Loading...
HomeMy WebLinkAbout*Item I Heritage Center Fiscal Analysis CITY OF DUBLIN HERITAGE COMMITTEE AGENDA STATEMENT MEETING DATE: May 12, 1992 SUBJECT . Heritage Center Fiscal Analysis EXHIBITS ATTACHED : A. Estimate of Acquisition Costs B. Estimate of Renovation Costs - School C. Estimate of Renovation Costs - Church D. Estimate of Initial Clean-up Costs E. Annual Work Program & Budget - School F. Annual Work Program & Budget - Church G. Annual Work Program & Budget - Grounds RECOMMENDATION . Review and comment on preliminary cost estimates FINANCIAL STATEMENT : See discussion below DESCRIPTION At the April 27, 1992 meeting of the Dublin City Council, the Council received a report summarizing the fiscal impact to the City for acquiring, renovating and maintaining the Heritage Center properties. After some discussion, the Council directed Staff to work with the Heritage Committee to clarify the proposed budget figures and to prepare purchase agreements. ACOUISITION The City Attorney has determined that the following procedures should be followed if the City is to acquire the properties: Old St. Raymond's Church (purchase price - $10,700) 1. Obtain a preliminary title report on the property 2 . Determine if there are a) any current deed restrictions, and b) any proposed deed restrictions 3 . Obtain an appraisal of the property 4. Prepare a purchase agreement for the property Dublin Cemetery (purchase price - $0) 1. Obtain preliminary title reports on the property 2 . Determine if there are a) any current deed restrictions, and b) any proposed deed restrictions 3. Prepare a transfer agreement for the property Original Murray Schoolhouse (purchase price - $0) 1. Determine if there are any proposed deed restrictions 2. Prepare a transfer agreement for the building In addition, the City Attorney recommends that a soils report be obtained on the site. Attached in Exhibit A are the costs associated with the acquisition of the properties. RENOVATION The City's Building Department has inspected both the church and the school to determine the renovation necessary to address code compliance issues, as well as to determine those areas which require repair to prevent further deterioration of the buildings. ITEM NO. .Y COPIES TO: City Council The estimated cost to renovate the church is $88, 725; the estimated cost to renovate the school is $125,260. Thus the total estimated cost to restore the buildings so that they are fully accessible and in good repair is $213 ,985. The recommended scope of work for each building is attached in Exhibits B and C. The City's Public Works Department has inventoried the Heritage Center Grounds to determine the initial clean-up required to bring the grounds up to City standards. The recommended work program includes tree pruning and removal of dead trees, pruning and trimming of bedding plants and shrubs, manual weeding and chemical weed control, repairs to the gravel parking lot and lighting, and repair and replacement of fencing. If City crews were utilized to do the clean-up, the estimated one-time cost to the City is estimated at $43,455. A break down of the work involved as well as the costs are attached in Exhibit D. MAINTENANCE AND OPERATION Costs for maintenance and operation of the Heritage Center will vary to some extent according to how the buildings