Jnity,
Bui[idicrs profits and cityl taxes are short terim gia,hiiis,. A. re(Lp,,hbiorhood Jams savi gencrablonsMilding
good ne(OWnhoods is an invilestmenit in rnp..d6ng agreat chy. In LAW 2, dicrie was a-smiaH coniimiercial orica
initi.".ffly plannicid wi-tich mas clorrverted. to InWe Pam Muni fy Hornes, Alsir.) in Llrdt 2, proposed 1 (or 20) [] stare
Residential (1111 - GA units per acres) has been convened into 140,Single Panidy I 11i (1i to 6 LOR s
pil ;,wric), ThJs htas created houses withstie,ep bliackyards which vannot bil usicid for any purplose, hic:)usies
surround bid an th ril si dies, I)y OLITiOr 11OLLS'C'S %VhiiCh are vicry Closle 1011 eh;.
7, area k:a c,ateid R;anch developonenthas lx,,en scrapped, Riesiil:,lients Iha ve Jo
Ove about 3 niflies to gethasic amenW Thcre is no ownmunity cleater witi) activiticis hkie inil
corruviunity gathMn[,;,, inidoor pil letic
R, Bhiildier pil optimizaioni somms to be only goal Df diis, pric.iposaL, Ry resiqriicting nunibeir ofunits tiajust
ome less le's's fi"u,an 20, The budder has intielhgenfiy avloWd Inchminnuy Musiing Requirernents.; and Public
Art Provision rirnents,
19. The sheet A Schaefer Ramh Unit 3 will be as Private Street- The mainticii .,,-i
�ncc and rnanagieniew: ofthilu
stroal mM I be by I 11oine Owners ALSISC)'C"iatiOn, "I"his cosrwHI have u) bleshariocl by atihier horne iowmniers. The
riesidionts wh,(.) re not on this street Al 5111 have to contribLite Iar and man5giunrient of thi s
private stre,let,
Jeff Inkeiii-
ROM: Kietiaii o
Seav 11%,Aiesday, Gictrobler 27, 2015 121.8 AIA
To: Jeff Baker
sdwed: I qjl::a p asir.? t h P ;xroloasied Gen aral Phan Ainendme nt amid P As nned wid opnvnt Zo ring
Project: IPI RA 21012 10,0 101.3 Schaefer Rainch
PQRct PLR 0 12 40013 Sdhaefer Ra nd--h
I a Rpse Om p ro pose d I Gehm ral P W n Arrm mdm ev L a ad P As n nod Develo p ment ZDn Un', .
2, My fhoWd have shible nurnber 6or new Estate ROOM (IODI - M8 uOts per- auvQ UnK MW help Dublin
Reskients Mhdincreased income find an luau paciNe home wANn D&Iiirii. II t As nieressairy tic) have affioirdallo4e tiousAnIg lionit: li n
alry dity &I nr IlarN4 it [rdeshra A to have upxWh homes 6 Mich nwkkmM bna Ares avid iihio u Aid be will liing� tr.)
irmove Int,
2. The she is perfech[V suked and plotted for F,statie Ipta'slirpaurdall. IlIralusBs, 151dildilng Shoe FWWQ hNnIeS 601S 10C Poll'.
Exim" p W, or n e s adi propeMy 1 t he cwv p Roted d1vieways t ha t ia re be Ong p mposed An the niew plain, 10, n e id
ciavactAng three houses. There are many such features An thie new priopioisahwhkh go aphnst We numm oUteadirr,
3. 0 uAT ng h Igh deAn TV housing an a stir &e. it wit In id lowri , g rad he n t MUM on batti A es is id is in gie. 11"nILIS. i in Icasla 0f 5tir eiet
No ck age Hre/Po N ce/Ann h u to nce ovill not It a b he to go In, H e Nco pte rs YOM a As a am b e wery uwfrd becia me a Mew r
etevation an badi ides,
4, Sich a e fe r R a rich h onie ow mmy p" fo 0 h e G HA [). l By but thing t. 1° riva iP t i rin i i tii 119) thi ppippin se tin u ses thep, r1ba h UY Of
any damage and Gie associatied ris�l(gioes up duarstlically. Schaefer Raix! Mime owners amd up paylg the AN& So, R ki,
hi die Antenest of SchavWr Ranich Home ownerris UD 111TIAnihnilze risJk'
5 A t rn wy mot be cout a f Maw to me r Lro ri t h a t 5ic. n a afer Ra n dh h a s Peen b u AN on a s Tie On lia s re poilindly had ne a dy 610
tandshides. Sorme have ali fljat the prdJect's developer had to bh5t n1i LIJIVI i vairds of hairid rock, rniuvie IJAM
clUbAc yards of dArt, and' ftj'p i Cc) 1. SiD fee t a f ski to ON to ne w ne A de n tial conmr un TV, .
6, 1hulders prolits and:dry's Ipuax es i AM teiTi gains. A nell-ibmtood lasts ',r"-u' veirall Igalum roratioirlrs. IBiu illdiir,lg gloloo
neWhImAinods As an Unionzment M maing a gmakcityin Only Z thwe was a small commanch I alma h0thally Oanned
ovIhh:-:IIn,wa!; canvieMed to Ingh FwNN HommsAva Ari iUnnlit 2, proposed 15 Car 21D) Il statie 1�10.101- ty. luunits peir
acres) hras been convorted No NO &nWe If Horne"OA to 16 UnRs per auey T-Iiis has created houses with steel)
backyards kyhodi cwmmt be wwd for any pulpose, hmisie.s surroluindeld on Me slides by indieir him,,ises whktlu i vi
Chosetiolo, et[',
7. CommmerThal ar'en'a Ill ocateid within Schaefer unchipidevehopment has been ResiAdiervirs have to i abaut 3
m1hes to get basic arneril bes. The re A no cmvniiu niry cii with activAN Ire kdoorzarn mun[ty latherh& indoor
gaimeq Wrinni poot MR. BuRderlpal'it to be only goal of til Als propiosaill, 11I y restdicflrm,g number of
units to Pat one less less than zo, Cho lbulder lias WeNjerrHy avoWeid Inchushonary 1-fousing Requhrommquand MIT: Airt
ProWslon reqUlierrenm
9. The".' street Mduipfip it 'Ra rri ch U ini L 3 w All be a lirvate Street. The ma Ante n mue a Mmariagem va a VA 0 g reet wM be by
Home I Ownem Anachathan. This cost 011 have "o be homd by othier home awners3he nosWents who me not on VAs
st roe t wN I st 1 H h2VO to 00 I'litirl b iu tie friar' nim n me arxe a no Irn.arha geinnieirii t io of t h is jpirha'a te s Are iet ,
Thahk You
Ketan 13havan
OUNNUNNINO,
INAAK, CA 94568
DUBLIN Pil ANPYING (01011101PAISSIIOP9
Gily crjijirwicill 101hailnbF"; III
11(')10 Civilic I
Dulblllin 'CA 94,516,15
I I IP ro � i�.-, c It 113 l.- I 2.1r) 1 �2 - 0 0110 13 , ir, 11-�a e II r n a ir�ir h
Ocf,dber 13, 2015
Dear Rlaiirri iirig r,oimirnIssJ,or'i,,
.. r .. han I.0 yo U III a r a I 1110 W i n g rag f 0 a x rge ( .2 r o pi n i o n U n rna Ulle N, re alI ng to w,j r co m r-ni r,.A ri Ii ty and T1 0 clity.
We have boun Schaefer Ranch (esik..Jents sirice 2012', We looked M. over SIC hionilers in several Bay Are-a
cifi es. iricluding East II 'before selectliiriq H ws cornmunilly.
Wp IMP prcf>xied Glerieral Plan Amendrnenit arid Planned Dievelopment'Zoniing for severall
reas;nnrs:
I BuMing high derisfty t "*usirig on a street with a down gradlent wilh hills sk„a-rour,idinq it Carl pose a
dwigeir lo Its r(..."sldenls.
