HomeMy WebLinkAboutReso 53-05 DubTransitCtrD&E
RESOLUTION NO. 53 - 05
A RESOLUTION OF THE CITY COUNCIL
OF THE CITY OF DUBLIN
* * * * * * . . *
APPROVING PARCEL MAP 7892 AND IMPROVEMENT AGREEMENT
(DUBLIN TRANSIT CENTER, SITES D & E)
WHEREAS, Parcel Map 7892, in the incorporated territory of the City of Dublin, State of
California, has been presented to this City Council for approval, all in accordance with provisions of the
Subdivision Map Act of the State of California and the City of Dublin Municipal Code; and
WHEREAS, the Developer, AvalonBay Communities, Inc., has executed and filed with the City of
Dublin an Improvement Agreement to complete required subdivision improvements in accordance with the
Conditions of Approval for the Tentative Map, and the improvement plans attached thereto; and
WHEREAS, said Improvement Agreement is secured by a bond furnished by the Arch Insurance
Company in the amount of $ 2,057,200, for the tract improvements (Bond No. SUt 006064), conditioned
upon faithful performance of said Agreement; and
WHEREAS, said Improvement Agreement is secured by a bond furnished by the Arch Insurance
Company in the amount of$ 2,057,200, for the tract improvements (Bond No. SUI 006064), conditioned
upon payment for labor performed or material furnished under the terms of said Agreement;
NOW, THEREFORE, BE IT RESOLVED that said agreement and bonds are hereby approved.
BE IT FURTHER RESOLVED that the Mayor is hereby authorized by the City Council to
execute the Improvement Agreement, hereto attached as Exhibit "A."
BE IT FURTHER RESOLVED that Parcel Map 7892 is hereby approved, and that rights to the
areas marked as Martine1li Way, Campus Drive, Altamirano Avenue and Arnold Road, offered for
dedication to public use in confomrity with the terms of dedication, are hereby accepted, subject to
improvement, and that the Clerk of this City Council is hereby directed to transmit said Map to the County
Recorder for filing.
PASSED, APPROVED AND ADOPTED this 5th day of April, 2005.
AYES: Councilmembers Hildenbrand, McComrick, Oravetz, Zika and Mayor Lockhart
NOES: None
ABSENT: None
ABST ATN: None
ATTEST:
K'/G/4-5-05/reso 53-05
2 (Item 4.8)
CITY OF DUBLIN
IMPROVEMENT AGREEMENT
PARCEL MAP 7892
This agreement is made and entered into this 5th day of April, 2005, by and between the
CITY of Dublin, a municipal corporation, hereinafter referred to as "CITY", and the Surplus Property
Authority of the County of Alameda, a Public Corporation, and AVALONBAY COMMUNITIES,INC., a
Maryland corporation, hereinafter referred to as "DEVELOPER".
RECITALS
WHEREAS, it has been determined by the CITY Council of the CITY of Dublin, State of
California, that DEVELOPER, desires to improve and dedicate those public improvements (hereafter
"The Improvements") required for Parcel Map 7892 by Planning Commission Resolution No. 02-40
adopted on October 22, 2002 In accordance with the requirements and conditions set forth in said
resolution, the requirements of the Subdivision Map Act of the State of California, the Subdivision
Ordinance of the CITY, and those certain plans for said development entitled Street Improvement
Plans Associated with Parcel Map 7892 for Porlions of DeMarcus Blvd., Iron Horse Pkwy., Marlinelli.,
Campus Dr., Altamirano Ave. & Dublin Blvd., consisting of 60 sheets and prepared by BKF
Engineers/Surveyors/ Planners, and now on file in the office of the City Engineer, which are hereby
referred to for a more definite and distinct description of the work to be performed under this
Agreement as though set forth at length herein;
WHEREAS, DEVELOPER intends to satisfactorily complete The Improvements within the time
hereinafter specified, and CITY intends to accept DEVELOPER's offer(s) of dedication of The
Improvements in consideration for DEVELOPER's satisfactory performance of the terms and
conditions of this Agreement; and
WHEREAS, CITY has determined that The Improvements are a public works subject to
California prevailing wage requirements:
NOW, THEREFORE, in consideration of the mutual promises, conditions and covenants
herein contained, the parties agree as follows:
1. Comoletion Time.
DEVELOPER will commence construction of The Improvements within one hundred and fifty
(150) days following the date on which CITY executes this Agreement. DEVELOPER shall complete
said work not later than two years following said date of execution. Time is of the essence in this
Agreement. Upon completion, DEVELOPER shall furnish CITY with a complete and reproducible set
of final as-built plans of The Improvements, including any authorized modifications.
2. Estimated Cost of Improvements.
The estimated cost of constructing The Improvements required by this agreement as
presented in the Bond Estimate Improvements Associated with Parcel Map 7892, dated March 10,
2005 prepared by BKF Engineers/Surveyors/Planners is agreed to be $2,057,200. Said amount
Includes costs and reasonable expenses and fees which may be incurred In enforcing the obligation
secu red.
1---
i
I
I
3. Bonds Furnished.
Concurrently with the execution of this Agreement, DEVELOPER shall furnish CITY with the
following security in a form satisfactory to the CITY Attorney:
A. Faithful Performanos. Either a cash deposit, a corporate surety bond issued by a
company duly and legally licensed to conduct a general surety business in the State of California, or
an instrument of credit equivalent to one hundred per cent (100%) of the estimate set forth in
Paragraph 2 and sufficient to assure CITY that The Improvements will be satisfactorily cornpleted.
B. Labor and Materials. Either a cash deposit, a corporate surety bond Issued by a
company duly and legally licensed to conduct a general surety business in the State of California, or
an instrument of credit equivalent to one~hundred per cent (100%) of the estimate set forth In
Paragraph 2 and sufficient to assure CITY that DEVELOPER'S contractors, subcontractors, and other
persons furnishing labor, materials, or equipment shall be paid therefor.
C. If required by CITY, a cash deposit, corporate surety bond, or Instrument of credit
sufficient to assure CITY that the surface water drainage of the subdivision shall not interfere with the
use of neighboring property, including public streets and highways.
CITY shall be the sole indemnitee named on any instrument required by this Agreement. Any
instrument or deposit required herein shall conform with the provisions of Chapter 5 of the Subdivision
Map Act.
4. Insurance Required.
Prior to cornmencing construction of the improvements, DEVELOPER shall obtain or cause to
be obtained and filed with the CITY, all Insurance required under this paragraph Prior to the
commencement of work under this Agreement, DEVELOPER's general contractor shall obtain or
cause to be obtained and filed with the Administrative Services Director, all insurance required under
this paragraph DEVELOPER shall not allow any contractor or subcontractor to commence work on
this contract or subcontract untii all insurance required for DEVELOPER and DEVELOPER's general
contractor shall have been so obtained and approved. Said insurance shall be maintained in full foros
and effect until the completion of work under this Agreement and the final acceptance thereof by
CITY. All requirements herein provided shall appear either in the body of the insurance policies or as
endorsements and shall specifically bind the insurance carrier.
A. Minimum Scope of Insurance. Coverage shall be at least as broad as:
1) Insurance Services Office form number GL 0002 (Ed. 1/73) covering
comprehensive General Liabilitv and Insurance Services Office form number GL 0404
covering Broad Form Comprehensive General Liability; or Insurance Services Office
Commercial Genéral Liability coverage ("occurrence" form CG 0001.)
2) Insurance Services Office form number CA 0001 (Ed. 1/78) covering
Automobile Liability, code 1 "any auto" and endorsement CA 0025.