and grounds are utilized. In preparing a preliminary cost estimate, Staff has assumed that use of the site will increase under the City's supervision. Further the cost estimates assume that the City would be responsible for maintenance of the grounds and buildings and, in addition, would be overseeing their use. The estimated costs are as follows: 1) grounds maintenance - $18,600; 2) building maintenance - $15,800; 3) utilities - $2,870; and 4) scheduling - $9, 200. Thus the total estimated annual cost of maintenance and operation for the Heritage Center is $46,470. The annual work program and budget for building and grounds maintenance is attached in Exhibits E, F and G. CONCLUSION The cost estimates prepared by Staff have come under scrutiny by members of the various organizations as well as the City Council. Consequently the purpose of the meeting will be to review the estimates and discuss the rationale behind their development. In addition to the Heritage Committee, Staff from the Building and Public Works Department will be in attendance as well as the City Attorney. EXHIBIT A HERITAGE CENTER ACQUISITION COSTS Purchase Price (Old St. Raymond's Church) $10,700 Appraisal (Old St. Raymond's Church) $ 2,500 - $ 3 ,000 Title Reports (4 parcels @ $250) $ 1, 000 Escrow (based on purchase price or value) allow $ 1,000 Soils Report (entire site) $ 3 000 - $ 3 ,500 Legal Expenses (preparation of agreements) $ 4,000 - $ 6,000 TOTAL ACQUISITION COSTS $22,200 - $25,200 EXHIBIT B ORIGINAL MURRAY SCHOOLHOUSE SCOPE OF WORK AND ESTIMATE OF COSTS 1. Bead blast siding to remove old paint. 2. Remove the over hang soffit and repair dry rot. 3 . Remove the siding on 7" x 22" x 10" and replace with exterior plywood and battens. ' 4 . Repair and bring hand rails and steps up to code on front deck (12' x 11' ) . 5. Repair and bring hand rails and steps up to code on back deck (6' x 6' ) . 6 . Replace back deck (8' x 8' ) . 7. Install metal flashing on ramp; repair adjacent building dry rot. 8 . Replace threshold to front door. 9. Replace back new and threshold. 10. Replace sliding glass door or remove sliding glass door and replace with 3' door and fill in 3' wall. 11. Sheet rock, tape and texture, and paint restrooms and back entry hall. 12. Install new hand rail in the restroom and change the slope of the drains under the sinks and the urinal . 13 . Replace ceiling in exhibit room with 1/2' sheet rock and tape, texture and paint. 14. Paint the outside of the school. • 15. Check, repair and/or replace windows. 16 . Replace roof of detached garage. TOTAL AMOUNT FOR LABOR & MATERIAL $122 , 250 17 . Bring electric up to code TOTAL AMOUNT FOR LABOR & MATERIAL $ 3,010 TOTAL ESTIMATED COST $125,260 • EXHIBIT C OLD ST. RAYMOND'S CHURCH SCOPE OF WORK AND ESTIMATE OF COSTS 1. Bead blast siding to remove old paint. 2. Remove all dry rot material and replace with new siding to match the existing. 3 . Remove the rear porch and build a handicapped ramp; replace back door and threshold. 4. Check, repair and/or replace windows. 5. Replace roof, floor and siding of bell tower. 6 . Install foundation vents in the building. 7. Check floor for damaged planks. 8 . Remove dry rot in overhang and gutters, and replace with all redwood material. 9. Paint the outside of the church. 