P. BuRdir-iig Nap 'try We 19 proposed hornec..; it 'the pl,w n ed w 'will i n c re as e th e cl-i a n ce of d am ag s
and a sm') ri a 1: ed r I s k, s, S c h a e I e r R a n rn h rers 1 d ein, MI M I I ic, nid Nip I In d i r ect I y' p a y l rg lo r d a i Ms u s i r ig
GA H A l' re se rve
3 Min r1nor(.!^ htx-nes on, the terrain wl mro there have hisitorically l>een dozier�s of laridslHdF,�s, there is
one agalriw ani risk oif danger.
4 1 hiere is also concern alhou 11 irw.., cwej-,alll incrPase iiiri N,')usilng and no major plaw.,; to bitfild rrioire
,!Mhools to suppofl the rF1a,jWiV)N-jx of residents oll sclmcit agied children, WO saturwiorN Of
hm,n(.,..?rq irithis, city, our c1II Yvill' Wrirriately SLAITROrri-n overcroyvded schools and a ffi.....wcresera
qualtilly OIl' educaWn,
5 rhe i r wcreasr.;';,' In h ous 1 Ing does not see rn to be ba lainced M �. h r."c rnme rclial Silica 10 sup Por'l 0"Ne
re s i de rs l: s le lte c h vd y, T' h "i is f r.) rce s re s i d e ri t' s to sI..wpport other I oc a V b U S 1 1111CI SS i n nie I g 1"w bo r I rq c I I i1a F�
G 13uildirig r'nore 1,-,ioaws W Schaefer will hea%fily irnpact WPie !flow of liranie,': waxed raorigesr]Oni in
lhis aroa and ultin'iaWy the enhire cir/,
'l han k yo u Ito r, tak i n g 1 1,-N tern e t o pr as en 10 Ur' I B i: er, F." I le as u ke e p I h e f e r R a nich C o m m un R y s n f ki a rN d
Best Regarcig,
Adf A II pir
11111110
rtmi-in
Sent NeM rim l DOMNg 21 2I0 !`� ]-.!AS
rmrmtAO6@Smahxom; Anm W4
(::airlckrtlia, .5ollo; II.Jiilhm , S"'Irnliblh�:.�Ielrf Ili: akvir
Mmmig CommMixi tor6qht- plawle SOV rwo to 13RAW",
hi li b
:,
(;)Ileasle foii vivaird t1i Scirill"I IWlIlkan I can not Wid him i Fionvaird mile This eirridil addriess, MOIL -1, se
I respecOully request Hie Illy 4andig corurrvisisllioioi Ir..m lut appmve amy riioii,ii vestii',-.-.A I pirlojects p1l"(.1111POSled lll,Js
eye n hvkTheve is A ed utle. py IG O ble in efit, to o iu r cily f irlo rn the, Sle p irlojects ,
\ii is Ist,aff reloonimending appmvW of His pMject? TUE.) Staff r'IeIOIOII 1. ildiE-.,,irAJfies n I beii mlefits to d lile city,
yet stal recommends app. val, libidliery ull'. i stiff IP "m IuINr ur erm;@Iii i ir'ilelutrap oin pr s and not fir.. y, to
Np the scales Ipii i 'fa voir of iirlore dielvellopirneirit v%rhen II' eWdimls Ir,,e ClOmplia iirflng alblowit
exicessive girowlU,,ii, terridl::flie traffilo, ar,d
Respecdully'
Keiiririle Cl iat*t, 1 Yli ir idieirlt
Task. l::::'1o1r,Ce lclolmirnfttlele qp�� ::)ldiiirttlele
Jeff Balr
Fronv- David NmWey jM0MMMVXN0pjWjprAngW
Ina n Tu E!i id a y, Dc to be r 2 7, 201 15 2 :34 P M
rrc NWMIG comansion
Slubject- P"LPA 71D12--0Qr,)13 - Schaefer Ranch:G, enr.,.-iral Plan Ame mitt pnT, INanrl eid Dpve�r,rP.rnent
�Rezone with Pi Star
and StAge 2 Deimblamol PNR She Dinkoprniera ReAel%
Vening Walivir,,'0,4ap 8136 to Create 19 Ims and a Adidendurn
RE; PLPA 2OIZIOD13 —!Whatfer UK") (..ienPr,M Plan Arnemdrnenl, Rezone. witl',r related Sto[P,'e 1,
anti Stage 2 Development Plan, We Dewdopment Review, Vewnp 'rentative Map::r 8136 to create 19 sIngboball lats,
and a CE1QA Adider�durn
Dirr, a r [.) ubh n P a rv:n; ng co rn rn ssi r-u e ir's ,
I arrl Una to to rnakiet he rniee tinir, ''t' onirght (October 21 2015) regardh, the St: h air Ier Panc h Gerrera Plan Airneridirrvent as
noted above,
I Haw that you all urn dersitand that my failure to be at your meeUngs or forthal matter We faillure of Whimi I not an
h0led own ent or an iagreew ent i tpnnr proponentsoir the 5WE p ha vex appe,,aried for over 25 ye. airs lopfDre catindi
r3nid i nissinni -arild In tlhat rontexr, have Wed an apprWation W, the I Roicle sses GnVIC W d ir land use idecWoj,)
malting. So as to thk pankmiar proposal, to cmwixo 6 Enne Residentlal hMs to 28 reddential lots arn,d Cr if-Mte'd 11i lot
on a dMerent greet which am not currentTy viesteld isinapproprAiatie, given the everidevelopment WkIlas a mWer If
fact, r*t opin nr'n, eKI' , LS Ilrn i City L,Drday
As you aH know the more jnt under nine Umuond wilti pLanned but net twidt herip In DiubHr), "T"his prio pip: sall confers
absolMey no synificant braefits to Me local comrnun ty or tthe city ir. generaI and buridiens UIP 101111"E-CR SChalf-WEr
rmlcleMs w4h owr dnebpment ,
Conddishng 'Where f ro We estabhhed need and where is the bernefit conferred to anyone other thar�
thinse who wW benefah by selling inane homes? There am ank buVem—no signiRont We% w4h this proposal
that app: em in the StOf RepaQ
For exwnpf: 19 unds addecl gbe a benett to tive buHder not the Cky as It Is bienw the' 2Q unit threshiotcl for ac'r,'Itsirinig a
Payrrient lr hiii reip fID11" Suloh projects as Te PuNc An Fu n$ offordaWe housing and some other Noon tho tram swe 11
atvr m r0nswidienln . at the pre5rent. tirne.
Anaawr example: Open spann is not hmmewd by 20 acnes but shifted to an area Ont Is rapt aWWA to Me pVWW. Rmt
N reAY a bminx a5 someone MH have the burden of care and Ge public gets WhIng of value. Inaviaving open spine
in Schaefer Ranch is a talsehood wrrd in rny op[riion, a UsirepresentaWn of fact,
Diver nny 25 years of pank4ming and Wiving We many prJects before this Coy i have read rnarry rietailed Staff
re pork. The staff 1 compted wAh proUsImul A 1 tw% hat I have noted ur nurneirclus occaslk::;p nrs In the paA 25
years enrol% Wpm of Wemtandhg, anid i iroppropriam, bias in their reports. YOU ShOuld wrilderst-and that this Irs
Eve ku oUwr clies too, as W as for Mher profit-55lWIS, HI Par'11CLIkIr i icanl Wtua:Iy docurnent rna ny of the errr,.,,r5 apid
biases over Wis 25 year, Urne plerioid as vve Has very Lpo oid mparting by he Staff which 1 no"rnpo= at to tWs motteir
howevor,
pin my oorvio N p rio h "�,s ilu adre pens in gemna 4 vxh as Staff Re po rts sho Wd never be au qp CNA Untead shoul d re a d
for hnformaamn amid anajsN onW. In VU particular case, the Staff reclornimends app-oval, In iiny opinfon tJhi paancuiar
Staff reclornmendaflon is inappropAte; it is for the Canuniston tD advise and Gum= awke thot dKIM Staff
shibuki reirMin rewtral in this case panicufarty Where the iobser vat illp bluiidem outvivleig
.,h
PWase debt'` and read this ena a i I iIntio Voluir Airgs",
ONPA
""O"A's -,
Thank you,
David Bewley
Jeff BBasin,,
IIIIIIIIIIIII . � � iA4�pµ, Ninnd�rn6Uk +imniomnmmnnoon0000noiouuuuouu ooioo i iuuwl YPoUUNriumuuuuUlOnnonnOnOm000000m000000000000iop000iUl�W�m iN .p�n9n ������������������u19���������tl���������������m����. �g�� nMp���W+m�� �uNP��UUUIUnI�UIUll�NUNmnN�����O�NU��UNmiuumuuWWronW +miu
SAIMCM R+n RCe�o ' &Ale r Randi amid Re,ro nsii�M.' n I..`l:�'r�'rirli�,orre 'or%
f' eo i nna l A Do ArH o yen ICS �� II iri
P111 EASE t HP"'fC'L IEIE ASS' A14 RE l,-I OR T
Rease reject the Schaefer Ranch Pro,ject that ts befl �rs thie Plian�n'tlrig ',w, i Rion tt�,t � r��r',n
n 'r'� '� w n' ���:t� � '�r "��u ' 'r'��r �a�p p ea ll, � your r ' approval ' �f the � � ' �'� ' � '���"i '�� i � nie in � � I ' l ' .. 1 16 ItiIr'r on
e t r Hl by T'riumairk III°'t r ni e'er u
Our lcoirrirm rr twy doe's not SILu t) rt W yea can not afford M VeSt Efll ° More resilidential wurrrts lir`n. Dublin,
VVe m! ,suMe °r'in'g now the rrrn e'qu' ii nces of poor" ' eicisho!rns rina de Prieviousty iroioncerrn'nn„r OSHA
IH @r °'
riesiideint4l diaw l pr �,..it
We do riot have thle urntm' tru to re to , up pad any addMonlml reSiWenhal UrflrtS that will further, implaetthe
ovilaircrowild i rig of our` s0iolo Is, rror r'nge' t €turn on r u s ts a, ind t he q Y a iity raf I I fe for all Dub llrrn ire is a d le rrts .
