HomeMy WebLinkAbout6.1.b - 2. Applicant's Appeal Filed April 6 2018 Page 1 of 5 STAFF REPORT CITY COUNCIL DATE: November 21, 2017 TO: Honorable Mayor and City Councilmembers FROM: Christopher L. Foss, City Manager SUBJECT: Study Session: Saint Patrick Way Residential Development Project (PLPA-2017-00049) Prepared by: Amy Million, Principal Planner EXECUTIVE SUMMARY: Bayview Development Group/The Morley Bros. is seeking to develop an 8.53 acre site located at 6700 Golden Gate Drive within the Downtown Dublin Specific Plan Transit Oriented District. The proposal includes the demolition of the existing partially vacant 204,624 square foot warehouse building, construction of the ultimate extension of Saint Patrick Way and construction of a 5 story, 499 unit apartment community and related site improvements. Staff will provide the City Council with a brief overview of the project and the negotiated deal points of a proposed Community Benefit Agreement. The City Council will also receive a presentation by the Applicant outlining their vision for development of the project site. The City Council is being asked to provide staff and the applicant with feedback and direction regarding the proposed project and related deal points for a Community Benefit Agreement. The feedback received at this meeting will be used to prepare a comprehensive application submittal for entitlements and the preparation of a Community Benefit Agreement. STAFF RECOMMENDATION: Receive presentations by Staff and the applicant, and provide feedback regarding the proposed development and community benefits. FINANCIAL IMPACT: All cost related to this Study Session and the processing of this project application are borne by the applicant. DESCRIPTION: Background The project site, commonly referred to as the Prologis site, is located at 6700 Golden Gate Drive. This subject property is located in the Transit-Oriented District of the Downtown Dublin Specific Plan (DDSP). The 8.53 acre industrial site currently owned 4.1 Packet Pg. 3 Page 2 of 5 by AMB Dublin, LLC, is located north of the I-580 freeway and south of the future extension of Saint Patrick Way, as shown in Figure 1 below. Adjacent to the west boundary of the property are two restaurants (Outback Steakhouse and a vacant restaurant space) as well as commercial retail uses. To the east of the site is a 309 unit residential development, Connolly Station. The site currently includes a partially vacant 204,624 square foot warehouse building, surface parking lot, and outdoor storage area for an existing tenant. Figure 1: Vicinity Map The DDSP provides a list of permitted uses, development standards and design guidelines for all development with the Plan area. The DDSP identified a pool of 1,900 residential units that may be constructed in the Transit Oriented District. A developer must provide a benefit to the community for the use of these units. Since the establishment of the pool, 688 units have been constructed. There are 1,212 units remaining in this pool as shown in Table 1 below. Table 1. Transit Oriented District Residential Development Pool Transit Oriented District (1,900 Residential Units) Project Address Units Status Connelly Station 7550 St. Patrick Way 309 Complete Aster (Bay West) 7544 Dublin Blvd. 313 Complete Valor Crossing (Eden) 6707 Golden Gate Dr. 66 Complete Total Constructed Units 688 Remaining Units 1,212 4.1 Packet Pg. 4 Page 3 of 5 Project Overview Bayview Development Group/The Morley Bros. proposes to demolish the existing warehouse building and construct the ultimate extension of Saint Patrick Way, and construct a 5 story, 499 unit apartment community with related amenities including a club house, pool, roof top terrace, passive courtyards, leasing office and structured parking. The proposed unit mix is shown in Table 2 below. The entitlements for the project are anticipated to include a Site Development Review Permit, Condominium Map, and a Community Benefit Agreement. Table 2. Proposed Unit Mix Unit Type Number of Units Studios 49 1 Bedrooms 240 2 Bedrooms 210 Total: 499 The applicant has prepared a conceptual site plan and elevations of the proposed project as viewed from Saint Patrick Way and from Interstate 580 (Attachment 1). The architectural concept for the development is a contemporary five story building designed to front along the future extension of Saint Patrick Way. The conceptual design shows a variety of contemporary building materials (including wood composite lap siding, stucco, metal awnings), varying vertical parapet heights and upper level balconies. The front façade is complemented on both the ground level and roof level. The ground level is highlighted with a an entry plaza with a change in paving materials leading to a lobby, leasing office and community amenities that front along Saint Patrick Way and will help to activate the streetscape. The roof level provides a terrace which provides an open architectural feature that is also visible from Saint Patrick Way. The following is an overview of the DDSP Development Standards for the Transit Oriented District and a comparison to the proposed project. Table 3. Overview of DDSP Development Regulations Development Regulation Standard Proposed Density Range 30 to 85 units per acre 58.5 units per acre Building Height 8 floors / 90 feet 5 floors / 56 feet Setbacks: St. Patrick Way Interior I-580 Freeway 5’ min/15’ max (80% of bldg. façade) 5’ min 10’ min To be determined - conceptual plan only Parking 1.5 spaces/unit (749 spaces) 1.54 spaces/unit (766 spaces) Guest Parking Up to 15% of required parking 3% / 23 spaces 4.1 Packet Pg. 5 Page 4 of 5 Community Benefit Agreement As defined in the Downtown Dublin Specific Plan, units acquired from the Development Pool require a community benefit. The community benefit can come in the form of an improvement, payment or amenity desirable to the City Council in or for the benefit of the Downtown area. Staff has met with the applicant to review possible options for the City Council’s consideration. The applicant is proposing to achieve the community benefit through three distinct and important ways – affordable housing, enhanced streetscape along St. Patrick Way and supporting the City’s economic development efforts. Affordable Housing The applicant is proposing, as a means to satisfy the affordable housing requirement, the dedication of a 1.3-acre site just west of the said property for the purposes of developing affordable workforce housing. As proposed, the applicant would sell the site to Eden Housing for a nominal fee. However, the majority of the community benefit for the dedication and ultimate creation of affordable housing is in the additional credit market created for the units. As was the case for units created for Valor Crossing, the City will hold the excess credits of affordable units and can sell these credits to other projects in the community as a means of satisfying their affordable requirements. This could potentially yield the City $10 million in future revenues. Saint Patrick Way Streetscape Enhancements The proposed project would trigger the requirement to design, build and extend Saint Patrick Way from its current edge westward to Regional Street. The applicant and Staff have met to discuss significant enhancements to this segment of the street, creating plaza type improvements in an effort to make St. Patrick Way the destination street for events and activities. As proposed, the street would be able to be closed to use it as a place to hold weekend morning Farmers’ Markets, in addition to other street fairs and food truck events to be hosted by the City. The applicant can provide more detail on the street enhancements as part of the study session. Economic Development Efforts As part of the proposed project, the applicant would work with the City to provide a co- work space for local residents, entrepreneurs and emerging businesses. This space would be located within the project and on a prominent corner of the building. The space would open up to the enhanced plaza street location. The applicant would subsidize the space operation for a period of 10 years. Next Steps The City Council is requested to provide Staff and the applicant with feedback and direction regarding the proposed project and the negotiated deal points of a Community Benefit Agreement. Based on the feedback from the City Council, Staff will continue to work with the applicant on project details and the preparation of a complete application for a Site Development Review Permit and Condominium Map for consideration and 4.1 Packet Pg. 6 Page 5 of 5 action by the Planning Commission. The City Manager will prepare a Community Benefit Agreement that will be brought forward to the City Council for consideration after the Planning Commission takes action on the entitlement application. NOTICING REQUIREMENTS/PUBLIC OUTREACH: Although a public notice is not required, the City mailed a notice to all property owners and occupants within 300-feet of the proposed project. A public notice was published in the East Bay Times and posted in the designated posting places. A copy of this Staff Report was provided to the applicant and was made available on the City’s website. ATTACHMENTS: 1. Project Plans - Saint Patrick Way 4.1 Packet Pg. 7 A0.0COVER Architecture + Planning 1814 Franklin St., Ste. 400 Oakland, CA 94612 510.272.2910 ktgy.com DUBLIN, CA # 2017-0486 ST. PATRICK WAY CONCEPTUAL DESIGN NOVEMBER 1, 2017 4.1.a Packet Pg. 8 At t a c h m e n t : 1 . P r o j e c t P l a n s - S a i n t P a t r i c k W a y ( S a i n t P a t r i c k W a y S t u d y S e s s i o n ) Architecture + Planning 1814 Franklin St., Ste. 400 Oakland, CA 94612 510.272.2910 ktgy.com DUBLIN, CA # 2017-0486 ST. PATRICK WAY CONCEPTUAL DESIGN NOVEMBER 1, 2017 A0.1SHEET INDEX 0 50 10025 Architectural A0.0Cover A0.1Sheet Index A0.2Vicinity Map A0.3Surrounding Context Map A1.0 Conceptual Site Plan A2.0 Rendering A2.1 Rendering A2.2 Rendering A2.3 Rendering Landscape L1.0 Streetscape Concepts L2.0 Image Board Civil C1.0 Aerial + Vicinity Maps C2.0 St. Patrick Way Alignment C3.0 Preliminary Grading + Utility Plan 4.1.a Packet Pg. 9 At t a c h m e n t : 1 . P r o j e c t P l a n s - S a i n t P a t r i c k W a y ( S a i n t P a t r i c k W a y S t u d y S e s s i o n ) Architecture + Planning 1814 Franklin St., Ste. 400 Oakland, CA 94612 510.272.2910 ktgy.com DUBLIN, CA # 2017-0486 ST. PATRICK WAY CONCEPTUAL DESIGN NOVEMBER 1, 2017 A0.2VICINITY MAP 0 50 10025 4.1.a Packet Pg. 10 At t a c h m e n t : 1 . P r o j e c t P l a n s - S a i n t P a t r i c k W a y ( S a i n t P a t r i c k W a y S t u d y S e s s i o n ) Architecture + Planning 1814 Franklin St., Ste. 400 Oakland, CA 94612 510.272.2910 ktgy.com DUBLIN, CA # 2017-0486 ST. PATRICK WAY CONCEPTUAL DESIGN NOVEMBER 1, 2017 A0.3SURROUNDING CONTEXT MAP 4.1.a Packet Pg. 11 At t a c h m e n t : 1 . P r o j e c t P l a n s - S a i n t P a t r i c k W a y ( S a i n t P a t r i c k W a y S t u d y S e s s i o n ) 4.1.a Packet Pg. 12Attachment: 1. Project Plans - Saint Patrick Way (Saint Patrick Way Study Session) Architecture + Planning 1814 Franklin St., Ste. 400 Oakland, CA 94612 510.272.2910 ktgy.com DUBLIN, CA # 2017-0486 ST. PATRICK WAY CONCEPTUAL DESIGN AUGUST 4, 2017 A2.0RENDERING: ST. PATRICK LOOKING EAST 4.1.a Packet Pg. 13 At t a c h m e n t : 1 . P r o j e c t P l a n s - S a i n t P a t r i c k W a y ( S a i n t P a t r i c k W a y S t u d y S e s s i o n ) Architecture + Planning 1814 Franklin St., Ste. 400 Oakland, CA 94612 510.272.2910 ktgy.com DUBLIN, CA # 2017-0486 ST. PATRICK WAY CONCEPTUAL DESIGN AUGUST 4, 2017 A2.1RENDERING: ST. PATRICK LOOKING WEST 4.1.a Packet Pg. 14 At t a c h m e n t : 1 . P r o j e c t P l a n s - S a i n t P a t r i c k W a y ( S a i n t P a t r i c k W a y S t u d y S e s s i o n ) Architecture + Planning 1814 Franklin St., Ste. 400 Oakland, CA 94612 510.272.2910 ktgy.com DUBLIN, CA # 2017-0486 ST. PATRICK WAY CONCEPTUAL DESIGN AUGUST 4, 2017 A2.2RENDERING: ST. PATRICK MAIN ENTRY 4.1.a Packet Pg. 15 At t a c h m e n t : 1 . P r o j e c t P l a n s - S a i n t P a t r i c k W a y ( S a i n t P a t r i c k W a y S t u d y S e s s i o n ) Architecture + Planning 1814 Franklin St., Ste. 400 Oakland, CA 94612 510.272.2910 ktgy.com DUBLIN, CA # 2017-0486 ST. PATRICK WAY CONCEPTUAL DESIGN AUGUST 4, 2017 A2.3RENDERING: VIEW FROM 580 4.1.a Packet Pg. 16 At t a c h m e n t : 1 . P r o j e c t P l a n s - S a i n t P a t r i c k W a y ( S a i n t P a t r i c k W a y S t u d y S e s s i o n ) 4.1.a Packet Pg. 17 At t a c h m e n t : 1 . P r o j e c t P l a n s - S a i n t P a t r i c k W a y ( S a i n t P a t r i c k W a y S t u d y S e s s i o n ) 4.1.a Packet Pg. 18 At t a c h m e n t : 1 . P r o j e c t P l a n s - S a i n t P a t r i c k W a y ( S a i n t P a t r i c k W a y S t u d y S e s s i o n ) VALOR CROSSING APARTMENTS ASTER APARTMENTS ST. PATRICK WAY DUBLIN BOULEVARD GO L D E N G A T E D R I V E INTERSTATE 580 PROJECT SITE WEST DUBLIN BART STATION CONNOLLY STATION APARTMENTS RE G I O N A L S T R E E T WE S T S T R E E T SOUTH STREET CONCEPTUAL DESIGN OCTOBER 30, 2017 SACRAMENTO, CALIFORNIA SAN RAMON, CALIFORNIA CIVIL ENGINEERS SURVEYORSPLANNERS (925) 866 - 0322 www.cbandg.com (916) 375 - 1877 Carlson, Barbee & Gibson, Inc. DUBLIN, CA # 2763 ST. PATRICK WAY C1.0AERIAL MAP & VICINITY MAP 0 100 20050 SITE VICINITY MAP 4.1.a Packet Pg. 19 At t a c h m e n t : 1 . P r o j e c t P l a n s - S a i n t P a t r i c k W a y ( S a i n t P a t r i c k W a y S t u d y S e s s i o n ) 344 . 1 350 . 9 35 0 . 3 34 9 . 9 351 . 0 341 . 3 341 . 2 342 . 7 343 . 6 344 . 3 345 . 4 34 6 . 8 343 . 6 343 . 4 343 . 5 34 2 . 5 341 . 8 34 5 . 6 347 . 6 347 . 6 346 . 4 346 . 2 344 . 4 344 . 2 342 . 8 350 . 7 349 . 3 348 . 6 346 . 7 351 . 1 347 . 8 350 . 5 348 . 2 348 . 6 349 . 7 350 . 3 350 . 2 350 . 5 350 . 6 346 . 3 345 . 3 350 . 2 350 . 6 350 . 5 349 . 3 351 . 3 350 . 8 350 . 1 35 1 . 8 352 . 4 351 . 2 352 . 2 352 . 3 354 . 5 354 . 6 354 . 9 355 . 6 356 . 1 355 . 7 354 . 8 355 . 4 350 . 4 351 . 0 351 . 3 351 . 7 351 . 3 351 . 4 35 2 . 6 353 . 5 352 . 3 35 3 . 7 354 . 2 355 . 3 355 . 8 338 . 3 33 8 . 5 338 . 6 338 . 3 353 . 5 34 3 . 2 339 . 8 339 . 1 33 9 . 3 340 . 2 340 . 6 341 . 6 339 . 8 339 . 6 34 0 . 7 342 . 3 339 . 4 343 . 1 343 . 9 344 . 9 34 0 . 2 339 . 8 33 9 . 5 342 . 2 350 345 340 3 4 0 34 5 350 350 3 5 5 RE G I O N A L S T R E E T ST. PATRICK W A Y EN T R Y D R I V E ( P R I V A T E ) C ST. PATRICK WAY WE S T S T R E E T ( P R I V A T E ) GO L D E N G A T E D R I V E A C D B 34 5 . 4 34 7 . 6 34 6 . 4 34 6 . 2 34 4 . 9 34 5 SECTION A: PROPOSED SECTION C: PROPOSED SECTION D: EXISTING SECTION B: PROPOSED LEGEND ABBREVIATIONS ST. PATRICK & WEST STREET INTERSECTION DETIAL CONCEPTUAL DESIGN OCTOBER 30, 2017 SACRAMENTO, CALIFORNIA SAN RAMON, CALIFORNIA CIVIL ENGINEERS SURVEYORSPLANNERS (925) 866 - 0322 www.cbandg.com (916) 375 - 1877 Carlson, Barbee & Gibson, Inc. DUBLIN, CA # 2763 ST. PATRICK WAY C2.0ST. PATRICK WAY ALIGNMENT 0 40 8020 4.1.a Packet Pg. 20 At t a c h m e n t : 1 . P r o j e c t P l a n s - S a i n t P a t r i c k W a y ( S a i n t P a t r i c k W a y S t u d y S e s s i o n ) 344 . 1 350 . 9 350 . 3 349 . 9 351 . 0 349 . 4 35 5 . 4 355 . 2 343 . 6 344 . 3 345 . 4 343 . 6 347 . 6 346 . 4 346 . 2 344 . 4 348 . 6 346 . 7 351 . 1 347 . 8 350 . 5 348 . 2 348 . 6 349 . 7 350 . 3 350 . 2 350 . 5 350 . 6 346 . 3 345 . 3 346 . 6 35 0 . 2 350 . 6 350 . 5 349 . 3 351 . 3 350 . 8 350 . 1 351 . 8 35 4 . 6 354 . 9 357 . 2 355 . 6 357 . 2 356 . 4 356 . 6 356 . 1 355 . 7 354 . 8 355 . 4 355 . 5 353 . 5 350 . 1 354 . 7 35 6 . 2 356 . 8 355 . 4 357 . 6 35 8 . 5 357 . 6 357 . 7 355 . 7 355 . 1 35 6 . 8 35 2 . 3 35 1 . 2 352 . 2 351 . 5 348 . 5 35 0 . 6 349 . 6 349 . 8 350 . 5 35 0 . 4 351 . 5 350 . 8 350 . 3 350 . 3 350 . 6 351 . 3 351 . 9 35 1 . 4 350 . 6 352 . 6 351 . 4 350 . 1 350 . 8 350 . 4 351 . 0 351 . 3 351 . 7 351 . 3 351 . 5 351 . 4 352 . 6 353 . 5 35 2 . 3 353 . 7 355 . 3 355 . 8 357 . 1 353 . 2 353 . 5 343 . 9 344 . 9 .7 .7 347 . 9 348 . 2 348 . 3 348 . 4 348 . 5 348 . 5 34 8 . 8 348 . 9 351 . 5 353 . 8 351 . 5 354 . 3 353 . 3 351 . 4 3 5 0 350 345 34 5 350 350 3 5 5 34 5 . 5 346 . 2 34 6 . 6 346 . 5 346 . 6 346 . 8 34 7 . 6 346 . 9 347 . 3 347 . 5 348 . 3 348 . 4 347 . 6 348 . 2 346 . 8 GARAGE FF 351.1 COURT C FF 351.1 COURT A FF 351.1 COURT B FF 351.1 ST. PATRICK W A Y SOUTH STREET WE S T S T R E E T RE G I O N A L S T R E E T CONCEPTUAL DESIGN OCTOBER 30, 2017 SACRAMENTO, CALIFORNIA SAN RAMON, CALIFORNIA CIVIL ENGINEERS SURVEYORSPLANNERS (925) 866 - 0322 www.cbandg.com (916) 375 - 1877 Carlson, Barbee & Gibson, Inc. DUBLIN, CA # 2763 ST. PATRICK WAY C3.0 0 40 8020 PRELIMINARY GRADING & UTILITY PLAN LEGEND ABBREVIATIONS NOTES PRELIMINARY C.3 SUMMARY DMA TOTAL AREA (SF)TREATMENT TYPE TREATMENT FLOW RATE (CFS) BIO-RETENTION REQUIRED (SF) BIO-RETENTION PROVIDED (SF) ≥ SPECIAL PROJECT NON-LID TREATMENT REDUCTION CREDITS 4.1.a Packet Pg. 21 At t a c h m e n t : 1 . P r o j e c t P l a n s - S a i n t P a t r i c k W a y ( S a i n t P a t r i c k W a y S t u d y S e s s i o n ) Page 1 of 17 STAFF REPORT PLANNING COMMISSION DATE: March 27, 2018 TO: Planning Commission SUBJECT: St. Patrick Way Residential Project - Site Development Review and Vesting Tentative Map 10809 (PLPA-2017-00061) Prepared by:Amy Million, Prinicpal Planner EXECUTIVE SUMMARY: Bayview Development Group/The Morley Bros. is seeking to develop a ± 8.53 acre site located at 6700 Golden Gate Drive within the Downtown Dublin Specific Plan Transit - Oriented District. The proposal includes the demolition of the existing largely vacant 204,624 square foot warehouse building, construction of the final extension of St. Patrick Way and construction of a five-story, 499-unit residential building and related site improvements. The project includes a request for a Vestin g Tentative Map for condominium purposes. RECOMMENDATION: Disclose ex-parte contacts, conduct the public hearing, deliberate and adopt a Resolution approving a Site Development Review Permit and Vesting Tentative Map 10809 for the St. Patrick Way Project at 6700 Golden Gate Drive in Downtown Dublin. PROJECT DESCRIPTION: The project site, commonly referred to as the Prologis site, is located at 6700 Golden Gate Drive. The ±8.53-acre site is located north of I-580 and south of the future extension of St. Patrick Way, as shown in Figure 1 below. Adjacent to the west boundary of the property are two restaurants (Outback Steakhouse and a vacant restaurant space) as well as a retail/office building on the adjacent 1.3 acre site. To the east of the site is a 309-unit residential development, Connelly Station. The site currently includes a largely vacant 204,624 square foot warehouse/industrial building, surface parking lot, and outdoor storage area for an existing tenant. Industrial uses are not permitted in the DDSP which results in the building’s existing industrial use being legal-nonconforming. The existing warehouse building presents challenges to repurposing it with conforming commercial uses. Such challenges include parking and building code compliance. 5.1 Packet Pg. 9 Page 2 of 17 The subject property is located within the Transit-Oriented District of the Downtown Dublin Specific Plan (DDSP). This land use designation allows a variety of uses, including residential, retail and office uses. The DDSP identified a pool of 1,900 residential units that may be constructed in the Transit Oriented District. As part of the proposed project, the applicant is required to enter into a Community Benefit Agreement in exchange for using units from the pool. The Community Benefit Agreement is subject to review and approval by the City Council. Since the establishment of the pool, 688 units have been constructed. There are 1,212 units remaining in this pool as shown in Table 1 below. Table 1. Transit Oriented District Residential Development Pool Transit Oriented District (1,900 Residential Units) Project Address Units Status Connelly Station 7550 St Patrick Way 309 Approved 2012 - complete Aster (Bay West) 7544 Dublin Blvd. 313 Approved 2013 - complete Valor Crossing (Eden) 6707 Golden Gate Dr. 66 Approved 2013 - complete Total Developed Units 688 Remaining Units 1,212 St. Patrick Way 6700 Golden Gate Dr. 499 Proposed Project Remaining Units with Proposed Project 713 On November 21, 2017, City Council held a study session for and provided input on the proposed project and the negotiated deal points of the proposed Community Benefit Agreement, which included the following: 5.1 Packet Pg. 10 Page 3 of 17 • Dedication of a 1.3-acre site just west of the subject property for the purposes of developing affordable housing • Enhanced streetscape along St. Patrick Way to allow for its use for special events and Downtown activation. • Supporting the City’s economic development effort through providing a collaborative work space within the project for local residents, entrepreneurs and emerging businesses. City Council directed Staff to proceed with processing the project entitlements for consideration by the Planning Commission and prepare a Community Benefit Agreement for the City Council to consider. Current Request Bayview Development Group/The Morley Bros. proposes to demolish the existing industrial warehouse building, construct the ultimate extension of St. Patrick Way and construct a five-story, 499-unit residential community with related amenities including a club house, pool, roof top terrace, passive courtyards, collaborative work space, leasing office and structured parking. The entitlements for the project that are being presented to the Planning Commission for consideration are a Site Development Review Permit and Tentative Parcel Map for condominium purposes. The Community Benefit Agreement, which allocates the units, will be considered separately by the City Council. ANALYSIS: Site Development Review The DDSP contains allowed uses, development standards, and design guidelines for all projects within its boundaries. The development standards contained in the DDSP are purposefully permissive to allow flexibility in project design and implementation. The proposed building meets all the development standards of the Transit-Oriented District (DDSP Section 4.2). An overview of those standards is provided in Table 2 below. Table 2. Overview of DDSP Development Regulations Development Regulation Standard Proposed Density Range 30 to 85 units per net acre 65.66 units per net acre Building Height 8 floors / 90 feet 5 floors / 57 feet Setbacks: St. Patrick Way Interior I-580 Freeway 5 feet to 15 feet maximum 5 feet minimum 10 feet minimum Varies. 