10. Remove plywood panels on inside walls and replace with matching material. 11. Paint the inside of the church. TOTAL AMOUNT FOR LABOR & MATERIAL $ 86,125 17. Bring electric up to code TOTAL AMOUNT FOR LABOR & MATERIAL $ 2, 600 TOTAL ESTIMATED COST $ 88,725 • EXHIBIT D HERITAGE CENTER GROUNDS ESTIMATE OF INITIAL CLEAN—UP COSTS INVENTORY WORK HOURS TOTAL UNIT TOTAL ACTIVITY QNTY/UNIT L.O.S. QUANTITY UNIT HOURS COST COST Tree Pruning 105 ea 1.00 105 --- --- $15,000 $15,000 P/T Bedding Plants .26 ac 80 hrs 20.8 hrs 1.00 20.8 hrs $ 29.37 $ 611 Hanual Weed 3.31 ac 1.00 3.31 ac 29 hrs 96.0 hrs $ 21.76 $ 2,089 Prune Shrubs 76 ea 1.00 76 .50 38.0 hrs $ 25.25 $ 960 Parking Lot 20,113 SF .001 20.1 hrs 1.00 20.1 hrs $ 36.47 $ 733 Lighting 4 ea 1.00 4 --- --- $ 500 $ 500 SUBTOTAL $19,893 Paint Flag Pole (1) $ 200 Chemical Weed Control (3.31 ac @ $200) $ 662 Paint Light Poles (3) $ 600 SUBTOTAL $ 1,462 Fencing North Side (6' chain link w/razor ribbon) 500' @ $12/ft. $ 6,000 Replace existing 4'(6' chain link w/razor ribbon) 300' @ $15/ft $ 4,500 South Side (6' chain link w/razor ribbon) 500' @ $12/ft. $ 6,000 West Side (6' chain link w/razor ribbon) 300' @ $12/ft. $ 3,600 Vehicle Gates 2 @ $1000 $ 2,000 SUBTOTAL $22,100 TOTAL ESTIW FED INITIAL CLEAN-UP COSTS $43,455 • EXHIBIT E HERITAGE CENTER BUILDING MAINTENANCE ORIGINAL MURRAY SCHOOLHOUSE ANNUAL WORK PROGRAM & BUDGET ACTIVITY QNTY/UNIT L.O.S. WORK QNTY HOURS/UNIT TOTAL, HOURS UNIT COST TOTAL COST MEETING ROOM SET-UP 1.00 HR 26.00 HR 26.00 HR 1.00 HR 26.00 HR 26.96 700.96 ROUTINE INSPECTION 1.00 HR 12.00 HR 12.00 HR 1.00 HR 12.00 HR 29.10 349.20 FLOOR MAINTENANCE 1.00 HR 18.00 HR 18.00 HR 1.00 HR 18.00 HR 29.02 522.36 LIGHTING MAINTENANCE 1.00 HR 20.00 HR 20.00 HR 1.00 HR 20.00 HR 35.00 700.00 HVAC MAINTENANCE 1.00 HR 9.00 HR 9.00 HR 1.00 HR 9.00 HR 30.47 274.23 DOOR MAINTENANCE 1.00 HR 40.00 HR 40.00 HR 1.00 HR 40.00 HR 30.43 1,217.20 WINDOW COVERING MAINT. 1.00 HR 6.00 HR 6.00 HR 1.00 HR 6.00 HR 30.41 182.46 GLASS MAINTENANCE 1.00 HR 20.00 HR 20.00 HR 1.00 HR 20.00 HR 32.08 641.60 WALL MAINTENANCE 1.00 HR 24.00 HR 24.00 HR 1.00 HR 24.00 HR 30.12 722.88 PLUMBING MAINTENANCE 1.00 HR 20.00 HR 20.00 HR 1.00 HR 20.00 HR 29.92 598.40 FURNITURE MAINTENANCE 1.00 HR 10.00 HR 10.00 HR 1.00 HR 10.00 HR 27.98 279.80 FURNITURE ROVING 1.00 HR 5.00 HR 5.00 HR 1.00 HR 5.00 HR 29.29 146.45 RESTROOM REPAIR 1.00 HR 6.00 HR 6.00 HR 1.00 HR 6.00 HR 27.56 165.36 MISC. MAINTENANCE 1.00 HR 26.00 HR 26.00 HR 1.00 HR 26.00 HR 38.13 991.38 PEST CONTROL 1.00 HR 5.00 HR 5.00 HR 1.00 HR 5.00 HR 29.43 147.15 JANITORIAL 1.00 HR 12.00 HR 12.00 HR 1.00 HR 12.00 HR 30.75 369.00 ELECTRICAL 1.00 HR 24.00 HR 24.00 HR 1.00 HR 24.00 HR 31.34 752.16 ACTIVITY SUBTOTAL 8760.59 CONTRACT JANITORIAL (ALLOW) 1,600.00 ALARM MONITORING (ALLOW) 360.00 PEST CONTROL (ALLOW) 360.00 GRAND TOTAL 11,080.59 EXHIBIT F HERITAGE CENTER BUILDING PRAINTENANCE OLD ST. RAYMOND'S CHURCH ANNUAL WORK PROGRAM & BUDGET ACTIVITY QNTY/UNIT L.O.S. WORK QNTY HOURS/UNIT TOTAL HOURS UNIT COST TOTAL COST ROUTINE INSPECTION 1.00 HR 12.00 HR 12.00 HR 1.00 HR 12.00 HR 29.10 349.20' FLOOR MAINTENANCE 1.00 HR 6.00 HR 6.00 HR 1.00 HR 6.00 HR 29.02 174.12 LIGHTING MAINTENANCE 1.00 HR 12.00 HR 12.00 HR 1.00 HR 12.00 HR 35.00 420.00 HVAC MAINTENANCE 1.00 HR 6.00 HR 6.00 HR 1.00 HR 6.00 HR 30.47 182.82, DOOR MAINTENANCE 1.00 HR 24.00 HR 24.00 HR 1.00 HR 24.00 HR 