he,r r arle, i LMRS planned ' n'r over 55010 of grass omits aire vestleid rarid urndier deveHOtl-t r
t r nr:ra f. 'VVe r nruurr t ll to 'ffe t any,dinange tiothose viested but thie H lianrrir'r Conimilss�ioirl in,.IR
in-,ial(e a METiancie now in DAM fl by rejecting h feii Ranch 'err r reconsilderiing yic,,Aur dic, r t t rr
to eppmve 150tiowin 110MIDr on IR g or °raH Street in Dor ''r'r!tro r'n,; approveld Octiobeir I13t't'r IH by the
Comynhabn,
Schaefer llainchMl a dd 1 nru re lu.:)iusinq units to the i Iniau ir ig stock err °r vurnlry slngllie additiortal
M veMe t and approved th e (and MUD collectively ow &ibiulties to. the
r'otbl rrr of love rcrr;rwdi ng in DubII'tnn,. Additt rn tt' b the developer's prr:; Al of 0 i MiSteald of 20
rlefinquist,ies 'Clillarn ft Off) paying any °''Hr,..a hou Feel" for afflordable hoiu;" ir-i '@ 6-i 1 :0 acres s io :ol'IH. en s',p
t ha t a ppea is fa vora b W, 'gNan our cuman t A eNcR of pa Is b urt on Mew the scre age ap plem to bye
oru nimi, open space for the r'°airnt luu rd by the assuc'Hr tt r•n that faflissnort in rr"n,r)
rrn' munuty benefit. nefit. ' MU relawl ur. wvlf es no benefits to, the City ail we rnrrm tlhierue wilil be user, tive
to n eque nor~ 's to Its vesting. Ki conslr.erabo n of ttm a tr e tl',mrari Cornmissilaii r hQUIlu i the project,
egiorr Street C r tro n ly ung r tlnrr CWTV"nission to ii,"e onsi r your dezi t n all f)TOt OSM
hi 'Wl'III vest OCO moire r sli r nbal uinis in Dublin,, 'We can not aff r. d to c,t t any more non- 'veste. d
units, irr .iuWudinr Regilml Street, The project willfuo'tl,,er aldviersely effeict our city, adidirq rrrr'rr Hilt r lrm
to our sichloois and nilore oonigesflorn to Du!bf� i u Bivid. 'Phe prioposed devielloprnent of 60 tits rnes is too
H, II,,. r for 27 acres, he deal in is Hawed indiuMing the Iproposed paIl°ldn ' to lll's arm iriac1equatill gluiest
parking and widl ne way in and out aiccic,,,m ss rrr'fly firorrn l"Ziegionial 13tr ill -D,-,*reappears, WSO to have
been Me or no cons We r t:ii on to fl-,n ie fact Must 400 hornr....,,s are urn , cionstructilon a block, away on
t;tu,.Miiirn'Btvrt. Aiddirig rriore utunntrr to wntow n will f rftr r exacerbate th tr ffr and
ingestii r' °n. Tn Urn r'l s turr n , !H of 316 gust Iparking p is reiductiort in the i oilydsrmprn
Urn one, pi •kiing spaoa per unit and lets a bad precedent goiRg fojj,.4,13;cj ft.auir�,,,. VVe kriii
Ix", c �t &
. - ar�t nmy rqpioirts, that H Iii,'l, cuirrervt requirernev
inrsiufhaliesuit for those Hing in and vIoNng any of Rio exlUng o
cmpKes.
At buRkout our popukabon is prJected to himease by 210DO niore residients birIngiing our totW
popu Wti an N) MOCIG with some IWOOM Rg BO 100 POLM CRY ce in not owlb n k-A E,, id awri phi path, �as it has,
vvith ir�lo rerjaurd tio e,',,,c�irme1q:UIDnce& The resiideir'�.fiai piriraj,E-',�cts OffiF, niotti1ing in rett,jrn to
c,carnrnunity,
We are quIi l Iiinsirr q,the quaRty of our Fives in DiuMn and hope as a jn1I jjj-,jrjjrvg
M11, 0-mrige Chip s course. Please deny tho Schaefer I Rainich Projoict AND recionsWer rr Ire io-jaii
tf-iiie Reigiioirl,W cStreet Pro ji::m&W by T!ntrnark hioinietvL
shniu:;� lr'Oy'
Marl , no AARes-seRi
di"i"iiMww6
JeH Baker
hvm: t,4ita Emrnainue[ IjOHMEMMONMOOMN
SOMOMMMMMMW
Sent: Two day" ctober 27, 2015,316 PM
To, , SH UK; Naming ConvAlan
sulqect Prq�ea. ON...PA 2012-DO013 SichaFJier Ranch
Mn PhnWng ArruNsM, My o17 Dublin
I oppos e th le proploseld 10-tieneira � N a n Arn e nd nient a nd P [a n n ed De vie. U qprnie nt Zard in g easel an the
reas=i behW;
1, My AM have AM nun'ibier for riew Estate Residw itiAl (OrOl :0.8 nurr'nit Ip er alicries) Unit s, This
MH heli) I)Ut"fliu i ReWdeats Wh Sawed Inconie find rairi iu�psicale hounie, vviitl"sin i DLAl::)H11`1,. It iS lilieoeSSairy
to have affindaWe fousing Ludt 11tH any c,0 y, Sir-nilady, I'[ lip dii irabile to leave �,tpsoale flOUSieS in wMich
aii id WIllio,ir4i't;s A= be Wiling W nave M.