3) Workers' Compensation insurance as required by the Labor Code of the State
of California and Employers Liability Insurance.
2
B. Minimum Limits of Insurance. DEVELOPER shall maintain iimits no less than:
1) General Liabilitv: $1,000,000 combined single limit per occurrence for bodily
Injury, personal injury and property damage. If commercial General liability Insurance
or other form with a general aggregate limitis used, either the general aggregate limit
shall apply separately to this project/location or the general aggregate limit shall be
twice the required occurrence limit.
2) Automobile Liability: $1,000,000 combined single limit per accident for bodily
injury and property damage.
3) Workers' Compensation and Employers Liabilitv: Workers' compensation
limits as required by the Labor Code of the State of California and Employers Liability
limits of $1 ,000,000 per accident.
C. Deductibles and Self-Insurance Retentions. Any deductibles or self-insured
retentions must be declared to and approved by the CITY. At the option of the CITY, either
the insurer shall reduce or eliminate such deductibles or self-insured retentions as respects
the CITY, its officers, officials and employees; or the DEVELOPER shall procure a bond
guaranteeing payment of losses and related investigations, claim administration and defense
expenses.
D. Other Insurance Provisions. The policies are to contain, or be endorsed to
contain, the following provisions:
1) General Liabilitv and Automobile Liabilitv CoveraQes.
a) The CITY, its officers, agents, officials, employees and volunteers shall
be named as additional insureds as respects: liability arising out of
activities performed by or on behalf of the DEVELOPER; products and
completed operations of the DEVELOPER; premises owned, occupied
or used by the DEVELOPER; or automobiles owned, leased, hired or
borrowed by the DEVELOPER. The coverage shall contain no special
limitations on the scope of the protection afforded to the CITY, its
officers, officials, employees or volunteers.
b) The DEVELOPER's insurance coverage shall be primary insurance as
respects the CITY, its officers, officials, employees and volunteers. Any
insurance or self-insurance maintained by the CITY, its officers, officials,
employees or volunteers shall be excess of the DEVELOPER's
insurance and shall not contribute with it.
c) Any failure to comply with reporting provisions of the policies shall not
affect coverage provided to the CITY, its officers, officials, employees or
volunteers.
d) The DEVELOPER's insurance shall apply separately to each insured
against whom claim is made or suit is brought, except with respect to
the limits of the insurer's liability.
3
2) Workers' CornDensation and EmDIDvers Liabilltv Coveraoe.
The insurer shall agree to waive all rights of subrogation against the CITY, its
officers, officials, employees and volunteers for losses arising from work performed by
the DEVELOPER for the CITY.
3) All Coveraoes.
Each insurance policy required by this clause shall be endorsed to state that
coverage shall not be suspended, voided, cancelled by either party, reduced In coverage or in
limits except after thirty (30) days' prior written notice by certified mail, return receipt
requested, has been given to the CITY.
a) Accectabilitv of Insurers. Insurance is to be placed with insurers with a
Bests' rating of no less than A:VII.
b) Verification of Coveraoe. DEVELOPER shall furnish CITY with
certificates of insurance and with original endorsements effecting
coverage required by this clause. The certificates and endorsements for
each insurance policy are to be signed by a person authorized by that
insurer to bind coverage on Its behalf. The certificates and
endorsements are to be received and approved by the CITY before
work commences. The CITY reserves the right to require complete,
certified copies of all required insurance policies, at any time.
c) Subcontractors. DEVELOPER and/or DEVELOPER's general
contractor shall include all subcontractors as insureds under its policies
or shall obtain separate certificates and endorsements for each
subcontractor. All coverages for subcontractors shall be subject to all of
the requirements stated herein.
5. Work Performance and Guarantee.
Except as otherwise expressly provided In this Agreement, and excepting only items of routine
maintenance, ordinary wear and tear and unusual abuse or neglect, DEVELOPER guarantees all
work executed by DEVELOPER and/or DEVELOPER's agents, and all supplies, materials and
devices of whatsoever nature incorporated in, or attached to the work, or otherwise delivered to CITY
as a part of the work pursuant to the Agreement, to be free of all defects of workmanship and
materials for a period of one (1) year after initial acceptance of the entire work by CITY.
DEVELOPER shall repair or replace any or all such work or material, together with ail or any other
work or materials which may be displaced or damaged in so doing, that may prove defective in
workmanship or material within said one-year guarantee period without expense or charge of any
nature whatsoever to CITY. DEVELOPER further covenants and agrees that when defects in design,
workmanship and materials actually appear during the one-year guarantee period, and have been
corrected, the guarantee period shall automatically be extended for an additional year to insure that
such defects have actually been corrected.
In the event the DEVELOPER shall fail to comply with the conditions of the foregoing
guarantee within thirty (30) days time, after being notified of the defect in writing, CITY shall have the
right, but shall not be obligated, to repair or obtain the repair of the defect, and DEVELOPER shall pay
to CITY on demand all costs and expense of such repair. Notwithstanding anything herein to the
contrary, in the event that any defect in workmanship or material covered by the foregoing guarantee
4
results In a condition which constitutes an immediate hazard to the public health, safety, or welfare,
CITY shall have the right to immediately repair, or cause to be repaired, such defect, and
DEVELOPER shall pay to CITY on demand all costs and expense of such repair. The foregoing
statement relating to hazards to health and safety shall be deemed to include either temporary or
permanent repairs which may be required as determined in the sole discretion and judgment of CITY.
If CITY. at its sole option, makes or causes to be made the necessary repairs or replacements
or performs the necessary work, DEVELOPER shall pay, in addition to actual costs and expenses of
such repair or work, fifty percent (50%) of such costs and expenses for overhead and Interest at the
maximum rate of interest permitted by law accruing thirty (30) days from the date of billing for such
work or repairs.
6. Insoection of the Work.
DEVELOPER shall guarantee free access to CITY through its City Engineer and designated
representative for the safe and convenient inspection of the work throughout its construction. Said
CITY representative shall have the authority to reject all materials and workmanship which are not in
accordance with the plans and specifications, and all such materials and or work shall be removed
promptly by DEVELOPER and replaced to the satisfaction of CITY without any expense to CITY in
strict accordance with the Improvement plans and specifications.
7. Aqreement Assiqnment.
This Agreement shall not be assigned by DEVELOPER without the written consent of CITY.
8. Abandonment of Work.
Neither DEVELOPER nor any of DEVELOPER's agents or contractors are or shall be
considered to be agents of CITY in connection with the performance of DEVELOPER's obligations
under this Agreement.
If DEVELOPER refuses or fails to obtain prosecution of the work, or any severable part
thereof, with such diligence as wili Insure Its compietion within the time specified, or any extension
thereof, or fails to obtain completion of said work within such time, or if DEVELOPER should be
adjudged as bankrupt, or should make a general assignment for the benefit of DEVELOPER's
creditors, or if a receiver should be appointed, or if DEVELOPER, or any of DEVELOPER's
contractors, subcontractors, agents or employees should violate any of the provisions of this
Agreement, the CITY through Its City Engineer may serve written notice on DEVELOPER and
DEVELOPER's surety or holder of other security of breach of this Agreement, or of any portion,
thereof, and default of DEVELOPER.
