HomeMy WebLinkAboutItem 7.3 Emerald Glen Pk Bldg Planor
19 82
/ii � 111
DATE:
TO:
FROM:
SUBJECT
STAFF REPORT
CITY COUNCIL
September 18, 2012
Honorable Mayor and City Councilmembers
Joni Pattillo City Manager""'
CITY CLERK
File #215 -30
Proposed Building Plan for Emerald Glen Park
Prepared by Paul McCreary, Parks and Community Services Director
EXECUTIVE SUMMARY:
The Emerald Glen Park Master Plan envisions two public buildings: a Recreation and Aquatic
Complex and a Community Center. The 2012 -2017 Capital Improvement Program includes
funding to restart the design process for the Recreation and Aquatic Complex which was
suspended in 2009 due to the downturn in the economy. The City Council will consider a
revised building plan that combines the remaining facilities planned for Emerald Glen into one
building totaling 51,360 square feet (sf) that would be constructed in three phases, with Phase I
being completed in 2015. The City Council will also consider whether to defer some of the
improvements proposed for Phase I to advance the next phase of Fallon Sports Park.
FINANCIAL IMPACT:
It is estimated that, at the build -out of the Eastern Dublin Specific Plan Area, the Public Facilities
Fee program will have generated $34.7 million toward development of the facilities planned at
Emerald Glen as follows:
Community and Recreation Facilities Fee $28.5 million
Aquatic Center Fee $5.5 million
Community Park Improvements Fee $0.7 million
Total Project Funding at Build -out $34.7 million
In addition, the City has $1.5 million in a designated General Fund reserve for construction of
the Natatorium. In total, the funding the City collects over time for the project will be $36.2
million (in 2012 dollars).
The adopted budget in the 2012 -2017 Capital Improvement Program for Phase I of the
Recreation and Aquatic Complex is $22.5 million. If the City Council approves the proposed
building plan with the Natatorium in the first phase, the $1.5 million in the General Fund
designated reserve would need to be appropriated to the project budget for Phase I, increasing
it to $24.0 million.
Page 1 of 6 ITEM NO. 7.3
RECOMMENDATION:
Staff recommends the City Council receive the Staff and consultant presentations and approve
the proposed building and phasing plan as presented by Staff.
Submitted B Reviewed By
Director of Parkland Assistant City Manager
Community Services
DESCRIPTION:
The Emerald Glen Park Master Plan (Attachment 1) envisions two public buildings: a Recreation
and Aquatic Complex as well as a Community Center. The 2012 -2017 Capital Improvement
Program includes funding to restart the design process for the Recreation and Aquatic Complex,
which was suspended in 2009 due to the downturn in the economy.
At the direction of the City Council, Staff has worked with the Dahlin Group to prepare an update
to the building and phasing plan for Emerald Glen Park. As proposed, the remaining facilities
planned for Emerald Glen Park (Recreation and Aquatic Complex, Natatorium and Community
Center) would be combined into one building totaling 51,360 square feet (sf) that would be
constructed in three phases, with Phase I being completed in 2015 (if design resumes in
September 2012). The original building plan envisioned 62,735 sf; however, based on the
standards established in the Park and Recreation Master Plan, the 51,360 sf that is proposed
will meet the needs of the City's population at build -out.
Combining the buildings into one reduces the number of public counters and staffing needed to
operate separate facilities, thus minimizing the ongoing staffing and operational costs in the
future. This is also a more efficient and effective use of the Public Facility Impact Fees.
Reducing the need to construct duplicate spaces such as the lobbies, reception and
administrative spaces allows Staff to focus the project budget more on enhancing the other
state -of- the -art features desired by the community.
Proposed Building Program and Phasing
In approaching the updated plan, the guiding principle was to focus on the aquatics facilities
earlier in the development of the facility and ensure the first phase has a state -of- the -art feel.