2, Thii is perfectly suite and plottedfor E."E'statie IRie side ntal house& DWWiJV SnWe Wailly
Kornes defies l h. For Exarnple. one siucf-'t property is the =Tplated drivieways 0-'rat are t�ieing
Immposed in the new jgw-i, i driveway connii ttirieie, Ihrr ouses, T]here ariernany suclh features in
the new ImaposW Wch go agairist the natIUT `ii lieriraliri,
1 B-�,dldilng high density IUnaui srng i a sheet w1h down grad WnVwkh hills i botl--n sides is, dangeirous.
In case of Wel Wockagle f"u r e/ Pic.) 1i ce/An'i bu Is mom Y H not be ablie tio, gain, I lelicoptiers, willf also:not be
very us:cful bef,,,naause of I-'flgi iler &Ievafion on b1i Sideers,
4. BMW AM hornis ownsrs I pay for tfi,Ei GHAI). By puMng three, tinles (6 to 1:9)thie propose
hoii Eiies the probUbly of any deniagle and Che assolated AR 9OMS 4P,driastici all y, m' haeffer Rancli
horre lowners eu n d iup praying the ciairns, So, it is IUa the iinterest 10,51cViaefor' Rsnicl--i Horne DVP tO
OnMe the hsk,
5, it rnay riot t)e out of llama to mention that Sc lea e1er Ranci,'i l--sas built oiri a sfte that has
repodrAj ha id rn ad IlariidslFdes. Sorne have allegii that the project`s devefoper haid to Ibiast
in le a rly 1,1'M i i c Ya W s of tear rock, rn 1 M clubi a Ya W a of d K a tid fi 11 u p to 1510 feet of sli to
twild tf,riis k ievi residential cornn)iunity,
6, Budders profis and citys taxes are short term gahs.A nailighborholod lastsseveral germ-,%,rafiions,
DILJOdiri golold neighborhoods it an investin-iiient in rnaking a gri city, In IU nit 2, there i a salali
DOMnier6al area ir'Otially piarinield Whilch %ws oonvic,',rte�d tio Single Famiiy Hornes, Also in Unit 2,
piropo,sield 16, (tour, 20) Estate Residwhial (aOl - CY8 unRs per scms) has been convejed So 140
Skle Farnity Hames ;19 to 6 LWAs per acm). Ms has createdhiousies witl-'n steep backyards,wtiich
ca n not be used RY a 111"I y P u 11 Dsi ih OUSeS S U rriou nc:ie d no the ee sildes by other i iouses whinch are very
viose too, etc.,
T Cornrnercial area located YAW SchaaWr Ranch development has been sompped. Residems have
to Me aboW3 tnilies to get basic an-teinfHes, [111ERM is rio cmmawnity center with activifles iike, indiolor
cicq"n:rnuir,nity gathe,,ring, Indoor ganies, swirnn-ting pc*11, etc,
B .$el 1proht o0mlabon seams to �be <:)rdy gr.,)al r,.)f tj-,�js jpirq�*sal, By restiric.bing in[Urribler c)f luinits', tc�
m's t one tess [ess than 0, fl,--Ve biuMerhas Uinte,,Higentfy avoWed lndLPSiOMDF-'Y
and Pul.Aiic k t, Piriu,�6sirc)n, ri int s
9 1 he stirlc,let in d`Z ar�ld � L)rdt 3 w�oi rlrivst(-,., � ;,treeq, "Phe MWintic nanlo(.� nT'ianagell'TlEmt of
�Jhle nk rr rr will 1,:r e by I11 Jic.yn, Owners Asmwatiloll 1 Tl° is cost will to be', shairerd Iby other homie
awriem. The reMerVs who iairie II M an SIP Wet Y60 SUN have to contrit)ute foir ir-iiaintc.,maince anici
cif this pr16waltic.� skeel,
:R 6"I'm1p 'E' , Ctf U C J Y,
S!uir,dV,,,) Emmanuel
Resider nt of F"tarich
beff Balreir
Fili Sharion
Sent. Irlue,.;1day, ir,)ctiober 27, 2015 59 IPM
Tm CF6AW
Jeff Baker
We Chabot
Nomie Wo no oir% rncare nevi d ttdt
PWme vWe NO tonjM on he 5c[)aefPir Ran, Oh riezonea parcel to hr..)irnes, ' et rne vOe NO I
My farn0v mo,,m.id to Dublin W NO3 %ulth cows behind awlwme amd the expediatIon of always Ih Wng
a skAit in an
huncrovided" pW&k s0ao.l there were homes beWnd us or DDWS On he hami, I hoe &eem Dur
t ire men d in u s gii u n the e Ray Area . .,P, sptei ali iV thasie who w 0 r k a ry S H,U) n vra:Rey. i recogin We that EM&A is an aff.briddWe
pa Ac fc; r niewccurne rs w1ho cio im im ute f ro, rTI here by c x or 0 or w ho wo A here - i t r'n ip C r men V a
.,�r.,)od o �s,6 ce, c in you
ne�ii Rvii y,r.rni are doing a new Dlubkn reindua a Awar H you give thern as home aS then fo.i th6r kilds and viii
DuHn residents WAo an ove mrowded Avvicom?
My farridiy feel that the exploswe (anc.3 irres-ponsible) growth and poor ph rin ing to alOgn ed UICu
i rreiii, with: a
&Ii ijx,)putti tiori for ow cly mMi,evAose of us who sielecteid Dubhn years ar ,lo f pe�l ip r. has i "baltaind
SW C :D in LPS', 10 U r fa Mi �y i s in in w r, t u a c o in s ie ri n Vi, 3 p I a n t o I e av e h L re be, fo re 0 U r y ID IU r"I air k, i d s r P. a c ! -h r 0 1 ryl
sure„ wic i have rIlD trouble sF.,,HOng wAir hii to another ralerion WOW is uawwv of Me grovie mme ow city has came br�
Wth Ick of planning far gmwQ,
I feel sad For people b"Ag a nvN hm,ne not knowirrq,,f the i 1behind Me comirrwiniky thin they are kining —00e that
is ma lies overcrowidiOng the "r,iiew nonnor. Not anIV WE that, Chey rniight cornip Lo siermiou t1hie[ii- presence is Tess
wan elcomki; with eumv new boa of homes your Wi au' v Ong coirnrnissk,'an frurcimi throlup
g
dN Shiarvin NUn% EdD
Glieniedglies ICurra b,liin:Rianch Neiiighl'
,., )MI11,00d
511 firum my rPad
Williatii D. '11'111:11D I'll S "(1) [1
11222, IwS i� :Ipalidv S@riv ct" (,"'A 1104:55dl
Cky of DiNhia
Anarn) of Lave
. . . . . .. .. . .. .. ..... . . ....... ....... . .....
October 27, 20 15
Re: Agendaiwill 8, 1 - Sidlaef"or Rr010'11
Dew ir P lann 6g C"o i v0-rvrs�
Kh CO25) 606-6725
Fax: 1925) 4474071
flu emeal W cwA-e qf'
My oRke represcirs IN FergvBon, Dav VI L, W'KI FickIs ffinlukv No Clems Wz ownas nf
pnTeny to Out wea onhe Sdme&r R,anchi projccl, MQkno cmnmdy hnc a 60 Rmt WC
enemov W 1 BMW by Ow roadway nmned Schaefr.,'r r"hrl
N136.
Ph s u Haw i h i s co rreqxwridienco �:L) a a as cv n inn 0 Al Ord my We= havc no
fVRACIX, 11, Lji gj 01..,,roba 2 7 , 210 1 15, , fo r
tolhc malficcoinnimidations set "w1jI in tj'�k,
a,p a OTI , f d I a p q i� c i� &j J�,m � ug s , � b �,,, v k W A h i n s o I'a ppr,, I I ti,:) r ni at i v ic NI ap S 1.36 r t h
Sdmukr Ranh Unh 3 PnUt am WE&
T hu m dy add 4 um a I UnnnIdIt MY C I 9,C f11,5 W10 LI Id uWVI kC 6 [ t 4 hei r is ari
vnj c ftjjf, 1,11 1 "i, "' a d& of way kw rwK w uy p urNAus and I r Me ou w Nud W, ma h-iY; onan c:e and
opumbn 00H LAW&S in, Linde, over, Mong, and across he 60, wkk emwmov. As a W% 1t
S by n,�y �Jkn-,trs may �mpacl sor�alc of
00111 bit W01 Wt ke PU10all ROM WIARM on of 0" ,
the pmpned Wuhpawms awng SWIr Mkysiu�,,,h as sir,,itwalks, lrir�c% and uthiur u6hOv'ri lhn�l:
C u'k'.I ht: illgallud, the condhwrw t4unaa"I Ar TeMwkv KCW HA 16 ve nwt.
I ryou requke uny uddr[hmal WRMMAk ""�n" VII')IILjKA ✓W.
s vnour,(A,,�,
NVIYF jk)
cc: CNIUS
Jeff Baker
Sent: Tut,nsickv, I Oic.tofbeir 27, 210115 4339 Ihm ll'i
TID::: Jeff Bakeir
swifoct: PLRA 201=013
Parn
marn ju,js arId Ravi Sharma
iCA 945168 P hone 11111111110111 sending ennall unith follovoks contents to
ch
.....................