In the event of any such notice of breach of this Agreement, DEVELOPER's surety shall have
the duty to take over and complete The Improvements herein specified; provided, however, that if the
surety, within thirty (30) days after the serving upon it of such notice of breach, does not give CITY
written notice of its intention to take over the performance of the contract, and does not commence
performance thereof within thirty (30) days after notice to CITY of such election, CITY may take over
the work and prosecute the same to completion, by contract or by any other method CITY may deem
advisable, for the account and at the expense of DEVELOPER and DEVELOPER's surety shall be
liable to CITY for any damages and/or reasonable and documented excess costs occasioned by CITY
thereby; and, in such event, CITY, without liability for so doing, may take possession of, and utilize in
completing the work, such materials, appliances, plant and other property belonging to DEVELOPER
as may be on the site of the work and necessary therefor.
5
All notices herein required shall be in writing, and delivered In person or sent by registered
mail, postage prepaid.
Notices required to be given to CITY shall be addressed as follows:
Mark Lander, City Engineer
City of Dublin
100 Civic Plaza
Dublin, CA 94568
Notices required to be given to DEVELOPER shall be addressed as follows:
Nathan Hong, Vice President
AvalonBay Communities, Inc.
400 Race Street, Suite 200
San Jose, CA 95126
and
Pat Cashman
Surplus Property Authority of the County of Alameda
224 W. Winton Avenue, Room 110
Hayward, CA 94544-1215
Notices required to be given surety of DEVELOPER shall be addressed as follows:
Arch Insurance Company
Mark W. Edwards II
135 N. Los Robles Avenue
Pasadena, CA 91101
Any party or the surety may change such address by notice in writing to the other party and
thereafter notices shall be addressed and transmitted to the new address.
9. Use of Streets or Improvements.
At all times prior to the final acceptance of the work by CITY, the use of any or all streets and
improvements within the work to be performed under this Agreement shall be at the sole and
exclusive risk of DEVELOPER. The Issuance of any building or occupancy permit by CITY for
dwellings located within the tract shall not be construed in any manner to constitute a partial or final
acceptance or approval of any or all such improvements by CITY. DEVELOPER agrees that CITY's
Building Official may withhold the Issuance of building or occupancy permits when the work or its
progress may substantially and/or detrimentally affect public health and safety.
10. Safetv Devices.
DEVELOPER shall provide and maintain such guards, watchmen, fences, barriers, regulatory
signs, warning lights, and other safety devices adjacent to and on the tract site as may be necessary
to prevent accidents to the public and damage to the property. DEVELOPER shall furnish, place, and
maintain such lights as may be necessary for illuminating the said fences, barriers, signs, and other
safety devices. At the end of all work to be performed under this Agreement, all fences, barriers,
regulatory signs, warning lights, and other safety devices (except such safety items as may be shown
6
on the plans and included in the items of work) shall be removed from site of the work by the
DEVELOPER, and the entire site left clean and orderly.
11. Acceptance of Work.
Upon notice of the completion of all tract work and the delivery of a set of final as-buiit plans to
CITY by DEVELOPER, CITY, through its City Engineer or his designated representative, shall
examine the tract work without delay, and, if found to be in accordance with said plans and
specifications and this Agreement, shall recommend acceptance of the work to the City Council and,
upon such acceptance, shall notify DEVELOPER or his designated agents of such acceptance.
12. Patent and Copvriaht Costs.
'In the event that said plans and specifications require the use of any material, process or
publication which is subject to a duly registered patent or copyright, DEVELOPER shall be liable for,
and shall indemnify CITY from any fees, costs or litigation expenses, including attorneys' fees and
court costs. which may result from the use of said patented or copyrighted material, process or
publication.
13. Alterations in Plans and Specifications.
Any alteration or alterations made in the plans and specifications which are a part of this
Agreement or any provision of this Agreement shall not operate to release any surety or sureties from
liability on any bond or bonds attached hereto and made a part hereof, and consent to make such
alterations is hereby given, and the sureties to said bonds hereby waive the provisions of Section
2819 of the Civil Code of the State of California.
14. Liability,
A. DEVELOPER Primarilv Liable. DEVELOPER hereby warrants that the design and
construction of The Improvements will not adversely affect any portion of adjacent properties
and that all work will be performed in a proper manner. DEVELOPER agrees to indemnify,
defend, release, a[1d save harmless CITY, and each of its elective and appointive boards,
commissions, officers agents and employees, from and against any and all loss, claims, suits,
liabilities, actions, damages, or causes of action of every kind, nature and description, directly
or indirectly arising from an act or omission of DEVELOPER, its employees, agents, or
independent contractors in connection with DEVELOPER'S actions and obligations hereunder;
provided as follows:
1) That CITY does not, and shall not, waive any rights against DEVELOPER
which it may have by reason of the aforesaid hold harmless agreement, because of the
acceptance by CITY, or the deposit with CITY by DEVELOPER, of any of the
insurance policies described in Paragraph 4 hereof.
2) That the aforesaid hold harmless agreement by DEVELOPER shall apply to
all damages and claims for damages of every kind suffered, or alleged to have been
suffered, by reason of any of the aforesaid operations referred to in this paragraph,
regardless of whether or not CITY has prepared, supplied. or approved of plans and/or
specifications for the subdivision, or regardless of whether or not such insurance
policies shall have been determined to be applicable to any of such damages or claims
for damages.
7
3) Desian Defect. If, in the opinion of the CITY, a design defect in the work of
improvement becomes apparent during the course of construction, or within one (1)
year following acceptance by the CITY of the improvements, and said design defect, in
the opinion of the CITY, may substantially impair the public health and safety,
DEVELOPER shall, upon order by the CITY, correct said design defect at his sole cost
and expense, and the sureties under the Faithful Performance and Labor and Materials
Bonds shall be liable to the CITY for the corrective work required.
4) Litioation EXDenses. In the event that legal action is instituted by either
party to this Agreement, and said action seeks damages for breach of this Agreement
or seeks to specifically enforce the terms of this Agreement, and, in the event judgment
is entered in said action, the prevailing party shall be entitled to recover Its attorneys'
fees and court costs. If CITY is the prevailing party, CITY shall also be entitled to
recover its attorney's fees and costs in any action against DEVELOPER's surety on the
bonds provided under paragraph 3.
15. Recitals.
The foregoing Recitals are true and correct and are made a part hereof.
IN WITNESS WHEREOF, the parties hereto have executed this Agreement in duplicate at
Dublin, California, the day and year first above written.
By:
Janet Lockhart, Mayor
By:
3/[7(0)
CITY OF DUBLIN:
AVALON BAY C
Date:
Date:
A TIEST:
By:
Kay Keck, City Clerk
SURPLUS PROPERTY AUTHORITY OF ALAMENDA
COUNTY ~
/'Í~/. ~.
By: ,~f/¿.d-.ç ft¿l...{ Af. )
Date: "7 / I ~/ 0,;-::;---
I .
Date:
G:\DEVELOP\Dublin Transit CtrlParcel Map 7892\improvement agmt PM 7892.doc
8
~Bk.f
~ftß'¡SM~~
540 PRICE AVENUE
REDWOOD CITY, CA
PH. 650. 482-f1300
Flilx ese¡, 4,a,2·63QQ
3/1 0105
Job No. 940168-20
ESTIMA TE FOR BONDING PURPOSES
OPINION OF PROBABL.E CONSTRUCTION COSTS FOR
OFF-SITE IMPROVEMENTS ASSOCIA TED WITH PARCEL MAP 7892
SUMMARY
DEMARCUS BOULEVARD $ 553,500
IRON HORSE: PARKWAY $ :374,600
MARTINELLI WAY $ 619,400
CAMPUS DRIV¡;; $ 202,'700
AL TIMIRANO AVENUE $ 307,000
TOTAL $ 2.067.200
General Notos'
Thl~ bond estimate Ie based upon Ihe plans titled W'Street Improvem8Mt F1lans 'Assoc.JattM:! w! Parcel Map 7892
for PortIons of DeMarcus Boulevard, Iton HOf&ð parkway, Martinelli Way, Campus Drive &. A1tamirçlnO Avef1ue",
preparoo till BKF= Engine-81'S, Dated January 31,2005, that have not be~n completely reviewed by the
City of Dublin and that actus! quantltiB¡;I CGvld very from shown In thie estimate. BKF 5nglneers makes no warranty,
either exprs¡;.Qed or implied, th~t ectusl costs will not very from amounts Indlca.ted, and assumes no liability
for BUch variances..