The greatest facility need the City is facing is aquatics. The current Swim Center is 40 years old
and the community has no competitive swimming facility that meets today's standards for
effective training and competition. The current facility is in need of major modernization that
cannot be done without an alternate facility in place for aquatic programs during the renovation,
which would likely happen over two swim seasons. Another reason to focus on the aquatic
facilities first is that the City currently has access to a sufficient number of existing facilities, such
as gymnasiums and multi - purpose spaces that have been planned for the Recreation and
Aquatic Complex, and therefore could be deferred to future phases.
In June of 2012, voters approved a Dublin Unified School District (DUSD) bond measure for
new facilities. One of the facilities included in the bond was a competitive swimming facility for
Dublin High School (DHS). Therefore, in order to not develop duplicate facilities, Staff began
discussions with DUSD to determine the vision for the proposed pool at Dublin High School and
how it relates to the Emerald Glen Recreation and Aquatic Complex. Based on those
Page 2 of 6
discussions, it is likely the new DHS competitive pool will be located on the Dublin Swim Center
site, although no decisions have been made and no formal agreement is in place. The new pool
at the Dublin Swim Center site would be able to accommodate the competitive swimming needs
of the school and the community. Thus the competitive swimming pool has been eliminated
from the proposed Emerald Glen building plan.
Following is a summary of the proposed building and phasing plan for Emerald Glen Park:
Phase 1 (27,230 square feet) (Attachment 2)
• Indoor pool for year round lessons, lap swim, exercise and recreational swim
• Outdoor shallow beach entry pool with a water playground for seasonal use
• Outdoor waterslide with splash down pool for seasonal use
• Multi- purpose room that is dividable for party rentals and classes
• Locker Rooms with showers, changing areas and restrooms
• Special Need /Unisex Restrooms
• Lobby and Reception Area
• Administrative Offices
• First Aid and Lifeguard Rooms
• Aquatic Storage, Mechanical and Chemical Rooms
Phase 11(10,690 square feet) (Attachment 3)
• Outdoor pool for seasonal lessons, lap swim, exercise and recreational swim
• Game Room
• Fitness Room with cardio exercise machines
• Group Exercise / Dance Studio
• Locker Rooms with showers, changing areas and restrooms
• Special needs changing room
• General Building Receiving, Maintenance and Storage Spaces
Phase 111(13,440 square feet) (Attachment 4)
• Gymnasium with one full size court (same size as Stager Community Gym)
• Preschool with two classrooms, support spaces and outdoor play area (replaces modular
building)
• Multi- Purpose Room for classes that use mats (tumbling, gymnastics, martial arts, etc.)
The proposed building plan primarily differs from the existing plan since the Natatorium has
been moved to from the future phase to Phase I, and the fitness components have been moved
to later phases. In addition the Natatorium would be partially funded by the Public Facility Fee
program, rather than funded fully by the General Fund. This was primarily accomplished by
consolidating the facilities and reducing duplicated spaces, and by eliminating the 150 -seat
social hall that was planned for the Community Center.
In recommending the elimination of the social hall, Staff would point out that the City already has
several rooms available for rental by the community. While the Shannon Community Center is
well utilized, the Dublin Senior Center has a consistent vacancy rate on weekends. The
Recreation Complex would have a party room poolside that would be slightly larger than the
Regional Meeting Room and available for rental. The Natatorium building would garner more
use as a community facility than a 150 -seat social hall, and have a greater potential to generate
Page 3 of 6
revenue than a social hall. Additionally a traditional social hall for weddings, anniversaries, etc.,
would not fit into the feel of the proposed Recreation and Aquatic Complex.
Option to Reduce Cost of Phase I and Re- Allocate Budget to Fallon Sports Park
In preparing the proposed Building Plan for Emerald Glen Park, Staff has taken into
consideration the desire of the City Council to consider reducing the scope of Phase I of the
Recreation and Aquatic Complex in order to advance the next phase of improvements at Fallon
Sports Park. The City Council could choose to defer the outdoor pools, water playground and
waterslides to a future phase. This option would reduce the total project cost for Phase I by
$3.1 million and result in the following amenities for Phase L
Amenities in Reduced Option for Phase 1(26,550 square feet)
• Indoor pool for year round lessons, lap swim, exercise and recreational swim
• Multi- purpose room for party rentals and classes that can be divided
• Locker Rooms with showers, changing areas and restrooms
• Lobby and Reception Area
• Administrative Offices
• First Aid and Lifeguard Rooms
• Storage, Mechanical and Chemical Rooms
If the City Council is inclined to reduce the scope of Phase I of the Recreation and Aquatic
Complex to advance funding for improvements at Fallon Sports Park, then Staff recommends
focusing on completion of the soccer complex and the installation of two synthetic turf soccer
fields with minimal improvements, and deferring the baseball field to the next phase of the park.