I yo u umn t gnu.' Ca In a I'sio of l ris I'd i r.'a'j i nig s i a n e rn a
WO also be going to the hearing an TheWay and give a suritten Law whih CA coruivent,
PriojecL Pl FIA 210 IL 2 .1000 13 Schaefer lRatnclhn
I oppose the I puposed Will Plain Aim,einidiment and An nest Develtopment Zoning,
1. C NY s KnOld In eve siza b W, lo ry) bi e r fo r n e w IEs Ate Refdam hal (0 41 - 0.8 units per acrvO Ud tL Th A MH he 40DUM W
R esiae in t; On: h I incrensed kro me f In d ia in iu psica Ile l l - , i Dirne vy A h 1 in 1) u b I i I t is mecewaN to We a ffo rid a b1li h niusi ng u ini t I n
any dity Shnkarly,a lint k deAmbb to We IuuupmscaUrm hmnedin whWI I irn u I t:l - rri I I I Ion ia I re s and b M lend res A oWd he will Ing to
rnove Into,
2, The SHE is perfectly Qwd and plliottiecl for [; statla , lliesildierntial hower Building SiilljgIIE F.a;lulify IIirmnnlas idefles I1Q9ic.
E xwnp W, one s adh pvpe My Whe emu 0 ke kid id i wa ys r hat am be i p ropmed in Me new p lan. On a dAmway
C101i"Illnil ing 111thiree. howsey There are rna ny,such features 1 n thie inew pirCIP105a I Wh 110,11 i agairvist fl tlle inat.iii Of rieriraiin',
3. &AWling high deii s i it y h u lu s I In jg� o n a s, it r P P t w I It I), id o lw in 9 1 a id I e in t 'w I t I ii In I I IS ID In to D t I'll S I d IF S i S 'd ia In I g,, e ro U S' 11111 C a 5 101 1 is I 11"C' i It
blockage will not he WE to go A I-WHooplers, will @U!sin not be wexy usehA because OVIPOW"'
elevation on butli sW
4. Sdhae6er Ranch home awner-s l:Iiay for Inie &H AD. By puttPrqg Qvie tilimies (6 t.io :jjj.,q)' tliii' e propose houses the probably of
a irly dw 0@13le alillid Olin- asunchMed ri goes ul,::a d ra sitlica Illy, Sichalubir Ranch hom le owinleiii s ern, d u p i mis, SO, R. is
in ME intimust of Schaefer Rmxh Homill ovi tic) rilrdinir-I fr-,n ie risk.
Olt Imlay not be rail of tic) awit Schaefer Ranch has been buillplan a sRe theOus, reputedly had In earfly 60
liand sl ides , Sornie inavie allezied that the imuleciVs developer had to bEnt nee My 1,- 111`0 iculbliic yards oi I've rd rodlr, rrialve 9 AM
cut::aIic Vaircl is of i rt, and hH lu;i to ISO fiee it, & siml to tw l d dhis new 11r, sIdrri'Irndall conys unity,,
5. BudWs pndRs and ci tnes are shan te"n gai WOMmArood Wmis several seneraCbru. Rulding goold
nelglilbarlinialocis is arn inviestirnil ilin rinalking a great city. h Una 2ahery mos; a mnalkloirnirrill airil iinilit[011y pilainnied
which wi.vs cxmvinirted to Single FaWly Annues. Also in Unit 2, piroposield 1.6 1 ?C),) ji 'state lkei sit if,,.inllall (10,101 - ME Wits, Per
acres) has been convirMed kao 1AG Shife Fm011y Hornies (03 to iG i inks per scirej Dis Inas cireataid 1-nousir-s wlthsteel:p
Wkyards wh&W Ciaillirliillit brm Iur,s led fix airly pur'l:,),o,se, hiriuses surrounded on thiriec., silo !by odl'rieir vvniclh are very
Cuse toopetic,
7. C �j, m m e im ISO mm a W c W A w Wh i n Sc ha e for R a n id 'v P, I ID 11.) IT le rl t in a s bean suapped. Rewdems have to dve abouit 3
11 1 jj,rB I in li ty c c in t I r w �ii I I'll a c it. ii v � it, a les 11'(1c Ii In id lcx� 11, rc() jjya jj,ya u III �i t y ga tl'�, e ir i ngi n d a o I,
I to Bet bask: amenitles, '�leire �s inio
EjvvIinvii 0 �. it .'.
.; pic), - ll,� ic, ic
& iR u i IcJ �e r ip r1c) If t fA I "Ini �7 a) t i lo rm to u e 0 dy jo a 10 f lb is pr a po sa L By r es Vid c 6 1119 in, I in-� �b I ir lo IF I in lit s to j! u s t (:) in e I e is s I e is s
it h a n 2 0 t he No du h as hu e W S e in M; a vo W1 d m 0 ugww rV H c u d in 0 R eq u Ne ii rAs �a III id P, k., II r, A 11, t p ric) v it il lo in rwp&e im e IU !s
10 'Fh le !$'I, ii I . � i ii S,cjf),r.),E, I i i , u- r � n R inic h U 1 1 � i L 3 wli I I be a IP Avate S3 ree t , T he M gi in Lena ince ODMm =90110M Of Me arnt wW he by
Home ownus Anialciiatiolli "I'll"is wfl ham to be Oa mid by other bonne awners. The resirciipints vvl'ac) aiii riolt I Mi S,
St reel vAl s U h awe to con Vilulte for main He nwxe a n I Ii kle ryl� e nt I it In is 1."'wNatle St ric.-I, ev"
N
RESOLUTION NO. 15-13
A RESOLUTION OF THE PLANNING COMMISSION
OF THE CITY OF DUBLIN
____________________________________________________________________________
RECOMMENDING THAT THE CITY COUNCIL NOT APPROVE THE GENERAL PLAN
AMENDMENT, PLANNED DEVELOPMENT REZONE WITH RELATED STAGE 1 AND
STAGE 2 DEVELOPMENT PLAN, SITE DEVELOPMENT REVIEW, VESTING TENTATIVE
MAP AND CEQA ADDENDUM FOR
SCHAEFER RANCH UNIT 3
WHEREAS,
the Applicant, Schaefer Ranch Holdings LLC (Discovery Builders), proposes
a General Plan Amendment to change the land use designation on a 17.30 acre site from Estate
Residential (0.01 to 0.8 units) to 7.04 acres of Single-Family Residential (0.9-6.0 units/acre) and
10.26 acres of Open Space, consistent PD-Planned Development rezoning with Stage 1 and
Stage 2 Development Plan, Site Development Review, and Vesting Tentative Map 8136 to allow
development of 19 single-family detached homes. The proposed development applications are
collectively known as the “Project”; and
WHEREAS,
the site is located at the western terminus of Dublin Boulevard; and
WHEREAS
, the California Environmental Quality Act (CEQA), together with the State
guidelines and City environmental regulations, require that certain projects be reviewed for
environmental impacts and that environmental documents be prepared. To comply with CEQA,
the City prepared an Addendum to the environmental impact report that was certified by the City
in 1996 (Schaefer Ranch Project/General Plan Amendment Environmental Impact Report, State
Clearinghouse No. 95033070); and
WHEREAS,
a Staff Report, dated October 27, 2015 and incorporated herein by
reference, described and analyzed the Project for the Planning Commission; and
WHEREAS,
the Planning Commission reviewed the Staff Report at a noticed public
hearing on October 27, 2015 at which time all interested parties had the opportunity to be heard;
and
WHEREAS,
the Planning Commission did hear and consider the Addendum, all said
reports, recommendations and testimony and used its independent judgment to evaluate the
project prior to making its recommendation.
NOW, THEREFORE, BE IT RESOLVED THAT
the foregoing recitals are true and correct
and made a part of this resolution.