K:\MA.IN\1e94\9415S.20\ CO$t 5$"~¡¡ntitilll$\
A E:nglnesl"ß E!!.!ity¡sle.s. QUil.nilllt!t$\!¡¡liglli." 1;0$1 5$1 (PM 7199:2) 3~10·05.xls
ÞagG; 1 01 13
Dl'Bkf
baItit!tØi~.I"~
540 PRIÇEAVENUE
REDWOOD CITY, CA
PH. e~o. 482-6300
Fa¡ç: eso, 482-B39Q
3/1 or05
Job No. 940158-2()
ESTIMA TE FOR BONDING PURPOSES
OPINION OF PROBABLE CONSTRUCTION COSTS FOR
OFF-SITE IMPROVEMENTS ASSOCIA TED wrrH PARCEL MAP 7892
DEMARCUS BOULEVARD
SUMMARY
A. GRADING & PAVING
B. CONcREtE WORK
C. D~MOLITION WORK
D. STORM DRAIN
~< SIGNING AND STRIPING
F. EROSION CONTROL
G. MISCELlAN EOUS
10% CONSTRUCTION CONTINGENCY
$ 111,900
$ 23.400
$ 71,800
$ 44.700
$ 13,400
$ 5.000
$ 233.200
SUBTOTAl $ 503,200
$ 60,300
TOTAl. $ 553,50D
General Notes"
'fhis Opinion of Probable Construction Cast, is.I;!.n el;lÐmlilte for bonding purposes, 01 the anUclpled work rec¡ult9d 10
Cönslrud the DeMarcus Boulevard improvemen~, for acceptance by the City of Dublin. complied basod upon the
Street Improvement Ph;lnl;l ASBocißtad wI Parcel MElp 7aS2 for F'ortlons 01 DeMarcus aQUléV.al'd. Iron HOrse Parkway,
Martinelli Way, C¡¡:¡mpus Drive & AI4¡mirl;!no Avenue, prepared by SKF Englnee:rs, Date:cl 01-31-05.
13KF Englneera m¡;¡kes no WBrI1¡:mty. either expre~eed or Implied, that actual costs will not varY (rom amounts indicated,
and BSSUme¡¡¡ no liability for l;Iuch v¡;¡r]enœ!¡,
2 ACS;:;Alamede County Standard Dßtalls, COD~Clty of Dublin Standard Detail, Caf=CAL TRANS Standard Detli!lI
3 DSR.SD~Oublin San ~amon Sal'viCé6 District S~ndard Details,
4 Information regarding exil;l.tin¡;¡ CQ"dition!iJ were take" from record data, aerial topography and lÎêld surveys.
5 E.arthwork ~Iculatlons do not inc¡LJd~ faclots for Shrinkage and swelling, Please refer to geotechnical report
6 The Opininon of Probable Conetructlon Coat does not Include joint trench aM traffic control costs.
7 No PSRSD costs are ,Iriclude.cl for Water, Sewer and R.e¡:;laimad Water.
(;'MAIN\200S\OÖ25-10\09 Cost Ëat-Qusnlltlas\
A 5nl3iri0ø~ Eslimales - OuantltlBs\!:.nglneSl' Cost Ës[ (PM 7892) 3_10..o6.xl$
P~ge .2 of 13
~BkF 540 PRICE AVENUE
REDWOOD CITY, CA
PH. 650. 45.·6300
~';~OK:"~ Fa:w: 650. 48:2~6389
3/10105
JDb No. 940158-20
ESTlMA TE FOR BONDING PURPOSES
OPINION OF PROBABLE CONSTRUCTION COSTS FOR .
OFF-SITE IMPROVEMENTS ASSOCIA TED WITH PARCEL MAP 7882
DEMARCUS BOULEVARD
ITEMS DESCRIP1 ¡UN QUAN III Y UNJJ UNIT PRICE AMOUNT
A. GRADING & PAVING
1 3" AC GrInd & Removal MOO SF $1 $ 8,000
2 3" AC Overlay 1S0 TON $70 $ 10,500
3 Sawcut AC 1,010 LF $1.75 $ 1,873
4 Subgrade Þl'éþsration 19,600 SF 10.50 $ 9,750
5 ÞaYémant SectlDn 5.5" AC 850 TON $10 $ 46,500
6 Pavement Section 20,S" AB 2,420 TON $16 $ 36,300
SUBTOTAL $ 111,923
a. CONCRETE WORK
1 ß" Curb and Gutter (COD: SD~300) 875 LF $12 $ B,10D
2 6.5" Vertical Curb (COD: ÇD-300) 900 LF 114 I 12,600
3 Whtlalchair Ramp wI 12" CLUI AB 450 5F $6 $ 2,700
SUBTOTAL $ 23,400
G. D~MOLITlON WORK
1 Remove Existing Curb and Gutter 700 LF $3 $ 2,100
2 Remove: ExÎsting Median Curb 1,250 LF $3 $ 3.7~O
3 Ri!l:move AC/AB 27,700 SF $1.50 $ 41,550
4 Remove Sidewalk 5,570 SF $1.25 $ 6,oe3
6 Rl!tmovB Median Landscaping and Dlsposa Over Area 340 CY 125 $ 8,500
6 Ramove ~!1d SElIVßge Street L.lghts to CIty Corporation Yard 5 EA $760 $ 3/750
7 Relocate BART
8 Miscellaneous Demolition LS $5,000 $ 5,000
SUBTOTAL $ 71,S13
D. STORM DRAIN
1 12~ RCP Storm pr¡;¡ln 60 LF $37 $ 2,220
2 1B~ RCP Storm Drain 380 LF $61 $ 23,180
3 Storm DraIn Manholo iype "A" (8D-405) 1 EA $2.300 $ 2,300
4 Storm Drain Manhole: Type "8" (8D-408) 2 EA $2,300 $ 4,600
5 SDCB Type ~A" Curb Inlat (CD-400) 3 EA $1,800 $ 5,400
6 Storm Drain Stub and Plug 2 EA 100 $ 180
7 Median Subdreln 630 LF 110 $ 6,300
8 Connect MedIan 5uDdraln 10 Storm brain Syetam (4"50 connection) 2 EA $250 $ 500
SUBTOTAL $ 44,680
E. SIGNING AND STRIPING
1 Striping 350 LF $2 $ 700
2 Pavement Marking 4,100 SF $1 $ 4,100
3 Removo Striping 1 LS $2,000 $ 2,000
4 Signing 4 EA $210 $ e40
5 Parallel Parking PealgnatlQn 25 EA $20 $ 500
6 Chevron MarkIngs (a" White Stripe) 1 LS $800 $ 800