6.4 feet minimum Varies. 12 feet minimum Varies. 54 feet minimum Required Frontage A building facade shall be Approximately 83% of 5.1 Packet Pg. 11 Page 4 of 17 constructed within 10 ft of the minimum street setback line along at least 80% of the property’s total street frontage the building façade is constructed within this area. Private Outdoor Space 100 square feet per unit or 49,900 square feet 50,000 square feet Residential Parking 1.5 spaces per unit / 749 spaces 749 spaces Guest Parking Up to 15% of required parking / 0 to 112 spaces 2.1% / 16 spaces Work Space Parking 1 space per 250 square feet / 6 spaces 6 spaces In addition to defining uses, development standards, and design guidelines, the DDSP also includes a set of guiding principles to help prioritize the direction and developm ent strategy for Downtown Dublin as a whole (DDSP Section 3.3). The purpose of the guiding principles is to define a framework for future land uses, development standards and design guidelines. For details on the project’s consistency with those guiding principles see the “Consistency with the General Plan, Specific Plans, and Zoning Ordinance” section below. Overall Site Plan and Circulation The proposed building includes 499 market rate apartments and a 1,500 square foot collaborate work space along the extension of St. Patrick Way. The 499-units will be distributed through five floors which wrap around three internal courtyards and a five - story parking structure. The 1,500 square foot collaborative work space is located on the ground floor at northeast corner of the building facing St. Patrick Way. Vehicular access to the site is provided by a single driveway off St. Patrick Way. The driveway provides access to the parking garage as well as guest parking spaces along the driveway. A second vehicle access, for emergency vehicles only, is provided off West Street, a private road along the eastern property line, which is shared with the adjacent residential community, Connelly Station. This access road is restricted with a gate at the entry (located at the property line) that wraps around the building to the south, providing a buffer between the proposed building and I -580. Pedestrian access to the site is provided from St. Patrick Way, West Street and the project drive. A plaza feature has been designed in front of the leasing office centrally located along the St. Patrick Way street frontage. The plaza and leasing office create a focal point for the front façade with enhanced pavement in the plaza leading to the leasing office, which is designed as an open two-story interior space. A small second lobby is located on the east side of the building near the emergency vehicle access road off West Street. This lobby provides a direct pedestrian connection to South Street which leads to Golden Gate Drive and the West Dublin/Pleasanton BART station. A 5.1 Packet Pg. 12 Page 5 of 17 pedestrian gate next to the emergency vehicle gate will provide secure access for the residents using this lobby. A third lobby is located on the west side of the building off the project drive adjacent to the guest parking spaces. As outlined in Table 2 above, there are a total of 771 parking spaces on -site, both at- grade and in the parking garage. The parking requirement for residential uses in the DDSP area is 1.5 spaces per residential unit and up to 15% add itional spaces for guest parking. Consistent with the DDSP, the applicant is proposing to provide 1.5 spaces per unit (749 spaces) and a limited amount of guest parking of 2.1% (16 spaces) that the applicant feels will adequately serve the needs of the building. For commercial uses, the DDSP refers to the parking standards in the Dublin Zoning Ordinance. The collaborative work space, located on the ground -floor facing St. Patrick Way is designed to be open to the public, so that it can be used by both resi dents of the project and non-residents. As such, a parking requirement of 1 space per 250 square feet for a total of 6 spaces is required for this work space and will be provided on -site. The DDSP requires private outdoor spaces for all residential development projects at a ratio of 100 square feet per residential unit. This space may be provided in a series of spaces which are common to all residents such as courtyards or roof gardens or private to individual residences such as individual balconies and patios. A total of 49,990 square feet of open space is required for the proposed 499 units and 50,000 square feet is provided. The layout of the building provides for individual balconies as well as three large internal courtyards designed for both active and passive uses including a pool, spa, BBQ, fountains, seating, and a fireplace. Additional detail on the courtyard spaces is provided in the Landscape Design section below. A site plan highlighting access locations and project features is provided in Figure 2 below and included as Attachment 2, Sheet A0.4. 5.1 Packet Pg. 13 Page 6 of 17 As part of the review, the City engaged the services of Kittelson & Associates to complete a project-level analysis of the transportation effects, which included a review of the site circulation and access. The proposed project was determined to have adequate site circulation and access for all users including residents, emergency vehicles and service vehicles such as garage trucks. St. Patrick Way Extension The project includes the extension of St. Patrick Way from West Street to Regional Street, completing the planned connection. The street incorporates the Complete Streets standards of the General Plan (Section 5.4) with infrastructure for all modes of transportation including vehicles, pedestrians and bicyclists. The applicant is proposing to further enhance St. Patrick Way along this segment of the street. The proposal includes creating plaza type improvements such as seat walls, enhanced paving, poles for decorative string lights, temporary bollards, etc., in an effort to make St. Patrick Way a destination street for events and activities. As proposed, the street could periodically be closed for use as a place to hold Farmers’ Markets, in addition to other street fairs and food truck events hosted by the City. Figures 3 and 4 below show completion of St. Patrick Way and a detail of some of the proposed enhancements. 5.1 Packet Pg. 14 Page 7 of 17 The proposed street enhancements implement with the guiding principles identified in the DDSP for the downtown such as: • Enhance the visual quality of Downtown Dublin, including public streetscape improvements, entryways, on‐site landscaping and the appearance of individual buildings. • Create a pedestrian‐friendly downtown that minimizes potential conflicts between vehicles, pedestrians and bicyclists. • Enhance the multi‐modal circulation network to better accommodate alternative transportation choices including BART, bus, bicycle, and pedestrian transportation. • Encourage development that will create a vibrant and dynamic downtown that is considered an attractive and distinctive amenity to the Tri‐Valley Region. • Work with property owners and business to achieve the goals and objectives of the Downtown Dublin Specific Plan. • The cost of infrastructure should be paid for by development. The conceptual streetscape improvements are included in the project plans for reference (Attachment 2, Sheets L1.2 and L5.1). The details on the streetscape improvements will be included in the Community Benefit Agreement as previously discussed. 5.1 Packet Pg. 15 Page 8 of 17 Building Architecture and Materials The architectural concept for the development is a contemporary building designed to front along the future extension of St. Patrick Way. The north half of the building which is primarily visible from St. Patrick Way and West Street focuses on the pedestrian experience using smaller architectural details, materials and entry features. The southern half of the building which is primarily visible from I -580 focuses on experiencing the development from a vehicle on I -580 through its larger design features and color palette. The two halves of the building relate through the building’s consistent architectural theme and materials and differentiate through the changes in articulation and details. The building’s contemporary look and geometry follows the St. Patrick Way street frontage with articulation and architectural features in key locations. The ground level along St. Patrick Way is highlighted with an entry plaza with a change in paving materials leading to a two-story interior leasing office. Entry stoops for the ground -floor units provide pedestrian scale and create a direct connection to St. Patrick Way. At the corner of St. Patrick Way and West Street is a two -story cooperative working space at the ground level that also activates the corner. A partially open terrace is also provided on the 5th floor above the leasing and amenity space along the St. Patrick Way frontage. Figure 5. Partial North Elevation – St. Patrick Way 5.1 Packet Pg. 16 Page 9 of 17 Figure 6. Detail view of Work Space and Front Entries on St. Patrick Way The parking structure is located on the southern half of the building and is wrapped on the three of the four sides, leaving the southern façade exposed to I -580. The building’s architecture screens the parking structure which is accented by colorful metal screens that are placed along the 5th floor of the parking structure and continued down the east side of the south facade to the ground floor to add further interest. Figure 7. South Elevation – I-580 The exterior materials throughout the building are a variety of contemporary building materials including, wood composite lap siding, cementitious panels, stucco, glass and metal awnings. The building’s façade is articulated through the use of two a nd three story architectural elements, grouped windows and varying window patterns that create visual interest at different levels. Balconies and awnings are used throughout the buildings along with varying vertical parapet heights. 5.1 Packet Pg. 17 Page 10 of 17 Figure 8. Awning and Balcony Details The roofline has a traditional contemporary form that rises and falls with the various architectural projections. The open amenity space on the 5th floor directly above the ground floor leasing office and amenity space off ers additional visual relief to the building’s five-story mass. The building is further accented with balconies with wood railings, glass panels along the 5th floor amenity space, and metal awnings over selected windows and doors. These perspectives and elevations are included as Attachment 2, Sheets A1.0-A2.3. Landscape Design The landscaping is designed to enhance the building’s architecture while complementing the already established landscaping in the surrounding developments and on the street. The landscape is also functionally designed to buffer the proposed building in key locations such as along 1 -580 and the vacant property to the east adjacent to BART. The DDSP encourages the use of landscaping on all sides of buildings, along streets, walkways, driveways and private outdoor spaces. A combination of trees, shrubs and groundcovers are also encouraged which may be provided in planters, pots or in the ground. The DDSP supports the inclusion of shade trees along walkways and near buildings. These encouraged features are included in the proposed design. The design concept for the interior courtyard continues the contemporary design theme. The furnishings and plant palate are clean and contemporary. The three courtyard spaces provide different functions with both active and passive uses. The most active courtyard is the largest of the three and located directly behind the leasing and amenity space. This area includes the pool and spa. The second courtyard is directly connected to the first and is designed with a variety of seating, a fireplace and BBQs. The third courtyard provides a passive setting for the units on the southern half of the building closest to I-580. Due to its location, this space is designed to function less as an active space and more as a passive open space for the residents. 5.1 Packet Pg. 18 Page 11 of 17 The plants selected will provide year-round seasonal interest, with a mix of evergreen and deciduous plantings. The plantings will be drought tolerant with water management features that will allow the site to use a minimum amount of water while creating an attractive and thriving environment. The conceptual landscape plan is included as Attachment 2, Sheet L1.1, which details on Sheets L3.0 and L5.2. Public Art The applicant intends to satisfy the City’s public art requirement through the inclusion of public art. The preliminary location of the art is shown along St. Patrick Way at the east and west corners of the building. Condition of Approval No. 20 confirms the public art requirement. Vesting Tentative Map 10809 The Applicant has indicated that the proposed development will be rental housing; however, a request to subdivide the ± 8.53 acre property for condominium purposes has been included to allow flexibility in the future to convert the project to ownership units. The vesting tentative map will allow up to the proposed 499 -units. No condominium conversion may take place in the City without the owner first obtaining a Condominium Conversion Permit pursuant to Dublin Municipal Code Chapter 8.54 from the Planning Commission. The Vesting Tentative Map is included in the Project Plans as Sheet C1.0. The Resolution approving Vesting Tentative Map 10809 is included as Attachment 1 to this Staff Report. CONSISTENCY WITH THE GENERAL PLAN, SPECIFIC PLANS, AND ZONING ORDINANCE The project is consistent with the General Plan land use designation of Downtown Dublin – Transit-Oriented District and the DDSP. The DDSP was written as a comprehensive plan for future development in the Downtown area. The Specific P lan contains the allowed uses, development standards, and design guidelines with which all projects within the boundaries must be in compliance. The proposed project, with the allocation of residential units from the Development Pool as described above, i s consistent with the DDSP and the City’s Zoning Ordinance. The proposed facility has been designed to be compatible with surrounding residential and commercial properties, while encouraging the appropriate integration to activate this key area of Downtow n Dublin. In addition, the proposed project will contribute to the implementation of the vision of the DDSP and the housing opportunities offered in the DDSP area. Downtown Dublin Specific Plan Guiding Principles A set of guiding principles are included to help prioritize the direction and development strategy for Downtown Dublin as a whole (DDSP Section 3.3). The purpose of the guiding principles is to define a framework for future land uses, development standards and design guidelines. In addition, guiding principles for Downtown Dublin as a whole, guiding principles have been identified for the Transit‐Oriented District (DDSP Section 3.3.3). Those that apply to the proposed project are as follows: • Promote transit‐oriented development to create a distinctive and active district; 5.1 Packet Pg. 19 Page 12 of 17 • Identify opportunity sites for future development that incorporate mixed ‐use and provide public and/or private plazas and outdoor gathering areas at strategic locations; and • Encourage underground and/or above ground parking stru ctures. Downtown Dublin Specific Plan Vision The established vision of the DDSP is to make Downtown Dublin “a vibrant and dynamic commercial and mixed-use center that provides a wide array of opportunities for shopping, services, dining, working, living a nd entertainment in a pedestrian-friendly and aesthetically pleasing setting that attracts both local and regional residents.” The redevelopment of the subject property is an important incremental improvement to advance this vision. The proposed project also supports the narrower vision for the Transit-Oriented District which is “to encourage the development of the area with land uses that support and complement transit uses, particularly the West Dublin BART Station. These uses include high-density multi-family residential and those that are generally more urban that the surrounding area”. In addition, a pedestrian-scale, walkable environment is encouraged through the development of plazas and connectively within the District and areas outside the District. The proposed project with its completion of St. Patrick Way and site design will further the vision of the Transit-Oriented District. Downtown Dublin Specific Plan Design Guidelines The DDSP establishes design guidelines for development within the pl an area (DDSP Section 4.4). The proposed project meets the key design guidelines of the DDSP (DDSP Section 4.4), including: • Using high-quality building materials and treating all building facades that are visible from the public realm with similar archite ctural elements, materials, and colors; • Incorporating treatments into the building design to ensure articulation and visual interest by utilizing techniques such as changing direction of the wall or façade, altering the height of the rooflines, providing p rojecting elements such as canopies, balconies, trellises, and breaking up large surfaces with logical changes in materials, texture, or colors; • Use of bold colors as accent features only and maximizing the use of muted or soft colors; • For residential uses, porches, balconies, and courtyards and providing ground- floor access to both individual and common building entrances; and • Finishing materials and color used on all building facades should be complementary to cone another and appropriate for the architec tural style and character of the building. AFFORDABLE HOUSING/INCLUSIONARY ZONING The inclusionary requirement for a 499 -unit residential project is 62 units. The applicant is proposing to satisfy the affordable housing requirement through the dedicati on of a 1.3-acre site just west of the subject property for the purposes of developing affordable housing. As proposed, the applicant would sell the property to the City or an affordable housing developer for a nominal fee. As was the case for units create d for the Valor 5.1 Packet Pg. 20 Page 13 of 17 Crossing Veteran’s Housing Project, the City will hold any excess credits of affordable units and can sell these credits to other projects in the community as a means of satisfying their affordable requirements. REVIEW BY APPLICABLE DEPARTMENT AND AGENCIES: The Building Division, Fire Prevention Bureau, Public Works Department, and Dublin San Ramon Services District reviewed the project and provided Conditions of Approval where appropriate to ensure that the Project is established in comp liance with all local Ordinances and Regulations. Conditions of Approval from these departments and agencies have been included in the attached Resolution (Attachment 1). ENVIRONMENTAL REVIEW: The project which includes demolition of the existing wareho use building, construction of the ultimate extension of St. Patrick Way, and construction of a 5 story, 499 unit apartment community with related amenities including a club house, pool, roof top terrace, passive courtyards, leasing office and structured parking, is located within the Transit-Oriented District of the Downtown Dublin Specific Plan (DDSP), which was the subject of an Environmental Impact Report (EIR), State Clearinghouse number 20100022005. The DDSP Final EIR was certified by City Council Res olution No. 08-11 on February 1, 2011. Pursuant to the California Environmental Quality Act (CEQA) the proposed residential development is (1) exempt from further environmental review under Government Code Section 65457 and CEQA Guidelines Section 15182 a nd under (2) CEQA Guidelines Section 15168 this residential project is in conformity with the DDSP and within the scope of the project analyzed in the DDSP EIR; therefore, no further CEQA review or document is required. Government Code sec. 65457 and CEQA Guidelines Section 15182 - Exemption Pursuant to Government Code sec. 65457 and CEQA Guidelines Section 15182(a) (Residential Projects Pursuant to a Specific Plan) of the CEQA Guidelines which states: "Exemption. Where a public agency has prepared an EIR on a specific plan after January 1, 1980, no EIR or negative declaration need be prepared for a residential project undertaken pursuant to and in conformity to that specific plan if the project meets the requirements of this section including” an event as described in CEQA Guidelines Section 15162. As identified in CEQA Section 15162 and briefly describes as follows, supplemental environmental review is required only when there are new or substantially more severe significant environmental impacts which require major revisions to the EIR due to project changes, substantial changes with respect to circumstances under which the project is undertaken or new information of substantial importance, or other standards under CEQA section 15162 are met. On February 1, 2011, the Dublin City Council adopted Resolution 09 -11 adopting the Downtown Dublin Specific Plan (DDSP). At the meeting, the City Council adopted Resolution 08-11 certifying an EIR for the DDSP. The purpose of the adopted DDSP was to guide development and design for the approximately 284 acres located in Downtown Dublin. The DDSP consists of a comprehensive set of incentives, standards, and requirements that implements the vision for the future development of downtown Dublin. The DDSP defines the physical envelope for Downtown Dublin’s future growth using height limits, setbacks, density, and design standards. 