The primary reason to focus on the soccer fields is that it would create a unique tournament
destination and accommodate year -round use. Following is a summary of the proposed
improvements for a mini -phase of the Lower Terrace at Fallon Sports Park.
Improvements for potential Mini -Phase of Fallon Sports Park
• Two synthetic turf soccer fields (65x110 and 80x110) with warm -up area and utility stubs
for future field lighting
• Restroom Building with utility connections
• Pedestrian circulation to existing soccer fields
• Pedestrian circulation around new soccer fields with pathway lighting
• Grading of dirt area for future parking lot and use for overflow parking for tournaments
• Grading and erosion control for future landscape areas
Based on the consultant's cost estimate from December 2011, Staff estimates this mini -phase
would cost $5.2 million, of which $1.6 million is attributable to the increased costs to install
synthetic turf and would need to come from a source other than Public Facility Fees. Even with
the savings from reducing the first phase of the aquatic facility, the Fallon Sports Park project
could not move forward until funding has been identified for the shortfall. If this was the City
Council's desire, Staff would re- evaluate the schedule and available funds for Fallon Sports
Park as the CIP is updated in the spring. Once funding has been identified it would take
approximately two years to design and construct the improvements.
Page 4 of 6
Recommendation from Parks and Community Services Commission
On August 20, 2012, the Parks and Community Services Commission reviewed the proposed
building and phasing plan as presented by Staff. Attachment 5 is a draft copy of the minutes
related to the discussion of the building plan. The Commission also received testimony from a
Board Member from Dublin United Soccer League.
The Commission voted 4 -0 -0, with Commissioners Boboc and Jones absent, to recommend to
the City Council the Reduced Option for Phase I of the proposed building plan in order to
reallocate funding to the next phase of improvements at Fallon Sports Park.
In addition the Commission requested that when design of the lower terrace begins that
spectator seating be addressed at the existing and the future soccer fields.
Summary
In developing the proposed Building Plan for Emerald Glen Park, Staff has worked with the
architect, landscape architect and had discussions with the School District. The City is in
desperate need of new and modernized aquatic facilities. The proposed building plan focuses
on those amenities as they are of greater need now to the community than multi - purpose
spaces, gymnasium or sports fields. As a result, Staff recommends the City Council adopt the
proposed building program without reducing the scope of Phase I of the Recreation and Aquatic
Complex in order to advance the next phase of Fallon Sports Park.
Staff recommends not downsizing the aquatic facilities in the first phase because the synergy
created by joining together the indoor pool with the outdoor recreational amenities creates an
opportunity to provide the best, most comprehensive set of aquatic programs available to all
community members. It also meets the City Council Strategic Goal of developing a state- of -the-
art recreation /aquatic complex.
The family aquatic features such as the water playground, slides and beach entry pool will also
improve the cost recovery rate for the facility. The City's aquatic consultant has been compiling
revenue and expenditure data from California municipalities for years and has found that cost
recovery for a facility with only an instructional or competitive pool is around 50 -60 %, while cost
recovery for an aquatic facility with the addition of interactive amenities increases by 20 -30%
more.
Keeping the outdoor recreational pools will be the key to create a facility that appeals to the
entire community. For instance the zero entry depth or beach style entry pool is ideal for seniors
and young children, as well as people with disabilities or mobility challenges. It allows for
patrons to slowly enter a pool and adjust to the water without the fear of jumping in or the
difficulties of using a step ladder. Children are able to find a water depth which is very
comfortable, whether it be ankle deep, knee high or to the waist.