7 12" WhItE! Crosswalk Striping 480 LF $4 $ 1,920
6 ÄrI1JWS and Words 10 EA $250 $ 2,500
sueTOTAL $ 13,3eO
K;\MAIN\2003\O025-10109 C09t E9t..Quant\1I8$\
A Ei:ngine9n:1 Estimates - QuantltJes\E:nglneer CO¡$I E!!t (PM 7892) 3-10...o(5,xl$
Page 3 of 13
~BkF
~;~I5-t~
540 PRICE AVENUE;
R.EPWOOD CITY, CA
PH. 650. 462-6300
Fax Ei5O. 4B2·e~99
3110105
Job No. 940158-20
ESTIMA TE FOR BONDING PURPOSES
OPINION OF PROBABLE CONSTRUCTION COSTS FOR
OFF-SITE IMPROVEMENTS ASSOCIA TED WITH PARCEL MAP 7892
DEMARCUS BOULEVARD
J11=MS DESCRIPTION QUANTiTY UNIT UNIT PRICE AMOUNT
F. EROSION CONTROL
1 Maintain Ero&IOn Control Fa!:ilitisb 1 LS $3,000 $ 3,000
2 Catch Basin Ssdi'"!ll;lnt Barriers {per Datail E11EC-~) 4 EA $2.0 $ 960
3 Stabilized Conijtructlon ¡:¡:ntrances 1 EA $350 $ 350
. F!ber Roll 490 LF $1.S0 $ 73S
SUBTOTAL $ 5,046
G. MISCELLANEOUS
1 Medlalll".Ii!ndsc.aping w/lrriljstlon 5100 SF $'2 $ 61,200
2 Frontage L.lgh1lng (E.al!it Side 01 ~adway) a EA $3.500 $ 28,000
$ Frontage Lighting (Wast Side of Roadway) 5 EA $3.500 $ 17,500
4 8~ PVc ItrigBtion Sleevl;t 60 LF $2S $ 1.500
6 Tl'Bffic Signa! Modlflcetiona (DeMarcus Blvd. and Dublin Blvd.) 1 LS $1215.000 $ 125,000
SUBTOTAL $ 23J,200
K:\MAIN\2003\0025010\09 Cost E6t-Quantiti98\
A Engine.Bf$ ¡¡;'~imôl\t:5 . QUOIIntlties\En¡¡lneer CDst t:sl (pM 7892) 3-10-05.)(18
Pl;!ga 4 of 13
~Bkf
ÐøøIIHi~I~:$fiItfIoMW
ESTlMA TE FOR BONDING PURPOSES
OPINION OF PROBABI..E CONSTRUCTION COSTS FOR
OFF-SITE IMPROVEMENTS ASSOC/A TED WITH PARCEl.. M11P 7892
IRON HORSE PARKWAY
SUMMARY
A. GRADING & PAVING
B. CONCRETE woRK
C. DEMOLITION WORK
D. STORM DRAIN
E. SIGNING AND STRipiNG
F. EROSION CONTROL
G. MISCELLANEOUS
540 PRJCE AvENUE
REDwOOD CITY. CA
pH. 650. 482-e300
FAX 660. 482u6399
S/10106
Job No. 940166-.20
$ 115,700
$ 9,700
$ 58,200
$ 19,100
$ 1MOO
$ 5,000
$ 117,500
SUBTOTAL $ 34o,öOO
$ 34,100
TOTAL $ 374.600
10% CON6mUCTION CONTINGENCY
General Nötü'
This Opinion of Probable Construction Cost. Is an ebtimate fOr bonding purposes, of the antlc!p1ed work requrred to
CQI15truct the Iron Horse Parkway ImprovemBnts..1or acceþtance by thl;! City of Dublin, complied based upon '\he
Street Improvement Plans Assoclat&d wI Parcel Map 7892 fur Pl;lrtion¡¡¡ of DeMarcus Boulevard, Iron Horse Parkway,
Martinelli W~y, Campus Drive & Altamlrario Avenue, prepared by BKF Engineer!i, D;aled 01-31-05.
BKF 5nglneers makes no warranty, either expressed or implied, that :actual costs will not vary from amount& Indicated.
¡¡md asaumes no lIabiJlty for such variances.
2 ACS=Allilmeda County Standard Details. COD=Ci1y of Dublin Standal'd Detail, Csl=CAL TRANS Standard Detail
3 DSRSD-Dublln San Ramon Sðl"lllceS Di~lri¡:;t Standard Details.
4 Informl;lticn reg;;¡rding exlstln!jJ conditions were taken from r'éCötd datI;:!, serial topography and field SUl"Veys.
5 Earthwork calculations do not include fattars for shrinkl;lQe end swelling, Please refer to geotechnIcal report
e The Oplninon of' Probable Construction Cost dces not Include Joint trench and traffic: Control casts,
7 No DSRSD cO$ts. :are Included for Wate-r. Sewer and Reclaimed Wa1ar,
K:\MAIN\2003\O025-10\a9 Oos! E!3;t-Qusntltl&!t'1
Po. Engir"1o~~ Estimates - Quantltll!ls\Englneer Cog.! Eat (PM 789::i!) 3·1 O.O!.xlli
page 6 of 13
~Bkf 540 PRice AVENUE;
RI;:DWOOD CITY, CA
PH. 85Q, 48,2.-6300
~;~;I'~ Fox aðO. 4S2-eaes
S/10/0ð
Job No. S401~S·20
EST/MA TE FOR BONDING PURPOSES
OPINION OF PROBABLE CONSTRUCT/ON COSTS FOR
OFF-SITE IMPROVEMENTS ASSOCIA TED WITH PARCEL MAP 7892
IRON HORSE PARKWA Y
Ill:::M~ VJ:;:$r.:~lPTION QUANTITY UNIT UNfT PRICE AMuuNT'
A. GRADING & PAVING
1 3~ AC GrÎnd &. Overlay 1B,85O SF $1 $ 18,850
2 3~ AC Overlay S50 TON $70 $ 24,500
3 Sawcut AC 1,120 LF $1.76 $ 1,960
4 Subgrade Preperation 15,000 SF $0.50 $ 7,500
4 Pavement SectjQn $.$" AC 50'a TON $70 $ 35,000
5 Pavl;3mant Section 20.5" AB 1,saO TON $16 $ 27.900
SUBTOTAl.. $ 115,710
e. CONCRETE WORK
1 a" Curti and Gutter (GOD: SO-300) 6aO ,F $12 $ 6,160
2 WheelchaIr Ramp wI 12- CLIU AS 250 SF $6 $ 1,500