5.1 Packet Pg. 21 Page 14 of 17 On May 6, 2014, the City Council adopted Resolution 49-14 adopting an Addendum to the DDSP EIR for changes to the DDSP. The changes included increasing the number of residential units permitted in the DDSP area by 1,200 units and decreasing the amount of commercial square footage permitted by 773,000 square feet, creating minimum density thresholds for the Transit-Oriented and Retails Districts, and restricting residential development on the west side of San Ramon Road in the Retail District. DDSP EIR and the subsequent addendum analyzed the construction of approximately 2.2 million square feet of non-residential development and 2,500 residential dwelling units, included in the DDSP. Of the 2,500 residential dwelling units, 1,900 unit were allocated to the Transit-Oriented District. As shown in Table 1 above, the proposed project’s 499-units is within the already contemplated residential development activity in the Transit-Oriented District. The proposed project meets the development standards established in the DDSP as shown in Table 2 above. The project is consistent with DDSP. Approval of the proposed 499 -unit residential project would be within the development threshold of the 1,900 residential dwelling units allocated for the Transit-Oriented District. In addition, the proposed project conforms with the development regulations and design guidelines established in the specific plan in which is located. As provided in Government Code sec. 21166 and Section 15162 of the CEQA Guidelines, when an EIR has been prepared for a project (DDSP EIR), no new environmental document shall be prepared for the proposed project, unless the Planning Commission makes one of the following determinations under Section 15162(a): 1) Substantial changes are proposed in the project which will require major revisions of the previous EIR due to the involvement of new significant environmental effects or a substantial increase in the severity of previously identified significant effects; 2) Substantial changes occur with respect to the circumstances under which the project is undertaken which will require major revisions of the EIR due to the involvement of new significant environmental effects or a substantial increase in the severity of previously identified significant effects; or 3) New information of substantial importance, which was not known and could not have been known with the exercise of reasonable diligence at the time the EIR was adopted, shows any of the following: a. The project will have one or more significant effects not discussed in the previous EIR; b. Mitigation measures or alternatives previously found not to be feasible would in fact be feasible, and would substantially reduce one or more significant effects of the project, but the project proponents decline to adopt the mitigation measures or alternative; or c. Mitigation measures which are considerably different from those analyzed in the previous EIR would substantially reduce one or more significant effects on 5.1 Packet Pg. 22 Page 15 of 17 the environment, but the project proponents decline to adopt the mitigation measure. The City conducted a review to determine if the proposed project met any of the standards requiring the preparation of supplemental environmental review under CEQA. Based on a review of the project, the environmental analysis in the DDSP EIR and all the information in the Project record as a whole, the City has determined that there is no substantial evidence that any of the standards are met. As part of this determination, the City had an analysis of traffic and noise impacts prepared for the Project to ensure that potential impacts in those areas did not present new or substantially more s evere significant impacts than presented in the DDSP EIR. Therefore, pursuant to Government Code sec. 65457 and CEQA Guidelines Section 15182, the project is exempt from CEQA and no further environmental review is required for this project. Section 15168 – WITHIN SCOPE OF CERTIFIED DDSP PROGRAM EIR. The DDSP was prepared as a Program EIR under CEQA Guidelines Section 15168 to be used as the CEQA review for future implementing projects. Section 15168(a) defines a “program EIR” as one prepared on a series of actions that can be characterized as one large project and are related geographically and by other shared characteristics. Section 15168(c) states that subsequent activities in the program EIR must be examined in the light of the program EIR to determin e whether an additional environmental document must be prepared. If the agency finds that pursuant to CEQA Guidelines Section 15162(c)(2), no new effects could occur or no new mitigation measures would be required, the agency can approve the activity as be ing within the scope of the project covered by the program EIR and no new environmental document would be required. Operation Traffic Analysis The City engaged the services of Kittelson & Associates to complete a project -level analysis of the transportation effects. The analysis included trip generation, trip distribution, traffic operation, site circulation and access. Using the same methodology established in the DDSP DEIR which includes an analysis of both the Base FAR and Maximum FAR, the project was found to be within the impacts analyzed and mitigated in the DDSP EIR and no new or substantially more severe significant traffic impacts are presented for the project. As stated, the DDSP EIR assessed the transportation impacts of the DDSP by identifying large areas for development. Since the EIR did not assign development densities to individual parcels, general assumptions were required. Therefore, included in the evaluation of the proposed project was the intersection of Golden Gate Drive and St. Patrick Way. The study found that a traffic signal was not warranted by the project alone; however, it did note that in the future (before 2040) with additional projects, the signal will be required. This finding is consistent with the DDSP EIR Mitigation Measu re 3.9-1. This mitigation measure requires the City to collect impact fees from developers in the Specific Plan Area for the Tri-Valley Transportation Development Fee as well as the Western Dublin Traffic Impact Fee programs prior to issuance of Building P ermits. This will fund local and regional transportation improvements. The signal at Golden Gate Drive and St. Patrick Way has already been identified in the Western Dublin TIF program and the payment of the required TIF fees addresses this previously iden tified impact. 5.1 Packet Pg. 23 Page 16 of 17 Noise Impacts The DEIR for the DDSP identified the impact pertaining to the increase of noise levels in the area from mobile sources (vehicular traffic) at existing and future uses. To mitigate this impact the City adopted Mitigation Measure 3.7-3. This mitigation measure requires that future development within the DDSP project area located adjacent to Highway 580 prepare a site-specific acoustical analysis subject to review and approval by the City of Dublin. The mitigation required that the acoustical analysis evaluate resultant noise impacts in comparison to the City’s noise criteria for Land Use Compatibility for Community Noise Environments. Feasible project specific mitigation measures are required as part of the project design to reduce noise impacts at future noise sensitive land uses, including but not limited to the following: 1) site design, 2) operational restrictions, 3) barriers, 4) setbacks, and 5) insulation. An acoustical assessment dated March 2018, was prepared by Kimley Horn on behalf of the applicant. The assessment evaluated future uses at the project site and potential noise levels they would be exposed to. The assessment includes an evaluation of the existing conditions and concluded that the primary noise source was traffic on I-580. As required by Mitigation Measure 3.7-3, the assessment made project specific design recommendations to address noise levels. The recommendations are as follows: 1) Sound wall. A 7-foot noise barrier is needed to ensure that ground-floor exterior noise levels in Courtyard C (closest to I-580) 2) Upgraded windows. Units along the western, southern and eastern property line require thicker glass windows (minimum Sound Transmission Class of 36) 3) Balcony treatments. The first row of units that façade the western, southern and eastern site perimeter require incorporation of a noise attenuating balcony or patio treatment (42” minimum height) With implementation of the above recommendations, the interior noise levels at the project would not exceed the 45dBA interior threshold required by the California Building Code and the Dublin General Plan. They would also keep exterior noise levels from exceeding 60 dBA which is identified as a “normally acceptable” level for residential uses in the Dublin General Plan. Based on the Project record as a whole, the proposed project is within the scope of the project covered by the DDSP EIR and subsequent Addendum. The circumstances under which the Project is to be undertaken have not substantially change d since the DDSP EIR and subsequent Addendum were prepared and will not substantially change with the approval of the Project. As supported by the operational traffic analysis and noise study, the EIR adequately describes the impacts of the Project for the purposes of CEQA, no mitigation measures or new alternatives are required by the Project other than those previously disclosed and analyzed in the DDSP EIR and subsequent Addendum. Approval of the project will not create any site‐specific operations giving rise to environmental effects different from those examined by the EIR or requiring the preparation of an Initial Study. The proposed project is subject to the DDSP Mitigation Monitoring and Reporting Program. Consequently, pursuant to CEQA Guidelines 5.1 Packet Pg. 24 Page 17 of 17 Section 15182, the Project impacts are covered by the DDSP EIR and its Addendum and no further environmental review is required for this project. PUBLIC NOTICING: In accordance with State law, a public notice was mailed to all property owners and occupants within 300 feet of the proposed project to advertise the project and the upcoming public hearing. A public notice also was published in the East Bay Times and posted at several locations throughout the City. A Planning Application sign was posted on the project site and the project was also included on the City’s development projects webpage. A copy of this Staff Report has been provided to the Applicant. ATTACHMENTS: 1. Resolution Approving the Site Development Review Permit and Vesting Tentative Map 2. Exhibit A Project Plans 5.1 Packet Pg. 25 RESOLUTION NO. 18-XX A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF DUBLIN APPROVING A SITE DEVELOPMENT REVIEW PERMIT AND VESTING TENTATIVE MAP 10809 FOR THE ST. PATRICK WAY PROJECT AT 6700 GOLDEN GATE DRIVE IN DOWNTOWN DUBLIN APN:941-1500-047-07 PLPA-2017-00069 WHEREAS, the Applicant, Bayview Development Group/The Morley Bros. is seeking to develop an 8.53 acre site located at 6700 Golden Gate Drive within the Downtown Dublin Specific Plan. The proposal includes the demolition of the existing partially vacant 204,624 square foot warehouse building, construction of the ultimate extension of S t. Patrick Way and construction a 5 story, 499-unit apartment community and related site improvements. The St. Patrick Way Residential Project includes a request for a Vesting Tentative Map for condominium purposes; and WHEREAS, the project site is located in Downtown Dublin, within the Transit Oriented District of the Downtown Dublin Specific Plan; and WHEREAS, the 499 total residential dwelling units and 1,500 square feet of office (collaborative work space) in the collective project are permitted in the Transit Oriented District of the Downtown Dublin Specific Plan; and WHEREAS, the project site is currently occupied by a partially vacant 204,624 square foot warehouse building, surface parking lot, and outdoor storage area for an existing tenant ; and WHEREAS, the California Environmental Quality Act (CEQA), together with State Guidelines and City Environmental Regulations require that certain projects be reviewed for environmental impacts and that environmental documents be prepared; and WHEREAS, the project is located within the Transit-Oriented District of the Downtown Dublin Specific Plan (DDSP), which was the subject of an Environmental Impact Report (EIR), State Clearinghouse number 20100022005. The DDSP Final EIR was certified by City Council Resolution No. 08-11 on February 1, 2011. Pursuant to the California Environmental Quality Act (CEQA), the proposed residential development is exempt from fu rther environmental review under Government Code Section 65457 and CEQA Guidelines Section 15182. In addition, under CEQA Guidelines Section 15168 this residential project is in conformity with the DDSP and within the scope of the project analyzed in the D DSP EIR; therefore, no further CEQA review or document is required; and WHEREAS, a Staff Report, dated March 27, 2018 and incorporated herein by reference, described and analyzed the proposed St. Patrick Way Residential Project, including the Site Development Review application and Vesting Tentative Map application; and WHEREAS, the Planning Commission held a properly noticed public hearing on the St. Patrick Way Residential Project on March 27, 2018, at which time all interested parties had 5.1.a Packet Pg. 26 At t a c h m e n t : 1 . R e s o l u t i o n A p p r o v i n g t h e S i t e D e v e l o p m e n t R e v i e w P e r m i t a n d V e s t i n g T e n t a t i v e M a p ( S t . P a t r i c k W a y R e s i d e n t i a l P r o j e c t S D R the opportunity to be heard; and WHEREAS, the Planning Commission did hear and use independent judgment and considered all said reports, recommendations, and testimony hereinabove set forth. NOW, THEREFORE, BE IT RESOLVED that the foregoing recitals are true and correct and made a part of this resolution. BE IT FURTHER RESOLVED THAT THE City of Dublin Planning Commission does hereby make the following finding regarding the St. Patrick Way Project: A. The project which includes demolition of the existing warehouse building, construction the ultimate extension of Saint Patrick Way, and construct ion of a 5 story, 499 unit apartment community with related amenities including a club house, pool, roof top terrace, passive courtyards, leasing office and structured parking, is located within the Transit-Oriented District of the Downtown Dublin Specific Plan (DDSP), which was the subject of an Environmental Impact Report (EIR), State Clearinghouse number 20100022005. The DDSP Final EIR was certified by City Council Resolution No. 08-11 on February 1, 2011. Pursuant to the California Environmental Quality Act (CEQA ) the proposed residential development is exempt from further environmental review under Government Code Section 65457 and CEQA Guidelines Section 15182. In addition, under CEQA Guidelines Section 15168 this residential project is in conformity with the DDSP and within the scope of the project analyzed in the DDSP EIR; therefore, no further CEQA review or document is required. Government Code sec. 65457 and CEQA Guidelines Section 15182 - Exemption Pursuant to Government Code sec. 65457 and CEQA Guidelines Section 15182(a) (Residential Projects Pursuant to a Specific Plan) of the CEQA Guidelines which states: "Exemption. Where a public agency has prepared an EIR on a spe cific plan after January 1, 1980, no EIR or negative declaration need be prepared for a residential project undertaken pursuant to and in conformity to that specific plan if the project meets the requirements of this section” including an event as described in CEQA Guidelines Section 15162. As identified in CEQA Section 15162 and briefly describes as follows, supplemental environmental review is required only when there are new or substantially more severe significant environmental impacts which require major revisions to the EIR due to project changes, substantial changes with respect to circumstances under which the project is undertaken or new information of substantial importance, or other standards under CEQA section 15162 are met. On February 1, 2011, the Dublin City Council adopted Resolution 09-11 adopting the Downtown Dublin Specific Plan (DDSP). At the meeting, the City Council adopted Resolution 08-11 certifying an EIR for the DDSP. The purpose of the adopted DDSP was to guide development and design for the approximately 284 acres located in downtown Dublin. The DDSP consists of a comprehensive set of incentives, standards, and requirements that implements the vision for the future development of downtown Dublin. The DDSP defines the physical envelope for downtown Dublin’s future growth using height limits, setbacks, density, and design standards. On May 6, 2014, the City Council adopted Resolution 49-14 adopting an Addendum to the DDSP EIR for changes to the DDSP. The changes included increasing the number of residential units permitted in the DDSP area by 1,200 units and decreasing the amount of commercial square footage permitted by 773,000 square feet, creating 5.1.a Packet Pg. 27 At t a c h m e n t : 1 . R e s o l u t i o n A p p r o v i n g t h e S i t e D e v e l o p m e n t R e v i e w P e r m i t a n d V e s t i n g T e n t a t i v e M a p ( S t . P a t r i c k W a y R e s i d e n t i a l P r o j e c t S D R minimum density thresholds for the Transit-Oriented and Retails Districts, and restricting residential development on the west side of San Ramon Road in the Retail District. DDSP EIR and the subsequent addendum analyzed the construction of approximately 2.2 million square feet of non-residential development and 2,500 residential dwelling units, included in the DDSP. Of the 2,500 residential dwelling units, 1,900 unit were allocated to the Transit-Oriented District. As shown in Table 1 below, the proposed project’s 499-units is within the already contemplated residential development ac tivity in the Transit-Oriented District. Table 1. Transit Oriented District Residential Development Transit Oriented District (1,900 Residential Units) Project Address Units Status Connelly Station 7550 St Patrick Way 309 Approved 2012 - complete Aster (Bay West) 7544 Dublin Blvd. 313 Approved 2013 - complete Valor Crossing (Eden) 6707 Golden Gate Dr. 66 Approved 2013 - complete Total Developed Units 688 St. Patrick Way 6700 Golden Gate Dr. 499 Proposed Project Remaining Units with Proposed Project 713 The proposed project meets the development standards established in the DDSP as shown in Table 2 below. Table 2. Overview of DDSP Development Regulations Development Regulation Standard Proposed Density Range 30 to 85 units per net acre 65.66 units per net acre Building Height 8 floors / 90 feet 5 floors / 57 feet Setbacks: St. Patrick Way Interior I-580 Freeway 5 feet to 15 feet maximum 5 feet minimum 10 feet minimum Varies. 6.4 feet minimum Varies. 12 feet minimum Varies. 