Loading...
HomeMy WebLinkAboutItem 8.2 Shannon Pk Water Play Areaor 19 82 /ii � 111 DATE: TO: FROM: SUBJECT STAFF REPORT CITY COUNCIL April 16, 2013 Honorable Mayor and City Councilmembers Joni Pattillo City Manager""' CITY CLERK File #600 -35 Shannon Park Water Play Area Authorization to Bid Contract #13 -06 Prepared by Rosemary Alex, Parks and Facilities Development Coordinator EXECUTIVE SUMMARY: The 2012 -2017 Capital Improvement Program includes the renovation of the Shannon Park Water Play Area. On November 6, 2012, the City Council approved the conceptual plan for the new water play area. The construction documents have been completed and Staff is seeking City Council authorization to bid the Shannon Park Water Play Area for construction. FINANCIAL IMPACT: The 2012 -2017 Capital Improvement Program (CIP) includes a total appropriation of $535,540 for the project with expenses to be incurred over multiple fiscal years. The total amount appropriated for construction is $394,000. The cost of the construction is now estimated at $453,687 (including a 15% contingency) resulting in a potential funding shortfall as follows: Engineer's Estimate for Construction including 15% Contingency $453,687 Total Construction Budget Appropriated in FY 2012 -2013 Budget $394,000 Potential Funding Shortfall (depending on actual bid results) $59,687 The additional costs are related to unforeseen requirements of the State Health Code and the Americans with Disabilities Act. If the actual bids for the project exceed the available project budget, when the contract is awarded Staff will prepare a budget change for City Council consideration appropriating additional funds from Public Facility Fees. There is a sufficient fund balance in Public Facility Fees to approve a budget amendment, if necessary. RECOMMENDATION: It is recommended that the City Council authorize Staff to advertise Contract No. 13 -06 Shannon Park Water Play Area. Page 1 of 2 ITEM NO. 8.2 cC `''Submitted By1 Parks and Cominity Services Direc r � I P,�viewed',Ily Interim Administrative Services Director Reviewed by Assistant City Manager DESCRIPTION: As part of the 2012 -2017 Capital Improvement Program the City Council authorized the renovation of the Shannon Park Water Play Area and the design of project was initiated during Fiscal Year 2012 -2013. On November 6, 2012, the City Council approved the conceptual design and layout of the new water play area (Attachment 1). Based on the approved plan, the Consultant has completed the construction documents and Engineer's cost estimate. If the City Council authorizes Staff to advertise for bids, it is anticipated the City Council would consider awarding the construction contract on June 4, 2013. Since the project includes a pre- fabricated building to house the pumping equipment and a shower facility, the initial work on the project will entail completing the design and submittal of the pre- fabricated building as well as procurement of long -lead items for the project. With that in mind, it is anticipated that site construction will begin in August, leaving the existing play area open for most of the summer. It is anticipated construction would be completed by the end of 2013. As shown in Attachment 1 the new splash pad will include one water tunnel, three water jellies, one team spray cluster, two wall sprays and one ground geyser for an area totaling 1,520 square feet. NOTICING REQUIREMENTS /PUBLIC OUTREACH: Advertisement of project will be listed as a public notice in the Valley Times and posted on the City of Dublin's website. In addition, plans and specifications will be submitted to plan rooms throughout the Bay Area. ATTACHMENTS: 1. Approved Conceptual Plan Page 2 of 2 am z a J a PREFERRED CONCEPTUAL DESIGN Fr AQUATIC 0 SHANNON PARKWATER PLAY RENOVATION CiTYOf NOVEMBER 6.2012 DUBLIN - Planting terries Fountain structure to remain, _. blue file mosaic on inside face of fountain } R 11 11 _ Picnic table, typ. - Proposed trees with grates Standard concrete - Standard concrete Decorative thematic railing 4 Trees to be removed �- 2 -5 Play _ — Integral color decorative concrete with "river accent Area _ i Water tunnel Water jelly o° Team spray Splash pad i Ground geyser equipment _ h Wall sprays enclosure I and shower - LS- 12PIay facilities - __ Area i - - — clear - — - -- �P Wall to remain, blue tile !- - mosaic on wall face. Limits of water play area, 1,520 sf -1 771 RESTROOM am z a J a PREFERRED CONCEPTUAL DESIGN Fr AQUATIC 0 SHANNON PARKWATER PLAY RENOVATION CiTYOf NOVEMBER 6.2012 DUBLIN