SUBTOTAL $ 9,860
C. DEMOLITION WORK
1 Remove Existing Curb and Gutter 700 ,F $3 $ 2,100
2 Remove ~X)l;itlnQ Median Curb 1,2S0 LF $3 $ 3,840
3 RemovB AClAB 15,000 SF $1.50 $ 22,500
4 Remove Sidewalk 5,S20 SF $1.25 $ 7,025
S Remove Median l"andscaplng and Dispose Over Area S20 CY $25 $ 15,500
6 Remove ~nd S.e~ge Street 1.!ghts to City COtþol'Btlan Yard S ëA $750 $ 2,250
7 MIEicell.;!.neous, DemDlition 1 LS $6,000 $ 5,000
SUBTOTAL $ 58,215
C. STORM DRAIN
1 12Ø RCP Storm Crain 30 LF $37 $ 1,110
2 1a.~ RCP Slorm Drain 130 LF $61 $ 7,930
3 SDCe Type "A" Curb Inl.t (CD-4<>O) 3 ëA $1,800 $ 5,400
4 Storm Drain Stub and Plug 2 ëA $90 $ 180
6 Connect to ~xlßtjn!;l aON SD 2 ëA $1,500 $ 3,000
6 Connect to ExistIng Sx$ RCa SD 1 ëA Sì1,500 $ 1,500
SUBTOTAL $ 19,120
"- $IGNING AND STRIPING
1 Striping 1,250 LF $2 $ 2,600
2 Pavement Markin!;! 4,950 SF $1 $ 4,950
3 Remove Striping 1 LS $2,000 $ 2,000
4 Signing 8 EA $210 $ 630
5 F'arallèl Parking OBsignation 31 EA SZO $ 620
6 Chevron Markings (8Ø White Stripe) 1 LS $SSO $ 6S0
7 121. White Striping 400 LF $4 $ 1.600
6 Arrowa:Elnd Words 10 EA $260 S 2,500
SUBTOTAL $ 15,330
K;\MAIN\2003\o025-10\o9 Cost E!lt.Qu3t'1Utie!;t\
A Eil1ginllJiII['!. Estimates - Ouantltl8!;t\Englnear Cost Ee,t (PM 7Sg2) a.10-05,¡l.15
p¡;¡geaot 1$
Bi'BkF
$40 PRice AveNUE
REDWOOD CITY, CA
PH. Ei50. 482-f!300
F¡¡:¡x 850. 482-ß3Q9
aH:Ilt_"~w~
3110105
Job No. 940158-20
ESTlMA TE FOR BONDING PURPOSES
OPINION OF PROBABLE CONSTRUCTION COSTS FOR
OFF-SrrE IMPROVEMENTS ASSOCIA TED WITH PARCEL MAP 7892
IRON HORSE PARKWA Y
II&MS DESCRIPTION QUANTiTY UNIT UNIT PRICt:; A,MUUNI
F. eROSION CONTROL (BUDGeT)
1 Ma¡n~11l ErQslon Control Facllll~s 1 LS $3,000 $ 3.000
2 Catch BI;I¡¡,in Sediment Barrl~rs (Par Detail E;1/EC-5) 3 eA 1240 $ 720
3 Stabilized Construction Enttence5 1 eA $3$0 $ 350
4 Fiber Roll 600 LF $1.50 $ 900
SUBTO;AL $ 4,970
G. MiSCeLLANEOus
1 F'rcntEga lighting (West Side of R.oad) (Allowance) 10 EA $3,5QO.00 $ 35,000
2 Frontage l.lghtlng (East Side of ~aad) (Al1owence) 3 EA $MOO.OO $ 10,500
3 Street Mounrnent InstallaUon , EA $1,000.00 $ 2,000
4 Treffjc Signal ModIficatIons (I run HDrlile Pkwy. and Cublln Blvd.) 1 LS $70,000 $ 70,000
SUBTOTAL $ 117,500
K:\MAIN\2003\O02~-10\/J9 Cost Ë8t-Ouantltll!l!!i\
A EnglnHI'5 5s:timiltes - auantltle8\~ng!neer Cosl E$t (pM lE1S2) 3-10-05.xI9
Þage 7 01 13
·-Bkf
=.~ ...... ....
~1II!B.i~~Pl:~
540 PRIC!::. AVENUE
REDWOOD CITY, CA
PH. e50. 4e2-eSOO
Fax eeo. 4e2·6399
3/10/0.5
Job No, 940158-20
SSTIMA TE FOR BONPlNG PURPOSES
OPINION OF PROBA8LE ÇONSTRUÇTION ÇOSTS FOR
OFF-SITE IMPROVEMENTS ASSOClA TED WITH PARÇEL MAP 7892
MARTINELLI WA Y
SUMMARY
A. GRADING & PAVING
10% CONSTRUCTION CONTINGENCY
$ 215,300
$ 26,600
S 101.700
S 10,700
$ 10,300
S 198.500
SUSTOT AL S 563,100
I 5MOO
tOTAL S 619,40D
a. CONCRETE: WORK
C, STORM DRAIN
D. SIGNING AND STRIPING
E. EROSION CONTROL
F. MISCELLANEOUS
General Notes:
This Opinion of F'robablo Construction Cost, Is an estimate fot bonding purþoses, ofthB anticlpted work required to
construct the Martinelli Way l.rnprov9IT1an1:S, 10r a~eptanœ by the City of Dublin. cQmpiled oaead upon the
"S'lreet Improvement PlanE! AssaciBted wf Pç¡rçel Map 7a92 fOT Portions of DeMarcus Boulevard, Iron Horse F'arkway,
Martinelli Way, CampuB Drive & AltamIranO' Avenue, prepsred by BKF Engineers, Dated 01-31...05.
aKF' ~nglneere.lilakes no warranty, eIther e){prel;u~ed or implied, that Bctual costs will 001 vary from amounts indltated,
and abbUme! 110 liability fc;Jr I;Il,Jch vl;lrla.f1ces.
2 ACS=Alamede CQunty Stsndard Details, CODIIClty of Dublin Standa.rd De.tall, CaÞ:::CAL TRANS Standard Datail
.3 DSRSD~DubUn San Ramon Sel'viCéÞ Distrk;t Standard Det¡;¡ils.
4 Information regarding existing conditlonlil were tGIken from record data, aerial topography and field ~Urvays.
5 Earthwork calculations do not inch.Jde factors. for shrinkage and swelling. Please reter to g!:ot.echnital repotl
e The Oplnlnon of Probabl& Construction Co~1 does not include joint trench and traffic control costs.