54 feet minimum Required Frontage Buildout A building facade shall be constructed within 10 ft of the minimum street setback line along at least 80% of the property’s total street frontage Approximately 83% of the building façade is constructed with in this area. Private Outdoor Space 100 square feet per unit or 49,900 square feet 50,000 square feet Residential Parking 1.5 spaces per unit / 749 spaces 771 spaces Guest Parking Up to 15% of required parking / 0 to 112 spaces 2.1% / 16 spaces Work Space Parking 1 space per 250 square feet / 6 spaces 6 spaces 5.1.a Packet Pg. 28 At t a c h m e n t : 1 . R e s o l u t i o n A p p r o v i n g t h e S i t e D e v e l o p m e n t R e v i e w P e r m i t a n d V e s t i n g T e n t a t i v e M a p ( S t . P a t r i c k W a y R e s i d e n t i a l P r o j e c t S D R The project is consistent with DDSP. Approval of the proposed 499 -unit residential project would be within the development threshold of the 1,900 residential dwelling units allocated for the Transit-Oriented District. In addition, the proposed project conforms with the development regulations and design guidelines established in the specific plan in which is located. As provided in Government Code sec. 21166 and Section 15162 of the CEQA Guidelines, when an EIR has been prepared for a project (DDSP EIR), no new environmental document shall be prepared for the proposed project, unless the Planning Commission makes one of the following determinations under Section 15162(a): 1) Substantial changes are proposed in the project which will require major revisions of the previous EIR due to the involvement of new significant environmental effects or a substantial increase in the severity of previously identified significant effects; 2) Substantial changes occur with respect to the circumstances under which the project is undertaken which will require major revisions of the EIR due to the involvement of new significant environmental effects or a substantial increase in the severity of previously identified significant effects; or 3) New information of substantial importance, which was not known and could not have been known with the exercise of reasonable diligence at the time the EIR was adopted, shows any of the following: a. The project will have one or more significant effects not discussed in the previous EIR; b. Mitigation measures or alternatives previously found not to be feasible would in fact be feasible, and would substantially reduce one or more significant effects of the project, but the project proponents decline to adopt the mitigation measures or alternative; or c. Mitigation measures which are considerably different from those analyzed in the previous EIR would substantially reduce one or more significant effects on the environment, but the project proponents decline to adopt the mitigation measure. The City conducted a review to determine if the proposed project met any of the standards requiring the preparation of supplemental environmental review under CEQA. Based on a review of the project, the environmental analysis in the DDSP EIR and all the information in the Project record as a whole, the City has determined that there is no substantial evidence that any of the standards are met. As part of this determination, the City had an analysis of traffic and noise impacts prepared for the Project to ensure that potential impacts in those areas did not present new or substantially more severe significant impacts than presented in the DDSP EIR. Therefore, pursuant to Government Code sec. 65457 and CEQA Guidelines Section 15182, the project is exempt from CEQA and no further environmental review is required for this project. 5.1.a Packet Pg. 29 At t a c h m e n t : 1 . R e s o l u t i o n A p p r o v i n g t h e S i t e D e v e l o p m e n t R e v i e w P e r m i t a n d V e s t i n g T e n t a t i v e M a p ( S t . P a t r i c k W a y R e s i d e n t i a l P r o j e c t S D R Section 15168 – WITHIN SCOPE OF CERTIFIED DDSP PROGRAM EIR. The DDSP was prepared as a Program EIR under CEQA Guidelines Section 15168 to be used as the CEQA review for future implementing projects. Section 15168(a) defines a “program EIR” as one prepared on a series of actions that can be characterized as one large project and are related geo graphically and by other shared characteristics. Section 15168(c) states that subsequent activities in the program EIR must be examined in the light of the program EIR to determine whether an additional environmental document must be prepared. If the agenc y finds that pursuant to CEQA Guidelines Section 15162(c)(2), no new effects could occur or no new mitigation measures would be required, the agency can approve the activity as being within the scope of the project covered by the program EIR and no new environmental document would be required. Operation Traffic Analysis The City engaged the services of Kittelson & Associates to complete a project -level analysis of the transportation effects. The analysis included trip generation, trip distribution, traffic operation, site circulation and access. Using the same methodology established in the DDSP DEIR which includes an analysis of both the Base FAR and Maximum FAR, the project was found to be within the impacts analyzed and mitigated in the DDSP EIR and no new or substantially more severe significant traffic impacts are presented for the project. As stated, the DDSP EIR assessed the transportation impacts of the DDSP by identifying large areas for development. Since the EIR did not assign development densities to individual parcels, general assumptions were required. Therefore, included in the evaluation of the proposed project was the intersection of Golden Gate Drive and St. Patrick Way. The study found that a traffic signal was not warranted by the project alone; however, it did note that in the future (before 2040) with additional projects, the signal will be required. This finding is consistent with the DDSP EIR Mitigation Measure 3.9-1. This mitigation measure requires the City to collect impact fees from developers in the Specific Plan Area for the Tri-Valley Transportation Development Fee as well as the Downtown TIF programs prior to issuance of Building Permits. This will fund local and regional transportation improvements. The signal at Golden Gate Drive and St. Patrick Way has already been identified in the Downtown TIF program and the payment of the required TIF fees addresses this previously identified impact. Noise Impacts The DEIR for the DDSP identified the impact pertaining to the increase of noise levels in the area from mobile sources (vehicular traffic) at existing and future uses. To mitigate this impact the City adopted Mitigation Measure 3.7 -3. This mitigation measure requires that future development within the DDSP project area located adjacent to Highway 580 prepare a site -specific acoustical analysis subject to review and approval by the City of Dublin. The mitigation required that the acoustical analysis evaluate resultant noise impacts in comparison to the City’s noise criteria for Land Use Compatibility for Community Noise Environments. Feasible project specific mitigation measures are required as part of the project design to reduce noise impacts at future noise sensitive land uses, including but not limited to the following: 1) site design, 2) operational restrictions, 5.1.a Packet Pg. 30 At t a c h m e n t : 1 . R e s o l u t i o n A p p r o v i n g t h e S i t e D e v e l o p m e n t R e v i e w P e r m i t a n d V e s t i n g T e n t a t i v e M a p ( S t . P a t r i c k W a y R e s i d e n t i a l P r o j e c t S D R 3) barriers, 4) setbacks, and 5) insulation. An acoustical assessment dated March 2018, was prepared by Kimley Horn on behalf of the applicant. The assessment evaluated future uses at the project site a nd potential noise levels they would be exposed to. The assessment includes an evaluation of the existing conditions and concluded that the primary noise source was traffic on I-580. As required by Mitigation Measure 3.7-3, the assessment made project specific design recommendations to address noise levels. The recommendations are as follows: 1) Sound wall. A 7-foot noise barrier is needed to ensure that ground -floor exterior noise levels in Courtyard C (closest to I-580) 2) Upgraded windows. Units along the western, southern and eastern property line require thicker glass windows (minimum Sound Transmission Class of 36) 3) Balcony treatments. The first row of units that façade the western, southern and eastern site perimeter require incorporation of a noise attenuating balcony or patio treatment (42” minimum height) With implementation of the above recommendations, the interior noise levels at the project would not exceed the 45dBA interior threshold required by the California Building Code and the Dublin General Plan. They would also keep exterior noise levels from exceeding 60 dBA which is identified as a “normally acceptable” level for residential uses in the Dublin General Plan. Based on the Project record as a whole, the proposed project is within the scop e of the project covered by the DDSP EIR and subsequent Addendum. The circumstances under which the Project is to be undertaken have not substantially changed since the DDSP EIR and subsequent Addendum were prepared and will not substantially change with the approval of the Project. As supported by the operational traffic analysis and noise study, the EIR adequately describes the impacts of the Project for the purposes of CEQA, no mitigation measures or new alternatives are required by the Project other than those previously disclosed and analyzed in the DDSP EIR and subsequent Addendum. Approval of the project will not create any site ‐specific operations giving rise to environmental effects different from those examined by the EIR or requiring the preparation of an Initial Study. The proposed project is subject to the DDSP Mitigation Monitoring and Reporting Program. Consequently, pursuant to CEQA Guidelines Section 15182, the Project impacts are covered by the DDSP EIR and its Addendum and no further environmental review is required for this project. BE IT FURTHER RESOLVED THAT THE City of Dublin Planning Commission does hereby make the following findings and determinations regarding the Site Development Review Permit: A. The proposal is consistent with the purposes of Chapter 8.104 of the Zoning Ordinance, with the General Plan and any applicable Specific Plans and design guidelines because: 1) The project is compatible with the architectural character and scale of development in the immediate area in which the proposed project is to be located; 2) the project is utilizing traditional building forms with contemporary, high - quality materials and finishes in compliance with the design guidelines of the Downtown Dublin Specific Plan; 3) the project will provide unique, varied, and distinct 5.1.a Packet Pg. 31 At t a c h m e n t : 1 . R e s o l u t i o n A p p r o v i n g t h e S i t e D e v e l o p m e n t R e v i e w P e r m i t a n d V e s t i n g T e n t a t i v e M a p ( S t . P a t r i c k W a y R e s i d e n t i a l P r o j e c t S D R housing opportunities in an area where the City of Dublin has made efforts to incentivize higher-density housing; 4) the proposed project also supports the more specific vision for the Transit-Oriented District to encourage the development of the area with land uses that support and complement transit uses, particularly the West Dublin BART Station; 5) the project will help to provide affordable housing through the dedication of the 1.3 acre site; 6), the project will complete the planned extension of St. Patrick Way completing this roadway network; and 7) the project is consistent with the General Plan land use designation of Downtown Dublin Specific Plan – Transit- Oriented District. B. The proposal is consistent with the provisions of Title 8, Zoning Ordinance because: 1) the project contributes to the orderly, attractive, and harmonious site and architectural development that is compatible with the architectural style, intensity of development – either in place or permitted in the future, and context of surrounding and adjacent properties; and 2) the project complies with the development standards of the Downtown Dublin Zoning District, as outlined in the DDSP. C. The design of the project is appropriate to the City, the vicinity, su rrounding properties, and the lot in which the project is proposed because: 1) the project is consistent with the DDSP in that it provides additional housing opportunities in close proximity to the West Dublin/Pleasanton BART station; 2) the size and mass of the proposed buildings are consistent with other residential development in the immediate vicinity and in compliance with the minimum and maximum development density/intensity permitted; 3) the redevelopment of the subject property is an important incre mental change to advance the vision of the DDSP to make Downtown Dublin a vibrant and dynamic mixed-use center; and 4) the proposed building in conjunction with the completion of St. Patrick Way will provide a more complete street scene. D. The subject site is suitable for the type and intensity of the approved development because: 1) the Project provides residential development in an area that can support residential uses; 2) the Project is consistent with the Downtown Dublin Zoning District in which it is located; 3) the project site will be fully served by a network of existing and planned infrastructure of public roadways, services, and facilities and 4) he proposed project meets all of the development standards established to regulate development in the DDSP Transit-Oriented District and are consistent and compatible with other residential development projects in the immediate vicinity. E. Impacts to existing slopes and topographic features are addressed because: 1) the project site is generally flat; and 2) landscaping along St. Patrick Way and throughout the project will be complete. F. Architectural considerations including the character, scale and quality of the design, site layout, the architectural relationship with the site and other buildings, scree ning of unsightly uses, lighting, building materials and colors and similar elements result in a project that is harmonious with its surroundings and compatible with other developments in the vicinity because: 1) the Project provides a high degree of design and landscaping to provide a unique, urban, contemporary-themed housing opportunity in the DDSP; 2) the structures reflect the architectural styles and development standards for other higher-density residential projects within the DDSP; 3) the materials proposed will be high-quality and long-lasting; and 4) the color and materials proposed are appropriate to the contemporary architectural design proposed for the project and complementary to other commercial buildings in the project vicinit y; 4) the architectural 5.1.a Packet Pg. 32 At t a c h m e n t : 1 . R e s o l u t i o n A p p r o v i n g t h e S i t e D e v e l o p m e n t R e v i e w P e r m i t a n d V e s t i n g T e n t a t i v e M a p ( S t . P a t r i c k W a y R e s i d e n t i a l P r o j e c t S D R style and materials will be consistent and compatible with the contemporary architectural style, colors, and materials being utilized on other multi -family projects in the immediate vicinity; 5) the project is utilizing traditional building forms with contemporary, high-quality materials and finishes in compliance with the design guidelines of the Downtown Dublin Specific Plan; and 6) the size and scale of the development will be similar to multi-family project already being constructed in the immediate project vicinity. G. Landscape considerations, including the location, type, size, color, texture and coverage of plant materials, and similar elements have been incorporated into the project to ensure visual relief, adequate screening and an attractive environment for the public because: 1) all perimeter landscaping, streetscape enhancements, fences, and hardscape are proposed for construction in accordance with the DDSP; and 2) the project perimeter and interior landscaping is consistent with other developments currently under construction in the vicinity and 3) the project will conform to the requirements of the City’s Water Efficient Landscape Ordinance. H. The site has been adequately designed to ensure the proper circulation for bicyclist, pedestrians, and automobiles because: 1) all infrastructure including streets, sidewalks, and street lighting are proposed for construction in accordance with the project plans and have been reviewed for safety and adequate circulation; and 2) development of this project will include completion of the planned extension of St. Patrick way to Regional Street to City Standards including Complete Streets so that all modes of transportation are supported and ensuring the safe use of these facilities. BE IT FURTHER RESOLVED that the Planning Commission of the City of Dublin hereby makes the following findings and determinations regarding Vesting Tentative Map 10809: A. The proposed subdivision map together with the provisions for its design and improvement is consistent with the general plan and any applicable specific plan because: 1) the proposed Vesting Tentative Map 10809 together with the provisions for its design and improvements complies with the development standards of the DDSP and the Transit-Oriented District as well as the overall vision of the DDSP to provide a vibrant mixed-use center which includes high-density residential development. B. The subdivision site is physically suitable for the type and proposed density of development because: 1) the project site is physically suitable for the type and proposed density of development (65.66 units per acre) is consistent with the DDSP Transit Oriented District’s density range of 30 to 885 units per acre; 2) the proposed 5- story development is consistent with the scale of other residential developments in the immediate vicinity; and 3) the project site is located on approximately 8.53 acres of relatively flat topography, and so therefore is physically suitable for the type and density of development that is proposed. C. The tentative tract map is consistent with the intent of applicable subdivision design or improvements of the tentative tract map are consistent with the city’s general plan and any applicable specific plan because: 1) the proposed Vesting Tentative Map 10809 for no more than 499 residential condominium units is consistent with the development densities allowed in the DDSP and well with the overall vision of the DDSP to provide a vibrant mixed-use center which includes high-density residential development. 5.1.a Packet Pg. 33 At t a c h m e n t : 1 . R e s o l u t i o n A p p r o v i n g t h e S i t e D e v e l o p m e n t R e v i e w P e r m i t a n d V e s t i n g T e n t a t i v e M a p ( S t . P a t r i c k W a y R e s i d e n t i a l P r o j e c t S D R D. The subdivision design and proposed improvements will not cause substantial environmental damage or substantially and avoidably injure fish or wildlife or their habitat because: 1) the proposed Vesting Tentative Map is for the redevelopment of an already fully developed site with improvements and therefore already an urbanized site will not result in environmental damage or substantially injure fish or wildlife or their habitat or cause public health concerns; 2) in addition, the City conducted a review to determine if the proposed project met any of the standards requiring the preparation of supplemental environmental review under CEQA. Based on a review of the project and the environmental analysis in the DDSP EIR, the City has determined that there is no substantial evidence that any of the standards are met. Therefore, it has been determined that the project is exempt from CEQA and no further environmental review is required for this project. E. The design of the subdivision or type of improvements will not cause serious public health concerns because: 1) the design of the subdivision or type of improvements will not cause serious public health concerns as it has been conditioned to comply with all building codes and ordinances in effect at the ti me of permit issuance; 2) in addition, the City conducted a review to determine if the proposed project met any of the standards requiring the preparation of supplemental environmental review under CEQA. Based on a review of the project and the environmen tal analysis in the DDSP EIR, the City has determined that there is no substantial evidence that any of the standards are met. As part of this determination, the City had an analysis of traffic and noise impacts prepared for the Project to ensure that potential impacts in those areas did not present new or substantially more severe significant impacts than presented in the DDSP EIR. Therefore, it has been determined that the project is exempt from CEQA and no further environmental review is required for this project. F. The design of the subdivision or the type of improvements will not conflict with easements, acquired by the public at large, for access through or use of, property within the proposed subdivision; or alternate easements are provided pursuant to Government Code Section 66474(g) because: 1) the City Engineer has reviewed the Vesting Tentative Map and title report and has determined that the future proposed buildings will not conflict with existing or new easements nor with future property line s. G. The design or improvements of the tentative map are consistent with the city’s general plan and any applicable specific plan because: 1) the proposed Vesting Tentative Map 10809 together with the provisions for its design and improvements complies w ith the development standards of the DDSP and the Transit -Oriented District as well as the overall vision of the DDSP to provide a vibrant mixed-use center which includes high- density residential development. H. The subdivision is designed to provide for future passive or natural heating or cooling opportunities because: 1) the proposed design and orientation of the building is designed to limit the number of residential units from southern exposure ; 2) the limited number of units which have southern exposure are located on a single-loaded corridor limiting direct sun exposure; 3) the parking structure, which is an non-habitable space, is specifically located to align with the southern exposure and designed with openings to naturally vent; 4) awnings are included in the design of some of the window to provide some protection; and 5) along the southern property line, a dense canopy of evergreen trees are proposed to provide shade year round. 