BE IT FURTHER RESOLVED THAT
the Dublin Planning Commission hereby
recommends that the City Council not adopt the project approvals which include the General
Plan Amendment, Planned Development Rezone with related Stage 1 and Stage 2
Development Plan, Site Development Review, Vesting Tentative Maps, and Addendum for
Schaefer Ranch Unit 3 based on the following: 1) Lack of community benefit to create the
additional 13 lots; 2) Desire to maintain the diversity of housing types in Dublin and these estate
lots would further that diversity; 3) No provisions for Inclusionary Housing or Public Art within the
1
proposed project; 4) Changed circumstances with the schools since Discovery Builders entered
into a School Mitigation Agreement; and 5) potential effects on the GHAD.
PASSED, APPROVED AND ADOPTED
this 27th day of October 2015.
AYES: Goel, Bhuthimethee, Mittan
NOES:
ABSENT: Do, Kohli
ABSTAIN:
______________________
Planning Commission Chair
ATTEST
:
____________________________________
Assistant Community Development Director
2
DRAFT DRAFT
Planning Commission Minutes
Tuesday, October 27, 2015
CALL TO ORDER/ROLL CALL
Tuesday, October
A regular meeting of the City of Dublin Planning Commission was held on
27, 2015
, in the City Council Chambers located at 100 Civic Plaza. Chair Goel called the
meeting to order at 7:00 p.m.
Present: Chair Goel; Commissioners Bhuthimethee and Mittan; Jeff Baker, Assistant
Community Development Director; Kit Faubion, Assistant City Attorney; Mike Porto, Consulting
Planner; and Debra LeClair, Recording Secretary.
Absent: Vice Chair Kohli and Cm. Do
ADDITIONS OR REVISIONS TO THE AGENDANONE
–
MINUTES OF PREVIOUS MEETINGS –
On a motion by Cm. Mittan and seconded by Cm.
Bhuthimethee, on a vote of 3-0-2 with Vice Chair Kohli and Cm. Do being absent, the Planning
Commission approved the minutes of the October 13, 2015 meeting, as amended.
ORAL COMMUNICATIONS
–
Marlene Massetti, Dublin resident, spoke in opposition to the Trumark/Regional Street project
which was approved by the Planning Commission at the October 13, 2015 meeting. She asked
the Planning Commission to reconsider their approval. She was concerned with additional
residential units in Downtown Dublin and their impact on traffic, schools, parking and quality of
life.
Jeff Baker, Assistant Community Development Director, stated that Councilmember Gupta has
appealed the Planning Commission approval of the Trumark/Regional Street project to the City
Council and the appeal is tentatively scheduled to be considered on November 17, 2015.
CONSENT CALENDAR NONE
–
WRITTEN COMMUNICATIONSNONE
–
PUBLIC HEARINGS –
PLPA 2012-00013 – Schaefer Ranch
8.1 General Plan Amendment, Planned Development
Rezone with related Stage 1 and Stage 2 Development Plan, Site Development Review, Vesting
Tentative Map 8136 to create 19 single-family lots, and a CEQA Addendum
Mike Porto, Consulting Planner, presented the project as outlined in the Staff Report.
Chair Goel asked who will maintain the open space mentioned in the Staff Report.
Mr. Porto answered that the open space will be maintained by the Geologic Hazard Abatement
District (GHAD) and pointed out the area.
Planning Commission October 27, 2015
Regular Meeting Page | 82
DRAFT DRAFT
Chair Goel asked for an explanation of the GHAD.
Mr. Porto answered that the GHAD fee is included on the tax bill and is paid by the homeowners
in the general area.
Chair Goel asked if the “general area” would be defined as Schaefer Ranch or would it be
specifically for the 19 homes in the proposed project.
Mr. Porto answered that the GHAD would include all of Schaefer Ranch.
Chair Goel asked how many homes are included in the GHAD.
Mr. Porto answered that, if the proposed project is approved, there will be 419 homes.
Chair Goel asked if the City received any comments from the 419 residents.
Mr. Porto responded that there is a SB 343 document on the dais which includes approximately
10 emails from residents regarding the proposed project.
Mr. Baker mentioned that there are three emails that were requested to be read into the record.
Chair Goel asked if the open space was connected to any public trails.
Mr. Porto answered that the proposed open space is not connected to any trails but there is
connectivity in other portions of Schaefer Ranch. He stated that, in other portions of Schaefer
Ranch, there are connections to East Bay Regional Parks District (EBRPD) trail system through
the open space GHAD area. There is also an EBRPD staging area at the corner of Marshall
Canyon Road and Dublin Blvd that is connected to their trail system to the north, and into the
canyons.
Cm. Bhuthimethee asked, since the proposed open space will be private, if it will have any
public access.
Mr. Porto answered no; the resource agencies have been strict regarding the type of access
granted to these areas and what type of separation there will be. He stated that this was all part
of negotiations which were done a long time ago. He stated that the resource agencies became
involved and redistributed the land uses in the area and decided what land should be saved and
a lot of land went into open space category that was not originally planned in that way.
Cm. Bhuthimethee asked if the proposed open space is private open space and the public will
not have access to it. She felt it would be good to have the land preserved.
Mr. Porto answered yes.
Chair Goel asked if the open space was a part of any mitigation.
Mr. Porto answered no.
Planning Commission October 27, 2015
Regular Meeting Page | 83
DRAFT DRAFT
Chair Goel asked if, prior to the proposed design, the area that was designated by the resource
boards as open space was originally part of the 6 Estate Residential sites, how was the open
space protected at that time.
Mr. Porto answered that the open space designation did not have anything to do with the 6
Estate Residential sites but was included in other areas of Schaefer Ranch.
Chair Goel stated that the proposed project is requesting a reduction in the Estate Residential
acreage from 17 acres to 7 acres and converting 10.2 acres to open space.
Mr. Porto stated that the proposed project is not required open space. He stated that the
resource agencies did not require the proposed open space to be dedicated for any reason or
preserved for any reason. He added those areas have already been defined in Schaefer
Ranch; they have been dedicated and improved and the resource agencies are in support of
that.
Chair Goel asked why the proposed open space area will be private open space, will have no
access to a trail system, but will be protected.
Mr. Porto answered that there would be no reason to utilize the area because it is rolling hills
with no direct access to public streets. He stated that this area is similar to open space in other
communities within Dublin.
Chair Goel restated that there is no opportunity for pedestrians to access the proposed open
space area.
Mr. Porto pointed out the area on the map that shows the lands that are outside the City of
Dublin and privately owned; there are no public trails from the area that was pointed out.
Chair Goel asked if there will be access from the north and south of the project.
Mr. Porto pointed to an area of dedicated open space, controlled by resource agencies, and was
required as part of the mitigations for Schaefer Ranch. He also pointed out Mr. Otto Schaefer’s
property on the slide.
Chair Goel asked if there is an opportunity for public access in the open space area north or
south of the project.
Mr. Porto answered that there is a steep hillside with graded V-ditches and there would be no
purpose to be there because it leads to nowhere.
Chair Goel asked if the proposed project was located near any landslide areas.
Mr. Porto answered that the landslide area is in an already developed area of Schaefer Ranch.
Chair Goel asked where the nearest trail would be to the proposed 19 units.
Mr. Porto pointed out the nearest trail on the slide.
Planning Commission October 27, 2015
Regular Meeting Page | 84
DRAFT DRAFT
Cm. Mittan felt that there should be a benefit for increased open space in the project, but felt
that the developer was not taking buildable land and creating open space, which would be a
benefit, but, the proposed project is only taking an unbuildable area and creating open space
where they would not be able to build anyway.
Mr. Porto answered that the proposed project has an existing graded slope which is currently in
larger lots. The proposed project would change the designation to open space. He felt that the
area was probably not buildable because it was too steep and would not sustain additional
grading without violating the grading ordinance as being too steep. The area that has been re-
designated as open space would not be developable. He stated that the area could have been
a back or side yard for the estate lots.
Cm. Mittan felt that there was quite a lot of retaining wall usage on the lots in order to allow
buildable lots.
Mr. Porto answered yes; in some places.
Cm. Mittan asked if the developer has paid any school fees for the project.
Mr. Porto answered none at this time. He stated that the school district has known about the
site for approximately three years with no particular comment on this issue. He stated that the
Schaefer Ranch/Discovery Builders built the EBRPD staging area, the School of Imagination
and the community park, as well as providing inclusionary housing in the development, all as
community benefits.