7 No DSRSo cosh; ara ¡nauded for Water, SElWElr and Reclaimed Water.
K;\MAIN\.2003\OO2s'-10\o9 Cost Eat-Quantltlea\
A 5r'1girillllf/:r5 Eatlmat~ - Cluantltlaa\E:nglnaer Ooat I:.st (PM 7B92) :Mo.Ofi.:t~
Pige 13 of 13
~Bk.f 540 PRICE AVENUE
REDWOOD CITY. CA
PH. 650. 482-630D
~1t8B£.stM~,¡~ Fex 650. 4B2-6399
3110105
Job No. Q4015ß,2D
ESTlMA TE FOR BONDING PURPOSES
OPINION OF PROBABLE CONSTRUCTION COSTS FOR
OFF-SITE IMPROVEMENTS ASSOCIA TED WITH PARCEL MAP 7892
MARTINELLI WAY
rrEM~ f.)é~(';HJ""JUN QUAN7n y UNfl LlNfT PRICE: AMCJVNf
A. GRADING & PAVING
1 Clearing, Grubbing & Disposal 8~,3[)O SF $O,H5 $ 12,795
2 Road Grading Cut and Fill 320 çy $5 $ 1,600
3 Subgrade- Prepar.;¡tion (Sœrify & Recomp:;lct tQP 1;n 69,600 SF $0.40 $ 27,9'0
4 Roadway Import (assumes onslte materIal placed) 510 CY $10 $ 6,100
5 Pavement Sl!Ictíon 611 AC 1,700 TON $70 $ 119,000
. P¡:lVement Section 9.5" AB 2,700 TON $15 $ 40,ðOO
7 4' Rock Shoulder 10,800 SF $0.50 $ 5,400
SUBTOTAL $ 215,315
B. cONCReïE WORK
a,!5" Vertical CurD (COD; CD·300) 1,900 LF $14 $ 26,600
SUBTOTAL $ 26,600
C. STORM DRAIN
1 18" RCP Stcrm Drain 710 LF $61 $ 43,310
2 24" RCP StQrm Drain 205 LF $75 $ 15,375
3 3a" RCP Storm Drain 120 LF $90 $ 10,800
4 Storm Drain ManholE!! Typ8 !IN (SD-405) 1 EA $2,300 $ 2,300
5 3'x3' Field Inlet 4 EA $2.21' $ 8,880
6 :2'x:2' Field Inlet 2 EA $MOO $ 3,000
7 Storm Dr¡;¡in Stub enò Plug $ EA $90 $ 270
8 Medi¡;¡n Su~re¡n 1,750 LF $10 $ 17,500
9 Connect Median Subdrain to Storm Dr¡;¡ln SY!;I.tem (4"5D connection) 1 EA $'50 $ 250
S UBTOT Al. $ 101,665
D. SIGNING AND STRIPING
1 Striping 400 LF $' $ BOO
, p¡;¡Vement M~rking 5,800 SF $1 $ B,BOO
3 Signing 2 EA $210 $ 420
4 12Ø White Striping 40 LF $4 $ 160
5 Arr'QW$ and WOrds 10 EA $250 $ 2,500
·SU6TOTAL $ 10,660
~. ~ROSION CONTROL (BUDGET)
1 Maintain Erosion Cantrell i="aoilitie6 I LS $5,000 $ 5,000
2 C¡;¡tc;:h Baain S.eÒiment Barriers (P~r Det.!:¡1I E1/EC"5) 6 EA $240 $ 1,440
3 Stabilized Construction Entrances 2 EA $350 $ 700
4 Fiber Roll 2,100 LF $1.60 $ 3,150
SU6TOTAL $ 10,290
F. MISCELLANEOUS
1 Medlen l.:andscaping w/lrrlljJatlon 11,500 SF $12 $ 136,000
, Stré9l LIghting 6 EA $7.000 $ 42,000
3 Street Mounmant Installation 5 EA $1,000.00 $ 5,000
4 8" PVC Irriijaticn Sleeve 140 LF $25 $ 3,500
5 Future Traffic Signal Conduits and Pullboxes (Martinelli & Campus) 1 LS $5,000 $ 6,000
5 ::uture. Traffic SIgnal Conduits eM i='ullbDxe6 (Martinelli & Iron Horse) 1 i.S $5.000 $ 5,000
SUBTOTAl. $ 198,500
K:\MA1N\20D3\0025_10\oe cQ$t 5$!.QJ,J;!InIt1E1~\
A ËI1glnEtElI'8 EBtlmstð$. Quant~ðB\EnglneElr C;:O$t E~t (PM 7B92) 3.10.05.xls
Pagè90f 13
~Bkf
bGwlllllH¡:~I~.Ai
540 PRIC~ AVENUE
REQWOOD CITY. GA
PH. BOO, 482-B300
F.ax eso. 4S,2·63Q9
3/10105
Job No. 9401158-20
ESTlMA TE FOR BONDING PURPOSES
OPINION OF PROBABLE CONSTRUCTION COSTS FOR
OFF-SITE IMPROVEMENTS ASSOCIA TED wrrH PARCEL MAP 7892
CAMPUS DRIve
SUMMARY
A. GRADING & PAVING
10% CONSTRUCTION CONTINGENCY
$ 81.000
$ B,200
$ 66,300
$ 1,200
$ e.eoo
$ 1,000
SUBTOTAL $ 164,300
$ 18,400
TOTAl.. $ 202,700
e. CONCRE1E WO~I<
C. STORM DRAIN
D. SIGNING AND STRIPING
~. ~ROSION CONTROL
F. MISCELLANEOUS
General Note!!"
This Opinion of Pl'Obabh!!l CDnstruction Cost, Ie. ~11 e¡;¡(imate for bonding purposes, of the ant!olptèd work rè[¡uir'èd to
consttuct the Campus DrivEl improvement!i, for ¡¡¡cceptance by the City of Dublin, compiléd based upon the
"Street Imprcvemen,t Plane Ae.l;I.ocla.ted wI Parcel Map 7892 for F'ortlons or DeMal'Cus BOL:llavard, Iron Horel;! P.i;:\rkw,¡:¡y,
Martinelli Way, C!ilmpl.JjI Drive & Altamirano Avenue, þl'9parød by SKF Engineers. Dateò 01-31-05,
BKF EngIneers makes no warranty, l!ilthar BXþréEi5ed or implied, thet actual costs will not vary from amounts IndIcated,
ani;! :¡:I.66UmeS no liability for such variance:!;.
Z ACS-AlamiMIa County Standard Details, COD=City ÇlfDublill Standard Detail, Ca¡¡¡CAL. TRANS Standard Detail
:3 DSRSD~Dublîn San Ratnen ServiceEi District St.l;!ndard Detills.
4 Information regerdln!¡l exl~lnliJ conditIons were taken from n!lcord data. aerial topogœphy and field !;Iurveys.
5 E.arthwork calculations do not Indude fadöts. for Eihrinkage Bnd swelling. Plel;lse refer to geotechnical Tepon,
6 TM Oplninon of Pr!?ba,ble Conliltructian Coa.t does not Include Joint trench and traffic control costs.
7 No DSRSD costs are Included for Wetér. Sewer and Reclaimed Wa~er,'
K:\MAIN\2003\DOZ$-10\09 Cost E:st-Quantltlea\
A 5ngln(J91'S EstlmElÌBs - QuantJtles\E.nglneer Cost 1::81 (PM 7892) :MO.D5.~I$
Page 10 of 13
~Bkf 540 PRICE AVENUE
REDWOOD CITY. CA
PH. 860.482"8300
~:¡,,~P.oo.IlM." Fox e60. 482·8303
3/10/06
Job No. 940158-20
EST/MA TE FOR BONDING PURPOSES
OPINION OF PROBABLE CONSTIWCT/ON COSTS FOR
OFF·SITE IMPROVEMENTS ASSOCIA TED WITH PARCEL MAP 7892
CAMPUS DRIVE
ITEMS DESCRIPTION QUANTITY UNIT UNIT PRICE AMOUNT
A. GRADING & PAVING
1 Clearihg, Grubbing & Disposal 46,600 SF $0.15 $ 6,840
2 Road Gradil1;J çl,lt al1Q Fill 20 CY $5 $ 100
3 Subgrade Preparation (Scarify & Reoompact top 1.2") 22,600 SF $0.40 $ 9,000
4 Roadway Imþört (assumes on.sita matAflal placed) 2,200 CY $10 $ 22,000
5 8" Aggregl;lte Rock; (Acce:s!;I Road) 8,650 SF $0.50 $ 4,325
6 Pavement .sectIon 5H AC 420 TON $70 $. 29,40D