5.1.a Packet Pg. 34 At t a c h m e n t : 1 . R e s o l u t i o n A p p r o v i n g t h e S i t e D e v e l o p m e n t R e v i e w P e r m i t a n d V e s t i n g T e n t a t i v e M a p ( S t . P a t r i c k W a y R e s i d e n t i a l P r o j e c t S D R I. The tentative tract map, including design and improvement, shall comply with all the applicable provisions and requirements of the zoning ordinance, the latest municipal stormwater permit issued to the city by the Regional Water Quality Control Board, this title, any other ordinance of the city, and the Subdivision Map Act because: 1) the project is compliant with the California Regional Water Quality Control Board San Francisco Bay Region Municipal Regional Stormwater NPDES Permit ; 2) the project is located within a quarter mile of a BART Station, is characterized as a non -auto-related use, meets the minimum gross density requirements, and therefore is eligible for LID treatment reduction credit as a special project under Provision C.3 of the MRP; 3) the project would include bioretention areas and stormwater treatment vaul ts to ensure consistency with regional C.3 stormwater treatment; 4) the project meets hydromodification exempt requirements; and 5) the project would include full trash capture devices to ensure consistency with regional C.10 stormwater treatment requirements. J. The vesting tentative map complies with the associated site development review application. BE IT FURTHER RESOLVED that the Planning Commission of the City of Dublin hereby approves the Site Development Review Permit for the St. Patrick Way Residential Project, subject to the conditions included below, and in accordance with the Project Plans, incorporated herein by reference and attached as Exhibit A to this Resolution. BE IT FURTHER RESOLVED that the Planning Commission of the City of Dublin hereby approves the Vesting Tentative Map for the St. Patrick Way Residential Project, subject to the conditions included below, and in accordance with the Project Plans, incorporated herein by reference and attached as Exhibit A to this Resolution. CONDITIONS OF APPROVAL: Unless stated otherwise, all Conditions of Approval shall be complied with prior to the issuance of building permits or establishment of use and shall be subject to Planning Department review and approval. The following codes represent those departments/agencies responsible for monitoring compliance of the conditions of approval. [PL.] Planning, [B] Building, [PO] Police, [PW] Public Works [P&CS] Parks & Community Services, [ADM] Administration/City Attorney, [FIN] Finance, [F] Alameda County Fire Department, [DSR] Dublin San Ramon Services District, [CO] Alameda County Department of Environmental Health, [Z7] Zone 7. CONDITION TEXT RESPON. AGENCY WHEN REQ’D Prior to: 1. Approval. This Site Development Review and Tentative Map 10809 approval is for the St. Patrick Way Residential Project (PLPA-2017-00069). This approval shall be as generally depicted and indicated on the project plans prepared by KTGY and CBG dated received March 16, 2018, attached as Exhibit A, and other plans, text, and diagrams relating to this Site Development Review, unless modified by the Conditions of Approval contained herein. PL On-going 2. Permit Expiration – Site Development Review. Construction or use shall commence within one (1) year of the effective date of this Permit or the Site Development Review shall lapse and become null and void. If there is a PL One year after Effective Date 5.1.a Packet Pg. 35 At t a c h m e n t : 1 . R e s o l u t i o n A p p r o v i n g t h e S i t e D e v e l o p m e n t R e v i e w P e r m i t a n d V e s t i n g T e n t a t i v e M a p ( S t . P a t r i c k W a y R e s i d e n t i a l P r o j e c t S D R CONDITION TEXT RESPON. AGENCY WHEN REQ’D Prior to: dispute as to whether the Permit has expired, the City may hold a noticed public hearing to determine the matter. Such a determination may be processed concurrently with revocation proceedings in appropriate circumstances. If a Permit expires, a new application must be made and processed according to the requirements of this Ordinance. 3. Permit Expiration – Tentative Map. Approval of the Tentative Map shall be valid for 36 months from the effective date as set forth in Section 9.08.130.A of the Dublin Municipal Code. PW 36 months after Effective Date 4. Time Extension. The original approving decision-maker may, upon the Applicant’s written request for an extension of approval prior to expiration, upon the determination that all Conditions of Approval remain adequate and all applicable findings of approval will continue to be met, grant an extension of the approval for a period not to exceed six (6) months. All time extension requests shall be noticed and a public hearing shall be held before the original hearing body. PL One Year Following Expiration Date 5. Compliance. Developer shall comply with the Subdivision Map Act, the City of Dublin Subdivision and Zoning Ordinances, City of Dublin Title 7 Public Works Ordinance, which includes the Grading Ordinance, the City of Dublin Public Works Standards and Policies, the most current requirements of the State Code Title 24 and the Americans with Disabilities Act with regard to accessibility, and all building and fire codes and ordinances in effect at the time of building permit issuance. All public improvements constructed by Developer and to be dedicated to the City are hereby identified as “public works” under Labor Code section 1771. Accordingly, Developer, in constructing such improvements, shall comply with the Prevailing Wage Law (Labor Code. Sects. 1720 and following). PL, PW On-going 6. Effective Date. This Site Development Review approval becomes effective after the Community Benefit Agreement associated with the project is approved by the City Council. If the Community Benefit Agreement is not approved, the Site Development Review and Vesting Tentative Map approvals shall become null and void. PL Ongoing 7. Revocation of Permit. The Site Development Review approval shall be revocable for cause in accordance with Section 8.96.020.I of the Dublin Zoning Ordinance. Any violation of the terms or conditions of this permit shall be subject to citation. PL On-going 8. Requirements and Standard Conditions. The Applicant/ Developer shall comply with applicable City of Dublin Fire Prevention Bureau, Dublin Public Works Department, Dublin Building Department, Dublin Police Services, Alameda County Flood Control District Zone 7, Livermore Amador Valley Transit Authority, Alameda County Public and Environmental Health, Dublin San Ramon Services District and the California Department of Health Services requirements and standard conditions. Prior to issuance of building permits or the installation of any improvements Various Building Permit Issuance 5.1.a Packet Pg. 36 At t a c h m e n t : 1 . R e s o l u t i o n A p p r o v i n g t h e S i t e D e v e l o p m e n t R e v i e w P e r m i t a n d V e s t i n g T e n t a t i v e M a p ( S t . P a t r i c k W a y R e s i d e n t i a l P r o j e c t S D R CONDITION TEXT RESPON. AGENCY WHEN REQ’D Prior to: related to this project, the Applicant/Developer shall supply written statements from each such agency or department to the Planning Department, indicating that all applicable conditions required have been or will be met. 9. Required Permits. The Applicant/Developer shall obtain all permits required by other agencies which may include, but are not limited to Alameda County Environmental Health, Alameda County Flood Control and Water Conservation District (Zone 7), California Department of Fish and Wildlife, Army Corps of Engineers, Regional Water Quality Control Board, Caltrans, or other regional/state agencies as required by law, as applicable. Copies of the permits shall be provided to the Public Works Department. PW Building Permit Issuance 10. Fees. The Applicant/Developer shall pay all applicable fees and receive all applicable fee credits in effect at the time of building permit issuance, grading permit issuance and final map approval, including, but not limited to, Planning fees, Building fees, Traffic Impact Fees, TVTC fees, Dublin San Ramon Services District fees, Public Facilities fees, Dublin Unified School District School Impact fees, Fire Facilities Impact fees, Alameda County Flood and Water Conservation District (Zone 7) Drainage and Water Connection fees; or any other fee or credit that may be adopted and applicable, as provided by the Development Agreement, if any. The Developer shall be eligible for credits as stated in the Western Dublin Transportation Impact Fee Update: Final Report (WDTIF), dated August 2016, for public right-of-way dedicated and improvements constructed at St. Patrick Way. Amounts of credit shall be consistent with areas dedicated and improvements constructed, not to exceed the amount set forth in the WDTIF. Various Final Map Approval, Grading Permit, and Building Permit Issuance 11. Indemnification. The Applicant/Developer shall defend, indemnify, and hold harmless the City of Dublin and its agents, officers, and employees from any claim, action, or proceeding against the City of Dublin or its agents, officers, or employees to attack, set aside, void, or annul an approval of the City of Dublin or its advisory agency, appeal board, Planning Commission, City Council, Community Development Director, Zoning Administrator, or any other department, committee, or agency of the City to the extent such actions are brought within the time period required by Government Code Section 66499.37 or other applicable law; provided, however, that the Applicant’s/Developer's duty to so defend, indemnify, and hold harmless shall be subject to the City's promptly notifying the Applicant/Developer of any said claim, action, or proceeding and the City's full cooperation in the defense of such actions or proceedings. ADM On-going 12. Clarification of Conditions. In the event that there needs to be clarification to the Conditions of Approval, the Director of Community Development and the City Engineer have the authority to clarify the intent of these Conditions of Approval to the Developer without going to a public hearing. The PL/PW On-going 5.1.a Packet Pg. 37 At t a c h m e n t : 1 . R e s o l u t i o n A p p r o v i n g t h e S i t e D e v e l o p m e n t R e v i e w P e r m i t a n d V e s t i n g T e n t a t i v e M a p ( S t . P a t r i c k W a y R e s i d e n t i a l P r o j e c t S D R CONDITION TEXT RESPON. AGENCY WHEN REQ’D Prior to: Director of Community Development and the City Engineer also have the authority to make minor modifications to these conditions without going to a public hearing in order for the Applicant/Developer to fulfill needed improvements or mitigations resulting from impacts of this project. 13. Clean-up. The Applicant/Developer shall be responsible for clean-up and disposal of project related trash to maintain a safe, clean, and litter-free site. PL On-going 14. Modifications. Modifications or changes to this Site Development Review approval may be considered by the Community Development Director in compliance with Chapter 8.104 of the Zoning Ordinance. PL On-going 15. Controlling Activities. The Applicant/Developer shall control all activities on the project site so as not to create a nuisance to the existing or surrounding businesses and residences. PL On-going 16. Accessory Structures. The use of any accessory structures, such as storage sheds or trailer/container units used for storage or for any other purpose during construction, shall not be allowed on the site at any time unless a Temporary Use Permit is applied for and approved. PL Establishment of the temporary use PLANNING DIVISION - PROJECT SPECIFIC CONDITIONS 17. Equipment Screening. All electrical, fire risers and/or mechanical equipment shall be screened from public view. Any roof-mounted equipment shall be completely screened from view by materials architecturally compatible with the building and to the satisfaction of the Community Development Director. The Building Permit plans shall show the location of all equipment and screening for review and approval by the Director of Community Development. PL Building Permit Issuance And On-going 18. Sound Attenuation. The project shall comply with the sound attenuation measures recommended in the Acoustical Assessment dated March 2018 prepared by Kimley Horn and generally outlined as follows: 1) Sound wall. A 7-foot noise barrier is needed to ensure that ground-floor exterior noise levels in Courtyard C (closest to I-580) 2) Upgraded windows. Units along the western, southern and eastern property line require thicker glass windows (minimum Sound Transmission Class of 36) 3) Balcony treatments. The first row of units that façade the western, southern and eastern site perimeter require incorporation of a noise attenuating balcony or patio treatment (42” minimum height) Refer to Acoustical Assessment for further details. PL Building Permit Issuance 19. Mitigation Monitoring Program. The Applicant/ Developer shall comply with the Downtown Dublin Specific Plan Final Environmental Impact Report (EIR) certified by City Council Resolution 08-11, including all mitigation measures, action programs, and implementation measures contained therein. The EIR is on file with the Community Development Department. PL Building Permit Issuance 5.1.a Packet Pg. 38 At t a c h m e n t : 1 . R e s o l u t i o n A p p r o v i n g t h e S i t e D e v e l o p m e n t R e v i e w P e r m i t a n d V e s t i n g T e n t a t i v e M a p ( S t . P a t r i c k W a y R e s i d e n t i a l P r o j e c t S D R CONDITION TEXT RESPON. AGENCY WHEN REQ’D Prior to: 20. Public Art. The project is required to comply with Sections 8.58.05A and 8.58.05D of Chapter 8.58 (Public Art Program) of the Dublin Municipal Code. PL Building Permit Issuance 21. Final building and site development plans shall be reviewed and approved by the Community Development Department staff prior to the issuance of a building permit. All such plans shall insure: a. That standard residential security requirements as established by the Dublin Police Department are provided. b. That ramps, special parking spaces, signing, and other appropriate physical features for the disabled, are provided throughout the site for all publicly used facilities. c. That exterior lighting of the building and site is not directed onto adjacent properties and the light source is shielded from direct offsite viewing. d. That all mechanical equipment, including air conditioning condensers, electrical and gas meters, are architecturally screened from view, and that electrical transformers are either underground or architecturally screened. e. That all vents, gutters, downspouts, flashings, etc., are painted to match the color of adjacent surface. f. That all materials and colors are to be as approved by the Dublin Community Development Department. Once constructed or installed, all improvements are to be maintained in accordance with the approved plans. Any changes, which affect the exterior character, shall be resubmitted to the Dublin Community Development Department for approval. g. That all exterior architectural elements not detailed on the plans be finished in a style and in materials in harmony with the exterior of the building. All materials shall wrap to the inside corners and terminate at a perpendicular wall plane. h. That all other public agencies that require review of the project are supplied with copies of the final building and site plans and that compliance is obtained with at least their minimum Code requirements. PL Building Permit Issuance LANDSCAPING 22. Final Landscape and Irrigation Plans. Final landscape plans, irrigation system plans, tree preservation techniques, and guarantees, shall be reviewed and approved by the Dublin Planning Division prior to the issuance of the building permit. All such submittals shall be reviewed and approved by the City Engineer and the Community Development Director. Plans shall be generally consistent with the Preliminary Landscape drawings included in the Project Plan Set prepared by Fletcher Studio received by PL Landscape plan approval and installation 5.1.a Packet Pg. 39 At t a c h m e n t : 1 . R e s o l u t i o n A p p r o v i n g t h e S i t e D e v e l o p m e n t R e v i e w P e r m i t a n d V e s t i n g T e n t a t i v e M a p ( S t . P a t r i c k W a y R e s i d e n t i a l P r o j e c t S D R CONDITION TEXT RESPON. AGENCY WHEN REQ’D Prior to: the Planning Division on February 9, 2018, except as modified by the Conditions listed below or as required by the Community Development Director to address specific site constraints or conditions. The Final Landscape Plans shall insure: a. That plant material is utilized which will be capable of healthy growth within the given range of soil and climate. b. That proposed landscape screening is of a height and density so that it provides a positive visual impact within three years from the time of planting. c. That unless unusual circumstances prevail, all trees on the site shall be a minimum of 15 gallons in size. All trees that are on the exterior building perimeter shall be 24” box minimum, with at least 30% at 36” box or greater. All shrubs shall be 5 gallon minimum. d. That a plan for an automatic irrigation system be provided which assures that all plants get adequate water. In unusual circumstances, and if approved by Staff, a manual or quick coupler system may be used. e. That concrete curbing is to be used at the edges of all planters and paving surfaces where applicable. f. That all cut and fill slopes conform to the conditions detailed in the Site Development Review packet. g. That a guarantee from the owners or contractors shall be required guaranteeing all shrubs and ground cover, all trees, and the irrigation system for one year. h. That a permanent maintenance agreement on all landscaping will be required from the owner insuring regular irrigation, fertilization and weed abatement, if applicable. 23. Landscaping at Street/Drive Aisle Intersections. Landscaping shall not obstruct the sight distance of motorists, pedestrians or bicyclists. Except for trees, landscaping (and/or landscape structures such as walls) at drive aisle intersections shall not be taller than 30 inches above the curb. Landscaping shall be kept at a minimum height and fullness giving patrol officers and the general public surveillance capabilities of the area. PL Ongoing 24. Plant Clearances. All trees planted shall meet the following clearances: a. 6’ from the face of building walls or roof eaves. b. 7’ from fire hydrants, storm drains, sanitary sewers and/or gas lines. c. 5’ from top of wing of driveways, mailboxes, water, telephone and/or electrical mains d. 15’ from stop signs, street or curb sign returns. e. 15’ from either side of street lights. PL Landscape plan approval and installation 5.1.a Packet Pg. 40 At t a c h m e n t : 1 . R e s o l u t i o n A p p r o v i n g t h e S i t e D e v e l o p m e n t R e v i e w P e r m i t a n d V e s t i n g T e n t a t i v e M a p ( S t . P a t r i c k W a y R e s i d e n t i a l P r o j e c t S D R CONDITION TEXT RESPON. AGENCY WHEN REQ’D Prior to: 25. Landscaping. Applicant/Developer shall construct all landscaping within the site and along the project frontage. PL, PW Landscape plan approval and installation 26. Backflow Prevention Devices. The Landscape Plan shall show the location of all backflow prevention devises. The location and screening of the backflow prevention devices shall be reviewed and approved by City staff. PL, PW, F Landscape plan approval and installation 27. Root Barriers and Tree Staking. The landscape plans shall provide details showing root barriers and tree staking will be installed which meet current City specifications. PL, PW Landscape plan approval and installation 28. Water Efficient Landscaping Ordinance. The Applicant/ Developer shall submit written documentation to the Public Works Department (in the form of a Landscape Documentation Package and other required documents) that the development conforms to the City’s Water Efficient Landscaping Ordinance. PL Landscape plan approval and installation BUILDING & SAFETY DIVISION 29. Building Codes and Ordinances. All project construction shall conform to all building codes and ordinances in effect at the time of building permit. B Through Completion 30. Building Permits. To apply for building permits, Applicant/Developer shall submit electronic plans and specs and the number of hard copies as determined by the Building Official for plan check. Each set of plans shall have attached an annotated copy of these Conditions of Approval. The notations shall clearly indicate how all Conditions of Approval will be or have been complied with. Construction plans will not be accepted without the annotated resolutions attached to each set of plans. Applicant/Developer will be responsible for obtaining the approvals of all participating non-City agencies prior to the issuance of building permits. B Building Permit Issuance 31. Construction Drawings. Construction plans shall be fully dimensioned (including building elevations) accurately drawn (depicting all existing and proposed conditions on site), and prepared and signed by a California licensed Architect or Engineer. All structural calculations shall be prepared and signed by a California licensed Architect or Engineer. The site plan, landscape plan and details shall be consistent with each other. B Building Permit Issuance 32. Foundation. Geotechnical Engineer for the soils report shall review and approve the foundation design. A letter shall be submitted to the Building Division on the approval. A soils report is required. B Building Permit Issuance 33. Engineer Observation. The Engineer of record shall be retained to provide observation services for all components of the lateral and vertical design of the building, including nailing, hold-downs, straps, shear, roof diaphragm and structural frame of building. A written report shall be submitted to the City Inspector prior to scheduling the final frame inspection. B Scheduling the Final Frame Inspection 34. Phased Occupancy Plan. If occupancy is requested to occur in phases, then all physical improvements within each phase shall be required to be completed prior to occupancy B Occupancy of any affected building 5.1.a Packet Pg. 41 At t a c h m e n t : 1 . R e s o l u t i o n A p p r o v i n g t h e S i t e D e v e l o p m e n t R e v i e w P e r m i t a n d V e s t i n g T e n t a t i v e M a p ( S t . P a t r i c k W a y R e s i d e n t i a l P r o j e c t S D R CONDITION TEXT RESPON. AGENCY WHEN REQ’D Prior to: of any unit within that phase except for items specifically excluded in an approved Phased Occupancy Plan, or minor handwork items, approved by the Department of Community Development. The Phased Occupancy Plan shall be submitted to the Directors of Community Development and Public Works for review and approval a minimum of 60 days prior to the request for any occupancy the building. No individual space shall be occupied until the adjoining area is finished, safe, accessible, and provided with all reasonable expected services and amenities, and separated from remaining additional construction activity. Subject to approval of the Director of Community Development, the completion of landscaping may be deferred due to inclement weather with the posting of a bond for the value of the deferred landscaping and associated improvements. 