Mr. Baker added that Schaefer Ranch/Discovery Builders helped fund the Heritage Park. He
stated that any further questions regarding the school impact fee payments should be directed
to the Applicant.
Cm. Mittan asked if the Applicant will use the .6 student per household calculation for the DUSD
allotment and if they have held discussions with DUSD.
Mr. Baker referred Cm. Mittan to the Applicant.
Cm. Bhuthimethee asked if there are any restrictions on how the 6 estate residential lots can be
developed
Mr. Porto answered that there are standard development guidelines that are part of the original
Planned Development (PD) for the area which would have to be followed regarding setbacks
and building heights, etc. But the proposed project is consistent with the PD and there is no
uniqueness to this area or the estate lots category in the existing PD.
Cm. Bhuthimethee asked if the estate lots remained estate lots, could the residents create a golf
course, a vineyard or something else on their lot, and would there be any restrictions.
Mr. Porto answered yes; there are restrictions. The size of the house and site coverage issues
are covered in the PD and the allowable coverage area is generous for estate lots. The homes
could cover up to 35% of the lot and 35% of a 24,000 sf lot is a very large house. If the
homeowners wanted to add swimming pools and vineyards that would be considered
landscaping and they can landscape their yards however they wanted.
Planning Commission October 27, 2015
Regular Meeting Page | 85
DRAFT DRAFT
Cm. Bhuthimethee asked if there are no restrictions on leaving part of their estate lot
undeveloped.
Mr. Porto answered no; there are no restrictions.
Cm. Bhuthimethee asked if there would also be no restrictions if the zoning were changed to
single-family residential.
Mr. Porto answered that there would still be no restrictions.
Cm. Bhuthimethee asked for an explanation of a Statement of Overriding Considerations.
Kit Faubion, Assistant City Attorney, explained that, under CEQA, an environmental review is
done to identify environmental impacts and mitigation measures that will resolve the impacts.
She stated that, in some cases, impacts are identified and even if mitigated, the impact won’t be
reduced to the level of significance, and in those cases, CEQA requires that the project can still
be approved but a statement of overriding considerations must be adopted stating how they
balance the unavoidable impacts against the benefit.
Chair Goel asked if all 6 estate parcels are considered developable and if the project was not
approved, can the developer still build the 6 estate units.
Mr. Porto answered yes; they are legal lots.
Chair Goel asked if the grading has been completed.
Mr. Porto answered yes; the majority of the grading has been done.
Chair Goel opened the public hearing.
Marlene Massetti, Dublin resident, spoke in opposition to the project. She felt that the proposed
project is of no benefit to the community. She was concerned that the proposed project includes
19 units instead of 20 therefore the developer avoided paying in lieu fees for affordable housing
and public art. She felt that there was no intent to provide a benefit to the community. She was
concerned that 19 more homes will add to the overcrowding of Dublin. She asked that the
Planning Commission deny the project.
Razi Sharma, Dublin resident, spoke in opposition to the project. He was concerned with the
lack of estate homes in the City and that there should be a wide range of properties. He felt it
would be good to have billionaires living in Dublin, and that the area is perfectly suited for estate
homes but building single-family homes defies logic because the area is very dangerous. He
was concerned with shared driveways and the line of site. He was also concerned with traffic
and the impact of the other residents paying the GHAD to maintain the open space and it would
not be accessible for the general public. He asked that the Planning Commission deny the
project.
Chair Goel read into the record the following comments:
Dear Dublin Planning Commissioners,
Planning Commission October 27, 2015
Regular Meeting Page | 86
DRAFT DRAFT
I am unable to make the meeting tonight (October 27, 2015) regarding the Schaefer Ranch
General Plan Amendment as noted above.
I know that you all understand that my failure to be at your meetings or for that matter the failure
of others is not an implied consent or an agreement with the proponents or the Staff. I have
appeared for over 25 years before the Council and Commission and in that context, have gained
an appreciation for the processes involved in land use decision making. So as to this particular
proposal, to convert 6 Estate Residential lots to 18 residential lots and create a 19th lot on a
different street which are not currently vested is inappropriate given the overdevelopment which,
as a matter of fact, not opinion, exists in our City today.
As you all know there are just under nine thousand units planned but not built here in Dublin. This
proposal confers absolutely no significant benefits to the local community or the city in general
and burdens the current Schaeffer residents with over development.
Considering overdevelopment: Where is the established need and where is the benefit conferred
to anyone other than those who will benefit by selling more homes? There are only
burdens………no significant benefits with this proposal that appear in the Staff Report.
For example: 19 units added give a benefit to the builder not the City as it is below the20 unit
threshold for acquiring a payment in lieu fee for such projects as the Public Art Fund, affordable
housing and some other factors that I am sure I am not considering at the present time.
Another example: Open space is not increased by 10 acres but shifted to an area that is not
available to the public. That is really a burden, as someone will have the burden of care and the
public gets nothing of value. Increasing open space in Schaefer Ranch is a falsehood and in my
opinion, a misrepresentation of fact.
Over my 25 years of participating and viewing the many projects before this City I have read
many detailed Staff reports. The staff is comprised with professionals it is true, but I have noted
on numerous occasions in the past 25 years errors, failures of understanding, and even
inappropriate bias in their reports . You should understand that this is true for other cities too, as
well as for other professions. In particular I can factually document many of the errors and biases
over this 25 year time period as well as very good reporting by the Staff which is not important at
to this matter however.
In my opinion, professional reports in general, such as Staff Reports should never be accepted
but instead should read for information and analysis only. In this particular case, the Staff
recommends approval. In my opinion this particular Staff recommendation is inappropriate; it is
for the Commission to advice and Council to make that decision. Staff should remain neutral in
this case particularly where the observable burdens outweigh the benefits.
Please deny and read this email into your record or include as an exhibit.
Thank you,
David Bewley
----------------------------------------------------------------------------------------------------------------------
I respectfully request the planning commission not approve any non-vested projects proposed
this evening. There is absolutely NO benefit to our city from these projects.
Why is staff recommending approval of this project? The staff report identifies no benefits to the
city, yet staff recommends approval. I believe our city Staff should remain neutral on projects and
Planning Commission October 27, 2015
Regular Meeting Page | 87
DRAFT DRAFT
not try to tip the scales in favor of more development when residents everywhere are complaining
about excessive growth, terrible traffic, and overcrowded schools.
Respectfully,
Kerrie Chabot, 16 year resident
Task Force Committee appointee
----------------------------------------------------------------------------------------------------------------------
Please vote NO tonight on the Schaefer Ranch rezone a parcel to homes. Let me repeat that-
Please vote NO!
My family moved to Dublin in 2003 with cows behind our home and the expectation of always
having a seat in an "uncrowded" public school classroom whether there were homes behind us or
cows in the future. I have seen our tremendous growth in the Bay Area --especially those who
work in Silicon Valley. I recognize that Dublin is an affordable place for newcomers who commute
from here by car or train -- or who work here. But in good conscience, can you really feel like you
are doing a new Dublin resident a favor if you give them a home and then force their kids and
veteran Dublin residents into an overcrowded classroom?
My family feels that the explosive (and irresponsible) growth and poor planning to align
educational needs with a growing population for our city makes those of us who selected Dublin
years ago feel like Dublin has done a "bait and switch" on us. Our family is now actually
considering a plan to leave here before our younger kids reach high school. I'm sure we will have
no trouble selling our home to another person who is unaware of the grave state our city has
come to with lack of planning for growth,
I feel sad for people buying a new home not knowing the details behind the community that they
are joining --one that is making overcrowding the "new normal". Not only that that, they might
come to sense their presence is less welcoming with every new tract of homes your planning
commission forces through.
-Dr Sharon Marts, EdD
Gleneagles Dublin Ranch Neighborhood
---------------------------------------------------------------------------------------------------------------------------------
Doug Chen, Discovery Buildings, Applicant, indicated he was available to answer questions.
Cm. Mittan asked about the Applicant’s conversation with DUSD regarding the impact of the
proposed project to the school district.