In reviewing sports field use, although the City has only two synthetic turf soccer fields, there is
a surplus of natural turf soccer fields and baseball diamonds available in Dublin. Based on field
rental permit data, some of these fields are vacant even during peak seasons and on game
days. However, when the natural turf fields are closed for the annual maintenance period from
December 15 to March 1, Dublin United Soccer indicates there are not a sufficient number of
soccer fields available to meet the needs of their competitive soccer program.
Page 5 of 6
Until the funding becomes available to install the additional synthetic turf fields, one temporary
solution would be to make Soccer Fields 5 and 6 at the Dublin Sports Grounds available during
the annual maintenance closure (except during rain events). This has been done on a limited
basis in the past to accommodate tryouts and other one -time events. These fields have lighting
and are playable after dark. Staff would develop alternative maintenance schedules for these
fields to make them available during the entire maintenance closure.
NOTICING REQUIREMENTS /PUBLIC OUTREACH:
A public meeting notice was sent to the residences neighboring Emerald Glen Park, the Parks
and Community Services Commission, as well as the presidents of the Dublin Green Gator
Swim Team, Dublin Little League, and Dublin United Soccer League.
ATTACHMENTS: 1. Existing Emerald Glen Park Master Plan
2. Phase 1 Site Plan
3. Phase 1 and 2 Site Plan
4. Phase 1, 2 and 3 Site Plan
5. Draft Minutes from the August 20, 2012 Parks and Community
Services Commission Meeting related to the Emerald Glen Building
Plan
Page 6 of 6
Lu
u] W ° .r w
M� 3
0, v - -- No
s: I m � ,I � • `w, Q d
v
W 't
r L±4 40 1 _
Z W
V, r■
rl
(9))!
h�
ik
FI
� L
S
0
P
O I
ro �
o�
fix. � ..
Z P
a_-
UJ
H
V)
a
:k w
LU
V3 w •t '
° �_ 1 dt
� 7L
a V Q W
r_m � a
C3
W ,
a
o W
o
LD
ro
(LOU N
W
0
O
0 0 \ O O
o \\ O O O
O
4p
p�
o �
o i
0 0�
0 0�
0 0 0
oo�
0 0 o a\
0 0 o a\
0 0
0 0 �
0 0
0
0 0
0
0
Z
O
a
/ 1
1 \ \ G
L J �
1
�J
Y2 1
,
W
Q
CL
0
�.J
0
a o \ OO O O
o \\ O O O
O
4p
4p /
/
o /
o �
0 0�
0 0�
0 0 0
oo\
0 0 o a\
0 0 o a\
0 0
0 0
0
0 0
0
� C `
o°
0
Z
O
a
/ 1
g
i
iZO
00
i
�J
s 1
N
06
w
CL
0
�.J
a
0
pp
"t
o /
o
0 0�
0 0\
o ° °
0 0
0 0 o a\
0 0 o a\
0 0
0 0 �
0 0
o
0 0
0
/
/
/
/
/ C `
/ m °o
0
Z
O
a
/ 1
M
06
N
w
V)
0
�.J
PARKS AND COMMUNITY SERVICES COMMISSION REGULAR MEETING
Drat Minutes related to Proposed Building Plan
for Emerald Glen Park
CITY OF DUBLIN
August 20, 2012
NEW BUSINESS
8.1 Proposed Building Plan for Emerald Glen Park
Mr. Paul McCreary, Parks and Community Services Director, presented the specifics of the item
as outlined in the Staff Report.
Vice Chair Totaro asked if there would be adequate funding available to move forward with
Phase I of the project as presented, and Mr. McCreary said yes.
Vice Chair Totaro asked about the projected timeline for the build -out of the project. Mr.
McCreary explained that the timeline and funding for the build -out of the project would be
discussed during the next Capital Improvement Plan (CIP) update. Currently only Phase I of
the project has available funding. Future phases will depend on the pace of residential
development.
Chair A. Elias asked about the location of the spectator section in the Fallon Sports Park Lower
Terrace. Mr. McCreary pointed out the proposed spectator section on the diagram.