35. Air Conditioning Units. Air conditioning units and ventilation ducts shall be screened from public view with materials compatible to the main building. Units shall be permanently installed on concrete pads or other non- movable materials approved by the Chief Building Official and Director of Community Development. Air conditioning units shall be located in accordance with the PD text. B Occupancy of Unit 36. CAL Green Building Standards Code. The project shall incorporate the requirements of the CAL Green Building Standards Code. The project shall be provided with: a) short term bicycle parking, and b) conduit installed from the electrical supply panel to the roof for the installation of future PV. The Green Building Plan shall be submitted to the Chief Building Official for review. B Permitting 37. Solar Zone – CA Energy Code. Show the location of the Solar Zone on the site plan. Detail the orientation of the Solar Zone. This information shall be shown in the master plan check on the overall site plan. This condition of approval will be waived if the project meets the exceptions provided in the CA Energy Code. B Through Completion 38. Accessible units under CBC 11A Project type requires a minimum of 10% of the units shall meet the requirements of chapter 11A of the CBC. The ten percent (10%) accessible units shall be constructed concurrently with the project. Certificate of Occupancies may be withheld by the Chief Building Official’s determination at any time that the 10% requirements are not being met. B Building Permit/ Occupancy 39. Accessible Parking. The required number of parking stalls, the design and location of the accessible parking stalls shall be as required by the CA Building Code. B Through Completion 40. Addressing (a) Address signage shall be provided as per the Dublin Commercial Security Code, Section 7.32.280 as applicable to multifamily buildings and parking structures. (Prior to Occupancy of any Unit) (b) Exterior address numbers shall be backlight and be posted in such a way that they may be seen from the street. B Prior to Occupancy 5.1.a Packet Pg. 42 At t a c h m e n t : 1 . R e s o l u t i o n A p p r o v i n g t h e S i t e D e v e l o p m e n t R e v i e w P e r m i t a n d V e s t i n g T e n t a t i v e M a p ( S t . P a t r i c k W a y R e s i d e n t i a l P r o j e c t S D R CONDITION TEXT RESPON. AGENCY WHEN REQ’D Prior to: (Prior to permit issuance, and through completion) (c) Address will be required on all doors leading to the exterior of the building. Addresses shall be illuminated and be able to be seen from the street, 4 inches in height minimum. 41. Accessory Structures. Separate building permits are required for all associated exterior amenities/structures and some of those are required to meet the accessibility and building codes. Examples of amenities include: swimming pools/spas, shade structures, fire pits, retaining walls, water features, exterior fixed seating, BBQs, etc. Provide a list of these structures requiring separate permits on the cover sheet of plans. B Building Permit 42. Temporary Fencing. Temporary Construction fencing shall be installed along the perimeter of all work under construction. B Through Completion 43. Copies of Approved Plans. Applicant shall provide City with 2 reduced (1/2 size) copies of the City of Dublin stamped approved plan. B 30 days after permit & each revision issuance FIRE DEPARTMENT 44. No fire service lines shall pass beneath buildings. F Approval of Improvement Plans 45. New Fire Sprinkler System & Monitoring Requirements In accordance with The Dublin Fire Code, fire sprinklers shall be installed in the building. The system shall be in accordance with the NFPA 13, the CA Fire Code and CA Building Code. Plans and specifications showing detailed mechanical design, cut sheets, listing sheets and hydraulic calculations shall be submitted to the Fire Department for approval and permit prior to installation. This may be a deferred submittal. a) Sprinkler Plans. (Deferred Submittal Item). Submit detailed mechanical drawings of all sprinkler modifications, including cut sheets, listing sheets and calculations to the Fire Department for approval and permit prior to installation. b) All sprinkler system components shall remain in compliance with the applicable N.F.P.A. 13 Standard, the CA Fire Code and the CA Building Code. c) Underground Plans. (Deferred Submittal Item). Submit detailed shop drawings for the fire water supply system, including cut sheets, listing sheets and calculations to the Fire Department for approval and permit prior to installation. All underground and fire water supply system components shall be in compliance with the applicable N.F.P.A. 13, 24, 20, 22 Standards, the CA Fire Code and the CA Building Code. The system shall be hydrostatically tested and inspected prior to being covered. Prior to the system being connected to any fire protection system, a system flush shall be witnessed by the Fire Department. d) Central Station Monitoring. Automatic fire extinguishing systems installed within buildings shall F Building Permit Issuance 5.1.a Packet Pg. 43 At t a c h m e n t : 1 . R e s o l u t i o n A p p r o v i n g t h e S i t e D e v e l o p m e n t R e v i e w P e r m i t a n d V e s t i n g T e n t a t i v e M a p ( S t . P a t r i c k W a y R e s i d e n t i a l P r o j e c t S D R CONDITION TEXT RESPON. AGENCY WHEN REQ’D Prior to: have all control valves and flow devices electrically supervised and maintained by an approved central alarm station. Zoning and annunciation of central station alarm signals shall be submitted to the Fire Department for approval. e) Fire Protection Equipment shall be identified with approved signs constructed of durable materials, permanently installed and readily visible. 46. b Fire Access During Construction. a) Fire Access. Access roads, turnaround, pullouts, and fire operation areas are fire lanes and shall be maintained clear and free of obstructions, including the parking of vehicles. b) Entrances. Entrances to job sites shall not be blocked, including after hours, other than by approved gates/barriers that provide for emergency access. c) Site Utilities. Site utilities that would require the access road to be dug up or made impassible shall be installed prior to construction commencing. d) Entrance flare, angle of departure, width, turning radii, grades, turnaround, vertical clearances, road surface, bridges/crossings, gates/key-switch, within a 150-foot distance to Fire Lane shall be maintained. e) Personnel Access. Route width, slope, surface and obstructions must be considered for the approved route to furthermost portion of the exterior wall. f) All-weather access. Fire access is required to be all- weather access. Show on the plans the location of the all-weather access and a description of the construction. Access roads must be designed to support the imposed loads of fire apparatus. F During Construction 47. Fire Alarm (detection) System Required A Fire Alarm-Detection System shall be installed throughout the building so as to provide full property protection, including combustible concealed spaces, as required by NFPA 72. The system shall be installed in accordance with NFPA 72, CA Fire, Building, Electrical, and Mechanical Codes. If the system is intended to serve as an evacuation system, compliance with the horn/strobe requirements for the entire building must also be met. All automatic fire extinguishing systems shall be interconnected to the fire alarm system so as to activate an alarm if activated and to monitor control valves. Delayed egress locks shall meet requirements of C.F.C. a) Fire Alarm Plans. (Deferred Submittal Item). Submit detailed drawings of the fire alarm system, including floor plan showing all rooms, device locations, ceiling height and construction, cut sheets, listing sheets and battery and voltage drop calculations to the Fire Department for review and permit prior to the installation. Where employee work area’s have audible F Occupancy 5.1.a Packet Pg. 44 At t a c h m e n t : 1 . R e s o l u t i o n A p p r o v i n g t h e S i t e D e v e l o p m e n t R e v i e w P e r m i t a n d V e s t i n g T e n t a t i v e M a p ( S t . P a t r i c k W a y R e s i d e n t i a l P r o j e c t S D R CONDITION TEXT RESPON. AGENCY WHEN REQ’D Prior to: alarm coverage, circuits shall be initially designed with a minimum 20% spare capacity for adding appliances to accommodate hearing impaired employee’s. b) Central Station Monitored Account. Automatic fire alarm systems shall be monitored by an approved central alarm station. Zoning and annunciation of central station alarm signals shall be approved by the Fire Department. c) Qualified Personnel. The system shall be installed, inspected, tested, and maintained in accordance with the provisions of NFPA 72. Only qualified and experienced persons shall perform this work. Examples of qualified individuals are those who have been factory trained and certified or are NICET Fire Alarm Certified. d) Inspection & Testing Documentation. Performance testing of all initiating & notification devices in the presence of the Fire Inspector shall occur prior to final of the system. Upon this inspection, proof that the specific account is UL Certificated must be provided to the Fire Inspector. 48. Fire Extinguishers. Extinguishers shall be visible and unobstructed. Signage shall be provided to indicate fire extinguisher locations. The number and location of extinguishers shall be shown on the plans. Additional fire extinguishers maybe required by the fire inspector. Fire extinguisher shall meet a minimum classification of 2A 10BC. Extinguishers weighing 40 pounds or less shall be mounted no higher than 5 feet above the floor measured to the top of the extinguisher. Extinguishers shall be inspected monthly and serviced by a licensed concern annually. F Occupancy 49. FD Building Key Box. Building Access. A Fire Department Key Box shall be installed at the main entrance to the Building. Note these locations on the plans. The key box should be installed approximately 5 1/2 feet above grade. The box shall be sized to hold the master key to the facility as well as keys for rooms not accessible by the master key. Specialty keys, such as the fire alarm control box key and elevator control keys shall also be installed in the box. The key box door and necessary keys are to be provided to the fire inspector upon the final inspection. The inspector will then lock the keys into the box. F Occupancy 50. Means of Egress. Exit signs shall be visible and illuminated with emergency lighting when building is occupied. F Occupancy 51. Main Entrance Hardware Exception. It is recommended that all doors be provided with exit hardware that allows exiting from the egress side even when the door is in the locked condition. However, an exception for A-3, B, F, M, S occupancies and all churches F Occupancy 5.1.a Packet Pg. 45 At t a c h m e n t : 1 . R e s o l u t i o n A p p r o v i n g t h e S i t e D e v e l o p m e n t R e v i e w P e r m i t a n d V e s t i n g T e n t a t i v e M a p ( S t . P a t r i c k W a y R e s i d e n t i a l P r o j e c t S D R CONDITION TEXT RESPON. AGENCY WHEN REQ’D Prior to: does allow key-locking hardware (no thumb-turns) on the main exit when the main exit consists of a single door or pair of doors. When unlocked the single door or both leaves of a pair of doors must be free to swing without operation of any latching device. A readily visible, durable sign on or just above the door stating “This door to remain unlocked whenever the building is occupied” shall be provided. The sign shall be in letters not less than 1 inch high on a contrasting background. This use of this exception may be revoked for cause. 52. Maximum Occupant Load. Posting of room capacity is required for any occupant load of 50 or more persons. Submittal of a seating plan on 8.5” x 11” paper is required prior to final occupancy. F Occupancy 53. Interior Finish. Wall and ceiling interior finish material shall meet the requirements of Chapter 8 of the California Fire Code. Interior finishes will be field verified upon final inspection. If the product is not field marked and the marking visible for inspection, maintain the products cut- sheets and packaging that show proof of the products flammability and flame-spread ratings. Decorative materials shall be fire retardant. F Occupancy 54. General Inspection. Upon inspection of the work for which this submittal was provided, a general inspection of the business and site will be conducted. F Occupancy 55. Addressing. Addressing shall be illuminated or in an illuminated area. The address characters shall be contrasting to their background. If address is placed on glass, the numbers shall be on the exterior of the glass and a contrasting background placed behind the numbers. Building Address. The building shall be provided with all addresses or the assigned address range so as to be clearly visible from either direction of travel on the street the address references. The address characters shall not be less than 5 inches in height by 1-inch stroke. Larger sizes may be necessary depending on the setbacks and visibility. Multi-Tenants. Where a building has multiple tenants, address shall also be provided near the main entrance door of each tenant space. The address shall be high enough on the building to be clearly visible from the driveway, street or parking area it faces even when vehicles are parked in front of the tenant space. The address shall not be less than 5- inches in height with a ½-inch stroke. F Occupancy of any building 56. FIRE SAFETY DURING CONSTRUCTION AND DEMOLITION a) Clearance to combustibles from temporary heating devices shall be maintained. Devices shall be fixed in place and protected from damage, dislodgement or overturning in accordance with the manufacturer’s instructions. b) Smoking shall be prohibited except in approved areas. Signs shall be posted “NO SMOKING” in a conspicuous location in each structure or location in which smoking is prohibited. F Ongoing during construction and demolition 5.1.a Packet Pg. 46 At t a c h m e n t : 1 . R e s o l u t i o n A p p r o v i n g t h e S i t e D e v e l o p m e n t R e v i e w P e r m i t a n d V e s t i n g T e n t a t i v e M a p ( S t . P a t r i c k W a y R e s i d e n t i a l P r o j e c t S D R CONDITION TEXT RESPON. AGENCY WHEN REQ’D Prior to: c) Combustible debris, rubbish and waste material shall be removed from buildings at the end of each shift of work. Flammable and combustible liquid storage areas shall be maintained clear of combustible vegetation and waste materials. 57. An Emergency Responder Radio Coverage system shall be installed. The system shall comply with all City, Fire and Building Codes. The system must be compliant with the radio systems used by Dublin Police and Fire services. F Occupancy 58. An Emergency Vehicle Access Easement shall be deeded between the Connolly Station private street and the proposed emergency vehicle access for this project. F Approval of improvement plans. 59. The project will be required to comply with all Building and Fire Code requirements in effect at time of permit application F Building Permit issuance. 60. Fire access road designs and gates shall meet fire code requirements F Approval of Improvement Plans 61. Additional fire hydrants shall be installed to ensure compliance with fire code requirements. F Approval of Utility Plans DUBLIN SAN RAMOM SERVICES DISTRICT 62. d Complete improvement plans shall be submitted to DSRSD that conform to the requirements of the Dublin San Ramon Services District Code, the DSRSD “Standard Procedures, Specifications and Drawings for Design and Installation of Water and Wastewater Facilities”, all applicable DSRSD Master Plans and all DSRSD policies. DSRSD Issuance of Building Permits 63. Planning and review fees, inspection fees, and fees associated with a wastewater discharge permit shall be paid to DSRSD in accordance with the rates and schedules and at time of payment as established in the DSRSD Code. Planning and review fees are due after the 1st submittal of plans. Construction Permit and Inspection Fees are due prior to the issuance of a Construction Permit. Capacity Reserve Fees are due before the water meter can be set or the connection to the sewer system. DSRSD Issuance of Building Permit or Improvement Plans 64. For Construction of DSRSD Facilities: Prior to, all improvement plans for DSRSD facilities shall be signed by the District Engineer. Each drawing of improvement plans for DSRSD facilities shall contain a signature block for the District Engineer indicating approval of the sanitary sewer and/or water facilities shown. Prior to approval by the District Engineer, the applicant shall pay all required DSRSD fees, and provide an engineer's estimate of construction costs for the sewer and water systems, a faithful performance bond, and a comprehensive general liability insurance policy in the amounts and forms that are acceptable to DSRSD. The applicant shall allow at least 15 working days for final improvement drawing review by DSRSD before signature by the District Engineer. DSRSD Issuance of any building permit by the City; or any Building Permit or Construction Permit by the DSRSD 65. All easement dedications for DSRSD facilities shall be by separate instrument irrevocably offered to DSRSD or by offer of dedication on the Final Map. Prior to approval by the City for Recordation, the Final Map shall be submitted DSRSD Approval of Final Map 5.1.a Packet Pg. 47 At t a c h m e n t : 1 . R e s o l u t i o n A p p r o v i n g t h e S i t e D e v e l o p m e n t R e v i e w P e r m i t a n d V e s t i n g T e n t a t i v e M a p ( S t . P a t r i c k W a y R e s i d e n t i a l P r o j e c t S D R CONDITION TEXT RESPON. AGENCY WHEN REQ’D Prior to: to and approved by DSRSD for easement locations, widths, and restrictions. 66. The Developer will be required to enter into a Planning Services Agreement with DSRSD to conduct a Water and Sewer Services Analysis to adequately size the water and sewer facilities for the project. DSRSD Approval of Improvement Plans 67. Where the narrow width of a proposed alley or cul-de-sac is so restrictive that the standard separation requirements for water mains and sewer mains cannot be maintained, the water and sewer mains shall be installed within main thoroughfares, outside of alleyways or cui-de-sacs. Water and sewer mains may not be installed within courtyards. Water meters shall be installed around the outer perimeter of buildings. Installation of water lines from the meter to each unit shall be documented and submitted to the District. DSRSD Issuance of Improvement Plans 68. All mains shall be sized to provide sufficient capacity to accommodate future flow demands in addition to each development project’s demand. Layout and sizing of mains shall be in conformance with DSRSD utility master planning. DSRSD Issuance of Improvement Plans 69. The locations and widths of all proposed easement dedications for water and sewer lines shall be submitted to and approved by DSRSD. DSRSD Issuance of Improvement Plans 70. Water and sewer mains shall be located in public streets rather than in offstreet locations to the fullest extent possible. If unavoidable, then sewer or water easements must be established over the alignment of each sewer or water main in an off-street or private street location to provide access for future maintenance and/or replacement. DSRSD Issuance of Improvement Plans 71. Domestic and fire protection waterline systems for Tracts or Commercial Developments shall be designed to be looped or interconnected to avoid dead end sections in accordance with requirements of the DSRSD Standard Specifications and sound engineering practice. DSRSD Issuance of Improvement Plans 72. Sewers shall be designed to operate by gravity flow to DSRSD’s existing sanitary sewer system. Pumping of sewage is discouraged and may only be allowed under extreme circumstances following a case by case review with DSRSD staff. Any pumping station will require specific review and approval by DSRSD of preliminary design reports, design criteria, and final plans and specifications. The DSRSD reserves the right to require payment of present worth 20 year maintenance costs as well as other conditions within a separate agreement with the applicant for any project that requires a pumping station. DSRSD Issuance of Improvement Plans 73. This project includes mixed use and/or multi-family residential units and is subject to the requirement of SB 7 (2016, Walk) as a condition of water service. Each individual residential unit shall be metered or submetered to measure water used by each unit. Water meters for each unit shall be shown on improvement plans. Exemptions may be made only for exempted uses listed in the legislation. If submetering is proposed in lieu or individual meters, plans reflecting the submeters and associated Issuance of Improvement Plans 5.1.a Packet Pg. 48 At t a c h m e n t : 1 . R e s o l u t i o n A p p r o v i n g t h e S i t e D e v e l o p m e n t R e v i e w P e r m i t a n d V e s t i n g T e n t a t i v e M a p ( S t . P a t r i c k W a y R e s i d e n t i a l P r o j e c t S D R CONDITION TEXT RESPON. AGENCY WHEN REQ’D Prior to: residential unit shall be submitted. DSRSD may not approve applications and issue construction permits without this submittal. 