Mr. Chen stated that there was an agreement with DUSD before Schaefer Ranch Holdings
purchased the property. They have continued to amend that agreement to include higher levels
of fees that were previously agreed to. He stated that there are three tiers to the school fees
based on the number of units (1-150 units, 151-300 units, and 301+ units) and they are currently
paying the highest fee.
Cm. Mittan asked if the calculation of .6 students per household was used in their agreement.
Mr. Chen stated that, regardless of what the calculation is, they agreed to pay fees at the higher
density tier.
Planning Commission October 27, 2015
Regular Meeting Page | 88
DRAFT DRAFT
Cm. Bhuthimethee felt that all previous benefits were negotiated for other parts of the Schaefer
Ranch and asked if there have been any new benefits negotiated for the proposed project.
Mr. Chen answered that during the discussion of fees for building the School of Imagination and
dedicating additional open space, it was always contemplated that they would be adding more
units, and as more units are added there would be additional fees.
Chair Goel stated that he will ask the questions brought up by the public and asked the
Applicant to respond. He asked if the 6 estate units planned were considered vested.
Mr. Chen responded that the 6 estate units were vested under the first final map. He stated that
a lot of those areas are sloped and therefore not buildable. He was concerned that the current
residents have built onto those slopes with hardscape and landscape features. He felt it was
reasonable to reduce the estate residential acreage to 7.04 acres of single-family residential
because the building pads for those 6 estate homes have already been created; there will be no
more grading of the slope. He stated that those same building pads will now accommodate 19
single-family homes.
Chair Goel asked about shared driveways and line of site that was mentioned by one of the
speakers.
Mr. Chen stated that those driveways were designed by a licensed civil engineer, as well as
extensive review by Public Works and the Fire Department to ensure that the access is within
the grading tolerance for the fire access requirement. He stated that there is a preliminary
grading plan in the Staff Report that shows driveway slopes which was reviewed by Public
Works and the Fire Department.
Chair Goel asked about the Applicant’s motivation to eliminate the estate homes when there are
few homes of that type within Dublin.
Mr. Chen responded that they did a market analysis and it was determined that there is currently
no market for estate homes in the area. He stated that the price is already high for the single-
family homes, and estate homes would be far more expensive and would limit affordability to a
select few.
Chair Goel asked Mr. Chen to address the comments regarding the community benefit.
Mr. Chen felt they have worked extensively with the City in providing parcels within Schaefer
Ranch for semi-public use when they were previously zoned for commercial use; they built the
School of Imagination on one parcel, which is definitely a benefit for the community and parcel K
remains semi-public and will be put to use at some point in the future; the contribution to the
Heritage Park; the 10 acre parcel of open space in the proposed project; the EBRPD staging
area and the trails that have been built. He stated that Schaefer Ranch is approximately 500
acres and they can build 474 homes with approximately 300 acres set aside for open space.
They also purchased another 250 acres for conservation research. He felt that they have
provided sufficient benefits to the community. He stated that not all open space parcels are
open for public use but there are trails throughout the open space and the remaining open
space is set aside as conservation easement for biological resources. He stated that the
general public cannot access those parcels but setting aside parcels for biological resources is
still considered a benefit to the overall community.
Planning Commission October 27, 2015
Regular Meeting Page | 89
DRAFT DRAFT
Chair Goel closed the public hearing.
Cm. Bhuthimethee was concerned about adding more units and how that would benefit the
community. She stated that projects are reviewed, not just for how they will affect the
immediate community, but for all of Dublin. She stated that, in reviewing the staff report, she felt
that there was not a lot of reason to approve it. She felt that there should be estate residential in
Dublin and that this was an appropriate place for it. She felt that there is a lot of merit in
designating open space as biological resources; however, with estate residential she felt it was
unlikely that the homeowners would develop the entire parcel because some of it would not be
buildable and would remain open space. She suggested that the City Council take into
account the Statement of Overriding Considerations when reviewing the project. She stated
that after reading the staff report she did not review the project plans and felt that the project
was not worth it.
Cm. Mittan felt that the homes seemed generic and had a problem with the design because he
wants Dublin to hold the builders to a higher standard of quality. He felt that Dublin is lacking in
estate homes and just by calling them “estate homes” does not make them mansions. He felt
that a 4,000-5,000 square foot home is not out of the question for the area. He asked for the
size of the largest home in Schaefer Ranch.
Mr. Porto answered that the largest home in Schaefer Ranch is approximately 5,000 square
feet.
Cm. Mittan felt that a 5,000 square foot home is an estate home.
Cm. Bhuthimethee stated that Mr. Porto mentioned that there would be the possibility of a much
larger home on the estate parcels.
Cm. Mittan felt that Dublin needs more estate type homes but that the developer would rather
build smaller single-family homes that will sell more quickly, than hold on to property indefinitely.
He felt that the community wants diversity in the home stock and that Dublin does not have it at
that end of the market.
Chair Goel was concerned with the increased liability and risk on existing community members
regarding GHAD and felt they may not understand the significant burden to them. He felt that
open space should add a natural resource or a human benefit, but that is not the case in the
project. He felt that there would be an additional burden on the schools and that even though
the developer had conversations with DUSD in the past, things have drastically changed. He
stated that he could be in support of the project if the developer stayed with the 6 estate units.
He was concerned with the affordable housing and public art issue with only 19 homes in this
project and felt that the public comment was clear about that. He stated that he respects and
understands the various contributions made by the developer in the past, but today is now. He
felt that estate homes would be welcome and might also provide an opportunity for some
custom homes in Dublin.
On a motion by Cm. Chair Goel and seconded by Cm. Bhuthimethee, on a vote of 3-0-2, with
Vice Chair Kohli and Cm. Do being absent, the Planning Commission denied:
Planning Commission October 27, 2015
Regular Meeting Page | 90
DRAFT DRAFT
Ms. Faubion stated that it would be helpful if the Planning Commission provided some guidance
to the City Council stating the main reasons for not recommending the project, which are:
1) Lack of community benefit;
2) Maintain a diversity of housing types;
3) The potential effects on the GHAD;
4) Times have changed since the developer made the agreement with DUSD; and
5) No affordable housing or public art benefit.
Ms. Faubion stated that Staff will prepare a resolution for the City Council indicating that the
Planning Commission recommends denial of all 4 actions.
RESOLUTION NO. 15-13
A RESOLUTION OF THE PLANNING COMMISSION
OF THE CITY OF DUBLIN
____________________________________________________________________________
RECOMMENDING THAT THE CITY COUNCIL NOT APPROVE THE GENERAL PLAN
AMENDMENT, PLANNED DEVELOPMENT REZONE WITH RELATED STAGE 1 AND
STAGE 2 DEVELOPMENT PLAN, SITE DEVELOPMENT REVIEW, VESTING TENTATIVE
MAP AND CEQA ADDENDUM FOR
SCHAEFER RANCH UNIT 3
NEW OR UNFINISHED BUSINESS – NONE
OTHER BUSINESS - NONE
Brief INFORMATION ONLY
10.1 reports from the Planning Commission and/or Staff,
including Committee Reports and Reports by the Planning Commission related to
meetings attended at City Expense (AB 1234).
10.2 Chair Goel mentioned a memo from Ms. Faubion regarding the City’s Ex-Parte
Communication Policy and asked if she would be providing instructions. Ms. Faubion
stated that she anticipated having a brief presentation as a part of the appeal of Grafton
Plaza Tentative Parcel Map at the November 10, 2015 Planning Commission meeting.
Mr. Baker stated that if the Planning Commissioners have questions about the policy then
they should talk about because it addresses their interactions in advance of that meeting.
Ms. Faubion gave a brief overview of the City’s Ex-Parte Communication Policy.
ADJOURNMENT
– The meeting was adjourned at 8:13:32 PM
Respectfully submitted,
Planning Commission Chair
ATTEST:
Planning Commission October 27, 2015
Regular Meeting Page | 91
DRAFT DRAFT
Jeff Baker
Assistant Community Development Director
G:\MINUTES\2015\PLANNING COMMISSION\10.27.15 DRAFT PC MINUTES.docx
Planning Commission October 27, 2015
Regular Meeting Page | 92