30.43 730.32 ' GLASS MAINTENANCE 1.00 HR 4.00 HR 4.00 HR 1.00 HR 4.00 HR 32.08 128.32 WALL MAINTENANCE 1.00 HR 12.00 HR 12.00 HR 1.00 HR 12.00 HR 30.12 361.44 FURNITURE MAINTENANCE 1.00 HR 16.00 HR 16.00 HR 1.00 HR 16.00 HR 27.98 447.68 FURNITURE MOVING 1.00 HR 4.00 HR 4.00 HR 1.00 HR 4.00 HR 29.29 468.64 MISC. MAINTENANCE 1.00 HR 12.00 HR 12.00 HR 1.00 HR 12.00 HR 38.13 457.56 ' PEST CONTROL 1.00 HR 4.00 HR 4.00 HR 1.00 HR 4.00 HR 29.43 117.72 ' JANITORIAL 1.00 HR 4.00 HR 4.00 HR 1.00 HR 4.00 HR 30.75 123.00 ELECTRICAL 1.00 HR 12.00 HR 12.00 HR 1.00 HR 12.00 HR 31.34 376.08' ACTIVITY SUBTOTAL, 4336.90 CONTRACT JANITORIAL (ALLOW) 500.00 ALARM MONITORING (ALLOW) 240.00 PEST CONTROL (ALLOW) 240.00 GRAND TOTAL 5,316.90 V 0 . .. EXHIBIT G HERITAGE CENTER GROUNDS MAINTENANCE ANNUAL WORK PROGRAM & BUDGET ACTIVITY QNTY/UNIT L.O.S. WORK QNTY HOURS/UNIT TOTAL HOURS UNIT COST TOTAL COST SPILL CLEAN-UP 1.00/SYS 1.00 HR 1.00 HR 1.000 1.00 HR 27.08 27.08 TREE/BRUSH CUTTING 1.00/SYS 20.00 HR 20.00 HR 1.000 20.00 HR 32.00 640.00 IN-HOUSE TREE REMOVAL 105 TREES 0.010 TR 1.05 TR 4.000 4.20 HR 33.86 142.21 IN-HOUSE PRUNING 105 TREES 0.200 TR 21.00 TR 2.000 42.00 HR 26.30 1,104.60 OTHER TREE NAINT. 105/SYS .050 HR 5.25 HR 1.000 5.25 HR 26.61 139.70 CONT. TREE FUNGUS SPRAY 105 TREES 0.250 TR 26.25 HR --- --- 10.00 262.50 CONTRACT TREE PRUNING 105 TREES 0.250 TR 26.25 HR --- --- 100.00 2,625.00 CONTRACT TREE REMOVAL 105 TREES 0.05 TR 5.25 TR --- --- 500.00 2,625.00 LITTER PICK-UP 4.26 ACRES 1200.00 HR 51.12 HR 1.000 51.12 HR 22.27 1,138.44 LEAF CLEAN-UP 4.26 ACRES 10.00 HR 42.6 HR 1.000 42.60 HR 27.04 1,151.90 P/T BEDDING PLANTS 0.26 AC BED 24.00 HR 6.24 HR 1.000 6.24 HR 24.28 151.51 MANUAL WEED REMOVAL 0.26 AC BED 1 TIME .26 HR 108.000 28.08 HR 21.76 611.02 CHEM. WEED CONTROL BEDS 0.26 AC BED 12 TINES 3.12 AC --- --- 230.52 719.22 PRUNE SHRUBS 76 EACH 0.250 BA 19.00 EA 0.437 8.303 HR 27.59 229.08 VALVE REPAIR 3 EACH 1.00 VLV 3.00 EA 1.000 3.00 HR 33.25 99.75 BACKFLOW REPAIR 1 EACH 3.00 HR 3.00 EA 1.000 3.00 HR 44.77 134.31 GRAVEL PATH/PARKING 20,311 SF .001 HR 20.113 HR 1.000 20.113 HR 21.79 438.26 RODENT CONTROL 1 PARK 10.00 HR 10.00 HR 1.000 10.00 HR 34.13 341.30 GRAFFITI 1 PARK 15.00 HR 15.00 HR 1.000 15.00 HR 39.92 598.80 OTHER BEAUTIFICATION 1 PARK 10.00 HR 10.00 HR 1.000 10.00 HR 31.73 317.30 TEMP. PATCHING 10.3 NSF .01 HR 10.30 HR 1.000 10.30 HR 32.56 335.37 OTHER PAVEHENT 1 PARK 4.00 HR 4.00 HR 1.000 4.00 HR 23.71 94.84 LIGHTING MAINTENANCE 4 EACH 1.00 HR 4.00 HR 1.000 4.00 HR 31.83 127.32 FENCE REPAIR 1,185 LF .01 HR 11.85 HR 1.000 11.85 HR 32.40 383.94 OTHER DRAINAGE 1.00/SYS 20.00 20.00 HR 1.000 20.00 HR 20.46 409.20 STORM PATROL INSP./C.0 1.00/SYS 10.00 HR 10.00 HR 1.000 10.00 HR 22.71 227.10 OTHER CONCRETE REPAIR 1 PARK 10.00 HR 10.00 HR 1.000 10.00 HR 50.00 500.00 INSTALL NEW SIGNS 18 EACH .100 SI 1.80 EA 1.550 2.79 HR 36.06 100.61 REPAIR SIGNS 18 EACH .50 SI 9.00 BA 0.417 3.75 HR 74.12 277.95 OTHER SIGNS 1.00/SYS 5.00 HR 5.00 HR 1.000 5.00 HR 33.86 169.30 CURB PAINTING 75 LF 1 TINE 75.00 LF 0.016 1.20 HR 31.60 37.92 NEW NARKING 1.00/SYS 3.00 HR 3.00 HR 1.000 3.00 HR 32.00 96.00 OTHER HARKING 1.00/SYS 3.00 HR 3.00 HR 1.000 3.00 HR 27.01 81.03 NON-TURF CHEN. WEED 3.78 ACRES 2 TIMES 7.56 AC --- --- 187.00 1413.72 SPOT SPRAY 1.00/SYS 5.00 HR 5.00 HR --- --- 48.40 242.00 GRAND TOTAL 17993.28