7 ~av8'ment Section 7" AB 600 TON $16 $ 0,000
6 5' Rock Shoulder 760 SF $0.50 $ 376
SU6TOTAL $ 81,040
B. COt.lCiRETJ;: WORK
6" Curb ond Gun.r (COD: SD-300) 62<) LF $12 $ e..~4Q
SUBTOTAL $ 6.240
C, STORM DRAIN
1 18P RCP Storm Drain 160 LF $61 $ 9,760
2 36" RGP Storm Drain 760 LF $90 $ 68,400
3 Storm Drain M:¡mhola Type "N (8D-405) 1 EA $2.300 $ 2,3{]O
4 SDCB Type "A" Curb Inlet (CD-400) 3 EA $1,800 $ 5,400
5 3'x3' Field Inlet 1 EA $2.215 $ 2,215
a Storm Dr¡:¡in Stub and Plug , EA $90 $ 180
SUBTOTAL $ 88,255
D. SIGNING AND STRIPING
1 Striping 210 LF $2 $ 42<)
2 Signing 1 EA $210 $ 210
3 12w Wnite Striping 20 LF $4 $ 50
4 Arrows and Words 2 EA $250 $ 500
SUBTOTAL $ 1,210
E. EROSION CONTROL (BUDGET)
1 Maintain Ercaion Control Fal;:j!itis8 1 LS $3.000 $ 3,000
2 Catch Basin Sediment Barr!ers (Per Detail E1/Ec-3) 4 EA $240 $ 960
3 Stabilized Construction Entra.nces 1 EA $360 $ 360
. Fiberf1:ol1 1,500 LF $1.60 $ 2,260
SUBTOTAL $ 6,560
F. MISCELLANEOUS
Street Mounment Installation EA 11,000.00 $ 1,000
SUBTOTAL $ 1.000
K:\MAIN\2003\0025.1 0\09 Cost E!!iM::¡U8ntllle!l\
A Engineers EBtlmatea - QuantltJas\Ënglnaar Coat Est (PM 7892) 3-1Q-05.xIB
Þage11 of 13
Bl'BkF
540 PRICE AVENUE
REDWOOD CITY. CA
PH. 650. 462-e300
F=Qx 650. 482-e3g(jl
ÐrafØUirSciwnaa.,'~~
8/10106
Job No, Q4015B-20
ESTlMA TE FOR BONDING PURPOSES
OPINION OF PROBABLE CONSTRUCTION COSTS FOR
OFF-SrrE IMPROVEMENTS ASSOCIA TED WITH ¡>ARCEL MAP 189l
ALTIMIRANO A VENUE
SUMMARY
A. GRADING & PAVING
a. CONCRETE WoRK
c. DEMOliTION WORK
D. STORM DRAIN
E. SIGNING ANO STRIPING
F. EROSION CONTROl
G. MISCEllAN EOUS
10v¡;. CONSTRUCTION CONl1NGENCY
$ 97.200
$ 40,600
I 41.aOO
$ 77,100
$ 1,QOO
$ 6,400
$ 14,000
SuBTOTAL $ 279.100
$ 27.000
TOTAl $ $07.000
General Note!l'
¡hili OpinIon of Probable Construction Cost, is ßn estimate far bonding purposes, ofthsli!nticipted work required to
construct the Altlmlr¡;¡no Avenue improvements, for acceptance by the City of Dublin, complied balied upen the
~Street Improvement Plen!;! Aalilocl~ted wI Parcel Msp raS2 for POrtIOn5õ of DeMarcus Boulevard, Iron Horse Parkway,
Martinelli Way, Campus Drive & Attam!rano Avenue, prepared by BKF Engineers, Dated 01-31·0~,
BKF Engin~r!;l make~ no warranty, either e)(pressad or Implied, that actual costs. will n01 VÐry from amounts IndIcated,
and S:1;I6UrTleS no liability for ljIuch ~r1~nce:s.
2: ACSII.Alameda County Standard Details, COD~City of ùublin Standard Detail, Cel=CAL TRANS Standal'd Detail
3 DSRSD=Dublin San Ramon SeNicas Diatrict Standard Detalla,
4 Information regarding exia.ting cond!tlof1s were takeo from record data, aerIal topography and field surveys.
5 Earthwork c;slculations do not indude fec:tor& for :shrinkage and swelling. Please refar to geotechnical rE;lport
ß The Oplnlnon of F'robable Construction Cost does not Include Joint trench and traffic control costs.
7 No IJS~SD tösts are încluclM for Water, Sawer and Reclaimed Water,
K:\MAIN\2003.\OQ2&10\09 Cost Est·Quiilntltig,5\
A Englneel'8 El!;tim".t~~· QUiiln1itilil:5\Engin.l9t Co~t 55t (PM 7892) 3-10-05.xI5
POa.ge 120f 1,J
!:~Bkf 640 PRIÇ~ AVENU~
R~OWOOD CITY. CA
PH. 660.462...300
~f~OII!I'~~1!I Fe,x 850. 482-6399
$/10fD5
JoO No. 940158·20
ESTIMA TE FOR BONDING PURPOSES
OPINION OF PROBABLE CONSTRUCTION COSTS FOR
OFF-SITE IMPROVEMENTS ASSOCIA TED WITH PARCEL MAP 7892
AL TIMIRANO A VENUE
11t:M~ Df;;;;SC;¡'W·'JION QUANTITY UNJf UN' I f-JRJÇi= AMOUNT
A. GRADING & pAVING
1 Clearing, Grubbing & D!spoeal 51,300 SF $0.16 $ 7,695
2 Road Grading Cut and Fill 200 CY $5 $ 1,000
3 $ubgrade Preparation (Sœtify & Rectlrripac.t top 1:2") 2$,000 SF $0.40 $ 9,200
4 Ro~dwßY EXPQrt (¡¡:¡ssums6 ansita matanal plaC:Bd) 1,600 CY $10 $ 16,000
S F'avemenl Sectipn 5.-5~ AC 660 TON $70 $ 46,200
6 F1a.vement Section a.5" AS 1,020 TON $16 $ 15,300
7 5' Rock Shoulder M30 SF $0.50 $ 1,765
SUBTOTAL $ 97\160
B. CONCRETo WORK
1 8.51. Vèrtlcal Curb (COD: CD·300) 820 LF $14 $ 11,400
2 8'Wide Sidewalk w/1~ CLlII AB 6,030 SF $5 I 29.160
SUBTOTAL $ 40,1330
C. DE.MOllTION wORK
1 Remove Exi¡;¡tl119 Curb 770 LF $3 $ 2,310
, Remove AC/AS 26,370 SF $1.60 I 39,555
SUBTOTAL $ 41;865
D. STORM DRAIN
1 IBM RCP Storm Oîain 240 LF $61 $ 14.640
2 sa- RCP Storm pr,ein 400 LF $90 $ 36,000
3 SO RCa Junctlol1 Box 1 EA $10,000 $ 10,000
4 6x4 RCEI '0 LF $400 $ 8,000
5 3')(3' FIeld Inlet 3 ~A $2.215 $ 8,645
. 2'X2' Field Inlet 1 EA $1,600 $ 1,500
7 Stoîm Drain SUJb and Plug 4 EA $90 $ 3GO
SU6TOTAL $ 77,145
E. SIGNING AND STRIPING
1 Striping 680 LF $2 $ 1,380
2 Signing 1 ~A $210 $ '10
3 12" White Striping 20 LF $4 $ 80
4 Arrows and Words 1 EA $250 $ 250
SU6TOTAL $ 1,900
F. EROSION CONTROL (BUDGET)
1 Maintain Erosion Control FaGilities 1 LS $3,000 $ 3,000
, Catch Sasln Sediment ß¡:¡rrier¡¡¡ (Per Detail E1/ËC-5) 4 EA $'40 $ 960
3 S'labll1zed ConstructIon En~rances 1 EA $360 $ 350
4 ~tbBr Roll 1,380 LF $1.50 I 2,070
SU6TOTAI. $ 6,380
G. MISGEH.LANEOUS
1 Street Lighting - Single Arm on ExIstIng Joint Pole 5 ~A $2,000 $ 10,000
2 Street Mounment Installation 4 ~A $1,000.00 I 4.000
SUBTOTAL $ 14,000
K:\MAIN\2002\0025·10\09 CO$I 5¡.~Ql,riJIntl!le$\
A ¡¡¡ngir'l"~ E:.$til1\ô!ltð:t.· Q¡.J;IInliiiilt$\~nglneer COst Est (PM 7892) 3-10-05..xla
F'8ge 1$ of 1;::