Vice Chair Totaro asked about additional field lighting proposed for the soccer fields in the lower
terrace at Fallon Sports Park. Mr. McCreary explained that an amendment to the existing
Environmental Impact Report would need to be prepared before additional lighting could be
included in the proposed plans.
Vice Chair Totaro asked if the project scheduling for the proposed Dublin Swim Center
modernization and the proposed building Plan for Emerald Glen Park would be coordinated in
order to avoid the absence of a functioning aquatics facility in the City, and McCreary said yes.
Vice Chair Totaro asked about the proposed two -year timeline for the potential Mini -Phase of
Fallon Sports Park. Mr. McCreary explained that the timeline provides for the design and
construction of the improvements, which includes the construction contractor's timeline. He
stated that Staff would work towards completing the Mini -Phase as quickly as possible once
funding is identified for the project.
Cm. Mack asked about the future cost of the $1.6 million estimated for the synthetic turf soccer
fields. Mr. McCreary stated that each year there is a potential for the project budget to increase
by an applicable cost factor, as determined by outside sources.
Cm. T. Elias asked about the maintenance costs of synthetic turf versus grass turf. Mr.
McCreary explained that given the capital outlay costs of maintaining synthetic turf, the
difference in costs is approximately neutral.
Chair A. Elias asked about the timing for the Proposed Building Plan for Emerald Glen Park.
Mr. McCreary explained that there are about 15 -18 +/- months remaining for design work and
about 24 +/- months anticipated for construction. Chair A. Elias asked how the timing would
affect future phases of Fallon Sports Park. Mr. McCreary explained that the subsequent phases
of Fallon Sports Park are currently scheduled to begin in the fifth year of the 2012 -2017 CIP.
Vice Chair Totaro asked about utilizing the City's General Fund as a resource for the $1.6
million needed to install synthetic turf soccer fields for the potential Mini -Phase of Fallon Sports
Park. Mr. McCreary stated that this decision would need to be made by the City Council.
Vice Chair Totaro asked if the design of the potential Mini —Phase of Fallon Sports Park could
begin prior to securing funding for the remaining construction of the project. Mr. McCreary
stated that he would caution against this due to the potential for changes in the Building Codes
prior to funding being secured.
Mr. James Fulweiller, Dublin United Soccer League (DUSL) Vice President, spoke in favor of
moving forward with the potential Mini -Phase of Fallon Sports Park. He stated that he would like
the phase to include an adequate spectator seating area. He expressed interest in partnering
with the City on financial assistance for the $1.6 million needed to install synthetic turf soccer
fields.
Mr. Karl Danielson, Project Consultant with the Dahlin Group, introduced himself to the
Commission and made himself available for questions.
Vice Chair Totaro stated that he supports a reduced option for Phase I of the proposed building
plan for Emerald Glen Park in order to reallocate funding to Fallon Sports Park. He suggested
that Staff work with DUSL on its offer of financial assistance.
Cm. Mack asked about the possibility of working with DUSL on its offer of financial assistance.
Mr. McCreary stated that the possibility of future discussions exists.
Cm. T. Elias stated that he is in favor of a reduced option for Phase I of the proposed building
plan for Emerald Glen Park in order to reallocate funding to Fallon Sports Park.
Chair A. Elias stated that he is not pleased about the further delay of the 90 -foot baseball field.
He stated that he recommends reducing the option for Phase I of the proposed building plan for
Emerald Glen Park in order to reallocate funding to Fallon Sports Park.
Chair A. Elias suggested that the proposed Fallon Sports Park Lower Terrace spectator seating
area be extended to part of the hillside. In addition, stepped seating should be added to allow
unobstructed views of the fields. Mr. McCreary stated that Staff would explore the costs options
for an improved seating area.
On a motion by Vice Chair Totaro, seconded by Cm. Mack, and by a vote of 4 -0 -0 with
Cms. Boboc and Jones absent, the Commission voted to recommend to the City Council
the Reduced Option for Phase I of the proposed building plan for Emerald Glen Park in
order to reallocate funding to the next phase of improvements at Fallon Sports Park.