74. The District employs Advanced Metering Infrastructure (AMI), a fixed water meter reading system. The system uses radio communication between the individual water meter boxes or vaults and Tower Gateway Base Stations (TGBs) to transmit data on water consumption and meter readings. Due to the high density and tall profile of the buildings in this project, the buildings themselves may hinder effective communication between the individual meter boxes and the TGBs. Applicant shall fund an AMI Propagation Study provided by the District to determine if supplementary AMI communication equipment is required. If required, the supplementary equipment will be provided by the developer, and the location and appearance of the equipment must be approved by both the City of Dublin and the District. DSRSD Approval of Improvement Plans 75. This project will be analyzed by DSRSD to determine if it represents additional water and/or sewer capacity demands on the District. Applicant will be required to pay all incremental capacity reserve fees for water and sewer services as required by the project demands. All capacity reserve fees must be paid prior to installation of a water meter for water. If a water meter is not required, the capacity reserve fee shall be paid prior to issuance of a building permit. The District may not approve the building permit until capacity reserve fees are paid. DSRSD Issuance of Building Permit 76. No sewer line or waterline construction shall be permitted unless the proper utility construction permit has been issued by DSRSD. A construction permit will only be issued after all of the items in the condition immediately above have been satisfied. DSRSD Any construction permit 77. Above ground backflow prevention devices/double detector check valves shall be installed on fire protection systems connected to the DSRSD water main. The applicant shall collaborate with the Fire Department and with DSRSD to size and configure its fire system. DSRSD Issuance of Improvement Plans 78. Development plans will not be approved until landscape plans are submitted and approved. DSRSD Approval of Landscape Plans 79. During construction of the sewer main in the entry drive easement applicant shall ensure uninterrupted service of the wastewater collection systems of the occupied parcels: Libby Parcel 2, PM 1920, Chin Parcel A 101 PM 47, Chin Parcel B 101 PM 47 and Green Bear, LP Parcel 2, 286 PM 5 to the west of the site. Applicant shall coordinate maintenance of service with District staff. DSRSD Issuance of Improvement Plans 80. Prior to issuance of a District Facilities Construction Permit, Applicant shall provide easement(s) from BART that meet the District requirements and connect seamlessly to (1) the easement for the water main in West Street; and (2) the DSRSD Issuance of Improvement Plans 5.1.a Packet Pg. 49 At t a c h m e n t : 1 . R e s o l u t i o n A p p r o v i n g t h e S i t e D e v e l o p m e n t R e v i e w P e r m i t a n d V e s t i n g T e n t a t i v e M a p ( S t . P a t r i c k W a y R e s i d e n t i a l P r o j e c t S D R CONDITION TEXT RESPON. AGENCY WHEN REQ’D Prior to: easement for the sewer main in South Street, to provide for the connection to the existing water and sewer mains. 81. Applicant must ensure that installation of new sanitary sewer mains does not adversely affect the operation of existing sanitary sewer mains and manholes in the vicinity of the project; particularly the existing sanitary sewer main north of the project site. DSRSD Issuance of Improvement Plans PUBLIC WORKS GENERAL CONDITIONS 82. Conditions of Approval. Developer shall comply with the City of Dublin Public Works Standard Conditions of Approval contained below (“Standard Condition”) unless specifically modified by Project Specific Conditions of Approval below. PW On-going 83. Compliance. Developer shall comply with the Subdivision Map Act, the City of Dublin Subdivision and Zoning Ordinances, City of Dublin Title 7 Public Works Ordinance, which includes the Grading Ordinance, the City of Dublin Public Works Standards and Policies, the most current requirements of the State Code Title 24 and the Americans with Disabilities Act with regard to accessibility, and all building and fire codes and ordinances in effect at the time of building permit. All public improvements constructed by Developer and to be dedicated to the City are hereby identified as “public works” under Labor Code section 1771. Accordingly, Developer, in constructing such improvements, shall comply with the Prevailing Wage Law (Labor Code. Sects. 1720 and following). PW On-going 84. Clarifications and Changes to the Conditions. In the event that there needs to be clarification to these Conditions of Approval, the City Engineer has the authority to clarify the intent of these Conditions of Approval to the Developer without going to a public hearing. The City Engineer also has the authority to make minor modifications to these conditions without going to a public hearing in order for the Developer to fulfill needed improvements or mitigations resulting from impacts of this project. PW On-going 85. Zone 7 Impervious Surface Fees. The Applicant shall complete a “Zone 7 Impervious Surface Fee Application” and submit an accompanying exhibit for review by the Public Works Department. Fees generated by this application will be due at issuance of Building Permit. PW Grading Permit or Building Permit Issuance PUBLIC WORKS – AGREEMENTS AND BONDS 86. Tract Improvement Agreement. Developer shall enter into an Improvement Agreement with the City for all public improvements including any required offsite storm drainage or roadway improvements that are needed to serve the development, as determined by the City Engineer. PW Final Map Approval or Grading Permit Issuance 87. Security. Developer shall provide faithful performance security to guarantee the improvements, as determined by the City Engineer (Note: The performance security shall remain in effect until one year after final inspection). PW Final Map Approval or Grading Permit Issuance 88. Storm Water Treatment Measures Maintenance Agreement. Developer shall enter into an Agreement with the City of Dublin that guarantees the property owner’s PW Final Map Approval 5.1.a Packet Pg. 50 At t a c h m e n t : 1 . R e s o l u t i o n A p p r o v i n g t h e S i t e D e v e l o p m e n t R e v i e w P e r m i t a n d V e s t i n g T e n t a t i v e M a p ( S t . P a t r i c k W a y R e s i d e n t i a l P r o j e c t S D R CONDITION TEXT RESPON. AGENCY WHEN REQ’D Prior to: perpetual maintenance obligation for all stormwater treatment measures installed as part of the project, including those on-site and within the public Right of Way along St. Patrick Way. Said Agreement is required pursuant to Provision C.3 of the Municipal Regional Stormwater NPDES Permit, Order No. R2-2009-0074. Said permit requires the City to provide verification and assurance that all treatment devices will be properly operated and maintained. The Agreement shall be recorded against the property and shall run with the land. PUBLIC WORKS – PERMITS 89. Encroachment Permit. Developer shall obtain an Encroachment Permit from the Public Works Department for all construction activity within the public right-of-way of any street where the City has accepted the street right of way. The encroachment permit may require surety for slurry seal and restriping. At the discretion of the City Engineer an encroachment permit for work specifically included in an Improvement Agreement may not be required. PW Start of Work 90. Grading Permit. Developer shall obtain a Grading Permit from the Public Works Department for all grading. PW Start of Work PUBLIC WORKS - SUBMITTALS 91. All submittals of plans shall comply with the requirements of the “City of Dublin Public Works Department Improvement Plan Submittal Requirements”, the “City of Dublin Improvement Plan Review Check List,” and current Public Works and industry standards. A complete submittal of improvement plans shall include all civil improvements, joint trench, street lighting and on-site safety lighting, landscape plans, and all associated documents as required. The Developer shall not piecemeal the submittal by submitting various components separately. PW Improvement Plan Approval 92. Developer will be responsible for submittals and reviews to obtain the approvals of all participating non-City agencies. The Alameda County Fire Department and the Dublin San Ramon Services District shall approve and sign the Improvement Plans. PW Improvement Plan Approval 93. Covenants, Conditions and Restrictions (CC&Rs). A Homeowners Association shall be formed by recordation of a declaration of Covenants, Conditions, and Restrictions to govern use and maintenance of the landscape features, decorative pavement and other features within the public right of way contained in the Agreement for Long Term Encroachments; all open space and common area landscaping; and all stormwater treatment measures. Said declaration shall set forth the Association name, bylaws, rules and regulations. The CC&Rs shall also contain a provision that prohibits the amendment of those provisions of the CC&Rs requested by City without the City’s approval. The CC&Rs shall ensure that there is adequate provision for the maintenance, in good repair and on a regular basis, of all private streets, landscaping & irrigation; decorative pavements; fences/gates; walls; drainage and stormwater treatment facilities; lighting; signs and other related PL, PW Final Map Approval 5.1.a Packet Pg. 51 At t a c h m e n t : 1 . R e s o l u t i o n A p p r o v i n g t h e S i t e D e v e l o p m e n t R e v i e w P e r m i t a n d V e s t i n g T e n t a t i v e M a p ( S t . P a t r i c k W a y R e s i d e n t i a l P r o j e c t S D R CONDITION TEXT RESPON. AGENCY WHEN REQ’D Prior to: improvements. The CC&Rs shall also contain all other items required by these conditions. The Developer shall submit a copy of the CC&Rs document to the City for review. 94. Composite Exhibit. Construction plan set shall include a Composite Exhibit showing all site improvements, utilities, landscaping improvements and trees, etc. to be constructed to ensure that there are no conflicts among the proposed and existing improvements. PW Improvement Plan Approval 95. Geotechnical Report. Developer shall submit a Design Level Geotechnical Report, which includes street pavement sections and grading recommendations. PW Approval of Improvement Plans, and Grading Plans 96. Ownership and Maintenance of Improvements. Applicant shall submit an Ownership and Maintenance Exhibit for review and approval by Planning Division and Public Works Department. Maintenance shall include but not be limited to, street cleaning of parking areas within Campbell Lane along project frontage. Terms of maintenance are subject to review and approval by the City Engineer. PL, PW Final Map Approval or Grading Permit Issuance 97. Building Pads, Slopes and Walls. Developer shall provide the Public Works Department with a letter from a registered civil engineer or surveyor stating that the building pads have been graded to within 0.1 feet of the grades shown on the approved Grading Plans, and that the top & toe of banks and retaining walls are at the locations shown on the approved Grading Plans. PW Acceptance of Improvements 98. Approved Plan Files. Developer shall provide the Public Works Department a PDF format file of approved site plans, including grading, improvement, landscaping & irrigation, joint trench and lighting. PW Improvement Plan Approval 99. Master Files. Developer shall provide the Public Works Department a digital vectorized file of the “master” files for the project, in a format acceptable to the City Engineer. Digital raster copies are not acceptable. The digital vectorized files shall be in AutoCAD 14 or higher drawing format. All objects and entities in layers shall be colored by layer and named in English. All submitted drawings shall use the Global Coordinate System of USA, California, NAD 83 California State Plane, Zone III, and U.S. foot. PW Acceptance of Improvements PUBLIC WORKS - EASEMENTS AND ACCESS RIGHTS 100. Abandonment of Easements. Developer shall obtain abandonment from all applicable public agencies of existing easements and rights of way within the development that will no longer be used. PW Final Map or Improvement Plan Approval 101. Acquisition of Easements. Developer shall acquire easements, and/or obtain rights-of-entry from the adjacent property owners for any improvements not located on their property. The easements and/or rights-of-entry shall be in writing and copies furnished to the Public Works Department. PW Final Map or Improvement Plan Approval 102. Private Street Easements. Public Utility Easements (PUE), Sanitary Sewer Easements (SSE) and Water Line Easements (WLE) shall be established over all private PW Final Map and Improvement Plan Approval 5.1.a Packet Pg. 52 At t a c h m e n t : 1 . R e s o l u t i o n A p p r o v i n g t h e S i t e D e v e l o p m e n t R e v i e w P e r m i t a n d V e s t i n g T e n t a t i v e M a p ( S t . P a t r i c k W a y R e s i d e n t i a l P r o j e c t S D R CONDITION TEXT RESPON. AGENCY WHEN REQ’D Prior to: streets within the subdivision. The PUE, SSE and WLE dedication statements on the Final Map are to recite that the easements are available for, but not limited to, the installation, access and maintenance of sanitary and storm sewers, water, electrical and communication facilities. Project entry monument signs and walls shall not be located within these easements. 103. Emergency Vehicle Access Easements. The Developer shall dedicate Emergency Vehicle Access Easements (EVAE) over the clear pavement width of all private streets. Easement geometry shall be subject to the approval of the City Engineer and Fire Marshall. PW Final Map PUBLIC WORKS - GRADING 104. Grading Plan. The Grading Plan shall be in conformance with the recommendation of the Geotechnical Report, the approved Tentative Map and Site Development Review, and the City design standards & ordinances. In case of conflict between the soil engineer’s recommendation and the City ordinances, the City Engineer shall determine which shall apply. PW Approval of Grading Plans 105. Erosion Control Plan. A detailed Erosion and Sediment Control Plan shall be included with the Grading Plan submittal. The plan shall include detailed design, location, and maintenance criteria of all erosion and sedimentation control measures. PW Grading Plan Approval 106. Retaining Walls. Tiebacks or structural fabric for retaining walls shall not cross property lines, or shall be located a minimum of 2’ below the finished grade of the upper lot. PW Grading Plan Approval PUBLIC WORKS - IMPROVEMENTS 107. Public Improvements. The public improvements shall be constructed generally as shown on the Vesting Tentative Map and Site Development Review. However, the approval of the Tentative Map and Site Development Review is not an approval of the specific design of the drainage, sanitary sewer, water, traffic circulation, parking, stormwater treatment, sidewalks and street improvements. PW Improvement Plan Approval 108. Public Improvement Conformance. All public improvements shall conform to the City of Dublin Standard Plans, current practices, and design requirements and as approved by the City Engineer. PW Improvement Plan Approval 109. Public Street Slopes. Public streets shall be a minimum 1% slope with minimum gutter flow of 0.7% around bumpouts. Private streets and alleys shall be a minimum 0.5% slope. PW Improvement Plan Approval 110. Curb Returns. Curb Returns on arterial and collector streets shall be 40-foot radius, all internal public streets curb returns shall be minimum 30-foot radius (36-foot with bump outs) and private streets/alleys shall be a minimum 20-foot radius, or as approved by the City Engineer. Curb ramp locations and design shall conform to the most current Title 24 and Americans with Disabilities Act requirements and as approved by the Public Works Traffic Engineer. PW Improvement Plan Approval 111. Decorative Pavement. Any decorative pavers/paving installed within City right-of -way shall be done to the PW Improvement Plan Approval 5.1.a Packet Pg. 53 At t a c h m e n t : 1 . R e s o l u t i o n A p p r o v i n g t h e S i t e D e v e l o p m e n t R e v i e w P e r m i t a n d V e s t i n g T e n t a t i v e M a p ( S t . P a t r i c k W a y R e s i d e n t i a l P r o j e c t S D R CONDITION TEXT RESPON. AGENCY WHEN REQ’D Prior to: satisfaction of the City Engineer. Where decorative paving is installed at signalized intersections, pre-formed traffic signal loops shall be put under the decorative pavement. Decorative pavements shall not interfere with the placement of traffic control devices, including pavement markings. All turn lane stripes, stop bars and crosswalks shall be delineated with concrete bands or color pavers to the satisfaction of the City Engineer. Maintenance costs of the decorative paving shall be the responsibility of the developer or future property owner. 112. Private Streets. The Developer shall establish private street access rights and install complete street improvements for the proposed private streets and alley ways within the development as shown on the Vesting Tentative Map. PW Improvement Plan Approval 113. Monuments. Final Maps shall include private street monuments to be set in all private streets. Private street monuments shall be set at all intersections and as determined by the City Engineer. PW Final Map 114. Private street and common area subdivision improvements. Common area improvements, private streets, private alleys and all other subdivision improvements owned or maintained by the homeowners’ owners association/property manager are subject to review and approval by the City Engineer prior to Final Map approval and shall be included in the Tract Improvement Agreement. Such improvements include, but are not limited to: curb & gutter, pavement areas, sidewalks, access ramps, driveways, parking and circulation in and at structures; enhanced street paving; parking spaces; street lights (wired underground) and appurtenances; drainage facilities; utilities; landscape and irrigation facilities; open space landscaping; stormwater treatment facilities; striping and signage; and fire hydrants. PW Improvement Plan Approval 115. Traffic Signing and Striping. Developer shall install all traffic signage, striping, and pavement markings as required by the Public Works Department. PW Certificate of Occupancy or Acceptance of Improvements 116. Street Lighting. Street light standards and luminaries shall be designed and installed or relocated as determined by the City Engineer. The maximum voltage drop for streetlights is 5%. PW Certificate of Occupancy or Acceptance of Improvements 117. Water and Sewer Facilities. Developer shall construct all potable and recycled water and sanitary sewer facilities required to serve the project in accordance with DSRSD master plans, standards, specifications and requirements. PW Certificate of Occupancy or Acceptance of Improvements 118. Fire Hydrants. Fire hydrant locations shall be approved by the Alameda County Fire Department. A raised reflector blue traffic marker shall be installed in the street opposite each hydrant. PW Certificate of Occupancy or Acceptance of Improvements 119. Storm Drain Inlet Markers. All on-site storm drain inlets must be marked with storm drain markers that read: “No dumping, drains to creek.” The stencils may be purchased from the Public Work Department. PW Certificate of Occupancy or Acceptance of Improvements 5.1.a Packet Pg. 54 At t a c h m e n t : 1 . R e s o l u t i o n A p p r o v i n g t h e S i t e D e v e l o p m e n t R e v i e w P e r m i t a n d V e s t i n g T e n t a t i v e M a p ( S t . P a t r i c k W a y R e s i d e n t i a l P r o j e c t S D R CONDITION TEXT RESPON. AGENCY WHEN REQ’D Prior to: 120. Utilities. Developer shall construct gas, electric, telephone, cable TV, and communication improvements within the fronting streets and as necessary to serve the project and the future adjacent parcels as approved by the City Engineer and the various Public Utility agencies. PW Certificate of Occupancy or Acceptance of Improvements 121. Utility Locations. All electric, telephone, cable TV, and communications utilities, shall be placed underground in accordance with the City policies and ordinances. All utilities shall be located and provided within public utility easements or public services easements and sized to meet utility company standards. PW Certificate of Occupancy or Acceptance of Improvements 122. Utility Vaults and Boxes. All utility vaults, boxes, and structures, unless specifically approved otherwise by the City Engineer, shall be underground and placed in landscaped areas and screened from public view. Prior to Joint Trench Plan approval, landscape drawings shall be submitted to the City showing the location of all utility vaults, boxes, and structures and adjacent landscape features and plantings. The Joint Trench Plans shall be signed by the City Engineer prior to construction of the joint trench improvements. PW Certificate of Occupancy or Acceptance of Improvements 123. Street Signs. Developer shall furnish and install street name signs, traffic signs and markings for the project as required by the City Engineer. PW Certificate of Occupancy or Acceptance of Improvements PUBLIC WORKS - CONSTRUCTION 124. Erosion Control Implementation. The Erosion and Sediment Control Plan shall be implemented between October 1st and April 30th unless otherwise allowed in writing by the City Engineer. The Developer will be responsible for maintaining erosion and sediment control measures for one year following the City’s acceptance of the improvements. PW On-going as needed 125. Archaeological Finds. If archaeological materials are encountered during construction, construction within 100 feet of these materials shall be halted until a professional Archaeologist who is certified by the Society of California Archaeology (SCA) or the Society of Professional Archaeology (SOPA) has had an opportunity to evaluate the significance of the find and suggest appropriate mitigation measures. PW On-going as needed 126. Construction Activities. Construction activities, including the idling, maintenance, and warming up of equipment, shall be limited to Monday through Friday, and non-City holidays, between the hours of 7:30 a.m. and 5:30 p.m. except as otherwise approved by the City Engineer. Extended hours or Saturday work will be considered by the City Engineer on a case-by-case basis. Note that the construction hours of operation within the public right of way are more restrictive. PW On-going as needed 127. Temporary Fencing. Temporary Construction fencing shall be installed along the perimeter of all work under construction to separate the construction operation from the public. All construction activities shall be confined within the PW Start of Construction and On-going 5.1.a Packet Pg. 55 At t a c h m e n t : 1 . R e s o l u t i o n A p p r o v i n g t h e S i t e D e v e l o p m e n t R e v i e w P e r m i t a n d V e s t i n g T e n t a t i v e M a p ( S t . P a t r i c k W a y R e s i d e n t i a l P r o j e c t S D R CONDITION TEXT RESPON. AGENCY WHEN REQ’D Prior to: fenced area. Construction materials and/or equipment shall not be operated or stored outside of the fenced area or within the public right-of-way unless approved in advance by the City Engineer. 128. Construction Noise Management Plan. Developer shall prepare a construction noise management plan that identifies measures to be taken to minimize construction noise on surrounding developed properties. The plan shall include hours of construction operation, use of mufflers on construction equipment, speed limit for construction traffic, haul routes and identify a noise monitor. Specific noise management measures shall be provided prior to project construction. PW Start of Construction Implementation, and On-going as needed 129. Traffic Control Plan. Closing of any existing pedestrian pathway and/or sidewalk during construction shall be implemented through a City approved Traffic Control Plan and shall be done with the goal of minimizing the impact on pedestrian circulation. PW Start of Construction and On-going as needed 130. Construction Traffic Interface Plan. Developer shall prepare a plan for construction traffic interface with public traffic on any existing public street. Construction traffic and parking may be subject to specific requirements by the City Engineer. PW Start of Construction; Implementation, and On-going as needed 131. Pest Control. Developer shall be responsible for controlling any rodent, mosquito, or other pest problem due to construction activities. PW On-going 132. Dust Control Measures. Developer shall be responsible for watering or other dust-palliative measures to control dust as conditions warrant or as directed by the City Engineer. PW Start of Construction; Implementation On-going as needed 133. Construction Traffic and Parking. All construction related parking shall be off street in an area provided by the Developer. Construction traffic and parking shall be provided in a manner approved by the City Engineer to minimize impact on BART patrons. PW On-going PUBLIC WORKS - NPDES 134. Stormwater Treatment. The project qualifies as a Category C Special Project – Transit-Oriented Development as defined in the NPDES Municipal Regional Permit (MRP). Planting within all bioretention areas or similar LID landscape-based stormwater treatment measures shall adhere to the guidelines summarized in the most current version of Appendix B to the C.3 Stormwater Technical Guidance Handbook published by the Alameda County Clean Water Program. PW Building Permit Issuance and Grading Permit Issuance 135. Media Filters. All media filters used for stormwater treatment shall have been certified under the Washington State Department of Ecology Technical Assessment Protocol – Ecology (TAPE) General Use Level Designation (GULD) for Basic Treatment. All media f ilters shall be hydraulically sized based on the criteria specified in the Municipal Regional Permit Provision C.3.d and the design operation rate for which the product received TAPE GULD PW Building Permit Issuance and Grading Permit Issuance 5.1.a Packet Pg. 56 At t a c h m e n t : 1 . R e s o l u t i o n A p p r o v i n g t h e S i t e D e v e l o p m e n t R e v i e w P e r m i t a n d V e s t i n g T e n t a t i v e M a p ( S t . P a t r i c k W a y R e s i d e n t i a l P r o j e c t S D R CONDITION TEXT RESPON. AGENCY WHEN REQ’D Prior to: certification for Basic Treatment. 136. NOI and SWPPP. Prior to any clearing or grading, Developer shall provide the City evidence that a Notice of Intent (NOI) has been sent to the California State Water Resources Control Board per the requirements of the NPDES. A copy of the Storm Water Pollution Prevention Plan (SWPPP) shall be provided to the Public Works Department and be kept at the construction site. PW Start of Any Construction Activities 137. SWPPP. The Storm Water Pollution Prevention Plan (SWPPP) shall identify the Best Management Practices (BMPs) appropriate to the project construction activities. The SWPPP shall include the erosion and sediment control measures in accordance with the regulations outlined in the most current version of the ABAG Erosion and Sediment Control Handbook or State Construction Best Management Practices Handbook. The Developer is responsible for ensuring that all contractors implement all storm water pollution prevention measures in the SWPPP. PW SWPPP to be Prepared Prior to Approval of Improvement Plans; Implementation Prior to Start of Construction and On-going as needed 138. Stormwater Management Plan. Construction Plans shall include a Stormwater Management Plan subject to review and approval of the City Engineer. PW Approval of Improvement Plans and Building Permit Issuance 139. Trash Capture. Specific information is required on the construction plan set demonstrating how MRP Provision C.10 (trash capture) requirements are met. Trash capture devices to be used shall be listed and details shown on plans. PW Approval of Improvement Plans and Building Permit Issuance PUBLIC WORKS - SPECIAL CONDITIONS 140. Approval. The Vesting Tentative Map approval for Tract 8460, for Condominium Purposes, PLPA 2017-00069, establishes the design concepts and expectations for the Vesting Tentative Tract Map. The Vesting Tentative Tract Map shall generally conform to the SDR and Tentative Map plans submitted by CB&G Engineers, submitted March 5, 2018, on file with the Community Development Department, and other plans, text, and diagrams relating to this Tentative Tract Map, unless modified by the Conditions of Approval contained herein. PL, PW On-going 141. Final Map Recordation. Tract Map 8460 shall record prior to the issuance of a building permit. PW Building Permit Issuance 142. Wells or Exploratory Boring. Any water well, cathodic protection well, or exploratory boring on the project property must be properly abandoned, backfilled, or maintained in accordance with applicable groundwater protection ordinances. For additional information contact Alameda County Flood Control, Zone 7. PW Through Completion 143. Landscape Features within Public Right of Way. • The Developer shall enter into an “Agreement for Long Term Encroachments” with the City to allow the Homeowner’s Association/Property Manager to maintain the sidewalk, landscape and decorative features within public Right of Way including frontage landscaping and special features (i.e., PW Final Map Approval 5.1.a Packet Pg. 57 At t a c h m e n t : 1 . R e s o l u t i o n A p p r o v i n g t h e S i t e D e v e l o p m e n t R e v i e w P e r m i t a n d V e s t i n g T e n t a t i v e M a p ( S t . P a t r i c k W a y R e s i d e n t i a l P r o j e c t S D R CONDITION TEXT RESPON. AGENCY WHEN REQ’D Prior to: walls, portals, benches, stormwater treatment facilities, etc.) as generally shown on the Site Development Review/Vesting Tentative Map package. The Agreement shall identify the ownership of the special features and maintenance responsibilities. • If property owners adjacent to public Right of Way along St. Patrick Way constructed with this project enter into an “Agreement for Long Term Encroachments” with the City to allow the Homeowner’s Association/Property Managers to maintain the portion of sidewalk, landscape and decorative features within the public Right of Way including frontage landscaping and special features (i.e. walls, portals, benches, stormwater treatment facilities, etc.) along their respective property frontages, the Developer shall be released of the maintenance responsibility of these specific areas, but will remain responsible for these features within the public Right of Way along their property frontage. 144. Parking Structure. • Parking Structure shall be landscaped per DMC Section 8.76.070.A.18. • Parking stall dimensions shall have a clear width of 9-feet to edge of columns. • Parking stalls shall be a minimum of 9’ x 18’ • Parking structure access and gate shall be such to provide a turnaround area for guests not able to access the garage, and be designed to allow residents to access the parking garage independently from a guest waiting for access. PW Grading Permit or Building Permit Issuance 145. Utility Services to Adjacent Property to the West. Existing utility main lines within “Entry Drive” are shown to be removed and new main lines installed. The adjacent site to the west is serviced off those main lines. The Developer shall notify and coordinate with the adjacent property owner(s) regarding any interruption in utility services. The Developer shall submit to the City copies of notifications. PW Approval of Improvement Plans and Ongoing 146. Landscaping on Adjacent Properties. The Developer shall obtain written authorization to enter and construct improvements on the adjacent properties as shown on the SDR/VTM package. The Developer shall submit a copy of the written authorization to the City. • Landscaping on adjacent properties shall blend with existing features/landscaping on those properties. PW Final Map and Improvement Plan Approval 147. Concrete Step-Out. There shall be an additional 6” wide concrete step-out at landscaped areas adjacent to driver side and passenger side of parking stalls on construction plan set. PW Improvement Plan Approval 148. Decorative Pavement. Decorative pavement within the public right-of-way is subject to the approval of the City Engineer. PW Improvement Plans Approval 149. Storm Drain Access Easement. The Developer shall PW Final Map 5.1.a Packet Pg. 58 At t a c h m e n t : 1 . R e s o l u t i o n A p p r o v i n g t h e S i t e D e v e l o p m e n t R e v i e w P e r m i t a n d V e s t i n g T e n t a t i v e M a p ( S t . P a t r i c k W a y R e s i d e n t i a l P r o j e c t S D R CONDITION TEXT RESPON. AGENCY WHEN REQ’D Prior to: dedicate a storm drain access easement over the proposed EVAE at the east side of the project to allow the City to access the existing storm drain facility located off-site to the east of the project for maintenance purposes. 150. Easements. The Developer shall be responsible for obtaining all dedications of easements on-site and off-site. The applicant shall be responsible for preparation of all required documentation for dedication of all easements on- site and off-site. PW Improvement Plan Approval 151. Construction on Adjacent Properties. The Developer shall be responsible for obtaining written authorization for right of entry and construction of improvements on adjacent property sites. The Developer shall submit a copy of the written authorization to the City PW Final Map or Improvement Plan Approval 152. St. Patrick Way. • The Developer shall irrevocably dedicate public right-of-way, subject to the terms of a Community Benefit Agreement between the Developer and the City, for the construction of St. Patrick Way public right-of-way consistent with the alignment shown on Sheet C3.0 of the Vesting Tentative Map. • The Developer shall be responsible for and provide all required documentation for the irrevocable dedication of this public right-of-way both on-site and off-site. • Developer shall construct all improvements at St. Patrick Way as shown on the Vesting Tentative Map and in accordance with current Public Works standards, which may include, but are not limited to: installation of asphalt pavement, new or replacement of existing concrete curb, gutter, and sidewalk; planting of new street trees and any appurtenant irrigation; relocation of existing utilities; placement of all new utilities underground; installation of new street lights; installation of new or modification of existing storm drainage facilities and stormwater treatment facilities. The lane configuration striping shall be as generally shown on the Vesting Tentative Map. Modifications shall be subject to approval by the City Engineer. • Drainage behind proposed walls along the northerly sidewalk at St. Patrick Way shall be collected and conveyed underground to the storm drain system. Wall Scuppers shall not be allowed. • St. Patrick Way shall be constructed with a Traffic Index (TI) of 11. • Applicant/Developer shall provide all necessary documentation, including, but not limited to noticing for public hearings, legal descriptions and plat maps, and right of way maps, to effectuate the acceptance of St. Patrick Way right of way as a public street and to rescind the previously established right of way line, as necessary and subject to the determination of the City Engineer, in accordance with Chapter PW Final Map or Improvement Plan Approval and Acceptance of Improvements 5.1.a Packet Pg. 59 At t a c h m e n t : 1 . R e s o l u t i o n A p p r o v i n g t h e S i t e D e v e l o p m e n t R e v i e w P e r m i t a n d V e s t i n g T e n t a t i v e M a p ( S t . P a t r i c k W a y R e s i d e n t i a l P r o j e c t S D R CONDITION TEXT RESPON. AGENCY WHEN REQ’D Prior to: 7.68 of the DMC. 153. St. Patrick Way Landscape Improvements. • Design of the irrigation system within the public right-of-way at St. Patrick Way shall be such the applicant will be responsible for irrigation and maintenance of the proposed landscaped areas along adjacent property frontages and within the public Right of Way at St. Patrick Way. • Irrigation shall be designed to allow for the possibility of irrigation to landscape areas within the public right-of-way along adjacent property frontages to be connected to and maintained by those adjacent property owners in the future. • Landscaping and trees along St. Patrick Way shall be consistent with the City’s Streetscape Master Plan and blend with the existing landscaping and street trees along St. Patrick Way to the east extending to Golden Gate Drive. This shall also include any proposed street furniture (i.e. benches, trash receptacles, etc.). PW Final Map or Improvement Plan Approval 154. String Lighting. String Lighting at St. Patrick Way is subject to the review and approval of the City Engineer and Fire Marshall. PW Improvement Plan Approval 155. Community Benefit Agreement. Improvements set forth in the Community Benefit Agreement between the City of Dublin and the Developer shall be shown on the Improvement Plans. PW Final Map and Improvement Plan Approval 156. Western Dublin Traffic Impact Fee. Applicant shall pay the Western Dublin Traffic Impact Fee to fulfill Fair Share obligation for the installation of a traffic signal at the intersection of St. Patrick Way and Golden Gate Drive. PW Final Map 157. Eastern Dublin Transportation Impact Fee Credits. The Developer shall be eligible for credits as stated in the Western Dublin Transportation Impact Fee Update: Final Report (WDTIF), dated August 2016, for public right-of-way dedicated and improvements constructed at St. Patrick Way. Amounts of credit shall be consistent with areas dedicated and improvements constructed, not to exceed the amount set forth in the WDTIF. PW Final Map 158. Private Access Easement (PAE). • The Developer shall provide an accessible pedestrian path from the westerly property line to the easterly within the PAE. • An additional pedestrian access location shall be added near the curved section of the EVA road (southeast corner) with a gate to allow access through the BART property. This will be in addition to the access location shown to the north at the EVA entrance location from West Street PW Final Map and Improvement Plan Approval 159. Public Service Easements (PSE). A 5’ Public Service Easement(s) shall be dedicated along the project’s St. Patrick Way to allow for the proper placement of public utility vaults, boxes, appurtenances or similar items behind the back-of-sidewalk. Private improvements such as fences, PW Final Map 5.1.a Packet Pg. 60 At t a c h m e n t : 1 . R e s o l u t i o n A p p r o v i n g t h e S i t e D e v e l o p m e n t R e v i e w P e r m i t a n d V e s t i n g T e n t a t i v e M a p ( S t . P a t r i c k W a y R e s i d e n t i a l P r o j e c t S D R CONDITION TEXT RESPON. AGENCY WHEN REQ’D Prior to: gates or trellises shall not be located within the public service easements. 160. Stormwater Management. The provided Stormwater Management Plan, Sheet C6.0 of the Vesting Tentative Map, prepared by Carlson, Barbee & Gibson, Inc. dated 3/5/2018 is approved in concept only, except as noted below. The final Stormwater Management Plan is subject to City Engineer approval prior to approval of the Improvement Plans. Approval is subject to the developer providing the necessary plans, details, and calculations that demonstrate the plan complies with the standards issued by the San Francisco Bay Regional Water Quality Control Board. • LID treatment reduction credit shall conform to C.3 Stormwater Technical Guidance, and is subject to the review and approval of the City Engineer. Infeasibility of LID treatment must be demonstrated to the satisfaction of the City Engineer. • Use of Interceptor Trees for stormwater treatment credit shall conform to the c.3 Stormwater Technical Guidance Handbook, and is subject to the review and approval of the City Engineer. PW Final Map and Improvement Plan Approval 161. Trash Room Chute Plan. Trash room/chute plan shall be adjusted to accommodate the use of 4-yard non-compacted trash bins and recycle bins as an alternative to 2-yard compacted trash. This could be achieved by lowering the floor of the trash rooms by 2 feet. Alternatively, the location of where the chute meets the ground floor trash room could be adjusted to allow space for 2-yard bins to catch material disposed of on the first floor and 4-yard bins for material coming from the 2nd-5th floors. The building shall be built to accommodate non-compacted collection should that be desired for use in the future. PW Issuance of Building Permit PASSED AND ADOPTED BY the Planning Commission of the City of Dublin, on this 27th day of March 2018 by the following votes: AYES: NOES: ABSENT: ABSTAIN: Planning Commission Chair ATTEST: Assistant Community Development Director 5.1.a Packet Pg. 61 At t a c h m e n t : 1 . R e s o l u t i o n A p p r o v i n g t h e S i t e D e v e l o p m e n t R e v i e w P e r m i t a n d V e s t i n g T e n t a t i v e M a p ( S t . P a t r i c k W a y R e s i d e n t i a l P r o j e c t S D R